{"id":28319,"date":"2023-10-26T12:56:47","date_gmt":"2023-10-26T12:56:47","guid":{"rendered":"https:\/\/skyplanner.ai\/viri\/placa-nacrtovalca-proizvodnje-na-svedskem-2023\/"},"modified":"2026-06-14T15:56:01","modified_gmt":"2026-06-14T15:56:01","slug":"placa-nacrtovalca-proizvodnje-na-svedskem-2026","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/sl\/viri\/placa-nacrtovalca-proizvodnje-na-svedskem-2026\/","title":{"rendered":"Pla\u010da na\u010drtovalca proizvodnje na \u0160vedskem 2026"},"content":{"rendered":"<div class=\"gb-container gb-container-bf558a89 article-main-content-container\">\n\n<h1 class=\"wp-block-heading\" id=\"h-production-planner-salary-in-sweden-2026\">Pla\u010da na\u010drtovalca proizvodnje na \u0160vedskem 2026<\/h1>\n\n\n<div class=\"gb-container gb-container-e8026af9\">\n\n<p><a href=\"\/sl\/\">Domov<\/a> &#8221; <a href=\"\/sl\/viri\/\">Viri<\/a> &#8221; Pla\u010da na\u010drtovalca proizvodnje na \u0160vedskem 2026<\/p>\n\n\n\n<p class=\"yoast-reading-time__wrapper\"><span class=\"yoast-reading-time__icon\"><svg xmlns=\"http:\/\/www.w3.org\/2000\/svg\" aria-hidden=\"true\" focusable=\"false\" data-icon=\"clock\" width=\"20\" height=\"20\" fill=\"none\" stroke=\"currentColor\" style=\"display:inline-block;vertical-align:-0.1em\" role=\"img\" viewbox=\"0 0 24 24\"><path stroke-linecap=\"round\" stroke-linejoin=\"round\" stroke-width=\"2\" d=\"M12 8v4l3 3m6-3a9 9 0 11-18 0 9 9 0 0118 0z\"><\/path><\/svg><\/span><span class=\"yoast-reading-time__spacer\" style=\"display:inline-block;width:1em\"><\/span><span class=\"yoast-reading-time__descriptive-text\">Predviden \u010das branja: <\/span><span class=\"yoast-reading-time__reading-time\">13<\/span><span class=\"yoast-reading-time__time-unit\"> minut<\/span><\/p>\n\n<\/div>\n\n<div class=\"gb-container gb-container-f0fd57d0\">\n<div class=\"gb-container gb-container-31dfeab3\"><div class=\"gb-inside-container\">\n\n<p><strong>Povpre\u010dna pla\u010da na\u010drtovalca proizvodnje na \u0160vedskem zna\u0161a pribli\u017eno 444.981 SEK na leto, kar v letu 2026 pomeni pribli\u017eno 37.082 SEK mese\u010dno pred obdav\u010ditvijo. Ta pla\u010da, ki odra\u017ea povpra\u0161evanje in pomembnost vloge v panogi, se lahko spreminja glede na ve\u010d dejavnikov, ki vplivajo nanjo.<\/strong><\/p>\n\n<\/div><\/div>\n\n\n<p>Leta 2026 bo \u0161vedski proizvodni sektor postal vrhunec evropskih inovacij in rasti. Zaradi zdru\u017eevanja najsodobnej\u0161e tehnologije in visokokvalificirane delovne sile nara\u0161\u010da povpra\u0161evanje po strokovnih na\u010drtovalcih proizvodnje. Ker ta panoga cveti, mnoge zanima, kak\u0161en je potencialni zaslu\u017eek teh strokovnjakov na \u0160vedskem. Vas zanima poglobitev? V nadaljevanju si preberite, kak\u0161ne so odgovornosti na\u010drtovalca proizvodnje, katere spremenljivke vplivajo na njegove pla\u010de in \u0161e ve\u010d informacij iz sredi\u0161\u010da \u0161vedske proizvodnje.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Raz\u010dlenitev \u0161tevilk<\/h2>\n\n\n\n<p>Preden se poglobite v podrobnosti pla\u010de na\u010drtovalca proizvodnje, je treba razumeti \u0161ir\u0161i prostor. Povpre\u010dna pla\u010da na \u0160vedskem trenutno zna\u0161a pribli\u017eno <strong><strong>417.600 \u0161vedskih kron<\/strong> na leto <\/strong>pred obdav\u010ditvijo. To povpre\u010dje predstavlja odli\u010dno izhodi\u0161\u010de za primerjavo specializiranih vlog, kot so na\u010drtovalci proizvodnje.<\/p>\n\n\n\n<p>Leta 2026 lahko na\u010drtovalec proizvodnje na \u0160vedskem pri\u010dakuje pribli\u017eno <strong>444.981 SEK povpre\u010dne letne pla\u010de<\/strong>, kar pomeni pribli\u017eno <strong> <strong>37.082<\/strong> SEK mese\u010dno <\/strong>pred obdav\u010ditvijo. \u010ceprav je ta \u0161tevilka zelo podobna povpre\u010dni pla\u010di v dr\u017eavi, je treba upo\u0161tevati, da lahko na ta znesek vpliva ve\u010d spremenljivk.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Pla\u010de na\u010drtovalcev proizvodnje v sosednjih dr\u017eavah<\/h2>\n\n\n\n<p>Pregled podro\u010dja nadomestil za na\u010drtovalce proizvodnje v Skandinaviji razkriva razli\u010dne trende. Pla\u010da na\u010drtovalca proizvodnje na \u0160vedskem in na <a href=\"\/sl\/viri\/placa-nacrtovalca-proizvodnje-na-norveskem-2026\/\">Norve\u0161kem<\/a> je zaradi vi\u0161jih \u017eivljenjskih stro\u0161kov pogosto nekoliko vi\u0161ja. Po drugi strani pa sta <a href=\"\/sl\/viri\/placa-nacrtovalca-proizvodnje-na-finskem-2026\/\">pla\u010da na\u010drtovalca proizvodnje na Finskem<\/a> in <a href=\"\/sl\/viri\/placa-nacrtovalca-proizvodnje-na-danskem-2026\/\">pla\u010da na\u010drtovalca proizvodnje na Danskem<\/a> na podobnem nivoju in se uvr\u0161\u010data v konkuren\u010dni polo\u017eaj. V baltskih dr\u017eavah, kot je Estonija, so pla\u010de obi\u010dajno skromnej\u0161e. Te razlike poudarjajo edinstveno privla\u010dnost vsake dr\u017eave za strokovnjake, ki se odlo\u010dajo za na\u010drtovanje proizvodnje.    <\/p>\n\n<\/div>\n\n<div class=\"gb-container gb-container-f7e777f3\">\n<div class=\"gb-container gb-container-0a56c9fa sticky\"><div class=\"gb-inside-container\">\n<div class=\"gb-container gb-container-eed176fc\"><div class=\"gb-inside-container\">\n<div class=\"gb-grid-wrapper gb-grid-wrapper-1b2f16ae\">\n<div class=\"gb-grid-column gb-grid-column-be655727\"><div class=\"gb-container gb-container-be655727\"><div class=\"gb-inside-container\">\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" width=\"1024\" height=\"685\" src=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Straight-PNG-1-1024x685.png\" alt=\"SkyPlanner APS - Production planning and scheduling product image straight view\" class=\"wp-image-4339\" srcset=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Straight-PNG-1-1024x685.png 1024w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Straight-PNG-1-300x201.png 300w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Straight-PNG-1-768x514.png 768w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Straight-PNG-1-1536x1027.png 1536w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Straight-PNG-1-2048x1370.png 2048w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n<\/div><\/div><\/div>\n\n<div class=\"gb-grid-column gb-grid-column-0821f9a0\"><div class=\"gb-container gb-container-0821f9a0\"><div class=\"gb-inside-container\">\n\n<h4 class=\"wp-block-heading mobile-text-center\" id=\"h-advanced-production-planning-with-ai-skyplanner-aps\" style=\"font-size:24px\">Advanced production planning with AI &#8211; SkyPlanner APS<\/h4>\n\n\n\n<p class=\"mobile-text-center\">Read more about our approach to production planning and optimization leveraging the power of AI.<\/p>\n\n\n<div class=\"gb-button-wrapper gb-button-wrapper-690cb95e\">\n\n<a class=\"gb-button gb-button-7b87a903 gb-button-text\" href=\"https:\/\/skyplanner.ai\/\" aria-label=\"Book a demo\">Production planning with AI<\/a>\n\n<\/div>\n<\/div><\/div><\/div>\n<\/div>\n<\/div><\/div>\n<\/div><\/div>\n<\/div>\n\n<div class=\"gb-container gb-container-33d6b196\">\n\n<h2 class=\"wp-block-heading\">Dejavniki, ki vplivajo na pla\u010do na\u010drtovalca proizvodnje na \u0160vedskem<\/h2>\n\n\n\n<h4 class=\"gb-headline gb-headline-306d2e62 gb-headline-text\">Izobra\u017eevanje<\/h4>\n\n\n\n<p>Na podro\u010dju na\u010drtovanja proizvodnje je izobra\u017eevanje temeljni okvir. Kandidati z visoko\u0161olsko izobrazbo ali specializiranimi certifikati s podro\u010dja upravljanja proizvodnje, dobavne verige ali sorodnih podro\u010dij so pogosto v prednosti. \u0160vedska podjetja obi\u010dajno dajejo prednost osebam s formalno izobrazbo na teh podro\u010djih, kar se pozitivno odra\u017ea na njihovih pla\u010dnih paketih.  <\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-a1c3941b gb-headline-text\">Izku\u0161nje<\/h4>\n\n\n\n<p>Delovna doba strokovnjaka na podro\u010dju na\u010drtovanja proizvodnje je zelo pomembna. Na\u010drtovalec, ki ima za seboj \u017ee ve\u010d let dela, bo verjetno bolje poznal nianse in izzive te vloge. Tako kot marsikje drugje tudi na \u0160vedskem izku\u0161nje pogosto pomenijo vi\u0161je pla\u010dilo zaradi vrednosti, ki jo prina\u0161ajo izku\u0161eni strokovnjaki.  <\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-58e030f7 gb-headline-text\">Spretnosti<\/h4>\n\n\n\n<p>Poleg formalne izobrazbe in izku\u0161enj lahko vrednost na\u010drtovalca proizvodnje pove\u010dajo tudi posebne spretnosti. Poznavanje orodij, ki se uporabljajo v panogi, analiti\u010dne sposobnosti ter sposobnost napovedovanja in oblikovanja strategij lahko pomembno vplivajo na vi\u0161ino nadomestila. <\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-e3fa76ca gb-headline-text\">Lokacija<\/h4>\n\n\n\n<p>\u0160vedska ima zaradi svoje raznolike gospodarske krajine ve\u010d industrijsko dejavnih regij kot druge. Pla\u010de se lahko razlikujejo glede na to, ali gre za delo v velikem mestu, kot je Stockholm, ali na bolj pode\u017eelskem obmo\u010dju. V velemestnih obmo\u010djih so obi\u010dajno vi\u0161je pla\u010de, vendar so lahko povezani tudi z vi\u0161jimi \u017eivljenjskimi stro\u0161ki.  <\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-a22a77c0 gb-headline-text\">Velikost podjetja<\/h4>\n\n\n\n<p>Ve\u010dje dru\u017ebe ali multinacionalke imajo pogosto bolj zapletene proizvodne cikle in dobavne verige. Zaradi kompleksnosti in odgovornosti teh podjetij so lahko pla\u010de na\u010drtovalcev proizvodnje vi\u0161je v primerjavi z manj\u0161imi lokalnimi podjetji. <\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-25faee6d gb-headline-text\">Vrsta podjetja<\/h4>\n\n\n\n<p>Panoga, v kateri podjetje deluje, lahko vpliva na pla\u010do na\u010drtovalca proizvodnje. Na primer, na\u010drtovalec proizvodnje v hitro razvijajo\u010dem se visokotehnolo\u0161kem sektorju lahko dobi druga\u010dno pla\u010do kot na\u010drtovalec v bolj tradicionalnem proizvodnem okolju. <\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Vloga in odgovornosti na\u010drtovalca proizvodnje<\/h2>\n\n\n\n<p>Na\u010drtovalec proizvodnje je povezovalni \u010dlen med proizvodno odli\u010dnostjo in operativno u\u010dinkovitostjo v industrijsko \u017eivahni \u0161vedski pokrajini. Zadol\u017eeni so za vodenje proizvodnega procesa za posamezen izdelek ali raznoliko paleto izdelkov in skrbno nadzorujejo vsako fazo proizvodne poti. Njihove glavne odgovornosti so:  <\/p>\n\n\n\n<ol class=\"wp-block-list\">\n<li><strong>Napovedovanje:<\/strong> Uporaba podatkov in analitike za napovedovanje koli\u010dine izdelkov, ki jih je treba izdelati v dolo\u010denem \u010dasovnem okviru.<\/li>\n\n\n\n<li><strong>Upravljanje virov:<\/strong> Na\u010drtovalci proizvodnje upravljajo in razporejajo vire, kot so surovine, oprema in delovna sila, da bi zagotovili u\u010dinkovito proizvodnjo.<\/li>\n\n\n\n<li><strong>Na\u010drtovanje:<\/strong> Oblikovanje celovitega urnika proizvodnje, ki je usklajen s cilji podjetja in povpra\u0161evanjem na trgu.<\/li>\n\n\n\n<li><strong>Povezovalka:<\/strong> Sodelovanje z razli\u010dnimi oddelki, kot so prodaja, nabava in logistika, da bi zagotovili racionaliziran proizvodni proces.<\/li>\n\n\n\n<li><strong>Re\u0161evanje problemov:<\/strong> Re\u0161ujejo in bla\u017eijo morebitne te\u017eave ali izzive v proizvodnem ciklu, da bi prepre\u010dili zamude ali neu\u010dinkovitost.<\/li>\n<\/ol>\n\n\n\n<h2 class=\"wp-block-heading\">Znanja, ki jih potrebuje na\u010drtovalec proizvodnje<\/h2>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Analiti\u010dne sposobnosti:<\/strong> Sposobnost razumevanja kompleksnih podatkov in sprejemanja utemeljenih odlo\u010ditev.<\/li>\n\n\n\n<li><strong>Komunikacija:<\/strong> U\u010dinkovita interakcija s \u010dlani ekipe, dobavitelji in drugimi oddelki je klju\u010dnega pomena.<\/li>\n\n\n\n<li><strong>Tehni\u010dna usposobljenost:<\/strong> Poznavanje programske opreme in orodij za na\u010drtovanje in napovedovanje, zna\u010dilnih za posamezno panogo.<\/li>\n\n\n\n<li><strong>Prilagodljivost:<\/strong> Sposobnost prilagajanja spremembam je bistvenega pomena.<\/li>\n\n\n\n<li><strong>Strate\u0161ko razmi\u0161ljanje:<\/strong> Strate\u0161ko razmi\u0161ljanje: pogled onkraj neposrednih nalog ter na\u010drtovanje dolgoro\u010dnih ciljev in izzivov.<\/li>\n<\/ul>\n\n\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" width=\"1024\" height=\"536\" src=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/08\/Display-wide-5-1024x536.png\" alt=\"\" class=\"wp-image-6463\" srcset=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/08\/Display-wide-5-1024x536.png 1024w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/08\/Display-wide-5-300x157.png 300w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/08\/Display-wide-5-768x402.png 768w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/08\/Display-wide-5-1536x804.png 1536w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/08\/Display-wide-5-2048x1072.png 2048w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\">Kako lahko APS z umetno inteligenco pomaga na\u010drtovalcu proizvodnje?<\/h2>\n\n\n\n<p>Sistemi za napredno na\u010drtovanje in razporeditev (APS), ki so povezani z umetno inteligenco, kot je <a href=\"\/sl\/\">Skyplanner<\/a>, lahko bistveno izbolj\u0161ajo vlogo na\u010drtovalca proizvodnje. Tukaj je opisano, kako:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Prediktivna analiza:<\/strong> Umetna inteligenca lahko analizira velike koli\u010dine podatkov, da predvidi prihodnje proizvodne potrebe, kar na\u010drtovalcem omogo\u010da, da predvidijo in se pripravijo na pove\u010danje ali zmanj\u0161anje povpra\u0161evanja.<\/li>\n\n\n\n<li><strong>Optimizacija virov:<\/strong> Z algoritmi umetne inteligence lahko sistemi APS predlagajo optimalne na\u010dine uporabe virov, zmanj\u0161ujejo izgube in zagotavljajo u\u010dinkovitost.<\/li>\n\n\n\n<li><strong>Prilagoditve v realnem \u010dasu:<\/strong> Umetna inteligenca lahko v primeru nenadne spremembe v dobavni verigi v realnem \u010dasu prilagodi urnik proizvodnje in tako zagotovi \u010dim manj motenj.<\/li>\n\n\n\n<li><strong>Zmanj\u0161anje napak:<\/strong> Pri vsakem delu je \u010dlove\u0161ka napaka nekaj povsem obi\u010dajnega. Vendar se z zmo\u017enostjo obdelave podatkov, ki jo omogo\u010da umetna inteligenca, zmanj\u0161a mo\u017enost napak pri napovedovanju ali na\u010drtovanju. <\/li>\n\n\n\n<li><strong>U\u010denje in prilagajanje:<\/strong> Umetna inteligenca se lahko s\u010dasoma u\u010di iz preteklih proizvodnih ciklov ter nenehno izbolj\u0161uje in izpopolnjuje postopek na\u010drtovanja.<\/li>\n<\/ul>\n\n\n\n<h2 class=\"wp-block-heading\">Panoge, ki zaposlujejo na\u010drtovalca proizvodnje na \u0160vedskem<\/h2>\n\n\n\n<p>Na \u0160vedskem so na\u010drtovalci proizvodnje klju\u010dnega pomena v razli\u010dnih panogah, od katerih vsaka predstavlja edinstvene izzive in prilo\u017enosti. Tukaj je pet sektorjev, ki pogosto zaposlujejo na\u010drtovalce proizvodnje: <\/p>\n\n\n\n<ol class=\"wp-block-list\">\n<li><strong>Proizvodnja:<\/strong> Ta obse\u017ena in raznolika panoga zajema vse od avtomobilske industrije do proizvodnje elektronike. Na\u010drtovalci proizvodnje na tem podro\u010dju upravljajo proizvodni proces, da zagotovijo u\u010dinkovitost, pravo\u010dasno izvedbo in nadzor kakovosti. <\/li>\n\n\n\n<li><strong>Farmacevtski izdelki:<\/strong> Na\u010drtovalci proizvodnje imajo klju\u010dno vlogo pri upravljanju proizvodnje zdravil in zdravstvenih izdelkov v farmacevtski industriji. Natan\u010dnost in skladnost s strogimi predpisi sta bistvena vidika te vloge. <\/li>\n\n\n\n<li><strong>Gradbeni\u0161tvo in infrastruktura:<\/strong> Ta panoga vklju\u010duje na\u010drtovanje in nadzor proizvodnje materialov, ki se uporabljajo pri gradbenih projektih. Na\u010drtovalci poskrbijo, da je potrebno gradivo pravo\u010dasno dobavljeno in izpolnjuje standarde kakovosti. <\/li>\n\n\n\n<li><strong>Hrana in pija\u010da:<\/strong> V tej hitro razvijajo\u010di se panogi na\u010drtovalci proizvodnje nadzorujejo proizvodne procese \u017eivil in pija\u010d ter upravljajo vse od pridobivanja sestavin do pakiranja in distribucije.<\/li>\n\n\n\n<li><strong>Tehnologija in elektronika:<\/strong> Ta hitro razvijajo\u010di se sektor se zana\u0161a na na\u010drtovalce proizvodnje, ki upravljajo proizvodnjo razli\u010dnih tehnolo\u0161kih izdelkov, od potro\u0161ni\u0161ke elektronike do industrijskih strojev, ter zagotavljajo, da izpolnjujejo zahteve trga in tehnolo\u0161ki napredek.<\/li>\n<\/ol>\n\n\n\n<h2 class=\"wp-block-heading\">Dodatne ugodnosti poleg pla\u010de za na\u010drtovalca proizvodnje na \u0160vedskem<\/h2>\n\n\n\n<ol class=\"wp-block-list\">\n<li><strong>Ravnovesje med delom in \u017eivljenjem:<\/strong> \u0160vedska podjetja dajejo prednost dobremu po\u010dutju svojih zaposlenih in pogosto ponujajo pro\u017een delovni \u010das in mo\u017enost dela na daljavo.<\/li>\n\n\n\n<li><strong>Velikodu\u0161no nadomestilo za dopust:<\/strong> Ve\u010dina \u0161vedskih delodajalcev ponuja veliko dni pla\u010danega dopusta.<\/li>\n\n\n\n<li><strong>Prednosti za zdravje in dobro po\u010dutje:<\/strong> Dostop do vrhunskih zdravstvenih in wellness programov je pogosto del paketa.<\/li>\n\n\n\n<li><strong>Prilo\u017enosti za nenehno u\u010denje:<\/strong> \u0160tevilna podjetja vlagajo v stalno izobra\u017eevanje svojih zaposlenih, saj ponujajo te\u010daje, delavnice in seminarje.<\/li>\n\n\n\n<li><strong>Pokojninski na\u010drti:<\/strong> Z zanesljivimi pokojninskimi na\u010drti je zaposlenim zagotovljena udobna upokojitev.<\/li>\n\n\n\n<li><strong>Porodni\u0161ki in o\u010detovski dopust:<\/strong> \u0160vedska je znana po velikodu\u0161ni politiki star\u0161evskega dopusta, ki star\u0161em omogo\u010da, da veliko \u010dasa pre\u017eivijo s svojimi novorojen\u010dki.<\/li>\n\n\n\n<li><strong>Kulturne koristi:<\/strong> Delo na \u0160vedskem omogo\u010da spoznavanje bogate kulturne krajine, kar spodbuja osebno rast in razumevanje.<\/li>\n<\/ol>\n\n\n\n<h2 class=\"wp-block-heading\">Je \u0160vedska pravo mesto za na\u010drtovalce proizvodnje?<\/h2>\n\n\n\n<p>\u010ce poleg denarnega vidika upo\u0161tevamo tudi mo\u017enosti za poklicno rast, je \u0160vedska dejansko celovita ponudba. Na\u010drtovalci proizvodnje bodo v \u010dasu svojega mandata na\u0161li \u0161tevilne mo\u017enosti za izbolj\u0161anje svojega znanja, zlasti zaradi vse ve\u010djega vklju\u010devanja sistemov APS, kot je Skyplanner, v na\u010drtovanje proizvodnje. <\/p>\n\n\n\n<p>Poleg pla\u010dila je \u0160vedska zaradi poudarka na ravnovesju med poklicnim in zasebnim \u017eivljenjem, najsodobnej\u0161ih proizvodnih praks in mo\u017enosti nenehnega u\u010denja zanimiva izbira za na\u010drtovalce proizvodnje po vsem svetu.<\/p>\n\n<\/div>\n\n<div class=\"gb-container gb-container-92545123\">\n<div class=\"gb-grid-wrapper gb-grid-wrapper-0a61546f\">\n<div class=\"gb-grid-column gb-grid-column-e4183086\"><div class=\"gb-container gb-container-e4183086\">\n\n<\/div><\/div>\n\n<div class=\"gb-grid-column gb-grid-column-84ccbb5d\"><div class=\"gb-container gb-container-84ccbb5d\">\n\n<\/div><\/div>\n<\/div>\n<\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>Pla\u010da na\u010drtovalca proizvodnje na \u0160vedskem 2026 Domov &#8221; Viri &#8221; Pla\u010da na\u010drtovalca proizvodnje na \u0160vedskem 2026 Povpre\u010dna pla\u010da na\u010drtovalca proizvodnje na \u0160vedskem zna\u0161a pribli\u017eno 444.981 SEK na leto, kar v letu 2026 pomeni pribli\u017eno 37.082 SEK mese\u010dno pred obdav\u010ditvijo. Ta pla\u010da, ki odra\u017ea povpra\u0161evanje in pomembnost vloge v panogi, se lahko spreminja glede na ve\u010d &#8230; <a title=\"Pla\u010da na\u010drtovalca proizvodnje na \u0160vedskem 2026\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/sl\/viri\/placa-nacrtovalca-proizvodnje-na-svedskem-2026\/\" aria-label=\"Read more about Pla\u010da na\u010drtovalca proizvodnje na \u0160vedskem 2026\">Read more<\/a><\/p>\n","protected":false},"author":6,"featured_media":28707,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[2711,302],"tags":[],"class_list":["post-28319","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-kariera-in-place","category-viri","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Pla\u010da na\u010drtovalca proizvodnje na \u0160vedskem 2026 &#8211; SkyPlanner<\/title>\n<meta name=\"description\" content=\"Povpre\u010dna pla\u010da na\u010drtovalca proizvodnje na \u0160vedskem zna\u0161a pribli\u017eno 444.981 SEK na leto, kar v letu 2026 pomeni pribli\u017eno 37.082 SEK mese\u010dno pred obdav\u010ditvijo.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/sl\/viri\/placa-nacrtovalca-proizvodnje-na-svedskem-2026\/\" \/>\n<meta property=\"og:locale\" content=\"sl_SI\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Pla\u010da na\u010drtovalca proizvodnje na \u0160vedskem 2026\" \/>\n<meta property=\"og:description\" content=\"Povpre\u010dna pla\u010da na\u010drtovalca proizvodnje na \u0160vedskem zna\u0161a pribli\u017eno 444.981 SEK na leto, kar v letu 2026 pomeni pribli\u017eno 37.082 SEK mese\u010dno pred obdav\u010ditvijo.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/sl\/viri\/placa-nacrtovalca-proizvodnje-na-svedskem-2026\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2023-10-26T12:56:47+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-06-14T15:56:01+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/10\/Production-Planner-Sweden-scaled.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"2560\" \/>\n\t<meta property=\"og:image:height\" content=\"1707\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"SkyPlanner\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"6 minut\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/placa-nacrtovalca-proizvodnje-na-svedskem-2026\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/placa-nacrtovalca-proizvodnje-na-svedskem-2026\\\/\"},\"author\":{\"name\":\"SkyPlanner\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#\\\/schema\\\/person\\\/9122a7382a3a91f77e5ed0207811724a\"},\"headline\":\"Pla\u010da na\u010drtovalca proizvodnje na \u0160vedskem 2026\",\"datePublished\":\"2023-10-26T12:56:47+00:00\",\"dateModified\":\"2026-06-14T15:56:01+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/placa-nacrtovalca-proizvodnje-na-svedskem-2026\\\/\"},\"wordCount\":1549,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/placa-nacrtovalca-proizvodnje-na-svedskem-2026\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2023\\\/10\\\/Production-Planner-Sweden-scaled.jpg\",\"articleSection\":[\"Kariera in pla\u010de\",\"viri\"],\"inLanguage\":\"sl-SI\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/placa-nacrtovalca-proizvodnje-na-svedskem-2026\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/placa-nacrtovalca-proizvodnje-na-svedskem-2026\\\/\",\"name\":\"Pla\u010da na\u010drtovalca proizvodnje na \u0160vedskem 2026 &#8211; SkyPlanner\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/placa-nacrtovalca-proizvodnje-na-svedskem-2026\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/placa-nacrtovalca-proizvodnje-na-svedskem-2026\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2023\\\/10\\\/Production-Planner-Sweden-scaled.jpg\",\"datePublished\":\"2023-10-26T12:56:47+00:00\",\"dateModified\":\"2026-06-14T15:56:01+00:00\",\"description\":\"Povpre\u010dna pla\u010da na\u010drtovalca proizvodnje na \u0160vedskem zna\u0161a pribli\u017eno 444.981 SEK na leto, kar v letu 2026 pomeni pribli\u017eno 37.082 SEK mese\u010dno pred obdav\u010ditvijo.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/placa-nacrtovalca-proizvodnje-na-svedskem-2026\\\/#breadcrumb\"},\"inLanguage\":\"sl-SI\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/placa-nacrtovalca-proizvodnje-na-svedskem-2026\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"sl-SI\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/placa-nacrtovalca-proizvodnje-na-svedskem-2026\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2023\\\/10\\\/Production-Planner-Sweden-scaled.jpg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2023\\\/10\\\/Production-Planner-Sweden-scaled.jpg\",\"width\":2560,\"height\":1707,\"caption\":\"Production Planner Sweden\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/placa-nacrtovalca-proizvodnje-na-svedskem-2026\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Pla\u010da na\u010drtovalca proizvodnje na \u0160vedskem 2026\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"sl-SI\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"sl-SI\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#\\\/schema\\\/person\\\/9122a7382a3a91f77e5ed0207811724a\",\"name\":\"SkyPlanner\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"sl-SI\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/b7d00e63bfb49c23e740cab317acbfb7287b7fa23d51b75e89a6659494daa9dd?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/b7d00e63bfb49c23e740cab317acbfb7287b7fa23d51b75e89a6659494daa9dd?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/b7d00e63bfb49c23e740cab317acbfb7287b7fa23d51b75e89a6659494daa9dd?s=96&d=mm&r=g\",\"caption\":\"SkyPlanner\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Pla\u010da na\u010drtovalca proizvodnje na \u0160vedskem 2026 &#8211; SkyPlanner","description":"Povpre\u010dna pla\u010da na\u010drtovalca proizvodnje na \u0160vedskem zna\u0161a pribli\u017eno 444.981 SEK na leto, kar v letu 2026 pomeni pribli\u017eno 37.082 SEK mese\u010dno pred obdav\u010ditvijo.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/sl\/viri\/placa-nacrtovalca-proizvodnje-na-svedskem-2026\/","og_locale":"sl_SI","og_type":"article","og_title":"Pla\u010da na\u010drtovalca proizvodnje na \u0160vedskem 2026","og_description":"Povpre\u010dna pla\u010da na\u010drtovalca proizvodnje na \u0160vedskem zna\u0161a pribli\u017eno 444.981 SEK na leto, kar v letu 2026 pomeni pribli\u017eno 37.082 SEK mese\u010dno pred obdav\u010ditvijo.","og_url":"https:\/\/skyplanner.ai\/sl\/viri\/placa-nacrtovalca-proizvodnje-na-svedskem-2026\/","og_site_name":"SkyPlanner","article_published_time":"2023-10-26T12:56:47+00:00","article_modified_time":"2026-06-14T15:56:01+00:00","og_image":[{"width":2560,"height":1707,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/10\/Production-Planner-Sweden-scaled.jpg","type":"image\/jpeg"}],"author":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"Written by":"SkyPlanner","Est. reading time":"6 minut"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/sl\/viri\/placa-nacrtovalca-proizvodnje-na-svedskem-2026\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/sl\/viri\/placa-nacrtovalca-proizvodnje-na-svedskem-2026\/"},"author":{"name":"SkyPlanner","@id":"https:\/\/skyplanner.ai\/sl\/#\/schema\/person\/9122a7382a3a91f77e5ed0207811724a"},"headline":"Pla\u010da na\u010drtovalca proizvodnje na \u0160vedskem 2026","datePublished":"2023-10-26T12:56:47+00:00","dateModified":"2026-06-14T15:56:01+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/sl\/viri\/placa-nacrtovalca-proizvodnje-na-svedskem-2026\/"},"wordCount":1549,"publisher":{"@id":"https:\/\/skyplanner.ai\/sl\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/sl\/viri\/placa-nacrtovalca-proizvodnje-na-svedskem-2026\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/10\/Production-Planner-Sweden-scaled.jpg","articleSection":["Kariera in pla\u010de","viri"],"inLanguage":"sl-SI"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/sl\/viri\/placa-nacrtovalca-proizvodnje-na-svedskem-2026\/","url":"https:\/\/skyplanner.ai\/sl\/viri\/placa-nacrtovalca-proizvodnje-na-svedskem-2026\/","name":"Pla\u010da na\u010drtovalca proizvodnje na \u0160vedskem 2026 &#8211; SkyPlanner","isPartOf":{"@id":"https:\/\/skyplanner.ai\/sl\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/sl\/viri\/placa-nacrtovalca-proizvodnje-na-svedskem-2026\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/sl\/viri\/placa-nacrtovalca-proizvodnje-na-svedskem-2026\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/10\/Production-Planner-Sweden-scaled.jpg","datePublished":"2023-10-26T12:56:47+00:00","dateModified":"2026-06-14T15:56:01+00:00","description":"Povpre\u010dna pla\u010da na\u010drtovalca proizvodnje na \u0160vedskem zna\u0161a pribli\u017eno 444.981 SEK na leto, kar v letu 2026 pomeni pribli\u017eno 37.082 SEK mese\u010dno pred obdav\u010ditvijo.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/sl\/viri\/placa-nacrtovalca-proizvodnje-na-svedskem-2026\/#breadcrumb"},"inLanguage":"sl-SI","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/sl\/viri\/placa-nacrtovalca-proizvodnje-na-svedskem-2026\/"]}]},{"@type":"ImageObject","inLanguage":"sl-SI","@id":"https:\/\/skyplanner.ai\/sl\/viri\/placa-nacrtovalca-proizvodnje-na-svedskem-2026\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/10\/Production-Planner-Sweden-scaled.jpg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/10\/Production-Planner-Sweden-scaled.jpg","width":2560,"height":1707,"caption":"Production Planner Sweden"},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/sl\/viri\/placa-nacrtovalca-proizvodnje-na-svedskem-2026\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/sl\/"},{"@type":"ListItem","position":2,"name":"Pla\u010da na\u010drtovalca proizvodnje na \u0160vedskem 2026"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/sl\/#website","url":"https:\/\/skyplanner.ai\/sl\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/sl\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/sl\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"sl-SI"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/sl\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/sl\/","logo":{"@type":"ImageObject","inLanguage":"sl-SI","@id":"https:\/\/skyplanner.ai\/sl\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/sl\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]},{"@type":"Person","@id":"https:\/\/skyplanner.ai\/sl\/#\/schema\/person\/9122a7382a3a91f77e5ed0207811724a","name":"SkyPlanner","image":{"@type":"ImageObject","inLanguage":"sl-SI","@id":"https:\/\/secure.gravatar.com\/avatar\/b7d00e63bfb49c23e740cab317acbfb7287b7fa23d51b75e89a6659494daa9dd?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/b7d00e63bfb49c23e740cab317acbfb7287b7fa23d51b75e89a6659494daa9dd?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/b7d00e63bfb49c23e740cab317acbfb7287b7fa23d51b75e89a6659494daa9dd?s=96&d=mm&r=g","caption":"SkyPlanner"}}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/10\/Production-Planner-Sweden-scaled.jpg",2560,1707,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/10\/Production-Planner-Sweden-150x150.jpg",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/10\/Production-Planner-Sweden-300x200.jpg",300,200,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/10\/Production-Planner-Sweden-768x512.jpg",768,512,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/10\/Production-Planner-Sweden-1024x683.jpg",1024,683,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/10\/Production-Planner-Sweden-1536x1024.jpg",1536,1024,true],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/10\/Production-Planner-Sweden-2048x1365.jpg",2048,1365,true],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/10\/Production-Planner-Sweden-scaled.jpg",360,240,false]},"uagb_author_info":{"display_name":"SkyPlanner","author_link":"https:\/\/skyplanner.ai\/sl\/author\/bettina\/"},"uagb_comment_info":0,"uagb_excerpt":"Pla\u010da na\u010drtovalca proizvodnje na \u0160vedskem 2026 Domov &#8221; Viri &#8221; Pla\u010da na\u010drtovalca proizvodnje na \u0160vedskem 2026 Povpre\u010dna pla\u010da na\u010drtovalca proizvodnje na \u0160vedskem zna\u0161a pribli\u017eno 444.981 SEK na leto, kar v letu 2026 pomeni pribli\u017eno 37.082 SEK mese\u010dno pred obdav\u010ditvijo. Ta pla\u010da, ki odra\u017ea povpra\u0161evanje in pomembnost vloge v panogi, se lahko spreminja glede na ve\u010d&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/posts\/28319","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/users\/6"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/comments?post=28319"}],"version-history":[{"count":0,"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/posts\/28319\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/media\/28707"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/media?parent=28319"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/categories?post=28319"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/tags?post=28319"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}