{"id":112568,"date":"2026-10-29T11:53:40","date_gmt":"2026-10-29T11:53:40","guid":{"rendered":"https:\/\/skyplanner.ai\/?p=112568"},"modified":"2026-10-29T12:26:00","modified_gmt":"2026-10-29T12:26:00","slug":"zaporedje-montaze-mesanih-modelov","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/sl\/viri\/zaporedje-montaze-mesanih-modelov\/","title":{"rendered":"Zaporedje monta\u017ee me\u0161anih modelov: izberite pravi vrstni red"},"content":{"rendered":"<div class=\"gb-container gb-container-article01 article-main-content-container\">\n\n<h1 class=\"wp-block-heading\">Zaporedje monta\u017ee me\u0161anih modelov: izberite pravi vrstni red<\/h1>\n\n<div class=\"gb-container gb-container-article02\">\n\n<p><a href=\"\/sl\/\">Domov<\/a> &raquo; <a href=\"https:\/\/skyplanner.ai\/sl\/viri\/\">Viri<\/a> &raquo; Zaporedje monta\u017ee me\u0161anih modelov: izberite pravi vrstni red<\/p>\n\n\n<p class=\"yoast-reading-time__wrapper\"><span class=\"yoast-reading-time__icon\"><svg aria-hidden=\"true\" focusable=\"false\" data-icon=\"clock\" width=\"20\" height=\"20\" fill=\"none\" stroke=\"currentColor\" style=\"display:inline-block;vertical-align:-0.1em\" role=\"img\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewBox=\"0 0 24 24\"><path stroke-linecap=\"round\" stroke-linejoin=\"round\" stroke-width=\"2\" d=\"M12 8v4l3 3m6-3a9 9 0 11-18 0 9 9 0 0118 0z\"><\/path><\/svg><\/span><span class=\"yoast-reading-time__spacer\" style=\"display:inline-block;width:1em\"><\/span><span class=\"yoast-reading-time__descriptive-text\">Predviden \u010das branja: <\/span><span class=\"yoast-reading-time__reading-time\">10<\/span><span class=\"yoast-reading-time__time-unit\"> minut<\/span><\/p>\n\n<\/div>\n<div class=\"gb-container gb-container-article03\">\n\n<p>V izmeni je predvideno pravo \u0161tevilo kosov vsakega modela, vendar se linija nenehno ustavlja. Zaporedoma prispejo trije kosi z veliko dela pri o\u017ei\u010denju. Delavec za\u010dne zaostajati, manj zahtevni kosi, ob katerih bi lahko nadomestil zaostanek, pa so na vrsti \u0161ele pozneje.<\/p>\n\n\n<p>Dnevna sestava modelov je prava. Vrstni red ni.<\/p>\n\n\n<p>Dolo\u010danje zaporedja monta\u017ee me\u0161anih modelov pomeni izbiro vrstnega reda, v katerem razli\u010dne izvedbe izdelka vstopajo na monta\u017eno linijo, tako da postaje zmorejo opraviti razli\u010den obseg dela. Dobro zaporedje ni le enakomerna razporeditev modelov: vsaki postaji z omejeno zmogljivostjo mora zagotoviti fizi\u010dno izvedljivo izmenjavanje obremenitev in \u010dasa za odpravo zaostanka.<\/p>\n\n\n<p>To zaporedje je nato treba umestiti v \u0161ir\u0161i plan proizvodnje. SkyPlanner APS zdru\u017euje operacije za posamezne izvedbe, razpolo\u017eljivost materiala in skupne vire v enoten <a href=\"https:\/\/skyplanner.ai\/sl\/viri\/kaj-je-terminiranje-proizvodnje\/\">terminski plan proizvodnje<\/a>. S tem zmanj\u0161a ro\u010dno usklajevanje monta\u017enega seznama z lo\u010denimi \u010dakalnimi vrstami za preizku\u0161anje in delo na delovnih centrih.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Uravnote\u017eena sestava modelov \u0161e ne pomeni izvedljivega zaporedja<\/h2>\n\n\n<p><a href=\"https:\/\/skyplanner.ai\/sl\/viri\/heijunka\/\">Izravnavanje proizvodnje<\/a> oziroma heijunka izravnava koli\u010dine in sestavo modelov v dolo\u010denem obdobju. Pri <a href=\"https:\/\/skyplanner.ai\/sl\/viri\/uravnotezenje-proizvodne-linije\/\">uravnote\u017eenju proizvodne linije<\/a> se posamezni delovni elementi razporedijo med postaje. Pri dolo\u010danju zaporedja monta\u017ee me\u0161anih modelov pa izberemo dejanski vrstni red kosov, ki bodo \u0161li skozi tako urejeno linijo.<\/p>\n\n\n<p>Te odlo\u010ditve se medsebojno podpirajo, vendar odgovarjajo na razli\u010dna vpra\u0161anja. \u010ce v vsaki izmeni izdelamo zahtevano sestavo modelov, to \u0161e ne pove, ali si dva zahtevna kosa lahko sledita neposredno. Sprejemljiv povpre\u010dni \u010das na postaji tudi ne poka\u017ee, kolik\u0161en zaostanek se na njej nabere, preden prispe manj zahteven kos.<\/p>\n\n\n<p>Ta razlika je pomembna, saj je zahtevnost odvisna od postaje. Izvedba z dodatnim o\u017ei\u010denjem je lahko zahtevna pri monta\u017ei, preizku\u0161anje pa je hitro. Drugo je morda preprosto sestaviti, vendar potrebuje dalj\u0161i preizkus. Izmenjavanje modelov pomaga le, \u010de se njihove dejanske obremenitve na postajah dopolnjujejo.<\/p>\n\n\n<p>Izhajajte iz obsega dela za vsak model na vsaki postaji, ne iz ene same ocene zahtevnosti celotnega izdelka.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Ugotovite, kak\u0161no obremenitev posamezna postaja dejansko zmore<\/h2>\n\n\n<p>Za vsako obravnavano izvedbo zabele\u017eite potrebno delo na vsaki postaji z omejeno zmogljivostjo. Vklju\u010dite obi\u010dajno ravnanje z izdelkom in preverjanja, delo zaradi dodatne opreme ter priprave, ki so odvisne od predhodnega modela. Lo\u010dite \u010das samostojnega delovanja stroja od dela, pri katerem je delavec zaseden, saj njuno prekrivanje vpliva na potrebno zmogljivost.<\/p>\n\n\n<p>Uporabite reprezentativne \u010dase za opredeljeno metodo dela. Najhitrej\u0161i opa\u017eeni cikel je slaba podlaga za zaporedje, ki ga mora ekipa ponavljati ves dan.<\/p>\n\n\n<p>Nato dolo\u010dite na\u010drtovani interval med prihodi kosov na postajo. Ta interval je \u010das, ki je na voljo pri preverjanju zaporedja. Takt glede na povpra\u0161evanje kupcev izra\u017ea zahtevani tempo proizvodnje; pri intervalu, s katerim nameravate dejansko delati, pa morate upo\u0161tevati tudi proizvodne izgube in rezervo za odpravo zaostankov, ki jo potrebuje va\u0161a linija.<\/p>\n\n\n<p>Nazadnje se dogovorite, kaj se zgodi, kadar kos zahteva ve\u010d \u010dasa, kot ga dopu\u0161\u010da ta interval:<\/p>\n\n\n<ul class=\"wp-block-list\"><li>Na liniji s togo dolo\u010denimi intervali pomika mora biti delo morda kon\u010dano pred naslednjim pomikom. Manj zahteven kos pozneje ne more popraviti \u017ee zamujenega pomika.<\/li><li>Na neprekinjeno premikajo\u010di se liniji ima lahko delavec odobreno delovno obmo\u010dje, znotraj katerega se delo lahko nadaljuje prek enega nazivnega intervala. \u0160e vedno pa veljajo omejitve glede dostopa, hoje, medsebojnega oviranja in izhoda kosa s postaje.<\/li><li>Na liniji z vmesnimi zalogami in manj togo povezanimi postajami se lahko pred postajo za\u010dasno nabere \u010dakalna vrsta, postaja pa nato nadomesti zaostanek. Preverite tako \u010dakalno vrsto pred njo kot tveganje, da bodo sosednje postaje ostale brez dela ali bile blokirane.<\/li><\/ul>\n\n\n<p>Upo\u0161tevajte le \u010das za odpravo zaostanka, ki ga fizi\u010dni proces dejansko dopu\u0161\u010da. To ne pomeni, da smete izpustiti preverjanje, predpostaviti hitrej\u0161e delo delavca ali si izposoditi nekoga, ki je \u017ee razporejen drugam.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Primer: enaka sestava modelov, zelo razli\u010dne koni\u010dne obremenitve<\/h2>\n\n\n<p>Predstavljajte si linijo, na katero vsakih 60 sekund vstopi en kos. Izdela po tri kose izvedb A in B. Za dve postaji veljajo naslednji poenostavljeni \u010dasi dela:<\/p>\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Izvedba<\/th><th>Postaja 1<\/th><th>Postaja 2<\/th><\/tr><\/thead><tbody><tr><td>A<\/td><td>78 sekund<\/td><td>42 sekund<\/td><\/tr><tr><td>B<\/td><td>42 sekund<\/td><td>78 sekund<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>Pri tej sestavi modelov zna\u0161a povpre\u010dni \u010das na vsaki postaji 60 sekund na kos. Ekipa primerja dva vrstna reda: <strong>A A A B B B<\/strong> in <strong>A B A B A B<\/strong>.<\/p>\n\n\n<p>Za ta prikaz predpostavimo, da ima vsaka postaja svojega delavca, da vrstni red kosov ostaja nespremenjen in da fizi\u010dna ureditev dopu\u0161\u010da prenos omejenega obsega dela v naslednji interval. \u010casi so stalni, brez dodatnih priprav ali prekinitev. Preverjamo le obremenitev posameznih postaj, ne simuliramo celotne linije.<\/p>\n\n\n<p>Ob vsakem naslednjem prihodu spremljajte, koliko nedokon\u010danega dela ostane:<\/p>\n\n\n<p><strong>Naslednji zaostanek = ve\u010dja izmed dveh vrednosti: 0 in (prej\u0161nji zaostanek + \u010das dela za ta kos \u2212 interval med prihodi).<\/strong><\/p>\n\n\n<p>Za\u010dnite z \u017ee obstoje\u010dim nedokon\u010danim delom, ne samodejno z ni\u010dlo. Negativnega salda nikoli ne prena\u0161ajte naprej kot dobroimetje: prostega \u010dasa pred prihodom kosa ni mogo\u010de uporabiti za monta\u017eo tega prihodnjega kosa.<\/p>\n\n\n<p>\u010ce postaja 1 za\u010dne brez zaostanka, pri skupinskem vrstnem redu po posameznih intervalih ostane <strong>18, 36, 54, 36, 18 in 0 sekund<\/strong> nedokon\u010danega dela. Pri izmeni\u010dnem vrstnem redu ostane <strong>18, 0, 18, 0, 18 in 0 sekund<\/strong>.<\/p>\n\n\n<p>Povpre\u010dje se ni spremenilo, najve\u010dji zaostanek pa se je:<\/p>\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Predlagani vrstni red<\/th><th>Najve\u010dji zaostanek na postaji 1<\/th><th>Najve\u010dji zaostanek na postaji 2<\/th><\/tr><\/thead><tbody><tr><td>A A A B B B<\/td><td>54 sekund<\/td><td>54 sekund<\/td><\/tr><tr><td>A B A B A B<\/td><td>18 sekund<\/td><td>18 sekund<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>Predpostavimo, da je ekipa v dejanskih fizi\u010dnih razmerah potrdila najve\u010dji dovoljeni zaostanek 24 sekund na vsaki postaji. Skupinski vrstni red to mejo prese\u017ee, izmeni\u010dni pa ob navedenih predpostavkah ostane znotraj nje. Dovoljenih 24 sekund je izmi\u0161ljena lastnost tega primera, ne priporo\u010dena rezerva za druge linije.<\/p>\n\n\n<p>Postaja 2 poka\u017ee tudi, zakaj je pomemben konec zaporedja. \u010ce za\u010dne brez zaostanka, pri izmeni\u010dnem vrstnem redu po zadnjem intervalu za B ostane \u0161e 18 sekund nedokon\u010danega dela. \u010ce se vzorec ponovi, naslednji A zagotovi dovolj prostega \u010dasa za odpravo zaostanka. \u010ce se proizvodnja tam kon\u010da, je za dokon\u010danje preostalega dela \u0161e vedno potreben \u010das. Konec izmene ga ne izbri\u0161e.<\/p>\n\n\n<p>Povpre\u010dna obremenitev obeh postaj je natanko enaka intervalu med prihodi, zato v tem primeru ni povpre\u010dne rezerve zmogljivosti za motnje. Izmeni\u010dni vzorec je ob nespremenljivih \u010dasih bolj\u0161a izbira, ni pa dokaz, da bo tempo proizvodnje vzdr\u017een tudi ob motnjah. Preden ga uvedete, na liniji preverite dejanska nihanja, pomike kosov in mo\u017enosti za odpravo zaostankov.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Pri izbiri zaporedja preverite vsako postajo z omejeno zmogljivostjo<\/h2>\n\n\n<p>Pri preverjanju vseh postaj uporabite isti seznam kosov v istem vrstnem redu. Za vsako postajo primerjajte najve\u010dji nabrani zaostanek z dovoljeno mejo in potrdite, da ga odpravlja dovolj pogosto za nadaljevanje dela. Upo\u0161tevajte nedokon\u010dano delo iz predhodnega proizvodnega obdobja in prehod med ponovitvami vzorca.<\/p>\n\n\n<p>Pri izbiri zaporedja je uporaben naslednji postopek:<\/p>\n\n\n<p>1. <strong>Zahtevane koli\u010dine in dogovorjeni roki naj ostanejo jasno vidni.<\/strong> Poteka obremenitve ne izbolj\u0161ujte tako, da neopazno izlo\u010dite zahtevne enote ali naro\u010dilo kupca prestavite izven dogovorjenega dobavnega obdobja.<\/p>\n\n\n<p>2. <strong>Ugotovite, kateri vzorci zaporedja najbolj obremenjujejo posamezne postaje.<\/strong> I\u0161\u010dite zaporedne enote z dodatno opremo, ki zahteva veliko dela, ne le zaporednih enakih oznak modelov. Razli\u010dne izvedbe imajo lahko enako zahtevno dodatno opremo.<\/p>\n\n\n<p>3. <strong>Kjer je treba odpraviti nakopi\u010deno nedokon\u010dano delo, vstavite enote, ki dejansko zahtevajo manj dela.<\/strong> Po vsaki spremembi znova preverite vse prizadete postaje. Izbolj\u0161anje pri o\u017ei\u010denju lahko ustvari nesprejemljivo zaporedje na preizkusni postaji.<\/p>\n\n\n<p>4. <strong>Izvedljiva zaporedja primerjajte \u0161e po preostalih stro\u0161kih.<\/strong> Upo\u0161tevajte priprave, dostavo in razporeditev komponent ob liniji ter dobavne roke. Najmanj menjav ni najbolj\u0161i rezultat, \u010de zaradi tega prihaja do ponavljajo\u010dih se ustavitev linije.<\/p>\n\n\n<p>5. <strong>Izbrano zaporedje preverite v reprezentativnih razmerah.<\/strong> Skupaj z ljudmi, ki delajo na liniji, preverite standardizirano delo, kakovost, ergonomijo in dejansko razpolo\u017eljiv prostor za dokon\u010danje nakopi\u010denega dela.<\/p>\n\n\n<p>\u010ce uporabljate pravilo za posamezen element dodatne opreme, ga jasno opredelite. \u00bbNajve\u010d dve enoti s tem elementom dodatne opreme v katerih koli \u0161tirih zaporednih enotah\u00ab je pravilo drse\u010dega okna, ne dnevni odstotek. Preverite prekrivajo\u010da se okna in prehode med seznami. Tak\u0161no pravilo je lahko koristna omejitev pri izvedbi, vendar mora izhajati iz dokazane zmo\u017enosti postaje, da odpravi nakopi\u010deno nedokon\u010dano delo, ne pa nadomestiti razumevanja te zmo\u017enosti.<\/p>\n\n\n<p>\u010ce povpre\u010dna obremenitev pri zahtevanem razmerju modelov \u017ee presega razpolo\u017eljivi \u010das postaje, s spreminjanjem zaporedja enot ne boste ustvarili manjkajo\u010dih zmogljivosti. Izbolj\u0161ajte na\u010din dela, prerazporedite delo, kjer je to mogo\u010de, zagotovite dodatne zmogljivosti, \u010de je to upravi\u010deno, ali spremenite tempo proizvodnje in dogovorjene obveznosti. Z dolo\u010danjem zaporedja obvladujete nihanje obremenitve; dela s tem ne odpravite.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Uskladite plan izvedb s preostalo proizvodnjo<\/h2>\n\n\n<p>Zaporedje, ki je za posamezno linijo sprejemljivo, je lahko \u0161e vedno neizvedljivo, \u010de ni potrebnih delov ali \u010de je skupna preizkusna naprava zasedena z drugim naro\u010dilom. \u010ce te pogoje vodite na lo\u010denih seznamih, morate ob vsaki spremembi razmerja modelov ali dobave znova opraviti enako usklajevanje.<\/p>\n\n\n<p>Tu priporo\u010damo SkyPlanner. Za posamezne izvedbe dolo\u010dite dejanske korake procesa, njihovo trajanje, ustrezne delovne centre in odvisnosti, namesto da terminirate povpre\u010den izdelek, ki prikrije dodatno delo. Arcturus, umetna inteligenca za terminiranje v sistemu SkyPlanner, te operacije razporedi glede na nastavljene izmene, zmogljivosti in prioritete, ki jih dolo\u010di planer. Ganttov diagram prikazuje tako razporejeno delo po posameznih virih.<\/p>\n\n\n<p>Pri skupni preizkusni postaji to pomeni, da dejansko preizkusno operacijo posamezne izvedbe terminirate skupaj z drugimi naro\u010dili, ki potrebujejo isto opremo. Tako monta\u017ei ne obljubite enega termina za preizkusno napravo, medtem ko drug oddelek v svoji \u010dakalni vrsti obljubi nezdru\u017eljiv termin. Pregledate lahko vpliv na \u010das dokon\u010danja in se odlo\u010dite, ali boste spremenili prioriteto, uporabili drug ustrezen vir ali zagotovili dodatne zmogljivosti.<\/p>\n\n\n<p>\u010ce je omogo\u010deno terminiranje z upo\u0161tevanjem materiala, Arcturus pri izra\u010dunu za\u010detnih \u010dasov upo\u0161teva tudi evidentirane zaloge in prihajajo\u010de dobave. Spremenjeni datum prihoda komponente lahko zato obravnavate skupaj s preostalimi koraki proizvodnega postopka, namesto da ga po izdelavi plana zmogljivosti naknadno usklajujete na lo\u010denem seznamu materiala.<\/p>\n\n\n<p>Lo\u010dujte med zmanj\u0161evanjem \u0161tevila priprav in odpravljanjem nakopi\u010denega nedokon\u010danega dela. Funkcija zdru\u017eevanja po lastnostih v sistemu SkyPlanner lahko daje prednost zaporednim nalogam z izbrano skupno lastnostjo, da zmanj\u0161a \u0161tevilo priprav. To je druga\u010den cilj kot razporejanje enot z zahtevno dodatno opremo bolj narazen; podobne naloge so lahko vse zahtevne za isto monta\u017eno postajo. Zdru\u017eevanje uporabljajte tam, kjer koristi dejanskemu procesu, ne pa kot dokaz, da je bilo preverjeno, ali linija zmore odpravljati zaostanke.<\/p>\n\n\n<p>Pri liniji z dolo\u010denim taktom, kjer veljajo omejitve glede pojavljanja dolo\u010dene dodatne opreme v drse\u010dem oknu ali glede delovnega obmo\u010dja ob transporterju, ta natan\u010dna pravila vklju\u010dite v zasnovo terminiranja ter preverite, kako bodo predstavljena in preverjana. Zgornji preizkus obremenitve posameznih postaj in usklajen terminski plan celotne tovarne imata razli\u010dna namena. Potrebujete tako fizi\u010dno izvedljivo zaporedje enot kot realno razpolo\u017eljivost virov, ki ga bodo izvedli.<\/p>\n\n\n<p>Ko je prihajajo\u010de delo preverjeno in pripravljeno, lahko funkcija \u010dasovnega zaklepanja v sistemu SkyPlanner za\u0161\u010diti naloge znotraj dolo\u010denega kratkoro\u010dnega \u010dasovnega okna pred ponovnim terminiranjem, medtem ko se razpored preostalega dela prera\u010dunava. To okno dolo\u010dite glede na \u010das, ki ga potrebujete za pripravo in odziv. Ob dejanskem pomanjkanju je \u0161e vedno potrebna odlo\u010ditev; z za\u0161\u010dito \u010dakalne vrste manjkajo\u010di deli ne postanejo razpolo\u017eljivi.<\/p>\n\n\n<p>Uporabljate lahko tudi svojega pomo\u010dnika z umetno inteligenco (na primer Claude, ChatGPT ali Microsoft Copilot), ki je s sistemom SkyPlanner povezan prek MCP. Ta povezava pomo\u010dniku omogo\u010da uporabo funkcij sistema SkyPlanner. Opi\u0161ite, kaj \u017eelite spremeniti v proizvodnem na\u010drtu; pomo\u010dnik uporabi svoje poznavanje sistema SkyPlanner in ustrezne funkcije, zato vam ni treba vsakega koraka opraviti ro\u010dno.<\/p>\n\n\n\n<p>Tako porabite manj \u010dasa za ponovno usklajevanje razmerja modelov, monta\u017enih operacij, preizku\u0161anja in preostale proizvodnje. Vi dolo\u010dite proizvodne prioritete in za\u0161\u010ditite delo, za katero ste se \u017ee zavezali, Arcturus pa izra\u010duna terminski plan ob upo\u0161tevanju medsebojnih povezav.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Liniji zagotovite eno veljavno razli\u010dico plana<\/h2>\n\n\n<p>Zaporedje mora priti tudi do ljudi, ki ga uporabljajo. Zamenjava tik pred izvedbo lahko spremeni obremenitev posamezne postaje, dostavo in razporeditev komponent ob liniji ter termine nadaljnjih operacij, tudi \u010de \u0161tevilo enot posameznega modela ostane enako. Preden izdate spremenjeno zaporedje, znova preverite te vplive in jasno dolo\u010dite, kateri razli\u010dici naj proizvodnja sledi.<\/p>\n\n\n<p><a href=\"https:\/\/skyplanner.ai\/sl\/zgodbe-strank\/utu\/\">UTU, finski proizvajalec razdelilnih omar in stikalnih naprav<\/a>, je prej planiral z lo\u010denimi preglednicami za posamezne oddelke. Spremembe proizvodnega zaporedja v svojem sistemu ERP niso vedno dosegle proizvodnje, dejansko razpolo\u017eljive zmogljivosti pa je bilo te\u017eko oceniti.<\/p>\n\n\n<p>S povezavo sistemov SkyPlanner in Oracle NetSuite je UTU zdru\u017eil linije in oddelke svoje tovarne v kraju Ulvila v enoten sistem za planiranje. Ekipa izpostavlja terminiranje z umetno inteligenco, Ganttov diagram in pregled nad zmogljivostmi ter poro\u010da, da posodobljena \u010dakalna vrsta nalog dose\u017ee monterje na liniji v nekaj sekundah.<\/p>\n\n\n<p>Ta izku\u0161nja ponazarja vrednost skupne, a\u017eurne \u010dakalne vrste nalog. Pri proizvodnji me\u0161anih modelov tak pregled pove\u017eite s preverjanjem postaj: ekipa potrebuje odobreno zaporedje, ne zgolj najnovej\u0161ega seznama s pravimi koli\u010dinami.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Uskladite naslednje obdobje proizvodnje me\u0161anih modelov<\/h2>\n\n\n<p>Izberite zaporedje modelov, pri katerem postaje zmorejo odpraviti nakopi\u010deno nedokon\u010dano delo, nato pa dejanske operacije vklju\u010dite v skupen plan z drugimi viri in naro\u010dili. V tem je prakti\u010dna vrednost sistema SkyPlanner APS: terminiranje celotne tovarne, ki upo\u0161teva posamezne izvedbe, zahteva manj ro\u010dnega usklajevanja \u010dakalnih vrst ter omogo\u010da jasen nadzor nad prioritetami in prihajajo\u010dim delom.<\/p>\n\n\n<p>SkyPlanner se prek odprtega vmesnika REST API povezuje s katerim koli sistemom ERP ali MES. Obdr\u017eite lahko sistem, v katerem upravljate naro\u010dila, in njegove proizvodne podatke pove\u017eete z usklajenim terminskim planom.<\/p>\n\n\n<p><a href=\"https:\/\/skyplanner.ai\/sl\/kontaktna-prodaja\/\">Rezervirajte predstavitev sistema SkyPlanner<\/a> in pripravite nekaj dejanskih izvedb, njihove \u010dase po postajah in materiale, primer prekrivanja potreb po skupnem viru ter vse obvezne omejitve zaporedja. S temi podatki ocenite nastavitve terminiranja in vpliv spremembe razmerja modelov na preostalo proizvodnjo. \u010ce \u017eelite sistem najprej raziskati sami, <a href=\"https:\/\/skyplanner.ai\/sl\/preizkus\/\">preizkusite SkyPlanner<\/a> z demonstracijskimi podatki ali uporabite funkcijo Getting Started s podporo umetne inteligence v SkyPlanner Assistant.<\/p>\n\n<\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>Zaporedje monta\u017ee me\u0161anih modelov: izberite pravi vrstni red Domov &raquo; Viri &raquo; Zaporedje monta\u017ee me\u0161anih modelov: izberite pravi vrstni red V izmeni je predvideno pravo \u0161tevilo kosov vsakega modela, vendar se linija nenehno ustavlja. Zaporedoma prispejo trije kosi z veliko dela pri o\u017ei\u010denju. Delavec za\u010dne zaostajati, manj zahtevni kosi, ob katerih bi lahko nadomestil zaostanek, &#8230; <a title=\"Zaporedje monta\u017ee me\u0161anih modelov: izberite pravi vrstni red\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/sl\/viri\/zaporedje-montaze-mesanih-modelov\/\" aria-label=\"Read more about Zaporedje monta\u017ee me\u0161anih modelov: izberite pravi vrstni red\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":112610,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[2539,302],"tags":[],"class_list":["post-112568","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-aps-in-terminiranje","category-viri","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Zaporedje monta\u017ee me\u0161anih modelov: izberite pravi vrstni red<\/title>\n<meta name=\"description\" content=\"Tudi prava dnevna sestava lahko preobremeni postajo. Preverite zaporedje modelov, omogo\u010dite odpravo zaostanka in delo uskladite s planom proizvodnje.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/sl\/viri\/zaporedje-montaze-mesanih-modelov\/\" \/>\n<meta property=\"og:locale\" content=\"sl_SI\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Zaporedje monta\u017ee me\u0161anih modelov: izberite pravi vrstni red\" \/>\n<meta property=\"og:description\" content=\"Tudi prava dnevna sestava lahko preobremeni postajo. Preverite zaporedje modelov, omogo\u010dite odpravo zaostanka in delo uskladite s planom proizvodnje.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/sl\/viri\/zaporedje-montaze-mesanih-modelov\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2026-10-29T11:53:40+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-29T12:26:00+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/mixed-model-sequencing-hero-1.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1774\" \/>\n\t<meta property=\"og:image:height\" content=\"887\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"12 minut\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/zaporedje-montaze-mesanih-modelov\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/zaporedje-montaze-mesanih-modelov\\\/\"},\"author\":{\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\"},\"headline\":\"Zaporedje monta\u017ee me\u0161anih modelov: izberite pravi vrstni red\",\"datePublished\":\"2026-10-29T11:53:40+00:00\",\"dateModified\":\"2026-10-29T12:26:00+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/zaporedje-montaze-mesanih-modelov\\\/\"},\"wordCount\":2401,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/zaporedje-montaze-mesanih-modelov\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/mixed-model-sequencing-hero-1.png\",\"articleSection\":[\"APS in terminiranje\",\"viri\"],\"inLanguage\":\"sl-SI\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/zaporedje-montaze-mesanih-modelov\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/zaporedje-montaze-mesanih-modelov\\\/\",\"name\":\"Zaporedje monta\u017ee me\u0161anih modelov: izberite pravi vrstni red\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/zaporedje-montaze-mesanih-modelov\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/zaporedje-montaze-mesanih-modelov\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/mixed-model-sequencing-hero-1.png\",\"datePublished\":\"2026-10-29T11:53:40+00:00\",\"dateModified\":\"2026-10-29T12:26:00+00:00\",\"description\":\"Tudi prava dnevna sestava lahko preobremeni postajo. Preverite zaporedje modelov, omogo\u010dite odpravo zaostanka in delo uskladite s planom proizvodnje.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/zaporedje-montaze-mesanih-modelov\\\/#breadcrumb\"},\"inLanguage\":\"sl-SI\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/zaporedje-montaze-mesanih-modelov\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"sl-SI\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/zaporedje-montaze-mesanih-modelov\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/mixed-model-sequencing-hero-1.png\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/mixed-model-sequencing-hero-1.png\",\"width\":1774,\"height\":887,\"caption\":\"Open rectangular frames and rounded cylinders alternate on an assembly conveyor beside a connected second lane.\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/zaporedje-montaze-mesanih-modelov\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Zaporedje monta\u017ee me\u0161anih modelov: izberite pravi vrstni red\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"sl-SI\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"sl-SI\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\",\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"sl-SI\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"caption\":\"Jussi M\u00e4ntyl\u00e4\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Zaporedje monta\u017ee me\u0161anih modelov: izberite pravi vrstni red","description":"Tudi prava dnevna sestava lahko preobremeni postajo. Preverite zaporedje modelov, omogo\u010dite odpravo zaostanka in delo uskladite s planom proizvodnje.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/sl\/viri\/zaporedje-montaze-mesanih-modelov\/","og_locale":"sl_SI","og_type":"article","og_title":"Zaporedje monta\u017ee me\u0161anih modelov: izberite pravi vrstni red","og_description":"Tudi prava dnevna sestava lahko preobremeni postajo. Preverite zaporedje modelov, omogo\u010dite odpravo zaostanka in delo uskladite s planom proizvodnje.","og_url":"https:\/\/skyplanner.ai\/sl\/viri\/zaporedje-montaze-mesanih-modelov\/","og_site_name":"SkyPlanner","article_published_time":"2026-10-29T11:53:40+00:00","article_modified_time":"2026-10-29T12:26:00+00:00","og_image":[{"width":1774,"height":887,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/mixed-model-sequencing-hero-1.png","type":"image\/png"}],"author":"Jussi M\u00e4ntyl\u00e4","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Jussi M\u00e4ntyl\u00e4","Est. reading time":"12 minut"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/sl\/viri\/zaporedje-montaze-mesanih-modelov\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/sl\/viri\/zaporedje-montaze-mesanih-modelov\/"},"author":{"name":"Jussi M\u00e4ntyl\u00e4","@id":"https:\/\/skyplanner.ai\/sl\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5"},"headline":"Zaporedje monta\u017ee me\u0161anih modelov: izberite pravi vrstni red","datePublished":"2026-10-29T11:53:40+00:00","dateModified":"2026-10-29T12:26:00+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/sl\/viri\/zaporedje-montaze-mesanih-modelov\/"},"wordCount":2401,"publisher":{"@id":"https:\/\/skyplanner.ai\/sl\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/sl\/viri\/zaporedje-montaze-mesanih-modelov\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/mixed-model-sequencing-hero-1.png","articleSection":["APS in terminiranje","viri"],"inLanguage":"sl-SI"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/sl\/viri\/zaporedje-montaze-mesanih-modelov\/","url":"https:\/\/skyplanner.ai\/sl\/viri\/zaporedje-montaze-mesanih-modelov\/","name":"Zaporedje monta\u017ee me\u0161anih modelov: izberite pravi vrstni red","isPartOf":{"@id":"https:\/\/skyplanner.ai\/sl\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/sl\/viri\/zaporedje-montaze-mesanih-modelov\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/sl\/viri\/zaporedje-montaze-mesanih-modelov\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/mixed-model-sequencing-hero-1.png","datePublished":"2026-10-29T11:53:40+00:00","dateModified":"2026-10-29T12:26:00+00:00","description":"Tudi prava dnevna sestava lahko preobremeni postajo. Preverite zaporedje modelov, omogo\u010dite odpravo zaostanka in delo uskladite s planom proizvodnje.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/sl\/viri\/zaporedje-montaze-mesanih-modelov\/#breadcrumb"},"inLanguage":"sl-SI","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/sl\/viri\/zaporedje-montaze-mesanih-modelov\/"]}]},{"@type":"ImageObject","inLanguage":"sl-SI","@id":"https:\/\/skyplanner.ai\/sl\/viri\/zaporedje-montaze-mesanih-modelov\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/mixed-model-sequencing-hero-1.png","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/mixed-model-sequencing-hero-1.png","width":1774,"height":887,"caption":"Open rectangular frames and rounded cylinders alternate on an assembly conveyor beside a connected second lane."},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/sl\/viri\/zaporedje-montaze-mesanih-modelov\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/sl\/"},{"@type":"ListItem","position":2,"name":"Zaporedje monta\u017ee me\u0161anih modelov: izberite pravi vrstni red"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/sl\/#website","url":"https:\/\/skyplanner.ai\/sl\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/sl\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/sl\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"sl-SI"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/sl\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/sl\/","logo":{"@type":"ImageObject","inLanguage":"sl-SI","@id":"https:\/\/skyplanner.ai\/sl\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/sl\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]},{"@type":"Person","@id":"https:\/\/skyplanner.ai\/sl\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5","name":"Jussi M\u00e4ntyl\u00e4","image":{"@type":"ImageObject","inLanguage":"sl-SI","@id":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","caption":"Jussi M\u00e4ntyl\u00e4"}}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/mixed-model-sequencing-hero-1.png",1774,887,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/mixed-model-sequencing-hero-1-150x150.png",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/mixed-model-sequencing-hero-1-300x150.png",300,150,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/mixed-model-sequencing-hero-1-768x384.png",768,384,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/mixed-model-sequencing-hero-1-1024x512.png",1024,512,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/mixed-model-sequencing-hero-1-1536x768.png",1536,768,true],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/mixed-model-sequencing-hero-1.png",1774,887,false],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/mixed-model-sequencing-hero-1-360x180.png",360,180,true]},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/sl\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Zaporedje monta\u017ee me\u0161anih modelov: izberite pravi vrstni red Domov &raquo; Viri &raquo; Zaporedje monta\u017ee me\u0161anih modelov: izberite pravi vrstni red V izmeni je predvideno pravo \u0161tevilo kosov vsakega modela, vendar se linija nenehno ustavlja. Zaporedoma prispejo trije kosi z veliko dela pri o\u017ei\u010denju. Delavec za\u010dne zaostajati, manj zahtevni kosi, ob katerih bi lahko nadomestil zaostanek,&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/posts\/112568","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/comments?post=112568"}],"version-history":[{"count":1,"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/posts\/112568\/revisions"}],"predecessor-version":[{"id":112685,"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/posts\/112568\/revisions\/112685"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/media\/112610"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/media?parent=112568"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/categories?post=112568"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/tags?post=112568"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}