{"id":29034,"date":"2023-11-02T11:34:53","date_gmt":"2023-11-02T11:34:53","guid":{"rendered":"https:\/\/skyplanner.ai\/viri\/placa-nacrtovalca-proizvodnje-na-madzarskem-2023\/"},"modified":"2026-06-19T21:04:57","modified_gmt":"2026-06-19T21:04:57","slug":"placa-nacrtovalca-proizvodnje-na-madzarskem-2026","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/sl\/viri\/placa-nacrtovalca-proizvodnje-na-madzarskem-2026\/","title":{"rendered":"Pla\u010da na\u010drtovalca proizvodnje na Mad\u017earskem 2026"},"content":{"rendered":"<div class=\"gb-container gb-container-bf558a89 article-main-content-container\">\n\n<h1 class=\"wp-block-heading\" id=\"h-production-planner-salary-in-hungary-2026\">Pla\u010da na\u010drtovalca proizvodnje na Mad\u017earskem 2026<\/h1>\n\n\n<div class=\"gb-container gb-container-e8026af9\">\n\n<p><a href=\"\/sl\/\">Domov<\/a>&nbsp;\u00bb&nbsp;<a href=\"\/sl\/viri\/\">Viri<\/a>&nbsp;\u00bb&nbsp;Pla\u010da na\u010drtovalca proizvodnje na Mad\u017earskem 2026<\/p>\n\n\n\n<\/div>\n\n<div class=\"gb-container gb-container-f0fd57d0\">\n<div class=\"gb-container gb-container-31dfeab3\"><div class=\"gb-inside-container\">\n\n<p><strong>Povpre\u010dna pla\u010da na\u010drtovalca proizvodnje na Mad\u017earskem v letu 2026 zna\u0161a pribli\u017eno HUF 7,336,425 letno, kar pomeni okoli HUF <strong>611,368<\/strong> na mesec pred obdav\u010ditvijo. Vendar na to \u0161tevilko vpliva ve\u010d dejavnikov. Pla\u010da se lahko razlikuje glede na posameznikovo izobrazbo, geografsko lokacijo znotraj dr\u017eave in vrsto podjetja.&nbsp;<\/strong><\/p>\n\n<\/div><\/div>\n\n\n<p>V letu 2026 je mad\u017earski proizvodni sektor, ki blesti v avtomobilski industriji, elektroniki, farmaciji in drugih panogah, postal sredi\u0161\u010de inovacij v Srednji Evropi. Ta rast je pove\u010dala potrebo po usposobljenih na\u010drtovalcih proizvodnje, kar je klju\u010dnega pomena pri optimizaciji proizvodnje v teh panogah. Kaj to torej pomeni za zaslu\u017ekovni potencial na\u010drtovalca proizvodnje na Mad\u017earskem v letu 2026? Poglobimo se v vrednost in nagrade te klju\u010dne vloge v cveto\u010dem industrijskem okolju Mad\u017earske.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Povpre\u010dna pla\u010da v primerjavi s pla\u010dilom na\u010drtovalca proizvodnje na Mad\u017earskem<\/h2>\n\n\n\n<p>Pri ocenjevanju zaslu\u017ekov na Mad\u017earskem je najprej koristno upo\u0161tevati splo\u0161no sliko pla\u010d. V povpre\u010dju posamezniki na Mad\u017earskem zaslu\u017eijo pribli\u017eno <strong>HUF 609 761 na mesec<\/strong> pred obdav\u010ditvijo. Ta podatek zagotavlja izhodi\u0161\u010de za razumevanje \u0161ir\u0161ega gospodarskega okolja.<\/p>\n\n\n\n<p>\u010ce se zdaj osredoto\u010dimo na specifi\u010dno podro\u010dje na\u010drtovanja proizvodnje, so finan\u010dne nagrade opazno vi\u0161je. Leta 2026 povpre\u010dna pla\u010da na\u010drtovalca proizvodnje na Mad\u017earskem zna\u0161a pribli\u017eno <strong>HUF <strong>7,336,425<\/strong> letno<\/strong>, kar pomeni okoli <strong>HUF 611,368 mese\u010dno<\/strong> pred obdav\u010ditvijo. Ta razlika poudarja specializirano naravo in veliko povpra\u0161evanje po teh strokovnjakih v proizvodnem sektorju.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Primerjalna analiza s sosednjimi dr\u017eavami<\/h2>\n\n\n\n<p>Pri ocenjevanju privla\u010dnosti Mad\u017earske za na\u010drtovalce proizvodnje je razkrivajo\u010da primerjava njihovih zaslu\u017ekov s tistimi v sosednjih dr\u017eavah. Na splo\u0161no je <a href=\"\/sl\/viri\/placa-nacrtovalca-proizvodnje-na-poljskem-2026\/\">pla\u010da na\u010drtovalca proizvodnje na Poljskem<\/a> nekoliko podobna pla\u010dam v Mad\u017earski, kar odra\u017ea \u0161ir\u0161e gospodarske trende in razlike v \u017eivljenjskih stro\u0161kih. Medtem je <a href=\"\/sl\/viri\/placa-nacrtovalca-proizvodnje-v-ceski-republiki-2026\/\">pla\u010da na\u010drtovalca proizvodnje na \u010ce\u0161kem <\/a>vi\u0161ja kot na Mad\u017earskem, \u010deprav lahko pride do manj\u0161ih razlik glede na posamezne panoge. <a href=\"\/sl\/viri\/placa-nacrtovalca-proizvodnje-na-slovaskem-2023\/\">Pla\u010da na\u010drtovalca proizvodnje na Slova\u0161kem<\/a> je prav tako vi\u0161ja; tam na\u010drtovalci proizvodnje pogosto prejemajo bolj\u0161e pla\u010de kot na Mad\u017earskem, kar se ujema z njeno zna\u010dilno gospodarsko strukturo in \u017eivljenjskimi stro\u0161ki. Ta primerjalna analiza poudarja konkuren\u010dni polo\u017eaj Mad\u017earske v regiji za strokovnjake na tem podro\u010dju.<\/p>\n\n<\/div>\n\n<div class=\"gb-container gb-container-f7e777f3\">\n<div class=\"gb-container gb-container-0a56c9fa sticky\"><div class=\"gb-inside-container\">\n<div class=\"gb-container gb-container-eed176fc\"><div class=\"gb-inside-container\">\n<div class=\"gb-grid-wrapper gb-grid-wrapper-1b2f16ae\">\n<div class=\"gb-grid-column gb-grid-column-be655727\"><div class=\"gb-container gb-container-be655727\"><div class=\"gb-inside-container\">\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" width=\"1024\" height=\"685\" src=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Straight-PNG-1-1024x685.png\" alt=\"SkyPlanner APS - Production planning and scheduling product image straight view\" class=\"wp-image-4339\" srcset=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Straight-PNG-1-1024x685.png 1024w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Straight-PNG-1-300x201.png 300w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Straight-PNG-1-768x514.png 768w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Straight-PNG-1-1536x1027.png 1536w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Straight-PNG-1-2048x1370.png 2048w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n<\/div><\/div><\/div>\n\n<div class=\"gb-grid-column gb-grid-column-0821f9a0\"><div class=\"gb-container gb-container-0821f9a0\"><div class=\"gb-inside-container\">\n\n<h4 class=\"wp-block-heading mobile-text-center\" id=\"h-advanced-production-planning-with-ai-skyplanner-aps\" style=\"font-size:24px\">Advanced production planning with AI &#8211; SkyPlanner APS<\/h4>\n\n\n\n<p class=\"mobile-text-center\">Read more about our approach to production planning and optimization leveraging the power of AI.<\/p>\n\n\n<div class=\"gb-button-wrapper gb-button-wrapper-690cb95e\">\n\n<a class=\"gb-button gb-button-7b87a903 gb-button-text\" href=\"https:\/\/skyplanner.ai\/\" aria-label=\"Book a demo\">Production planning with AI<\/a>\n\n<\/div>\n<\/div><\/div><\/div>\n<\/div>\n<\/div><\/div>\n<\/div><\/div>\n<\/div>\n\n<div class=\"gb-container gb-container-33d6b196\">\n\n<h2 class=\"wp-block-heading\">Dejavniki, ki vplivajo na pla\u010do na\u010drtovalca proizvodnje na Mad\u017earskem<\/h2>\n\n\n\n<p>Pri dolo\u010danju pla\u010de na\u010drtovalca proizvodnje na Mad\u017earskem ima vlogo ve\u010d dejavnikov. Vsak od teh elementov lahko bistveno vpliva na potencial zaslu\u017eka v tem poklicu.<\/p>\n\n\n\n<h4 class=\"wp-block-heading\">Izobrazba<\/h4>\n\n\n\n<p>Vi\u0161je izobrazbene kvalifikacije pogosto vodijo do bolj\u0161ih pla\u010dnih ponudb. Za na\u010drtovalce proizvodnje so lahko \u0161e posebej koristne diplome iz industrijskega in\u017eenirstva, poslovne administracije ali upravljanja oskrbovalne verige. Delodajalci cenijo te izobrazbene ozadja, saj na\u010drtovalce opremijo s teoreti\u010dnim znanjem in analiti\u010dnimi ve\u0161\u010dinami, potrebnimi pri na\u010drtovanju proizvodnje.<\/p>\n\n\n\n<h4 class=\"wp-block-heading\">Izku\u0161nje<\/h4>\n\n\n\n<p>Kot pri mnogih poklicih ima tudi tu izku\u0161nja klju\u010dno vlogo pri dolo\u010danju pla\u010de. Na\u010drtovalec proizvodnje z dolgoletnimi prakti\u010dnimi izku\u0161njami pri upravljanju proizvodnih linij in oskrbovalnih verig bo verjetno zahteval vi\u0161jo pla\u010do kot novinec na tem podro\u010dju. To je posledica njihove dokazane sposobnosti obvladovanja zapletenih situacij in izbolj\u0161anja u\u010dinkovitosti proizvodnje.<\/p>\n\n\n\n<h4 class=\"wp-block-heading\">Ve\u0161\u010dine<\/h4>\n\n\n\n<p>Posebne ve\u0161\u010dine, kot so usposobljenost za sisteme naprednega na\u010drtovanja in razporejanja (APS) ali <a href=\"\/sl\/viri\/kaj-je-erp\/\">sisteme ERP<\/a>, upravljanje zalog in nadzor proizvodnje, neposredno vplivajo na potencial zaslu\u017eka. Na\u010drtovalci proizvodnje, ki so ve\u0161\u010di uporabe najsodobnej\u0161e tehnologije in orodij pri na\u010drtovanju proizvodnje, so pogosto zelo iskani in lahko izpogajajo vi\u0161je pla\u010de.<\/p>\n\n\n\n<h4 class=\"wp-block-heading\">Lokacija<\/h4>\n\n\n\n<p>Geografska lokacija delovnega mesta na Mad\u017earskem pomembno vpliva na pla\u010de. Na\u010drtovalci proizvodnje, ki delajo v Budimpe\u0161ti, prestolnici in gospodarskem sredi\u0161\u010du Mad\u017earske, na primer obi\u010dajno zaslu\u017eijo ve\u010d kot tisti na pode\u017eelju ali v manj\u0161ih mestih. To razliko povzro\u010dajo vi\u0161ji \u017eivljenjski stro\u0161ki in koncentracija velikih proizvodnih podjetij v mestnih sredi\u0161\u010dih.<\/p>\n\n\n\n<h4 class=\"wp-block-heading\">Velikost podjetja<\/h4>\n\n\n\n<p>Ve\u010dja podjetja na splo\u0161no ponujajo vi\u0161je pla\u010de v primerjavi z manj\u0161imi podjetji. To je posledica ve\u010dje kompleksnosti in obsega poslovanja v ve\u010djih podjetjih, ki zahtevajo bolj usposobljene in izku\u0161ene na\u010drtovalce proizvodnje.<\/p>\n\n\n\n<h4 class=\"wp-block-heading\">Vrsta podjetja<\/h4>\n\n\n\n<p>Panoga ali sektor, v katerem podjetje deluje, lahko prav tako vpliva na pla\u010de. Na\u010drtovalci proizvodnje, ki delajo v visokotehnolo\u0161kih ali farmacevtskih panogah, lahko na primer zaslu\u017eijo ve\u010d kot tisti v tradicionalnih proizvodnih sektorjih zaradi vi\u0161je vrednosti in kompleksnosti vklju\u010denih izdelkov.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Vloga in odgovornosti na\u010drtovalca proizvodnje<\/h2>\n\n\n\n<p>Na\u010drtovalec proizvodnje ima klju\u010dno vlogo v proizvodnem podjetju, saj zagotavlja, da proizvodni procesi potekajo u\u010dinkovito in uspe\u0161no. Njihove odgovornosti vklju\u010dujejo:<\/p>\n\n\n\n<ol class=\"wp-block-list\">\n<li><strong>Razporejanje proizvodnje<\/strong>: Izdelava podrobnih proizvodnih razporedov in usklajevanje z ve\u010d oddelki za zagotavljanje pravo\u010dasnega dokon\u010danja izdelkov.<\/li>\n\n\n\n<li><strong>Upravljanje zalog<\/strong>: Nadzor nad ravnmi zalog ter naro\u010danje potreb\u0161\u010din in materialov po potrebi za zadovoljevanje proizvodnih zahtev.<\/li>\n\n\n\n<li><strong>Nadzor kakovosti<\/strong>: Sodelovanje z ekipo za nadzor kakovosti pri ohranjanju standardov izdelkov in skladnosti s predpisi.<\/li>\n\n\n\n<li><strong>Izbolj\u0161anje procesov<\/strong>: Prepoznavanje in uvajanje na\u010dinov za optimizacijo proizvodnih procesov za ve\u010djo u\u010dinkovitost in prihranke stro\u0161kov.<\/li>\n\n\n\n<li><strong>Usklajevanje z oddelki<\/strong>: Povezovanje med oddelki prodaje, oskrbovalne verige in proizvodnje za uskladitev proizvodnje s tr\u017enimi zahtevami.<\/li>\n<\/ol>\n\n\n\n<h2 class=\"wp-block-heading\">Spretnosti, ki jih potrebuje na\u010drtovalec proizvodnje<\/h2>\n\n\n\n<p>Za odli\u010dnost v tej vlogi mora imeti na\u010drtovalec proizvodnje raznoliko paleto spretnosti:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Analiti\u010dno razmi\u0161ljanje<\/strong>: Sposobnost analiziranja proizvodnih metrik in podatkov za sprejemanje utemeljenih odlo\u010ditev.<\/li>\n\n\n\n<li><strong>Spretnosti re\u0161evanja te\u017eav<\/strong>: Hitro obravnavanje in odpravljanje proizvodnih te\u017eav, ko se pojavijo.<\/li>\n\n\n\n<li><strong>Komunikacijske sposobnosti<\/strong>: Na\u010drtovalec proizvodnje mora imeti mo\u010dne komunikacijske spretnosti za u\u010dinkovito usklajevanje z razli\u010dnimi oddelki.<\/li>\n\n\n\n<li><strong>Pozornost do podrobnosti<\/strong>: Zagotavljanje natan\u010dnosti pri razporejanju in upravljanju zalog, da se izognemo proizvodnim zamudam in odve\u010dnim stro\u0161kom.<\/li>\n<\/ul>\n\n\n\n<div class=\"wp-block-uagb-image uagb-block-a08b80f8 wp-block-uagb-image--layout-default wp-block-uagb-image--effect-static wp-block-uagb-image--align-none\"><figure class=\"wp-block-uagb-image__figure\"><img decoding=\"async\" src=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/08\/Display-wide-5-1024x536.png\" alt=\"\" class=\"uag-image-6463\" width=\"1024\" height=\"536\" title=\"\" loading=\"lazy\" role=\"img\" \/><\/figure><\/div>\n\n\n\n<h2 class=\"wp-block-heading\">Vloga z umetno inteligenco izbolj\u0161anega sistema APS pri pomo\u010di na\u010drtovalcem proizvodnje<\/h2>\n\n\n\n<p>Sistem za napredno na\u010drtovanje in razporejanje (APS), integriran z umetno inteligenco (UI), kot je <a href=\"\/sl\/\">SkyPlanner<\/a>, lahko znatno pove\u010da zmogljivosti na\u010drtovalca proizvodnje. Takole:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Izbolj\u0161ano napovedovanje<\/strong>: Algoritmi umetne inteligence lahko analizirajo velike koli\u010dine podatkov za natan\u010dnej\u0161e napovedovanje povpra\u0161evanja in s tem ustvarjajo u\u010dinkovitej\u0161e proizvodne razporede.<\/li>\n\n\n\n<li><strong>Optimizacija virov<\/strong>: Umetna inteligenca lahko optimizira razporeditev virov, kot so stroji, materiali in delovna sila, ter zagotovi njihovo naju\u010dinkovitej\u0161o uporabo.<\/li>\n\n\n\n<li><strong>Re\u0161evanje problemov v realnem \u010dasu<\/strong>: Z umetno inteligenco se lahko sistem APS hitro prilagodi spremembam ali motnjam v proizvodnem procesu in predlaga alternativne re\u0161itve za ohranjanje u\u010dinkovitosti delovnega toka.<\/li>\n\n\n\n<li><strong>Izbolj\u0161ano odlo\u010danje<\/strong>: Umetna inteligenca lahko na\u010drtovalcem proizvodnje zagotovi vpoglede in priporo\u010dila na podlagi podatkovnih trendov ter tako pomaga pri sprejemanju informiranih odlo\u010ditev.<\/li>\n\n\n\n<li><strong>Zmanj\u0161anje \u010dlove\u0161kih napak<\/strong>: Avtomatizacija rutinskih opravil zmanj\u0161uje verjetnost \u010dlove\u0161kih napak in s tem izbolj\u0161uje splo\u0161no natan\u010dnost in u\u010dinkovitost proizvodnje.<\/li>\n<\/ul>\n\n\n\n<p>Z izkori\u0161\u010danjem umetne inteligence se lahko na\u010drtovalci proizvodnje osredoto\u010dijo na bolj strate\u0161ke vidike svoje vloge in se zana\u0161ajo na tehnologijo pri obravnavi kompleksnih analiz podatkov in optimizaciji rutinskih opravil.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Panoge na Mad\u017earskem, ki zaposlujejo na\u010drtovalce proizvodnje<\/h2>\n\n\n\n<p>Na Mad\u017earskem razli\u010dne panoge prepoznavajo klju\u010dno vlogo na\u010drtovalcev proizvodnje pri svojem poslovanju. Med klju\u010dnimi sektorji so:<\/p>\n\n\n\n<ol class=\"wp-block-list\">\n<li><strong>Avtomobilska industrija<\/strong>: Mad\u017earska gosti ve\u010d velikih avtomobilskih proizvajalcev in dobaviteljev, zaradi \u010desar je vodilni sektor za na\u010drtovalce proizvodnje.<\/li>\n\n\n\n<li><strong>Elektronika in tehnologija<\/strong>: Z rasto\u010dim tehnolo\u0161kim sektorjem so na\u010drtovalci proizvodnje klju\u010dni pri upravljanju zapletene proizvodnje elektronskih komponent in naprav.<\/li>\n\n\n\n<li><strong>Farmacevtska industrija<\/strong>: Farmacevtska industrija, znana po strogem regulativnem okolju, zaposluje na\u010drtovalce proizvodnje za zagotavljanje u\u010dinkovitih in skladnih proizvodnih procesov.<\/li>\n\n\n\n<li><strong>Predelava hrane in pija\u010d<\/strong>: Ta sektor se zana\u0161a na na\u010drtovalce proizvodnje pri upravljanju dobavne verige in proizvodnih urnikov, zlasti v panogah s pokvarljivim blagom.<\/li>\n\n\n\n<li><strong>Proizvodnja tekstila in obla\u010dil<\/strong>: Na\u010drtovalci v tej panogi usklajujejo proizvodni proces od nabave surovin do distribucije kon\u010dnih izdelkov.<\/li>\n<\/ol>\n\n\n\n<p>Te panoge, vsaka s svojimi edinstvenimi izzivi in zahtevami, ponujajo na\u010drtovalcem proizvodnje na Mad\u017earskem raznolike prilo\u017enosti za uporabo njihovih spretnosti in strokovnega znanja.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Dodatne ugodnosti za na\u010drtovalce proizvodnje na Mad\u017earskem poleg pla\u010de<\/h2>\n\n\n\n<p>Na\u010drtovalci proizvodnje na Mad\u017earskem poleg pla\u010de u\u017eivajo razli\u010dne ugodnosti, zaradi katerih je njihov celoten zaposlitveni paket izjemno privla\u010den:<\/p>\n\n\n\n<ol class=\"wp-block-list\">\n<li><strong>Programi za zdravstvo in dobro po\u010dutje<\/strong>: Delodajalci pogosto zagotavljajo celovite zdravstvene ugodnosti, vklju\u010dno z dostopom do kakovostnih zdravstvenih storitev, programi dobrega po\u010dutja in v\u010dasih \u010dlanstvi v telovadnici ali subvencijami, povezanimi z zdravjem.<\/li>\n\n\n\n<li><strong>Pokojninske in upokojitvene ugodnosti<\/strong>: \u0160tevilni delodajalci na Mad\u017earskem zagotavljajo obse\u017ene pokojninske na\u010drte. Te sheme prispevajo k dolgoro\u010dni finan\u010dni stabilnosti njihove delovne sile in predstavljajo bistveno sestavino celotnega paketa nadomestil.<\/li>\n\n\n\n<li><strong>Ravnovesje med delom in zasebnim \u017eivljenjem<\/strong>: Mad\u017earska podjetja se vse bolj osredoto\u010dajo na zagotavljanje uravnote\u017eenega ravnovesja med delom in zasebnim \u017eivljenjem za svoje zaposlene ter ponujajo prilagodljiv delovni \u010das, mo\u017enosti dela na daljavo in obilo dopusta.<\/li>\n\n\n\n<li><strong>Kulturne in dru\u017ebene ugodnosti<\/strong>: \u017divljenje na Mad\u017earskem ponuja bogato kulturno izku\u0161njo, \u0161tevilne organizacije pa omogo\u010dajo kulturne dejavnosti, dru\u017eabne dogodke ali ekipne odmike, ki krepijo dru\u017ebeni vidik dela.<\/li>\n<\/ol>\n\n\n\n<p>Te celovite ugodnosti, skupaj s konkuren\u010dnim pla\u010dnim paketom Mad\u017earske, jo naredijo za ugodno destinacijo za na\u010drtovalce proizvodnje, ki i\u0161\u010dejo izpolnjujo\u010do kariero in visoko kakovost \u017eivljenja.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Je Mad\u017earska obetavna destinacija za na\u010drtovalce proizvodnje?<\/h2>\n\n\n\n<p>Mad\u017earska res ponuja ve\u010d kot le privla\u010den pla\u010dilni paket za na\u010drtovalce proizvodnje v letu 2026. Glede na to, da dr\u017eava poudarja strokovni razvoj, Mad\u017earska ponuja celovito karierno izku\u0161njo.<\/p>\n\n\n\n<p>Poleg tega zavezanost k ravnovesju med poklicnim in zasebnim \u017eivljenjem, bogato kulturno okolje in strate\u0161ki polo\u017eaj v Evropi krepijo privla\u010dnost Mad\u017earske. V povezavi s prilo\u017enostjo, da postanete del \u017eivahnega in rasto\u010dega industrijskega sektorja, je Mad\u017earska prepri\u010dljiva izbira za na\u010drtovalce proizvodnje, ki \u017eelijo napredovati v karieri v dinami\u010dnem in podpornem okolju.<\/p>\n\n<\/div>\n\n<div class=\"gb-container gb-container-92545123\">\n<div class=\"gb-grid-wrapper gb-grid-wrapper-0a61546f\">\n<div class=\"gb-grid-column gb-grid-column-e4183086\"><div class=\"gb-container gb-container-e4183086\">\n\n<\/div><\/div>\n\n<div class=\"gb-grid-column gb-grid-column-84ccbb5d\"><div class=\"gb-container gb-container-84ccbb5d\">\n\n<\/div><\/div>\n<\/div>\n<\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>Pla\u010da na\u010drtovalca proizvodnje na Mad\u017earskem 2026 Domov&nbsp;\u00bb&nbsp;Viri&nbsp;\u00bb&nbsp;Pla\u010da na\u010drtovalca proizvodnje na Mad\u017earskem 2026 Povpre\u010dna pla\u010da na\u010drtovalca proizvodnje na Mad\u017earskem v letu 2026 zna\u0161a pribli\u017eno HUF 7,336,425 letno, kar pomeni okoli HUF 611,368 na mesec pred obdav\u010ditvijo. Vendar na to \u0161tevilko vpliva ve\u010d dejavnikov. Pla\u010da se lahko razlikuje glede na posameznikovo izobrazbo, geografsko lokacijo znotraj dr\u017eave in &#8230; <a title=\"Pla\u010da na\u010drtovalca proizvodnje na Mad\u017earskem 2026\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/sl\/viri\/placa-nacrtovalca-proizvodnje-na-madzarskem-2026\/\" aria-label=\"Read more about Pla\u010da na\u010drtovalca proizvodnje na Mad\u017earskem 2026\">Read more<\/a><\/p>\n","protected":false},"author":6,"featured_media":28771,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[2711,302],"tags":[],"class_list":["post-29034","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-kariera-in-place","category-viri","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Pla\u010da na\u010drtovalca proizvodnje na Mad\u017earskem 2026 \u2013 SkyPlanner<\/title>\n<meta name=\"description\" content=\"Povpre\u010dna pla\u010da na\u010drtovalca proizvodnje na Mad\u017earskem v letu 2026 zna\u0161a pribli\u017eno HUF 7,336,425 letno, kar pomeni okoli HUF 611,368 na mesec pred obdav\u010ditvijo.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/sl\/viri\/placa-nacrtovalca-proizvodnje-na-madzarskem-2026\/\" \/>\n<meta property=\"og:locale\" content=\"sl_SI\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Pla\u010da na\u010drtovalca proizvodnje na Mad\u017earskem 2026\" \/>\n<meta property=\"og:description\" content=\"Povpre\u010dna pla\u010da na\u010drtovalca proizvodnje na Mad\u017earskem v letu 2026 zna\u0161a pribli\u017eno HUF 7,336,425 letno, kar pomeni okoli HUF 611,368 na mesec pred obdav\u010ditvijo.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/sl\/viri\/placa-nacrtovalca-proizvodnje-na-madzarskem-2026\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2023-11-02T11:34:53+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-06-19T21:04:57+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/10\/Production-Planner-Hungary-1024x683.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1024\" \/>\n\t<meta property=\"og:image:height\" content=\"683\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"SkyPlanner\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"8 minut\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/placa-nacrtovalca-proizvodnje-na-madzarskem-2026\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/placa-nacrtovalca-proizvodnje-na-madzarskem-2026\\\/\"},\"author\":{\"name\":\"SkyPlanner\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#\\\/schema\\\/person\\\/9122a7382a3a91f77e5ed0207811724a\"},\"headline\":\"Pla\u010da na\u010drtovalca proizvodnje na Mad\u017earskem 2026\",\"datePublished\":\"2023-11-02T11:34:53+00:00\",\"dateModified\":\"2026-06-19T21:04:57+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/placa-nacrtovalca-proizvodnje-na-madzarskem-2026\\\/\"},\"wordCount\":1700,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/placa-nacrtovalca-proizvodnje-na-madzarskem-2026\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2023\\\/10\\\/Production-Planner-Hungary.png\",\"articleSection\":[\"Kariera in pla\u010de\",\"viri\"],\"inLanguage\":\"sl-SI\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/placa-nacrtovalca-proizvodnje-na-madzarskem-2026\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/placa-nacrtovalca-proizvodnje-na-madzarskem-2026\\\/\",\"name\":\"Pla\u010da na\u010drtovalca proizvodnje na Mad\u017earskem 2026 \u2013 SkyPlanner\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/placa-nacrtovalca-proizvodnje-na-madzarskem-2026\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/placa-nacrtovalca-proizvodnje-na-madzarskem-2026\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2023\\\/10\\\/Production-Planner-Hungary.png\",\"datePublished\":\"2023-11-02T11:34:53+00:00\",\"dateModified\":\"2026-06-19T21:04:57+00:00\",\"description\":\"Povpre\u010dna pla\u010da na\u010drtovalca proizvodnje na Mad\u017earskem v letu 2026 zna\u0161a pribli\u017eno HUF 7,336,425 letno, kar pomeni okoli HUF 611,368 na mesec pred obdav\u010ditvijo.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/placa-nacrtovalca-proizvodnje-na-madzarskem-2026\\\/#breadcrumb\"},\"inLanguage\":\"sl-SI\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/placa-nacrtovalca-proizvodnje-na-madzarskem-2026\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"sl-SI\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/placa-nacrtovalca-proizvodnje-na-madzarskem-2026\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2023\\\/10\\\/Production-Planner-Hungary.png\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2023\\\/10\\\/Production-Planner-Hungary.png\",\"width\":4990,\"height\":3327,\"caption\":\"Production Planner Hungary\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/placa-nacrtovalca-proizvodnje-na-madzarskem-2026\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Pla\u010da na\u010drtovalca proizvodnje na Mad\u017earskem 2026\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"sl-SI\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"sl-SI\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#\\\/schema\\\/person\\\/9122a7382a3a91f77e5ed0207811724a\",\"name\":\"SkyPlanner\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"sl-SI\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/b7d00e63bfb49c23e740cab317acbfb7287b7fa23d51b75e89a6659494daa9dd?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/b7d00e63bfb49c23e740cab317acbfb7287b7fa23d51b75e89a6659494daa9dd?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/b7d00e63bfb49c23e740cab317acbfb7287b7fa23d51b75e89a6659494daa9dd?s=96&d=mm&r=g\",\"caption\":\"SkyPlanner\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Pla\u010da na\u010drtovalca proizvodnje na Mad\u017earskem 2026 \u2013 SkyPlanner","description":"Povpre\u010dna pla\u010da na\u010drtovalca proizvodnje na Mad\u017earskem v letu 2026 zna\u0161a pribli\u017eno HUF 7,336,425 letno, kar pomeni okoli HUF 611,368 na mesec pred obdav\u010ditvijo.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/sl\/viri\/placa-nacrtovalca-proizvodnje-na-madzarskem-2026\/","og_locale":"sl_SI","og_type":"article","og_title":"Pla\u010da na\u010drtovalca proizvodnje na Mad\u017earskem 2026","og_description":"Povpre\u010dna pla\u010da na\u010drtovalca proizvodnje na Mad\u017earskem v letu 2026 zna\u0161a pribli\u017eno HUF 7,336,425 letno, kar pomeni okoli HUF 611,368 na mesec pred obdav\u010ditvijo.","og_url":"https:\/\/skyplanner.ai\/sl\/viri\/placa-nacrtovalca-proizvodnje-na-madzarskem-2026\/","og_site_name":"SkyPlanner","article_published_time":"2023-11-02T11:34:53+00:00","article_modified_time":"2026-06-19T21:04:57+00:00","og_image":[{"width":1024,"height":683,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/10\/Production-Planner-Hungary-1024x683.png","type":"image\/png"}],"author":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"Written by":"SkyPlanner","Est. reading time":"8 minut"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/sl\/viri\/placa-nacrtovalca-proizvodnje-na-madzarskem-2026\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/sl\/viri\/placa-nacrtovalca-proizvodnje-na-madzarskem-2026\/"},"author":{"name":"SkyPlanner","@id":"https:\/\/skyplanner.ai\/sl\/#\/schema\/person\/9122a7382a3a91f77e5ed0207811724a"},"headline":"Pla\u010da na\u010drtovalca proizvodnje na Mad\u017earskem 2026","datePublished":"2023-11-02T11:34:53+00:00","dateModified":"2026-06-19T21:04:57+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/sl\/viri\/placa-nacrtovalca-proizvodnje-na-madzarskem-2026\/"},"wordCount":1700,"publisher":{"@id":"https:\/\/skyplanner.ai\/sl\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/sl\/viri\/placa-nacrtovalca-proizvodnje-na-madzarskem-2026\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/10\/Production-Planner-Hungary.png","articleSection":["Kariera in pla\u010de","viri"],"inLanguage":"sl-SI"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/sl\/viri\/placa-nacrtovalca-proizvodnje-na-madzarskem-2026\/","url":"https:\/\/skyplanner.ai\/sl\/viri\/placa-nacrtovalca-proizvodnje-na-madzarskem-2026\/","name":"Pla\u010da na\u010drtovalca proizvodnje na Mad\u017earskem 2026 \u2013 SkyPlanner","isPartOf":{"@id":"https:\/\/skyplanner.ai\/sl\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/sl\/viri\/placa-nacrtovalca-proizvodnje-na-madzarskem-2026\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/sl\/viri\/placa-nacrtovalca-proizvodnje-na-madzarskem-2026\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/10\/Production-Planner-Hungary.png","datePublished":"2023-11-02T11:34:53+00:00","dateModified":"2026-06-19T21:04:57+00:00","description":"Povpre\u010dna pla\u010da na\u010drtovalca proizvodnje na Mad\u017earskem v letu 2026 zna\u0161a pribli\u017eno HUF 7,336,425 letno, kar pomeni okoli HUF 611,368 na mesec pred obdav\u010ditvijo.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/sl\/viri\/placa-nacrtovalca-proizvodnje-na-madzarskem-2026\/#breadcrumb"},"inLanguage":"sl-SI","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/sl\/viri\/placa-nacrtovalca-proizvodnje-na-madzarskem-2026\/"]}]},{"@type":"ImageObject","inLanguage":"sl-SI","@id":"https:\/\/skyplanner.ai\/sl\/viri\/placa-nacrtovalca-proizvodnje-na-madzarskem-2026\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/10\/Production-Planner-Hungary.png","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/10\/Production-Planner-Hungary.png","width":4990,"height":3327,"caption":"Production Planner Hungary"},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/sl\/viri\/placa-nacrtovalca-proizvodnje-na-madzarskem-2026\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/sl\/"},{"@type":"ListItem","position":2,"name":"Pla\u010da na\u010drtovalca proizvodnje na Mad\u017earskem 2026"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/sl\/#website","url":"https:\/\/skyplanner.ai\/sl\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/sl\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/sl\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"sl-SI"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/sl\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/sl\/","logo":{"@type":"ImageObject","inLanguage":"sl-SI","@id":"https:\/\/skyplanner.ai\/sl\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/sl\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]},{"@type":"Person","@id":"https:\/\/skyplanner.ai\/sl\/#\/schema\/person\/9122a7382a3a91f77e5ed0207811724a","name":"SkyPlanner","image":{"@type":"ImageObject","inLanguage":"sl-SI","@id":"https:\/\/secure.gravatar.com\/avatar\/b7d00e63bfb49c23e740cab317acbfb7287b7fa23d51b75e89a6659494daa9dd?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/b7d00e63bfb49c23e740cab317acbfb7287b7fa23d51b75e89a6659494daa9dd?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/b7d00e63bfb49c23e740cab317acbfb7287b7fa23d51b75e89a6659494daa9dd?s=96&d=mm&r=g","caption":"SkyPlanner"}}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/10\/Production-Planner-Hungary.png",4990,3327,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/10\/Production-Planner-Hungary-150x150.png",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/10\/Production-Planner-Hungary-300x200.png",300,200,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/10\/Production-Planner-Hungary-768x512.png",768,512,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/10\/Production-Planner-Hungary-1024x683.png",1024,683,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/10\/Production-Planner-Hungary-1536x1024.png",1536,1024,true],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/10\/Production-Planner-Hungary-2048x1365.png",2048,1365,true],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/10\/Production-Planner-Hungary.png",360,240,false]},"uagb_author_info":{"display_name":"SkyPlanner","author_link":"https:\/\/skyplanner.ai\/sl\/author\/bettina\/"},"uagb_comment_info":0,"uagb_excerpt":"Pla\u010da na\u010drtovalca proizvodnje na Mad\u017earskem 2026 Domov&nbsp;\u00bb&nbsp;Viri&nbsp;\u00bb&nbsp;Pla\u010da na\u010drtovalca proizvodnje na Mad\u017earskem 2026 Povpre\u010dna pla\u010da na\u010drtovalca proizvodnje na Mad\u017earskem v letu 2026 zna\u0161a pribli\u017eno HUF 7,336,425 letno, kar pomeni okoli HUF 611,368 na mesec pred obdav\u010ditvijo. Vendar na to \u0161tevilko vpliva ve\u010d dejavnikov. Pla\u010da se lahko razlikuje glede na posameznikovo izobrazbo, geografsko lokacijo znotraj dr\u017eave in&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/posts\/29034","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/users\/6"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/comments?post=29034"}],"version-history":[{"count":3,"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/posts\/29034\/revisions"}],"predecessor-version":[{"id":94379,"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/posts\/29034\/revisions\/94379"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/media\/28771"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/media?parent=29034"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/categories?post=29034"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/tags?post=29034"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}