{"id":111332,"date":"2026-10-27T18:49:22","date_gmt":"2026-10-27T18:49:22","guid":{"rendered":"https:\/\/skyplanner.ai\/?p=111332"},"modified":"2026-10-27T18:50:51","modified_gmt":"2026-10-27T18:50:51","slug":"min-max-upravljanje-zalog","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/sl\/viri\/min-max-upravljanje-zalog\/","title":{"rendered":"Min-max upravljanje zalog: kdaj naro\u010diti in koliko"},"content":{"rendered":"<div class=\"gb-container gb-container-article01 article-main-content-container\">\n\n<h1 class=\"wp-block-heading\">Min-max upravljanje zalog: kdaj naro\u010diti in koliko<\/h1>\n\n<div class=\"gb-container gb-container-article02\">\n\n<p><a href=\"\/sl\/\">Domov<\/a> &raquo; <a href=\"https:\/\/skyplanner.ai\/sl\/viri\/\">Viri<\/a> &raquo; Min-max upravljanje zalog: kdaj naro\u010diti in koliko<\/p>\n\n\n<p class=\"yoast-reading-time__wrapper\"><span class=\"yoast-reading-time__icon\"><svg aria-hidden=\"true\" focusable=\"false\" data-icon=\"clock\" width=\"20\" height=\"20\" fill=\"none\" stroke=\"currentColor\" style=\"display:inline-block;vertical-align:-0.1em\" role=\"img\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewBox=\"0 0 24 24\"><path stroke-linecap=\"round\" stroke-linejoin=\"round\" stroke-width=\"2\" d=\"M12 8v4l3 3m6-3a9 9 0 11-18 0 9 9 0 0118 0z\"><\/path><\/svg><\/span><span class=\"yoast-reading-time__spacer\" style=\"display:inline-block;width:1em\"><\/span><span class=\"yoast-reading-time__descriptive-text\">Predviden \u010das branja: <\/span><span class=\"yoast-reading-time__reading-time\">10<\/span><span class=\"yoast-reading-time__time-unit\"> minut<\/span><\/p>\n\n<\/div>\n<div class=\"gb-container gb-container-article03\">\n\n<p>Zaloga v zaboju kopni, zato nabavnik naro\u010di novo serijo. Medtem v proizvodnji \u017ee izdelujejo isti artikel za dopolnitev zaloge. Vsaka odlo\u010ditev zase se zdi smiselna. Skupaj pa ustvarita zalogo, ki je tovarna ni potrebovala.<\/p>\n\n\n<p>Min-max upravljanje zalog dolo\u010da enotno pravilo za dopolnjevanje: spodnja meja pove, kdaj ukrepati, zgornja ciljna raven pa, do kod dopolniti zalogo. Za u\u010dinkovito uporabo v proizvodnji morate poleg kosov na polici upo\u0161tevati tudi \u017ee naro\u010dene koli\u010dine in potrjene potrebe.<\/p>\n\n\n<p>Nato je treba sprejeti \u0161e odlo\u010ditev o proizvodnji. \u010ce zalogo dopolnjujete z lastno izdelavo, morate za to koli\u010dino zagotoviti \u010das na dejanskih strojih, ki so zasedeni tudi z delom za kupce. SkyPlanner APS odobreno dopolnitev zaloge vklju\u010di v isti terminski plan, ki upo\u0161teva kapacitete in materiale. Tako vidite, kdaj bo kon\u010dana, ne da bi morali ro\u010dno sestavljati lo\u010deno \u010dakalno vrsto.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Kaj je min-max upravljanje zalog?<\/h2>\n\n\n<p>Min-max upravljanje zalog je politika dopolnjevanja, ki za vsak artikel na zalogi dolo\u010da dva parametra:<\/p>\n\n\n<ul class=\"wp-block-list\"><li><strong>Minimum:<\/strong> prag, ki spro\u017ei odlo\u010danje o dopolnitvi zaloge.<\/li><li><strong>Maksimum:<\/strong> ciljno neto stanje zaloge, do katerega zalogo dopolnite.<\/li><\/ul>\n\n\n<p>Minimum ni raven, pri kateri nameravate ostati brez zaloge. Zagotoviti mora dovolj \u010dasa, da dopolnitev prispe, medtem ko se poraba nadaljuje. Maksimum ni koli\u010dina, ki jo vsaki\u010d naro\u010dite, niti zagotovilo, da fizi\u010dna zaloga te ravni nikoli ne more prese\u010di.<\/p>\n\n\n<p>Pri politiki min-max je koli\u010dina naro\u010dila odvisna od razlike do ciljne ravni. \u010ce je cilj 600 kosov, upo\u0161tevano neto stanje zaloge pa 230, je izhodi\u0161\u010dna koli\u010dina za dopolnitev 370 kosov. \u010ce je neto stanje 280, je ta koli\u010dina 320 kosov.<\/p>\n\n\n<p>Zapi\u0161ite, ali dopolnitev spro\u017ei stanje \u00bbpod minimumom\u00ab ali \u00bbna minimumu ali pod njim\u00ab, saj se sistemi in pravila podjetij pri tej meji lahko razlikujejo. V spodnjih primerih se dopolnitev spro\u017ei, ko neto stanje pade <strong>pod<\/strong> minimum.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Upo\u0161tevajte neto stanje zaloge, ne le fizi\u010dne zaloge<\/h2>\n\n\n<p>Fizi\u010dna zaloga pove, kaj je dejansko prisotno v skladi\u0161\u010du. Neto stanje zaloge pa vam pomaga presoditi, ali je potrebno dodatno naro\u010dilo za dopolnitev, ko upo\u0161tevate \u017ee naro\u010dene koli\u010dine in obveznosti.<\/p>\n\n\n<p>\u010ce va\u0161a politika pri izra\u010dunu od\u0161teva potrjene potrebe, uporabite:<\/p>\n\n\n<p><strong>Neto stanje zaloge = uporabna fizi\u010dna zaloga + \u0161e neprejete koli\u010dine za dopolnitev \u2212 vklju\u010dene potrjene potrebe<\/strong><\/p>\n\n\n<p>\u0160e neprejete koli\u010dine lahko izvirajo iz odprtih nabavnih naro\u010dil, premikov med skladi\u0161\u010di ali internih nalogov za dopolnitev zaloge. Vsak vir upo\u0161tevajte le enkrat. Po delnem prevzemu upo\u0161tevajte preostalo pri\u010dakovano koli\u010dino, ne prvotne koli\u010dine naro\u010dila.<\/p>\n\n\n<p>Pred izra\u010dunom dolo\u010dite obseg: en artikel, eno lokacijo ali dogovorjeno skupino lokacij, eno mersko enoto ter usklajene \u010dasovne meje za vklju\u010devanje dobav in potreb. Izlo\u010dite zalogo v karanteni in drugo neuporabno zalogo. Istih obveznosti ne od\u0161tevajte dvakrat: \u010de so rezervacije \u017ee od\u0161tete od izhodi\u0161\u010dnega stanja, jih ne od\u0161tejte ponovno.<\/p>\n\n\n<p>Vsi sistemi pri izra\u010dunu ne od\u0161tevajo istih vrst potreb. Pomembno je vedeti, kaj va\u0161 izra\u010dun vklju\u010duje, in uporabljati pragove, dolo\u010dene na tej podlagi. Minimuma, izra\u010dunanega po eni opredelitvi, ni varno uporabiti po drugi brez predhodnega preverjanja.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Primer uporabe min-max v proizvodnji<\/h3>\n\n\n<p>Predstavljajte si proizvajalca, ki ima za ponavljajo\u010da se naro\u010dila na zalogi standardni nosilec. Minimum je 300 kosov, ciljna najvi\u0161ja raven pa 600. Politika pri izra\u010dunu od\u0161teva potrjene potrebe znotraj dogovorjenega planskega obdobja.<\/p>\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Vhodni podatek<\/th><th>Koli\u010dina<\/th><th>Upo\u0161tevanje v izra\u010dunu<\/th><\/tr><\/thead><tbody><tr><td>Uporabni nosilci na zalogi<\/td><td>180<\/td><td>Upo\u0161tevajte kot trenutno fizi\u010dno zalogo<\/td><\/tr><tr><td>\u017de odobrena, \u0161e neprejeta dopolnitev zaloge<\/td><td>200<\/td><td>Pri\u0161tejte enkrat kot \u0161e neprejeto koli\u010dino<\/td><\/tr><tr><td>Potrjene potrebe, vklju\u010dene v ta pregled<\/td><td>150<\/td><td>Od\u0161tejte enkrat<\/td><\/tr><tr><td>Neto stanje zaloge<\/td><td>230<\/td><td>Primerjajte z minimumom 300<\/td><\/tr><tr><td>Koli\u010dina za novo dopolnitev<\/td><td>370<\/td><td>Pove\u010dajte neto stanje z 230 na 600<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>Izra\u010dun je <strong>180 + 200 \u2212 150 = 230<\/strong>. Ker je 230 manj kot 300, politika zahteva dopolnitev zaloge. Izhodi\u0161\u010dna koli\u010dina naro\u010dila je <strong>600 \u2212 230 = 370 kosov<\/strong>.<\/p>\n\n\n<p>\u010ce bi prezrli obstoje\u010de naro\u010dilo za 200 kosov, bi dobili predlog za 570 kosov. Tako bi za isto potrebo dvakrat naro\u010dili 200 kosov. \u010ce pa bi prezrli potrjene potrebe, bi izra\u010dun pokazal neto stanje 380 in dopolnitve sploh ne bi spro\u017eil.<\/p>\n\n\n<p>Cilj opisuje neto stanje po pri\u0161tetju novega naro\u010dila, ne nujno fizi\u010dne zaloge ob njegovem prejemu. Med nabavo ali izdelavo naro\u010denih koli\u010din se poraba nadaljuje.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Tudi \u017ee naro\u010dena koli\u010dina lahko prispe prepozno<\/h3>\n\n\n<p>Neto stanje zaloge odgovori na vpra\u0161anje o koli\u010dini, samo po sebi pa ne potrjuje, da bo vsaka potreba pokrita na zahtevani datum.<\/p>\n\n\n<p>V primeru z nosilci predpostavimo, da v torek potrebujete 120 kosov, v sredo pa \u0161e 30. Zaloga 180 uporabnih kosov pokrije obe potrebi. \u010ce pa vseh 200 kosov iz obstoje\u010dega naro\u010dila za dopolnitev zamuja in prispe \u0161ele po datumu neke nove potrebe, lahko ta poznej\u0161a potreba ostane nepokrita, \u010deprav je naro\u010dilo vklju\u010deno v skupno neto stanje zaloge.<\/p>\n\n\n<p>Poleg skupnih koli\u010din preverite tudi datume. Pospe\u0161itev ali sprememba termina obstoje\u010dega naro\u010dila je lahko smiselnej\u0161a re\u0161itev kot novo naro\u010dilo za celotno dopolnitev zaloge. <a href=\"https:\/\/skyplanner.ai\/sl\/viri\/pokritost-zalog\/\">Preverjanje pokritosti zalog<\/a> po datumih dopolnjuje min-max upravljanje, ne nadome\u0161\u010da pa njegovega spro\u017eilnega praga in ciljne ravni.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Kako dolo\u010diti najni\u017ejo in najvi\u0161jo raven zaloge<\/h2>\n\n\n<p>Za\u010dnite z artiklom, ki se redno porablja in za katerega imate zanesljive podatke o porabi ter dopolnjevanju. Obe ravni dolo\u010dite skupaj, vendar naj ima vsaka svojo jasno vlogo.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Minimum naj pokrije \u010das do dopolnitve zaloge<\/h3>\n\n\n<p>Pri razmeroma enakomernih potrebah je prakti\u010dno izhodi\u0161\u010de:<\/p>\n\n\n<p><strong>Minimum = pri\u010dakovane potrebe v preto\u010dnem \u010dasu dopolnitve + varnostna zaloga<\/strong><\/p>\n\n\n<p>Upo\u0161tevajte \u010das do trenutka, ko je zaloga uporabna, ne le prevoznega \u010dasa dobavitelja ali \u010dasa obdelave na stroju. Ta \u010das lahko vklju\u010duje tudi odobritev, nabavo, \u010dakanje na proizvodne kapacitete in prevzem.<\/p>\n\n\n<p>Predstavljajte si artikel s porabo 40 kosov na delovni dan. Dopolnitev traja pet delovnih dni, podjetje pa se je odlo\u010dilo za varnostno zalogo 80 kosov. Pri\u010dakovane potrebe v preto\u010dnem \u010dasu zna\u0161ajo 200 kosov, zato je izhodi\u0161\u010dni minimum <strong>280 kosov<\/strong>.<\/p>\n\n\n<p>Varnostna zaloga 80 kosov je predpostavka tega primera, ne priporo\u010dena raven oskrbe. Varnostno zalogo dolo\u010dite glede na variabilnost in posledice pomanjkanja. Poceni sestavni del, zaradi katerega se ustavi kon\u010dna monta\u017ea, lahko zahteva ve\u010d pozornosti, kot bi sklepali po njegovi nabavni vrednosti.<\/p>\n\n\n<p>Pomembna je tudi pogostost pregledovanja. Stalno spremljanje praga ni enako preverjanju poro\u010dila enkrat tedensko. \u010ce lahko stanje pade pod prag takoj po pregledu, upo\u0161tevajte \u0161e dodatno \u010dakanje, preden kdo odda naro\u010dilo. Sicer lahko minimum, ki se zdi ustrezen, spro\u017ei ukrepanje prepozno.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Z maksimumom dolo\u010dite \u017eeleni cikel dopolnjevanja<\/h3>\n\n\n<p>Maksimum dolo\u010da, do katere ravni dopolnite neto stanje zaloge, ko pade pod spro\u017eilni prag. Vi\u0161ji maksimum praviloma pomeni ve\u010dje dopolnitve in ve\u010d tveganj, povezanih z zalogami. Ni\u017eji maksimum praviloma pomeni pogostej\u0161e dopolnjevanje ter ve\u010d dela z naro\u010danjem ali pripravo proizvodnje.<\/p>\n\n\n<p>V primeru s porabo 40 kosov na dan predpostavimo, da izberete najvi\u0161jo ciljno zalogo 600 kosov. Razlika do minimalne zaloge 280 kosov je 320 kosov, kar pri tej povpre\u010dni porabi ustreza osmim delovnim dnem. Tako si lahko ponazorite predlagani cikel dopolnjevanja, vendar to ni dokaz, da je cilj 600 kosov stro\u0161kovno najugodnej\u0161i ali najbolj\u0161i.<\/p>\n\n\n<p>Preverite, ali je cilj primeren glede na skladi\u0161\u010dni prostor, rok uporabnosti, tveganje zastaranja, obratni kapital in velikosti proizvodnih ali dobaviteljevih serij. \u010ce ima artikel z majhno porabo kratek rok uporabnosti, lahko tudi na videz ustrezen razpon min\u2013max povzro\u010di drag odpis.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Pred sprostitvijo naro\u010dila upo\u0161tevajte omejitve naro\u010danja<\/h3>\n\n\n<p>Izra\u010dunana razlika je izhodi\u0161\u010dna koli\u010dina. Najmanj\u0161e koli\u010dine, ki jih zahteva dobavitelj, ve\u010dkratniki pakiranj in omejitve proizvodnih serij lahko spremenijo koli\u010dino, ki jo dejansko lahko naro\u010dite.<\/p>\n\n\n<p>\u010ce je predlagano naro\u010dilo nosilcev 370 kosov, dobava pa je mogo\u010da le v pakiranjih po 50, z zaokro\u017eitvijo navzgor dobite 400 kosov. S tem prvotni cilj prese\u017eete za 30 kosov. Odlo\u010dite se, ali boste to razliko sprejeli, spremenili dogovor o dobavi ali prilagodili pravila dopolnjevanja. \u00bbNajvi\u0161ja ciljna zaloga\u00ab in \u00bbnajve\u010dja koli\u010dina naro\u010dila\u00ab nista ista nastavitev: prva dolo\u010da \u017eeleno neto koli\u010dino zaloge ob upo\u0161tevanju dobav in potreb, druga pa omejuje posamezno naro\u010dilo.<\/p>\n\n\n<p>Odobreno dopolnitev \u010dim prej evidentirajte kot odprto dobavo. S tem prepre\u010dite, da bi kdo ob naslednjem pregledu ali drug nabavnik znova naro\u010dil koli\u010dino za pokritje iste razlike.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Kdaj min\u2013max upravljanje zalog deluje in kdaj sami pragovi niso dovolj<\/h2>\n\n\n<p>Min\u2013max upravljanje zalog je uporabno za artikle, ki jih dr\u017eite na zalogi, se redno porabljajo in imajo proces dopolnjevanja, ki ga lahko spremljate: obi\u010dajne komponente, standardne podsklope ali pogosto uporabljen potro\u0161ni material. Njegova prednost je doslednost. Vsi lahko vidijo, zakaj je dopolnitev potrebna in kako je bila dolo\u010dena koli\u010dina.<\/p>\n\n\n<p>Metoda je manj zanesljiva, kadar povpre\u010dje prikriva velike potrebe z dolo\u010denimi roki. Za komponento, ki se uporablja le v ob\u010dasnih serijah za kupce, je lahko namesto stalnega razpona zalog potrebno \u010dasovno razporejeno planiranje materialnih potreb. Tudi pri rezervnem delu z ob\u010dasno porabo je lahko treba odlo\u010ditev o zalogi opreti na njegovo kriti\u010dnost; nizka povpre\u010dna poraba ne pove, koliko bi stalo, \u010de rezervnega dela ne bi bilo na voljo.<\/p>\n\n\n<p>Razlikujte med sorodnimi pristopi:<\/p>\n\n\n<ul class=\"wp-block-list\"><li><strong><a href=\"https:\/\/skyplanner.ai\/sl\/viri\/varnostna-zaloga\/\">Varnostna zaloga<\/a><\/strong> je rezerva za nepredvidena odstopanja. Pomaga lahko pri dolo\u010ditvi minimalne zaloge, ne dolo\u010da pa celotne politike min\u2013max upravljanja zalog.<\/li><li><strong><a href=\"https:\/\/skyplanner.ai\/sl\/viri\/optimalna-kolicina-narocila\/\">Optimalna koli\u010dina naro\u010dila (EOQ)<\/a><\/strong> dolo\u010da velikost naro\u010dila na podlagi predpostavk o stro\u0161kih naro\u010danja in vzdr\u017eevanja zalog. Metoda min\u2013max pa dopolnjuje vsakokratno razliko do zgornje ciljne ravni.<\/li><li><strong>Izdelava na zalogo<\/strong> pomeni odlo\u010ditev za proizvodnjo pred prejemom naro\u010dil kupcev. Min\u2013max je eden od mo\u017enih na\u010dinov upravljanja dopolnjevanja zalog v okviru te strategije.<\/li><\/ul>\n\n\n<p>Ravni zalog preverite ob spremembah porabe, uspe\u0161nosti dobaviteljev, preto\u010dnega \u010dasa proizvodnje ali \u017eivljenjske dobe izdelka. Preden preprosto raz\u0161irite razpon, razi\u0161\u010dite vzroke za ponavljajo\u010de se pomanjkanje in prese\u017eke zalog: zamude pri prevzemih, neto\u010dna stanja in podvojena naro\u010dila zahtevajo razli\u010dne re\u0161itve.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Odobreno dopolnitev vklju\u010dite v terminski plan proizvodnje<\/h2>\n\n\n<p>Pri delu, ki ga izdelujete sami, je \u00bbnaro\u010diti 370 kosov\u00ab le polovica odlo\u010ditve. To \u0161e ne pove, ali bodo nosilci pripravljeni, preden zmanjka zaloge, niti katere operacije za naro\u010dila kupcev bo treba prestaviti, da jim naredite prostor.<\/p>\n\n\n<p>Predstavljajte si, da za odobreno dopolnitev potrebujete isti obdelovalni center kot za naro\u010dilo kupca z rokom dobave ta teden. \u010ce dopolnitev postavite na vrh lo\u010denega seznama za dopolnjevanje zalog, ta konflikt ostane skrit. Ko jo vklju\u010dite v skupni terminski plan, vidite, kako bi njena izvedba vplivala na naro\u010dilo kupca, ko je \u0161e \u010das za odlo\u010ditev.<\/p>\n\n\n<p>Izberite <strong>SkyPlanner APS<\/strong> za <a href=\"https:\/\/skyplanner.ai\/sl\/viri\/kaj-je-terminiranje-proizvodnje\/\">la\u017eje upravljanje skupnega terminskega plana<\/a>. Arcturus, njegova umetna inteligenca za terminiranje, razporedi delo glede na nastavljena delovna mesta, izmene, prioritete, odvisnosti med operacijami in materiale. Ganttov diagram poka\u017ee, kam se dopolnitev uvrsti med druga naro\u010dila in kdaj naj bi bila kon\u010dana. Tako porabite manj \u010dasa za usklajevanje seznama zalog s \u010dakalnimi vrstami na posameznih strojih in dobite jasnej\u0161o podlago za zagotavljanje pravo\u010dasnih dobav.<\/p>\n\n\n<p>SkyPlanner omogo\u010da opozorilo o nizki koli\u010dini zaloge, ki vas pozove k ustvarjanju naro\u010dila za dopolnitev. Ciljne ravni min\u2013max, koli\u010dino dopolnitve in odobritev uskladite z odgovornim planerjem oziroma v sistemu ERP\/MRP. Nato v SkyPlanner razporedite odobreno delo skupaj z naro\u010dili kupcev, da odlo\u010ditev o zalogi postane del skupnega proizvodnega plana tovarne.<\/p>\n\n\n<p>\u010ce je omogo\u010deno terminiranje z upo\u0161tevanjem materialov in so podatki o ustreznih materialih vzdr\u017eevani, izra\u010dun upo\u0161teva tudi njihovo razpolo\u017eljivost v \u010dasu izvajanja operacij, ki jih porabljajo. Pri kupljenih materialih so podlaga za terminiranje datumi prihoda iz nabavnih naro\u010dil. Ko se datum prihoda ali prioriteta spremeni, ponovno izra\u010dunajte skupni plan in preverite posledice, namesto da ro\u010dno prestavljate vsako prizadeto operacijo.<\/p>\n\n\n<p><strong>SkyPlanner se prek odprtega vmesnika REST API pove\u017ee s katerim koli sistemom ERP ali MES.<\/strong> Obdr\u017eite lahko sistem, v katerem upravljate pravila dopolnjevanja, in njegova odobrena naro\u010dila pove\u017eete s terminskim planom proizvodnje, ki upo\u0161teva dejanske kapacitete.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Kako je to videti pri izdelavi na zalogo<\/h3>\n\n\n<p><a href=\"https:\/\/skyplanner.ai\/sl\/zgodbe-strank\/opes-corporation\/\">Opes Corporation<\/a> izdeluje na zalogo na podlagi predvidljivih obveznosti do kupcev. Pred uvedbo re\u0161itve SkyPlanner je podjetje uporabljalo Excel in lo\u010deno skladi\u0161\u010dno aplikacijo, podatki pa so bili shranjeni na razli\u010dnih mestih. S postopno integracijo sistema Visma Nova je te podatke povezalo s planiranjem proizvodnje.<\/p>\n\n\n<p>Po navedbah podjetja SkyPlanner ekipi omogo\u010da jasen pregled nad kapacitetami. Ko prejmejo nujna manj\u0161a naro\u010dila ali naloge za razvojne serije, posodobljen proizvodni plan poka\u017ee njihov vpliv na dobavne roke. Spremembe lahko izvedejo hitreje, planerji pa vidijo, kako se posamezne operacije medsebojno usklajujejo.<\/p>\n\n\n<p>Za dopolnjevanje zalog je pomemben ta nauk: tudi pri stabilnih potrebah po zalogi je treba obvladovati izjeme. Skupni terminski plan ekipi omogo\u010da, da dodatno delo presoja glede na obstoje\u010de obveznosti, namesto da vsako \u010dakalno vrsto upravlja lo\u010deno.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Pravila preizkusite na eni dejanski dopolnitvi<\/h2>\n\n\n<p>Izberite artikel, ki ga redno uporabljate. Preverite njegovo uporabno zalogo, odprte dobave, upo\u0161tevane obveznosti in preto\u010dni \u010das. Na tej podlagi dolo\u010dite spro\u017eilni prag in ciljno raven, izra\u010dunajte razliko ter preverite, kdaj bo ta koli\u010dina dejansko potrebna.<\/p>\n\n\n<p>Nato na predstavitev re\u0161itve SkyPlanner prinesite primer odobrene dopolnitve in naro\u010dila kupca, ki se potegujeta za iste kapacitete. Prosite, naj vam poka\u017eejo, kako si njuni proizvodni postopki delijo kapacitete, kdaj bo dopolnitev kon\u010dana in kaj se zgodi ob zamudi pri prihodu materiala. Tako boste videli, kaj poleg izra\u010duna zaloge vklju\u010duje odlo\u010ditev o dopolnitvi, ki jo je mogo\u010de izvesti v proizvodnji.<\/p>\n\n\n<p><a href=\"https:\/\/skyplanner.ai\/sl\/kontaktna-prodaja\/\">Rezervirajte predstavitev re\u0161itve SkyPlanner<\/a>, na kateri boste obravnavali razmere v svoji tovarni, ali pa najprej <a href=\"https:\/\/skyplanner.ai\/sl\/preizkus\/\">preizkusite SkyPlanner s predstavitvenimi podatki<\/a>. Cilj je preprost: dopolniti zalogo s potrebno koli\u010dino, prepre\u010diti podvojena naro\u010dila in delo razporediti po terminskem planu, ki ga va\u0161a tovarna lahko izvede.<\/p>\n\n<\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>Min-max upravljanje zalog: kdaj naro\u010diti in koliko Domov &raquo; Viri &raquo; Min-max upravljanje zalog: kdaj naro\u010diti in koliko Zaloga v zaboju kopni, zato nabavnik naro\u010di novo serijo. Medtem v proizvodnji \u017ee izdelujejo isti artikel za dopolnitev zaloge. Vsaka odlo\u010ditev zase se zdi smiselna. Skupaj pa ustvarita zalogo, ki je tovarna ni potrebovala. Min-max upravljanje zalog &#8230; <a title=\"Min-max upravljanje zalog: kdaj naro\u010diti in koliko\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/sl\/viri\/min-max-upravljanje-zalog\/\" aria-label=\"Read more about Min-max upravljanje zalog: kdaj naro\u010diti in koliko\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":111344,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[2539,302],"tags":[],"class_list":["post-111332","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-aps-in-terminiranje","category-viri","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Min-max upravljanje zalog: kdaj naro\u010diti in koliko<\/title>\n<meta name=\"description\" content=\"Dolo\u010dite min-max ravni zalog brez dvojnega naro\u010danja za iste potrebe. Kaj upo\u0161tevati, koliko naro\u010diti in kako SkyPlanner terminira odobreno delo.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/sl\/viri\/min-max-upravljanje-zalog\/\" \/>\n<meta property=\"og:locale\" content=\"sl_SI\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Min-max upravljanje zalog: kdaj naro\u010diti in koliko\" \/>\n<meta property=\"og:description\" content=\"Dolo\u010dite min-max ravni zalog brez dvojnega naro\u010danja za iste potrebe. Kaj upo\u0161tevati, koliko naro\u010diti in kako SkyPlanner terminira odobreno delo.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/sl\/viri\/min-max-upravljanje-zalog\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2026-10-27T18:49:22+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-27T18:50:51+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/min-max-inventory-manufacturing-hero.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1672\" \/>\n\t<meta property=\"og:image:height\" content=\"941\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"12 minut\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/min-max-upravljanje-zalog\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/min-max-upravljanje-zalog\\\/\"},\"author\":{\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\"},\"headline\":\"Min-max upravljanje zalog: kdaj naro\u010diti in koliko\",\"datePublished\":\"2026-10-27T18:49:22+00:00\",\"dateModified\":\"2026-10-27T18:50:51+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/min-max-upravljanje-zalog\\\/\"},\"wordCount\":2357,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/min-max-upravljanje-zalog\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/min-max-inventory-manufacturing-hero.png\",\"articleSection\":[\"APS in terminiranje\",\"viri\"],\"inLanguage\":\"sl-SI\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/min-max-upravljanje-zalog\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/min-max-upravljanje-zalog\\\/\",\"name\":\"Min-max upravljanje zalog: kdaj naro\u010diti in koliko\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/min-max-upravljanje-zalog\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/min-max-upravljanje-zalog\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/min-max-inventory-manufacturing-hero.png\",\"datePublished\":\"2026-10-27T18:49:22+00:00\",\"dateModified\":\"2026-10-27T18:50:51+00:00\",\"description\":\"Dolo\u010dite min-max ravni zalog brez dvojnega naro\u010danja za iste potrebe. Kaj upo\u0161tevati, koliko naro\u010diti in kako SkyPlanner terminira odobreno delo.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/min-max-upravljanje-zalog\\\/#breadcrumb\"},\"inLanguage\":\"sl-SI\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/min-max-upravljanje-zalog\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"sl-SI\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/min-max-upravljanje-zalog\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/min-max-inventory-manufacturing-hero.png\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/min-max-inventory-manufacturing-hero.png\",\"width\":1672,\"height\":941,\"caption\":\"A low bracket bin with lower and upper reference marks beside incoming parts illustrates min\u2013max replenishment.\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/min-max-upravljanje-zalog\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Min-max upravljanje zalog: kdaj naro\u010diti in koliko\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"sl-SI\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"sl-SI\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\",\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"sl-SI\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"caption\":\"Jussi M\u00e4ntyl\u00e4\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Min-max upravljanje zalog: kdaj naro\u010diti in koliko","description":"Dolo\u010dite min-max ravni zalog brez dvojnega naro\u010danja za iste potrebe. Kaj upo\u0161tevati, koliko naro\u010diti in kako SkyPlanner terminira odobreno delo.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/sl\/viri\/min-max-upravljanje-zalog\/","og_locale":"sl_SI","og_type":"article","og_title":"Min-max upravljanje zalog: kdaj naro\u010diti in koliko","og_description":"Dolo\u010dite min-max ravni zalog brez dvojnega naro\u010danja za iste potrebe. Kaj upo\u0161tevati, koliko naro\u010diti in kako SkyPlanner terminira odobreno delo.","og_url":"https:\/\/skyplanner.ai\/sl\/viri\/min-max-upravljanje-zalog\/","og_site_name":"SkyPlanner","article_published_time":"2026-10-27T18:49:22+00:00","article_modified_time":"2026-10-27T18:50:51+00:00","og_image":[{"width":1672,"height":941,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/min-max-inventory-manufacturing-hero.png","type":"image\/png"}],"author":"Jussi M\u00e4ntyl\u00e4","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Jussi M\u00e4ntyl\u00e4","Est. reading time":"12 minut"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/sl\/viri\/min-max-upravljanje-zalog\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/sl\/viri\/min-max-upravljanje-zalog\/"},"author":{"name":"Jussi M\u00e4ntyl\u00e4","@id":"https:\/\/skyplanner.ai\/sl\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5"},"headline":"Min-max upravljanje zalog: kdaj naro\u010diti in koliko","datePublished":"2026-10-27T18:49:22+00:00","dateModified":"2026-10-27T18:50:51+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/sl\/viri\/min-max-upravljanje-zalog\/"},"wordCount":2357,"publisher":{"@id":"https:\/\/skyplanner.ai\/sl\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/sl\/viri\/min-max-upravljanje-zalog\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/min-max-inventory-manufacturing-hero.png","articleSection":["APS in terminiranje","viri"],"inLanguage":"sl-SI"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/sl\/viri\/min-max-upravljanje-zalog\/","url":"https:\/\/skyplanner.ai\/sl\/viri\/min-max-upravljanje-zalog\/","name":"Min-max upravljanje zalog: kdaj naro\u010diti in koliko","isPartOf":{"@id":"https:\/\/skyplanner.ai\/sl\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/sl\/viri\/min-max-upravljanje-zalog\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/sl\/viri\/min-max-upravljanje-zalog\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/min-max-inventory-manufacturing-hero.png","datePublished":"2026-10-27T18:49:22+00:00","dateModified":"2026-10-27T18:50:51+00:00","description":"Dolo\u010dite min-max ravni zalog brez dvojnega naro\u010danja za iste potrebe. Kaj upo\u0161tevati, koliko naro\u010diti in kako SkyPlanner terminira odobreno delo.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/sl\/viri\/min-max-upravljanje-zalog\/#breadcrumb"},"inLanguage":"sl-SI","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/sl\/viri\/min-max-upravljanje-zalog\/"]}]},{"@type":"ImageObject","inLanguage":"sl-SI","@id":"https:\/\/skyplanner.ai\/sl\/viri\/min-max-upravljanje-zalog\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/min-max-inventory-manufacturing-hero.png","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/min-max-inventory-manufacturing-hero.png","width":1672,"height":941,"caption":"A low bracket bin with lower and upper reference marks beside incoming parts illustrates min\u2013max replenishment."},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/sl\/viri\/min-max-upravljanje-zalog\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/sl\/"},{"@type":"ListItem","position":2,"name":"Min-max upravljanje zalog: kdaj naro\u010diti in koliko"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/sl\/#website","url":"https:\/\/skyplanner.ai\/sl\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/sl\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/sl\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"sl-SI"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/sl\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/sl\/","logo":{"@type":"ImageObject","inLanguage":"sl-SI","@id":"https:\/\/skyplanner.ai\/sl\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/sl\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]},{"@type":"Person","@id":"https:\/\/skyplanner.ai\/sl\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5","name":"Jussi M\u00e4ntyl\u00e4","image":{"@type":"ImageObject","inLanguage":"sl-SI","@id":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","caption":"Jussi M\u00e4ntyl\u00e4"}}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/min-max-inventory-manufacturing-hero.png",1672,941,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/min-max-inventory-manufacturing-hero-150x150.png",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/min-max-inventory-manufacturing-hero-300x169.png",300,169,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/min-max-inventory-manufacturing-hero-768x432.png",768,432,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/min-max-inventory-manufacturing-hero-1024x576.png",1024,576,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/min-max-inventory-manufacturing-hero-1536x864.png",1536,864,true],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/min-max-inventory-manufacturing-hero.png",1672,941,false],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/min-max-inventory-manufacturing-hero-360x203.png",360,203,true]},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/sl\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Min-max upravljanje zalog: kdaj naro\u010diti in koliko Domov &raquo; Viri &raquo; Min-max upravljanje zalog: kdaj naro\u010diti in koliko Zaloga v zaboju kopni, zato nabavnik naro\u010di novo serijo. Medtem v proizvodnji \u017ee izdelujejo isti artikel za dopolnitev zaloge. Vsaka odlo\u010ditev zase se zdi smiselna. Skupaj pa ustvarita zalogo, ki je tovarna ni potrebovala. Min-max upravljanje zalog&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/posts\/111332","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/comments?post=111332"}],"version-history":[{"count":1,"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/posts\/111332\/revisions"}],"predecessor-version":[{"id":111397,"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/posts\/111332\/revisions\/111397"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/media\/111344"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/media?parent=111332"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/categories?post=111332"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/tags?post=111332"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}