{"id":111518,"date":"2026-10-27T22:44:45","date_gmt":"2026-10-27T22:44:45","guid":{"rendered":"https:\/\/skyplanner.ai\/?p=111518"},"modified":"2026-10-27T22:46:17","modified_gmt":"2026-10-27T22:46:17","slug":"obvladovanje-pomanjkanja-materiala","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/sl\/viri\/obvladovanje-pomanjkanja-materiala\/","title":{"rendered":"Obvladovanje pomanjkanja materiala: naj naro\u010dila ne obstanejo"},"content":{"rendered":"<div class=\"gb-container gb-container-article01 article-main-content-container\">\n\n<h1 class=\"wp-block-heading\">Obvladovanje pomanjkanja materiala: naj naro\u010dila ne obstanejo<\/h1>\n\n<div class=\"gb-container gb-container-article02\">\n\n<p><a href=\"\/sl\/\">Domov<\/a> &raquo; <a href=\"https:\/\/skyplanner.ai\/sl\/viri\/\">Viri<\/a> &raquo; Obvladovanje pomanjkanja materiala: naj naro\u010dila ne obstanejo<\/p>\n\n\n<p class=\"yoast-reading-time__wrapper\"><span class=\"yoast-reading-time__icon\"><svg aria-hidden=\"true\" focusable=\"false\" data-icon=\"clock\" width=\"20\" height=\"20\" fill=\"none\" stroke=\"currentColor\" style=\"display:inline-block;vertical-align:-0.1em\" role=\"img\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewBox=\"0 0 24 24\"><path stroke-linecap=\"round\" stroke-linejoin=\"round\" stroke-width=\"2\" d=\"M12 8v4l3 3m6-3a9 9 0 11-18 0 9 9 0 0118 0z\"><\/path><\/svg><\/span><span class=\"yoast-reading-time__spacer\" style=\"display:inline-block;width:1em\"><\/span><span class=\"yoast-reading-time__descriptive-text\">Predviden \u010das branja: <\/span><span class=\"yoast-reading-time__reading-time\">10<\/span><span class=\"yoast-reading-time__time-unit\"> minut<\/span><\/p>\n\n<\/div>\n<div class=\"gb-container gb-container-article03\">\n\n<p>Dobavitelj obljubi pospe\u0161eno dobavo manjkajo\u010de komponente. Nabava ima na\u010drt za odpravo te\u017eave. Proizvodnja pa \u0161e vedno potrebuje odgovor: bo komponenta prispela dovolj zgodaj, da bo naro\u010dilo mogo\u010de pravo\u010dasno izpolniti, in kaj naj se proizvaja do njenega prihoda?<\/p>\n\n\n<p>To je prava naloga obvladovanja pomanjkanja materiala. \u010ce se z vsakim manjkajo\u010dim delom ukvarjate enako zavzeto, razpr\u0161ite pozornost med te\u017eave z zelo razli\u010dnimi posledicami. Najkoristnej\u0161i je ukrep, ki omogo\u010di dobavo v dogovorjenem roku ali prepre\u010di zastoj, ki se mu \u0161e lahko izognete.<\/p>\n\n\n<p>SkyPlanner APS povezuje razpolo\u017eljivost materiala s proizvodnimi zmogljivostmi in prednostnimi nalogami. Ko potrdite pomanjkanje in se odlo\u010dite, kako boste ukrepali, te podatke pretvori v skupen terminski plan proizvodnje. Tako porabite manj \u010dasa za ponovno razporejanje dela na strojih in ve\u010d za re\u0161evanje te\u017eave, ki je res pomembna.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Kaj je obvladovanje pomanjkanja materiala v proizvodnji?<\/h2>\n\n\n<p>Obvladovanje pomanjkanja materiala je proces prepoznavanja, preverjanja, prednostnega obravnavanja in odpravljanja pomanjkanja materialov ali komponent, ki ogro\u017ea proizvodnjo. Te\u017eavo z oskrbo pove\u017ee s prizadetimi operacijami, obveznostjo do kupca in izvedljivim ukrepom za odpravo te\u017eave.<\/p>\n\n\n<p>Pomanjkanje ne pomeni vedno, da je stanje zaloge ni\u010d. Material je lahko na polici, vendar ga ni dovolj za vsa naro\u010dila, ki ga potrebujejo pred naslednjim prejemom. Zaloga je lahko nedostopna tudi zato, ker je rezervirana za drug namen, \u010daka na kontrolo ali pa ob predvidenem za\u010detku ni na pravi lokaciji.<\/p>\n\n\n<p>Prav tako vsako pomanjkanje ne pomeni, da je odpovedal dobavitelj. Zaradi zamud pri prejemu, neto\u010dnih evidenc zalog, neevidentirane porabe, izmeta, napak pri komisioniranju in sprememb materialnih potreb, ki izhajajo iz naro\u010dil, lahko operacija ostane brez potrebnega materiala. Pomanjkanje lahko povzro\u010di tudi \u0161ir\u0161a motnja v dobavni verigi, vendar je neposredno vpra\u0161anje v proizvodnji \u0161e vedno konkretno: katere operacije so prizadete in kaj lahko storimo?<\/p>\n\n\n<p><a href=\"\/sl\/viri\/mrp-kratek-vodnik\/\">MRP<\/a> ugotavlja potrebe po materialu in primanjkljaje v oskrbi. <a href=\"https:\/\/skyplanner.ai\/sl\/viri\/pokritost-zalog\/\">Pokritost zalog<\/a> pomaga oceniti, za koliko \u010dasa bo materiala dovolj. Obvladovanje pomanjkanja gre korak dlje: dolo\u010di, kateri potrjeni primanjkljaj je treba odpraviti najprej, in izbrani ukrep pretvori v delo, ki ga proizvodnja lahko izvede.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Preden zahtevate nujno ukrepanje, preverite pomanjkanje<\/h2>\n\n\n<p>Za\u010dnite pri prizadeti operaciji, ne le pri \u0161ifri materiala. Zapis o pomanjkanju je uporaben, ko pove, kaj manjka, kje je potrebno in kdaj mora biti na voljo za uporabo.<\/p>\n\n\n<p>Zberite naslednje podatke:<\/p>\n\n\n<ul class=\"wp-block-list\"><li>Zahtevana specifikacija in koli\u010dina materiala, vklju\u010dno z mersko enoto.<\/li><li>Dejanska koli\u010dina materiala, primernega za uporabo, in vse obstoje\u010de obveznosti, za katere je \u017ee namenjen.<\/li><li>Prizadeta naro\u010dila in operacije ter dogovorjeni dobavni roki.<\/li><li>Pri\u010dakovana koli\u010dina in zanesljiv datum razpolo\u017eljivosti, ki po potrebi upo\u0161teva tudi prevzem, kontrolo in notranji transport.<\/li><li>Drugi manjkajo\u010di materiali ali omejitve zmogljivosti, ki bi \u0161e vedno prepre\u010devali dokon\u010danje.<\/li><li>Oseba, odgovorna za naslednji ukrep, in \u010das ponovnega preverjanja stanja.<\/li><\/ul>\n\n\n<p>Tako se izognete dragim ukrepom za napa\u010dno te\u017eavo. \u010ce je ustrezna komponenta \u017ee v obratu, a \u0161e ni prispela do delovnega centra, dodaten nakup ne bo omogo\u010dil dana\u0161njega za\u010detka. \u010ce je prejeti material v karanteni, njegova prisotnost v skladi\u0161\u010du \u0161e ne pomeni, da je na voljo za uporabo v proizvodnji.<\/p>\n\n\n<p>Lo\u010dujte med pri\u010dakovanim in potrjenim prejemom. Dobavitelja vpra\u0161ajte, kaj je dejansko \u017ee izdelano ali odpremljeno, ne le, ali prvotna obljuba \u0161e velja. Proizvodnja potrebuje zanesljiv datum za planiranje. Optimisti\u010den datum, prepisan z nabavnega naro\u010dila iz prej\u0161njega tedna, lahko prikriva te\u017eavo, vse dokler ni zamujen \u0161e naslednji za\u010detek operacije.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Dajte prednost dobavi, ki jo \u0161e lahko izvedete pravo\u010dasno<\/h2>\n\n\n<p>Najve\u010dja manjkajo\u010da koli\u010dina nima samodejno najvi\u0161je prednosti. Enako velja za najdra\u017ejo komponento ali naro\u010dilo kupca, ki najvztrajneje kli\u010de.<\/p>\n\n\n<p>Pri vsakem potrjenem pomanjkanju se vpra\u0161ajte: <strong>kaj bi odprava tega pomanjkanja spremenila za dobavo?<\/strong> Preverite vse preostale operacije prizadetega naro\u010dila. Zgodnej\u0161i prihod materiala pomaga le, \u010de ostane dovolj \u010dasa za vse potrebne korake, kot so strojna obdelava, kon\u010dna obdelava, monta\u017ea, kontrola in odprema.<\/p>\n\n\n<p>Odlo\u010dilen torej ni le dobavni rok, dogovorjen s kupcem. Pomemben je najpoznej\u0161i trenutek, ko mora biti material na voljo za uporabo, da je mogo\u010de pravo\u010dasno izvesti \u0161e preostali proizvodni postopek. Komponenta, ki prispe v sredo, lahko omogo\u010di eno \u010detrtkovo odpremo, za drugo, ki \u0161e zahteva kon\u010dno obdelavo pri zunanjem izvajalcu, pa je lahko \u017ee prepozna.<\/p>\n\n\n<p>Pomanjkanja primerjajte s tremi prakti\u010dnimi vpra\u0161anji:<\/p>\n\n\n<p>1. <strong>Kaj je ogro\u017eeno?<\/strong> Ugotovite, katere obveznosti do kupcev ali skupine naro\u010dil so ogro\u017eene oziroma kje grozi zastoj proizvodnje. Upo\u0161tevajte poslovne prioritete, o katerih ste se dogovorili v ekipi.<\/p>\n\n\n<p>2. <strong>Ali lahko s predlaganim ukrepom \u0161e dose\u017eete cilj?<\/strong> Preverite druge materiale, preostale operacije in razpolo\u017eljive zmogljivosti. Ne pla\u010dujte za pospe\u0161eno dobavo ene komponente, \u010de druga onemogo\u010da pravo\u010dasno izpolnitev istega naro\u010dila.<\/p>\n\n\n<p>3. <strong>Koliko \u010dasa je \u0161e za ukrepanje?<\/strong> Medtem ko se vsi ukvarjajo z manj nujno te\u017eavo, lahko zmanjka \u010dasa za pravo\u010dasno izpolnitev naro\u010dila, ki bi ga sicer \u0161e lahko izpolnili v roku.<\/p>\n\n\n<p>Nekatera pomanjkanja zahtevajo takoj\u0161njo obravnavo na vi\u0161ji ravni, ker ogro\u017eajo ve\u010d naro\u010dil ali klju\u010dno \u010dasovno okno za proizvodnjo. Pri drugih lahko po\u010dakate na potrjeni redni prejem, ne da bi to vplivalo na dobavni rok. Ta razlika naj bo jasno vidna, da bodo nabava, proizvodnja in prodaja delovale po istih prioritetah.<\/p>\n\n\n<p>\u010ce pravo\u010dasna izvedba ni ve\u010d mogo\u010da, kupca o tem obvestite zgodaj in se dogovorite za nov rok. \u010ce neizvedljiv datum \u0161e naprej ozna\u010dujete kot \u00bbnujen\u00ab, s tem ne pridobite manjkajo\u010dega proizvodnega \u010dasa.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Izberite ukrep, ki spremeni izid<\/h2>\n\n\n<p>Pospe\u0161evanje dobave je smiselno, kadar zgodnej\u0161a razpolo\u017eljivost materiala za uporabo vpliva na to, kaj lahko dokon\u010date. Zahtevajte koli\u010dino in \u010das prihoda, ki to omogo\u010data. Potrjena delna po\u0161iljka je lahko koristnej\u0161a od nepotrjene obljube za celotno nabavno naro\u010dilo.<\/p>\n\n\n<p>Preden se odlo\u010dite za dra\u017eji prevoz, preverite, ali bosta prevzem in kontrola lahko obdelala prispeli material ter ali bodo nato na voljo potrebni proizvodni viri. Prihranek pri prevoznem \u010dasu nima velike vrednosti, \u010de material nato \u010daka na stroj \u0161e po predvidenem roku odpreme.<\/p>\n\n\n<p>Druga mo\u017enost je lahko razpolo\u017eljiva zaloga na drugi lokaciji. Preden odobrite njeno uporabo, preverite specifikacijo, stanje, \u010das premestitve in obstoje\u010de obveznosti, za katere je \u017ee namenjena. Prenos pomanjkanja z enega kupca na drugega je poslovna odlo\u010ditev, ne popravek zaloge.<\/p>\n\n\n<p>Nadomestni material ali komponento morata ustrezno odobriti tehni\u010dna slu\u017eba in slu\u017eba kakovosti, pridobiti pa je treba tudi morebitno zahtevano soglasje kupca. Podoben opis ali mere \u0161e ne pomenijo dovoljenja za uporabo. Pri odlo\u010danju o ukrepu upo\u0161tevajte tudi \u010das za pridobitev odobritev.<\/p>\n\n\n<p>Sprememba zaporedja operacij lahko ohrani proizvodnjo v teku, medtem ko blokirana operacija \u010daka. Izberite delo, za katero so na voljo materiali in izpolnjeni drugi pogoji, nato pa preverite, katere skupne vire bo zasedlo. Zapolnitev trenutno prostega stroja je lahko napa\u010dna odlo\u010ditev, \u010de s tem zasedete termin za kon\u010dno obdelavo, ki ga bo prednostno naro\u010dilo potrebovalo ob prihodu materiala.<\/p>\n\n\n<p>Pomagata lahko tudi delna izdelava ali delna odprema, \u010de to dopu\u0161\u010data proizvodni postopek in dogovor s kupcem. Jasno dolo\u010dite koli\u010dine in preostalo obveznost. Sicer lahko ve\u010d delno dokon\u010danih naro\u010dil porabi material, ki ga primanjkuje, ne da bi lahko odpremili vsaj eno dobavo.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Primer: ista komponenta, razli\u010dni ukrepi za izpolnitev naro\u010dil<\/h2>\n\n\n<p>Predstavljajte si dve naro\u010dili, od katerih vsako potrebuje 40 kosov iste komponente. Za uporabo je na voljo le 40 kosov. Za petek je potrjena dobava \u0161e 40 kosov.<\/p>\n\n\n<p>Naro\u010dilo A je treba odpremiti v \u010detrtek. Drugi materiali zanj so pripravljeni, preostale operacije pa je mogo\u010de izvesti do odpreme, \u010de dobi razpolo\u017eljive komponente. Rok za naro\u010dilo B je naslednji torek, vendar bo druga komponenta, ki jo potrebuje, na voljo za uporabo \u0161ele v ponedeljek.<\/p>\n\n\n<p><strong>Naro\u010dilo A.<\/strong> Potrebuje 40 komponent. Drugi materiali so pripravljeni, dokon\u010danje v \u010detrtek pa je izvedljivo, \u010de zagotovite zmogljivosti za preostale operacije. Odobrite uporabo razpolo\u017eljive koli\u010dine za naro\u010dilo A in zagotovite termine za njegov preostali proizvodni postopek.<\/p>\n\n\n<p><strong>Naro\u010dilo B.<\/strong> Potrebuje 40 komponent, vendar izvedbo do ponedeljka ovira pomanjkanje drugega materiala. Preverite, ali petkov prevzem ob upo\u0161tevanju pripravljenosti v ponedeljek in preostalih operacij omogo\u010da dobavo v torek.<\/p>\n\n\n<p><strong>Naro\u010dilo C, pripravljeno za izvedbo.<\/strong> Ne potrebuje komponente, ki je primanjkuje, vendar za kon\u010dno obdelavo potrebuje isti vir. Razporedite ga le v termin, ki ohranja potrebne zmogljivosti za kon\u010dno obdelavo naro\u010dila A.<\/p>\n\n\n<p>Dodelitev razpolo\u017eljive koli\u010dine naro\u010dilu A je v tem primeru upravi\u010dena zaradi celovite slike pripravljenosti in mo\u017enosti dobave, ne zgolj zato, ker ima A zgodnej\u0161i rok. Tudi \u010de bi za B pospe\u0161ili dobavo dodatne koli\u010dine skupne komponente, s tem ne bi odpravili druge ovire, zaradi katere mora \u010dakati do ponedeljka.<\/p>\n\n\n<p>Iz istega razloga nasvet \u00bbizvajajte vse, kar je pripravljeno\u00ab ni dovolj. Izvedba naro\u010dila C je lahko koristna, vendar ne sme zasesti zmogljivosti, ki omogo\u010dajo, da naro\u010dilo A \u0161e pravo\u010dasno dokon\u010date.<\/p>\n\n\n<p>\u010ce dobava druge komponente, predvidena za ponedeljek, zamuja, je za B potrebna nova odlo\u010ditev. To spremembo je treba usklajeno upo\u0161tevati na seznamu manjkajo\u010dih materialov, pri \u017ee dodeljenem materialu in v terminskem planu proizvodnje.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Odlo\u010ditev o ukrepanju prenesite v terminski plan v sistemu SkyPlanner<\/h2>\n\n\n<p>Seznam manjkajo\u010dih materialov poka\u017ee, \u010demu se je treba posvetiti. Sam po sebi pa ne more uskladiti preostalega dela z vsemi drugimi naro\u010dili v tovarni. Prav tu SkyPlanner prina\u0161a prakti\u010dno prednost.<\/p>\n\n\n<p>Ko je omogo\u010deno terminiranje z upo\u0161tevanjem materiala, SkyPlanner pri izra\u010dunu terminskega plana upo\u0161teva materiale, povezane s proizvodnjo, in sproti posodobljene podatke o njihovi razpolo\u017eljivosti. Na podlagi datumov dobave na nabavnih naro\u010dilih se pri dolo\u010danju terminov operacij upo\u0161tevajo tudi pri\u010dakovane dobave materiala, ki ga te operacije potrebujejo. Ko posodobite datum dobave, ki zamuja, in znova izra\u010dunate terminski plan, se sprememba prenese v planiranje proizvodnje, namesto da bi ostala le v opombi nabave.<\/p>\n\n\n<p>Arcturus, umetna inteligenca za terminiranje v sistemu SkyPlanner, razporedi delo glede na nastavljene zmogljivosti, izmene, odvisnosti med operacijami in prioritete. Rezultat je viden v <a href=\"https:\/\/skyplanner.ai\/sl\/viri\/kaj-je-terminiranje-proizvodnje\/\">Ganttovem terminskem planu<\/a>. Preverite lahko, kdaj so prizadete operacije na\u010drtovane, kako so razporejene preostale operacije in kaj se je spremenilo pri drugih naro\u010dilih.<\/p>\n\n\n<p>V zgornjem primeru planer najprej potrdi koli\u010dino, primerno za uporabo, in odobri odlo\u010ditev o dodelitvi materiala. Posodobljeni podatki o materialu in izbrane prioritete so nato podlaga za ponovni izra\u010dun terminskega plana proizvodnje. Planer pregleda zaporedje operacij za A, poznej\u0161o pripravljenost naro\u010dila B in umestitev naro\u010dila C v terminski plan skupnega vira. Za pregled skupnega vpliva na proizvodnjo ni treba posebej preurejati \u010dakalne vrste vsakega stroja.<\/p>\n\n\n<p><strong>Vi odlo\u010dite, katere obveznosti je treba ohraniti; SkyPlanner na podlagi teh odlo\u010ditev izra\u010duna terminski plan.<\/strong> Ko so viri omejeni, lahko prioritete strank vplivajo na vrstni red razporejanja. Tako je s planiranjem manj dela, poslovna presoja pa ostane v rokah ljudi, ki so odgovorni za odnose s strankami.<\/p>\n\n\n<p>SkyPlanner se prek odprtega vmesnika REST API pove\u017ee s katerim koli sistemom ERP ali MES. Obstoje\u010de podatke o naro\u010dilih in materialih lahko pove\u017eete s terminiranjem proizvodnje z omejenimi zmogljivostmi, ne da bi morali zgolj zaradi usklajevanja ukrepov ob pomanjkanju zamenjati delujo\u010d sistem ERP.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Kaj je bolj\u0161i pregled nad materiali spremenil v podjetju Eskomatic<\/h2>\n\n\n<p><a href=\"https:\/\/skyplanner.ai\/sl\/zgodbe-strank\/eskomatic\/\">Eskomatic, podjetje za pogodbeno strojno obdelavo,<\/a> je prej \u010dakalne vrste operacij urejalo ve\u010dinoma ro\u010dno v starej\u0161em sistemu ERP in sistemu za vodenje proizvodnje. Zaradi omejenega pregleda nad razpolo\u017eljivostjo materiala so pomanjkanje lahko odkrili \u0161ele tik pred na\u010drtovanim za\u010detkom operacije.<\/p>\n\n\n<p>S sistemom SkyPlanner je Eskomatic dobil preglednej\u0161i prikaz zaporedja operacij v Ganttovem diagramu in pregled nad pomanjkanjem materiala ob na\u010drtovani obremenitvi proizvodnje. Podjetje poro\u010da o manj zastojih v proizvodnji zaradi manjkajo\u010dega materiala in natan\u010dnej\u0161em dolo\u010danju dobavnih rokov s samodejnim razporejanjem dela glede na obremenitev proizvodnje.<\/p>\n\n\n<p>Za planerja, ki re\u0161uje pomanjkanje materiala, je to pomembna sprememba: manj \u010dasa porabi za ugotavljanje, zakaj dela ni mogo\u010de za\u010deti, in ima jasnej\u0161o podlago za odlo\u010danje, kaj je \u0161e mogo\u010de dobaviti.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Dokon\u010dajte ukrep, ne le zaprite vrstice na seznamu<\/h2>\n\n\n<p>Vsakemu ukrepu za odpravo te\u017eave dolo\u010dite odgovorno osebo in \u010das naslednjega preverjanja. Nabava potrdi, kako bo zagotovljena dobava; skladi\u0161\u010de in slu\u017eba kakovosti potrdita razpolo\u017eljivost materiala, primernega za uporabo; planiranje proizvodnje posodobi zaporedje; prodaja sporo\u010di morebitne spremembe dogovorjenih dobavnih rokov. V majhni tovarni lahko ena oseba opravlja ve\u010d vlog, vendar je treba informacije med njimi vseeno predati.<\/p>\n\n\n<p>Odstopanja ne ozna\u010dite kot re\u0161enega zgolj zato, ker dobavitelj sporo\u010di, da je blago odposlano. Potrdite, da je zahtevana koli\u010dina primerna za uporabo, da so prizadete operacije v terminski plan ume\u0161\u010dene tako, da jih je mogo\u010de izvesti, in da imajo izvajalci aktualen plan.<\/p>\n\n\n<p>Nato se u\u010dite iz ponavljajo\u010dih se te\u017eav. Spremljajte trajanje zastojev zaradi materiala, zanesljivost obljub o odpravi te\u017eav in katere dogovorjene dobavne roke ste z ukrepi dejansko ohranili. Poi\u0161\u010dite izvor ponavljajo\u010dih se napak v evidencah, nena\u010drtovane porabe ali nezanesljivih dobav. Manj odprtih vrstic na seznamu manjkajo\u010dih materialov ni uspeh, \u010de nedokon\u010dana naro\u010dila zgolj \u010dakajo drugje.<\/p>\n\n\n<p>Za tovarne, ki se redno spoprijemajo z zamudami pri dobavi materiala in usklajujejo uporabo skupnih strojev, je SkyPlanner APS prakti\u010den na\u010din, da odlo\u010ditve o ukrepanju pove\u017eejo z izvedljivim planom proizvodnje. Zmanj\u0161a ro\u010dno usklajevanje seznamov materiala s \u010dakalnimi vrstami na strojih, zato se lahko ekipa osredoto\u010di na ohranjanje dobavnih rokov.<\/p>\n\n\n<p><a href=\"https:\/\/skyplanner.ai\/sl\/kontaktna-prodaja\/\">Rezervirajte predstavitev sistema SkyPlanner<\/a> in pripravite en resni\u010den primer pomanjkanja, naro\u010dila, ki potrebujejo ta material, ter potrjen datum dobave. Na tej podlagi se pogovorite, kaj je mogo\u010de izvajati zdaj, kaj mora po\u010dakati in kako odlo\u010ditev vpliva na preostalo proizvodnjo. \u010ce \u017eelite sistem najprej raziskati sami, <a href=\"https:\/\/skyplanner.ai\/sl\/preizkus\/\">preizkusite SkyPlanner z demonstracijskimi podatki<\/a> ali uporabite postopek za prve korake s pomo\u010djo umetne inteligence v pomo\u010dniku SkyPlanner.<\/p>\n\n<\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>Obvladovanje pomanjkanja materiala: naj naro\u010dila ne obstanejo Domov &raquo; Viri &raquo; Obvladovanje pomanjkanja materiala: naj naro\u010dila ne obstanejo Dobavitelj obljubi pospe\u0161eno dobavo manjkajo\u010de komponente. Nabava ima na\u010drt za odpravo te\u017eave. Proizvodnja pa \u0161e vedno potrebuje odgovor: bo komponenta prispela dovolj zgodaj, da bo naro\u010dilo mogo\u010de pravo\u010dasno izpolniti, in kaj naj se proizvaja do njenega prihoda? &#8230; <a title=\"Obvladovanje pomanjkanja materiala: naj naro\u010dila ne obstanejo\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/sl\/viri\/obvladovanje-pomanjkanja-materiala\/\" aria-label=\"Read more about Obvladovanje pomanjkanja materiala: naj naro\u010dila ne obstanejo\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":111530,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[2539,302],"tags":[],"class_list":["post-111518","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-aps-in-terminiranje","category-viri","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Obvladovanje pomanjkanja materiala: naj naro\u010dila ne obstanejo<\/title>\n<meta name=\"description\" content=\"Dolo\u010dite, katero pomanjkanje odpraviti najprej, ohranite dobavne roke in s SkyPlanner izdelajte izvedljiv proizvodni plan glede na razpolo\u017eljivi material.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/sl\/viri\/obvladovanje-pomanjkanja-materiala\/\" \/>\n<meta property=\"og:locale\" content=\"sl_SI\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Obvladovanje pomanjkanja materiala: naj naro\u010dila ne obstanejo\" \/>\n<meta property=\"og:description\" content=\"Dolo\u010dite, katero pomanjkanje odpraviti najprej, ohranite dobavne roke in s SkyPlanner izdelajte izvedljiv proizvodni plan glede na razpolo\u017eljivi material.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/sl\/viri\/obvladovanje-pomanjkanja-materiala\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2026-10-27T22:44:45+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-27T22:46:17+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/material-shortages-manufacturing-hero.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1774\" \/>\n\t<meta property=\"og:image:height\" content=\"887\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"12 minut\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/obvladovanje-pomanjkanja-materiala\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/obvladovanje-pomanjkanja-materiala\\\/\"},\"author\":{\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\"},\"headline\":\"Obvladovanje pomanjkanja materiala: naj naro\u010dila ne obstanejo\",\"datePublished\":\"2026-10-27T22:44:45+00:00\",\"dateModified\":\"2026-10-27T22:46:17+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/obvladovanje-pomanjkanja-materiala\\\/\"},\"wordCount\":2378,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/obvladovanje-pomanjkanja-materiala\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/material-shortages-manufacturing-hero.png\",\"articleSection\":[\"APS in terminiranje\",\"viri\"],\"inLanguage\":\"sl-SI\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/obvladovanje-pomanjkanja-materiala\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/obvladovanje-pomanjkanja-materiala\\\/\",\"name\":\"Obvladovanje pomanjkanja materiala: naj naro\u010dila ne obstanejo\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/obvladovanje-pomanjkanja-materiala\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/obvladovanje-pomanjkanja-materiala\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/material-shortages-manufacturing-hero.png\",\"datePublished\":\"2026-10-27T22:44:45+00:00\",\"dateModified\":\"2026-10-27T22:46:17+00:00\",\"description\":\"Dolo\u010dite, katero pomanjkanje odpraviti najprej, ohranite dobavne roke in s SkyPlanner izdelajte izvedljiv proizvodni plan glede na razpolo\u017eljivi material.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/obvladovanje-pomanjkanja-materiala\\\/#breadcrumb\"},\"inLanguage\":\"sl-SI\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/obvladovanje-pomanjkanja-materiala\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"sl-SI\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/obvladovanje-pomanjkanja-materiala\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/material-shortages-manufacturing-hero.png\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/material-shortages-manufacturing-hero.png\",\"width\":1774,\"height\":887,\"caption\":\"An assembly waits for a missing component while available parts keep another assembly moving.\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/obvladovanje-pomanjkanja-materiala\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Obvladovanje pomanjkanja materiala: naj naro\u010dila ne obstanejo\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"sl-SI\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"sl-SI\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\",\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"sl-SI\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"caption\":\"Jussi M\u00e4ntyl\u00e4\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Obvladovanje pomanjkanja materiala: naj naro\u010dila ne obstanejo","description":"Dolo\u010dite, katero pomanjkanje odpraviti najprej, ohranite dobavne roke in s SkyPlanner izdelajte izvedljiv proizvodni plan glede na razpolo\u017eljivi material.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/sl\/viri\/obvladovanje-pomanjkanja-materiala\/","og_locale":"sl_SI","og_type":"article","og_title":"Obvladovanje pomanjkanja materiala: naj naro\u010dila ne obstanejo","og_description":"Dolo\u010dite, katero pomanjkanje odpraviti najprej, ohranite dobavne roke in s SkyPlanner izdelajte izvedljiv proizvodni plan glede na razpolo\u017eljivi material.","og_url":"https:\/\/skyplanner.ai\/sl\/viri\/obvladovanje-pomanjkanja-materiala\/","og_site_name":"SkyPlanner","article_published_time":"2026-10-27T22:44:45+00:00","article_modified_time":"2026-10-27T22:46:17+00:00","og_image":[{"width":1774,"height":887,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/material-shortages-manufacturing-hero.png","type":"image\/png"}],"author":"Jussi M\u00e4ntyl\u00e4","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Jussi M\u00e4ntyl\u00e4","Est. reading time":"12 minut"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/sl\/viri\/obvladovanje-pomanjkanja-materiala\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/sl\/viri\/obvladovanje-pomanjkanja-materiala\/"},"author":{"name":"Jussi M\u00e4ntyl\u00e4","@id":"https:\/\/skyplanner.ai\/sl\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5"},"headline":"Obvladovanje pomanjkanja materiala: naj naro\u010dila ne obstanejo","datePublished":"2026-10-27T22:44:45+00:00","dateModified":"2026-10-27T22:46:17+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/sl\/viri\/obvladovanje-pomanjkanja-materiala\/"},"wordCount":2378,"publisher":{"@id":"https:\/\/skyplanner.ai\/sl\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/sl\/viri\/obvladovanje-pomanjkanja-materiala\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/material-shortages-manufacturing-hero.png","articleSection":["APS in terminiranje","viri"],"inLanguage":"sl-SI"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/sl\/viri\/obvladovanje-pomanjkanja-materiala\/","url":"https:\/\/skyplanner.ai\/sl\/viri\/obvladovanje-pomanjkanja-materiala\/","name":"Obvladovanje pomanjkanja materiala: naj naro\u010dila ne obstanejo","isPartOf":{"@id":"https:\/\/skyplanner.ai\/sl\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/sl\/viri\/obvladovanje-pomanjkanja-materiala\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/sl\/viri\/obvladovanje-pomanjkanja-materiala\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/material-shortages-manufacturing-hero.png","datePublished":"2026-10-27T22:44:45+00:00","dateModified":"2026-10-27T22:46:17+00:00","description":"Dolo\u010dite, katero pomanjkanje odpraviti najprej, ohranite dobavne roke in s SkyPlanner izdelajte izvedljiv proizvodni plan glede na razpolo\u017eljivi material.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/sl\/viri\/obvladovanje-pomanjkanja-materiala\/#breadcrumb"},"inLanguage":"sl-SI","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/sl\/viri\/obvladovanje-pomanjkanja-materiala\/"]}]},{"@type":"ImageObject","inLanguage":"sl-SI","@id":"https:\/\/skyplanner.ai\/sl\/viri\/obvladovanje-pomanjkanja-materiala\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/material-shortages-manufacturing-hero.png","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/material-shortages-manufacturing-hero.png","width":1774,"height":887,"caption":"An assembly waits for a missing component while available parts keep another assembly moving."},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/sl\/viri\/obvladovanje-pomanjkanja-materiala\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/sl\/"},{"@type":"ListItem","position":2,"name":"Obvladovanje pomanjkanja materiala: naj naro\u010dila ne obstanejo"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/sl\/#website","url":"https:\/\/skyplanner.ai\/sl\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/sl\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/sl\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"sl-SI"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/sl\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/sl\/","logo":{"@type":"ImageObject","inLanguage":"sl-SI","@id":"https:\/\/skyplanner.ai\/sl\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/sl\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]},{"@type":"Person","@id":"https:\/\/skyplanner.ai\/sl\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5","name":"Jussi M\u00e4ntyl\u00e4","image":{"@type":"ImageObject","inLanguage":"sl-SI","@id":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","caption":"Jussi M\u00e4ntyl\u00e4"}}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/material-shortages-manufacturing-hero.png",1774,887,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/material-shortages-manufacturing-hero-150x150.png",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/material-shortages-manufacturing-hero-300x150.png",300,150,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/material-shortages-manufacturing-hero-768x384.png",768,384,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/material-shortages-manufacturing-hero-1024x512.png",1024,512,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/material-shortages-manufacturing-hero-1536x768.png",1536,768,true],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/material-shortages-manufacturing-hero.png",1774,887,false],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/material-shortages-manufacturing-hero-360x180.png",360,180,true]},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/sl\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Obvladovanje pomanjkanja materiala: naj naro\u010dila ne obstanejo Domov &raquo; Viri &raquo; Obvladovanje pomanjkanja materiala: naj naro\u010dila ne obstanejo Dobavitelj obljubi pospe\u0161eno dobavo manjkajo\u010de komponente. Nabava ima na\u010drt za odpravo te\u017eave. Proizvodnja pa \u0161e vedno potrebuje odgovor: bo komponenta prispela dovolj zgodaj, da bo naro\u010dilo mogo\u010de pravo\u010dasno izpolniti, in kaj naj se proizvaja do njenega prihoda?&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/posts\/111518","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/comments?post=111518"}],"version-history":[{"count":1,"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/posts\/111518\/revisions"}],"predecessor-version":[{"id":111582,"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/posts\/111518\/revisions\/111582"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/media\/111530"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/media?parent=111518"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/categories?post=111518"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/tags?post=111518"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}