{"id":110412,"date":"2026-10-26T00:03:20","date_gmt":"2026-10-26T00:03:20","guid":{"rendered":"https:\/\/skyplanner.ai\/?p=110412"},"modified":"2026-10-26T00:04:48","modified_gmt":"2026-10-26T00:04:48","slug":"pfep","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/sl\/viri\/pfep\/","title":{"rendered":"Na\u010drt za vsak del (PFEP): deli, pripravljeni za delo"},"content":{"rendered":"<div class=\"gb-container gb-container-article01 article-main-content-container\">\n\n<h1 class=\"wp-block-heading\">Na\u010drt za vsak del (PFEP): deli, pripravljeni za delo<\/h1>\n\n<div class=\"gb-container gb-container-article02\">\n\n<p><a href=\"\/sl\/\">Domov<\/a> &raquo; <a href=\"https:\/\/skyplanner.ai\/sl\/viri\/\">Viri<\/a> &raquo; Na\u010drt za vsak del (PFEP): deli, pripravljeni za delo<\/p>\n\n\n<p class=\"yoast-reading-time__wrapper\"><span class=\"yoast-reading-time__icon\"><svg aria-hidden=\"true\" focusable=\"false\" data-icon=\"clock\" width=\"20\" height=\"20\" fill=\"none\" stroke=\"currentColor\" style=\"display:inline-block;vertical-align:-0.1em\" role=\"img\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewBox=\"0 0 24 24\"><path stroke-linecap=\"round\" stroke-linejoin=\"round\" stroke-width=\"2\" d=\"M12 8v4l3 3m6-3a9 9 0 11-18 0 9 9 0 0118 0z\"><\/path><\/svg><\/span><span class=\"yoast-reading-time__spacer\" style=\"display:inline-block;width:1em\"><\/span><span class=\"yoast-reading-time__descriptive-text\">Predviden \u010das branja: <\/span><span class=\"yoast-reading-time__reading-time\">10<\/span><span class=\"yoast-reading-time__time-unit\"> minut<\/span><\/p>\n\n<\/div>\n<div class=\"gb-container gb-container-article03\">\n\n<p>Del je v obratu. Nabava ga vidi v poro\u010dilu o zalogah. Delavec pa kljub temu \u010daka, ker ni dogovorjeno, kako bo del pri\u0161el do tega delovnega centra, v kak\u0161nem vsebniku in kdo bo poskrbel za dopolnitev, ko bo zaboj prazen.<\/p>\n\n\n<p>Te vrzeli zapolni na\u010drt za vsak del oziroma PFEP (Plan for Every Part). V redno vzdr\u017eevani zbirki podatkov zdru\u017euje navodila za oskrbo, skladi\u0161\u010denje, ravnanje z vsakim delom in njegovo dostavo na mesto uporabe. Tako je manj iskanja, manj improviziranih dostav in manj prekinitev zaradi predaj, za katere je vedel le posameznik.<\/p>\n\n\n<p>Zanesljiv na\u010drt oskrbe z deli pa potrebuje tudi zanesljiv proizvodni na\u010drt. S PFEP dolo\u010dite, kako material prispe do mesta dela, s sistemom SkyPlanner APS pa njegovo razpolo\u017eljivost pove\u017eete z nalogi, operacijami in zmogljivostmi, ki ga potrebujejo. Va\u0161a ekipa lahko tako porabi manj \u010dasa za usklajevanje seznamov in ve\u010d za nemoten potek proizvodnje.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Kaj je na\u010drt za vsak del?<\/h2>\n\n\n<p>Na\u010drt za vsak del je podroben zapis o dobavi, skladi\u0161\u010denju in dostavi vsakega dela na mesto uporabe ter o ravnanju z njim. Obi\u010dajno se zanj uporablja kratica PFEP. Podpira vitek tok materiala, saj jasno dolo\u010da prakti\u010dne zahteve: za kateri del gre, koliko ga potrebujemo, kam gre, kako pride tja in kaj spro\u017ei dopolnitev zaloge.<\/p>\n\n\n<p>\u0160ifra dela in stanje zaloge ne zadostujeta. Povesta, za kateri artikel gre in kolik\u0161na je njegova evidentirana koli\u010dina, ne pa tudi, ali gre lahko dobaviteljev karton neposredno na linijo, ali del zahteva za\u0161\u010dito pri ravnanju oziroma kako no\u010dna izmena dobi nadomestni vsebnik.<\/p>\n\n\n<p>PFEP te podatke pove\u017ee z odlo\u010ditvami o izvedbi in jasno dolo\u010denimi odgovornostmi. Njegovo uporabnost lahko preverite tako: ali lahko nekdo, ki dela ne pozna, sledi njegovi dogovorjeni poti, ne da bi moral nenehno spra\u0161evati, kako se stvari obi\u010dajno izvajajo?<\/p>\n\n\n<p>Njegovo vlogo lo\u010dujte od vloge sorodnih orodij:<\/p>\n\n\n<ul class=\"wp-block-list\"><li>Kosovnica dolo\u010da sestavne dele in koli\u010dine, potrebne za izdelavo izdelka. PFEP dolo\u010da, kako se ti deli dobavljajo in kako se z njimi ravna.<\/li><li>Evidence zalog prikazujejo zalogo in premike. PFEP dolo\u010da pravila in fizi\u010dno ureditev, na katerih temelji ta tok.<\/li><li>Pri <a href=\"https:\/\/skyplanner.ai\/sl\/viri\/kompletiranje-v-proizvodnji\/\">kompletiranju<\/a> se zberejo in preverijo deli za dolo\u010deno delo. PFEP lahko dolo\u010da, da se del dobavlja v kompletu, namesto da bi bil v zaboju ob liniji, katerega zaloga se dopolnjuje.<\/li><li>ABC analiza pomaga dolo\u010diti, koliko pozornosti pri upravljanju zalog nameniti posameznim artiklom glede na vrednost porabe. Ta razvrstitev je lahko podlaga za odlo\u010ditve v PFEP, ne dolo\u010da pa poti dela do delavca.<\/li><\/ul>\n\n\n<p>Ta orodja naj uporabljajo usklajene identifikacijske oznake in ne delujejo kot razli\u010dne, med seboj neusklajene razli\u010dice istega seznama.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Kateri podatki sodijo v PFEP?<\/h2>\n\n\n<p>Vklju\u010dite podatke, ki jih potrebujete za sprejemanje in sprotno preverjanje odlo\u010ditev o oskrbi. Spodnja tabela je prakti\u010dno izhodi\u0161\u010de za strukturo, ne predpisano \u0161tevilo stolpcev.<\/p>\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Skupina podatkov<\/th><th>Kaj je treba dolo\u010diti<\/th><th>\u010cemu slu\u017ei<\/th><\/tr><\/thead><tbody><tr><td>Identifikacija dela<\/td><td>Enoli\u010dna \u0161ifra, opis, ustrezna revizija, enota vodenja zaloge in pretvorba nabavne enote<\/td><td>Prevzem, skladi\u0161\u010de in proizvodnja prepoznajo isti artikel, primeren za uporabo, in njegovo koli\u010dino.<\/td><\/tr><tr><td>Potrebe in uporaba<\/td><td>Izdelki ali operacije, pri katerih se del porablja, vzorec porabe in mesta uporabe<\/td><td>Oskrba je urejena glede na to, kje in kdaj dejansko prihaja do porabe.<\/td><\/tr><tr><td>Vir oskrbe in dopolnjevanje zaloge<\/td><td>Dobavitelj ali notranji vir, \u010das dopolnitve zaloge, pogostost naro\u010danja in omejitve pri naro\u010danju<\/td><td>Ekipa ve, kaj spro\u017ei dopolnitev zaloge in koliko \u010dasa ta traja.<\/td><\/tr><tr><td>Pakiranje in ravnanje<\/td><td>Koli\u010dina v dobaviteljevem pakiranju, koli\u010dina v internem vsebniku, mere, te\u017ea in zahteve za za\u0161\u010dito<\/td><td>Vsebniki ustrezajo skladi\u0161\u010dnemu prostoru, na\u010dinu ravnanja in delovnemu mestu.<\/td><\/tr><tr><td>Skladi\u0161\u010denje in dostava<\/td><td>Skladi\u0161\u010dna lokacija, mesto ob liniji, na\u010din in pogostost dostave ter odgovorna vloga<\/td><td>Za del je dogovorjena fizi\u010dna pot od prevzema do porabe.<\/td><\/tr><tr><td>Nadzor in vzdr\u017eevanje podatkov<\/td><td>Signal za dopolnitev zaloge, pravila za bla\u017eilno zalogo, kontaktna oseba ob odstopanjih, skrbnik podatkov in zadnje preverjanje<\/td><td>Dolo\u010dena oseba ukrepa, \u0161e preden pride do izpada oskrbe, in skrbi za a\u017eurnost navodil.<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>Podatke, ki veljajo za del, lo\u010dujte od ureditev, zna\u010dilnih za posamezno lokacijo. \u010ce se isto tesnilo uporablja v ve\u010d celicah, lahko vsaka potrebuje svojo koli\u010dino v vsebniku, pogostost dostave in signal za dopolnitev zaloge. Na eno \u0161ifro artikla je zato lahko vezanih ve\u010d zapisov za mesta uporabe, ne da bi s tem nastalo ve\u010d nasprotujo\u010dih si opredelitev dela.<\/p>\n\n\n<p>Prav tako lo\u010dujte pravila od dana\u0161njega stanja. Standardni dobavni rok dobavitelja je podatek za planiranje, spremenjeni \u010das prihoda zamujene po\u0161iljke pa trenutno odstopanje. Ciljna koli\u010dina ob liniji je pravilo, koli\u010dina, ki je tam trenutno primerna za uporabo, pa operativni podatek. Oboje je pomembno, vendar posodobitev enega ne popravi samodejno drugega.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Prvi PFEP zasnujte na dejanskem toku materiala<\/h2>\n\n\n<p>Za\u010dnite z dolo\u010denim proizvodnim obmo\u010djem ali dru\u017eino izdelkov, kjer se te\u017eava ka\u017ee v ponavljajo\u010dem se pomanjkanju, iskanju ali nepotrebnem ravnanju z materialom. Kon\u010dni cilj je lahko zajeti vsak del, vendar omejen pilotni projekt ekipi omogo\u010di, da metodo preizkusi, preden se nezanesljive predpostavke raz\u0161irijo po celotnem obratu.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Sledite delu, ne le evidencam<\/h3>\n\n\n<p>Spremljajte pot izbranih delov od prevzema prek skladi\u0161\u010da do dejanske uporabe. Vklju\u010dite nabavo, skladi\u0161\u010dnike, zaposlene v notranji logistiki in ljudi, ki te dele uporabljajo. Dejansko dogajanje primerjajte z zapisi v sistemu ERP, lokalnimi seznami in navodili.<\/p>\n\n\n<p>Pozorni bodite predvsem na neformalne re\u0161itve: dodatno skladi\u0161\u010dno mesto, manj\u0161i vsebnik, ki ga uporablja ena izmena, ali vodjo, ki odda naro\u010dilo, ko ga kdo za to prosi. To so pogosto manjkajo\u010di \u010dleni, ki jih urejen izvoz podatkov o artiklih ne poka\u017ee.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Preverite podrobnosti, ki vplivajo na odlo\u010ditev<\/h3>\n\n\n<p>Preden dolo\u010dite koli\u010dine za dopolnjevanje zaloge, preverite \u0161ifre, revizije, enote in lokacije. Jasno lo\u010dite nabavna pakiranja od internih vsebnikov. Zabele\u017eite \u010das od internega signala za dopolnitev do trenutka, ko je zaloga v delovnem centru primerna za uporabo, ne le \u010das vo\u017enje vili\u010darja.<\/p>\n\n\n<p>Dopolnjevanje zaloge od dobavitelja in interna dostava imata razli\u010dna \u010dasovna okvira. Pogosti interni dostavni obhodi ne morejo nadomestiti naro\u010dila, ki dobavitelju sploh ni bilo oddano. Prav tako prihod zaloge na razkladalno mesto \u0161e ne pomeni, da je ta takoj uporabna pri stroju, \u010de jo je treba prej \u0161e pregledati ali prepakirati.<\/p>\n\n\n<p>Manjkajo\u010de podatke ozna\u010dite za preverjanje in dolo\u010dite odgovorno osebo. Manjkajo\u010di \u010das dopolnitve zaloge je vidna te\u017eava, izmi\u0161ljeni pa lahko neopazno postane podlaga za napa\u010dno pravilo oskrbe.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Izberite pravila oskrbe in jih nato preizkusite<\/h3>\n\n\n<p>Odlo\u010dite se, ali boste del hranili na mestu uporabe, zalogo dopolnjevali prek supermarketa (obmo\u010dja z nadzorovano vmesno zalogo), del dostavljali v kompletu ali ga dobavljali za posamezen nalog. Pravila prilagodite porabi, prostoru, obsegu dela pri ravnanju z materialom in tveganju pomanjkanja, namesto da vse artikle obravnavate enako.<\/p>\n\n\n<p>Koli\u010dine v vsebnikih in spro\u017eilce dopolnjevanja dolo\u010dite glede na porabo v ustreznem \u010dasu dopolnjevanja zaloge ter predvidite primerno rezervo za nepredvidene razmere. Preverite tudi prostorske omejitve in omejitve pri ravnanju z materialom. Ve\u010dji zaboj ni koristna re\u0161itev za zagotavljanje bla\u017eilne zaloge, \u010de ovira dostop ali pove\u010duje nevarnost po\u0161kodb.<\/p>\n\n\n<p>Ureditev preizkusite med dejanskim delom. Ali zaposleni v notranji logistiki opazi signal? Ali lahko nadomestna zaloga prispe, preden se razpolo\u017eljiva porabi? Kaj se zgodi, ko se spremeni nabor izdelkov ali ko je oseba, ki to obi\u010dajno opravlja, odsotna? Preden ureditev raz\u0161irite, popravite pravila.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Primer: zakaj lahko celici kljub polnemu kartonu zmanjka delov<\/h2>\n\n\n<p>Predstavljajte si proizvajalca, ki isto tesnilo uporablja v dveh monta\u017enih celicah. Nabava ga naro\u010da po kartonih, skladi\u0161\u010de vodi zalogo v kosih, zaposleni v notranji logistiki pa tesnila razdelijo v manj\u0161e za\u0161\u010ditne vsebnike za delovne mize.<\/p>\n\n\n<p>Prvi osnutek PFEP vsebuje dobavitelja, \u0161tevilo kosov v kartonu in glavno skladi\u0161\u010dno lokacijo. Zdi se popoln, dokler se ne spremeni proizvodni program. Ena celica za\u010dne tesnila porabljati precej hitreje, oskrbovalni obhod pa \u0161e vedno poteka na ustaljeni na\u010din. V skladi\u0161\u010du je zaloga, celica pa \u010daka.<\/p>\n\n\n<p>Prava re\u0161itev ni zgolj \u00bbkupimo ve\u010d tesnil\u00ab. Ekipa v na\u010drt doda posamezna mesta uporabe, koli\u010dine v internih zabojnikih za vsako od njih, signale za dopolnjevanje in odgovornosti za dostavo. Preveri pretvorbo med merskimi enotami in potrdi, kdo spremeni na\u010din oskrbe, ko se spremeni proizvodni program.<\/p>\n\n\n<p>Za tesnilo je zdaj dolo\u010den operativni na\u010drt, ne le opis za nabavo. Naslednji korak je povezati naloge, ki ga porabljajo, z razpolo\u017eljivim materialom in proizvodnimi zmogljivostmi. Sicer lahko planer \u0161e vedno obema celicama obljubi isto zalogo ali prestavi nalog, ne da bi prepoznal posledice za nadaljnje delo.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Poskrbite, da se vsaka pomembna sprememba odrazi v na\u010drtu<\/h2>\n\n\n<p>PFEP izgublja zanesljivost, \u010de je njegovo vzdr\u017eevanje prepu\u0161\u010deno prosti izbiri in pride na vrsto \u0161ele po nujnem delu. Posodabljanje naj bo sestavni del sprememb, ki vplivajo na oskrbo.<\/p>\n\n\n<p>Nabava je lahko odgovorna za pogoje dobaviteljev, omejitve pri naro\u010danju in potrjene spremembe dobavnih rokov za dopolnjevanje zalog. Logistika lahko skrbi za skladi\u0161\u010dna mesta, zabojnike in na\u010din dostave. Tehnologija in kakovost lahko prevzameta odgovornost za zadevne spremembe specifikacij in odobrene zahteve za ravnanje z deli. Proizvodnja lahko potrjuje mesta uporabe in spremembe vzorcev porabe. En koordinator PFEP skrbi za celotno strukturo in obvladovanje nere\u0161enih izjem.<\/p>\n\n\n<p>Koordinatorju ne bi smelo biti treba samemu odkrivati vsake spremembe. Za vsako skupino podatkov dolo\u010dite odgovorno osebo, posodobitve pa pove\u017eite z dogodki, kot so:<\/p>\n\n\n<ul class=\"wp-block-list\"><li>Nov del, dobavitelj, revizija ali odobrena zamenjava.<\/li><li>Sprememba embala\u017ee, nabavne enote ali koli\u010dine v internem zabojniku.<\/li><li>Premik celice, novo mesto uporabe, sprememba razporeda izmen ali proizvodnega programa.<\/li><li>Ponavljajo\u010de se pomanjkanje, po\u0161kodovani deli ali nepojasnjeno odstopanje v zalogi.<\/li><\/ul>\n\n\n<p>Za vsako spremembo zabele\u017eite, kdo jo odobri, kdaj za\u010dne veljati ter katera povezana navodila ali sisteme je treba posodobiti. \u010ce zamenjate oznako na regalu, navodilo za dostavo pa ostane nespremenjeno, posodobitev ni kon\u010dana.<\/p>\n\n\n<p>Vseh podatkov ni treba prepisovati v novo podatkovno zbirko. Za vsako vrsto podatkov ohranite merodajen vir in jasno dolo\u010dite njegovo povezavo s PFEP. \u010ce so nabavni pogoji v sistemu ERP, fizi\u010dne lokacije pa v sistemu WMS, ne ustvarjajte kopij, ki jih je mogo\u010de lo\u010deno urejati, ne da bi kdo odgovarjal za njihovo usklajevanje. Cilj je enotna in zanesljiva vsebina podatkov, tudi kadar jo zagotavlja ve\u010d sistemov.<\/p>\n\n\n<p>Izjeme pregledujte dovolj pogosto, da lahko ukrepate, in ob\u010dasno preverite dejansko ureditev oskrbe. Nedavni datum urejanja zapisa \u0161e ne dokazuje, da zabojnik \u0161e vedno ustreza ali da dostavna pot \u0161e vedno deluje.<\/p>\n\n\n<h2 class=\"wp-block-heading\">S SkyPlanner pove\u017eite razpolo\u017eljivost materiala s proizvodnjo<\/h2>\n\n\n<p>PFEP zagotavlja zanesljivej\u0161i materialni tok. SkyPlanner pa olaj\u0161a obvladovanje posledic, ki jih ima razpolo\u017eljivost materiala za proizvodnjo.<\/p>\n\n\n<p>V SkyPlanner se materiali, povezani z izdelkom, prenesejo na njegove postavke naro\u010dila. Podatke o zalogi lahko vzdr\u017eujete prek integracije ali neposredno v modulu Warehouse v SkyPlanner. Ko je omogo\u010deno terminiranje z upo\u0161tevanjem materiala, Arcturus, umetna inteligenca za terminiranje v SkyPlanner, v istem izra\u010dunu upo\u0161teva razpolo\u017eljivost materiala, zmogljivost delovnih centrov, izmene, odvisnosti med operacijami in pravila, ki ste jih nastavili.<\/p>\n\n\n<p>Ta povezava je dragocena, kadar ve\u010d nalogov porablja isti material ali potrebuje iste stroje. Namesto da preverjate seznam materiala in za vsak stroj posebej na novo sestavljate zaporedje nalogov, lahko celoten povezan terminski na\u010drt pregledate v Ganttovem diagramu. \u010ce se vhodni podatki spremenijo, ponovite izra\u010dun in preverite, kako je mogo\u010de razporediti delo ter katerim obljubljenim dobavnim rokom je treba nameniti pozornost. Vi dolo\u010dite prioritete, Arcturus pa opravi <a href=\"https:\/\/skyplanner.ai\/sl\/viri\/kaj-je-terminiranje-proizvodnje\/\">izra\u010dun terminiranja proizvodnje<\/a>.<\/p>\n\n\n<p>SkyPlanner se prek odprtega vmesnika REST API povezuje s katerim koli sistemom ERP ali MES. Obdr\u017eite lahko sistem, v katerem vodite nabavne podatke in podatke o artiklih, ustrezne identifikatorje, potrebe po materialu in njegovo razpolo\u017eljivost pa pove\u017eete s podrobnim terminiranjem proizvodnje. Navodila za ravnanje z deli in dostavo v PFEP \u0161e vedno usmerjajo fizi\u010dno delo: evidentirana koli\u010dina na zalogi ne potrjuje, da je nepo\u0161kodovan zabojnik prispel do prave delovne mize.<\/p>\n\n\n<p>V <a href=\"https:\/\/skyplanner.ai\/sl\/zgodbe-strank\/eskomatic\/\">podjetju Eskomatic, ki izvaja strojno obdelavo po naro\u010dilu<\/a>, sta starej\u0161i ERP in prete\u017eno ro\u010dno urejanje zaporedja nalogov ote\u017eevala celovit pregled, zlasti nad razpolo\u017eljivostjo materiala. Ko so SkyPlanner povezali z obstoje\u010dim sistemom ERP, je ekipa dobila jasnej\u0161i pregled nad materialom, samodejno razporejanje obremenitev in vizualni prikaz zaporedja nalogov. Eskomatic poro\u010da o manj zastojih v proizvodnji zaradi pomanjkanja materiala in natan\u010dnej\u0161em dolo\u010danju dobavnih rokov.<\/p>\n\n\n<p>To je prakti\u010den razlog za povezavo zanesljivih podatkov o delih s terminiranjem: manj presene\u010denj ob na\u010drtovanih za\u010detkih dela in manj \u010dasa za ro\u010dno razre\u0161evanje posledic.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Merite, ali na\u010drt pomaga ohranjati nemoten potek dela<\/h2>\n\n\n<p>Pilotno uvedbo ocenjujte po spremembah na mestu uporabe, ne le po \u0161tevilu izpolnjenih polj. Spremljajte prekinitve zaradi manjkajo\u010dih ali napa\u010dnih delov, nujne dostave, \u010das iskanja in delo, potrebno za dopolnjevanje zalog na tem obmo\u010dju. Ob teh rezultatih preverjajte tudi zaloge in porabo prostora, da navidezno izbolj\u0161anje ne bi bilo zgolj posledica tega, da ste vsak prost koti\u010dek napolnili z zalogo.<\/p>\n\n\n<p>Ko se pomanjkanje ponovi, razi\u0161\u010dite, kje je pri\u0161lo do napake. Je bil zapis napa\u010den, signal za dopolnjevanje spregledan, dobavitelj pozen ali pa je terminski na\u010drt temeljil na zastarelih podatkih o razpolo\u017eljivosti? Vsak vzrok zahteva druga\u010den ukrep. Posodobite tisto pravilo ali operativni podatek, ki je dejansko povzro\u010dil te\u017eavo.<\/p>\n\n\n<p>Izberite SkyPlanner, kadar morajo va\u0161i planerji kljub zanesljivim podatkom o delih \u0161e vedno ro\u010dno usklajevati material z nalogi, ki tekmujejo za iste vire, in z zaporedji dela na strojih. <a href=\"https:\/\/skyplanner.ai\/sl\/kontaktna-prodaja\/\">Rezervirajte predstavitev SkyPlanner<\/a> in pripravite primer dela, ki ga ve\u010dkrat zmanjka, naloga, ki ga porablja, ter drugega naloga, ki potrebuje iste vire. Na tem primeru razi\u0161\u010dite, kako vam lahko terminiranje z upo\u0161tevanjem materiala olaj\u0161a naslednjo odlo\u010ditev v proizvodnji. \u010ce \u017eelite najprej raziskovati sami, <a href=\"https:\/\/skyplanner.ai\/sl\/preizkus\/\">preizkusite SkyPlanner z demonstracijskimi podatki<\/a>.<\/p>\n\n<\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>Na\u010drt za vsak del (PFEP): deli, pripravljeni za delo Domov &raquo; Viri &raquo; Na\u010drt za vsak del (PFEP): deli, pripravljeni za delo Del je v obratu. Nabava ga vidi v poro\u010dilu o zalogah. Delavec pa kljub temu \u010daka, ker ni dogovorjeno, kako bo del pri\u0161el do tega delovnega centra, v kak\u0161nem vsebniku in kdo bo &#8230; <a title=\"Na\u010drt za vsak del (PFEP): deli, pripravljeni za delo\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/sl\/viri\/pfep\/\" aria-label=\"Read more about Na\u010drt za vsak del (PFEP): deli, pripravljeni za delo\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":110424,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[2539,302],"tags":[],"class_list":["post-110412","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-aps-in-terminiranje","category-viri","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Na\u010drt za vsak del (PFEP): deli, pripravljeni za delo<\/title>\n<meta name=\"description\" content=\"Deli na zalogi, a ne pri delu? S PFEP dolo\u010dite pravila oskrbe in odgovornosti ter pove\u017eite razpolo\u017eljivost materiala s terminiranjem proizvodnje.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/sl\/viri\/pfep\/\" \/>\n<meta property=\"og:locale\" content=\"sl_SI\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Na\u010drt za vsak del (PFEP): deli, pripravljeni za delo\" \/>\n<meta property=\"og:description\" content=\"Deli na zalogi, a ne pri delu? S PFEP dolo\u010dite pravila oskrbe in odgovornosti ter pove\u017eite razpolo\u017eljivost materiala s terminiranjem proizvodnje.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/sl\/viri\/pfep\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2026-10-26T00:03:20+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-26T00:04:48+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/plan-for-every-part-hero.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1672\" \/>\n\t<meta property=\"og:image:height\" content=\"941\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"12 minut\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/pfep\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/pfep\\\/\"},\"author\":{\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\"},\"headline\":\"Na\u010drt za vsak del (PFEP): deli, pripravljeni za delo\",\"datePublished\":\"2026-10-26T00:03:20+00:00\",\"dateModified\":\"2026-10-26T00:04:48+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/pfep\\\/\"},\"wordCount\":2373,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/pfep\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/plan-for-every-part-hero.png\",\"articleSection\":[\"APS in terminiranje\",\"viri\"],\"inLanguage\":\"sl-SI\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/pfep\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/pfep\\\/\",\"name\":\"Na\u010drt za vsak del (PFEP): deli, pripravljeni za delo\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/pfep\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/pfep\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/plan-for-every-part-hero.png\",\"datePublished\":\"2026-10-26T00:03:20+00:00\",\"dateModified\":\"2026-10-26T00:04:48+00:00\",\"description\":\"Deli na zalogi, a ne pri delu? S PFEP dolo\u010dite pravila oskrbe in odgovornosti ter pove\u017eite razpolo\u017eljivost materiala s terminiranjem proizvodnje.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/pfep\\\/#breadcrumb\"},\"inLanguage\":\"sl-SI\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/pfep\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"sl-SI\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/pfep\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/plan-for-every-part-hero.png\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/plan-for-every-part-hero.png\",\"width\":1672,\"height\":941,\"caption\":\"Seals move from a supplier carton through storage to separate containers at two assembly benches\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/pfep\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Na\u010drt za vsak del (PFEP): deli, pripravljeni za delo\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"sl-SI\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"sl-SI\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\",\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"sl-SI\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"caption\":\"Jussi M\u00e4ntyl\u00e4\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Na\u010drt za vsak del (PFEP): deli, pripravljeni za delo","description":"Deli na zalogi, a ne pri delu? S PFEP dolo\u010dite pravila oskrbe in odgovornosti ter pove\u017eite razpolo\u017eljivost materiala s terminiranjem proizvodnje.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/sl\/viri\/pfep\/","og_locale":"sl_SI","og_type":"article","og_title":"Na\u010drt za vsak del (PFEP): deli, pripravljeni za delo","og_description":"Deli na zalogi, a ne pri delu? S PFEP dolo\u010dite pravila oskrbe in odgovornosti ter pove\u017eite razpolo\u017eljivost materiala s terminiranjem proizvodnje.","og_url":"https:\/\/skyplanner.ai\/sl\/viri\/pfep\/","og_site_name":"SkyPlanner","article_published_time":"2026-10-26T00:03:20+00:00","article_modified_time":"2026-10-26T00:04:48+00:00","og_image":[{"width":1672,"height":941,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/plan-for-every-part-hero.png","type":"image\/png"}],"author":"Jussi M\u00e4ntyl\u00e4","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Jussi M\u00e4ntyl\u00e4","Est. reading time":"12 minut"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/sl\/viri\/pfep\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/sl\/viri\/pfep\/"},"author":{"name":"Jussi M\u00e4ntyl\u00e4","@id":"https:\/\/skyplanner.ai\/sl\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5"},"headline":"Na\u010drt za vsak del (PFEP): deli, pripravljeni za delo","datePublished":"2026-10-26T00:03:20+00:00","dateModified":"2026-10-26T00:04:48+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/sl\/viri\/pfep\/"},"wordCount":2373,"publisher":{"@id":"https:\/\/skyplanner.ai\/sl\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/sl\/viri\/pfep\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/plan-for-every-part-hero.png","articleSection":["APS in terminiranje","viri"],"inLanguage":"sl-SI"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/sl\/viri\/pfep\/","url":"https:\/\/skyplanner.ai\/sl\/viri\/pfep\/","name":"Na\u010drt za vsak del (PFEP): deli, pripravljeni za delo","isPartOf":{"@id":"https:\/\/skyplanner.ai\/sl\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/sl\/viri\/pfep\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/sl\/viri\/pfep\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/plan-for-every-part-hero.png","datePublished":"2026-10-26T00:03:20+00:00","dateModified":"2026-10-26T00:04:48+00:00","description":"Deli na zalogi, a ne pri delu? S PFEP dolo\u010dite pravila oskrbe in odgovornosti ter pove\u017eite razpolo\u017eljivost materiala s terminiranjem proizvodnje.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/sl\/viri\/pfep\/#breadcrumb"},"inLanguage":"sl-SI","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/sl\/viri\/pfep\/"]}]},{"@type":"ImageObject","inLanguage":"sl-SI","@id":"https:\/\/skyplanner.ai\/sl\/viri\/pfep\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/plan-for-every-part-hero.png","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/plan-for-every-part-hero.png","width":1672,"height":941,"caption":"Seals move from a supplier carton through storage to separate containers at two assembly benches"},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/sl\/viri\/pfep\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/sl\/"},{"@type":"ListItem","position":2,"name":"Na\u010drt za vsak del (PFEP): deli, pripravljeni za delo"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/sl\/#website","url":"https:\/\/skyplanner.ai\/sl\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/sl\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/sl\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"sl-SI"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/sl\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/sl\/","logo":{"@type":"ImageObject","inLanguage":"sl-SI","@id":"https:\/\/skyplanner.ai\/sl\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/sl\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]},{"@type":"Person","@id":"https:\/\/skyplanner.ai\/sl\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5","name":"Jussi M\u00e4ntyl\u00e4","image":{"@type":"ImageObject","inLanguage":"sl-SI","@id":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","caption":"Jussi M\u00e4ntyl\u00e4"}}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/plan-for-every-part-hero.png",1672,941,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/plan-for-every-part-hero-150x150.png",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/plan-for-every-part-hero-300x169.png",300,169,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/plan-for-every-part-hero-768x432.png",768,432,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/plan-for-every-part-hero-1024x576.png",1024,576,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/plan-for-every-part-hero-1536x864.png",1536,864,true],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/plan-for-every-part-hero.png",1672,941,false],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/plan-for-every-part-hero-360x203.png",360,203,true]},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/sl\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Na\u010drt za vsak del (PFEP): deli, pripravljeni za delo Domov &raquo; Viri &raquo; Na\u010drt za vsak del (PFEP): deli, pripravljeni za delo Del je v obratu. Nabava ga vidi v poro\u010dilu o zalogah. Delavec pa kljub temu \u010daka, ker ni dogovorjeno, kako bo del pri\u0161el do tega delovnega centra, v kak\u0161nem vsebniku in kdo bo&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/posts\/110412","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/comments?post=110412"}],"version-history":[{"count":1,"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/posts\/110412\/revisions"}],"predecessor-version":[{"id":110474,"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/posts\/110412\/revisions\/110474"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/media\/110424"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/media?parent=110412"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/categories?post=110412"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/tags?post=110412"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}