{"id":111426,"date":"2026-10-27T20:52:03","date_gmt":"2026-10-27T20:52:03","guid":{"rendered":"https:\/\/skyplanner.ai\/?p=111426"},"modified":"2026-10-27T20:54:32","modified_gmt":"2026-10-27T20:54:32","slug":"milk-run-logistika","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/sl\/viri\/milk-run-logistika\/","title":{"rendered":"Milk run logistika: za nemoten pretok materiala v obratu"},"content":{"rendered":"<div class=\"gb-container gb-container-article01 article-main-content-container\">\n\n<h1 class=\"wp-block-heading\">Milk run logistika: za nemoten pretok materiala v obratu<\/h1>\n\n<div class=\"gb-container gb-container-article02\">\n\n<p><a href=\"\/sl\/\">Domov<\/a> &raquo; <a href=\"https:\/\/skyplanner.ai\/sl\/viri\/\">Viri<\/a> &raquo; Milk run logistika: za nemoten pretok materiala v obratu<\/p>\n\n\n<p class=\"yoast-reading-time__wrapper\"><span class=\"yoast-reading-time__icon\"><svg aria-hidden=\"true\" focusable=\"false\" data-icon=\"clock\" width=\"20\" height=\"20\" fill=\"none\" stroke=\"currentColor\" style=\"display:inline-block;vertical-align:-0.1em\" role=\"img\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewBox=\"0 0 24 24\"><path stroke-linecap=\"round\" stroke-linejoin=\"round\" stroke-width=\"2\" d=\"M12 8v4l3 3m6-3a9 9 0 11-18 0 9 9 0 0118 0z\"><\/path><\/svg><\/span><span class=\"yoast-reading-time__spacer\" style=\"display:inline-block;width:1em\"><\/span><span class=\"yoast-reading-time__descriptive-text\">Predviden \u010das branja: <\/span><span class=\"yoast-reading-time__reading-time\">10<\/span><span class=\"yoast-reading-time__time-unit\"> minut<\/span><\/p>\n\n<\/div>\n<div class=\"gb-container gb-container-article03\">\n\n<p>Predstavljajte si, da vozilo za oskrbo z materialom pripelje vsake pol ure. Monta\u017eni celici kljub temu zmanjka delov. Obhodi so redni, material za dopolnitev zaloge pa prispe prepozno.<\/p>\n\n\n<p>Prav v tem je razlika med tem, da imate milk run, in tem, da ta tudi deluje. Milk run logistika temelji na ponavljajo\u010di se poti z ve\u010d postanki za prevzem ali dostavo materiala. Znotraj obrata lahko ponavljajo\u010de se posami\u010dne prevoze nadomesti s predvidljivim obhodom, ki dostavi dele in odpelje prazne zabojnike.<\/p>\n\n\n<p>Ni dovolj vpra\u0161ati: \u00bbAli lahko to pot prevozimo vsakih 30 minut?\u00ab Pomembnej\u0161e vpra\u0161anje je: \u00bbAli bo imel vsak delovni center dovolj uporabnega materiala do naslednje dopolnitve zaloge?\u00ab Najprej odgovorite na to. Nato razpolo\u017eljivost materiala pove\u017eite s planom proizvodnje. SkyPlanner APS vam pomaga operacije, ki porabljajo ta material, terminirati skupaj s preostalo proizvodnjo, ne da bi morali ro\u010dno popravljati zaporedja na vseh odvisnih strojih.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Kaj je milk run v proizvodnji?<\/h2>\n\n\n<p>Notranji milk run je ponavljajo\u010d se oskrbovalni obhod med izvorno lokacijo, na primer skladi\u0161\u010dem ali supermarketom (nadzorovanim mestom za oskrbo z materialom), in ve\u010d proizvodnimi delovnimi centri. Pot in interval obiskov sta dolo\u010dena, tovor pa se lahko spreminja glede na porabo. Polni zabojniki prispejo na dogovorjena dostavna mesta, prazni zabojniki in signali za dopolnitev zaloge pa se po oskrbovalnem krogu vrnejo na izhodi\u0161\u010de.<\/p>\n\n\n<p>Isti izraz se uporablja tudi v zunanji logistiki, na primer za tovornjak, ki pri ve\u010d dobaviteljih prevzame dele in se nato vrne v obrat. Ta vodnik obravnava notranjo oskrbo proizvodnje, pri kateri je klju\u010den prenos razpolo\u017eljive zaloge do delovnega centra, ki jo potrebuje.<\/p>\n\n\n<p>Milk run in kanban imata razli\u010dni vlogi. <a href=\"https:\/\/skyplanner.ai\/sl\/viri\/kanban-v-proizvodnji\/\">Kanban odobri dopolnitev zaloge<\/a> po porabi, milk run pa material fizi\u010dno prepelje. Prazen zabojnik lahko slu\u017ei kot signal, vendar zaznani signal \u0161e ne pomeni, da je nadomestni polni zabojnik \u017ee na poti.<\/p>\n\n\n<p>\u010ce ti vlogi jasno lo\u010dite, la\u017eje ugotovite vzrok pomanjkanja. Je delovni center signal poslal prepozno? Na izvorni lokaciji ni bilo zaloge? Komisioniranje ni bilo kon\u010dano do odhoda? Ali pa je vozilo prispelo \u0161ele, ko je delovnemu centru \u017ee zmanjkalo materiala? Vsaka od teh te\u017eav zahteva druga\u010den odziv.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Kdaj je milk run smiselna izbira?<\/h2>\n\n\n<p>Za\u010dnite s tokovi materiala, ne z nakupom vozila. Primerni so tokovi s ponavljajo\u010dimi se potrebami na ve\u010d bli\u017enjih lokacijah, z zabojniki, s katerimi je preprosto ravnati, in z izvorno lokacijo, ki lahko zanesljivo pripravi material za dopolnitev zalog. Redni obhod je smiseln, ker zdru\u017ei ve\u010d oskrbovalnih potreb.<\/p>\n\n\n<p>Preverite vzorec porabe znotraj izmene. Del, ki se enakomerno porablja ves dan, zahteva druga\u010dno oskrbo kot velik sestavni del, ki ga potrebujete le enkrat za posebno naro\u010dilo. Po povpre\u010dni dnevni koli\u010dini bi se lahko oba zdela primerna za milk run, \u010deprav so njune potrebe po prevozu zelo razli\u010dne.<\/p>\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Zna\u010dilnosti toka materiala<\/th><th>Smiselna za\u010detna izbira<\/th><\/tr><\/thead><tbody><tr><td>Ve\u010d celic redno porablja obi\u010dajne dele iz majhnih zabojnikov<\/td><td>Preizkusite skupni milk run z dolo\u010denim signalom za dopolnitev zaloge in intervalom obiskov.<\/td><\/tr><tr><td>Ena lokacija ob vsakem obisku porabi skoraj ves tovor polno nalo\u017eenega vozila<\/td><td>Namesto dodajanja nepovezanih postankov preverite mo\u017enost namenske oskrbe.<\/td><\/tr><tr><td>Veliki ali dragi deli so potrebni ob dolo\u010denih, nerednih terminih<\/td><td>Razmislite o lo\u010deni dostavi ob dolo\u010denem \u010dasu, namesto da te dele vklju\u010dujete v vmesno zalogo za redne obhode.<\/td><\/tr><tr><td>Na postankih redko potrebujejo material, vozilo pa pri ve\u010dini obhodov preva\u017ea malo tovora<\/td><td>Znova presodite obseg poti ali uporabite oskrbo na podlagi dejanskih potreb.<\/td><\/tr><tr><td>Poraba se ob spremembi proizvodnega programa mo\u010dno spremeni<\/td><td>Preden dolo\u010dite stalen interval in koli\u010dino na zabojnik, posebej preverite proizvodni program z najve\u010djo porabo.<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>Prakti\u010dna re\u0161itev je pogosto kombiniran pristop: redni obhod za primerne dele in jasno dolo\u010den postopek za izjeme. Da bi izkoristili prednosti milk run logistike, ni treba vsega materiala v obratu vklju\u010diti v eno pot.<\/p>\n\n\n<p>Mo\u017ene koristi so jasne. Skupni obhodi zmanj\u0161ajo \u0161tevilo posami\u010dnih oskrbovalnih vo\u017eenj, zanesljiv interval dopolnjevanja pa omogo\u010da planiranje manj\u0161ih zalog ob liniji. Operaterji lahko porabijo manj \u010dasa za iskanje in pridobivanje delov. Te koristi so odvisne od delovanja celotnega oskrbovalnega kroga: malo nalo\u017eeno vozilo ni dokaz neuspeha, polno vozilo pa ne dokazuje, da je proizvodnja dobro oskrbljena.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Pred dolo\u010ditvijo voznega reda zasnujte celoten krog dopolnjevanja zalog<\/h2>\n\n\n<p>Na\u010drt poti poka\u017ee, kje vozi vozilo. Za u\u010dinkovito oskrbo pa je treba dolo\u010diti tudi, kaj spro\u017ei dopolnitev zaloge, kdaj izvorna lokacija prejme to informacijo in ob katerem obisku prispe nadomestni material.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Za\u010dnite s porabo v vsakem delovnem centru<\/h3>\n\n\n<p>Za vsak del in ciljno lokacijo dolo\u010dite koli\u010dino v zabojniku, pri\u010dakovano porabo pri ustreznem proizvodnem programu, dostavno mesto in razpolo\u017eljivi prostor. Zabele\u017eite tudi izvorno lokacijo ter osebo ali postopek, odgovoren za pripravo naslednjega tovora. Te informacije je smiselno zbrati v <a href=\"https:\/\/skyplanner.ai\/sl\/viri\/pfep\/\">planu za vsak del (PFEP)<\/a>.<\/p>\n\n\n<p>Nato sledite enemu zabojniku skozi celoten krog. Kdaj se izprazni? Kako se to sporo\u010di? Kdaj se lahko za\u010dne komisioniranje? Bo nadomestni zabojnik pripravljen za naslednji obisk ali \u0161ele za obisk za njim? Izmerite \u010das od dejanske spro\u017eitve zahteve do trenutka, ko je material na delovnem centru na voljo za uporabo, ne le \u010dasa vo\u017enje iz skladi\u0161\u010da.<\/p>\n\n\n<p>Preostala zaloga mora pokriti prav ta \u010das do dopolnitve. Premi\u0161ljeno dodajte rezervo za nihanja, ki naj bi jih sistem obvladoval. Te rezerve ne skrivajte v nepojasnjenem dodatnem kupu zabojnikov.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Kako lahko polurni obhod pomeni uro \u010dakanja<\/h3>\n\n\n<p>Predstavljajte si monta\u017eno celico, ki v obdobju enakomerne proizvodnje porabi 60 enakih delov na uro. Vsak zabojnik vsebuje 20 delov, milk run pa celico obi\u0161\u010de vsakih 30 minut.<\/p>\n\n\n<p>En zabojnik zado\u0161\u010da za 20 minut. Med dvema obiskoma se porabi 30 delov. Nobeden od teh podatkov sam zase \u0161e ne pove, koliko zabojnikov mora kro\u017eiti v sistemu dopolnjevanja zalog.<\/p>\n\n\n<p>Predpostavimo, da voznik prevzame prazen zabojnik kot signal za dopolnitev zaloge. Zabojnik se izprazni tik po obisku. Voznik ga prevzame ob naslednjem obhodu, skoraj 30 minut pozneje. Na izvorni lokaciji nato pripravijo nadomestni polni zabojnik in ga dostavijo ob \u0161e naslednjem obhodu. Od signala do nadomestnega zabojnika tako mine skoraj 60 minut, \u010de je pripravo mogo\u010de opraviti v tem ciklu.<\/p>\n\n\n<p>Pri predpostavljeni porabi celica med tem \u010dakanjem potrebuje skoraj 60 delov, torej preostalo zalogo v obsegu treh polnih zabojnikov. Pri tem \u0161e ni upo\u0161tevana izbrana rezerva za zamude ali nihanja porabe. \u010ce bi upo\u0161tevali le 30 delov, porabljenih med obiskoma, bi spregledali polovico \u010dakalnega \u010dasa.<\/p>\n\n\n<p>\u010ce zahteva prispe na izvorno lokacijo dovolj zgodaj za komisioniranje in natovarjanje pred naslednjim odhodom, lahko nadomestni zabojnik prispe \u017ee ob naslednjem obisku. To zahteva druga\u010den tok informacij; sama nespremenjena pot te koristi ne prinese.<\/p>\n\n\n<p>\u0160tevilo zabojnikov v krogu dolo\u010dite glede na dejanski \u010das prenosa signala in priprave materiala. Pravilo \u00bbdveh ciklov\u00ab ni univerzalna re\u0161itev za vsak milk run. Pri tem lo\u010dite \u0161tevilo vseh zabojnikov v obtoku od prostora, ki ga zabojniki v posameznem trenutku zasedajo v delovnem centru.<\/p>\n\n\n<h3 class=\"wp-block-heading\">V izbrani interval vklju\u010dite celoten obhod<\/h3>\n\n\n<p>Vozni red sestavite na podlagi opazovanja dejanskega dela. Upo\u0161tevajte vo\u017enjo, postanke, ravnanje z dostavljenim materialom, prevzem praznih zabojnikov, obdelavo signalov, raztovarjanje vrnjenih zabojnikov in pripravo naslednjega odhoda. \u010ce sama vo\u017enja traja 20 minut, lahko izvedba celotnega obhoda zahteva precej ve\u010d \u010dasa.<\/p>\n\n\n<p>Predpostavimo na primer, da predlagani 30-minutni obhod zahteva osem minut vo\u017enje, deset minut dela na postankih, pet minut za raztovarjanje vrnjenih zabojnikov in natovarjanje za naslednji obhod ter tri minute za preverjanja in obdelavo signalov. Skupaj je to 26 minut, do naslednjega predvidenega odhoda pa ostanejo \u0161tiri minute.<\/p>\n\n\n<p>Te predpostavke so zgolj ponazoritev, ne priporo\u010dilo za \u010dasovno rezervo. Preverite, ali rezerva zado\u0161\u010da za obi\u010dajna nihanja, odmore in predaje izmen. \u010ce vsega dela ni mogo\u010de opraviti v razpolo\u017eljivem \u010dasu, spremenite razporeditev postankov v skupine, na\u010din ravnanja z materialom, ureditev oskrbe ali pogostost obhodov. Voznega reda ne prilagajajte zgolj na papirju tako, da izpustite nujna opravila.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Preverite tovor in povratno pot<\/h3>\n\n\n<p>Preverite najve\u010djo obremenitev, ki jo lahko realno pri\u010dakujete pri obhodu, ne le povpre\u010dne. Ali je mogo\u010de vse polne zabojnike prepeljati in dostaviti v zahtevanem zaporedju? Kam boste med dostavljanjem odlagali prazne zabojnike? Ali ima vsak delovni center dovolj dogovorjenega prostora za prejeti material?<\/p>\n\n\n<p>Upo\u0161tevajte dovoljene obremenitve in druge omejitve opreme ter zahteve obrata glede prometa in ravnanja z materialom. Izbira vozila in prometna ureditev zahtevata presojo razmer na konkretni lokaciji; skica poti te presoje ne nadomesti.<\/p>\n\n\n<p>Vra\u010danju prazne embala\u017ee namenite enako pozornost kot dostavi. Manjkajo\u010di prazni zabojniki, nejasni signali ali vrsta zabojnikov, ki \u010dakajo na ponovno polnjenje, lahko ogrozijo naslednji obhod, tudi \u010de je bil trenutni opravljen pravo\u010dasno.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Poskusno uvedite eno oskrbovalno pot in razi\u0161\u010dite prave vzroke te\u017eav<\/h2>\n\n\n<p>Izberite omejen nabor delovnih centrov in sestavnih delov, dolo\u010dite odgovorno osebo za oskrbovalno pot ter se dogovorite, kako ukrepati, kadar zahtevka ni mogo\u010de izpolniti. Postopek za obve\u0161\u010danje odgovornih in nadaljnje ukrepanje ob pomanjkanju mora biti dolo\u010den, \u0161e preden voznik ob odhodu odkrije te\u017eavo.<\/p>\n\n\n<p>Med poskusnim izvajanjem bele\u017eite na\u010drtovane in dejanske obiske, neizpolnjene zahtevke, nujne dostave ter vsak primer pomanjkanja v delovnem centru, ko je bila uporabna zaloga \u0161e na izvornem mestu. Opazujte tudi ravnanje operaterjev: oskrbovalna pot ni uspe\u0161na, \u010de morajo \u0161e vedno zapu\u0161\u010dati svoje delovne centre in sami hoditi po sestavne dele.<\/p>\n\n\n<p>Zbrane podatke preglejte po vzrokih:<\/p>\n\n\n<ul class=\"wp-block-list\"><li>Ob zamudi pri obisku preverite obseg dela na poti, prekinitve in upo\u0161tevanje \u010dasa odhoda.<\/li><li>\u010ce je obisk pravo\u010dasen, tovor pa napa\u010den, preverite signale, pripravo in ozna\u010devanje.<\/li><li>\u010ce po pravilni dostavi pride do pomanjkanja, preverite porabo, koli\u010dine v zabojnikih in predpostavko o \u010dasu dopolnjevanja.<\/li><li>\u010ce se v delovnem centru vztrajno kopi\u010dijo prese\u017eki, preverite iste predpostavke, le v nasprotni smeri.<\/li><\/ul>\n\n\n<p>Preden raz\u0161irite oskrbovalno pot, jo preizkusite v zna\u010dilnih obdobjih najve\u010dje obremenitve in pri zna\u010dilnih kombinacijah izdelkov. Poleg dela, potrebnega za prevoz, primerjajte tudi prekinitve proizvodnje in nujne posege. Sicer lahko navidezno u\u010dinkovit obhod stro\u0161ke \u010dakanja zgolj prenese na proizvodnjo.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Operacije, ki jim dobavljate material, realno umestite v proizvodni razpored<\/h2>\n\n\n<p>Uspe\u0161en obhod re\u0161i vpra\u0161anje fizi\u010dne oskrbe: kako sestavni deli pridejo do delovnega centra? Planiranje proizvodnje pa mora odgovoriti na drugo vpra\u0161anje: kdaj je mogo\u010de izvesti operacije, ki te dele porabljajo, ob upo\u0161tevanju vseh drugih potreb v obratu?<\/p>\n\n\n<p>Zaloga v skladi\u0161\u010du sama po sebi \u0161e ne dokazuje, da je sestavni del na mestu uporabe. To predajo jasno opredelite v procesu oskrbe z materialom. Podatki o razpolo\u017eljivosti, ki jih uporablja proizvodnja, morajo odra\u017eati dogovorjeni na\u010din dela; stanje zaloge ne sme veljati za sprotno potrditev dejanske dostave.<\/p>\n\n\n<p>SkyPlanner APS je pravi naslednji korak, \u010de spremembe razpolo\u017eljivosti materiala ro\u010dno usklajujete s \u010dakalnimi vrstami na strojih. Ko je omogo\u010deno terminiranje z upo\u0161tevanjem materiala, sistem upo\u0161teva evidentirano razpolo\u017eljivost materialov, ki jih porabljajo proizvodne operacije. Arcturus te operacije razporedi glede na nastavljene delovne centre, izmene, prioritete in odvisnosti med operacijami. Ganttov prikaz poka\u017ee nastalo zaporedje in njegov vpliv na datume zaklju\u010dka.<\/p>\n\n\n<p>Tako dobite <a href=\"https:\/\/skyplanner.ai\/sl\/viri\/kaj-je-terminiranje-proizvodnje\/\">enoten proizvodni razpored<\/a>, namesto da bi morali usklajevati seznam materialov in lo\u010dene \u010dakalne vrste na strojih. Ko se razpolo\u017eljivost spremeni, izra\u010dun razporeda skupaj obravnava vse prizadete operacije, vi pa dolo\u010dite prioritete in preverite obljubljene dobavne roke.<\/p>\n\n\n<p>Predstavljajte si kupljeni sestavni del, ki ga po internem oskrbovalnem procesu dostavljate v monta\u017eo. Dobava tega dela od dobavitelja zamuja. V sistemu SkyPlanner datum dobave na nabavnem naro\u010dilu predstavlja pri\u010dakovano razpolo\u017eljivost materiala; ko naro\u010dilo potrdite kot dostavljeno, se zaloga posodobi. Posodobite pri\u010dakovani prihod in znova izra\u010dunajte razpored. Prizadete proizvodne operacije se nato uskladijo s tem datumom ob upo\u0161tevanju drugih omejitev v obratu.<\/p>\n\n\n<p>Planer lahko tako oceni posledice za proizvodnjo, \u0161e preden od interne logistike zahteva, naj omogo\u010di za\u010detek, ki ga ni mogo\u010de izvesti. Z internim obhodom je treba sestavni del \u0161e vedno dostaviti na dogovorjeno mesto. Terminiranje na podlagi nabavnih naro\u010dil ne nadomesti te fizi\u010dne predaje.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Kako to poteka v proizvodnji pri stranki<\/h3>\n\n\n<p>V podjetju KJH-Comp, ki se ukvarja s pogodbeno proizvodnjo plo\u010devinastih izdelkov, so s sistemom C9000 in preglednicami neko\u010d okvirno na\u010drtovali tedenske obremenitve, dnevno dodeljevanje dela strojem pa je ostalo ro\u010dno. Podjetje je obdr\u017ealo svoj ERP in uvedlo SkyPlanner za terminiranje z omejenimi kapacitetami.<\/p>\n\n\n<p>V re\u0161itvi, uvedeni pri podjetju KJH-Comp, v koraku zbiranja delov pred varjenjem preverijo, ali so pripravljeni vsi deli za operacijo, tudi kupljeni, preden jo uvrstijo v \u010dakalno vrsto. SkyPlanner poskrbi tudi za dodeljevanje dela strojem, vodja pa lahko v razporedu vidi ozka grla.<\/p>\n\n\n<p>Klju\u010dni nauk je povezava med pripravljenostjo za izvedbo in naslednjo proizvodno operacijo. Enako povezavo potrebujete po zasnovi oskrbovalnega obhoda: zaporedje dela v obratu mora temeljiti na tem, kaj je dejansko mogo\u010de izvesti, ne zgolj na skupnem tedenskem obsegu. Celotno zgodbo uvedbe preberite v <a href=\"https:\/\/skyplanner.ai\/sl\/zgodbe-strank\/kjh-comp\/\">oceni sistema SkyPlanner podjetja KJH-Comp<\/a>.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Pove\u017eite odlo\u010ditve o materialu s proizvodnim razporedom<\/h2>\n\n\n<p>Milk run logistiko uporabite tam, kjer ponavljajo\u010de se skupne dostave ustrezajo toku materiala. Jasno opredelite signale, pripravljalna dela, povratni tok in zalogo, ki mora pokrivati porabo v delovnih centrih. Nato s sistemom SkyPlanner usklajujte operacije, ki ta material porabljajo, z a\u017eurnimi podatki o razpolo\u017eljivosti materiala in dejanskimi kapacitetami.<\/p>\n\n\n<p>SkyPlanner se prek odprtega vmesnika REST API pove\u017ee s katerim koli sistemom ERP ali MES. Sisteme, s katerimi upravljate naro\u010dila, lahko obdr\u017eite, njihove proizvodne podatke pa pove\u017eete z enotnim razporedom. S tem zmanj\u0161ate ro\u010dno delo pri usklajevanju sprememb razpolo\u017eljivosti materiala s \u010dakalnimi vrstami na strojih.<\/p>\n\n\n<p><a href=\"https:\/\/skyplanner.ai\/sl\/kontaktna-prodaja\/\">Rezervirajte predstavitev sistema SkyPlanner<\/a> na primeru enega sestavnega dela, operacij, ki ga porabljajo, in zamude pri njegovi dobavi. Prosite, naj vam poka\u017eejo, katere operacije se premaknejo in kako se spremenijo dobavni roki. Tako lahko prakti\u010dno ocenite korist za svojo proizvodnjo. \u010ce \u017eelite sistem najprej raziskati sami, <a href=\"https:\/\/skyplanner.ai\/sl\/preizkus\/\">preizkusite SkyPlanner z demonstracijskimi podatki<\/a>.<\/p>\n\n<\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>Milk run logistika: za nemoten pretok materiala v obratu Domov &raquo; Viri &raquo; Milk run logistika: za nemoten pretok materiala v obratu Predstavljajte si, da vozilo za oskrbo z materialom pripelje vsake pol ure. Monta\u017eni celici kljub temu zmanjka delov. Obhodi so redni, material za dopolnitev zaloge pa prispe prepozno. Prav v tem je razlika &#8230; <a title=\"Milk run logistika: za nemoten pretok materiala v obratu\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/sl\/viri\/milk-run-logistika\/\" aria-label=\"Read more about Milk run logistika: za nemoten pretok materiala v obratu\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":111438,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[2539,302],"tags":[],"class_list":["post-111426","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-aps-in-terminiranje","category-viri","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Milk run logistika: za nemoten pretok materiala v obratu<\/title>\n<meta name=\"description\" content=\"Milk run logistika: uskladite obhode s porabo, prepre\u010dite pomanjkanje ob liniji in pove\u017eite razpolo\u017eljivost materiala s proizvodnjo v svojem obratu.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/sl\/viri\/milk-run-logistika\/\" \/>\n<meta property=\"og:locale\" content=\"sl_SI\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Milk run logistika: za nemoten pretok materiala v obratu\" \/>\n<meta property=\"og:description\" content=\"Milk run logistika: uskladite obhode s porabo, prepre\u010dite pomanjkanje ob liniji in pove\u017eite razpolo\u017eljivost materiala s proizvodnjo v svojem obratu.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/sl\/viri\/milk-run-logistika\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2026-10-27T20:52:03+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-27T20:54:32+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/milk-run-manufacturing-hero.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1774\" \/>\n\t<meta property=\"og:image:height\" content=\"887\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"12 minut\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/milk-run-logistika\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/milk-run-logistika\\\/\"},\"author\":{\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\"},\"headline\":\"Milk run logistika: za nemoten pretok materiala v obratu\",\"datePublished\":\"2026-10-27T20:52:03+00:00\",\"dateModified\":\"2026-10-27T20:54:32+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/milk-run-logistika\\\/\"},\"wordCount\":2351,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/milk-run-logistika\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/milk-run-manufacturing-hero.png\",\"articleSection\":[\"APS in terminiranje\",\"viri\"],\"inLanguage\":\"sl-SI\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/milk-run-logistika\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/milk-run-logistika\\\/\",\"name\":\"Milk run logistika: za nemoten pretok materiala v obratu\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/milk-run-logistika\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/milk-run-logistika\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/milk-run-manufacturing-hero.png\",\"datePublished\":\"2026-10-27T20:52:03+00:00\",\"dateModified\":\"2026-10-27T20:54:32+00:00\",\"description\":\"Milk run logistika: uskladite obhode s porabo, prepre\u010dite pomanjkanje ob liniji in pove\u017eite razpolo\u017eljivost materiala s proizvodnjo v svojem obratu.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/milk-run-logistika\\\/#breadcrumb\"},\"inLanguage\":\"sl-SI\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/milk-run-logistika\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"sl-SI\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/milk-run-logistika\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/milk-run-manufacturing-hero.png\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/milk-run-manufacturing-hero.png\",\"width\":1774,\"height\":887,\"caption\":\"A factory milk run links a supply rack and assembly stations, delivering full bins and returning empty containers.\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/milk-run-logistika\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Milk run logistika: za nemoten pretok materiala v obratu\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"sl-SI\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"sl-SI\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\",\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"sl-SI\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"caption\":\"Jussi M\u00e4ntyl\u00e4\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Milk run logistika: za nemoten pretok materiala v obratu","description":"Milk run logistika: uskladite obhode s porabo, prepre\u010dite pomanjkanje ob liniji in pove\u017eite razpolo\u017eljivost materiala s proizvodnjo v svojem obratu.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/sl\/viri\/milk-run-logistika\/","og_locale":"sl_SI","og_type":"article","og_title":"Milk run logistika: za nemoten pretok materiala v obratu","og_description":"Milk run logistika: uskladite obhode s porabo, prepre\u010dite pomanjkanje ob liniji in pove\u017eite razpolo\u017eljivost materiala s proizvodnjo v svojem obratu.","og_url":"https:\/\/skyplanner.ai\/sl\/viri\/milk-run-logistika\/","og_site_name":"SkyPlanner","article_published_time":"2026-10-27T20:52:03+00:00","article_modified_time":"2026-10-27T20:54:32+00:00","og_image":[{"width":1774,"height":887,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/milk-run-manufacturing-hero.png","type":"image\/png"}],"author":"Jussi M\u00e4ntyl\u00e4","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Jussi M\u00e4ntyl\u00e4","Est. reading time":"12 minut"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/sl\/viri\/milk-run-logistika\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/sl\/viri\/milk-run-logistika\/"},"author":{"name":"Jussi M\u00e4ntyl\u00e4","@id":"https:\/\/skyplanner.ai\/sl\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5"},"headline":"Milk run logistika: za nemoten pretok materiala v obratu","datePublished":"2026-10-27T20:52:03+00:00","dateModified":"2026-10-27T20:54:32+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/sl\/viri\/milk-run-logistika\/"},"wordCount":2351,"publisher":{"@id":"https:\/\/skyplanner.ai\/sl\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/sl\/viri\/milk-run-logistika\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/milk-run-manufacturing-hero.png","articleSection":["APS in terminiranje","viri"],"inLanguage":"sl-SI"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/sl\/viri\/milk-run-logistika\/","url":"https:\/\/skyplanner.ai\/sl\/viri\/milk-run-logistika\/","name":"Milk run logistika: za nemoten pretok materiala v obratu","isPartOf":{"@id":"https:\/\/skyplanner.ai\/sl\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/sl\/viri\/milk-run-logistika\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/sl\/viri\/milk-run-logistika\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/milk-run-manufacturing-hero.png","datePublished":"2026-10-27T20:52:03+00:00","dateModified":"2026-10-27T20:54:32+00:00","description":"Milk run logistika: uskladite obhode s porabo, prepre\u010dite pomanjkanje ob liniji in pove\u017eite razpolo\u017eljivost materiala s proizvodnjo v svojem obratu.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/sl\/viri\/milk-run-logistika\/#breadcrumb"},"inLanguage":"sl-SI","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/sl\/viri\/milk-run-logistika\/"]}]},{"@type":"ImageObject","inLanguage":"sl-SI","@id":"https:\/\/skyplanner.ai\/sl\/viri\/milk-run-logistika\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/milk-run-manufacturing-hero.png","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/milk-run-manufacturing-hero.png","width":1774,"height":887,"caption":"A factory milk run links a supply rack and assembly stations, delivering full bins and returning empty containers."},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/sl\/viri\/milk-run-logistika\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/sl\/"},{"@type":"ListItem","position":2,"name":"Milk run logistika: za nemoten pretok materiala v obratu"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/sl\/#website","url":"https:\/\/skyplanner.ai\/sl\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/sl\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/sl\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"sl-SI"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/sl\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/sl\/","logo":{"@type":"ImageObject","inLanguage":"sl-SI","@id":"https:\/\/skyplanner.ai\/sl\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/sl\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]},{"@type":"Person","@id":"https:\/\/skyplanner.ai\/sl\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5","name":"Jussi M\u00e4ntyl\u00e4","image":{"@type":"ImageObject","inLanguage":"sl-SI","@id":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","caption":"Jussi M\u00e4ntyl\u00e4"}}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/milk-run-manufacturing-hero.png",1774,887,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/milk-run-manufacturing-hero-150x150.png",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/milk-run-manufacturing-hero-300x150.png",300,150,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/milk-run-manufacturing-hero-768x384.png",768,384,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/milk-run-manufacturing-hero-1024x512.png",1024,512,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/milk-run-manufacturing-hero-1536x768.png",1536,768,true],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/milk-run-manufacturing-hero.png",1774,887,false],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/milk-run-manufacturing-hero-360x180.png",360,180,true]},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/sl\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Milk run logistika: za nemoten pretok materiala v obratu Domov &raquo; Viri &raquo; Milk run logistika: za nemoten pretok materiala v obratu Predstavljajte si, da vozilo za oskrbo z materialom pripelje vsake pol ure. Monta\u017eni celici kljub temu zmanjka delov. Obhodi so redni, material za dopolnitev zaloge pa prispe prepozno. Prav v tem je razlika&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/posts\/111426","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/comments?post=111426"}],"version-history":[{"count":1,"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/posts\/111426\/revisions"}],"predecessor-version":[{"id":111489,"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/posts\/111426\/revisions\/111489"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/media\/111438"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/media?parent=111426"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/categories?post=111426"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/tags?post=111426"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}