{"id":112384,"date":"2026-10-29T07:21:41","date_gmt":"2026-10-29T07:21:41","guid":{"rendered":"https:\/\/skyplanner.ai\/?p=112384"},"modified":"2026-10-29T07:22:59","modified_gmt":"2026-10-29T07:22:59","slug":"resevanje-problemov-a3","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/sl\/viri\/resevanje-problemov-a3\/","title":{"rendered":"Re\u0161evanje problemov A3 v proizvodnji: do u\u010dinkovitih sprememb"},"content":{"rendered":"<div class=\"gb-container gb-container-article01 article-main-content-container\">\n\n<h1 class=\"wp-block-heading\">Re\u0161evanje problemov A3 v proizvodnji: do u\u010dinkovitih sprememb<\/h1>\n\n<div class=\"gb-container gb-container-article02\">\n\n<p><a href=\"\/sl\/\">Domov<\/a> &raquo; <a href=\"https:\/\/skyplanner.ai\/sl\/viri\/\">Viri<\/a> &raquo; Re\u0161evanje problemov A3 v proizvodnji: do u\u010dinkovitih sprememb<\/p>\n\n\n<p class=\"yoast-reading-time__wrapper\"><span class=\"yoast-reading-time__icon\"><svg aria-hidden=\"true\" focusable=\"false\" data-icon=\"clock\" width=\"20\" height=\"20\" fill=\"none\" stroke=\"currentColor\" style=\"display:inline-block;vertical-align:-0.1em\" role=\"img\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewBox=\"0 0 24 24\"><path stroke-linecap=\"round\" stroke-linejoin=\"round\" stroke-width=\"2\" d=\"M12 8v4l3 3m6-3a9 9 0 11-18 0 9 9 0 0118 0z\"><\/path><\/svg><\/span><span class=\"yoast-reading-time__spacer\" style=\"display:inline-block;width:1em\"><\/span><span class=\"yoast-reading-time__descriptive-text\">Predviden \u010das branja: <\/span><span class=\"yoast-reading-time__reading-time\">10<\/span><span class=\"yoast-reading-time__time-unit\"> minut<\/span><\/p>\n\n<\/div>\n<div class=\"gb-container gb-container-article03\">\n\n<p>Korektivni ukrep je ozna\u010den kot zaklju\u010den. Vpenjalna priprava je nastavljena, ekipa je dobila opomnik o postopku in proizvodnja spet te\u010de. Naslednji teden se ista napaka ponovi.<\/p>\n\n\n<p>Ukrep je bil izveden. Ni pa nujno, da je bil problem re\u0161en.<\/p>\n\n\n<p>Re\u0161evanje problemov A3 pomaga proizvodni ekipi povezati opa\u017eeni problem, dokaze o njegovem vzroku, spremembo, ki jo \u017eeli preizkusiti, in rezultate, ki upravi\u010dujejo ohranitev te spremembe. Namen ni izdelati lepo oblikovanega poro\u010dila, temve\u010d skupaj sprejeti bolj\u0161o odlo\u010ditev za proizvodnjo.<\/p>\n\n\n<p>Za izvedbo te odlo\u010ditve je treba zagotoviti tudi \u010das v proizvodnji. SkyPlanner APS odobreni proizvodni preizkus vklju\u010di v isti terminski plan kot naro\u010dila kupcev. Tako je manj dela z ume\u0161\u010danjem izbolj\u0161av med operacije, ki \u010dakajo na posameznih strojih. Va\u0161a ekipa lahko razi\u0161\u010de problem, se dogovori o protiukrepu in preizkusu zagotovi realno izvedljiv termin.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Kaj je re\u0161evanje problemov A3?<\/h2>\n\n\n<p>Re\u0161evanje problemov A3 je strukturiran sodelovalni pristop k razumevanju problema, preizku\u0161anju protiukrepov in preverjanju njihove u\u010dinkovitosti. Razvili so ga v Toyoti. S strnjenim, obi\u010dajno enostranskim poro\u010dilom jasno predstavi razmi\u0161ljanje in podpira razpravo med nosilcem re\u0161evanja problema, mentorjem in ljudmi, ki jih problem zadeva.<\/p>\n\n\n<p>Ime izhaja iz formata papirja A3, ki meri 297 \u00d7 420 mm. Velikost lista spodbuja jasno, vizualno predstavitev, vendar je na\u010din razmi\u0161ljanja pomembnej\u0161i od mer. Enako razmi\u0161ljanje lahko predstavimo tudi na digitalni strani.<\/p>\n\n\n<p>Nelo\u010dljivo so povezani trije vidiki:<\/p>\n\n\n<ul class=\"wp-block-list\"><li>Razmi\u0161ljanje A3: pred odlo\u010ditvijo razi\u0161\u010dite problem in preverite, ali va\u0161a razlaga ustreza dejanskemu dogajanju.<\/li><li>Proces A3: vklju\u010dite prave ljudi, preu\u010dite dokaze in z novimi spoznanji dopolnjujte svoje razumevanje.<\/li><li>Poro\u010dilo A3: povzemite svoje razmi\u0161ljanje, da ga lahko drugi kriti\u010dno preverijo in pomagajo pri nadaljnjem delu.<\/li><\/ul>\n\n\n<p>Izpolnjeno poro\u010dilo \u0161e ne dokazuje, da je bilo razmi\u0161ljanje pravilno. Prav tako uveden protiukrep \u0161e ne dokazuje, da je bil u\u010dinkovit.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Kako je A3 povezan s PDCA in analizo temeljnih vzrokov?<\/h3>\n\n\n<p>A3 sledi logiki u\u010denja po ciklu na\u010drtuj\u2013izvedi\u2013preveri\u2013ukrepaj (PDCA): razumite stanje in na\u010drtujte spremembo, jo preizkusite, preu\u010dite izid ter nato odlo\u010dite, kaj boste uvedli ali raziskali v nadaljevanju.<\/p>\n\n\n<p><a href=\"https:\/\/skyplanner.ai\/sl\/viri\/analiza-temeljnih-vzrokov\/\">Analiza temeljnih vzrokov<\/a> podpira raziskovanje znotraj tega cikla. Diagram ribje kosti ali razprava po metodi 5 zakajev lahko pomagata oblikovati mo\u017ene razlage, vendar ne nadomestita dokazov. A3 obravnavo nadaljuje: zakaj izbrati prav ta protiukrep, kdo ga bo preizkusil, kako bo preizkus potekal in kak\u0161en rezultat bi upravi\u010dil spremembo ustaljenega na\u010dina dela.<\/p>\n\n\n<p>A3 uporabite, kadar ponavljajo\u010d se ali pomemben problem zahteva raziskavo in usklajevanje. \u0160e posebej je uporaben, kadar proizvodnja, kakovost, tehnologija in planiranje vidijo razli\u010dne plati istega problema. Pri manj\u0161em problemu, ki ga dobro razumete, lahko zadostuje neposredna odprava napake namesto formalnega postopka A3. Neposredno tveganje za varnost ali kakovost pa \u0161e vedno zahteva takoj\u0161nje zajezitvene ukrepe v skladu z va\u0161imi uveljavljenimi postopki; ne \u010dakajte na poro\u010dilo.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Kaj naj vsebuje poro\u010dilo A3?<\/h2>\n\n\n<p>Dobro poro\u010dilo A3 omogo\u010da razumevanje poteka razmi\u0161ljanja tudi nekomu, ki ni sodeloval pri vseh razpravah. Razporeditve vsebine in \u0161tevilo korakov se razlikujejo. Izberite naslove, ki olaj\u0161ajo odgovore na spodnja vpra\u0161anja, namesto da bi eno predlogo obravnavali kot splo\u0161no veljaven standard.<\/p>\n\n\n<p><figure class=\"wp-block-table\"><table><thead><tr><th>Del obravnave<\/th><th>Kaj mora bralec razumeti<\/th><\/tr><\/thead><tbody><tr><td>Ozadje in problem<\/td><td>Zakaj je problem pomemben, kje se pojavlja in katero konkretno vrzel je treba odpraviti<\/td><\/tr><tr><td>Trenutno stanje<\/td><td>Opis trenutnega dogajanja na podlagi opa\u017eanj in opredeljenega izhodi\u0161\u010dnega stanja<\/td><\/tr><tr><td>Ciljno stanje<\/td><td>Kaj naj se spremeni, do kdaj in kako se bo merila uspe\u0161nost<\/td><\/tr><tr><td>Analiza vzrokov<\/td><td>Katero razlago podpirajo dokazi in kaj ostaja negotovo<\/td><\/tr><tr><td>Protiukrep in preizkus<\/td><td>S katero spremembo se bo preverila ta razlaga in zakaj je bila izbrana<\/td><\/tr><tr><td>Izvedba<\/td><td>Kdo je odgovoren za posamezen ukrep, kateri viri so potrebni in kdaj bo delo potekalo<\/td><\/tr><tr><td>Spremljanje in u\u010denje<\/td><td>Kak\u0161en je rezultat glede na cilj, kaj ohraniti in kaj raziskati v nadaljevanju<\/td><\/tr><\/tbody><\/table><\/figure><\/p>\n\n\n<p>Pogosta razporeditev na levi strani prika\u017ee problem in analizo, na desni pa predlagano spremembo in spremljanje. Kjer to pove ve\u010d kot odstavek besedila, uporabite preprosto skico procesa, fotografijo napake ali prikaz trenda pred spremembo in po njej. Podporni zapisi naj ostanejo dostopni, ne da bi morali vsako opa\u017eanje stla\u010diti na eno stran.<\/p>\n\n\n<p>Vsebina poro\u010dila A3 naj se spreminja z napredovanjem raziskave. \u010ce preizkus ovr\u017ee domnevni vzrok, popravite razlago. Prvotnega cilja ne spreminjajte zato, da bi bil rezultat videti uspe\u0161en.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Dolo\u010dite nosilca re\u0161evanja, ne le podpisnika odobritve<\/h3>\n\n\n<p>Dolo\u010dite eno osebo, ki bo odgovorna za napredovanje procesa A3. Ta oseba zbira dokaze, vklju\u010duje sodelavce in spremlja uresni\u010devanje odlo\u010ditev; ni pa ji treba izvesti vsakega ukrepa ali voditi vseh vklju\u010denih oddelkov.<\/p>\n\n\n<p>Mentor ali vodja pomaga tako, da kriti\u010dno preverja razmi\u0161ljanje. Koristna so vpra\u0161anja: Kaj ste neposredno opazili? Kaj bi \u0161e lahko pojasnilo ta vzorec? Zakaj naj bi ta sprememba vplivala na problem? Zaradi \u010desa bi svojo razlago zavrnili?<\/p>\n\n\n<p>Z operaterji in drugimi, ki jih delo zadeva, se pogovarjajte \u017ee med obravnavo problema. Poro\u010dilo, predstavljeno \u0161ele po izbiri re\u0161itve, spodbuja podpisovanje, ne u\u010denja. Zgodnji pogovor lahko razkrije prakti\u010dno oviro, \u0161e preden zaradi nje pride do dragega preizkusa.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Primer iz proizvodnje: ponavljajo\u010de se napake po menjavi<\/h2>\n\n\n<p>Predstavljajte si ekipo v mehanski obdelavi, ki po menjavi na dolo\u010deno dru\u017eino izdelkov pri prvih kosih vedno znova odkrije mero zunaj tolerance. Obi\u010dajen odziv je popravek nastavitve in opomnik operaterju, naj jo preveri. Ekipa \u017eeli uporabiti A3, ker se problem ponavlja in prekinja delo na skupnem stroju.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Opi\u0161ite vrzel, ne da bi v opis \u017ee vgradili re\u0161itev<\/h3>\n\n\n<p>\u00bbOperaterji potrebujejo dodatno usposabljanje\u00ab je predlagana razlaga in odziv, ne opredelitev problema. Trditev \u00bbKakovost mehanske obdelave je slaba\u00ab pa je pre\u0161iroka, da bi usmerjala raziskavo.<\/p>\n\n\n<p>Uporabnej\u0161e izhodi\u0161\u010de je: \u00bbPri tej dru\u017eini izdelkov na tem stroju kontrole prvega kosa po menjavi vedno znova poka\u017eejo neskladnost, zato je pred nadaljevanjem serije potreben popravek nastavitve.\u00ab Ekipa nato iz svojih evidenc doda opa\u017eeno pogostost, obdobje pojavljanja in posledi\u010dno izgubljeni proizvodni \u010das.<\/p>\n\n\n<p>Zabele\u017eite tako izid kontrole kot \u0161tevilo primerov, na katere se nana\u0161a: \u0161tevilo neuspe\u0161nih kontrol prvega kosa glede na vse primerljive menjave, ne le \u0161tevila napak. Sicer bi lahko teden z manj proizvodnje dajal vtis izbolj\u0161anja zgolj zato, ker je bilo manj menjav.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Opazujte sedanji na\u010din dela in preverite razlago<\/h3>\n\n\n<p>Nosilec re\u0161evanja problema skupaj z operaterji in in\u017eenirjem kakovosti opazuje menjave. Ekipa primerja veljavno navodilo za nastavitev z dejansko uporabljeno vpenjalno pripravo ter preveri, kdaj se opravi posamezna kontrola. Pri tem lo\u010duje opa\u017eanja od hipotez.<\/p>\n\n\n<p>Denimo, da raziskava naka\u017ee, da dvoumno navodilo o namestitvi vpenjalne priprave dopu\u0161\u010da dve razli\u010dni nastavitvi. To je \u0161e vedno razlaga, ki jo je treba preveriti, ne pa potrjen temeljni vzrok zgolj zato, ker se vsem zdi verjetna.<\/p>\n\n\n<p>Ekipa preveri, ali se domnevna razlika pojavlja pri menjavah s te\u017eavami, pri primerljivih uspe\u0161nih menjavah pa ne. Vsako nadzorovano ponavljanje te\u017eave mora potekati v skladu z varnostnimi in kakovostnimi zahtevami obrata. \u010ce opa\u017eanja ne podpirajo razlage, se preiskava nadaljuje, namesto da bi se takoj odlo\u010dili za ponovno usposabljanje.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Dogovorite se o ukrepu in smiselnem preizkusu<\/h3>\n\n\n<p>\u010ce dokazi podpirajo razlago, povezano s polo\u017eajem vpenjala, je mo\u017een ukrep odobren pripomo\u010dek za dolo\u010danje polo\u017eaja z nedvoumnim preverjanjem nastavitve. Ekipi za kakovost in tehnologijo odlo\u010dita, ali je primeren in kako ga varno preizkusiti.<\/p>\n\n\n<p>V poro\u010dilu A3 pred preizkusom opredelite pri\u010dakovani u\u010dinek: manj neuspe\u0161nih kontrol prvega kosa za dolo\u010deno dru\u017eino izdelkov v primerljivih razmerah. Navedite tudi merila za sprejem, obdobje opazovanja in morebitne varovalne pogoje, na primer ohranitev dimenzijske skladnosti brez nesprejemljivega podalj\u0161anja pripravljalnega \u010dasa.<\/p>\n\n\n<p>Dolo\u010dite odgovorno osebo za pripravo pripomo\u010dka, drugo za zbiranje rezultatov kontrol in jasno opredelite, kdo odlo\u010di o sprejetju ali zavrnitvi spremembe. V na\u010drt vklju\u010dite strojni \u010das, ljudi in kontrolne zmogljivosti, potrebne za preizkus. \u00bbPreizkus naslednji teden\u00ab \u0161e ni izvedljiv na\u010drt.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Odobreni preizkus vklju\u010dite v terminski plan proizvodnje<\/h2>\n\n\n<p>Izbolj\u0161ave pogosto tekmujejo za zmogljivosti prav z naro\u010dili, katerih izvedbo naj bi olaj\u0161ale. V opisanem primeru je za pripravo in preizkus pripomo\u010dka za dolo\u010danje polo\u017eaja potreben skupni obdelovalni vir, naro\u010dila kupcev pa je treba \u0161e vedno odpremiti.<\/p>\n\n\n<p>\u010ce preizkus ostane na lo\u010denem seznamu ukrepov, ga mora planer uskladiti s \u010dakalno vrsto na stroju, razpolo\u017eljivostjo operaterjev in nadaljnjimi operacijami. Ob prihodu nujnega naro\u010dila mora vse to ponovno uskladiti. Preizkus se zato zlahka prestavi, saj njegove potrebe po zmogljivostih v proizvodnem planu niso vidne.<\/p>\n\n\n<p>SkyPlanner olaj\u0161a to usklajevanje. Odobreni preizkus opredelite kot proizvodno delo s potrebnimi koraki postopka, ustreznimi delovnimi centri, trajanji in odvisnostmi. Arcturus, mehanizem za terminiranje v sistemu SkyPlanner, to delo razporedi skupaj z operacijami za naro\u010dila kupcev ter pri tem upo\u0161teva izmene, zmogljivosti delovnih centrov in nastavljena pravila terminiranja.<\/p>\n\n\n<p>Ganttov diagram poka\u017ee, kam je mogo\u010de umestiti preizkus in kako obremenitev skupnih virov vpliva na dokon\u010danje naro\u010dil. Namesto ro\u010dnega popravljanja lo\u010denih \u010dakalnih vrst na strojih planer uporablja <a href=\"https:\/\/skyplanner.ai\/sl\/viri\/kaj-je-terminiranje-proizvodnje\/\">enoten, povezan terminski plan<\/a> in lahko pri odlo\u010ditvi upo\u0161teva tudi posledice za dobavne roke.<\/p>\n\n\n<p>Va\u0161a ekipa \u0161e vedno odlo\u010da, ali naj se preizkus izvede in katero delo ima prednost. Prioritete, pravila in zaklepi usmerjajo izra\u010dun terminskega plana; sama umestitev preizkusa na \u010dasovnico ne pomeni odobritve z vidika varnosti ali kakovosti.<\/p>\n\n\n<p>Ko je uspe\u0161na sprememba odobrena za redno uporabo, posodobite ustrezne proizvodne podatke, na primer dogovorjeni pripravljalni \u010das ali proizvodni postopek. SkyPlanner nato prihodnje delo razporeja na podlagi teh podatkov. Tako izbolj\u0161avo pove\u017eete z vsakodnevnim planiranjem, namesto da bi v terminskem planu ostale stare predpostavke.<\/p>\n\n\n<p>SkyPlanner se prek odprtega vmesnika REST API pove\u017ee s katerim koli sistemom ERP ali MES, zato lahko tak na\u010din terminiranja uporabljate skupaj s poslovnimi sistemi, ki jih \u017ee imate.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Preverite u\u010dinek, ne le tega, ali je bil ukrep izveden<\/h2>\n\n\n<p>Z namestitvijo pripomo\u010dka za dolo\u010danje polo\u017eaja je izvedbena naloga zaklju\u010dena. Proces A3 s tem \u0161e ni zaklju\u010den.<\/p>\n\n\n<p>Rezultat preizkusa primerjajte s prvotnim ciljem, pri tem pa uporabite enake opredelitve kot pri izhodi\u0161\u010dnem stanju. V primeru strojne obdelave preu\u010dite primerljive menjave, rezultate kontrol prvega kosa in pripravljalni \u010das. Zabele\u017eite spremembe v naboru izdelkov ali delovnih razmerah, ki bi lahko pojasnile razliko. Hitreje opravljena operacija na preprostej\u0161em kosu ne dokazuje, da je ukrep odpravil prvotni problem.<\/p>\n\n\n<p>SkyPlanner za tak pregled zagotavlja koristne podatke o okoli\u0161\u010dinah izvedbe v proizvodnji. Poro\u010dilo o operaciji prikazuje dejansko zabele\u017eeni \u010das za operacijo, kdo jo je izvajal in kateri delovni center je bil uporabljen. Pregled vseh \u010dasovnih zapisov vsebuje dogodke s \u010dasovnimi oznakami, poro\u010dilo o postavki naro\u010dila pa na ravni postavke zdru\u017euje trajanje, zabele\u017eeni \u010das in razliko med njima.<\/p>\n\n\n<p>Ti zapisi ekipi pomagajo povezati opa\u017eanja z dejansko izvedenim delom, namesto da bi primerjala skupne vrednosti iz razli\u010dnih tednov, ne da bi vedela, kaj zajemajo. Uporabljajte jih skupaj z rezultati kontrol in neposrednimi opa\u017eanji procesa, potrebnimi za A3. Sam zabele\u017eeni \u010das ne more pojasniti, zakaj je napaka nastala, ali dokazati, da je izbolj\u0161avo povzro\u010dil uvedeni ukrep.<\/p>\n\n\n<p>Preden spremenite predpostavke za prihodnje planiranje, ohranite prvotne izhodi\u0161\u010dne podatke in zapise preizkusa. Popravljena ocena je koristna za naslednji terminski plan, ne sme pa nadomestiti izhodi\u0161\u010da, glede na katero presojate preizkus.<\/p>\n\n\n<p>\u010ce preizkus ne dose\u017ee cilja, se vrnite k dokazom. Je bila domneva o vzroku napa\u010dna, je bil ukrep izveden druga\u010de, kot je bilo predvideno, ali se je spremenila katera druga okoli\u0161\u010dina? Zabele\u017eite ugotovitve in na\u010drtujte naslednji preizkus. Poro\u010dila ne zaklju\u010dite zgolj zato, ker na seznamu ni ve\u010d odprtih ukrepov.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Sprejeto spremembo vklju\u010dite v redno delo<\/h2>\n\n\n<p>Ko dokazi podpirajo spremembo in jo pristojna ekipa sprejme, posodobite ustrezna navodila za delo, preverjanja nastavitev in usposabljanje. Preverite, ali lahko vse izmene, ki jih sprememba zadeva, uporabljajo novo metodo, ter dolo\u010dite termin za naknadno <a href=\"https:\/\/skyplanner.ai\/sl\/viri\/kaizen-v-proizvodnji\/\">preverjanje, ali se izbolj\u0161ava ohranja<\/a>. Ugotovitve delite tudi z ekipami pri podobnih procesih, kjer bi lahko bile uporabne, namesto da bi predpostavljali, da ista re\u0161itev ustreza vsakemu stroju.<\/p>\n\n\n<p>Pomembno je tudi, da posodobljeni terminski plan pride do proizvodnje. Nova metoda ne more zanesljivo pomagati, \u010de proizvodnja \u0161e naprej dela po zastarelem vrstnem redu.<\/p>\n\n\n<p>Pri <a href=\"https:\/\/skyplanner.ai\/sl\/zgodbe-strank\/utu\/\">proizvajalcu elektri\u010dne opreme UTU<\/a> so lo\u010dene preglednice po oddelkih neko\u010d ote\u017eevale sporo\u010danje sprememb proizvodnega zaporedja v proizvodnjo. V opisu svojih izku\u0161enj s sistemom SkyPlanner navajajo skupen pogled na plan za celotno tovarno in posodobljene \u010dakalne vrste operacij, ki proizvodno linijo dose\u017eejo v nekaj sekundah. To je koristen dokaz, da je spremenjeni plan mogo\u010de prenesti v vsakodnevno delo, namesto da bi morali zaposleni usklajevati lo\u010dene sezname.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Za\u010dnite z enim problemom, ki se ponavlja<\/h2>\n\n\n<p>Izberite ponavljajo\u010de se odstopanje v proizvodnji, jasno omejite njegov obseg in dolo\u010dite odgovorno osebo. Delo opazujte skupaj z ljudmi, ki ga opravljajo, dolo\u010dite primerljivo izhodi\u0161\u010dno stanje in s pomo\u010djo A3 omogo\u010dite kriti\u010dno preverjanje predlagane razlage. Dogovorite se o preizkusu in dokazih, na podlagi katerih boste odlo\u010dili, ali naj sprememba ostane v uporabi.<\/p>\n\n\n<p>S sistemom SkyPlanner dogovorjeno proizvodno delo vklju\u010dite v realisti\u010den terminski plan skupaj z naro\u010dili kupcev. Tako si prihranite ponavljajo\u010de se usklajevanje seznama izbolj\u0161av z lo\u010denimi \u010dakalnimi vrstami na strojih, ekipa pa lahko \u0161e pred odlo\u010ditvijo za izvedbo vidi, kaj preizkus pomeni za proizvodnjo.<\/p>\n\n\n<p><a href=\"https:\/\/skyplanner.ai\/sl\/kontaktna-prodaja\/\">Rezervirajte predstavitev<\/a> in nanjo prinesite primer enega odobrenega preizkusa, skupnega vira, ki ga potrebuje, ter operacij za naro\u010dila kupcev, ki tekmujejo za isti vir. Oglejte si, kako jih SkyPlanner zdru\u017ei v povezan plan. Lahko pa <a href=\"https:\/\/skyplanner.ai\/sl\/preizkus\/\">za\u010dnete preizkusno uporabo<\/a> z demonstracijskimi podatki ali uporabite postopek Getting Started s podporo umetne inteligence v funkciji SkyPlanner Assistant ter sami razi\u0161\u010dete potek terminiranja.<\/p>\n\n<\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>Re\u0161evanje problemov A3 v proizvodnji: do u\u010dinkovitih sprememb Domov &raquo; Viri &raquo; Re\u0161evanje problemov A3 v proizvodnji: do u\u010dinkovitih sprememb Korektivni ukrep je ozna\u010den kot zaklju\u010den. Vpenjalna priprava je nastavljena, ekipa je dobila opomnik o postopku in proizvodnja spet te\u010de. Naslednji teden se ista napaka ponovi. Ukrep je bil izveden. Ni pa nujno, da je &#8230; <a title=\"Re\u0161evanje problemov A3 v proizvodnji: do u\u010dinkovitih sprememb\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/sl\/viri\/resevanje-problemov-a3\/\" aria-label=\"Read more about Re\u0161evanje problemov A3 v proizvodnji: do u\u010dinkovitih sprememb\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":112402,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[2539,302],"tags":[],"class_list":["post-112384","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-aps-in-terminiranje","category-viri","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Re\u0161evanje problemov A3 v proizvodnji: do u\u010dinkovitih sprememb<\/title>\n<meta name=\"description\" content=\"Ukrep je izveden, napaka se vra\u010da. Pristop A3 pove\u017ee dokaze, izvedljiv preizkus v proizvodnji in spremljanje, ki poka\u017ee, ali sprememba deluje.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/sl\/viri\/resevanje-problemov-a3\/\" \/>\n<meta property=\"og:locale\" content=\"sl_SI\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Re\u0161evanje problemov A3 v proizvodnji: do u\u010dinkovitih sprememb\" \/>\n<meta property=\"og:description\" content=\"Ukrep je izveden, napaka se vra\u010da. Pristop A3 pove\u017ee dokaze, izvedljiv preizkus v proizvodnji in spremljanje, ki poka\u017ee, ali sprememba deluje.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/sl\/viri\/resevanje-problemov-a3\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2026-10-29T07:21:41+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-29T07:22:59+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/a3-problem-solving-manufacturing-hero.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1672\" \/>\n\t<meta property=\"og:image:height\" content=\"941\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"12 minut\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/resevanje-problemov-a3\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/resevanje-problemov-a3\\\/\"},\"author\":{\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\"},\"headline\":\"Re\u0161evanje problemov A3 v proizvodnji: do u\u010dinkovitih sprememb\",\"datePublished\":\"2026-10-29T07:21:41+00:00\",\"dateModified\":\"2026-10-29T07:22:59+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/resevanje-problemov-a3\\\/\"},\"wordCount\":2356,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/resevanje-problemov-a3\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/a3-problem-solving-manufacturing-hero.png\",\"articleSection\":[\"APS in terminiranje\",\"viri\"],\"inLanguage\":\"sl-SI\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/resevanje-problemov-a3\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/resevanje-problemov-a3\\\/\",\"name\":\"Re\u0161evanje problemov A3 v proizvodnji: do u\u010dinkovitih sprememb\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/resevanje-problemov-a3\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/resevanje-problemov-a3\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/a3-problem-solving-manufacturing-hero.png\",\"datePublished\":\"2026-10-29T07:21:41+00:00\",\"dateModified\":\"2026-10-29T07:22:59+00:00\",\"description\":\"Ukrep je izveden, napaka se vra\u010da. Pristop A3 pove\u017ee dokaze, izvedljiv preizkus v proizvodnji in spremljanje, ki poka\u017ee, ali sprememba deluje.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/resevanje-problemov-a3\\\/#breadcrumb\"},\"inLanguage\":\"sl-SI\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/resevanje-problemov-a3\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"sl-SI\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/resevanje-problemov-a3\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/a3-problem-solving-manufacturing-hero.png\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/a3-problem-solving-manufacturing-hero.png\",\"width\":1672,\"height\":941,\"caption\":\"Hands compare a machined part and locating fixture beside sketches during an A3 improvement discussion.\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/resevanje-problemov-a3\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Re\u0161evanje problemov A3 v proizvodnji: do u\u010dinkovitih sprememb\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"sl-SI\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"sl-SI\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\",\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"sl-SI\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"caption\":\"Jussi M\u00e4ntyl\u00e4\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Re\u0161evanje problemov A3 v proizvodnji: do u\u010dinkovitih sprememb","description":"Ukrep je izveden, napaka se vra\u010da. Pristop A3 pove\u017ee dokaze, izvedljiv preizkus v proizvodnji in spremljanje, ki poka\u017ee, ali sprememba deluje.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/sl\/viri\/resevanje-problemov-a3\/","og_locale":"sl_SI","og_type":"article","og_title":"Re\u0161evanje problemov A3 v proizvodnji: do u\u010dinkovitih sprememb","og_description":"Ukrep je izveden, napaka se vra\u010da. Pristop A3 pove\u017ee dokaze, izvedljiv preizkus v proizvodnji in spremljanje, ki poka\u017ee, ali sprememba deluje.","og_url":"https:\/\/skyplanner.ai\/sl\/viri\/resevanje-problemov-a3\/","og_site_name":"SkyPlanner","article_published_time":"2026-10-29T07:21:41+00:00","article_modified_time":"2026-10-29T07:22:59+00:00","og_image":[{"width":1672,"height":941,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/a3-problem-solving-manufacturing-hero.png","type":"image\/png"}],"author":"Jussi M\u00e4ntyl\u00e4","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Jussi M\u00e4ntyl\u00e4","Est. reading time":"12 minut"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/sl\/viri\/resevanje-problemov-a3\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/sl\/viri\/resevanje-problemov-a3\/"},"author":{"name":"Jussi M\u00e4ntyl\u00e4","@id":"https:\/\/skyplanner.ai\/sl\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5"},"headline":"Re\u0161evanje problemov A3 v proizvodnji: do u\u010dinkovitih sprememb","datePublished":"2026-10-29T07:21:41+00:00","dateModified":"2026-10-29T07:22:59+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/sl\/viri\/resevanje-problemov-a3\/"},"wordCount":2356,"publisher":{"@id":"https:\/\/skyplanner.ai\/sl\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/sl\/viri\/resevanje-problemov-a3\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/a3-problem-solving-manufacturing-hero.png","articleSection":["APS in terminiranje","viri"],"inLanguage":"sl-SI"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/sl\/viri\/resevanje-problemov-a3\/","url":"https:\/\/skyplanner.ai\/sl\/viri\/resevanje-problemov-a3\/","name":"Re\u0161evanje problemov A3 v proizvodnji: do u\u010dinkovitih sprememb","isPartOf":{"@id":"https:\/\/skyplanner.ai\/sl\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/sl\/viri\/resevanje-problemov-a3\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/sl\/viri\/resevanje-problemov-a3\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/a3-problem-solving-manufacturing-hero.png","datePublished":"2026-10-29T07:21:41+00:00","dateModified":"2026-10-29T07:22:59+00:00","description":"Ukrep je izveden, napaka se vra\u010da. Pristop A3 pove\u017ee dokaze, izvedljiv preizkus v proizvodnji in spremljanje, ki poka\u017ee, ali sprememba deluje.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/sl\/viri\/resevanje-problemov-a3\/#breadcrumb"},"inLanguage":"sl-SI","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/sl\/viri\/resevanje-problemov-a3\/"]}]},{"@type":"ImageObject","inLanguage":"sl-SI","@id":"https:\/\/skyplanner.ai\/sl\/viri\/resevanje-problemov-a3\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/a3-problem-solving-manufacturing-hero.png","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/a3-problem-solving-manufacturing-hero.png","width":1672,"height":941,"caption":"Hands compare a machined part and locating fixture beside sketches during an A3 improvement discussion."},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/sl\/viri\/resevanje-problemov-a3\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/sl\/"},{"@type":"ListItem","position":2,"name":"Re\u0161evanje problemov A3 v proizvodnji: do u\u010dinkovitih sprememb"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/sl\/#website","url":"https:\/\/skyplanner.ai\/sl\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/sl\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/sl\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"sl-SI"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/sl\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/sl\/","logo":{"@type":"ImageObject","inLanguage":"sl-SI","@id":"https:\/\/skyplanner.ai\/sl\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/sl\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]},{"@type":"Person","@id":"https:\/\/skyplanner.ai\/sl\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5","name":"Jussi M\u00e4ntyl\u00e4","image":{"@type":"ImageObject","inLanguage":"sl-SI","@id":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","caption":"Jussi M\u00e4ntyl\u00e4"}}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/a3-problem-solving-manufacturing-hero.png",1672,941,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/a3-problem-solving-manufacturing-hero-150x150.png",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/a3-problem-solving-manufacturing-hero-300x169.png",300,169,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/a3-problem-solving-manufacturing-hero-768x432.png",768,432,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/a3-problem-solving-manufacturing-hero-1024x576.png",1024,576,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/a3-problem-solving-manufacturing-hero-1536x864.png",1536,864,true],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/a3-problem-solving-manufacturing-hero.png",1672,941,false],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/a3-problem-solving-manufacturing-hero-360x203.png",360,203,true]},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/sl\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Re\u0161evanje problemov A3 v proizvodnji: do u\u010dinkovitih sprememb Domov &raquo; Viri &raquo; Re\u0161evanje problemov A3 v proizvodnji: do u\u010dinkovitih sprememb Korektivni ukrep je ozna\u010den kot zaklju\u010den. Vpenjalna priprava je nastavljena, ekipa je dobila opomnik o postopku in proizvodnja spet te\u010de. Naslednji teden se ista napaka ponovi. Ukrep je bil izveden. Ni pa nujno, da je&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/posts\/112384","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/comments?post=112384"}],"version-history":[{"count":1,"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/posts\/112384\/revisions"}],"predecessor-version":[{"id":112447,"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/posts\/112384\/revisions\/112447"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/media\/112402"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/media?parent=112384"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/categories?post=112384"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/tags?post=112384"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}