{"id":111704,"date":"2026-10-28T03:02:21","date_gmt":"2026-10-28T03:02:21","guid":{"rendered":"https:\/\/skyplanner.ai\/?p=111704"},"modified":"2026-10-28T03:03:47","modified_gmt":"2026-10-28T03:03:47","slug":"sistem-dveh-zabojnikov","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/sl\/viri\/sistem-dveh-zabojnikov\/","title":{"rendered":"Sistem dveh zabojnikov: drobni deli pripravljeni za proizvodnjo"},"content":{"rendered":"<div class=\"gb-container gb-container-article01 article-main-content-container\">\n\n<h1 class=\"wp-block-heading\">Sistem dveh zabojnikov: drobni deli pripravljeni za proizvodnjo<\/h1>\n\n<div class=\"gb-container gb-container-article02\">\n\n<p><a href=\"\/sl\/\">Domov<\/a> &raquo; <a href=\"https:\/\/skyplanner.ai\/sl\/viri\/\">Viri<\/a> &raquo; Sistem dveh zabojnikov: drobni deli pripravljeni za proizvodnjo<\/p>\n\n\n<p class=\"yoast-reading-time__wrapper\"><span class=\"yoast-reading-time__icon\"><svg aria-hidden=\"true\" focusable=\"false\" data-icon=\"clock\" width=\"20\" height=\"20\" fill=\"none\" stroke=\"currentColor\" style=\"display:inline-block;vertical-align:-0.1em\" role=\"img\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewBox=\"0 0 24 24\"><path stroke-linecap=\"round\" stroke-linejoin=\"round\" stroke-width=\"2\" d=\"M12 8v4l3 3m6-3a9 9 0 11-18 0 9 9 0 0118 0z\"><\/path><\/svg><\/span><span class=\"yoast-reading-time__spacer\" style=\"display:inline-block;width:1em\"><\/span><span class=\"yoast-reading-time__descriptive-text\">Predviden \u010das branja: <\/span><span class=\"yoast-reading-time__reading-time\">10<\/span><span class=\"yoast-reading-time__time-unit\"> minut<\/span><\/p>\n\n<\/div>\n<div class=\"gb-container gb-container-article03\">\n\n<p>Na monta\u017enem mestu zmanjka drobnega dela. Nekje v tovarni je \u0161e na zalogi, vendar ga mora nekdo poiskati, zahtevati dopolnitev in prinesti operaterju. Zaradi poceni sestavnega dela je proizvodnja pravkar obstala in izgublja dragoceni \u010das.<\/p>\n\n\n<p>Sistem dveh zabojnikov poka\u017ee potrebo po dopolnitvi, \u0161e preden na delovnem centru zmanjka delov. Operaterji porabljajo dele iz enega zabojnika, drugi pa \u010daka kot rezerva. Ko se prvi izprazni, se spro\u017ei dopolnjevanje; drugi med \u010dakanjem na novo zalogo zagotavlja dele za proizvodnjo.<\/p>\n\n\n<p>Bistveno vpra\u0161anje ni, ali imate dva zabojnika, temve\u010d ali bo dopolnitev prispela, preden porabite rezervo. Pri delih, ki jih izdelujete na strojih, namenjenih tudi drugim naro\u010dilom, vam SkyPlanner APS pomaga odgovoriti na to vpra\u0161anje. Sprejete naloge za dopolnitev zaloge terminira skupaj z naro\u010dili strank, namesto da bi ostale na lo\u010denem seznamu za dopolnjevanje.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Kaj je sistem dveh zabojnikov?<\/h2>\n\n\n<p><strong>Sistem dveh zabojnikov<\/strong> je vizualna metoda dopolnjevanja zalog, pri kateri dve dolo\u010deni koli\u010dini istega artikla omogo\u010data ponavljajo\u010d se cikel porabe in dopolnjevanja. Iz enega zabojnika se oskrbuje mesto porabe. Ko se izprazni, kartica, prazen zabojnik ali drug dogovorjeni signal sporo\u010di potrebo po dopolnitvi, poraba pa se nadaljuje iz drugega zabojnika.<\/p>\n\n\n<p>Drugi zabojnik zagotavlja zalogo za \u010das do dopolnitve. Prednost je preprosta: operaterju ni treba pre\u0161tevati vseh preostalih delov, da bi vedel, kdaj je potrebna dopolnitev. Fizi\u010dna sprememba jasno poka\u017ee potrebo.<\/p>\n\n\n<p>V proizvodnji je metoda posebej uporabna za pritrdilne elemente, spojne elemente in druge drobne dele z redno, ponavljajo\u010do se porabo. Zalogo je mogo\u010de dopolnjevati iz centralnega skladi\u0161\u010da, od zunanjega dobavitelja ali z lastno proizvodnjo. Od vira je odvisno, kaj je treba po prejemu signala opraviti, potreba po zanesljivem odzivu pa ostaja enaka.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Kako poteka cikel z enakima koli\u010dinama<\/h3>\n\n\n<p>Za preprost pilotni preizkus uporabite dva zabojnika z enako standardno koli\u010dino:<\/p>\n\n\n<p>1. <strong>Dele porabljajte le iz enega zabojnika.<\/strong> Drugi naj bo jasno ozna\u010den kot rezerva, ne kot dodatno mesto za odvzem.<\/p>\n\n\n<p>2. <strong>Ko se zabojnik v uporabi izprazni, oddajte signal.<\/strong> Prazen zabojnik ali njegovo kartico prestavite na dolo\u010deno zbirno mesto ali zabele\u017eite dogovorjeni elektronski zahtevek.<\/p>\n\n\n<p>3. <strong>Nadaljujte s porabo iz polnega rezervnega zabojnika.<\/strong> Proizvodnja se nadaljuje, medtem ko oseba, odgovorna za dopolnjevanje, poskrbi za novo zalogo.<\/p>\n\n\n<p>4. <strong>Potrdite, da je dopolnitev v obravnavi.<\/strong> Odgovorna oseba, ki prejme signal, potrdi njegov prejem in dolo\u010di, kdaj naj bi bili uporabni deli spet na mestu porabe.<\/p>\n\n\n<p>5. <strong>Napolnjeni zabojnik vrnite kot rezervo.<\/strong> Preverite artikel in koli\u010dino, ponovno zagotovite ustrezno ozna\u010ditev ter zaklju\u010dite zapis o dopolnitvi. Dele \u0161e naprej porabljajte iz trenutnega zabojnika, dokler se ne izprazni.<\/p>\n\n\n<p>Nato zabojnika znova zamenjata vlogi. Izogibajte se sprotnemu dodajanju delov v zabojnik, ki je v uporabi: s tem lahko prikrijete izpraznitev, ki naj bi spro\u017eila dopolnjevanje.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Izberite dele, katerih poraba in dobava ustrezata metodi<\/h2>\n\n\n<p>Za\u010dnite z deli, ki se redno porabljajo, so jasno ozna\u010deni in imajo zanesljiv vir dopolnjevanja. Najprimernej\u0161i so tisti, s katerimi je v standardni koli\u010dini enostavno ravnati in katerih specifikacije se med posameznimi operacijami ne spreminjajo.<\/p>\n\n\n<p>Poceni del je lahko primeren za to metodo tudi takrat, ko njegovo pomanjkanje ustavi drago operacijo. Njegova nabavna cena ne pove, koliko stane izpad zaloge. Nasprotno pa lahko s polnjenjem dveh velikih zabojnikov z dragim artiklom, ki ga redko uporabljate, ve\u017eete sredstva, ne da bi re\u0161ili ponavljajo\u010do se te\u017eavo z oskrbo.<\/p>\n\n\n<p>Previdnej\u0161i bodite, kadar je poraba ob\u010dasna ali jo ve\u010dinoma dolo\u010dajo posamezna velika naro\u010dila. \u017de en odvzem lahko iz\u010drpa rezervo veliko prej, kot je obi\u010dajno mogo\u010de zagotoviti dopolnitev. Tudi deli, specifi\u010dni za posamezno naro\u010dilo, pogoste spremembe konstrukcije, kratek rok uporabnosti ali zahtevno spremljanje serij zahtevajo ve\u010d kot le priro\u010den par zabojnikov. Ohranite zahtevane postopke ozna\u010devanja, kro\u017eenja zalog in zagotavljanja sledljivosti.<\/p>\n\n\n<p>Dopolnjevanje z dvema zabojnikoma je <a href=\"https:\/\/skyplanner.ai\/sl\/viri\/kanban-v-proizvodnji\/\">povezano s kanbanom<\/a>, vendar <strong>dva zabojnika ne pomenita dveh kartic kanban<\/strong>. Proizvodni cikel z dvema karticama lo\u010duje dovoljenje za izdelavo od dovoljenja za premik materiala. Sistem dveh zabojnikov, opisan v tem \u010dlanku, se nana\u0161a na fizi\u010dno zalogo in odziv ob porabi ene dolo\u010dene koli\u010dine.<\/p>\n\n\n<p>Prav tako ne gre za enako odlo\u010ditev kot pri <a href=\"https:\/\/skyplanner.ai\/sl\/viri\/min-max-upravljanje-zalog\/\">politiki min\u2013max<\/a>. Ta uporablja prag za ponovno naro\u010danje in ciljno raven, do katere se zaloga dopolni; dva zabojnika pa na mestu porabe vidno poka\u017eeta doseganje dolo\u010denega praga porabe. Po zbirni poti je mogo\u010de preva\u017eati prazne in polne zabojnike, vendar sama pot \u0161e ne zagotovi potrditve zahtevka ali izvedbe dopolnitve.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Rezervo dolo\u010dite za celoten \u010das do dopolnitve<\/h2>\n\n\n<p>Merite \u010das od <strong>signala o porabi do trenutka, ko je nova zaloga uporabnih delov na voljo na dolo\u010denem delovnem centru<\/strong>. Merjenja ne kon\u010dajte \u017ee ob oddaji nabavnega naro\u010dila, koncu rezanja na stroju ali prihodu dostave do tovarni\u0161kih vrat.<\/p>\n\n\n<p>Ta \u010das lahko vklju\u010duje \u010dakanje na prevzem signala, preverjanje in odobritev zahtevka, komisioniranje ali izdelavo, kontrolo, prevoz ter vra\u010dilo delov na pravo lokacijo. Pri delih iz lastne proizvodnje je lahko \u010dakanje na stroj, ki obdeluje tudi druga naro\u010dila, pomembnej\u0161e od samega \u010dasa obdelave.<\/p>\n\n\n<p>Za za\u010detni izra\u010dun pomno\u017eite pri\u010dakovano porabo na obratovalno obdobje s \u0161tevilom takih obdobij v celotnem \u010dasu do dopolnitve. Nato dodajte zalogo za za\u0161\u010dito pred nihanji porabe in \u010dasa dopolnjevanja, ki jih mora va\u0161 proces prenesti. Varnostna zaloga je dodatna za\u0161\u010dita znotraj dolo\u010dene koli\u010dine, ne nujno celotna vsebina drugega zabojnika.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Ponazoritveni primer z dvema zabojnikoma<\/h3>\n\n\n<p>Predstavljajte si monta\u017eno mesto, ki porabi 40 sponk na obratovalno izmeno. Vsak zabojnik vsebuje 240 uporabnih sponk. Ko se eden izprazni in operater za\u010dne uporabljati drugega, polni zabojnik pri tej stopnji porabe zagotavlja zalogo za \u0161est obratovalnih izmen.<\/p>\n\n\n<p>\u010ce celoten postopek dopolnitve traja \u0161tiri obratovalne izmene, se na monta\u017enem mestu med \u010dakanjem porabi 160 sponk. Ko prispe nova zaloga, je v zabojniku, ki je v uporabi, \u0161e 80 sponk. Ta preostala koli\u010dina v primeru predstavlja za\u0161\u010dito pred nihanji, ne pa priporo\u010denega dodatka za vsako tovarno.<\/p>\n\n\n<p>Zdaj predpostavimo, da izdelava sponk traja le kratek \u010das, vendar se zaradi \u010dakalne vrste na proizvodnem stroju vrnejo \u0161ele po ve\u010d kot \u0161estih obratovalnih izmenah. Sistem odpove kljub ustreznim zabojnikom in vidnemu signalu. Skraj\u0161ati morate \u010das do dopolnitve, zagotoviti ve\u010djo za\u0161\u010ditno zalogo ali izbrati druga\u010den na\u010din dopolnjevanja.<\/p>\n\n\n<p>Pri izra\u010dunu dosledno upo\u0161tevajte delovne koledarje. \u010ce monta\u017ea porablja dele v no\u010dni izmeni, skladi\u0161\u010de, dobavitelj ali proces dopolnjevanja pa takrat ne deluje, se za\u0161\u010ditna zaloga porablja tudi v tem \u010dasu. Izra\u010dun naj temelji na dejanski porabi v \u010dasu, ko nova zaloga ni na voljo, ne na nepojasnjenem me\u0161anju koledarskih dni in delovnih ur.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Ali morata oba zabojnika vsebovati enako koli\u010dino?<\/h3>\n\n\n<p>Ne. Sistem lahko uporablja ve\u010djo delovno koli\u010dino in manj\u0161o rezervo, ki zadostuje za \u010das do dopolnitve. Vendar zanj dolo\u010dite druga\u010dno pravilo ponovne vzpostavitve zaloge: ob prejemu najprej dopolnite rezervo do predpisane koli\u010dine, preostanek pa dajte v delovni zabojnik.<\/p>\n\n\n<p>Zabojnikov z razli\u010dnima koli\u010dinama ne izmenjujte, kot da bi zagotavljala enako za\u0161\u010dito. Pri za\u010detnem uvajanju je izmenjavo z enakima koli\u010dinama la\u017eje razumeti in preverjati. Razli\u010dni koli\u010dini izberite le, kadar prihranek pri zalogi ali prostoru upravi\u010di potrebo po stro\u017ejem upo\u0161tevanju pravil.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Za vsak signal praznega zabojnika dolo\u010dite odgovorno osebo<\/h2>\n\n\n<p>Kartica v odlagalniku je zahtevek, ne dokaz, da je kdo \u017ee ukrepal. Pred za\u010detkom pilotnega preizkusa se dogovorite, kdo prejme signal, kako hitro potrdi prejem in kdo ukrepa, \u010de bo dopolnitev zamujala. Odgovornost dolo\u010dite za vse izmene, vklju\u010dno z nadome\u0161\u010danjem ob odsotnosti obi\u010dajno odgovorne osebe.<\/p>\n\n\n<p>Signal naj vsebuje dovolj natan\u010dne podatke, da je mogo\u010de ukrepati brez telefonskega klica. Navedite del in po potrebi njegovo revizijo, standardno koli\u010dino za dopolnitev, vir, lokacijo vra\u010dila ter identifikacijsko oznako zabojnika ali kartice. Oseba, ki skrbi za dopolnjevanje, mora ta zahtevek znati lo\u010diti od zahtevka, ki je \u017ee v obravnavi.<\/p>\n\n\n<p>Uporabite lahko na primer dogovorjene statuse, kot so zahtevano, sprejeto in vrnjeno. Papirni signal lahko povsem dobro deluje, \u010de odgovorna oseba potrdi njegov prejem in odprti zahtevki ostanejo vidni. \u010ce isti zahtevek zabele\u017eite tudi elektronsko, pove\u017eite oba zapisa, namesto da bi spro\u017eili \u0161e eno dopolnitev.<\/p>\n\n\n<p>Usklajena morata biti tudi fizi\u010dni cikel in evidenca zalog. Sam premik zabojnika \u0161e ne pomeni elektronske knji\u017ebe zaloge in ne ustvari proizvodnega naloga. Dolo\u010dite, kdaj se v izbranem delovnem postopku evidentirajo poraba, interni prenos, prevzem in morebitni zahtevek za proizvodnjo. \u010ce je bila zaloga \u017ee zmanj\u0161ana na podlagi poro\u010danja o proizvodnji, porabe ne knji\u017eite ponovno zgolj zato, ker je nekdo prevzel prazen zabojnik.<\/p>\n\n\n<p>Ob vrnitvi preverite koli\u010dino uporabnih kosov, njihovo identiteto in lokacijo, preden zaprete zahtevek. Po\u0161kodovani kosi v na videz polnem zabojniku ne zagotavljajo predvidene za\u0161\u010dite pred pomanjkanjem. Dopolnitev je kon\u010dana, ko so pravi, uporabni kosi na voljo uporabniku, ne \u017ee takrat, ko nekdo predhodno nalogo ozna\u010di kot kon\u010dano.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Poraba rezerve je obi\u010dajen signal, zamuda pri dopolnitvi pa izjema<\/h3>\n\n\n<p>Uporaba drugega zabojnika je pri\u010dakovana. Ni pa pri\u010dakovano, da se izprazni, preden prispe dopolnitev.<\/p>\n\n\n<p>Dolo\u010dite, kdaj je treba vklju\u010diti nadrejene oziroma druge odgovorne osebe, in sicer dovolj zgodaj, da lahko ukrepate, dokler je zaloga \u0161e na voljo. \u010ce odgovorni za dopolnitev ne more potrditi vrnitve, preden zmanjka preostale zaloge, vklju\u010dite osebo, ki lahko spremeni odlo\u010ditev o oskrbi ali proizvodnji. Nujna premestitev zaloge je lahko ustrezna re\u0161itev, vendar jo evidentirajte in nato v obeh zabojnikih znova vzpostavite predvideni koli\u010dini. Neevidentirano izposojanje z drugega delovnega mesta pomanjkanje le prestavi drugam.<\/p>\n\n\n<p>Med pilotnim preizkusom spremljajte manjkajo\u010de potrditve prevzema zahtevkov, dejanski \u010das od signala do vrnitve, preostalo rezervo ob vrnitvi in nujne posege. Na podlagi teh ugotovitev izbolj\u0161ajte postopek prevzema signalov in dopolnjevanja, preden zmanj\u0161ate zaloge. Koli\u010dine znova preverite ob spremembah povpra\u0161evanja, izmen, uspe\u0161nosti dobaviteljev ali proizvodnega postopka.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Lastno proizvodnjo za dopolnjevanje zalog terminirajte skupaj z delom, ki potrebuje iste zmogljivosti<\/h2>\n\n\n<p>Pri kupljenih pritrdilnih elementih lahko dopolnjevanje obsega predvsem komisioniranje, dobavo od dobavitelja in notranji transport. Pri sponki, nosilcu ali distan\u010dniku, ki ga izdelujete sami, pa so za dopolnjevanje potrebni isti stroji in \u010das kot za naro\u010dila kupcev. Seznam dopolnitev, ki teh obveznosti ne upo\u0161teva, ni verodostojna podlaga za obljubljeni rok vrnitve.<\/p>\n\n\n<p><strong>Izberite SkyPlanner, kadar za dopolnjevanje zalog potrebujete te skupne proizvodne zmogljivosti.<\/strong> Ko je dopolnitev sprejeta kot proizvodni nalog, Arcturus, umetna inteligenca za terminiranje v sistemu SkyPlanner, <a href=\"https:\/\/skyplanner.ai\/sl\/viri\/kaj-je-terminiranje-proizvodnje\/\">izra\u010duna razpored njenih operacij skupaj z drugim delom<\/a>. Pri tem upo\u0161teva nastavljene delovne centre, zmogljivosti, izmene, odvisnosti med operacijami in prioritete. Ganttov diagram prikazuje izra\u010dunano zaporedje in na\u010drtovani zaklju\u010dek.<\/p>\n\n\n<p>Tako vam ni treba voditi ene \u010dakalne vrste za naro\u010dila kupcev in druge za serije za dopolnjevanje zalog ter ju nato ro\u010dno usklajevati. Vidite lahko, ali je dopolnitev mogo\u010de izvesti, preden bo po pri\u010dakovanjih zmanjkalo rezerve, in kako sprememba prioritete vpliva na druge obveznosti.<\/p>\n\n\n<p>Vrnimo se k primeru sponke. Pri planiranju je klju\u010dno vpra\u0161anje, ali lahko sprejeta nadomestna serija dovolj zgodaj opravi vse korake proizvodnega postopka, da ostane \u010das \u0161e za pregled in dostavo nazaj na monta\u017eo. \u010ce je skupni stroj \u017ee zaseden, lahko o re\u0161itvi tega konflikta odlo\u010dite, \u0161e preden na monta\u017ei zmanjka kosov. Prioritete dolo\u010dite vi, Arcturus pa na njihovi podlagi izra\u010duna terminski na\u010drt.<\/p>\n\n\n<p>\u010ce je omogo\u010deno terminiranje z upo\u0161tevanjem materiala in so podatki o zalogah a\u017eurni, SkyPlanner upo\u0161teva tudi material, potreben za dopolnitev. Prost stroj ne zadostuje, \u010de manjka surovina za serijo. Pri kupljenih delih je mogo\u010de a\u017eurirane datume prihodov iz nabavnih naro\u010dil upo\u0161tevati pri terminiranju dela, za katero so ti deli potrebni. Ko se ti datumi spremenijo, znova izra\u010dunajte terminski na\u010drt.<\/p>\n\n\n<p>SkyPlanner se prek odprtega vmesnika REST API pove\u017ee s katerim koli sistemom ERP ali MES. Obstoje\u010de podatke o naro\u010dilih in zalogah lahko pove\u017eete s terminskim na\u010drtom proizvodnje, namesto da bi dopolnjevanje zalog planirali lo\u010deno. Na delovnem mestu ohranite preprost signal praznega zabojnika, delo, ki ga ta spro\u017ei, pa vklju\u010dite v na\u010drt, ki upo\u0161teva tudi preostalo proizvodnjo.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Kaj je bolj\u0161i pregled nad materialom spremenil v podjetju Eskomatic<\/h3>\n\n\n<p><a href=\"https:\/\/skyplanner.ai\/sl\/zgodbe-strank\/eskomatic\/\">Eskomatic, finsko podjetje za pogodbeno strojno obdelavo<\/a>, je prej \u010dakalne vrste dela urejalo prete\u017eno ro\u010dno. Zaradi omejenega pregleda nad razpolo\u017eljivostjo materiala so pomanjkanje lahko odkrili \u0161ele tik pred na\u010drtovanim za\u010detkom operacije.<\/p>\n\n\n<p>S povezavo sistema SkyPlanner z obstoje\u010dim sistemom ERP je podjetje pridobilo preglednej\u0161i vizualni prikaz \u010dakalne vrste dela in samodejno terminiranje obremenitev. V podjetju Eskomatic poro\u010dajo o natan\u010dnej\u0161ih dobavnih rokih in manj zastojih proizvodnje zaradi pomanjkanja materiala.<\/p>\n\n\n<p>Njihova izku\u0161nja ka\u017ee, kako koristno je povezati razpolo\u017eljivost materiala z dnevnim terminiranjem: planerji se lahko odzovejo prej, namesto da re\u0161ujejo te\u017eavo takrat, ko bi delo \u017ee moralo potekati. Pri dopolnjevanju sistema dveh zabojnikov s proizvodnjo na skupnih strojih gre za enako prakti\u010dno potrebo: pri\u010dakovani rok vrnitve mora temeljiti na dejanskem proizvodnem na\u010drtu.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Za\u010dnite z enim delom in preverite celoten cikel<\/h2>\n\n\n<p>Pilotno preizkusite en del, ki ga redno uporabljate, na enem mestu porabe. Potrdite obe za\u010detni koli\u010dini, uskladite morebitne \u017ee odprte zahtevke za dopolnitev, ozna\u010dite lokacije ter z operaterji in odgovornimi za dopolnjevanje vadite zamenjavo praznega zabojnika. Pred \u0161iritvijo spremljajte ve\u010d celotnih ciklov, vklju\u010dno s predajami izmen.<\/p>\n\n\n<p>Ohranite tisto, kar daje sistemu dveh zabojnikov vrednost: jasen signal in preprosto rutino za operaterja. Pri planiranju se osredoto\u010dite na bistveno: zagotoviti, da je dopolnitev, ki jo signal spro\u017ei, dejansko izvedljiva.<\/p>\n\n\n<p>\u010ce \u017eelite videti, kako bi SkyPlanner terminiral va\u0161o lastno proizvodnjo za dopolnjevanje zalog, <a href=\"https:\/\/skyplanner.ai\/sl\/kontaktna-prodaja\/\">rezervirajte predstavitev<\/a>. Za primer vzemite en del, ki ga redno uporabljate, \u010das pokritja z njegovo rezervo in operacijo za kupca, ki potrebuje isti vir. Ogledate si lahko, kam se dopolnitev uvrsti v skupnem terminskem na\u010drtu in kako vpliva na drugo delo. Lahko pa <a href=\"https:\/\/skyplanner.ai\/sl\/preizkus\/\">preizkusite SkyPlanner s predstavitvenimi podatki<\/a>. \u010ce vam bolj ustreza vodeno uvajanje, uporabite funkcijo Getting Started s podporo umetne inteligence v pomo\u010dniku Assistant.<\/p>\n\n<\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>Sistem dveh zabojnikov: drobni deli pripravljeni za proizvodnjo Domov &raquo; Viri &raquo; Sistem dveh zabojnikov: drobni deli pripravljeni za proizvodnjo Na monta\u017enem mestu zmanjka drobnega dela. Nekje v tovarni je \u0161e na zalogi, vendar ga mora nekdo poiskati, zahtevati dopolnitev in prinesti operaterju. Zaradi poceni sestavnega dela je proizvodnja pravkar obstala in izgublja dragoceni \u010das. &#8230; <a title=\"Sistem dveh zabojnikov: drobni deli pripravljeni za proizvodnjo\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/sl\/viri\/sistem-dveh-zabojnikov\/\" aria-label=\"Read more about Sistem dveh zabojnikov: drobni deli pripravljeni za proizvodnjo\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":111722,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[2567,302],"tags":[],"class_list":["post-111704","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-ucinkovitost-proizvodnje","category-viri","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Sistem dveh zabojnikov: drobni deli pripravljeni za proizvodnjo<\/title>\n<meta name=\"description\" content=\"Prazen zabojnik naj spro\u017ei dopolnitev, ne zastoja. Vzpostavite zanesljiv sistem dveh zabojnikov in s SkyPlanner na\u010drtujte proizvodnjo lastnih delov.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/sl\/viri\/sistem-dveh-zabojnikov\/\" \/>\n<meta property=\"og:locale\" content=\"sl_SI\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Sistem dveh zabojnikov: drobni deli pripravljeni za proizvodnjo\" \/>\n<meta property=\"og:description\" content=\"Prazen zabojnik naj spro\u017ei dopolnitev, ne zastoja. Vzpostavite zanesljiv sistem dveh zabojnikov in s SkyPlanner na\u010drtujte proizvodnjo lastnih delov.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/sl\/viri\/sistem-dveh-zabojnikov\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2026-10-28T03:02:21+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-28T03:03:47+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/two-bin-system-manufacturing-hero.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1536\" \/>\n\t<meta property=\"og:image:height\" content=\"864\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"12 minut\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/sistem-dveh-zabojnikov\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/sistem-dveh-zabojnikov\\\/\"},\"author\":{\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\"},\"headline\":\"Sistem dveh zabojnikov: drobni deli pripravljeni za proizvodnjo\",\"datePublished\":\"2026-10-28T03:02:21+00:00\",\"dateModified\":\"2026-10-28T03:03:47+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/sistem-dveh-zabojnikov\\\/\"},\"wordCount\":2387,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/sistem-dveh-zabojnikov\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/two-bin-system-manufacturing-hero.png\",\"articleSection\":[\"U\u010dinkovitost proizvodnje\",\"viri\"],\"inLanguage\":\"sl-SI\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/sistem-dveh-zabojnikov\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/sistem-dveh-zabojnikov\\\/\",\"name\":\"Sistem dveh zabojnikov: drobni deli pripravljeni za proizvodnjo\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/sistem-dveh-zabojnikov\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/sistem-dveh-zabojnikov\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/two-bin-system-manufacturing-hero.png\",\"datePublished\":\"2026-10-28T03:02:21+00:00\",\"dateModified\":\"2026-10-28T03:03:47+00:00\",\"description\":\"Prazen zabojnik naj spro\u017ei dopolnitev, ne zastoja. Vzpostavite zanesljiv sistem dveh zabojnikov in s SkyPlanner na\u010drtujte proizvodnjo lastnih delov.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/sistem-dveh-zabojnikov\\\/#breadcrumb\"},\"inLanguage\":\"sl-SI\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/sistem-dveh-zabojnikov\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"sl-SI\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/sistem-dveh-zabojnikov\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/two-bin-system-manufacturing-hero.png\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/two-bin-system-manufacturing-hero.png\",\"width\":1536,\"height\":864,\"caption\":\"Two equal parts bins hold assembly clips: one supplies the workstation while the full second bin waits in reserve.\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/sistem-dveh-zabojnikov\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Sistem dveh zabojnikov: drobni deli pripravljeni za proizvodnjo\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"sl-SI\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"sl-SI\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\",\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"sl-SI\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"caption\":\"Jussi M\u00e4ntyl\u00e4\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Sistem dveh zabojnikov: drobni deli pripravljeni za proizvodnjo","description":"Prazen zabojnik naj spro\u017ei dopolnitev, ne zastoja. Vzpostavite zanesljiv sistem dveh zabojnikov in s SkyPlanner na\u010drtujte proizvodnjo lastnih delov.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/sl\/viri\/sistem-dveh-zabojnikov\/","og_locale":"sl_SI","og_type":"article","og_title":"Sistem dveh zabojnikov: drobni deli pripravljeni za proizvodnjo","og_description":"Prazen zabojnik naj spro\u017ei dopolnitev, ne zastoja. Vzpostavite zanesljiv sistem dveh zabojnikov in s SkyPlanner na\u010drtujte proizvodnjo lastnih delov.","og_url":"https:\/\/skyplanner.ai\/sl\/viri\/sistem-dveh-zabojnikov\/","og_site_name":"SkyPlanner","article_published_time":"2026-10-28T03:02:21+00:00","article_modified_time":"2026-10-28T03:03:47+00:00","og_image":[{"width":1536,"height":864,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/two-bin-system-manufacturing-hero.png","type":"image\/png"}],"author":"Jussi M\u00e4ntyl\u00e4","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Jussi M\u00e4ntyl\u00e4","Est. reading time":"12 minut"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/sl\/viri\/sistem-dveh-zabojnikov\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/sl\/viri\/sistem-dveh-zabojnikov\/"},"author":{"name":"Jussi M\u00e4ntyl\u00e4","@id":"https:\/\/skyplanner.ai\/sl\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5"},"headline":"Sistem dveh zabojnikov: drobni deli pripravljeni za proizvodnjo","datePublished":"2026-10-28T03:02:21+00:00","dateModified":"2026-10-28T03:03:47+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/sl\/viri\/sistem-dveh-zabojnikov\/"},"wordCount":2387,"publisher":{"@id":"https:\/\/skyplanner.ai\/sl\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/sl\/viri\/sistem-dveh-zabojnikov\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/two-bin-system-manufacturing-hero.png","articleSection":["U\u010dinkovitost proizvodnje","viri"],"inLanguage":"sl-SI"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/sl\/viri\/sistem-dveh-zabojnikov\/","url":"https:\/\/skyplanner.ai\/sl\/viri\/sistem-dveh-zabojnikov\/","name":"Sistem dveh zabojnikov: drobni deli pripravljeni za proizvodnjo","isPartOf":{"@id":"https:\/\/skyplanner.ai\/sl\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/sl\/viri\/sistem-dveh-zabojnikov\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/sl\/viri\/sistem-dveh-zabojnikov\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/two-bin-system-manufacturing-hero.png","datePublished":"2026-10-28T03:02:21+00:00","dateModified":"2026-10-28T03:03:47+00:00","description":"Prazen zabojnik naj spro\u017ei dopolnitev, ne zastoja. Vzpostavite zanesljiv sistem dveh zabojnikov in s SkyPlanner na\u010drtujte proizvodnjo lastnih delov.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/sl\/viri\/sistem-dveh-zabojnikov\/#breadcrumb"},"inLanguage":"sl-SI","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/sl\/viri\/sistem-dveh-zabojnikov\/"]}]},{"@type":"ImageObject","inLanguage":"sl-SI","@id":"https:\/\/skyplanner.ai\/sl\/viri\/sistem-dveh-zabojnikov\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/two-bin-system-manufacturing-hero.png","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/two-bin-system-manufacturing-hero.png","width":1536,"height":864,"caption":"Two equal parts bins hold assembly clips: one supplies the workstation while the full second bin waits in reserve."},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/sl\/viri\/sistem-dveh-zabojnikov\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/sl\/"},{"@type":"ListItem","position":2,"name":"Sistem dveh zabojnikov: drobni deli pripravljeni za proizvodnjo"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/sl\/#website","url":"https:\/\/skyplanner.ai\/sl\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/sl\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/sl\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"sl-SI"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/sl\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/sl\/","logo":{"@type":"ImageObject","inLanguage":"sl-SI","@id":"https:\/\/skyplanner.ai\/sl\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/sl\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]},{"@type":"Person","@id":"https:\/\/skyplanner.ai\/sl\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5","name":"Jussi M\u00e4ntyl\u00e4","image":{"@type":"ImageObject","inLanguage":"sl-SI","@id":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","caption":"Jussi M\u00e4ntyl\u00e4"}}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/two-bin-system-manufacturing-hero.png",1536,864,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/two-bin-system-manufacturing-hero-150x150.png",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/two-bin-system-manufacturing-hero-300x169.png",300,169,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/two-bin-system-manufacturing-hero-768x432.png",768,432,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/two-bin-system-manufacturing-hero-1024x576.png",1024,576,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/two-bin-system-manufacturing-hero.png",1536,864,false],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/two-bin-system-manufacturing-hero.png",1536,864,false],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/two-bin-system-manufacturing-hero-360x203.png",360,203,true]},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/sl\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Sistem dveh zabojnikov: drobni deli pripravljeni za proizvodnjo Domov &raquo; Viri &raquo; Sistem dveh zabojnikov: drobni deli pripravljeni za proizvodnjo Na monta\u017enem mestu zmanjka drobnega dela. Nekje v tovarni je \u0161e na zalogi, vendar ga mora nekdo poiskati, zahtevati dopolnitev in prinesti operaterju. Zaradi poceni sestavnega dela je proizvodnja pravkar obstala in izgublja dragoceni \u010das.&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/posts\/111704","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/comments?post=111704"}],"version-history":[{"count":1,"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/posts\/111704\/revisions"}],"predecessor-version":[{"id":111767,"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/posts\/111704\/revisions\/111767"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/media\/111722"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/media?parent=111704"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/categories?post=111704"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/tags?post=111704"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}