{"id":28953,"date":"2023-11-02T09:52:12","date_gmt":"2023-11-02T09:52:12","guid":{"rendered":"https:\/\/skyplanner.ai\/viri\/placa-nacrtovalca-proizvodnje-v-ceski-republiki-2023\/"},"modified":"2026-06-19T21:02:58","modified_gmt":"2026-06-19T21:02:58","slug":"placa-nacrtovalca-proizvodnje-v-ceski-republiki-2026","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/sl\/viri\/placa-nacrtovalca-proizvodnje-v-ceski-republiki-2026\/","title":{"rendered":"Pla\u010da na\u010drtovalca proizvodnje v \u010ce\u0161ki republiki 2026"},"content":{"rendered":"<div class=\"gb-container gb-container-bf558a89 article-main-content-container\">\n<div class=\"gb-container gb-container-f0fd57d0\">\n<div class=\"gb-container gb-container-31dfeab3\"><div class=\"gb-inside-container\">\n\n<p><strong>V letu 2026 lahko na\u010drtovalec proizvodnje na \u010ce\u0161kem pri\u010dakuje povpre\u010dno pla\u010do pribli\u017eno CZK 730 229 na leto oziroma okoli CZK 60,852 mese\u010dno pred obdav\u010ditvijo. Pomembno pa je opozoriti, da lahko ta pla\u010da niha glede na razli\u010dne dejavnike, vklju\u010dno z mestom zaposlitve, leti izku\u0161enj na tem podro\u010dju in specifi\u010dno panogo znotraj proizvodnega sektorja.<\/strong><\/p>\n\n<\/div><\/div>\n\n\n<p>\u010ce\u0161ki proizvodni sektor, ki blesti na podro\u010djih, kot sta avtomobilska industrija in elektronika, v letu 2026 ka\u017ee izjemno rast. To dr\u017eavo uvr\u0161\u010da med mo\u010dne tekmece na evropskem industrijskem prizori\u0161\u010du. V tem uspe\u0161nem okolju so na\u010drtovalci proizvodnje klju\u010dni za optimizacijo raznolikih proizvodnih procesov. Zato se porajajo nekatera bistvena vpra\u0161anja: koliko zaslu\u017ei na\u010drtovalec proizvodnje na \u010ce\u0161kem v letu 2026 in kaj vpliva na pla\u010do?<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Finan\u010dni vidik: Pla\u010da na\u010drtovalca proizvodnje  <\/h2>\n\n\n\n<p>\u010ce raziskujemo finan\u010dne razmere v \u010ce\u0161ki republiki, lahko ugotovimo, da je povpre\u010dna pla\u010da v dr\u017eavi pribli\u017eno <strong>54.550 CZK na mesec<\/strong> pred obdav\u010ditvijo. To zagotavlja osnovo za razumevanje dinamike zaslu\u017eka v dr\u017eavi.  <\/p>\n\n\n\n<p>Nasprotno pa je povpre\u010dna pla\u010da na\u010drtovalca proizvodnje v letu 2026 opazno vi\u0161ja. Ti strokovnjaki lahko pri\u010dakujejo zaslu\u017eek okoli <strong>CZK <strong>730 229<\/strong><\/strong> letno, kar znese pribli\u017eno <strong>CZK <strong>60,852<\/strong><\/strong> mese\u010dno. Ta znatna razlika poudarja specializirana znanja in izku\u0161nje, ki jih na\u010drtovalci proizvodnje prina\u0161ajo v svoje vloge, zaradi \u010desar so dragocena pridobitev v proizvodnem sektorju.<\/p>\n\n\n\n<p>Vendar je treba upo\u0161tevati, da lahko na te \u0161tevilke vplivajo dejavniki, kot so lokacija mesta, izku\u0161nje in posebnosti panoge, kar odra\u017ea specializirano naravo njihove vloge.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Primerjalna analiza: \u010ce\u0161ka v primerjavi s sosednjimi dr\u017eavami<\/h2>\n\n\n\n<p>\u010ce\u0161ka se v srednjeevropskem prostoru uveljavlja s konkuren\u010dnimi pla\u010dami na\u010drtovalcev proizvodnje. V primerjavi s sosednjimi dr\u017eavami je scenarij precej jasen. <a href=\"\/sl\/viri\/placa-nacrtovalca-proizvodnje-na-madzarskem-2026\/\">Pla\u010da na\u010drtovalca proizvodnje na Mad\u017earskem je ni\u017eja od pla\u010de<\/a> njegovega \u010de\u0161kega kolega, kar odra\u017ea razli\u010dno gospodarsko mo\u010d in industrijski razvoj obeh dr\u017eav. Podobno je tudi <a href=\"\/sl\/viri\/placa-nacrtovalca-proizvodnje-na-poljskem-2026\/\">pla\u010da na\u010drtovalca proizvodnje na Poljskem <\/a>na splo\u0161no ni\u017eja kot na \u010ce\u0161kem. <a href=\"\/sl\/viri\/placa-nacrtovalca-proizvodnje-na-slovaskem-2023\/\">Pla\u010da na\u010drtovalca proizvodnje na Slova\u0161kem<\/a> predstavlja tesnej\u0161o konkurenco, vendar so pla\u010de \u0161e vedno nekoliko ni\u017eje od pla\u010d na\u010drtovalcev proizvodnje na \u010ce\u0161kem.  <\/p>\n\n\n\n<p>Ta splo\u0161na primerjava ne poudarja le mo\u010dnega \u010de\u0161kega proizvodnega sektorja, temve\u010d tudi privla\u010dnost \u010ce\u0161ke kot poklicnega sredi\u0161\u010da za usposobljene na\u010drtovalce proizvodnje v regiji.<\/p>\n\n<\/div>\n\n<div class=\"gb-container gb-container-f7e777f3\">\n<div class=\"gb-container gb-container-0a56c9fa sticky\"><div class=\"gb-inside-container\">\n<div class=\"gb-container gb-container-eed176fc\"><div class=\"gb-inside-container\">\n<div class=\"gb-grid-wrapper gb-grid-wrapper-1b2f16ae\">\n<div class=\"gb-grid-column gb-grid-column-be655727\"><div class=\"gb-container gb-container-be655727\"><div class=\"gb-inside-container\">\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" width=\"1024\" height=\"685\" src=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Straight-PNG-1-1024x685.png\" alt=\"SkyPlanner APS - Production planning and scheduling product image straight view\" class=\"wp-image-4339\" srcset=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Straight-PNG-1-1024x685.png 1024w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Straight-PNG-1-300x201.png 300w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Straight-PNG-1-768x514.png 768w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Straight-PNG-1-1536x1027.png 1536w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Straight-PNG-1-2048x1370.png 2048w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n<\/div><\/div><\/div>\n\n<div class=\"gb-grid-column gb-grid-column-0821f9a0\"><div class=\"gb-container gb-container-0821f9a0\"><div class=\"gb-inside-container\">\n\n<h4 class=\"wp-block-heading mobile-text-center\" id=\"h-advanced-production-planning-with-ai-skyplanner-aps\" style=\"font-size:24px\">Advanced production planning with AI &#8211; SkyPlanner APS<\/h4>\n\n\n\n<p class=\"mobile-text-center\">Read more about our approach to production planning and optimization leveraging the power of AI.<\/p>\n\n\n<div class=\"gb-button-wrapper gb-button-wrapper-690cb95e\">\n\n<a class=\"gb-button gb-button-7b87a903 gb-button-text\" href=\"https:\/\/skyplanner.ai\/\" aria-label=\"Book a demo\">Production planning with AI<\/a>\n\n<\/div>\n<\/div><\/div><\/div>\n<\/div>\n<\/div><\/div>\n<\/div><\/div>\n<\/div>\n\n<div class=\"gb-container gb-container-33d6b196\">\n\n<h2 class=\"wp-block-heading\">Dejavniki, ki vplivajo na pla\u010do na\u010drtovalca proizvodnje v \u010ce\u0161ki republiki<\/h2>\n\n\n\n<p>Na pla\u010do na\u010drtovalca proizvodnje na \u010ce\u0161kem vpliva ve\u010d dejavnikov. Ti dejavniki vklju\u010dujejo izobrazbo, izku\u0161nje, spretnosti, lokacijo, velikost podjetja in vrsto podjetja. Vsak od njih ima edinstveno vlogo pri dolo\u010danju nadomestila.  <\/p>\n\n\n\n<h4 class=\"wp-block-heading\">Izobra\u017eevanje<\/h4>\n\n\n\n<p>Vi\u0161ja izobrazba obi\u010dajno vodi do bolj\u0161ih pla\u010dnih mo\u017enosti za na\u010drtovalce proizvodnje. Za\u017eelena je izobrazba na podro\u010djih, kot so industrijski in\u017eeniring, poslovna administracija ali upravljanje dobavne verige. Z naprednimi diplomami ali specializiranimi certifikati lahko \u0161e pove\u010date mo\u017enosti za zaslu\u017eek.  <\/p>\n\n\n\n<h4 class=\"wp-block-heading\">Izku\u0161nje<\/h4>\n\n\n\n<p>Izku\u0161nje so klju\u010dni dejavnik pri dolo\u010danju pla\u010de. Za\u010detni na\u010drtovalci proizvodnje zaslu\u017eijo manj kot tisti z ve\u010dletnimi izku\u0161njami na tem podro\u010dju. Vi\u0161ji na\u010drtovalci z bogatimi izku\u0161njami lahko prejemajo vi\u0161je pla\u010de zaradi svojega strokovnega znanja in izku\u0161enj pri upravljanju zapletenih proizvodnih procesov.  <\/p>\n\n\n\n<h4 class=\"wp-block-heading\">Spretnosti<\/h4>\n\n\n\n<p>Poleg splo\u0161nih vodstvenih spretnosti se vrednost na\u010drtovalca proizvodnje pove\u010da tudi z znanjem o posebnih programskih orodjih. Posebej koristno je poznavanje sistemov <a href=\"\/sl\/viri\/kaj-je-erp\/\">ERP (Na\u010drtovanje virov podjetja)<\/a> in APS (napredno na\u010drtovanje in razporejanje). Ta orodja pomagajo optimizirati proizvodne na\u010drte in vire, zato so usposobljeni na\u010drtovalci nepogre\u0161ljivi.  <\/p>\n\n\n\n<h4 class=\"wp-block-heading\">Lokacija<\/h4>\n\n\n\n<p>Pla\u010de se lahko v razli\u010dnih regijah zelo razlikujejo. V Pragi, glavnem mestu in gospodarskem sredi\u0161\u010du \u010ce\u0161ke republike, na primer na\u010drtovalci proizvodnje pogosto zaslu\u017eijo ve\u010d zaradi vi\u0161jih \u017eivljenjskih stro\u0161kov in koncentracije velikih podjetij. <\/p>\n\n\n\n<h4 class=\"wp-block-heading\">Velikost podjetja<\/h4>\n\n\n\n<p>Obi\u010dajno so pla\u010de v ve\u010djih podjetjih vi\u0161je kot v manj\u0161ih. Ta trend je posledica ve\u010djega obsega poslovanja in bolj zapletenih proizvodnih postopkov v pomembnih podjetjih, ki zahtevajo bolj izku\u0161ene na\u010drtovalce. <\/p>\n\n\n\n<h4 class=\"wp-block-heading\">Vrsta podjetja<\/h4>\n\n\n\n<p>Na pla\u010de vpliva tudi vrsta panoge. Podjetja v sektorjih z visoko dodano vrednostjo, kot sta avtomobilska industrija ali proizvodnja elektronike, obi\u010dajno pla\u010dujejo vi\u0161je pla\u010de kot podjetja v manj specializiranih panogah. <\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Vloga in naloge na\u010drtovalca proizvodnje<\/h2>\n\n\n\n<p>V proizvodnem sektorju je na\u010drtovalec proizvodnje klju\u010dnega pomena za organizacijo u\u010dinkovitih proizvodnih procesov. Ta vloga je ve\u010dplastna, saj vklju\u010duje strate\u0161ko na\u010drtovanje, natan\u010dno organizacijo in proaktivno re\u0161evanje te\u017eav za zagotavljanje nemotenega delovanja. <\/p>\n\n\n\n<p><strong>Podrobne odgovornosti na\u010drtovalca proizvodnje:<\/strong><\/p>\n\n\n\n<ol class=\"wp-block-list\">\n<li><strong>Napovedovanje povpra\u0161evanja<\/strong>: Na\u010drtovalci proizvodnje uporabljajo podatkovno analitiko za napovedovanje potreb po izdelkih z razumevanjem tr\u017enih trendov in povpra\u0161evanja kupcev, s \u010dimer zagotavljajo skladnost s tr\u017enimi zahtevami.<\/li>\n\n\n\n<li><strong>Dodelitev sredstev<\/strong>: Za u\u010dinkovito doseganje ciljev upravljajo vire, kot so materiali, delovna sila in stroji, ter usklajujejo razpolo\u017eljivost s proizvodnimi potrebami za optimalno produktivnost.<\/li>\n\n\n\n<li><strong>Na\u010drtovanje<\/strong>: Na\u010drtovalci oblikujejo podrobne \u010dasovne na\u010drte proizvodnje ter dodeljujejo naloge in odgovornosti, ki so klju\u010dne za sinhronizirano in pravo\u010dasno dokon\u010danje projekta.<\/li>\n\n\n\n<li><strong>Upravljanje zalog<\/strong>: Nadzor nad ravnmi zalog vklju\u010duje spremljanje materialov in naro\u010danje zalog, da bi se izognili prevelikim zalogam ali pomanjkanju, kar je klju\u010dnega pomena za upravljanje stro\u0161kov.<\/li>\n\n\n\n<li><strong>Nadzor kakovosti<\/strong>: Na\u010drtovalci v sodelovanju z ekipami za zagotavljanje kakovosti pomagajo vzdr\u017eevati proizvodne standarde in proaktivno obravnavajo te\u017eave s kakovostjo.<\/li>\n\n\n\n<li><strong>Upravljanje stro\u0161kov<\/strong>: Razvijajo strategije za optimizacijo proizvodnih stro\u0161kov, pri \u010demer se osredoto\u010dajo na zmanj\u0161evanje odpadkov in pove\u010devanje u\u010dinkovitosti.<\/li>\n\n\n\n<li><strong>Re\u0161evanje problemov<\/strong>: Na\u010drtovalci proizvodnje re\u0161ujejo te\u017eave takoj, tako da zagotavljajo \u010dim manj motenj in ohranjajo proizvodne na\u010drte.<\/li>\n<\/ol>\n\n\n\n<p>Vloga na\u010drtovalca proizvodnje je celovita in zahteva kombinacijo analiti\u010dnih sposobnosti, strate\u0161kega razmi\u0161ljanja in prakti\u010dnega re\u0161evanja problemov. Njihovo delo je bistvenega pomena za uspe\u0161nost proizvodnih dejavnosti, saj vpliva na vse od razpolo\u017eljivosti izdelkov do u\u010dinkovitosti proizvodnje in splo\u0161ne kakovosti. <\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Znanja in spretnosti za na\u010drtovalca proizvodnje<\/h2>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Analiti\u010dne sposobnosti<\/strong>: Nujne za ocenjevanje zapletenih proizvodnih procesov in sprejemanje odlo\u010ditev, ki temeljijo na podatkih.<\/li>\n\n\n\n<li><strong>Sposobnost re\u0161evanja problemov<\/strong>: Pri prepoznavanju in re\u0161evanju te\u017eav, ki se lahko pojavijo med proizvodnjo, je klju\u010dnega pomena.<\/li>\n\n\n\n<li><strong>Organizacijske sposobnosti<\/strong>: Organizacijske sposobnosti: klju\u010dne za u\u010dinkovito upravljanje ve\u010d nalog in urnikov.<\/li>\n\n\n\n<li><strong>Komunikacijske spretnosti<\/strong>: Pomembne za usklajevanje z razli\u010dnimi oddelki in jasno posredovanje informacij.<\/li>\n\n\n\n<li><strong>Tehni\u010dna usposobljenost<\/strong>: Poznavanje sistemov ERP in APS ter druge ustrezne programske opreme je zelo koristno.<\/li>\n<\/ul>\n\n\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" width=\"1024\" height=\"536\" src=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/08\/Display-wide-5-1024x536.png\" alt=\"\" class=\"wp-image-6463\" srcset=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/08\/Display-wide-5-1024x536.png 1024w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/08\/Display-wide-5-300x157.png 300w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/08\/Display-wide-5-768x402.png 768w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/08\/Display-wide-5-1536x804.png 1536w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/08\/Display-wide-5-2048x1072.png 2048w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\">Sistemi APS z umetno inteligenco, ki izbolj\u0161ujejo na\u010drtovanje proizvodnje<\/h2>\n\n\n\n<p>Sistemi za napredno na\u010drtovanje in razporeditev (APS), integrirani z umetno inteligenco, kot je <a href=\"\/sl\/\">Skyplanner<\/a>, revolucionarno spreminjajo na\u010drtovanje proizvodnje. Tukaj je kratek pregled:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Napovedovanje povpra\u0161evanja<\/strong>: Umetna inteligenca v sistemih APS z analizo preteklih in trenutnih podatkov natan\u010dno napoveduje povpra\u0161evanje po izdelkih ter pomaga na\u010drtovalcem pri sprejemanju informiranih odlo\u010ditev.<\/li>\n\n\n\n<li><strong>Dodelitev sredstev<\/strong>: Ti sistemi z analizo podatkov v realnem \u010dasu optimizirajo uporabo materialov, delovne sile in strojev ter tako pove\u010dujejo produktivnost.<\/li>\n\n\n\n<li><strong>Dinami\u010dno na\u010drtovanje<\/strong>: Algoritmi umetne inteligence hitro prilagajajo proizvodne urnike kot odziv na spremembe povpra\u0161evanja ali motnje v dobavni verigi in tako ohranjajo u\u010dinkovitost.<\/li>\n\n\n\n<li><strong>Upravljanje zalog<\/strong>: APS, ki ga poganja umetna inteligenca, predvideva natan\u010dne potrebe po zalogah, prepre\u010duje prevelike zaloge ali pomanjkanje in zagotavlja stro\u0161kovno u\u010dinkovito razpolo\u017eljivost materiala.<\/li>\n\n\n\n<li><strong>Nadzor kakovosti<\/strong>: Povezovanje umetne inteligence s sistemi za upravljanje kakovosti omogo\u010da zgodnje odkrivanje morebitnih te\u017eav s kakovostjo in podpira visoke proizvodne standarde.<\/li>\n\n\n\n<li><strong>Upravljanje stro\u0161kov<\/strong>: Umetna inteligenca prepoznava na\u010dine za zmanj\u0161anje proizvodnih stro\u0161kov z analizo vzorcev in uporabe virov, ne da bi se pri tem poslab\u0161ala kakovost.<\/li>\n<\/ul>\n\n\n\n<p>APS z umetno inteligenco ne le dopolnjuje vlogo na\u010drtovalca proizvodnje, temve\u010d tudi pove\u010duje njegovo sposobnost za sprejemanje natan\u010dnej\u0161ih, u\u010dinkovitej\u0161ih in strate\u0161kih odlo\u010ditev.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Panoge, ki zaposlujejo na\u010drtovalce proizvodnje na \u010ce\u0161kem<\/h2>\n\n\n\n<p>V razli\u010dnih panogah na \u010ce\u0161kem se zavedajo pomena na\u010drtovalcev proizvodnje za u\u010dinkovito poslovanje. Klju\u010dni sektorji vklju\u010dujejo: <\/p>\n\n\n\n<ol class=\"wp-block-list\">\n<li><strong>Avtomobilska industrija<\/strong>: \u010ce\u0161ka ima kot pomemben akter v evropskem avtomobilskem sektorju \u0161tevilne prilo\u017enosti za na\u010drtovalce proizvodnje. So klju\u010dnega pomena pri upravljanju zapletenih monta\u017enih linij in dobavnih verig, povezanih s proizvodnjo vozil. <\/li>\n\n\n\n<li><strong>Proizvodnja elektronike<\/strong>: Elektronska industrija v dr\u017eavi, ki je znana po proizvodnji visokokakovostnih komponent, se zana\u0161a na na\u010drtovalce proizvodnje, ki racionalizirajo proizvodne procese in upravljajo zapletena oskrbovalna omre\u017eja.<\/li>\n\n\n\n<li><strong>Proizvodnja strojev in opreme<\/strong>: Ta sektor, ki vklju\u010duje proizvodnjo industrijskih strojev in opreme, zahteva usposobljene na\u010drtovalce proizvodnje za optimizacijo proizvodnih procesov in zagotavljanje pravo\u010dasne dobave izdelkov.<\/li>\n\n\n\n<li><strong>Industrija hrane in pija\u010d<\/strong>: Na\u010drtovalci proizvodnje se osredoto\u010dajo na pove\u010danje u\u010dinkovitosti proizvodnje in distribucije \u017eivil in pija\u010d, pri \u010demer upo\u0161tevajo dejavnike, kot so rok trajanja, sezonsko povpra\u0161evanje in logistika dobavne verige.<\/li>\n\n\n\n<li><strong>Farmacevtski izdelki<\/strong>: Farmacevtska industrija, ki se osredoto\u010da na proizvodnjo zdravil in izdelkov, povezanih z zdravjem, od na\u010drtovalcev proizvodnje zahteva, da strogo spo\u0161tujejo standarde kakovosti in regulativne standarde.<\/li>\n\n\n\n<li><strong>Kemi\u010dna industrija<\/strong>: Ta sektor, ki vklju\u010duje proizvodnjo kemikalij za razli\u010dne namene, zahteva natan\u010dno na\u010drtovanje za upravljanje zapletenih procesov ter zagotavljanje varnosti in okoljske skladnosti.<\/li>\n<\/ol>\n\n\n\n<p>Vsaka od teh panog ponuja edinstvene izzive in prilo\u017enosti, zato je vloga na\u010drtovalca proizvodnje dinami\u010dna in je sestavni del njihovega uspeha.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Dodatne ugodnosti poleg pla\u010de za na\u010drtovalce proizvodnje<\/h2>\n\n\n\n<ol class=\"wp-block-list\">\n<li><strong>Strokovni razvoj<\/strong>: Rast \u010de\u0161kega proizvodnega sektorja, zlasti na podro\u010dju avtomobilske industrije in elektronike, ponuja veliko prilo\u017enosti za izbolj\u0161anje znanja in spretnosti ter poklicno napredovanje.<\/li>\n\n\n\n<li><strong>Napredne tehnologije<\/strong>: Izpostavljenost inovativnim tehnologijam, vklju\u010dno s sistemi umetne inteligence in APS, omogo\u010da na\u010drtovalcem proizvodnje najsodobnej\u0161e znanje v industriji.<\/li>\n\n\n\n<li><strong>Ugodnosti zdravstvenega varstva<\/strong>: Na\u010drtovalci proizvodnje so obi\u010dajno dele\u017eni celovitega zdravstvenega zavarovanja, ki zagotavlja zdravo ravnovesje med poklicnim in zasebnim \u017eivljenjem ter miren spanec.<\/li>\n\n\n\n<li><strong>Pokojninski na\u010drti<\/strong>: Z zanesljivimi pokojninskimi sistemi, ki so pogosto del paketa zaposlitve, se zagotovi dolgoro\u010dna finan\u010dna varnost na\u010drtovalcev proizvodnje.<\/li>\n\n\n\n<li><strong>Mednarodna izpostavljenost<\/strong>: \u010ce\u0161ka ima strate\u0161ko lego v Srednji Evropi, kar na\u010drtovalcem proizvodnje omogo\u010da, da se seznanijo z razli\u010dnimi proizvodnimi praksami in svetovnimi standardi.<\/li>\n<\/ol>\n\n\n\n<h2 class=\"wp-block-heading\">Ali je \u010ce\u0161ka idealna destinacija za na\u010drtovalce produkcije?<\/h2>\n\n\n\n<p>\u010ce upo\u0161tevamo ve\u010d kot le finan\u010dne ugodnosti, je \u010ce\u0161ka za strokovnjake na tem podro\u010dju dobro pripravljena.  <\/p>\n\n\n\n<p>Poleg privla\u010dne pla\u010de je \u010ce\u0161ka poleg tega zaradi osredoto\u010denosti na uravnote\u017eeno kulturo poklicnega in zasebnega \u017eivljenja, najsodobnej\u0161ih proizvodnih procesov in prilo\u017enosti za nenehno u\u010denje privla\u010dna izbira za na\u010drtovalce proizvodnje po vsem svetu.  <\/p>\n\n\n\n<p>\u010ce\u0161ki proizvodni sektor in s tem vloga na\u010drtovalcev proizvodnje sta zaradi kombinacije tradicionalnih industrijskih prednosti in sodobnega tehnolo\u0161kega napredka dinami\u010dna in obetavna.<\/p>\n\n<\/div>\n\n<div class=\"gb-container gb-container-92545123\">\n<div class=\"gb-grid-wrapper gb-grid-wrapper-0a61546f\">\n<div class=\"gb-grid-column gb-grid-column-e4183086\"><div class=\"gb-container gb-container-e4183086\">\n\n<\/div><\/div>\n\n<div class=\"gb-grid-column gb-grid-column-84ccbb5d\"><div class=\"gb-container gb-container-84ccbb5d\">\n\n<\/div><\/div>\n<\/div>\n<\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>V letu 2026 lahko na\u010drtovalec proizvodnje na \u010ce\u0161kem pri\u010dakuje povpre\u010dno pla\u010do pribli\u017eno CZK 730 229 na leto oziroma okoli CZK 60,852 mese\u010dno pred obdav\u010ditvijo. Pomembno pa je opozoriti, da lahko ta pla\u010da niha glede na razli\u010dne dejavnike, vklju\u010dno z mestom zaposlitve, leti izku\u0161enj na tem podro\u010dju in specifi\u010dno panogo znotraj proizvodnega sektorja. \u010ce\u0161ki proizvodni sektor, &#8230; <a title=\"Pla\u010da na\u010drtovalca proizvodnje v \u010ce\u0161ki republiki 2026\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/sl\/viri\/placa-nacrtovalca-proizvodnje-v-ceski-republiki-2026\/\" aria-label=\"Read more about Pla\u010da na\u010drtovalca proizvodnje v \u010ce\u0161ki republiki 2026\">Read more<\/a><\/p>\n","protected":false},"author":6,"featured_media":28907,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[2711,302],"tags":[],"class_list":["post-28953","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-kariera-in-place","category-viri","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Pla\u010da na\u010drtovalca proizvodnje v \u010ce\u0161ki republiki 2026 \u2013 SkyPlanner<\/title>\n<meta name=\"description\" content=\"Leta 2026 lahko na\u010drtovalec proizvodnje na \u010ce\u0161kem pri\u010dakuje povpre\u010dno pla\u010do v vi\u0161ini pribli\u017eno 730 229 CZK na leto ali pribli\u017eno 60 852 CZK mese\u010dno pred obdav\u010ditvijo.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/sl\/viri\/placa-nacrtovalca-proizvodnje-v-ceski-republiki-2026\/\" \/>\n<meta property=\"og:locale\" content=\"sl_SI\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Pla\u010da na\u010drtovalca proizvodnje v \u010ce\u0161ki republiki 2026\" \/>\n<meta property=\"og:description\" content=\"Leta 2026 lahko na\u010drtovalec proizvodnje na \u010ce\u0161kem pri\u010dakuje povpre\u010dno pla\u010do v vi\u0161ini pribli\u017eno 730 229 CZK na leto ali pribli\u017eno 60 852 CZK mese\u010dno pred obdav\u010ditvijo.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/sl\/viri\/placa-nacrtovalca-proizvodnje-v-ceski-republiki-2026\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2023-11-02T09:52:12+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-06-19T21:02:58+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/11\/Production-Planner-the-Czech-Republic-1024x683.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1024\" \/>\n\t<meta property=\"og:image:height\" content=\"683\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"SkyPlanner\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"7 minut\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/placa-nacrtovalca-proizvodnje-v-ceski-republiki-2026\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/placa-nacrtovalca-proizvodnje-v-ceski-republiki-2026\\\/\"},\"author\":{\"name\":\"SkyPlanner\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#\\\/schema\\\/person\\\/9122a7382a3a91f77e5ed0207811724a\"},\"headline\":\"Pla\u010da na\u010drtovalca proizvodnje v \u010ce\u0161ki republiki 2026\",\"datePublished\":\"2023-11-02T09:52:12+00:00\",\"dateModified\":\"2026-06-19T21:02:58+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/placa-nacrtovalca-proizvodnje-v-ceski-republiki-2026\\\/\"},\"wordCount\":1834,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/placa-nacrtovalca-proizvodnje-v-ceski-republiki-2026\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2023\\\/11\\\/Production-Planner-the-Czech-Republic.png\",\"articleSection\":[\"Kariera in pla\u010de\",\"viri\"],\"inLanguage\":\"sl-SI\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/placa-nacrtovalca-proizvodnje-v-ceski-republiki-2026\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/placa-nacrtovalca-proizvodnje-v-ceski-republiki-2026\\\/\",\"name\":\"Pla\u010da na\u010drtovalca proizvodnje v \u010ce\u0161ki republiki 2026 \u2013 SkyPlanner\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/placa-nacrtovalca-proizvodnje-v-ceski-republiki-2026\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/placa-nacrtovalca-proizvodnje-v-ceski-republiki-2026\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2023\\\/11\\\/Production-Planner-the-Czech-Republic.png\",\"datePublished\":\"2023-11-02T09:52:12+00:00\",\"dateModified\":\"2026-06-19T21:02:58+00:00\",\"description\":\"Leta 2026 lahko na\u010drtovalec proizvodnje na \u010ce\u0161kem pri\u010dakuje povpre\u010dno pla\u010do v vi\u0161ini pribli\u017eno 730 229 CZK na leto ali pribli\u017eno 60 852 CZK mese\u010dno pred obdav\u010ditvijo.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/placa-nacrtovalca-proizvodnje-v-ceski-republiki-2026\\\/#breadcrumb\"},\"inLanguage\":\"sl-SI\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/placa-nacrtovalca-proizvodnje-v-ceski-republiki-2026\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"sl-SI\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/placa-nacrtovalca-proizvodnje-v-ceski-republiki-2026\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2023\\\/11\\\/Production-Planner-the-Czech-Republic.png\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2023\\\/11\\\/Production-Planner-the-Czech-Republic.png\",\"width\":4990,\"height\":3327,\"caption\":\"Production Planner the Czech Republic\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/placa-nacrtovalca-proizvodnje-v-ceski-republiki-2026\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Pla\u010da na\u010drtovalca proizvodnje v \u010ce\u0161ki republiki 2026\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"sl-SI\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"sl-SI\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#\\\/schema\\\/person\\\/9122a7382a3a91f77e5ed0207811724a\",\"name\":\"SkyPlanner\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"sl-SI\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/b7d00e63bfb49c23e740cab317acbfb7287b7fa23d51b75e89a6659494daa9dd?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/b7d00e63bfb49c23e740cab317acbfb7287b7fa23d51b75e89a6659494daa9dd?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/b7d00e63bfb49c23e740cab317acbfb7287b7fa23d51b75e89a6659494daa9dd?s=96&d=mm&r=g\",\"caption\":\"SkyPlanner\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Pla\u010da na\u010drtovalca proizvodnje v \u010ce\u0161ki republiki 2026 \u2013 SkyPlanner","description":"Leta 2026 lahko na\u010drtovalec proizvodnje na \u010ce\u0161kem pri\u010dakuje povpre\u010dno pla\u010do v vi\u0161ini pribli\u017eno 730 229 CZK na leto ali pribli\u017eno 60 852 CZK mese\u010dno pred obdav\u010ditvijo.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/sl\/viri\/placa-nacrtovalca-proizvodnje-v-ceski-republiki-2026\/","og_locale":"sl_SI","og_type":"article","og_title":"Pla\u010da na\u010drtovalca proizvodnje v \u010ce\u0161ki republiki 2026","og_description":"Leta 2026 lahko na\u010drtovalec proizvodnje na \u010ce\u0161kem pri\u010dakuje povpre\u010dno pla\u010do v vi\u0161ini pribli\u017eno 730 229 CZK na leto ali pribli\u017eno 60 852 CZK mese\u010dno pred obdav\u010ditvijo.","og_url":"https:\/\/skyplanner.ai\/sl\/viri\/placa-nacrtovalca-proizvodnje-v-ceski-republiki-2026\/","og_site_name":"SkyPlanner","article_published_time":"2023-11-02T09:52:12+00:00","article_modified_time":"2026-06-19T21:02:58+00:00","og_image":[{"width":1024,"height":683,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/11\/Production-Planner-the-Czech-Republic-1024x683.png","type":"image\/png"}],"author":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"Written by":"SkyPlanner","Est. reading time":"7 minut"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/sl\/viri\/placa-nacrtovalca-proizvodnje-v-ceski-republiki-2026\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/sl\/viri\/placa-nacrtovalca-proizvodnje-v-ceski-republiki-2026\/"},"author":{"name":"SkyPlanner","@id":"https:\/\/skyplanner.ai\/sl\/#\/schema\/person\/9122a7382a3a91f77e5ed0207811724a"},"headline":"Pla\u010da na\u010drtovalca proizvodnje v \u010ce\u0161ki republiki 2026","datePublished":"2023-11-02T09:52:12+00:00","dateModified":"2026-06-19T21:02:58+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/sl\/viri\/placa-nacrtovalca-proizvodnje-v-ceski-republiki-2026\/"},"wordCount":1834,"publisher":{"@id":"https:\/\/skyplanner.ai\/sl\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/sl\/viri\/placa-nacrtovalca-proizvodnje-v-ceski-republiki-2026\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/11\/Production-Planner-the-Czech-Republic.png","articleSection":["Kariera in pla\u010de","viri"],"inLanguage":"sl-SI"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/sl\/viri\/placa-nacrtovalca-proizvodnje-v-ceski-republiki-2026\/","url":"https:\/\/skyplanner.ai\/sl\/viri\/placa-nacrtovalca-proizvodnje-v-ceski-republiki-2026\/","name":"Pla\u010da na\u010drtovalca proizvodnje v \u010ce\u0161ki republiki 2026 \u2013 SkyPlanner","isPartOf":{"@id":"https:\/\/skyplanner.ai\/sl\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/sl\/viri\/placa-nacrtovalca-proizvodnje-v-ceski-republiki-2026\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/sl\/viri\/placa-nacrtovalca-proizvodnje-v-ceski-republiki-2026\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/11\/Production-Planner-the-Czech-Republic.png","datePublished":"2023-11-02T09:52:12+00:00","dateModified":"2026-06-19T21:02:58+00:00","description":"Leta 2026 lahko na\u010drtovalec proizvodnje na \u010ce\u0161kem pri\u010dakuje povpre\u010dno pla\u010do v vi\u0161ini pribli\u017eno 730 229 CZK na leto ali pribli\u017eno 60 852 CZK mese\u010dno pred obdav\u010ditvijo.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/sl\/viri\/placa-nacrtovalca-proizvodnje-v-ceski-republiki-2026\/#breadcrumb"},"inLanguage":"sl-SI","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/sl\/viri\/placa-nacrtovalca-proizvodnje-v-ceski-republiki-2026\/"]}]},{"@type":"ImageObject","inLanguage":"sl-SI","@id":"https:\/\/skyplanner.ai\/sl\/viri\/placa-nacrtovalca-proizvodnje-v-ceski-republiki-2026\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/11\/Production-Planner-the-Czech-Republic.png","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/11\/Production-Planner-the-Czech-Republic.png","width":4990,"height":3327,"caption":"Production Planner the Czech Republic"},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/sl\/viri\/placa-nacrtovalca-proizvodnje-v-ceski-republiki-2026\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/sl\/"},{"@type":"ListItem","position":2,"name":"Pla\u010da na\u010drtovalca proizvodnje v \u010ce\u0161ki republiki 2026"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/sl\/#website","url":"https:\/\/skyplanner.ai\/sl\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/sl\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/sl\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"sl-SI"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/sl\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/sl\/","logo":{"@type":"ImageObject","inLanguage":"sl-SI","@id":"https:\/\/skyplanner.ai\/sl\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/sl\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]},{"@type":"Person","@id":"https:\/\/skyplanner.ai\/sl\/#\/schema\/person\/9122a7382a3a91f77e5ed0207811724a","name":"SkyPlanner","image":{"@type":"ImageObject","inLanguage":"sl-SI","@id":"https:\/\/secure.gravatar.com\/avatar\/b7d00e63bfb49c23e740cab317acbfb7287b7fa23d51b75e89a6659494daa9dd?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/b7d00e63bfb49c23e740cab317acbfb7287b7fa23d51b75e89a6659494daa9dd?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/b7d00e63bfb49c23e740cab317acbfb7287b7fa23d51b75e89a6659494daa9dd?s=96&d=mm&r=g","caption":"SkyPlanner"}}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/11\/Production-Planner-the-Czech-Republic.png",4990,3327,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/11\/Production-Planner-the-Czech-Republic-150x150.png",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/11\/Production-Planner-the-Czech-Republic-300x200.png",300,200,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/11\/Production-Planner-the-Czech-Republic-768x512.png",768,512,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/11\/Production-Planner-the-Czech-Republic-1024x683.png",1024,683,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/11\/Production-Planner-the-Czech-Republic-1536x1024.png",1536,1024,true],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/11\/Production-Planner-the-Czech-Republic-2048x1365.png",2048,1365,true],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/11\/Production-Planner-the-Czech-Republic.png",360,240,false]},"uagb_author_info":{"display_name":"SkyPlanner","author_link":"https:\/\/skyplanner.ai\/sl\/author\/bettina\/"},"uagb_comment_info":0,"uagb_excerpt":"V letu 2026 lahko na\u010drtovalec proizvodnje na \u010ce\u0161kem pri\u010dakuje povpre\u010dno pla\u010do pribli\u017eno CZK 730 229 na leto oziroma okoli CZK 60,852 mese\u010dno pred obdav\u010ditvijo. Pomembno pa je opozoriti, da lahko ta pla\u010da niha glede na razli\u010dne dejavnike, vklju\u010dno z mestom zaposlitve, leti izku\u0161enj na tem podro\u010dju in specifi\u010dno panogo znotraj proizvodnega sektorja. \u010ce\u0161ki proizvodni sektor,&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/posts\/28953","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/users\/6"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/comments?post=28953"}],"version-history":[{"count":3,"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/posts\/28953\/revisions"}],"predecessor-version":[{"id":94343,"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/posts\/28953\/revisions\/94343"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/media\/28907"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/media?parent=28953"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/categories?post=28953"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/tags?post=28953"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}