{"id":113081,"date":"2026-10-30T01:32:22","date_gmt":"2026-10-30T01:32:22","guid":{"rendered":"https:\/\/skyplanner.ai\/?p=113081"},"modified":"2026-10-30T01:33:53","modified_gmt":"2026-10-30T01:33:53","slug":"vhodna-kontrola","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/sl\/viri\/vhodna-kontrola\/","title":{"rendered":"Vhodna kontrola: od prevzema do sprostitve v proizvodnjo"},"content":{"rendered":"<div class=\"gb-container gb-container-article01 article-main-content-container\">\n\n<h1 class=\"wp-block-heading\">Vhodna kontrola: od prevzema do sprostitve v proizvodnjo<\/h1>\n\n<div class=\"gb-container gb-container-article02\">\n\n<p><a href=\"\/sl\/\">Domov<\/a> &raquo; <a href=\"https:\/\/skyplanner.ai\/sl\/viri\/\">Viri<\/a> &raquo; Vhodna kontrola: od prevzema do sprostitve v proizvodnjo<\/p>\n\n\n<p class=\"yoast-reading-time__wrapper\"><span class=\"yoast-reading-time__icon\"><svg aria-hidden=\"true\" focusable=\"false\" data-icon=\"clock\" width=\"20\" height=\"20\" fill=\"none\" stroke=\"currentColor\" style=\"display:inline-block;vertical-align:-0.1em\" role=\"img\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewBox=\"0 0 24 24\"><path stroke-linecap=\"round\" stroke-linejoin=\"round\" stroke-width=\"2\" d=\"M12 8v4l3 3m6-3a9 9 0 11-18 0 9 9 0 0118 0z\"><\/path><\/svg><\/span><span class=\"yoast-reading-time__spacer\" style=\"display:inline-block;width:1em\"><\/span><span class=\"yoast-reading-time__descriptive-text\">Predviden \u010das branja: <\/span><span class=\"yoast-reading-time__reading-time\">10<\/span><span class=\"yoast-reading-time__time-unit\"> minut<\/span><\/p>\n\n<\/div>\n<div class=\"gb-container gb-container-article03\">\n\n<p><strong>Vhodna kontrola<\/strong> je preverjanje skladnosti nabavljenega materiala, delov ali komponent s predpisanimi zahtevami, preden se sprostijo za uporabo. Imenujemo jo tudi prevzemna kontrola. Povezuje tisto, kar je dobavitelj dobavil, s tistim, kar lahko tovarna varno uporabi v proizvodnji.<\/p>\n\n\n<p>V \u017eivahnem prevzemnem prostoru je ta razlika pomembna. Dobava je lahko \u017ee fizi\u010dno prispela, pre\u0161teta in evidentirana v zalogi, a \u0161e vedno \u010daka na kontrolo mer ali zahtevani certifikat. \u010ce jo proizvodnja \u017ee obravnava kot razpolo\u017eljiv material, lahko zaporedje operacij na naslednjem stroju \u017ee temelji na napa\u010dni predpostavki.<\/p>\n\n\n<p>U\u010dinkovit postopek vhodne kontrole se zato kon\u010da z jasno odlo\u010ditvijo: kateri material je spro\u0161\u010den, koliko ga je uporabnega in kaj ostaja zadr\u017eano. \u010ce to odlo\u010ditev vklju\u010dite v planiranje proizvodnje, se lahko na pomanjkanje odzovete, \u0161e preden povzro\u010di izmeno brez dela ali zamudo pri dobavi. SkyPlanner APS pomaga na podlagi posodobljenih podatkov o materialu pripraviti izvedljiv terminski plan, ki usklajuje potrebe naro\u010dil ter razpolo\u017eljive vire.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Kaj je treba preveriti pri vhodni kontroli?<\/h2>\n\n\n<p>Izhajajte iz zahtev za posamezni artikel, ne iz splo\u0161nega kontrolnega seznama, ki ga enako uporabljate za vse. Nabavljeni strojno obdelani del, elektronska komponenta in temperaturno ob\u010dutljiva surovina zahtevajo razli\u010dna dokazila.<\/p>\n\n\n<p>Za vsak prevzem dolo\u010dite ustrezna preverjanja:<\/p>\n\n\n<ul class=\"wp-block-list\"><li><strong>Identiteta:<\/strong> ustrezen dobavitelj, \u0161tevilka dela, revizija in kakovost materiala ter oznaka \u0161ar\u017ee, taline ali serijska \u0161tevilka, kadar je zahtevana.<\/li><li><strong>Koli\u010dina:<\/strong> primerjava dobavljene koli\u010dine in merskih enot z naro\u010dilnico in dobavno dokumentacijo.<\/li><li><strong>Stanje:<\/strong> po\u0161kodbe, onesna\u017eenost, nepo\u0161kodovanost embala\u017ee ter izpolnjevanje morebitnih predpisanih pogojev prevoza ali skladi\u0161\u010denja.<\/li><li><strong>Dokumentacija:<\/strong> zahtevani certifikati, poro\u010dila o preskusih ali druga dokazila, ki se nana\u0161ajo na dejansko prejeti material.<\/li><li><strong>Lastnosti izdelka:<\/strong> mere, videz, sestava, delovanje ali druge lastnosti, dolo\u010dene v kontrolnem planu.<\/li><\/ul>\n\n\n<p>Certifikat je uporaben le, \u010de se nana\u0161a na pravi material in vsebuje dokazila, ki jih zahtevate. Ujemajo\u010da se \u0161tevilka dela ne odpravi neskladja zaradi napa\u010dne revizije, nepo\u0161kodovana \u0161katla pa ne dokazuje, da je klju\u010dna mera znotraj tolerance.<\/p>\n\n\n<p>Vhodno kontrolo lo\u010dujte od <a href=\"https:\/\/skyplanner.ai\/sl\/viri\/pregled-prvega-kosa\/\">pregleda prvega kosa<\/a>. Vhodna kontrola obravnava prejeto dobavno \u0161ar\u017eo. Pri pregledu prvega kosa se preveri skladnost za\u010detnega proizvodnega kosa z veljavnimi zahtevami in pripravijo pripadajo\u010da dokazila. Odobritev prvega kosa sama po sebi \u0161e ne pomeni, da je sprejemljiva vsaka poznej\u0161a dobava.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Postopek vhodne kontrole v praksi<\/h2>\n\n\n<p>Naslednji potek dela povezuje prevzem, kakovost, nabavo in proizvodnjo v skupen postopek od prihoda materiala do uporabe. Odgovornosti dodelite jasno opredeljenim vlogam v svojem podjetju; v manj\u0161i tovarni lahko ista oseba opravlja ve\u010d vlog.<\/p>\n\n\n<h3 class=\"wp-block-heading\">1. Pripravite zahteve pred prihodom dobave<\/h3>\n\n\n<p>Izvajalcem zagotovite dostop do veljavne risbe ali specifikacije, nabavnih zahtev in navodil za kontrolo. Dolo\u010dite, kaj je treba preveriti, merila sprejemljivosti, metodo vzor\u010denja, kjer je ustrezna, in kdo lahko odobri sprostitev.<\/p>\n\n\n<p>Dolo\u010dite tudi, katera dokazila morajo prispeti s po\u0161iljko. \u010ce manjkajo\u010di certifikat materiala zahtevate \u0161ele, ko je stroj \u017ee rezerviran, povzro\u010dite zamudo, ki bi se ji lahko izognili. Nabava lahko dobavitelja s to zahtevo jasno seznani \u017ee pred odpremo.<\/p>\n\n\n<p>Obseg kontrole prilagodite posledicam napak, veljavnim zahtevam in uspe\u0161nosti dobavitelja. Zahtevane kontrole ne zmanj\u0161ujte zgolj zato, ker je dobava nujna. \u010ce je potrebno zunanje presku\u0161anje, pri predvidenem datumu razpolo\u017eljivosti upo\u0161tevajte tudi \u010das izvedbe preskusov. Ne predpostavljajte, da bo material na dan prevzema \u017ee na voljo za proizvodnjo.<\/p>\n\n\n<h3 class=\"wp-block-heading\">2. Prevzemite in ozna\u010dite material ter zagotovite nadzor nad njim<\/h3>\n\n\n<p>Evidentirajte prevzem ter preverite identiteto, koli\u010dino in vidne po\u0161kodbe zaradi prevoza. Ohranite povezavo med fizi\u010dnim materialom, dobaviteljevo \u0161ar\u017eo in pripadajo\u010do dokumentacijo. Nepreverjene dobave ne pome\u0161ajte s spro\u0161\u010deno zalogo tako, da jih ne bi bilo ve\u010d mogo\u010de razlikovati.<\/p>\n\n\n<p>Z namenskim prostorom za zadr\u017eani material, jasnimi oznakami statusa in ustreznimi sistemskimi omejitvami prepre\u010dite, da bi material, ki \u0161e \u010daka na odlo\u010ditev, izdali kot spro\u0161\u010deno zalogo. Tudi veliki kosi, ki jih ni mogo\u010de namestiti v ta prostor, morajo imeti nedvoumno ozna\u010den status.<\/p>\n\n\n<p>Prevzem potrjuje, kaj je prispelo. Sprostitev na podlagi kontrole kakovosti potrjuje, kaj se sme uporabiti. Dogodka si lahko \u010dasovno sledita zelo blizu, vendar morata ostati jasno lo\u010dena, \u010deprav oba vplivata na evidenco zalog.<\/p>\n\n\n<h3 class=\"wp-block-heading\">3. Izvedite kontrolo in zabele\u017eite rezultat<\/h3>\n\n\n<p>Predpisana preverjanja izvedite z ustrezno opremo in po veljavnih navodilih. Kjer so potrebne meritve, uporabite merilno opremo, katere ustreznost in status kalibracije izpolnjujeta zahteve va\u0161ega postopka zagotavljanja kakovosti.<\/p>\n\n\n<p>Zabele\u017eite dovolj dokazov, da boste odlo\u010ditev lahko utemeljili tudi pozneje: kaj je bilo pregledano, katera zahteva je veljala, rezultat, oznako materiala ter kdo je kontrolo izvedel in kdaj. Pri kontroli mer je dejanska izmerjena vrednost skupaj s pripadajo\u010do toleranco uporabnej\u0161a od kljukice brez pojasnila.<\/p>\n\n\n<p>\u010ce zahtevana dokazila manjkajo, to izrecno zabele\u017eite. Manjkajo\u010de poro\u010dilo in z meritvijo ugotovljena neskladnost sta razli\u010dni te\u017eavi, \u010deprav obe za zdaj prepre\u010dujeta sprostitev. To razlikovanje nabavi pomaga od dobavitelja pridobiti ustrezen odziv.<\/p>\n\n\n<h3 class=\"wp-block-heading\">4. Odlo\u010dite o nadaljnjem ravnanju s \u0161ar\u017eo<\/h3>\n\n\n<p>Poobla\u0161\u010dena oseba odlo\u010di, ali material izpolnjuje pogoje za sprostitev. Sprejeti material dobi jasno oznako, da je spro\u0161\u010den. Material, za katerega se \u0161e \u010dakajo dodatna dokazila, ostane zadr\u017ean; dolo\u010dita se odgovorna oseba in naslednji ukrep.<\/p>\n\n\n<p>Pri neskladnosti dolo\u010dite, kateri material je prizadet, zabele\u017eite odstopanje in prepre\u010dite nenamerno uporabo. Glede na odobreno odlo\u010ditev je lahko naslednji korak vra\u010dilo dobavitelju, zamenjava, sortiranje, dodelava ali zavrnitev. Vsaka uporaba z dovoljenim odstopanjem zahteva odobritev v skladu z veljavnim postopkom; proizvodni rok te odobritve ne nadomesti.<\/p>\n\n\n<p>Pri delni sprostitvi bodite natan\u010dni. \u010ce je mogo\u010de lo\u010deno ozna\u010deni del upravi\u010deno sprejeti, natan\u010dno zabele\u017eite koli\u010dino in oznake spro\u0161\u010denega materiala ter kaj ostaja zadr\u017eano. Dvoumna opomba za celotno dobavo ne sme postati dovoljenje za uporabo vseh vsebnikov.<\/p>\n\n\n<h3 class=\"wp-block-heading\">5. Posodobite razpolo\u017eljivost in proizvodni plan<\/h3>\n\n\n<p>Podatek o spro\u0161\u010deni koli\u010dini posredujte takoj. \u010ce material ostaja zadr\u017ean, planiranju sporo\u010dite \u010dim bolje utemeljen predvideni datum razpolo\u017eljivosti, nere\u0161eno vpra\u0161anje in kdo je odgovoren za naslednjo posodobitev. Dobaviteljeva obljuba, da bo odgovoril jutri, ni isto kot potrjena sprostitev jutri.<\/p>\n\n\n<p>Poleg evidence kakovosti posodobite tudi podatke za planiranje. Sicer je lahko material v skladi\u0161\u010du pravilno ozna\u010den kot zadr\u017ean, terminski plan pa \u0161e naprej predvideva njegovo porabo. Planiranje potrebuje <strong>uporabno koli\u010dino in zanesljiv podatek o \u010dasu razpolo\u017eljivosti<\/strong>, povezana z naro\u010dili, ki ta material potrebujejo.<\/p>\n\n\n<p>Nato preverite posledice za proizvodnjo. Katere operacije se lahko nadaljujejo? Za katere je potrebna nadomestna \u0161ar\u017ea? Ali lahko razpolo\u017eljive kapacitete med re\u0161evanjem te\u017eave izkoristite za drugo delo? Na tej to\u010dki kontrola ni ve\u010d le lo\u010dena naloga ob prevzemu, temve\u010d za\u010dne varovati dogovorjene dobavne roke.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Pregledati vsak kos ali uporabiti vzor\u010denje?<\/h2>\n\n\n<p>Enoten dele\u017e pregledanih kosov, ki bi ustrezal vsem vrstam vhodnega materiala, ne obstaja. Izbira je odvisna od zahtev, posledic sprejetja kosa z napako, kontrolne metode in razmer pri dobavitelju. Tudi poru\u0161itveni preskusi vplivajo na to, kaj je v praksi izvedljivo.<\/p>\n\n\n<p>Pri prevzemnem vzor\u010denju se na podlagi rezultatov naklju\u010dno izbranega vzorca odlo\u010di o dolo\u010deni \u0161ar\u017ei. To ne dokazuje, da je vsak posamezni kos ustrezen. Plan vzor\u010denja mora vnaprej dolo\u010dati velikost vzorca in pravila odlo\u010danja; vzorec ne sme biti le nekaj priro\u010dno pobranih kosov z vrha \u0161katle.<\/p>\n\n\n<p>\u010ce rezultat narekuje zavrnitev, sledite predpisanemu postopku odlo\u010danja o nadaljnjem ravnanju s \u0161ar\u017eo. Odstranitev kosov z napako, odkritih v vzorcu, \u0161e ne pomeni, da je nepregledani preostanek samodejno sprejemljiv. Dodatna kontrola ali sortiranje sta lahko del odobrenega ukrepanja, vendar zahtevata lo\u010deno odlo\u010ditev.<\/p>\n\n\n<p>Statisti\u010dno ozadje pojasnjuje <a href=\"https:\/\/www.itl.nist.gov\/div898\/handbook\/pmc\/section2\/pmc21.htm\">priro\u010dnik NIST o prevzemnem vzor\u010denju serij<\/a>, ki opisuje razliko med presojo serije in obvladovanjem dobaviteljevega procesa. Uporabite shemo vzor\u010denja, ki je zahtevana za va\u0161 primer uporabe; splo\u0161nega primera ne obravnavajte kot merila za prevzem.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Predaja podatkov o sprostitvi: kratek kontrolni seznam<\/h2>\n\n\n<p>Preden zaklju\u010dite vhodno kontrolo, poskrbite, da bo naslednji sodelavec lahko odgovoril na ta vpra\u0161anja brez dodatnega telefonskega klica:<\/p>\n\n\n<ul class=\"wp-block-list\"><li><strong>Za kateri material gre?<\/strong> Dobavitelj, artikel in revizija ter ustrezne oznake prevzema in serije.<\/li><li><strong>Kak\u0161na je bila odlo\u010ditev?<\/strong> Material je spro\u0161\u010den, \u0161e vedno zadr\u017ean ali zavrnjen; prilo\u017eena so dokazila o kontroli in odlo\u010ditev poobla\u0161\u010dene osebe.<\/li><li><strong>Koliko materiala se sme uporabiti?<\/strong> Natan\u010dna spro\u0161\u010dena koli\u010dina z mersko enoto, lo\u010deno od zadr\u017eane ali zavrnjene koli\u010dine.<\/li><li><strong>Kaj \u0161e ni re\u0161eno?<\/strong> Manjkajo\u010da dokazila, dodatna presku\u0161anja, odgovor dobavitelja ali odobrena korektivna dela, skupaj z odgovorno osebo in \u010dasom naslednje posodobitve.<\/li><li><strong>Katere informacije ima zdaj proizvodnja?<\/strong> Posodobljeni podatki o razpolo\u017eljivosti materiala za uporabo ter prizadete operacije ali obveznosti, ki jih je treba ponovno preveriti.<\/li><\/ul>\n\n\n<p>Redno pregledujte material, ki je \u017ee dlje \u010dasa zadr\u017ean. \u010ce za razre\u0161itev zadr\u017eanja ni dolo\u010dena odgovorna oseba, se lahko pri planiranju neopazno za\u010dne predpostavljati, da je material na voljo, zlasti \u010de je blago \u017ee ve\u010d dni v obratu. Informacije o ponavljajo\u010dih se napakah in pomanjkljivi dokumentaciji posredujte tudi odgovornim za upravljanje dobaviteljev, da se ista te\u017eava ne bi odkrivala znova ob vsaki dobavi.<\/p>\n\n\n<h2 class=\"wp-block-heading\">S sistemom SkyPlanner pretvorite podatke o spro\u0161\u010denem materialu v izvedljiv terminski plan<\/h2>\n\n\n<p>Predstavljajte si dobavo 1.000 komponent v dveh lo\u010deno ozna\u010denih podserijah. Za podserijo s 600 komponentami so vse zahtevane kontrole zaklju\u010dene, zato je spro\u0161\u010dena. Preostalih 400 komponent ostaja zadr\u017eanih, ker manjkajo zahtevana dokazila.<\/p>\n\n\n<p>Dva proizvodna naloga potrebujeta 400 oziroma 350 komponent. Spro\u0161\u010denih 600 komponent ne zado\u0161\u010da za oba naloga. \u010ce ima prvi nalog prednost, jih za drugega ostane 200, kar ne pokrije vseh njegovih potreb. \u010ce bi celotno dobavo \u0161teli kot uporabno, bi pomanjkanje ostalo skrito. Sprostitev 600 komponent \u0161e ne pomeni, da je na voljo tudi preostalih 400.<\/p>\n\n\n<p>Tudi ko razre\u0161ite dodelitev materiala, lahko oba naloga potrebujeta isto monta\u017eno postajo in pozneje \u0161e zmogljivosti za presku\u0161anje. Premik ene operacije spremeni razpolo\u017eljive termine za drugo delo. Seznam prevzetega materiala lahko prikazuje pravilen status materiala, ne pove pa, kako je zdaj mogo\u010de med seboj uskladiti vse te operacije.<\/p>\n\n\n<p><strong>SkyPlanner APS v istem izra\u010dunu terminiranja upo\u0161teva <a href=\"https:\/\/skyplanner.ai\/sl\/viri\/kaj-je-terminiranje-proizvodnje\/\">razpolo\u017eljivost materiala in proizvodne zmogljivosti<\/a>.<\/strong> Ko je omogo\u010deno terminiranje z upo\u0161tevanjem materiala, njegov pogon na osnovi umetne inteligence Arcturus poleg delovnih mest, izmen, odvisnosti med operacijami in va\u0161ih prednostnih meril upo\u0161teva tudi a\u017eurne podatke o koli\u010dinah materiala. Ganttov diagram prikazuje izra\u010dunano zaporedje dela in datume zaklju\u010dka. Tako porabite manj \u010dasa za usklajevanje seznama materiala z lo\u010denimi \u010dakalnimi vrstami na strojih in ve\u010d \u010dasa za odlo\u010danje o tem, kako za\u0161\u010dititi izvedbo pomembnih dobav.<\/p>\n\n\n<p>SkyPlanner se prek odprtega vmesnika REST API povezuje s katerim koli sistemom ERP ali MES. Stanje zalog materiala lahko posodabljate prek integracije ali ga vodite s knji\u017eenjem skladi\u0161\u010dnih premikov v skladi\u0161\u010dnem modulu SkyPlanner. Med uvedbo se dogovorite, kako se bodo odlo\u010ditve slu\u017ebe kakovosti prenesle v podatke o razpolo\u017eljivosti materiala za planiranje, tudi pri delnih sprostitvah in spremenjenih pri\u010dakovanjih glede zadr\u017eanega materiala.<\/p>\n\n\n<p>Ta prenos podatkov je pomemben, saj potrditev prihoda blaga ni potrditev njegove kakovostne ustreznosti. V sistemu SkyPlanner datum dobave nabavnega naloga pomeni pri\u010dakovano razpolo\u017eljivost, oznaka Dobavljeno pa posodobi zalogo. Poskrbite, da bo dogovorjeni tok podatkov odra\u017eal, kaj proizvodnja dejansko sme uporabiti; kontrola in odlo\u010ditev o sprostitvi sta del va\u0161ega procesa zagotavljanja kakovosti.<\/p>\n\n\n<p>Delate lahko tudi prek svojega pomo\u010dnika z umetno inteligenco, kot so Claude, ChatGPT ali Microsoft Copilot. Povezava MCP omogo\u010da poobla\u0161\u010denemu pomo\u010dniku dostop do podatkov, znanja o izdelku in funkcij sistema SkyPlanner. Tako mu lahko pojasnite nalogo planiranja, namesto da bi morali podatke o njej znova sestavljati na razli\u010dnih zaslonih. Vpra\u0161ate ga lahko na primer, kateri nalogi so odvisni od zadr\u017eane komponente, nato pa vam pomo\u010dnik v okviru va\u0161ih dovoljenj pomaga uporabiti funkcije sistema SkyPlanner za posodobitev plana. Arcturus izvede izra\u010dun terminiranja, vi pa dolo\u010dite prednostne naloge. Pomo\u010dnik ne nadome\u0161\u010da odlo\u010ditve poobla\u0161\u010dene osebe o sprostitvi materiala.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Zakaj se spla\u010da preiti na skupni plan<\/h3>\n\n\n<p>Pri proizvajalcu elektri\u010dne opreme UTU je planiranje proizvodnje neko\u010d temeljilo na lo\u010denih preglednicah posameznih oddelkov. Spremembe proizvodnega zaporedja v sistemu ERP niso vedno pri\u0161le do proizvodnje. SkyPlanner je proizvodne linije in oddelke zdru\u017eil v enoten sistem za planiranje, povezan z njihovim sistemom ERP. V podjetju UTU poro\u010dajo, da posodobljeno zaporedje dela dose\u017ee monterje v nekaj sekundah.<\/p>\n\n\n<p><a href=\"https:\/\/skyplanner.ai\/sl\/zgodbe-strank\/utu\/\">Izku\u0161nja podjetja UTU s sistemom SkyPlanner<\/a> ka\u017ee, kaj prinese prehod z lo\u010deno vzdr\u017eevanih planov na skupni plan. Isto na\u010delo je koristno tudi za ekipo, ki skrbi za vhodni material: ko se razpolo\u017eljivost spremeni, mora biti sprememba vidna v proizvodnem zaporedju tam, kjer se delo dejansko dodeljuje.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Preverite, kako zadr\u017eanje materiala vpliva na va\u0161e naloge<\/h2>\n\n\n<p>Dobro urejen proces vhodne kontrole zagotavlja odlo\u010ditev, ki ji lahko zaupate. SkyPlanner omogo\u010da, da jo uporabite pri terminiranju: katere operacije se lahko izvajajo, kam jih je mogo\u010de umestiti in kaj posodobljeni plan pomeni za dobavo.<\/p>\n\n\n<p><a href=\"https:\/\/skyplanner.ai\/sl\/kontaktna-prodaja\/\">Rezervirajte predstavitev sistema SkyPlanner<\/a> in pripravite dejanski primer vhodne komponente, njeno spro\u0161\u010deno ali pri\u010dakovano uporabno koli\u010dino ter naloge, ki konkurirajo za to koli\u010dino. Na tem primeru razi\u0161\u010dite, kako razpolo\u017eljivost materiala in omejene kapacitete skupaj spreminjajo plan.<\/p>\n\n\n<p>\u010ce \u017eelite sistem najprej raziskati sami, <a href=\"https:\/\/skyplanner.ai\/sl\/preizkus\/\">preizkusite SkyPlanner s predstavitvenimi podatki<\/a> ali uporabite vodeni za\u010detek dela s podporo umetne inteligence v pomo\u010dniku SkyPlanner Assistant. Tako lahko spoznate delovanje terminiranja, \u0161e preden opredelite, kako se bodo rezultati va\u0161e vhodne kontrole prenesli v podatke o razpolo\u017eljivosti materiala.<\/p>\n\n<\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>Vhodna kontrola: od prevzema do sprostitve v proizvodnjo Domov &raquo; Viri &raquo; Vhodna kontrola: od prevzema do sprostitve v proizvodnjo Vhodna kontrola je preverjanje skladnosti nabavljenega materiala, delov ali komponent s predpisanimi zahtevami, preden se sprostijo za uporabo. Imenujemo jo tudi prevzemna kontrola. Povezuje tisto, kar je dobavitelj dobavil, s tistim, kar lahko tovarna varno &#8230; <a title=\"Vhodna kontrola: od prevzema do sprostitve v proizvodnjo\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/sl\/viri\/vhodna-kontrola\/\" aria-label=\"Read more about Vhodna kontrola: od prevzema do sprostitve v proizvodnjo\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":113099,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[2539,302],"tags":[],"class_list":["post-113081","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-aps-in-terminiranje","category-viri","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Vhodna kontrola: od prevzema do sprostitve v proizvodnjo<\/title>\n<meta name=\"description\" content=\"Prevzeto \u0161e ni pripravljeno za uporabo. Vzpostavite vhodno kontrolo, ki obvladuje spro\u0161\u010danje materiala in proizvodnji zagotavlja izvedljiv terminski plan.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/sl\/viri\/vhodna-kontrola\/\" \/>\n<meta property=\"og:locale\" content=\"sl_SI\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Vhodna kontrola: od prevzema do sprostitve v proizvodnjo\" \/>\n<meta property=\"og:description\" content=\"Prevzeto \u0161e ni pripravljeno za uporabo. Vzpostavite vhodno kontrolo, ki obvladuje spro\u0161\u010danje materiala in proizvodnji zagotavlja izvedljiv terminski plan.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/sl\/viri\/vhodna-kontrola\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2026-10-30T01:32:22+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-30T01:33:53+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/incoming-inspection-manufacturing-hero.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1672\" \/>\n\t<meta property=\"og:image:height\" content=\"941\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"11 minut\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/vhodna-kontrola\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/vhodna-kontrola\\\/\"},\"author\":{\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\"},\"headline\":\"Vhodna kontrola: od prevzema do sprostitve v proizvodnjo\",\"datePublished\":\"2026-10-30T01:32:22+00:00\",\"dateModified\":\"2026-10-30T01:33:53+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/vhodna-kontrola\\\/\"},\"wordCount\":2290,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/vhodna-kontrola\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/incoming-inspection-manufacturing-hero.png\",\"articleSection\":[\"APS in terminiranje\",\"viri\"],\"inLanguage\":\"sl-SI\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/vhodna-kontrola\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/vhodna-kontrola\\\/\",\"name\":\"Vhodna kontrola: od prevzema do sprostitve v proizvodnjo\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/vhodna-kontrola\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/vhodna-kontrola\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/incoming-inspection-manufacturing-hero.png\",\"datePublished\":\"2026-10-30T01:32:22+00:00\",\"dateModified\":\"2026-10-30T01:33:53+00:00\",\"description\":\"Prevzeto \u0161e ni pripravljeno za uporabo. Vzpostavite vhodno kontrolo, ki obvladuje spro\u0161\u010danje materiala in proizvodnji zagotavlja izvedljiv terminski plan.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/vhodna-kontrola\\\/#breadcrumb\"},\"inLanguage\":\"sl-SI\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/vhodna-kontrola\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"sl-SI\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/vhodna-kontrola\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/incoming-inspection-manufacturing-hero.png\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/incoming-inspection-manufacturing-hero.png\",\"width\":1672,\"height\":941,\"caption\":\"Incoming brackets under a magnifier, with separate trays, an amber divider and a path to a workstation.\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/vhodna-kontrola\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Vhodna kontrola: od prevzema do sprostitve v proizvodnjo\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"sl-SI\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"sl-SI\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\",\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"sl-SI\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"caption\":\"Jussi M\u00e4ntyl\u00e4\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Vhodna kontrola: od prevzema do sprostitve v proizvodnjo","description":"Prevzeto \u0161e ni pripravljeno za uporabo. Vzpostavite vhodno kontrolo, ki obvladuje spro\u0161\u010danje materiala in proizvodnji zagotavlja izvedljiv terminski plan.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/sl\/viri\/vhodna-kontrola\/","og_locale":"sl_SI","og_type":"article","og_title":"Vhodna kontrola: od prevzema do sprostitve v proizvodnjo","og_description":"Prevzeto \u0161e ni pripravljeno za uporabo. Vzpostavite vhodno kontrolo, ki obvladuje spro\u0161\u010danje materiala in proizvodnji zagotavlja izvedljiv terminski plan.","og_url":"https:\/\/skyplanner.ai\/sl\/viri\/vhodna-kontrola\/","og_site_name":"SkyPlanner","article_published_time":"2026-10-30T01:32:22+00:00","article_modified_time":"2026-10-30T01:33:53+00:00","og_image":[{"width":1672,"height":941,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/incoming-inspection-manufacturing-hero.png","type":"image\/png"}],"author":"Jussi M\u00e4ntyl\u00e4","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Jussi M\u00e4ntyl\u00e4","Est. reading time":"11 minut"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/sl\/viri\/vhodna-kontrola\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/sl\/viri\/vhodna-kontrola\/"},"author":{"name":"Jussi M\u00e4ntyl\u00e4","@id":"https:\/\/skyplanner.ai\/sl\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5"},"headline":"Vhodna kontrola: od prevzema do sprostitve v proizvodnjo","datePublished":"2026-10-30T01:32:22+00:00","dateModified":"2026-10-30T01:33:53+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/sl\/viri\/vhodna-kontrola\/"},"wordCount":2290,"publisher":{"@id":"https:\/\/skyplanner.ai\/sl\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/sl\/viri\/vhodna-kontrola\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/incoming-inspection-manufacturing-hero.png","articleSection":["APS in terminiranje","viri"],"inLanguage":"sl-SI"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/sl\/viri\/vhodna-kontrola\/","url":"https:\/\/skyplanner.ai\/sl\/viri\/vhodna-kontrola\/","name":"Vhodna kontrola: od prevzema do sprostitve v proizvodnjo","isPartOf":{"@id":"https:\/\/skyplanner.ai\/sl\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/sl\/viri\/vhodna-kontrola\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/sl\/viri\/vhodna-kontrola\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/incoming-inspection-manufacturing-hero.png","datePublished":"2026-10-30T01:32:22+00:00","dateModified":"2026-10-30T01:33:53+00:00","description":"Prevzeto \u0161e ni pripravljeno za uporabo. Vzpostavite vhodno kontrolo, ki obvladuje spro\u0161\u010danje materiala in proizvodnji zagotavlja izvedljiv terminski plan.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/sl\/viri\/vhodna-kontrola\/#breadcrumb"},"inLanguage":"sl-SI","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/sl\/viri\/vhodna-kontrola\/"]}]},{"@type":"ImageObject","inLanguage":"sl-SI","@id":"https:\/\/skyplanner.ai\/sl\/viri\/vhodna-kontrola\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/incoming-inspection-manufacturing-hero.png","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/incoming-inspection-manufacturing-hero.png","width":1672,"height":941,"caption":"Incoming brackets under a magnifier, with separate trays, an amber divider and a path to a workstation."},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/sl\/viri\/vhodna-kontrola\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/sl\/"},{"@type":"ListItem","position":2,"name":"Vhodna kontrola: od prevzema do sprostitve v proizvodnjo"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/sl\/#website","url":"https:\/\/skyplanner.ai\/sl\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/sl\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/sl\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"sl-SI"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/sl\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/sl\/","logo":{"@type":"ImageObject","inLanguage":"sl-SI","@id":"https:\/\/skyplanner.ai\/sl\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/sl\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]},{"@type":"Person","@id":"https:\/\/skyplanner.ai\/sl\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5","name":"Jussi M\u00e4ntyl\u00e4","image":{"@type":"ImageObject","inLanguage":"sl-SI","@id":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","caption":"Jussi M\u00e4ntyl\u00e4"}}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/incoming-inspection-manufacturing-hero.png",1672,941,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/incoming-inspection-manufacturing-hero-150x150.png",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/incoming-inspection-manufacturing-hero-300x169.png",300,169,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/incoming-inspection-manufacturing-hero-768x432.png",768,432,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/incoming-inspection-manufacturing-hero-1024x576.png",1024,576,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/incoming-inspection-manufacturing-hero-1536x864.png",1536,864,true],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/incoming-inspection-manufacturing-hero.png",1672,941,false],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/incoming-inspection-manufacturing-hero-360x203.png",360,203,true]},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/sl\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Vhodna kontrola: od prevzema do sprostitve v proizvodnjo Domov &raquo; Viri &raquo; Vhodna kontrola: od prevzema do sprostitve v proizvodnjo Vhodna kontrola je preverjanje skladnosti nabavljenega materiala, delov ali komponent s predpisanimi zahtevami, preden se sprostijo za uporabo. Imenujemo jo tudi prevzemna kontrola. Povezuje tisto, kar je dobavitelj dobavil, s tistim, kar lahko tovarna varno&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/posts\/113081","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/comments?post=113081"}],"version-history":[{"count":1,"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/posts\/113081\/revisions"}],"predecessor-version":[{"id":113144,"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/posts\/113081\/revisions\/113144"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/media\/113099"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/media?parent=113081"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/categories?post=113081"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/tags?post=113081"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}