{"id":110871,"date":"2026-10-26T11:01:16","date_gmt":"2026-10-26T11:01:16","guid":{"rendered":"https:\/\/skyplanner.ai\/?p=110871"},"modified":"2026-10-26T11:02:50","modified_gmt":"2026-10-26T11:02:50","slug":"fifo-proga","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/sl\/viri\/fifo-proga\/","title":{"rendered":"FIFO proge v proizvodnji: \u010dakalne vrste pod nadzorom"},"content":{"rendered":"<div class=\"gb-container gb-container-article01 article-main-content-container\">\n\n<h1 class=\"wp-block-heading\">FIFO proge v proizvodnji: \u010dakalne vrste pod nadzorom<\/h1>\n\n<div class=\"gb-container gb-container-article02\">\n\n<p><a href=\"\/sl\/\">Domov<\/a> &raquo; <a href=\"https:\/\/skyplanner.ai\/sl\/viri\/\">Viri<\/a> &raquo; FIFO proge v proizvodnji: \u010dakalne vrste pod nadzorom<\/p>\n\n\n<p class=\"yoast-reading-time__wrapper\"><span class=\"yoast-reading-time__icon\"><svg aria-hidden=\"true\" focusable=\"false\" data-icon=\"clock\" width=\"20\" height=\"20\" fill=\"none\" stroke=\"currentColor\" style=\"display:inline-block;vertical-align:-0.1em\" role=\"img\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewBox=\"0 0 24 24\"><path stroke-linecap=\"round\" stroke-linejoin=\"round\" stroke-width=\"2\" d=\"M12 8v4l3 3m6-3a9 9 0 11-18 0 9 9 0 0118 0z\"><\/path><\/svg><\/span><span class=\"yoast-reading-time__spacer\" style=\"display:inline-block;width:1em\"><\/span><span class=\"yoast-reading-time__descriptive-text\">Predviden \u010das branja: <\/span><span class=\"yoast-reading-time__reading-time\">11<\/span><span class=\"yoast-reading-time__time-unit\"> minut<\/span><\/p>\n\n<\/div>\n<div class=\"gb-container gb-container-article03\">\n\n<p>Vozi\u010dek, ki je prispel prvi, \u0161e vedno \u010daka, ko prispe material za novo nujno delo. Nekdo nov material odlo\u017ei ob ozna\u010denem obmo\u010dju, pri naslednjem procesu vzamejo serijo, ki se zdi najnujnej\u0161a, in vse te\u017eje je pojasniti, kaj se dogaja z v\u010deraj\u0161njo \u010dakalno vrsto.<\/p>\n\n\n<p>FIFO proga je namenjena prepre\u010devanju tak\u0161nih razmer. Za dva procesa dolo\u010da skupno pravilo o vrstnem redu obdelave in jasno omejitev koli\u010dine, ki lahko \u010daka med njima. Koristi prina\u0161a upo\u0161tevanje tega dogovora, zlasti ko je proga polna, ne pa sama talna ozna\u010dba.<\/p>\n\n\n<p>Proga ureja lokalno predajo med procesoma. SkyPlanner APS vam pomaga uskladiti proizvodnjo okoli nje, tako da so operacije, ki polnijo \u010dakalno vrsto, in viri, ki jo praznijo, vklju\u010deni v isti terminski plan kot va\u0161a druga naro\u010dila. Tako porabite manj \u010dasa za usklajevanje lo\u010denih \u010dakalnih vrst pri strojih in jasneje vidite, kaj zamuda pomeni za dobave.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Kaj je FIFO proga v proizvodnji?<\/h2>\n\n\n<p>FIFO proga je jasno dolo\u010dena povezava z omejeno zmogljivostjo med procesom, ki material oddaja, in procesom, ki ga prevzema. FIFO pomeni \u00bbprvi noter, prvi ven\u00ab: material vstopa na enem koncu in izstopa na drugem v vrstnem redu prihoda. Ko proga dose\u017ee dogovorjeno najve\u010djo zasedenost, se v oskrbovalnem procesu ustavi nadaljnja proizvodnja za to povezavo, dokler se ne sprosti prostor.<\/p>\n\n\n<p>Za fizi\u010dno izvedbo lahko uporabite ozna\u010dena mesta za vozi\u010dke, preto\u010dni regal ali ustrezen transporter. Ne glede na opremo mora dogovor o uporabi dolo\u010dati troje: nedvoumen vhod in izhod, najve\u010djo dovoljeno koli\u010dino ter prepoved rednega prehitevanja.<\/p>\n\n\n<p>\u010ce z neomejenega kupa vedno izberete material, ki \u010daka najdlje, sicer upo\u0161tevate vrstni red FIFO, ne omejujete pa nedokon\u010dane proizvodnje. Prostorsko omejena proga dodaja navodilo, s katerim omejitev dejansko deluje: <strong>v polno \u010dakalno vrsto ne dodajajte novega materiala.<\/strong><\/p>\n\n\n<p>FIFO tu opisuje fizi\u010dni pretok materiala med proizvodnimi fazami. Ne gre za metodo vrednotenja zalog.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Pred ozna\u010devanjem tal dolo\u010dite pravila predaje<\/h2>\n\n\n<p>Najprej natan\u010dno opredelite dva procesa in material, ki naj bi prehajal med njima. Progo od raziglevanja do kontrole je la\u017eje upravljati kot obmo\u010dje, ozna\u010deno zgolj z \u00bbgotovi deli\u00ab, kjer razli\u010dne ekipe odlagajo material za razli\u010dne cilje.<\/p>\n\n\n<p>Dogovorite se o pogojih za vstop na progo. Material mora imeti zaklju\u010deno predhodno operacijo, biti jasno ozna\u010den in izpolnjevati zahteve za predajo naslednjemu procesu. Nepopoln komplet ali serija, pri kateri odlo\u010ditev o kakovosti \u0161e ni sprejeta, se mora jasno razlikovati od materiala, pripravljenega za obdelavo.<\/p>\n\n\n<p>Nato dolo\u010dite enoto, ki jo boste nadzorovali. Ali eno mesto pomeni vozi\u010dek z eno standardno transportno serijo, paleto ali en velik sestav? Zabele\u017eite tudi morebitno koli\u010dinsko omejitev znotraj te enote. \u0160tiri mesta za vozi\u010dke ne pomenijo smiselne omejitve \u0161tevila kosov, \u010de lahko vsak vozi\u010dek preva\u017ea poljubno koli\u010dino.<\/p>\n\n\n<p>Smer pretoka mora biti jasna obema ekipama. Novi material se postavi za tistega, ki \u017ee \u010daka, naslednji proces pa na izhodu prevzame serijo, ki \u010daka najdlje in izpolnjuje pogoje za obdelavo. \u0160teje vrstni red vstopa v to povezavo, ne datum kup\u010devega naro\u010dila ali rok, natisnjen na spremnem listu.<\/p>\n\n\n<p>Nazadnje dolo\u010dite osebe, odgovorne za oddajo, prevzem in ukrepanje ob zastoju pri predaji. Vsaka izmena mora vedeti, kdo lahko odobri izjemo in kdo posodobi proizvodni plan. Sicer polna proga postane skrb vseh, odlo\u010ditve pa ne sprejme nih\u010de.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Poskrbite, da pravilo o polni progi deluje tudi v praksi<\/h2>\n\n\n<p>Predstavljajte si, da material od raziglevanja do kontrole potuje prek \u0161tirih ozna\u010denih mest za vozi\u010dke. Na vsakem vozi\u010dku je ena dolo\u010dena transportna serija. Kontrola jemlje vozi\u010dke s sprednjega konca, pri raziglevanju pa nove dodajajo zadaj.<\/p>\n\n\n<p>Vsa \u0161tiri mesta so zasedena. \u010ce bi za to povezavo za\u010deli obdelovati peto serijo, zanjo ne bi bilo predvidenega prostora, tudi \u010de je stroj za raziglevanje prost. Operater ob progi ne ustvari neuradnega petega mesta. Ekipa za\u010dasno ustavi nadaljnjo proizvodnjo za to povezavo in pristojnemu vodji sporo\u010di razlog.<\/p>\n\n\n<p>Ko kontrola odpelje vozi\u010dek, ki \u010daka najdlje, se sprosti eno mesto. Po dogovorjenem pravilu za spro\u0161\u010danje v proizvodnjo se lahko za\u010dne obdelava ene nadomestne serije, \u010de to mesto ni \u017ee rezervirano za drugo serijo, ki je na poti.<\/p>\n\n\n<p>Ta zadnja podrobnost je pomembna. Prazno mesto ni nujno tudi nerezervirano. Pred za\u010detkom predhodne operacije upo\u0161tevajte koli\u010dino, ki bo nastala z njo, in ves drug material, ki je \u017ee na poti proti progi. Sicer lahko dva operaterja opazita isto prazno mesto, vsak za\u010dne obdelovati svojo serijo in material znova prese\u017ee zmogljivost proge.<\/p>\n\n\n<p>\u0160e pred pilotno uvedbo dolo\u010dite, koliko prostora je treba zagotoviti za material iz \u017ee za\u010detih operacij. Ne zana\u0161ajte se na ustavitev operacije sredi cikla, ko se zapolni zadnje mesto, \u010de bi bila tak\u0161na prekinitev nevarna ali neprakti\u010dna. \u010ce pri eni operaciji nastane ve\u010d transportnih serij hkrati, je treba pred za\u010detkom zagotoviti dovolj dogovorjenih sprejemnih mest za vse.<\/p>\n\n\n<p>Polna proga ne pomeni nujno ustavitve vseh operacij na stroju, ki se uporablja tudi za drugo delo. Vodja lahko dodeli drugo odobreno delo, za katerega je dolo\u010deno ustrezno mesto predaje, ali ta \u010das izkoristi za na\u010drtovano pripravo. Namen je ustaviti dodajanje v to \u010dakalno vrsto, ne pa ohranjati zasedenost stroja tako, da se dodatne zaloge skrijejo drugam.<\/p>\n\n\n<p>Ustavitev tudi razkrije te\u017eavo. Kontroli morda primanjkuje zmogljivosti, se ukvarja z dodelavo ali obdeluje material iz drugega proizvodnega postopka. \u010ce prese\u017eni material prestavite drugam, odstranite opozorilo, ne odpravite pa vzroka.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Kako velika naj bo FIFO proga?<\/h2>\n\n\n<p>Izberite omejitev, ki omogo\u010da nemoteno predajo ob obi\u010dajnih nihanjih, ne da bi proga postala dolgoro\u010dno skladi\u0161\u010de. Razpolo\u017eljiva talna povr\u0161ina je omejitev, ne razlog, da jo zapolnite.<\/p>\n\n\n<p>Pri za\u010detni odlo\u010ditvi izhajajte iz dejanskih pogojev dela:<\/p>\n\n\n<ul class=\"wp-block-list\"><li>Kako hitro naslednji proces obdela posamezno transportno serijo?<\/li><li>Koliko \u010dasa traja priprava nadomestne serije, vklju\u010dno s pripravo stroja in transportom?<\/li><li>Katere prekinitve mora povezava med procesoma razumno premostiti?<\/li><li>Kako mo\u010dno se razlikujejo velikosti serij in \u010dasi obdelave?<\/li><li>Koliko materiala bo \u0161e prispelo iz \u017ee za\u010detih operacij, ko se oskrbovalni proces ustavi?<\/li><\/ul>\n\n\n<p>Majhna vmesna zaloga lahko prepre\u010di, da bi naslednji proces ob kratki prekinitvi predhodnega procesa takoj ostal brez dela. Z ve\u010djo omejitvijo pa ne morete odpraviti trajnega pomanjkanja zmogljivosti v naslednjem procesu. Ve\u010dinoma mu le namenite ve\u010d prostora za kopi\u010denje materiala.<\/p>\n\n\n<p>Pri razli\u010dnih izdelkih poleg \u0161tevila zasedenih mest preverite tudi delovno obremenitev. Vozi\u010dek z materialom, ki zahteva dolgotrajno kontrolo, ni enakovreden vozi\u010dku, za katerega zadostuje hiter pregled. Fizi\u010dna omejitev naj ostane preprosta za upo\u0161tevanje, terminski plan proizvodnje pa naj upo\u0161teva razli\u010dne \u010dasovne zahteve.<\/p>\n\n\n<p>Pilotno uvedbo izvedite v reprezentativnih izmenah in z reprezentativnim naborom izdelkov. Bele\u017eite, kdaj je proga polna, kdaj naslednji proces nima materiala, pripravljenega za obdelavo, kako dolgo \u010daka najstarej\u0161a serija in zakaj zaposleni prosijo za izjeme. Pred spremembo omejitve poi\u0161\u010dite vzrok. Ponavljajo\u010de se pomanjkanje materiala zaradi nezanesljivega dopolnjevanja zahteva druga\u010den ukrep kot \u010dakalna vrsta, ki ostaja polna zaradi preobremenitve naslednjega procesa.<\/p>\n\n\n<p>Ko izbolj\u0161ave to omogo\u010dijo, zmanj\u0161ajte omejitev in preverite, ali predaja \u0161e vedno deluje. \u0160tevila mest ne dolo\u010dite zgolj zato, ker enako \u0161tevilo uporabljajo v drugi tovarni. Tudi zahtevanega \u010dasa su\u0161enja ali utrjevanja ne smete prepustiti naklju\u010dnemu \u010dakanju v vrsti: pripravljenost za naslednjo operacijo mora biti izrecno nadzorovana.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Dolo\u010dite, kaj storiti, \u010de najstarej\u0161a serija ne more naprej<\/h2>\n\n\n<p>Pravi preizkus ni prihod obi\u010dajnega vozi\u010dka. Nastopi takrat, ko najstarej\u0161a serija obstane, novej\u0161e naro\u010dilo pa je nujno potrebno.<\/p>\n\n\n<p>\u010ce ima najstarej\u0161a serija te\u017eavo s kakovostjo, jo ozna\u010dite in obravnavajte po postopku za kakovost. Ne vzemite preprosto naslednjega vozi\u010dka, medtem ko sumljivi material ostane videti kot obi\u010dajen material za obdelavo. Pristojni vodja in odgovorna oseba za kakovost morata odlo\u010diti, ali se predaja ustavi ali pa se serija premakne v nadzorovano obmo\u010dje za zadr\u017eani material, ter dolo\u010diti, kaj se zgodi s preostalim vrstnim redom.<\/p>\n\n\n<p>Serija v karanteni je \u0161e vedno del nedokon\u010dane proizvodnje, tudi \u010de ne zaseda ve\u010d mesta na progi. Ohranite jo vidno v ustreznih proizvodnih evidencah, da s sprostitvijo talne povr\u0161ine ne izgine tudi podatek o nedokon\u010danem delu.<\/p>\n\n\n<p>Nujno naro\u010dilo obravnavajte kot izrecno odlo\u010ditev o prednosti, ne kot dovoljenje, da lahko vsakdo izbere drug vozi\u010dek. Planer naj pregleda obveznosti, na katere sprememba vpliva, odobri morebitno potrebno odstopanje od FIFO in obema ekipama jasno sporo\u010di spremenjeni vrstni red. Zabele\u017eite razlog in nato znova vzpostavite dogovorjeno pravilo.<\/p>\n\n\n<p>\u010ce so izjeme stalnica, ponovno preverite zasnovo. Material, ki redno potrebuje razli\u010dne naslednje operacije ali posebne vire, morda zahteva lo\u010dene, jasno opredeljene povezave namesto ene proge, ki jo morajo vsi obiti. Pri izbiri na\u010dina predaje je treba upo\u0161tevati tudi zdru\u017eevanje materiala v serijo za obdelavo v naslednjem procesu. Obmo\u010dje, s katerega material izbirate po potrebi, ne postane FIFO proga zgolj zato, ker ga tako poimenujete.<\/p>\n\n\n<p>Cilj je pravilo, ki ga ljudje lahko uporabljajo v praksi in pri katerem je jasno, kdo je odgovoren za izjeme, ne pa toga oznaka nad nenadzorovano \u010dakalno vrsto.<\/p>\n\n\n<h2 class=\"wp-block-heading\">FIFO proge, kanban in CONWIP re\u0161ujejo razli\u010dne izzive vodenja proizvodnje<\/h2>\n\n\n<p>Ti pristopi se lahko uporabljajo hkrati, vendar vsak dovoljuje druga\u010dno dejanje.<\/p>\n\n\n<p>FIFO proga dolo\u010da zaporedje in najve\u010djo koli\u010dino \u010dakajo\u010dega materiala na dolo\u010deni povezavi med procesoma. Ko material odvzamemo, se sprosti prostor za novega, skladno s pravili te povezave.<\/p>\n\n\n<p><a href=\"https:\/\/skyplanner.ai\/sl\/viri\/kanban-v-proizvodnji\/\">Sistem dopolnjevanja zalog kanban<\/a> po porabi praviloma dovoli dopolnitev z dolo\u010denim artiklom v dolo\u010deni koli\u010dini. Vmesna zaloga po na\u010delu supermarketa za ponavljajo\u010de se komponente ima druga\u010den namen kot proga, po kateri material za razli\u010dna dela napreduje po vrstnem redu prihoda.<\/p>\n\n\n<p><a href=\"https:\/\/skyplanner.ai\/sl\/viri\/conwip\/\">CONWIP<\/a> omejuje obseg dela, spro\u0161\u010denega v dolo\u010den proizvodni krog. Dovoljenje za sprostitev novega dela se obnovi, ko delo zapusti ta krog, ne \u017ee takrat, ko se en vozi\u010dek z lokalne proge premakne na naslednjo operacijo.<\/p>\n\n\n<p>Premi\u0161ljeno dolo\u010dite, kateri del proizvodnje \u017eelite nadzorovati. Dobro vodena FIFO proga lahko prepre\u010di prekomerno proizvodnjo na enem mestu predaje, medtem ko se drugje v proizvodnem postopku kopi\u010di preve\u010d dela. Urejenost na posameznem mestu in izvedljiva obremenitev celotne tovarne sta povezani, vendar zahtevata razli\u010dni odlo\u010ditvi.<\/p>\n\n\n<h2 class=\"wp-block-heading\">S SkyPlanner uskladite delo pred FIFO progo in za njo<\/h2>\n\n\n<p>Ko so pravila delovanja proge jasna, je naslednje vpra\u0161anje, ali razpolo\u017eljivi viri zado\u0161\u010dajo za vse povezano delo. Skupna kontrolna postaja lahko slu\u017ei tudi drugi dru\u017eini izdelkov. Stroj za raziglevanje lahko oskrbuje ve\u010d proizvodnih poti. Pri naro\u010dilih kupcev je treba \u0161e vedno opraviti poznej\u0161e operacije in izpolniti dobavne roke.<\/p>\n\n\n<p>SkyPlanner APS te medsebojne odvisnosti zdru\u017ei v enoten <a href=\"https:\/\/skyplanner.ai\/sl\/viri\/kaj-je-terminiranje-proizvodnje\/\">terminski na\u010drt proizvodnje z omejenimi kapacitetami<\/a>. Arcturus, njegova umetna inteligenca za terminiranje, razporeja operacije glede na kapacitete delovnih centrov, izmene, ustrezne vire in odvisnosti med koraki proizvodnega postopka. \u010ce je omogo\u010deno terminiranje z upo\u0161tevanjem materiala, na mo\u017eni \u010das izvedbe vpliva tudi razpolo\u017eljivost materiala. Ganttov diagram prikazuje tako pripravljen na\u010drt po delovnih centrih.<\/p>\n\n\n<p>Namesto da bi za vsak stroj posebej na novo sestavljali \u010dakalno vrsto, dolo\u010dite prioritete in vzdr\u017eujete vhodne podatke o proizvodnji, Arcturus pa opravi izra\u010dun terminov. S pravili in zaklepi lahko ohranite sprejete planske odlo\u010ditve, medtem ko se razpored preostalega dela prera\u010duna.<\/p>\n\n\n<p>Poskrbite, da bo ta izra\u010dun usklajen z dejansko predajo materiala. <strong>Zaporedje operacij, ki ga dolo\u010di umetna inteligenca, ni samodejno tudi vrstni red prihoda na va\u0161o FIFO progo.<\/strong> Dogovorite se, kako bo \u017ee potrjeno delo prikazano in za\u0161\u010diteno v na\u010drtu. Sprememba prioritete zaradi dobavnega roka ne sme postati nepojasnjeno navodilo za odvzem materiala iz sredine fizi\u010dne \u010dakalne vrste.<\/p>\n\n\n<p>\u010ce se razpolo\u017eljivi \u010das izmene za kontrolo skraj\u0161a, zabele\u017eite spremembo kapacitete in prera\u010dunajte razpored povezanega dela. Nato lahko skupaj pregledate prizadete operacije in dobavne roke, namesto da bi trenutno te\u017eavo na progi re\u0161ili na ra\u010dun drugega naro\u010dila kupca, ne da bi bile posledice zanj vidne. Pravilo za spro\u0161\u010danje dela na progo \u0161e vedno dolo\u010da, kaj sme fizi\u010dno vstopiti nanjo.<\/p>\n\n\n<p>Prav zato je smiselno ob FIFO progi uporabljati SkyPlanner: jasno urejeno lokalno predajo podprete z usklajenim na\u010drtom za celotno tovarno. Zmanj\u0161ate obseg ro\u010dnega dela pri terminiranju in lahko sprejemate bolje utemeljene odlo\u010ditve o prioritetah, kapacitetah in zavezah kupcem. SkyPlanner se prek odprtega vmesnika REST API pove\u017ee s katerim koli sistemom ERP ali MES, zato za bolj\u0161e terminiranje ni treba zamenjati sistema, v katerem \u017ee vodite naro\u010dila.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Kaj izku\u0161nja podjetja Mamec pove o povezanih \u010dakalnih vrstah<\/h2>\n\n\n<p>Mamec, finski proizvajalec me\u0161alne tehnike in visokotehnolo\u0161kih izdelkov po naro\u010dilu, je prej prioritete v proizvodnji dolo\u010dal na podlagi dobavnih rokov na papirnih delovnih nalogih. Medsebojne odvisnosti ve\u010d tiso\u010d operacij je bilo prete\u017eko obvladovati ro\u010dno, vodstvo pa ni imelo zanesljivega celovitega pregleda nad obremenitvijo.<\/p>\n\n\n<p>Po povezavi sistema SkyPlanner z Oscar ERP osnovno delo zdaj opravi terminiranje z omejenimi kapacitetami. Mamec \u010dakalne vrste operacij zaklene za en teden vnaprej, zato imajo obdelovalci na strojih jasen pregled nad prihajajo\u010dimi operacijami. Podjetje poro\u010da o manj\u0161i obremenitvi pri planiranju, ve\u010dji zanesljivosti dobav in manj obratnega kapitala, po nepotrebnem vezanega v nedokon\u010dani proizvodnji, saj se operacije za\u010dnejo ob pravem \u010dasu.<\/p>\n\n\n<p>V tovarni z ve\u010d proizvodnimi potmi tak skupen pregled pomeni, da izbira naslednje operacije ni ve\u010d zgolj lokalna odlo\u010ditev: operacija ima jasno mesto v \u0161ir\u0161em proizvodnem na\u010drtu.<\/p>\n\n\n<p>Celotno izku\u0161njo preberite v <a href=\"https:\/\/skyplanner.ai\/sl\/zgodbe-strank\/mamec\/\">oceni sistema SkyPlanner, ki jo je podalo podjetje Mamec<\/a>.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Uredite \u010dakalno vrsto s pravilom, tovarno pa z usklajenim na\u010drtom<\/h2>\n\n\n<p>Za\u010dnite pri enem problemati\u010dnem mestu predaje. Dolo\u010dite, katero delo sme na progo, enoto prenosa, vhodni in odvzemni konec, najve\u010djo koli\u010dino ter osebo, ki je odgovorna, ko se pretok ustavi. Pravilo preizkusite tudi ob polni progi, ne le takrat, ko vse te\u010de gladko.<\/p>\n\n\n<p>Nato poglejte \u0161e onkraj ozna\u010denih mest. Ali lahko predhodna operacija, ki oskrbuje progo, in naslednja, ki z nje prevzema material, izpolnita svoje obveznosti ob vsem drugem delu na istih virih? SkyPlanner vam za to odlo\u010ditev daje trdnej\u0161o podlago kot lo\u010dene, ro\u010dno vzdr\u017eevane \u010dakalne vrste.<\/p>\n\n\n<p><a href=\"https:\/\/skyplanner.ai\/sl\/kontaktna-prodaja\/\">Rezervirajte predstavitev sistema SkyPlanner<\/a> ter pripravite trenutno \u010dakalno vrsto, zna\u010dilen proizvodni postopek naro\u010dila in druga dela, ki tekmujejo za iste vire na obeh straneh predaje. Na teh primerih razi\u0161\u010dite, kako bi usklajen terminski na\u010drt z omejenimi kapacitetami va\u0161i ekipi pomagal obvladovati obremenitev in se odzivati na zamude. \u010ce \u017eelite sistem najprej raziskati sami, <a href=\"https:\/\/skyplanner.ai\/sl\/preizkus\/\">preizkusite SkyPlanner s predstavitvenimi podatki<\/a>.<\/p>\n\n<\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>FIFO proge v proizvodnji: \u010dakalne vrste pod nadzorom Domov &raquo; Viri &raquo; FIFO proge v proizvodnji: \u010dakalne vrste pod nadzorom Vozi\u010dek, ki je prispel prvi, \u0161e vedno \u010daka, ko prispe material za novo nujno delo. Nekdo nov material odlo\u017ei ob ozna\u010denem obmo\u010dju, pri naslednjem procesu vzamejo serijo, ki se zdi najnujnej\u0161a, in vse te\u017eje je &#8230; <a title=\"FIFO proge v proizvodnji: \u010dakalne vrste pod nadzorom\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/sl\/viri\/fifo-proga\/\" aria-label=\"Read more about FIFO proge v proizvodnji: \u010dakalne vrste pod nadzorom\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":110883,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[2539,302],"tags":[],"class_list":["post-110871","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-aps-in-terminiranje","category-viri","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>FIFO proga v proizvodnji: \u010dakalne vrste pod nadzorom<\/title>\n<meta name=\"description\" content=\"\u010cakalna vrsta naj ne postane skladi\u0161\u010de. Dolo\u010dite meje in odgovornosti za FIFO progo, nato s SkyPlanner uskladite povezane operacije.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/sl\/viri\/fifo-proga\/\" \/>\n<meta property=\"og:locale\" content=\"sl_SI\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"FIFO proge v proizvodnji: \u010dakalne vrste pod nadzorom\" \/>\n<meta property=\"og:description\" content=\"\u010cakalna vrsta naj ne postane skladi\u0161\u010de. Dolo\u010dite meje in odgovornosti za FIFO progo, nato s SkyPlanner uskladite povezane operacije.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/sl\/viri\/fifo-proga\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2026-10-26T11:01:16+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-26T11:02:50+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/fifo-lanes-manufacturing-hero.png\" \/>\n\t<meta property=\"og:image:width\" content=\"2073\" \/>\n\t<meta property=\"og:image:height\" content=\"758\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"12 minut\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/fifo-proga\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/fifo-proga\\\/\"},\"author\":{\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\"},\"headline\":\"FIFO proge v proizvodnji: \u010dakalne vrste pod nadzorom\",\"datePublished\":\"2026-10-26T11:01:16+00:00\",\"dateModified\":\"2026-10-26T11:02:50+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/fifo-proga\\\/\"},\"wordCount\":2479,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/fifo-proga\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/fifo-lanes-manufacturing-hero.png\",\"articleSection\":[\"APS in terminiranje\",\"viri\"],\"inLanguage\":\"sl-SI\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/fifo-proga\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/fifo-proga\\\/\",\"name\":\"FIFO proga v proizvodnji: \u010dakalne vrste pod nadzorom\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/fifo-proga\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/fifo-proga\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/fifo-lanes-manufacturing-hero.png\",\"datePublished\":\"2026-10-26T11:01:16+00:00\",\"dateModified\":\"2026-10-26T11:02:50+00:00\",\"description\":\"\u010cakalna vrsta naj ne postane skladi\u0161\u010de. Dolo\u010dite meje in odgovornosti za FIFO progo, nato s SkyPlanner uskladite povezane operacije.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/fifo-proga\\\/#breadcrumb\"},\"inLanguage\":\"sl-SI\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/fifo-proga\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"sl-SI\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/fifo-proga\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/fifo-lanes-manufacturing-hero.png\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/fifo-lanes-manufacturing-hero.png\",\"width\":2073,\"height\":758,\"caption\":\"Four trolleys fill a marked FIFO lane between two workbenches, with an arrow showing the direction of flow.\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/fifo-proga\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"FIFO proge v proizvodnji: \u010dakalne vrste pod nadzorom\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"sl-SI\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"sl-SI\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\",\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"sl-SI\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"caption\":\"Jussi M\u00e4ntyl\u00e4\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"FIFO proga v proizvodnji: \u010dakalne vrste pod nadzorom","description":"\u010cakalna vrsta naj ne postane skladi\u0161\u010de. Dolo\u010dite meje in odgovornosti za FIFO progo, nato s SkyPlanner uskladite povezane operacije.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/sl\/viri\/fifo-proga\/","og_locale":"sl_SI","og_type":"article","og_title":"FIFO proge v proizvodnji: \u010dakalne vrste pod nadzorom","og_description":"\u010cakalna vrsta naj ne postane skladi\u0161\u010de. Dolo\u010dite meje in odgovornosti za FIFO progo, nato s SkyPlanner uskladite povezane operacije.","og_url":"https:\/\/skyplanner.ai\/sl\/viri\/fifo-proga\/","og_site_name":"SkyPlanner","article_published_time":"2026-10-26T11:01:16+00:00","article_modified_time":"2026-10-26T11:02:50+00:00","og_image":[{"width":2073,"height":758,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/fifo-lanes-manufacturing-hero.png","type":"image\/png"}],"author":"Jussi M\u00e4ntyl\u00e4","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Jussi M\u00e4ntyl\u00e4","Est. reading time":"12 minut"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/sl\/viri\/fifo-proga\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/sl\/viri\/fifo-proga\/"},"author":{"name":"Jussi M\u00e4ntyl\u00e4","@id":"https:\/\/skyplanner.ai\/sl\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5"},"headline":"FIFO proge v proizvodnji: \u010dakalne vrste pod nadzorom","datePublished":"2026-10-26T11:01:16+00:00","dateModified":"2026-10-26T11:02:50+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/sl\/viri\/fifo-proga\/"},"wordCount":2479,"publisher":{"@id":"https:\/\/skyplanner.ai\/sl\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/sl\/viri\/fifo-proga\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/fifo-lanes-manufacturing-hero.png","articleSection":["APS in terminiranje","viri"],"inLanguage":"sl-SI"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/sl\/viri\/fifo-proga\/","url":"https:\/\/skyplanner.ai\/sl\/viri\/fifo-proga\/","name":"FIFO proga v proizvodnji: \u010dakalne vrste pod nadzorom","isPartOf":{"@id":"https:\/\/skyplanner.ai\/sl\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/sl\/viri\/fifo-proga\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/sl\/viri\/fifo-proga\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/fifo-lanes-manufacturing-hero.png","datePublished":"2026-10-26T11:01:16+00:00","dateModified":"2026-10-26T11:02:50+00:00","description":"\u010cakalna vrsta naj ne postane skladi\u0161\u010de. Dolo\u010dite meje in odgovornosti za FIFO progo, nato s SkyPlanner uskladite povezane operacije.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/sl\/viri\/fifo-proga\/#breadcrumb"},"inLanguage":"sl-SI","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/sl\/viri\/fifo-proga\/"]}]},{"@type":"ImageObject","inLanguage":"sl-SI","@id":"https:\/\/skyplanner.ai\/sl\/viri\/fifo-proga\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/fifo-lanes-manufacturing-hero.png","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/fifo-lanes-manufacturing-hero.png","width":2073,"height":758,"caption":"Four trolleys fill a marked FIFO lane between two workbenches, with an arrow showing the direction of flow."},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/sl\/viri\/fifo-proga\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/sl\/"},{"@type":"ListItem","position":2,"name":"FIFO proge v proizvodnji: \u010dakalne vrste pod nadzorom"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/sl\/#website","url":"https:\/\/skyplanner.ai\/sl\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/sl\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/sl\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"sl-SI"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/sl\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/sl\/","logo":{"@type":"ImageObject","inLanguage":"sl-SI","@id":"https:\/\/skyplanner.ai\/sl\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/sl\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]},{"@type":"Person","@id":"https:\/\/skyplanner.ai\/sl\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5","name":"Jussi M\u00e4ntyl\u00e4","image":{"@type":"ImageObject","inLanguage":"sl-SI","@id":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","caption":"Jussi M\u00e4ntyl\u00e4"}}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/fifo-lanes-manufacturing-hero.png",2073,758,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/fifo-lanes-manufacturing-hero-150x150.png",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/fifo-lanes-manufacturing-hero-300x110.png",300,110,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/fifo-lanes-manufacturing-hero-768x281.png",768,281,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/fifo-lanes-manufacturing-hero-1024x374.png",1024,374,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/fifo-lanes-manufacturing-hero-1536x562.png",1536,562,true],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/fifo-lanes-manufacturing-hero-2048x749.png",2048,749,true],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/fifo-lanes-manufacturing-hero-360x132.png",360,132,true]},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/sl\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"FIFO proge v proizvodnji: \u010dakalne vrste pod nadzorom Domov &raquo; Viri &raquo; FIFO proge v proizvodnji: \u010dakalne vrste pod nadzorom Vozi\u010dek, ki je prispel prvi, \u0161e vedno \u010daka, ko prispe material za novo nujno delo. Nekdo nov material odlo\u017ei ob ozna\u010denem obmo\u010dju, pri naslednjem procesu vzamejo serijo, ki se zdi najnujnej\u0161a, in vse te\u017eje je&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/posts\/110871","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/comments?post=110871"}],"version-history":[{"count":1,"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/posts\/110871\/revisions"}],"predecessor-version":[{"id":110934,"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/posts\/110871\/revisions\/110934"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/media\/110883"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/media?parent=110871"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/categories?post=110871"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/tags?post=110871"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}