{"id":110319,"date":"2026-10-25T22:17:09","date_gmt":"2026-10-25T22:17:09","guid":{"rendered":"https:\/\/skyplanner.ai\/?p=110319"},"modified":"2026-10-25T22:18:40","modified_gmt":"2026-10-25T22:18:40","slug":"conwip","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/sl\/viri\/conwip\/","title":{"rendered":"CONWIP v proizvodnji: nadzor nad tem, kaj za\u017eenete naslednje"},"content":{"rendered":"<div class=\"gb-container gb-container-article01 article-main-content-container\">\n\n<h1 class=\"wp-block-heading\">CONWIP v proizvodnji: nadzor nad tem, kaj za\u017eenete naslednje<\/h1>\n\n<div class=\"gb-container gb-container-article02\">\n\n<p><a href=\"\/sl\/\">Domov<\/a> &raquo; <a href=\"https:\/\/skyplanner.ai\/sl\/viri\/\">Viri<\/a> &raquo; CONWIP v proizvodnji: nadzor nad tem, kaj za\u017eenete naslednje<\/p>\n\n\n<p class=\"yoast-reading-time__wrapper\"><span class=\"yoast-reading-time__icon\"><svg aria-hidden=\"true\" focusable=\"false\" data-icon=\"clock\" width=\"20\" height=\"20\" fill=\"none\" stroke=\"currentColor\" style=\"display:inline-block;vertical-align:-0.1em\" role=\"img\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewBox=\"0 0 24 24\"><path stroke-linecap=\"round\" stroke-linejoin=\"round\" stroke-width=\"2\" d=\"M12 8v4l3 3m6-3a9 9 0 11-18 0 9 9 0 0118 0z\"><\/path><\/svg><\/span><span class=\"yoast-reading-time__spacer\" style=\"display:inline-block;width:1em\"><\/span><span class=\"yoast-reading-time__descriptive-text\">Predviden \u010das branja: <\/span><span class=\"yoast-reading-time__reading-time\">10<\/span><span class=\"yoast-reading-time__time-unit\"> minut<\/span><\/p>\n\n<\/div>\n<div class=\"gb-container gb-container-article03\">\n\n<p>Prvi stroj je prost, zato za\u017eenete \u0161e en nalog. V nadaljevanju procesa pa pred kon\u010dno obdelavo \u017ee \u010daka vrsta. Do popoldneva \u010daka \u0161e ve\u010d kosov, v proizvodnji je vezanega \u0161e ve\u010d materiala, nalogi, predvideni za odpremo, pa so komaj kaj napredovali.<\/p>\n\n\n<p>S CONWIP lahko nehate pove\u010devati to te\u017eavo. Metoda omejuje koli\u010dino dela, ki lahko vstopi v dolo\u010den proizvodni tok: ko odobrena serija zapusti zanko, se njeno dovoljenje za proizvodnjo sprosti za drugo serijo. Do takrat delo \u010daka zunaj zanke, da se sprosti prostor.<\/p>\n\n\n<p>S tak\u0161no disciplino je te\u017eje po nepotrebnem prezgodaj zaganjati delo. Vendar sama ne dolo\u010di, kateri \u010dakajo\u010di nalog naj dobi naslednje dovoljenje, niti ne zagotovi, da bo njegov proizvodni postopek mogo\u010de izvesti na \u017ee zasedenih virih. S CONWIP nadzorujte vstop v proizvodnjo, s SkyPlanner APS pa vzdr\u017eujte povezan terminski plan, ki podpira to odlo\u010ditev. Tako se za va\u0161o pozornost poteguje manj nedokon\u010danega dela, ro\u010dnega usklajevanja \u010dakalnih vrst pred stroji pa je manj.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Kaj je CONWIP v proizvodnji?<\/h2>\n\n\n<p>CONWIP je kratica za stalno koli\u010dino nedokon\u010dane proizvodnje; izhaja iz angle\u0161kega izraza \u00bbConstant Work in Process\u00ab, pogosto tudi \u00bbConstant Work in Progress\u00ab. Gre za metodo vodenja proizvodnje po vle\u010dnem na\u010delu, ki omejuje skupno koli\u010dino odobrenega dela znotraj dolo\u010dene zanke, namesto da bi imel vsak delovni center svoj signal za dopolnjevanje.<\/p>\n\n\n<p>Dovoljenje za vstop predstavlja omejeno \u0161tevilo kartic ali elektronskih \u017eetonov. Vsak \u017eeton predstavlja dogovorjeno koli\u010dino dela, na primer eno opredeljeno proizvodno serijo. Tej seriji ostane dodeljen med celotnim prehodom skozi zanko in je znova na voljo ob dogovorjenem izstopnem dogodku.<\/p>\n\n\n<p>Za razliko od kartice za dopolnjevanje dolo\u010dene vrste kosa lahko \u017eeton CONWIP ob vsakem novem krogu odobri proizvodnjo drugega izdelka. Prednostno razvr\u0161\u010den seznam \u010dakajo\u010dih nalogov odgovarja na vpra\u0161anje \u00bbKaj naj izdelamo?\u00ab. Razpolo\u017eljivi \u017eeton pa odgovarja na vpra\u0161anje \u00bbAli smemo sprostiti \u0161e en nalog v proizvodnjo?\u00ab.<\/p>\n\n\n<p>\u00bbStalna\u00ab je nadzorovana zgornja meja odobrenega dela, ne pa zahteva, da mora biti proizvodnja ves \u010das polna. Dejanska koli\u010dina dela je lahko pod to mejo, kadar je povpra\u0161evanje manj\u0161e ali ni\u010d ni pripravljeno za za\u010detek. Sprostiti neustrezen nalog zgolj zato, da bi zasedli \u017eeton, je v nasprotju z namenom metode.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Sledite enemu dovoljenju skozi zanko<\/h2>\n\n\n<p>Pravilo je dovolj preprosto, da ga lahko razlo\u017eite ob za\u010detku izmene:<\/p>\n\n\n<p>1. <strong>\u010cakajo\u010de delo naj ostane zunaj zanke.<\/strong> Vodite seznam nalogov ali serij, ki \u0161e niso spro\u0161\u010deni v proizvodnjo. Nalog je lahko viden v planu, ne da bi se njegova izvedba \u017ee fizi\u010dno za\u010dela.<\/p>\n\n\n<p>2. <strong>Prosti \u017eeton dodelite delu, ki je pripravljeno za za\u010detek.<\/strong> Oseba, odgovorna za spro\u0161\u010danje v proizvodnjo, izbere naslednji ustrezen \u010dakajo\u010di nalog ali serijo na podlagi dogovorjenih prioritet in preverjanj pripravljenosti.<\/p>\n\n\n<p>3. <strong>Dovoljenje naj ostane dodeljeno istemu delu.<\/strong> Med obdelavo, premiki in \u010dakanjem znotraj zanke ostaja zasedeno isto dovoljenje. Premik s strojne na kon\u010dno obdelavo ga ne sprosti.<\/p>\n\n\n<p>4. <strong>\u017deton vrnite ob dolo\u010denem izstopu.<\/strong> Potrdite, da je serija izpolnila izstopni pogoj, uskladite podatke o njenem stanju in dovoljenje znova dajte na voljo.<\/p>\n\n\n<p>\u010ce so vsi \u017eetoni dodeljeni, mora naslednja serija po\u010dakati. Prosta zmogljivost pri prvi operaciji ni razlog za dodatno dovoljenje.<\/p>\n\n\n<p>Natan\u010dno dolo\u010dite izstop. \u010ce se na primer zanka kon\u010da pri kon\u010dnem prevzemu, se \u017eeton vrne po prevzemu. \u010ce zanka vklju\u010duje tudi zalogo kon\u010dnih izdelkov, se lahko \u017eeton vrne \u0161ele ob odvzemu izdelka za nadaljnjo uporabo. Tak\u0161ni zasnovi nadzorujeta razli\u010dni koli\u010dini. \u00bbProizvodnja je kon\u010dana\u00ab in \u00bbizdelek je zapustil zanko\u00ab nista zamenljiva dogodka.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Smiselno dolo\u010dite meje zanke in enoto \u0161tetja<\/h2>\n\n\n<p>O CONWIP je vredno razmisliti, kadar lahko razli\u010dni izdelki sledijo prepoznavnemu skupnemu toku, vzdr\u017eevanje lo\u010dene zanke za dopolnjevanje vsakega izdelka pa bi bilo preve\u010d zapleteno. Tak\u0161na logika je lahko primerna za izdelavo po naro\u010dilu: naslednji \u017eeton lahko uporabite za drug izdelek po zahtevah kupca, namesto da bi z njim dopolnili zalogo prej\u0161njega izdelka.<\/p>\n\n\n<p>Za\u010dnite z dru\u017eino izdelkov ali proizvodnim obmo\u010djem, kjer lahko zaposleni opazujejo vstop in izstop. Zanka naj zajame \u010dakalne vrste, ki jih \u017eelite nadzorovati, in naj se ne kon\u010da tik pred zahtevno operacijo. \u010ce se pri strojni obdelavi vsak \u017eeton vrne, \u0161e preden kosi vstopijo na preobremenjeno obmo\u010dje kon\u010dne obdelave, zanka ne omejuje nedokon\u010danega dela, ki se tam kopi\u010di.<\/p>\n\n\n<p>Razli\u010dni proizvodni postopki zahtevajo ve\u010d pozornosti. \u010ce serije presko\u010dijo dolo\u010dene operacije, gredo v kooperacijo ali se vklju\u010dijo v monta\u017eo, opredelite, kaj se zgodi z njihovimi dovoljenji. En sam \u0161tevec za celotno tovarno ni nujno uporabna re\u0161itev za nepovezane postopke z zelo razli\u010dnimi zaklju\u010dnimi to\u010dkami. Preden raz\u0161irite meje zanke, jo preizkusite na smiselno zaokro\u017eenem toku.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Ena serija ne pomeni stalne porabe zmogljivosti<\/h3>\n\n\n<p>Zapi\u0161ite, kaj predstavlja \u017eeton. \u010ce predstavlja eno serijo, dolo\u010dite dovoljeno koli\u010dino ali razpon koli\u010din v seriji in pravila za njeno delitev. Sicer se lahko za enakim \u0161tevilom kartic skriva precej ve\u010d dela zgolj zato, ker so serije ve\u010dje.<\/p>\n\n\n<p>Tudi ob doslednih pravilih lahko razli\u010dni izdelki zahtevajo razli\u010dno \u0161tevilo ur obdelave. Serija s kratko strojno obdelavo in serija, ki potrebuje dolgotrajno specializirano kon\u010dno obdelavo, lahko vsaka zasedata po en \u017eeton, vendar ne pomenita enake obremenitve. Poleg \u0161tevila \u017eetonov spremljajte tudi preostalo delo na skupnih virih, zlasti kadar se spreminja sestava proizvodnega programa.<\/p>\n\n\n<p>Omejitev skupne nedokon\u010dane proizvodnje prav tako ne dolo\u010da najve\u010dje \u010dakalne vrste pred vsakim delovnim centrom. Delo se lahko kopi\u010di pred mo\u010dno obremenjeno operacijo, medtem ko ga drugemu delovnemu centru primanjkuje. Jasno dolo\u010dite prostorske in varnostne omejitve ter razi\u0161\u010dite vztrajno kopi\u010denje, namesto da bi pri\u010dakovali, da bo zanka sama uravnote\u017eila obremenitev vseh virov.<\/p>\n\n\n<h2 class=\"wp-block-heading\">CONWIP, kanban in drum buffer rope nadzorujejo razli\u010dne vidike proizvodnje<\/h2>\n\n\n<p>Metode lahko uporabljate skupaj, vendar njihovi signali odgovarjajo na razli\u010dna vpra\u0161anja:<\/p>\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Metoda<\/th><th>Osnovna logika nadzora<\/th><th>Pomembna razlika<\/th><\/tr><\/thead><tbody><tr><td>CONWIP<\/td><td>Omejuje odobreno delo v dolo\u010deni skupni zanki; vrnjeno dovoljenje se dodeli izbranemu \u010dakajo\u010demu nalogu.<\/td><td>Naslednji izdelek se lahko razlikuje od tistega, ki je pravkar zapustil zanko.<\/td><\/tr><tr><td>Proizvodni kanban za dolo\u010deno vrsto kosa<\/td><td>Po signalu porabe spro\u017ei dopolnitev dolo\u010dene vrste kosa v dolo\u010deni koli\u010dini.<\/td><td>Signal dolo\u010da, kaj je treba nadomestiti.<\/td><\/tr><tr><td>Drum buffer rope<\/td><td>\u010cas sprostitve v proizvodnjo prilagaja terminskemu planu ozkega grla in varnostni rezervi, potrebni za pravo\u010dasen prihod dela do njega.<\/td><td>\u010cas sprostitve v proizvodnjo dolo\u010dajo potrebe ozkega grla.<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>Metodo izberite glede na tok, ki ga morate nadzorovati. Za ponavljajo\u010de se komponente, ki se porabljajo iz zaloge, je lahko primeren <a href=\"https:\/\/skyplanner.ai\/sl\/viri\/kanban-v-proizvodnji\/\">kanban za dolo\u010deno vrsto kosa<\/a>. Dru\u017eini izdelkov z razli\u010dnimi naro\u010dili kupcev lahko koristi ponovno uporabljivo dovoljenje CONWIP. Za tok z jasno dolo\u010denim ozkim grlom pa je lahko <a href=\"https:\/\/skyplanner.ai\/sl\/viri\/drum-buffer-rope\/\">primerna metoda drum buffer rope<\/a>.<\/p>\n\n\n<p>Noben od teh signalov ne ustvarja dodatnih zmogljivosti. \u0160e vedno potrebujete izvedljivo zaporedje operacij, skozi katere mora odobreno delo.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Vrnjeni \u017eeton \u0161e vedno zahteva plansko odlo\u010ditev<\/h2>\n\n\n<p>Predstavljajte si obrat strojne obdelave z zanko CONWIP, ki sega od vstopa v strojno obdelavo do kon\u010dne kontrole. Serija uspe\u0161no opravi kontrolo in zapusti zanko. Njen \u017eeton je zdaj na voljo, zunaj zanke pa \u010dakata dve pripravljeni seriji za kupca.<\/p>\n\n\n<p>Ena potrebuje kratko strojno obdelavo, nato pa dolgotrajno poliranje. Druga potrebuje ve\u010d strojne obdelave, poliranja pa ne. Pred delovnim centrom za poliranje je \u017ee dolga \u010dakalna vrsta, pri strojni obdelavi pa so danes \u0161e proste zmogljivosti.<\/p>\n\n\n<p>Obe seriji izpolnjujeta pravilo za dodelitev \u017eetona. Vendar se glede na preostalo delo v proizvodnji ne prilegata enako dobro.<\/p>\n\n\n<p>\u010ce serijo z veliko poliranja sprostite v proizvodnjo zato, ker je njena prva operacija kratka, lahko \u0161e podalj\u0161ate \u010dakalno vrsto, ki \u017ee zadr\u017euje dobave. Z izbiro druge serije bi lahko bolje izkoristili razpolo\u017eljive zmogljivosti, vendar ne, \u010de bi s tem ogrozili pomembnej\u0161o obljubo kupcu. Planer mora skupaj obravnavati preostale proizvodne postopke, dobavne roke in delo, ki tekmuje za iste zmogljivosti \u2013 ne le prvega prostega stroja ali najmanj\u0161e serije.<\/p>\n\n\n<p>Prav zaradi tega razlikovanja je CONWIP uporaben in ne zgolj omejujo\u010d. \u017deton daje dovoljenje za vstop. Preverjanje pripravljenosti potrdi, da se delo lahko nadaljuje. Povezan terminski plan pa poka\u017ee, kam se ume\u0161\u010dajo njegove operacije in kaj njegov zaklju\u010dek pomeni za druge obveznosti.<\/p>\n\n\n<h2 class=\"wp-block-heading\">S SkyPlanner pove\u017eite odlo\u010ditev o sprostitvi v proizvodnjo s celotnim proizvodnim postopkom<\/h2>\n\n\n<p>SkyPlanner APS opravi ta <a href=\"https:\/\/skyplanner.ai\/sl\/viri\/kaj-je-terminiranje-proizvodnje\/\">izra\u010dun terminskega plana za vsa va\u0161a naro\u010dila<\/a>. Dolo\u010dite korake postopka, njihovo trajanje, ustrezne delovne centre, izmene in prioritete. Arcturus, umetna inteligenca za terminiranje v re\u0161itvi SkyPlanner, razporedi operacije glede na nastavljene zmogljivosti in odvisnosti. \u010ce je omogo\u010deno terminiranje z upo\u0161tevanjem materialov, na plan vpliva tudi razpolo\u017eljivost materiala.<\/p>\n\n\n<p>V zami\u0161ljenem obratu to pomeni, da operacije strojne obdelave in poliranja \u010dakajo\u010de serije pregledate skupaj z delom, ki je \u017ee dodeljeno tem virom. Ganttov diagram prikazuje povezano zaporedje operacij in predvideni zaklju\u010dek. Ko se prioritete ali zmogljivosti spremenijo, lahko Arcturus znova izra\u010duna plan, namesto da bi morali sami popravljati \u010dakalno vrsto za vsak stroj posebej.<\/p>\n\n\n<p>Vi dolo\u010date prednostne naloge, umetna inteligenca pa poskrbi za medsebojno povezano razporejanje. Tako porabite manj \u010dasa za planiranje in la\u017eje vidite, kako odlo\u010ditev o sprostitvi v proizvodnjo vpliva na dobave. Ko se \u017eeton sprosti, je to razlog za pregled naslednjega ustreznega naro\u010dila, ne pa navodilo, da za\u010dnete tisto, kar je najbli\u017eje stroju.<\/p>\n\n\n<p>V re\u0161itvi SkyPlanner lahko z najzgodnej\u0161im dovoljenim datumom za\u010detka prepre\u010dite tudi razporeditev postavke naro\u010dila pred dogovorjenim datumom. To je omejitev pri terminiranju, ne kro\u017ee\u010di \u017eeton CONWIP ali dejanska sprostitev serije v proizvodnjo. Pri uvedbi jasno dolo\u010dite, kdo odobri sprostitev, kje se \u017eeton evidentira in kako se odlo\u010ditev prenese v proizvodni plan.<\/p>\n\n\n<p>SkyPlanner se prek odprtega vmesnika REST API pove\u017ee s katerim koli sistemom ERP ali MES. Ohranite sisteme za upravljanje naro\u010dil in izvajanje proizvodnje, ki vam dobro slu\u017eijo, njihove podatke pa pove\u017eite v skupen terminski plan z omejenimi zmogljivostmi. Tako la\u017eje obvladujete odlo\u010danje o tem, kaj naj bo naslednje na vrsti, ne da bi za vsak oddelek vzdr\u017eevali lo\u010deno razli\u010dico plana.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Kaj je v podjetju Eskomatic spremenil bolj\u0161i pregled nad pripravljenostjo za proizvodnjo<\/h3>\n\n\n<p><a href=\"https:\/\/skyplanner.ai\/sl\/zgodbe-strank\/eskomatic\/\">Eskomatic, podjetje za pogodbeno strojno obdelavo<\/a>, je prej \u010dakalne vrste dela urejalo prete\u017eno ro\u010dno. Zaradi omejenega pregleda nad materiali je bilo te\u017eje predvideti pomanjkanje pred na\u010drtovanim za\u010detkom.<\/p>\n\n\n<p>S povezavo re\u0161itve SkyPlanner z obstoje\u010dim sistemom ERP je podjetje dobilo grafi\u010dni prikaz \u010dakalne vrste dela v Ganttovem diagramu, samodejno razporejanje obremenitev in jasnej\u0161i pregled nad materiali. Eskomatic poro\u010da o natan\u010dnej\u0161em dolo\u010danju dobavnih rokov in manj zastojih v proizvodnji zaradi manjkajo\u010dih materialov.<\/p>\n\n\n<p>Za obrat, ki nadzoruje vstop dela v proizvodnjo, je to dragocena dopolnitev doslednega spro\u0161\u010danja: manj prekinitev, ki bi se jim lahko izognili, in jasnej\u0161a podlaga za obljubljanje rokov dokon\u010danja.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Dolo\u010dite za\u010detno omejitev, nato se u\u010dite iz dejanskega toka<\/h2>\n\n\n<p>Ni univerzalnega \u0161tevila kartic, ki bi zagotavljalo u\u010dinkovitost vsake zanke CONWIP. Potrebna koli\u010dina dela v sistemu je odvisna od proizvodnega postopka, razpolo\u017eljivih zmogljivosti, variabilnosti, pravil za oblikovanje serij in proizvodnega programa. Zgornja meja, ki ustreza kratkim ponavljajo\u010dim se serijam, se lahko ob prihodu dolgotrajnih naro\u010dil po meri obnese druga\u010de.<\/p>\n\n\n<p>Za\u010dnite pri dejanskem toku. Izmerite trenutno koli\u010dino dela znotraj predlaganih meja zanke, velikosti serij, \u010dase od sprostitve do izhoda, koli\u010dino dokon\u010dane proizvodnje in uspe\u0161nost dobav. Ugotovite, ali vir stoji, ker ni pripravljenega dela, oziroma ali preobremenjeni delovni center preprosto prejema ve\u010d dela, kot ga zmore dokon\u010dati. Na podlagi teh opa\u017eanj skupaj z ljudmi, ki delajo v zanki, izberite za\u010detno omejitev.<\/p>\n\n\n<p>Med pilotnim preizkusom hkrati spremljajte tri vidike:<\/p>\n\n\n<ul class=\"wp-block-list\"><li><strong>Tok:<\/strong> dokon\u010dano delo in \u010das od sprostitve do izhoda, ne le \u0161tevilo za\u010detih nalogov.<\/li><li><strong>Obremenitev:<\/strong> kje delo \u010daka, kako dolgo je \u017ee v sistemu in koliko preostalih ur dela se poteguje za klju\u010dne vire.<\/li><li><strong>Izpolnjevanje obveznosti:<\/strong> ali so zahtevana naro\u010dila dokon\u010dana pravo\u010dasno in kateri nujni posegi so za to potrebni.<\/li><\/ul>\n\n\n<p>\u010ce so \u010dakalne vrste \u0161e vedno predolge, preizkusite nadzorovano zmanj\u0161anje \u0161tevila dovoljenj za vstop ter ob tem spremljajte obseg dokon\u010dane proizvodnje in dobave. \u010ce obseg pade, preverite, ali omejitev klju\u010dnemu viru pu\u0161\u010da premalo dela, ali manjka material oziroma ali je zaporedje neustrezno. Dodajanje \u017eetonov ob vsaki te\u017eavi lahko prikrije vzrok in hkrati znova povzro\u010di prvotni prese\u017eek nedokon\u010dane proizvodnje.<\/p>\n\n\n<p>\u017detona ne vrnite samo zato, ker serija znotraj zanke \u010daka na dodelavo ali je zadr\u017eana zaradi kakovosti. Dolo\u010dite, kako se evidenca usklajuje ob izmetu, delnem dokon\u010danju in delitvi serij. Nujno naro\u010dilo mora imeti veljavno dovoljenje za vstop ali izrecno odobreno in evidentirano izjemo, ne pa nevidne dodatne kartice. Dolo\u010dite odgovornost za izgubljene \u017eetone in pred nadomestitvijo izgubljenega \u017eetona preverite ter uskladite njihovo \u0161tevilo.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Utemeljite, katero delo naj se za\u010dne naslednje<\/h2>\n\n\n<p>Koristen pilotni preizkus CONWIP ima jasno vidne meje, smiselno enoto \u0161tetja, jasno dolo\u010den dogodek vra\u010dila \u017eetona in odgovorno osebo za izbiro pripravljenega dela med \u010dakajo\u010dimi naro\u010dili. Merilo uspeha ni stalno polna zanka. Uspeh pomeni manj nepotrebnega dela v obratu, ob tem pa se prava naro\u010dila \u0161e naprej dokon\u010dujejo.<\/p>\n\n\n<p>Izberite SkyPlanner, ko vzdr\u017eevanje plana proizvodnih postopkov in zmogljivosti, na katerem temeljijo te odlo\u010ditve, va\u0161im planerjem jemlje ves dan. Pravila spro\u0161\u010danja zagotavljajo dosleden nadzor nad vstopom dela, SkyPlanner pa olaj\u0161a vzdr\u017eevanje skupnega terminskega plana ob spremembah proizvodnega programa in prednostnih nalog.<\/p>\n\n\n<p><a href=\"https:\/\/skyplanner.ai\/sl\/kontaktna-prodaja\/\">Rezervirajte predstavitev re\u0161itve SkyPlanner<\/a> in pripravite primer enega \u010dakajo\u010dega naro\u010dila, njegovega preostalega proizvodnega postopka, dela, ki je \u017ee znotraj predlagane zanke, ter svojega pravila za spro\u0161\u010danje. Na tem primeru preverite, kaj naj se za\u010dne naslednje in kaj to pomeni za dobavo. \u010ce \u017eelite najprej raziskati prikaz terminskega plana, <a href=\"https:\/\/skyplanner.ai\/sl\/preizkus\/\">preizkusite SkyPlanner s predstavitvenimi podatki<\/a>.<\/p>\n\n<\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>CONWIP v proizvodnji: nadzor nad tem, kaj za\u017eenete naslednje Domov &raquo; Viri &raquo; CONWIP v proizvodnji: nadzor nad tem, kaj za\u017eenete naslednje Prvi stroj je prost, zato za\u017eenete \u0161e en nalog. V nadaljevanju procesa pa pred kon\u010dno obdelavo \u017ee \u010daka vrsta. Do popoldneva \u010daka \u0161e ve\u010d kosov, v proizvodnji je vezanega \u0161e ve\u010d materiala, nalogi, &#8230; <a title=\"CONWIP v proizvodnji: nadzor nad tem, kaj za\u017eenete naslednje\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/sl\/viri\/conwip\/\" aria-label=\"Read more about CONWIP v proizvodnji: nadzor nad tem, kaj za\u017eenete naslednje\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":110332,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[2539,302],"tags":[],"class_list":["post-110319","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-aps-in-terminiranje","category-viri","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>CONWIP v proizvodnji: nadzor nad tem, kaj za\u017eenete naslednje<\/title>\n<meta name=\"description\" content=\"Preve\u010d nalogov v proizvodnji? S CONWIP omejite spro\u0161\u010deno delo, izberite naslednji pripravljeni nalog in vsak za\u010detek uskladite z realnim terminskim planom.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/sl\/viri\/conwip\/\" \/>\n<meta property=\"og:locale\" content=\"sl_SI\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"CONWIP v proizvodnji: nadzor nad tem, kaj za\u017eenete naslednje\" \/>\n<meta property=\"og:description\" content=\"Preve\u010d nalogov v proizvodnji? S CONWIP omejite spro\u0161\u010deno delo, izberite naslednji pripravljeni nalog in vsak za\u010detek uskladite z realnim terminskim planom.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/sl\/viri\/conwip\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2026-10-25T22:17:09+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-25T22:18:40+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/conwip-manufacturing-hero.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1672\" \/>\n\t<meta property=\"og:image:height\" content=\"941\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"12 minut\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/conwip\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/conwip\\\/\"},\"author\":{\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\"},\"headline\":\"CONWIP v proizvodnji: nadzor nad tem, kaj za\u017eenete naslednje\",\"datePublished\":\"2026-10-25T22:17:09+00:00\",\"dateModified\":\"2026-10-25T22:18:40+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/conwip\\\/\"},\"wordCount\":2367,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/conwip\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/conwip-manufacturing-hero.png\",\"articleSection\":[\"APS in terminiranje\",\"viri\"],\"inLanguage\":\"sl-SI\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/conwip\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/conwip\\\/\",\"name\":\"CONWIP v proizvodnji: nadzor nad tem, kaj za\u017eenete naslednje\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/conwip\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/conwip\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/conwip-manufacturing-hero.png\",\"datePublished\":\"2026-10-25T22:17:09+00:00\",\"dateModified\":\"2026-10-25T22:18:40+00:00\",\"description\":\"Preve\u010d nalogov v proizvodnji? S CONWIP omejite spro\u0161\u010deno delo, izberite naslednji pripravljeni nalog in vsak za\u010detek uskladite z realnim terminskim planom.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/conwip\\\/#breadcrumb\"},\"inLanguage\":\"sl-SI\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/conwip\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"sl-SI\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/conwip\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/conwip-manufacturing-hero.png\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/conwip-manufacturing-hero.png\",\"width\":1672,\"height\":941,\"caption\":\"A blue authorization card returns to waiting batches outside a bounded machining and inspection flow\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/conwip\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"CONWIP v proizvodnji: nadzor nad tem, kaj za\u017eenete naslednje\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"sl-SI\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"sl-SI\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\",\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"sl-SI\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"caption\":\"Jussi M\u00e4ntyl\u00e4\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"CONWIP v proizvodnji: nadzor nad tem, kaj za\u017eenete naslednje","description":"Preve\u010d nalogov v proizvodnji? S CONWIP omejite spro\u0161\u010deno delo, izberite naslednji pripravljeni nalog in vsak za\u010detek uskladite z realnim terminskim planom.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/sl\/viri\/conwip\/","og_locale":"sl_SI","og_type":"article","og_title":"CONWIP v proizvodnji: nadzor nad tem, kaj za\u017eenete naslednje","og_description":"Preve\u010d nalogov v proizvodnji? S CONWIP omejite spro\u0161\u010deno delo, izberite naslednji pripravljeni nalog in vsak za\u010detek uskladite z realnim terminskim planom.","og_url":"https:\/\/skyplanner.ai\/sl\/viri\/conwip\/","og_site_name":"SkyPlanner","article_published_time":"2026-10-25T22:17:09+00:00","article_modified_time":"2026-10-25T22:18:40+00:00","og_image":[{"width":1672,"height":941,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/conwip-manufacturing-hero.png","type":"image\/png"}],"author":"Jussi M\u00e4ntyl\u00e4","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Jussi M\u00e4ntyl\u00e4","Est. reading time":"12 minut"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/sl\/viri\/conwip\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/sl\/viri\/conwip\/"},"author":{"name":"Jussi M\u00e4ntyl\u00e4","@id":"https:\/\/skyplanner.ai\/sl\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5"},"headline":"CONWIP v proizvodnji: nadzor nad tem, kaj za\u017eenete naslednje","datePublished":"2026-10-25T22:17:09+00:00","dateModified":"2026-10-25T22:18:40+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/sl\/viri\/conwip\/"},"wordCount":2367,"publisher":{"@id":"https:\/\/skyplanner.ai\/sl\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/sl\/viri\/conwip\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/conwip-manufacturing-hero.png","articleSection":["APS in terminiranje","viri"],"inLanguage":"sl-SI"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/sl\/viri\/conwip\/","url":"https:\/\/skyplanner.ai\/sl\/viri\/conwip\/","name":"CONWIP v proizvodnji: nadzor nad tem, kaj za\u017eenete naslednje","isPartOf":{"@id":"https:\/\/skyplanner.ai\/sl\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/sl\/viri\/conwip\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/sl\/viri\/conwip\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/conwip-manufacturing-hero.png","datePublished":"2026-10-25T22:17:09+00:00","dateModified":"2026-10-25T22:18:40+00:00","description":"Preve\u010d nalogov v proizvodnji? S CONWIP omejite spro\u0161\u010deno delo, izberite naslednji pripravljeni nalog in vsak za\u010detek uskladite z realnim terminskim planom.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/sl\/viri\/conwip\/#breadcrumb"},"inLanguage":"sl-SI","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/sl\/viri\/conwip\/"]}]},{"@type":"ImageObject","inLanguage":"sl-SI","@id":"https:\/\/skyplanner.ai\/sl\/viri\/conwip\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/conwip-manufacturing-hero.png","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/conwip-manufacturing-hero.png","width":1672,"height":941,"caption":"A blue authorization card returns to waiting batches outside a bounded machining and inspection flow"},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/sl\/viri\/conwip\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/sl\/"},{"@type":"ListItem","position":2,"name":"CONWIP v proizvodnji: nadzor nad tem, kaj za\u017eenete naslednje"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/sl\/#website","url":"https:\/\/skyplanner.ai\/sl\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/sl\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/sl\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"sl-SI"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/sl\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/sl\/","logo":{"@type":"ImageObject","inLanguage":"sl-SI","@id":"https:\/\/skyplanner.ai\/sl\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/sl\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]},{"@type":"Person","@id":"https:\/\/skyplanner.ai\/sl\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5","name":"Jussi M\u00e4ntyl\u00e4","image":{"@type":"ImageObject","inLanguage":"sl-SI","@id":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","caption":"Jussi M\u00e4ntyl\u00e4"}}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/conwip-manufacturing-hero.png",1672,941,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/conwip-manufacturing-hero-150x150.png",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/conwip-manufacturing-hero-300x169.png",300,169,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/conwip-manufacturing-hero-768x432.png",768,432,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/conwip-manufacturing-hero-1024x576.png",1024,576,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/conwip-manufacturing-hero-1536x864.png",1536,864,true],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/conwip-manufacturing-hero.png",1672,941,false],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/conwip-manufacturing-hero-360x203.png",360,203,true]},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/sl\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"CONWIP v proizvodnji: nadzor nad tem, kaj za\u017eenete naslednje Domov &raquo; Viri &raquo; CONWIP v proizvodnji: nadzor nad tem, kaj za\u017eenete naslednje Prvi stroj je prost, zato za\u017eenete \u0161e en nalog. V nadaljevanju procesa pa pred kon\u010dno obdelavo \u017ee \u010daka vrsta. Do popoldneva \u010daka \u0161e ve\u010d kosov, v proizvodnji je vezanega \u0161e ve\u010d materiala, nalogi,&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/posts\/110319","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/comments?post=110319"}],"version-history":[{"count":1,"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/posts\/110319\/revisions"}],"predecessor-version":[{"id":110383,"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/posts\/110319\/revisions\/110383"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/media\/110332"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/media?parent=110319"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/categories?post=110319"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/tags?post=110319"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}