{"id":111239,"date":"2026-10-27T16:31:21","date_gmt":"2026-10-27T16:31:21","guid":{"rendered":"https:\/\/skyplanner.ai\/?p=111239"},"modified":"2026-10-27T16:32:54","modified_gmt":"2026-10-27T16:32:54","slug":"pokritost-zalog","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/sl\/viri\/pokritost-zalog\/","title":{"rendered":"Pokritost zalog v proizvodnji: bodo zaloge zadostovale?"},"content":{"rendered":"<div class=\"gb-container gb-container-article01 article-main-content-container\">\n\n<h1 class=\"wp-block-heading\">Pokritost zalog v proizvodnji: bodo zaloge zadostovale?<\/h1>\n\n<div class=\"gb-container gb-container-article02\">\n\n<p><a href=\"\/sl\/\">Domov<\/a> &raquo; <a href=\"https:\/\/skyplanner.ai\/sl\/viri\/\">Viri<\/a> &raquo; Pokritost zalog v proizvodnji: bodo zaloge zadostovale?<\/p>\n\n\n<p class=\"yoast-reading-time__wrapper\"><span class=\"yoast-reading-time__icon\"><svg aria-hidden=\"true\" focusable=\"false\" data-icon=\"clock\" width=\"20\" height=\"20\" fill=\"none\" stroke=\"currentColor\" style=\"display:inline-block;vertical-align:-0.1em\" role=\"img\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewBox=\"0 0 24 24\"><path stroke-linecap=\"round\" stroke-linejoin=\"round\" stroke-width=\"2\" d=\"M12 8v4l3 3m6-3a9 9 0 11-18 0 9 9 0 0118 0z\"><\/path><\/svg><\/span><span class=\"yoast-reading-time__spacer\" style=\"display:inline-block;width:1em\"><\/span><span class=\"yoast-reading-time__descriptive-text\">Predviden \u010das branja: <\/span><span class=\"yoast-reading-time__reading-time\">10<\/span><span class=\"yoast-reading-time__time-unit\"> minut<\/span><\/p>\n\n<\/div>\n<div class=\"gb-container gb-container-article03\">\n\n<p>Poro\u010dilo o zalogah ka\u017ee, da imate dovolj komponent za sedem delovnih dni. Naslednja dobava je predvidena za petek. Kljub temu za za\u010detek \u010detrtkovega proizvodnega naloga ni na voljo potrebne koli\u010dine.<\/p>\n\n\n<p>Tu ni protislovja: zaloga za sedem dni ob povpre\u010dni porabi ni isto kot zaloga, ki pokrije dejanska naro\u010dila v va\u0161i proizvodnji. Velika serija, zaloga, zadr\u017eana zaradi preverjanja kakovosti, ali material, ki je \u017ee namenjen drugemu delu, lahko spremenijo odgovor.<\/p>\n\n\n<p>Pokritost zalog vam pomaga odkriti tak\u0161no vrzel, \u0161e preden povzro\u010di zastoj. V proizvodnji je klju\u010dno konkretno vpra\u0161anje: <strong>katere prihodnje potrebe ne moremo ve\u010d pokriti in ali bo dopolnitev zaloge pravo\u010dasno na voljo za uporabo?<\/strong> SkyPlanner APS povezuje razpolo\u017eljivost materiala s terminskim planom proizvodnje, zato lahko pri ukrepanju poleg zalog upo\u0161tevate tudi zmogljivosti strojev in dogovorjene dobavne roke.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Kaj pomeni pokritost zalog v proizvodnji?<\/h2>\n\n\n<p>Pokritost zalog pove, kako dolgo lahko dolo\u010dena koli\u010dina zaloge zadovoljuje potrebe. Pogosto jo izra\u017eamo v dnevih ali tednih. V proizvodnji so to lahko potrebe po komponentah ali surovinah za prihodnje operacije, ne pa po kon\u010dnih izdelkih za prodajo kupcem.<\/p>\n\n\n<p>Osnova za izra\u010dun mora biti jasna. Pokritost zaloge ene komponente v eni tovarni ni isto kot kazalnik zalog za celotno podjetje. Prav tako se pokritost iz trenutno razpolo\u017eljive zaloge razlikuje od pokritosti, ki vklju\u010duje pri\u010dakovane prevzeme.<\/p>\n\n\n<p>Za hitro oceno pri enakomerni porabi uporabite:<\/p>\n\n\n<p><strong>Pokritost zalog = koli\u010dina uporabne zaloge \u00f7 dnevna poraba<\/strong><\/p>\n\n\n<p>Uporabljajte enake merske enote in isto \u010dasovno osnovo. \u010ce uporabna zaloga zna\u0161a 420 komponent, povpre\u010dna poraba pa 60 komponent na delovni dan, je ocenjena pokritost sedem delovnih dni. Ne primerjajte je neposredno z dobavnim rokom dobavitelja, izra\u017eenim v koledarskih dnevih, ne da bi prej uskladili koledarja.<\/p>\n\n\n<p>Ta ocena je uporabna za prepoznavanje materialov, pri katerih je treba preveriti pokritost. Kadar se poraba med naro\u010dili razlikuje, raje izra\u010dunajte pokritost za naprej na podlagi potreb z dolo\u010denimi datumi. Komponenta, ki se porablja v velikih serijah, ne zapu\u0161\u010da skladi\u0161\u010da enakomerno iz dneva v dan, kot bi lahko sklepali iz povpre\u010dja.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Pokritost zalog ni isto kot obra\u010danje zalog ali DIO<\/h3>\n\n\n<p><a href=\"https:\/\/skyplanner.ai\/sl\/viri\/obracanje-zalog\/\">Obra\u010danje zalog<\/a> in dnevi vezave zalog oziroma DIO na podlagi finan\u010dnih podatkov za dolo\u010deno obdobje opisujejo gibanje zalog ali \u010das njihovega zadr\u017eevanja. Pomagajo oceniti upravljanje zalog, planerju pa ne povedo, ali bo dolo\u010dena komponenta na voljo za \u010detrtkovo operacijo.<\/p>\n\n\n<p>Za tak\u0161no odlo\u010ditev uporabite koli\u010dine istega artikla in datume, ko jih potrebujete. Koli\u010dine komponente ne delite s stro\u0161ki prodanih izdelkov in ne predpostavljajte, da podatek o dnevih vezave zalog v preteklem obdobju dokazuje prihodnjo razpolo\u017eljivost materiala.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Za\u010dnite z zalogo, ki jo proizvodnja dejansko lahko uporabi<\/h2>\n\n\n<p>Pred izra\u010dunom pokritosti uskladite za\u010detno stanje zalog. Fizi\u010dno stanje lahko vklju\u010duje material, ki je sicer prisoten, vendar ni na voljo za delo, ki ga preverjate.<\/p>\n\n\n<p>Lo\u010dite \u0161tiri kategorije:<\/p>\n\n\n<ul class=\"wp-block-list\"><li><strong>Fizi\u010dna zaloga:<\/strong> evidentirana koli\u010dina, ki je fizi\u010dno prisotna na zadevni lokaciji.<\/li><li><strong>Nerazpolo\u017eljiva zaloga:<\/strong> material, zadr\u017ean zaradi preverjanja kakovosti, po\u0161kodovana zaloga, material s prete\u010denim rokom uporabe ali material s specifikacijo, ki za operacijo ni ustrezna.<\/li><li><strong>Rezervirana zaloga:<\/strong> material, namenjen drugemu delu, kar je treba pri izra\u010dunu upo\u0161tevati.<\/li><li><strong>Pri\u010dakovani prevzemi:<\/strong> koli\u010dine, ki bodo morda na voljo pozneje in \u0161e niso del fizi\u010dne zaloge.<\/li><\/ul>\n\n\n<p>Klju\u010dno je, da sta za\u010detno stanje in seznam potreb med seboj usklajena. \u010ce je bila rezervirana koli\u010dina \u017ee od\u0161teta od za\u010detnega stanja, iste potrebe pozneje ne od\u0161tejte \u0161e enkrat. \u010ce pa za\u010dnete z uporabno zalogo pred od\u0161tetjem rezervacij, vklju\u010dite \u0161e neizpolnjene potrebe, ki bodo to zalogo porabile.<\/p>\n\n\n<p>Ko sistem na primer prikazuje \u00bbprosto zalogo\u00ab, preverite, kaj je bilo pri izra\u010dunu te koli\u010dine \u017ee od\u0161teto. \u010ce od stanja, ki \u017ee izklju\u010duje odprta naro\u010dila, znova od\u0161tejete vsa ta naro\u010dila, boste prikazali pomanjkanje, ki ga v resnici ni.<\/p>\n\n\n<p>Tudi opozorilo glede <a href=\"https:\/\/skyplanner.ai\/sl\/viri\/varnostna-zaloga\/\">varnostne zaloge<\/a> lo\u010dite od dejanskega pomanjkanja materiala. Padec pod dolo\u010deno varnostno raven lahko zahteva ukrepanje, \u0161e preden katera od operacij ostane brez materiala. Navedite, katero mejo uporablja va\u0161 podatek o pokritosti: doseganje varnostne zaloge ali nezmo\u017enost pokritja potrebe.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Izra\u010dunajte pokritost za prihodnje operacije<\/h2>\n\n\n<p>Pri materialu, po katerem se potrebe v proizvodnji spreminjajo, obravnavajte potrebe po \u010dasovnem vrstnem redu. Za\u010dnite z usklajenim stanjem uporabne zaloge, od\u0161tejte vsako vklju\u010deno potrebo takrat, ko je material potreben, in pri\u0161tejte prevzem \u0161ele takrat, ko naj bi bila ta koli\u010dina na voljo za uporabo.<\/p>\n\n\n<p>Predvideno stanje sproti izra\u010dunavate tako:<\/p>\n\n\n<p><strong>Predvideno stanje = za\u010detna uporabna zaloga + prevzete koli\u010dine, ki so do takrat na voljo za uporabo \u2212 vklju\u010dene potrebe do tega trenutka<\/strong><\/p>\n\n\n<p>Poi\u0161\u010dite prvo potrebo, ki je razpolo\u017eljiva koli\u010dina ne more v celoti pokriti. Ta trenutek je klju\u010den za prepre\u010devanje pomanjkanja, tudi \u010de je zaradi poznej\u0161ega prevzema skupno stanje ob koncu tedna videti ugodno.<\/p>\n\n\n<p>Uporabite datum, ko je material potreben, in ne samodejno datuma odpreme kon\u010dnega naro\u010dila. Kupljeni surovec, ki ga potrebujete za strojno obdelavo v torek, ne more \u010dakati do petka, ko bo sestav odpremljen.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Primer: po povpre\u010dni porabi zaloga za sedem dni, v \u010detrtek pa pomanjkanje<\/h3>\n\n\n<p>Predstavljajte si proizvajalca, ki v ponedeljek zjutraj preverja zalogo ene kupljene komponente. Fizi\u010dno ima na zalogi 600 kosov. Od tega jih je 100 zadr\u017eanih zaradi preverjanja kakovosti, 80 pa rezerviranih za drugo delo, ki ni vklju\u010deno v ta primer. Za\u010detna uporabna zaloga za spodnje operacije zato zna\u0161a 420 kosov.<\/p>\n\n\n<p>Vklju\u010dene operacije zahtevajo 120 kosov v ponedeljek, 180 v torek in 160 v \u010detrtek. Te potrebe \u0161e niso bile od\u0161tete od za\u010detnega stanja 420 kosov. V petek zjutraj naj bi bilo za uporabo na voljo 200 kosov iz pri\u010dakovanega prevzema nabavljenega materiala.<\/p>\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>To\u010dka v planu<\/th><th>Potreba ali prevzem uporabnega materiala<\/th><th>Predvideno stanje<\/th><\/tr><\/thead><tbody><tr><td>Za\u010detno stanje v ponedeljek<\/td><td>Za\u010detna uporabna zaloga<\/td><td>420 kosov<\/td><\/tr><tr><td>Ponedeljkova operacija<\/td><td>Potrebnih 120 kosov<\/td><td>300 kosov<\/td><\/tr><tr><td>Torkova operacija<\/td><td>Potrebnih 180 kosov<\/td><td>120 kosov<\/td><\/tr><tr><td>\u010cetrtkova operacija<\/td><td>Potrebnih 160 kosov<\/td><td>Primanjkljaj 40 kosov<\/td><\/tr><tr><td>Petkov prevzem<\/td><td>200 kosov je na voljo za uporabo<\/td><td>160 kosov po pokritju vseh navedenih potreb<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>Ob nedavni povpre\u010dni porabi 60 kosov na delovni dan se zdi, da za\u010detna zaloga zagotavlja pokritost za sedem delovnih dni. Dejanske potrebe operacij pa opozorijo na nujnej\u0161o te\u017eavo: za \u010detrtkovo potrebo manjka 40 kosov. Petkov prevzem je ne pokrije pravo\u010dasno.<\/p>\n\n\n<p>Zadnja vrstica je planska projekcija, ne trditev, da lahko proizvodnja izdaja material iz negativne zaloge. Predpostavlja, da je treba neizpolnjeno \u010detrtkovo potrebo \u0161e vedno pokriti. Ko operacijo prestavite, morate z njo prestaviti tudi dejanski datum potrebe po materialu in datum dokon\u010danja.<\/p>\n\n\n<p>Sporo\u010dilo nabavi je zdaj natan\u010dno: pred \u010detrtkovo operacijo, ki bo porabila material, zagotovite vsaj manjkajo\u010dih 40 uporabnih kosov ali pa se dogovorite za druga\u010den proizvodni plan. Izjava \u00bbZaloge imamo za sedem dni\u00ab te nujnosti ne bi izrazila.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Dopolnitev zaloge upo\u0161tevajte, ko je material na voljo za uporabo<\/h2>\n\n\n<p>Nabavno naro\u010dilo lahko odpravi prihodnji koli\u010dinski primanjkljaj, ne zagotovi pa nujno pravo\u010dasne razpolo\u017eljivosti. Preverite, ali pri\u010dakovani datum pomeni prihod na lokacijo, zaklju\u010den prevzem ali sprostitev materiala za proizvodnjo. Prevzem, kontrola in notranji transport lahko povzro\u010dijo \u010dasovni zamik med temi dogodki.<\/p>\n\n\n<p>Pri kriti\u010dni operaciji je lahko tudi na\u010drtovanje po dnevih premalo natan\u010dno. Dobava, pri\u010dakovana pozno v \u010detrtek, ne more zagotoviti materiala za \u010detrtkovo jutranjo operacijo. Kadar ta razlika vpliva na odlo\u010ditev, uporabite natan\u010dnej\u0161e \u010dasovne podatke.<\/p>\n\n\n<p>Jasno lo\u010dite dva pogleda: katere potrebe pokrije trenutna uporabna zaloga sama in katere pokrije na\u010drt, \u010de vklju\u010dite zanesljivo pri\u010dakovane prevzeme. Tako vidite, koliko ste odvisni od dopolnitve zalog in kak\u0161ne bi bile posledice zamude.<\/p>\n\n\n<p>\u010ce so potrebe pokrite v celotnem obravnavanem obdobju, navedite \u00bbpotrebe so pokrite do konca planskega horizonta\u00ab. To ne pomeni, da bo zaloga zado\u0161\u010dala v nedogled. Tudi kadar ni pri\u010dakovane porabe, deljenje z ni\u010d ne daje smiselne podlage za odlo\u010danje o dopolnitvi zalog.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Kolik\u0161na pokritost zalog je zadostna?<\/h3>\n\n\n<p>Enotne ciljne pokritosti, ki bi ustrezala vsem materialom v proizvodnji, ni. Potrebna raven varnosti je odvisna od \u010dasa dopolnitve zalog, spremenljivosti, kriti\u010dnosti materiala, roka uporabnosti in posledic pomanjkanja.<\/p>\n\n\n<p>Najprej je smiselno preveriti, ali uporabne koli\u010dine pokrijejo potrebe do takrat, ko bo naslednja zanesljivo pri\u010dakovana dobava na voljo za uporabo, ob upo\u0161tevanju varnosti, ki jo zahteva va\u0161a politika zalog. Poceni sestavni del, ki lahko ustavi celotno monta\u017eo, si lahko zaslu\u017ei ve\u010d pozornosti kot precej dra\u017eji artikel, ki ga je preprosto nadomestiti.<\/p>\n\n\n<p>Ne kupujte ve\u010d vsakega artikla zgolj zato, da bi izbolj\u0161ali kazalnik pokritosti zalog. Preverite, ali navidezno tveganje izhaja iz dejanskega primanjkljaja, napa\u010dnih podatkov o zalogi, nea\u017eurnih potreb ali nerealnega datuma prevzema.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Izberite ukrep, ki zmanj\u0161uje tveganja za proizvodnjo in dobave<\/h2>\n\n\n<p>Ko ugotovite, katera potreba je prva nepokrita, presodite, s katero spremembo jo lahko pokrijete. V na\u0161em primeru bi zgodnej\u0161a delna dobava lahko odpravila primanjkljaj 40 kosov. V drugih primerih bo morda treba uporabiti odobren nadomestni material, spremeniti velikost serije ali zaporedje operacij.<\/p>\n\n\n<p>Vsaka mo\u017enost ima posledice za proizvodnjo. Nadomestni material potrebuje ustrezno tehni\u010dno odobritev. Manj\u0161a serija lahko pomeni dodatno pripravo. \u010ce drug nalog premaknete na zgodnej\u0161i termin, lahko stroj ostane zaseden, vendar s tem odlo\u017eite dobavo kupcu, katerega material je bil prvotno predviden za ta termin.<\/p>\n\n\n<p>Zato mora preverjanje pokritosti zalog voditi v <a href=\"https:\/\/skyplanner.ai\/sl\/viri\/kaj-je-terminiranje-proizvodnje\/\">terminiranje proizvodnje<\/a>, ne pa se kon\u010dati pri nabavnem ukrepu. Tudi \u010de dobavitelj pospe\u0161i dobavo manjkajo\u010dih kosov, je termin na stroju morda \u017ee zaseden, za nadaljnje operacije pa pred odpremo morda ni ve\u010d dovolj \u010dasa.<\/p>\n\n\n<p>Obe vpra\u0161anji preverite skupaj: <strong>ali bo material na voljo in ali bo preostalo delo \u0161e mogo\u010de dokon\u010dati pravo\u010dasno?<\/strong> Tako prepre\u010dite, da bi odlo\u010ditev o zalogi, ki je sama zase smiselna, neopazno povzro\u010dila drugo te\u017eavo pri dobavi.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Na podlagi razpolo\u017eljivosti materiala pripravite izvedljiv terminski na\u010drt v sistemu SkyPlanner<\/h2>\n\n\n<p>SkyPlanner APS pri izra\u010dunu terminskega na\u010drta poleg delovnih mest, izmen, prioritet in odvisnosti med operacijami upo\u0161teva tudi materiale in predvidene dobave iz nabave. Ko s pravilom Upo\u0161tevaj materiale omogo\u010dite terminiranje z upo\u0161tevanjem materialov, SkyPlanner pri razporejanju operacij preveri razpolo\u017eljivost materialov, ki so zanje dolo\u010deni.<\/p>\n\n\n<p>Prednost je v tem, da se odlo\u010ditev o materialu odrazi v terminskem na\u010drtu in ne ostane le na lo\u010denem seznamu zalog. Arcturus, umetna inteligenca za terminiranje v sistemu SkyPlanner, izra\u010duna terminski na\u010drt proizvodnje na podlagi vnesenih podatkov o razpolo\u017eljivosti in nastavljenih zmogljivosti. Ganttov diagram prika\u017ee tako dobljeno zaporedje operacij, da lahko ocenite vpliv na dobave, ne da bi morali ro\u010dno preurejati \u010dakalno vrsto za vsak stroj.<\/p>\n\n\n<p>Datumi dobav iz nabave imajo v tem na\u010drtu prakti\u010dno vlogo. SkyPlanner datum dobave, vnesen na nabavnem naro\u010dilu, obravnava kot pri\u010dakovani datum razpolo\u017eljivosti materiala. Ko material prispe in nabavno naro\u010dilo potrdite kot Dobavljeno, se zaloga posodobi. Pri\u010dakovane dobave in \u017ee prevzeta zaloga tako ostajajo lo\u010dene.<\/p>\n\n\n<p>Vrnimo se k \u010detrtkovemu primanjkljaju. Ker je prevzem pri\u010dakovan v petek, vnesite ta podatek o prihodu in znova izra\u010dunajte terminski na\u010drt. Preverite, kam se prizadete operacije in operacije, ki jim sledijo, zdaj uvrstijo ob drugih nalogih. \u010ce nabava zagotovi zgodnej\u0161o dobavo, ocenite novi terminski na\u010drt na podlagi spremenjene razpolo\u017eljivosti, namesto da predpostavite, da je prvotno obljubljeni dobavni rok s tem samodejno spet dosegljiv.<\/p>\n\n\n<p>Vi dolo\u010dite prioritete, Arcturus pa izra\u010duna terminski na\u010drt. Tako imata planiranje in nabava skupno podlago za izbiro ukrepa ter porabita manj \u010dasa za usklajevanje seznamov zalog in lo\u010denih na\u010drtov za stroje.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Kaj se je s tem spremenilo v podjetju Eskomatic<\/h3>\n\n\n<p>Podjetje Eskomatic, ki izvaja strojno obdelavo po naro\u010dilu, je v svojem starej\u0161em okolju za vodenje proizvodnje \u010dakalne vrste operacij urejalo prete\u017eno ro\u010dno in imelo omejen vpogled v razpolo\u017eljivost materiala. Pomanjkanje se je lahko pokazalo \u0161ele tik pred na\u010drtovanim za\u010detkom operacije, ko je bilo za ukrepanje \u017ee malo manevrskega prostora.<\/p>\n\n\n<p>Po uvedbi sistema SkyPlanner so vizualni prikaz zaporedja operacij v Ganttovem diagramu, samodejno terminiranje obremenitev in bolj\u0161i vpogled v pomanjkanje materiala prinesli ve\u010djo preglednost pri vsakodnevnem planiranju. <a href=\"https:\/\/skyplanner.ai\/sl\/zgodbe-strank\/eskomatic\/\">Eskomatic poro\u010da<\/a> o manj zastojih v proizvodnji zaradi manjkajo\u010dega materiala in natan\u010dnej\u0161em dolo\u010danju dobavnih rokov.<\/p>\n\n\n<p>Ta izku\u0161nja ka\u017ee, zakaj je pomembno povezati materiale s proizvodnim na\u010drtom: planerji lahko obravnavajo vpliv na delo in obveznosti do kupcev, namesto da bi pomanjkanje odkrili \u0161ele pri stroju.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Preverite, kaj bi zamuda pri dobavi materiala spremenila v va\u0161i tovarni<\/h2>\n\n\n<p>SkyPlanner se prek odprtega vmesnika REST API pove\u017ee s katerim koli sistemom ERP ali MES. Obstoje\u010de podatke o naro\u010dilih in materialih lahko pove\u017eete s terminiranjem proizvodnje z omejenimi zmogljivostmi, namesto da bi lo\u010deno vzdr\u017eevali in ro\u010dno usklajevali \u010dakalne vrste operacij.<\/p>\n\n\n<p>Za ciljno usmerjeno predstavitev sistema SkyPlanner pripravite podatke o enem pomembnem sestavnem delu, operacijah, ki ga porabljajo, in nedavni zamudi pri dopolnitvi zaloge. Prosite za prikaz, kako vneseni datum prihoda vpliva na skupni terminski na\u010drt in dobavne roke. Tako lahko prakti\u010dno ocenite koristi, ki presegajo sam kazalnik pokritosti zalog.<\/p>\n\n\n<p><a href=\"https:\/\/skyplanner.ai\/sl\/kontaktna-prodaja\/\">Rezervirajte predstavitev sistema SkyPlanner<\/a>, na kateri boste obravnavali svoje proizvodne razmere, ali pa <a href=\"https:\/\/skyplanner.ai\/sl\/preizkus\/\">preizkusite SkyPlanner z demonstracijskimi podatki<\/a> in najprej spoznajte potek terminiranja.<\/p>\n\n<\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>Pokritost zalog v proizvodnji: bodo zaloge zadostovale? Domov &raquo; Viri &raquo; Pokritost zalog v proizvodnji: bodo zaloge zadostovale? Poro\u010dilo o zalogah ka\u017ee, da imate dovolj komponent za sedem delovnih dni. Naslednja dobava je predvidena za petek. Kljub temu za za\u010detek \u010detrtkovega proizvodnega naloga ni na voljo potrebne koli\u010dine. Tu ni protislovja: zaloga za sedem dni &#8230; <a title=\"Pokritost zalog v proizvodnji: bodo zaloge zadostovale?\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/sl\/viri\/pokritost-zalog\/\" aria-label=\"Read more about Pokritost zalog v proizvodnji: bodo zaloge zadostovale?\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":111252,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[2539,302],"tags":[],"class_list":["post-111239","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-aps-in-terminiranje","category-viri","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Pokritost zalog v proizvodnji: bodo zaloge zadostovale?<\/title>\n<meta name=\"description\" content=\"Odkrijte prvo pomanjkanje pred zastojem. Izra\u010dunajte pokritost zalog za prihodnje operacije in pove\u017eite razpolo\u017eljivost s planom v SkyPlanner.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/sl\/viri\/pokritost-zalog\/\" \/>\n<meta property=\"og:locale\" content=\"sl_SI\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Pokritost zalog v proizvodnji: bodo zaloge zadostovale?\" \/>\n<meta property=\"og:description\" content=\"Odkrijte prvo pomanjkanje pred zastojem. Izra\u010dunajte pokritost zalog za prihodnje operacije in pove\u017eite razpolo\u017eljivost s planom v SkyPlanner.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/sl\/viri\/pokritost-zalog\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2026-10-27T16:31:21+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-27T16:32:54+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/inventory-coverage-manufacturing-hero.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1672\" \/>\n\t<meta property=\"og:image:height\" content=\"941\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"11 minut\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/pokritost-zalog\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/pokritost-zalog\\\/\"},\"author\":{\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\"},\"headline\":\"Pokritost zalog v proizvodnji: bodo zaloge zadostovale?\",\"datePublished\":\"2026-10-27T16:31:21+00:00\",\"dateModified\":\"2026-10-27T16:32:54+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/pokritost-zalog\\\/\"},\"wordCount\":2248,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/pokritost-zalog\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/inventory-coverage-manufacturing-hero.png\",\"articleSection\":[\"APS in terminiranje\",\"viri\"],\"inLanguage\":\"sl-SI\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/pokritost-zalog\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/pokritost-zalog\\\/\",\"name\":\"Pokritost zalog v proizvodnji: bodo zaloge zadostovale?\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/pokritost-zalog\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/pokritost-zalog\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/inventory-coverage-manufacturing-hero.png\",\"datePublished\":\"2026-10-27T16:31:21+00:00\",\"dateModified\":\"2026-10-27T16:32:54+00:00\",\"description\":\"Odkrijte prvo pomanjkanje pred zastojem. Izra\u010dunajte pokritost zalog za prihodnje operacije in pove\u017eite razpolo\u017eljivost s planom v SkyPlanner.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/pokritost-zalog\\\/#breadcrumb\"},\"inLanguage\":\"sl-SI\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/pokritost-zalog\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"sl-SI\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/pokritost-zalog\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/inventory-coverage-manufacturing-hero.png\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/inventory-coverage-manufacturing-hero.png\",\"width\":1672,\"height\":941,\"caption\":\"Held components behind a closed barrier and a small usable stock feeding assembly illustrate inventory coverage.\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/pokritost-zalog\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Pokritost zalog v proizvodnji: bodo zaloge zadostovale?\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"sl-SI\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"sl-SI\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\",\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"sl-SI\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"caption\":\"Jussi M\u00e4ntyl\u00e4\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Pokritost zalog v proizvodnji: bodo zaloge zadostovale?","description":"Odkrijte prvo pomanjkanje pred zastojem. Izra\u010dunajte pokritost zalog za prihodnje operacije in pove\u017eite razpolo\u017eljivost s planom v SkyPlanner.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/sl\/viri\/pokritost-zalog\/","og_locale":"sl_SI","og_type":"article","og_title":"Pokritost zalog v proizvodnji: bodo zaloge zadostovale?","og_description":"Odkrijte prvo pomanjkanje pred zastojem. Izra\u010dunajte pokritost zalog za prihodnje operacije in pove\u017eite razpolo\u017eljivost s planom v SkyPlanner.","og_url":"https:\/\/skyplanner.ai\/sl\/viri\/pokritost-zalog\/","og_site_name":"SkyPlanner","article_published_time":"2026-10-27T16:31:21+00:00","article_modified_time":"2026-10-27T16:32:54+00:00","og_image":[{"width":1672,"height":941,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/inventory-coverage-manufacturing-hero.png","type":"image\/png"}],"author":"Jussi M\u00e4ntyl\u00e4","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Jussi M\u00e4ntyl\u00e4","Est. reading time":"11 minut"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/sl\/viri\/pokritost-zalog\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/sl\/viri\/pokritost-zalog\/"},"author":{"name":"Jussi M\u00e4ntyl\u00e4","@id":"https:\/\/skyplanner.ai\/sl\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5"},"headline":"Pokritost zalog v proizvodnji: bodo zaloge zadostovale?","datePublished":"2026-10-27T16:31:21+00:00","dateModified":"2026-10-27T16:32:54+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/sl\/viri\/pokritost-zalog\/"},"wordCount":2248,"publisher":{"@id":"https:\/\/skyplanner.ai\/sl\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/sl\/viri\/pokritost-zalog\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/inventory-coverage-manufacturing-hero.png","articleSection":["APS in terminiranje","viri"],"inLanguage":"sl-SI"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/sl\/viri\/pokritost-zalog\/","url":"https:\/\/skyplanner.ai\/sl\/viri\/pokritost-zalog\/","name":"Pokritost zalog v proizvodnji: bodo zaloge zadostovale?","isPartOf":{"@id":"https:\/\/skyplanner.ai\/sl\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/sl\/viri\/pokritost-zalog\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/sl\/viri\/pokritost-zalog\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/inventory-coverage-manufacturing-hero.png","datePublished":"2026-10-27T16:31:21+00:00","dateModified":"2026-10-27T16:32:54+00:00","description":"Odkrijte prvo pomanjkanje pred zastojem. Izra\u010dunajte pokritost zalog za prihodnje operacije in pove\u017eite razpolo\u017eljivost s planom v SkyPlanner.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/sl\/viri\/pokritost-zalog\/#breadcrumb"},"inLanguage":"sl-SI","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/sl\/viri\/pokritost-zalog\/"]}]},{"@type":"ImageObject","inLanguage":"sl-SI","@id":"https:\/\/skyplanner.ai\/sl\/viri\/pokritost-zalog\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/inventory-coverage-manufacturing-hero.png","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/inventory-coverage-manufacturing-hero.png","width":1672,"height":941,"caption":"Held components behind a closed barrier and a small usable stock feeding assembly illustrate inventory coverage."},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/sl\/viri\/pokritost-zalog\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/sl\/"},{"@type":"ListItem","position":2,"name":"Pokritost zalog v proizvodnji: bodo zaloge zadostovale?"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/sl\/#website","url":"https:\/\/skyplanner.ai\/sl\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/sl\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/sl\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"sl-SI"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/sl\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/sl\/","logo":{"@type":"ImageObject","inLanguage":"sl-SI","@id":"https:\/\/skyplanner.ai\/sl\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/sl\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]},{"@type":"Person","@id":"https:\/\/skyplanner.ai\/sl\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5","name":"Jussi M\u00e4ntyl\u00e4","image":{"@type":"ImageObject","inLanguage":"sl-SI","@id":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","caption":"Jussi M\u00e4ntyl\u00e4"}}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/inventory-coverage-manufacturing-hero.png",1672,941,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/inventory-coverage-manufacturing-hero-150x150.png",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/inventory-coverage-manufacturing-hero-300x169.png",300,169,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/inventory-coverage-manufacturing-hero-768x432.png",768,432,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/inventory-coverage-manufacturing-hero-1024x576.png",1024,576,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/inventory-coverage-manufacturing-hero-1536x864.png",1536,864,true],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/inventory-coverage-manufacturing-hero.png",1672,941,false],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/inventory-coverage-manufacturing-hero-360x203.png",360,203,true]},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/sl\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Pokritost zalog v proizvodnji: bodo zaloge zadostovale? Domov &raquo; Viri &raquo; Pokritost zalog v proizvodnji: bodo zaloge zadostovale? Poro\u010dilo o zalogah ka\u017ee, da imate dovolj komponent za sedem delovnih dni. Naslednja dobava je predvidena za petek. Kljub temu za za\u010detek \u010detrtkovega proizvodnega naloga ni na voljo potrebne koli\u010dine. Tu ni protislovja: zaloga za sedem dni&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/posts\/111239","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/comments?post=111239"}],"version-history":[{"count":1,"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/posts\/111239\/revisions"}],"predecessor-version":[{"id":111303,"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/posts\/111239\/revisions\/111303"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/media\/111252"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/media?parent=111239"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/categories?post=111239"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/tags?post=111239"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}