{"id":110227,"date":"2026-10-25T20:19:32","date_gmt":"2026-10-25T20:19:32","guid":{"rendered":"https:\/\/skyplanner.ai\/?p=110227"},"modified":"2026-10-25T20:20:59","modified_gmt":"2026-10-25T20:20:59","slug":"kaizen-v-proizvodnji","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/sl\/viri\/kaizen-v-proizvodnji\/","title":{"rendered":"Kaizen v proizvodnji: poskrbite, da se izbolj\u0161ave ohranijo"},"content":{"rendered":"<div class=\"gb-container gb-container-article01 article-main-content-container\">\n\n<h1 class=\"wp-block-heading\">Kaizen v proizvodnji: poskrbite, da se izbolj\u0161ave ohranijo<\/h1>\n\n<div class=\"gb-container gb-container-article02\">\n\n<p><a href=\"\/sl\/\">Domov<\/a> &raquo; <a href=\"https:\/\/skyplanner.ai\/sl\/viri\/\">Viri<\/a> &raquo; Kaizen v proizvodnji: poskrbite, da se izbolj\u0161ave ohranijo<\/p>\n\n\n<p class=\"yoast-reading-time__wrapper\"><span class=\"yoast-reading-time__icon\"><svg aria-hidden=\"true\" focusable=\"false\" data-icon=\"clock\" width=\"20\" height=\"20\" fill=\"none\" stroke=\"currentColor\" style=\"display:inline-block;vertical-align:-0.1em\" role=\"img\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewBox=\"0 0 24 24\"><path stroke-linecap=\"round\" stroke-linejoin=\"round\" stroke-width=\"2\" d=\"M12 8v4l3 3m6-3a9 9 0 11-18 0 9 9 0 0118 0z\"><\/path><\/svg><\/span><span class=\"yoast-reading-time__spacer\" style=\"display:inline-block;width:1em\"><\/span><span class=\"yoast-reading-time__descriptive-text\">Predviden \u010das branja: <\/span><span class=\"yoast-reading-time__reading-time\">11<\/span><span class=\"yoast-reading-time__time-unit\"> minut<\/span><\/p>\n\n<\/div>\n<div class=\"gb-container gb-container-article03\">\n\n<p>Delavnica za izbolj\u0161ave se kon\u010da z bolje urejenim delovnim centrom, kraj\u0161o menjavo in ekipo, zadovoljno z dose\u017eenim. Nato se spremeni nabor izdelkov, delo prevzame druga izmena in stara te\u017eava se vrne. Zamisel je bila koristna, vendar v obratu novi na\u010din dela nikoli ni postal ustaljena praksa.<\/p>\n\n\n<p>Kaizen v proizvodnji to vrzel zapolnjuje s ponavljajo\u010dimi se prakti\u010dnimi izbolj\u0161avami, pri katerih sodelujejo ljudje, ki delo opravljajo. Izberete te\u017eavo, razumete njen vzrok, preizkusite spremembo in poskrbite, da je uspe\u0161no metodo mogo\u010de ponavljati. Cilj sta manj nepotrebnega dela in zanesljivej\u0161a proizvodnja, ne dalj\u0161i seznam zaklju\u010denih pobud.<\/p>\n\n\n<p>Spremembam mora slediti tudi proizvodni plan. Ko izbolj\u0161ava spremeni realno trajanje operacije, proizvodni postopek ali razpolo\u017eljive zmogljivosti, vam SkyPlanner pomaga to spremembo upo\u0161tevati v terminskem planu skupaj z drugimi naro\u010dili. Va\u0161a ekipa dolo\u010di bolj\u0161o metodo, SkyPlanner pa opravi izra\u010dun terminov ob upo\u0161tevanju medsebojnih povezav, da se korist izbolj\u0161ave prenese tudi v vsakodnevno proizvodnjo.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Kaj je kaizen v proizvodnji?<\/h2>\n\n\n<p>Kaizen pomeni nenehno izbolj\u0161evanje s ponavljajo\u010dimi se spremembami na\u010dina dela. V proizvodnji povezuje operaterje, vodje in ustrezne strokovnjake, da skupaj zmanj\u0161ujejo izgube, izbolj\u0161ujejo kakovost in omogo\u010dajo la\u017eje ter zanesljivej\u0161e opravljanje dela.<\/p>\n\n\n<p>Sprememba je lahko majhna: pravo\u010dasna priprava ustreznih orodij pred menjavo, odprava ponavljajo\u010dega se iskanja delov ali jasna opredelitev, kdaj je serija pripravljena za naslednjo operacijo. Pomembno je, ali re\u0161uje resni\u010dno te\u017eavo in postane zanesljiva praksa.<\/p>\n\n\n<p>Kaizen je del vitke proizvodnje, ni pa drugo ime za vsako orodje vitke proizvodnje. <a href=\"https:\/\/skyplanner.ai\/sl\/viri\/gemba-sprehod\/\">Gemba sprehod<\/a> vam pomaga opazovati dejansko delo. Z analizo temeljnih vzrokov ugotavljate, zakaj te\u017eava nastaja. Metoda 5S pomaga urediti delovno okolje in urejenost ohranjati. Kaizen povezuje u\u010denje in ukrepanje v stalno prakso izbolj\u0161evanja, pri \u010demer ekipa uporablja orodja, ki jih potrebuje za konkretno te\u017eavo.<\/p>\n\n\n<p>Dogodek kaizen je osredoto\u010deno izbolj\u0161evanje, za katero so posebej namenjeni ljudje in \u010das. Koristen je lahko takrat, ko morajo pri jasno omejeni te\u017eavi sodelovati razli\u010dni oddelki. Vsakodnevni kaizen temelji na enakem sistemati\u010dnem pristopu, le da izbolj\u0161ave uvaja po manj\u0161ih korakih med rednim delom. Nobena od teh oblik ni zaklju\u010dena \u017ee s tem, da se sestanek kon\u010da ali da se sprememba uvede.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Za\u010dnite z eno ponavljajo\u010do se te\u017eavo, ki jo je vredno re\u0161iti<\/h2>\n\n\n<p>Izberite te\u017eavo, ki jo zaposleni prepoznajo in je pomembna za proizvodnjo. \u00bbIzbolj\u0161ajmo u\u010dinkovitost\u00ab ekipi ne daje jasne usmeritve. \u00bbCelica za krivljenje po koncu prej\u0161nje operacije vedno znova \u010daka na orodje\u00ab pa opredeli nekaj, kar lahko opazuje in spremeni.<\/p>\n\n\n<p>Primerna prva te\u017eava je jasno omejena, ima viden u\u010dinek in odgovorno osebo, ki lahko podpre preizkus. Biti mora dovolj majhna, da jo lahko razi\u0161\u010dete brez preurejanja celotne tovarne, a hkrati dovolj pomembna, da bi z njeno odpravo prihranili delo, prepre\u010dili napake ali pospe\u0161ili izvedbo naro\u010dil kupcev.<\/p>\n\n\n<p>Vpra\u0161ajte ljudi, ki delo opravljajo, kje se jim vedno znova pojavljajo iste te\u017eave. Bodite pozorni na iskanje, ponavljajo\u010de se nastavitve, manjkajo\u010de informacije, nepotrebno gibanje ali stalno \u010dakanje. Nato preverite posledice za proizvodnjo. Hitrej\u0161e izvajanje operacije, ki ni ozko grlo, lahko zmanj\u0161a obseg dela, ne bo pa nujno skraj\u0161alo preto\u010dnega \u010dasa naro\u010dila kupca, \u010de serija \u0161e vedno \u010daka na naslednji stopnji.<\/p>\n\n\n<p>Zapi\u0161ite, kaj se dogaja, kje se dogaja in na katero delo vpliva. Opa\u017eanja lo\u010dite od re\u0161itve, ki jo \u017eelite uvesti. \u00bbKupimo \u0161e en stroj\u00ab je predlog nalo\u017ebe, ne opis te\u017eave.<\/p>\n\n\n<p>Eni osebi dodelite odgovornost, da raziskavo pripelje do odlo\u010ditve. Vklju\u010dite operaterje iz izmen, ki bodo metodo uporabljale, ter sodelavce iz vzdr\u017eevanja, kakovosti, tehnologije ali planiranja, \u010de sprememba vpliva na njihovo delo. Naloga vodje je zagotoviti \u010das in odpraviti ovire, ne pa priti z odgovorom, ki naj bi ga vsi drugi zgolj potrdili.<\/p>\n\n\n<h2 class=\"wp-block-heading\">S ciklom PDCA od zamisli do preizku\u0161ene izbolj\u0161ave<\/h2>\n\n\n<p>Cikel PDCA \u2013 na\u010drtuj, izvedi, preveri, ukrepaj \u2013 ekipi omogo\u010da, da se sistemati\u010dno u\u010di in ta postopek ponavlja. Klju\u010dno je razlikovati med obetavno razlago in dokazi, da sprememba deluje.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Na\u010drtuj: razumite izgubo in opredelite preizkus<\/h3>\n\n\n<p>Delo opazujte skupaj z operaterjem. Kdaj se prekinitev za\u010dne in kdaj kon\u010da? Se pojavi pri vsakem izdelku, v eni izmeni ali po dolo\u010deni menjavi? Kateri dokazi podpirajo domnevni vzrok?<\/p>\n\n\n<p>Pozen za\u010detek sam po sebi \u0161e ne dokazuje, da je postopek priprave po\u010dasen. Morda manjkajo orodja, material ni na voljo ali pa je bila operacija zaradi zamude pri predhodni operaciji pozno spro\u0161\u010dena. Preden izberete ukrep, razi\u0161\u010dite vzrok. \u010ce razlaga ni zanesljiva, opravite <a href=\"https:\/\/skyplanner.ai\/sl\/viri\/analiza-temeljnih-vzrokov\/\">usmerjeno analizo temeljnih vzrokov<\/a>, namesto da ugibanje spremenite v novo navodilo.<\/p>\n\n\n<p>Dogovorite se, kaj boste s preizkusom spremenili, kdo ga bo izvedel in kak\u0161en rezultat bi \u0161teli za koristen. Izberite neposredno merilo izgube in na\u010din preverjanja stranskih u\u010dinkov. Pri spremembi priprave na menjavo bi lahko na primer spremljali trajanje priprave stroja, ustreznost prvega kosa in obseg pripravljalnega dela, prenesenega drugam.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Izvedi: spremembo preizkusite v obvladljivem obsegu<\/h3>\n\n\n<p>Predlagano metodo preizkusite pri ustreznem delu, preden jo raz\u0161irite. Poskrbite, da sodelujo\u010di razumejo spremembo ter imajo pooblastila, vire in \u010das za njeno izvedbo. Spremembe, ki vplivajo na opremo, varnost ali prevzem izdelkov, \u0161e vedno zahtevajo odobritev ustreznih strokovnjakov.<\/p>\n\n\n<p>Preizkus naj bo dovolj omejen, da boste lahko razlo\u017eili rezultate. \u010ce ekipa hkrati spremeni orodja, material, zasedbo in zaporedje operacij, bo te\u017eko pojasniti, kaj je prineslo bolj\u0161i rezultat. Zabele\u017eite dejanski potek, tudi odstopanja od predlagane metode.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Preveri: primerjajte primerljivo<\/h3>\n\n\n<p>Rezultat preglejte skupaj z ljudmi, ki so delo opravili. Se je izguba, ki ste jo \u017eeleli odpraviti, zmanj\u0161ala? Se je kakovost ohranila? Je bila metoda uporabna v obi\u010dajnih razmerah ali pa je bil preizkus odvisen od dodatne pomo\u010di, ki pozneje ne bo ve\u010d na voljo?<\/p>\n\n\n<p>Primerjajte podobne izdelke, velikosti serij in pogoje dela ter vedno merite enako opredeljen del procesa. Skupno trajanje priprave, obseg dela operaterja in preto\u010dni \u010das naro\u010dila odgovarjajo na razli\u010dna vpra\u0161anja. Z zgodnej\u0161o pripravo lahko skraj\u0161ate \u010dakanje stroja, ne da bi odpravili samo pripravljalno delo.<\/p>\n\n\n<p>Ne upo\u0161tevajte le najbolj\u0161e izvedbe. Metodo preizkusite v razmerah, v katerih se bo obi\u010dajno uporabljala, tudi v ustreznih izmenah in pri razli\u010dnih izvedbah izdelkov. \u010ce rezultati niso enozna\u010dni, ugotovite, kaj ostaja negotovo, in na\u010drtujte nov preizkus, namesto da razglasite prihranek za celotno tovarno.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Ukrepaj: spremembo sprejmite, prilagodite ali zavrnite<\/h3>\n\n\n<p>\u010ce sprememba deluje, se dogovorite o novi metodi, usposobite ljudi, ki jo potrebujejo, in posodobite informacije, ki dolo\u010dajo na\u010din dela. \u010ce ne deluje, popravite razlago ali preizkus in ponovite cikel. Koristen poskus lahko izlo\u010di slabo zamisel, ne da bi postal neuspe\u0161en projekt, o katerem nih\u010de no\u010de govoriti.<\/p>\n\n\n<p>Dolo\u010dite, kdo je odgovoren za novi standard in kdaj ga bo ekipa znova preverila. Korak \u00bbukrepaj\u00ab je trenutek, ko izbolj\u0161ava za\u010dne postajati del redne proizvodnje, ne pa trenutek, ko odgovornost zanjo izgine.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Primer: kako ohraniti bolj\u0161i na\u010din menjave tudi po preizkusu<\/h2>\n\n\n<p>Predstavljajte si celico za krivljenje, v kateri operaterji po zaklju\u010dku prej\u0161njega naro\u010dila redno i\u0161\u010dejo orodje. Ekipa to sprva opi\u0161e kot dolgotrajno menjavo. Z opazovanjem ugotovi, da se priprava za\u010dne prepozno in da je seznam orodij za dru\u017eino izdelkov, ki se redno ponavlja v proizvodnji, nejasen.<\/p>\n\n\n<p>Operaterji in tehnologi se dogovorijo o jasnej\u0161em seznamu za pripravo ter dolo\u010denem mestu za potrebna orodja. Preizkusijo pripravo naslednjega odobrenega kompleta, \u0161e preden se stroj sprosti, pri tem pa ohranijo zahtevana preverjanja. Gre za spremembo priprave in predaje, ne za navodilo, naj se pri sami nastavitvi stroja hiti.<\/p>\n\n\n<p>Ekipa bele\u017ei trajanje priprave stroja, obseg pripravljalnega dela in rezultate preverjanja prvih kosov. Preizkus ponovi na reprezentativnih operacijah in vanj vklju\u010di \u0161e drugo izmeno. \u010ce stroj \u010daka manj, drug operater pa porabi ve\u010d \u010dasa za iskanje, se je prvotna izguba le preselila drugam. Metodo je treba znova prilagoditi.<\/p>\n\n\n<p>Ko se rezultat potrdi, vodja dolo\u010di odgovornost za pripravo in vra\u010danje orodij. Tehnologi skrbijo za seznam, izmene pa se nau\u010dijo dogovorjene metode. Planer nato pregleda pripravljalni \u010das, predviden za zadevno delo. \u010ce bi ohranil staro vrednost, bi uporabne zmogljivosti ostale skrite; \u010de bi jo nadomestil z najbolj\u0161im \u010dasom iz preizkusa, pa bi tvegal, da obljubi zmogljivosti, ki jih celica ne more zanesljivo zagotavljati.<\/p>\n\n\n<p>Potrjena vrednost za planiranje mora odra\u017eati metodo, ki jo ekipa lahko ponavlja. Tako izbolj\u0161ava v proizvodnem obratu koristi tudi naslednjim naro\u010dilom kupcev, ne le seriji, uporabljeni na delavnici.<\/p>\n\n\n<h2 class=\"wp-block-heading\">S SkyPlanner prenesite sprejeto spremembo v proizvodnjo<\/h2>\n\n\n<p>SkyPlanner APS povezuje podatke o opravljenem delu s planom za prihodnja naro\u010dila. Njegova funkcija Timer bele\u017ei dejanski \u010das operacije ob za\u010detku, prekinitvi, nadaljevanju in zaklju\u010dku dela. Poro\u010dilo Job Report ta \u010das pove\u017ee z ustrezno operacijo in delovnim centrom, kar vam pomaga primerjati planirano in dejansko trajanje operacij.<\/p>\n\n\n<p>Ti zapisi so trdnej\u0161a podlaga za pogovor o izbolj\u0161avah kot ocene po spominu. Preden jih uporabite za primerjavo, preverite, kako dosledno je ekipa bele\u017eila delo in kaj zajema zabele\u017eeni \u010dasovni interval. Podatki vam pomagajo pri raziskovanju, vendar ekipa \u0161e vedno presodi, ali je rezultat posledica spremenjene metode.<\/p>\n\n\n<p>Pri ponavljajo\u010dem se delu lahko k oceni trajanja posamezne operacije prispeva tudi funkcija SkyPlanner za ocenjevanje \u010dasa na podlagi preteklih podatkov, \u010de so na voljo podatki preteklih naro\u010dil. Te podatke uporabite skupaj z ugotovitvami preizkusa. Ocena na podlagi preteklih podatkov je koristen vhodni podatek za planiranje, ne pa samodejen dokaz, da je novo preizku\u0161ena metoda pripravljena za uvedbo kot standard.<\/p>\n\n\n<p>Ko ekipa sprejme spremembo, njen vpliv na proizvodnjo vnesite v ustrezne planske podatke: trajanje operacije ali pripravljalni \u010das, dolo\u010den proizvodni postopek in odvisnosti, ustrezne delovne centre ali razpolo\u017eljivost virov. Arcturus, umetna inteligenca za terminiranje v sistemu SkyPlanner, <a href=\"https:\/\/skyplanner.ai\/sl\/viri\/kaj-je-terminiranje-proizvodnje\/\">izra\u010duna nov terminski plan<\/a> glede na nastavljene zmogljivosti in prioritete. Ganttov diagram poka\u017ee, kako so dela medsebojno usklajena.<\/p>\n\n\n<p>V primeru celice za upogibanje kraj\u0161i pripravljalni \u010das, ki ga je mogo\u010de zanesljivo dosegati, spremeni \u010das, ki je na voljo za zadevne operacije. Te \u0161e vedno tekmujejo z drugimi naro\u010dili za isti stroj, njihove naslednje operacije pa \u0161e vedno potrebujejo zmogljivosti. SkyPlanner uskladi to povezano delo, zato planerju ni treba popravljati \u010dakalne vrste za vsak stroj posebej. Tako porabite manj truda za terminiranje in dobite plan, ki bolje odra\u017ea sedanji na\u010din dela v proizvodnji.<\/p>\n\n\n<p>Hitrej\u0161a operacija tudi ne pomeni, da morate ustvarjati nepotrebne zaloge. Preverite, kaj spremenjeni terminski plan pomeni za dejanska naro\u010dila: zgodnej\u0161i zaklju\u010dek, kjer je to koristno, prostor za dodatna naro\u010dila kupcev ali manj\u0161o obremenitev preobremenjene izmene. Tako lahko spro\u0161\u010dene zmogljivosti prinesejo poslovno korist.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Skupno planiranje olaj\u0161a obvladovanje ponavljajo\u010dih se sprememb<\/h3>\n\n\n<p><a href=\"https:\/\/skyplanner.ai\/sl\/zgodbe-strank\/mamec\/\">Mamec, finski proizvajalec me\u0161alnikov in pogodbeni proizvajalec visokotehnolo\u0161kih izdelkov<\/a>, ponazarja, zakaj je usklajen plan pomemben. Pred uvedbo sistema SkyPlanner so vodje dolo\u010dali prioritete za tiso\u010de medsebojno odvisnih delovnih nalogov na podlagi dobavnih rokov na papirnih nalogih. Funkcije za planiranje v sistemu ERP niso zagotavljale celovitega pregleda, ro\u010dno obvladovanje teh odvisnosti pa je obremenjevalo vodenje proizvodnje.<\/p>\n\n\n<p>Mamec je SkyPlanner povezal s sistemom Oscar ERP in ga uvedel kot glavno platformo za planiranje proizvodnje. Podjetje poro\u010da o ob\u010dutno manj\u0161i obremenitvi pri planiranju, manj zastojih delovnih centrov zaradi bolj\u0161ega zaporedja dela in la\u017ejem obvladovanju sprememb proizvodnih zaporedij. Zaposleni imajo skupen pregled nad stanjem operacij in terminskim planom, namesto da bi se zana\u0161ali na lo\u010dene ocene obremenitve.<\/p>\n\n\n<p>Za tovarno, ki izbolj\u0161uje svoje metode dela, je tak\u0161na skupna podlaga dragocena: spremembo lahko obravnava skupaj z naro\u010dili kupcev, na katera vpliva, brez novega kroga nepovezanega prilagajanja \u010dakalnih vrst.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Ohranite metodo v praksi, ne le grafa izbolj\u0161av<\/h2>\n\n\n<p>Bolj\u0161i rezultat se bo ohranil le, \u010de bo novi na\u010din dela ostal izvedljiv v praksi. Navodila za sprejeto metodo postavite tja, kjer jih ljudje uporabljajo, odstranite zastarela navodila ter poskrbite za potrebna orodja, informacije in pripravo v vseh izmenah, ki jih sprememba zadeva.<\/p>\n\n\n<p>S kratkim naknadnim preverjanjem ocenite tako metodo kot rezultat. Vpra\u0161ajte, ali lahko zaposleni delo opravljajo po dogovoru, ali se prvotna te\u017eava vra\u010da in ali se je drugje pojavila nova te\u017eava. \u010ce se standard v praksi redno obhaja, ugotovite, zakaj. Neprakti\u010dno navodilo je treba izbolj\u0161ati, ne pa dodati \u0161e enega podpisa, ki potrjuje njegov obstoj.<\/p>\n\n\n<p>O ukrepih obve\u0161\u010dajte ljudi, ki so opozorili na te\u017eavo. Povejte jim, kaj ste preizkusili, kaj ste ugotovili in kaj sledi. \u010ce zamisli ne sprejmete, pojasnite razlog. Sodelovanje dobi smisel, ko opa\u017eanja vodijo do odlo\u010ditev, namesto da bi izginila na seznamu predlogov.<\/p>\n\n\n<p>Uspeh merite po izgubi, ki ste jo \u017eeleli odpraviti, in njenem vplivu na proizvodnjo, ne po \u0161tevilu oddanih zamisli. Manj dodelav, manj iskanja, zanesljivej\u0161a priprava ali manj \u010dakanja strojev so koristni dose\u017eki, ki jih je vredno ohraniti. Tabla, polna zaklju\u010denih ukrepov, \u0161e ne dokazuje, da se je kateri od teh rezultatov spremenil.<\/p>\n\n\n<p>Ko se metoda obnese tudi ob obi\u010dajnih proizvodnih obremenitvah, prenesite pridobljeno znanje na drugo primerno podro\u010dje. Prenesite na\u010din razmi\u0161ljanja in ustaljeni postopek izbolj\u0161evanja; preden uporabite enako re\u0161itev, preverite tamkaj\u0161nji vzrok te\u017eave.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Naslednjo izbolj\u0161avo vklju\u010dite v dnevni plan<\/h2>\n\n\n<p>Kaizen deluje, ko se tovarna nenehno u\u010di in pridobljeno znanje uporablja. Za\u010dnite z eno ponavljajo\u010do se te\u017eavo, vklju\u010dite ljudi, ki jo najbolje poznajo, in spremljajte spremembo tudi po prvem dobrem rezultatu. Poskrbite, da bo bolj\u0161o metodo mogo\u010de ponavljati, nato pa jo upo\u0161tevajte tudi v proizvodnem planu.<\/p>\n\n\n<p>Izberite SkyPlanner, ko je treba izbolj\u0161ave prenesti v skupni terminski plan, namesto da ostanejo omejene na lo\u010dene \u010dakalne vrste strojev in planske preglednice. V istem okolju za planiranje zdru\u017euje dejanski \u010das operacij, dolo\u010dene proizvodne korake in razpolo\u017eljive zmogljivosti, Arcturus pa poskrbi za izra\u010dun terminskega plana. SkyPlanner se prek odprtega vmesnika REST API pove\u017ee s katerim koli sistemom ERP ali MES, zato lahko nadgradite sisteme, ki \u017ee podpirajo va\u0161o proizvodnjo.<\/p>\n\n\n<p><a href=\"https:\/\/skyplanner.ai\/sl\/kontaktna-prodaja\/\">Rezervirajte predstavitev sistema SkyPlanner<\/a> ter pripravite eno proizvodno spremembo, ki jo je va\u0161a ekipa sprejela, in druga naro\u010dila, ki uporabljajo isti vir. Preverite, kako spremenjeno trajanje, proizvodni postopek ali razpolo\u017eljivost vpliva na terminski plan in katerim odlo\u010ditvam glede dobav se je treba posvetiti. \u010ce \u017eelite najprej sami raziskati pristop k planiranju, <a href=\"https:\/\/skyplanner.ai\/sl\/preizkus\/\">preizkusite SkyPlanner s predstavitvenimi podatki<\/a>.<\/p>\n\n<\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>Kaizen v proizvodnji: poskrbite, da se izbolj\u0161ave ohranijo Domov &raquo; Viri &raquo; Kaizen v proizvodnji: poskrbite, da se izbolj\u0161ave ohranijo Delavnica za izbolj\u0161ave se kon\u010da z bolje urejenim delovnim centrom, kraj\u0161o menjavo in ekipo, zadovoljno z dose\u017eenim. Nato se spremeni nabor izdelkov, delo prevzame druga izmena in stara te\u017eava se vrne. Zamisel je bila koristna, &#8230; <a title=\"Kaizen v proizvodnji: poskrbite, da se izbolj\u0161ave ohranijo\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/sl\/viri\/kaizen-v-proizvodnji\/\" aria-label=\"Read more about Kaizen v proizvodnji: poskrbite, da se izbolj\u0161ave ohranijo\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":110245,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[2539,302],"tags":[],"class_list":["post-110227","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-aps-in-terminiranje","category-viri","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Kaizen v proizvodnji: poskrbite, da se izbolj\u0161ave ohranijo<\/title>\n<meta name=\"description\" content=\"Ponavljajo\u010de se te\u017eave v proizvodnji spremenite v trajne izbolj\u0161ave. Preizkusite spremembo, ohranite bolj\u0161i na\u010din dela in koristi vklju\u010dite v proizvodni plan.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/sl\/viri\/kaizen-v-proizvodnji\/\" \/>\n<meta property=\"og:locale\" content=\"sl_SI\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Kaizen v proizvodnji: poskrbite, da se izbolj\u0161ave ohranijo\" \/>\n<meta property=\"og:description\" content=\"Ponavljajo\u010de se te\u017eave v proizvodnji spremenite v trajne izbolj\u0161ave. Preizkusite spremembo, ohranite bolj\u0161i na\u010din dela in koristi vklju\u010dite v proizvodni plan.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/sl\/viri\/kaizen-v-proizvodnji\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2026-10-25T20:19:32+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-25T20:20:59+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/kaizen-manufacturing-hero.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1672\" \/>\n\t<meta property=\"og:image:height\" content=\"941\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"12 minut\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/kaizen-v-proizvodnji\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/kaizen-v-proizvodnji\\\/\"},\"author\":{\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\"},\"headline\":\"Kaizen v proizvodnji: poskrbite, da se izbolj\u0161ave ohranijo\",\"datePublished\":\"2026-10-25T20:19:32+00:00\",\"dateModified\":\"2026-10-25T20:20:59+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/kaizen-v-proizvodnji\\\/\"},\"wordCount\":2449,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/kaizen-v-proizvodnji\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/kaizen-manufacturing-hero.png\",\"articleSection\":[\"APS in terminiranje\",\"viri\"],\"inLanguage\":\"sl-SI\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/kaizen-v-proizvodnji\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/kaizen-v-proizvodnji\\\/\",\"name\":\"Kaizen v proizvodnji: poskrbite, da se izbolj\u0161ave ohranijo\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/kaizen-v-proizvodnji\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/kaizen-v-proizvodnji\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/kaizen-manufacturing-hero.png\",\"datePublished\":\"2026-10-25T20:19:32+00:00\",\"dateModified\":\"2026-10-25T20:20:59+00:00\",\"description\":\"Ponavljajo\u010de se te\u017eave v proizvodnji spremenite v trajne izbolj\u0161ave. Preizkusite spremembo, ohranite bolj\u0161i na\u010din dela in koristi vklju\u010dite v proizvodni plan.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/kaizen-v-proizvodnji\\\/#breadcrumb\"},\"inLanguage\":\"sl-SI\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/kaizen-v-proizvodnji\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"sl-SI\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/kaizen-v-proizvodnji\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/kaizen-manufacturing-hero.png\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/kaizen-manufacturing-hero.png\",\"width\":1672,\"height\":941,\"caption\":\"Scattered tooling becomes an organized preparation trolley beside a bending cell for repeatable changeovers\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/kaizen-v-proizvodnji\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Kaizen v proizvodnji: poskrbite, da se izbolj\u0161ave ohranijo\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"sl-SI\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"sl-SI\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\",\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"sl-SI\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"caption\":\"Jussi M\u00e4ntyl\u00e4\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Kaizen v proizvodnji: poskrbite, da se izbolj\u0161ave ohranijo","description":"Ponavljajo\u010de se te\u017eave v proizvodnji spremenite v trajne izbolj\u0161ave. Preizkusite spremembo, ohranite bolj\u0161i na\u010din dela in koristi vklju\u010dite v proizvodni plan.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/sl\/viri\/kaizen-v-proizvodnji\/","og_locale":"sl_SI","og_type":"article","og_title":"Kaizen v proizvodnji: poskrbite, da se izbolj\u0161ave ohranijo","og_description":"Ponavljajo\u010de se te\u017eave v proizvodnji spremenite v trajne izbolj\u0161ave. Preizkusite spremembo, ohranite bolj\u0161i na\u010din dela in koristi vklju\u010dite v proizvodni plan.","og_url":"https:\/\/skyplanner.ai\/sl\/viri\/kaizen-v-proizvodnji\/","og_site_name":"SkyPlanner","article_published_time":"2026-10-25T20:19:32+00:00","article_modified_time":"2026-10-25T20:20:59+00:00","og_image":[{"width":1672,"height":941,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/kaizen-manufacturing-hero.png","type":"image\/png"}],"author":"Jussi M\u00e4ntyl\u00e4","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Jussi M\u00e4ntyl\u00e4","Est. reading time":"12 minut"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/sl\/viri\/kaizen-v-proizvodnji\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/sl\/viri\/kaizen-v-proizvodnji\/"},"author":{"name":"Jussi M\u00e4ntyl\u00e4","@id":"https:\/\/skyplanner.ai\/sl\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5"},"headline":"Kaizen v proizvodnji: poskrbite, da se izbolj\u0161ave ohranijo","datePublished":"2026-10-25T20:19:32+00:00","dateModified":"2026-10-25T20:20:59+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/sl\/viri\/kaizen-v-proizvodnji\/"},"wordCount":2449,"publisher":{"@id":"https:\/\/skyplanner.ai\/sl\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/sl\/viri\/kaizen-v-proizvodnji\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/kaizen-manufacturing-hero.png","articleSection":["APS in terminiranje","viri"],"inLanguage":"sl-SI"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/sl\/viri\/kaizen-v-proizvodnji\/","url":"https:\/\/skyplanner.ai\/sl\/viri\/kaizen-v-proizvodnji\/","name":"Kaizen v proizvodnji: poskrbite, da se izbolj\u0161ave ohranijo","isPartOf":{"@id":"https:\/\/skyplanner.ai\/sl\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/sl\/viri\/kaizen-v-proizvodnji\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/sl\/viri\/kaizen-v-proizvodnji\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/kaizen-manufacturing-hero.png","datePublished":"2026-10-25T20:19:32+00:00","dateModified":"2026-10-25T20:20:59+00:00","description":"Ponavljajo\u010de se te\u017eave v proizvodnji spremenite v trajne izbolj\u0161ave. Preizkusite spremembo, ohranite bolj\u0161i na\u010din dela in koristi vklju\u010dite v proizvodni plan.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/sl\/viri\/kaizen-v-proizvodnji\/#breadcrumb"},"inLanguage":"sl-SI","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/sl\/viri\/kaizen-v-proizvodnji\/"]}]},{"@type":"ImageObject","inLanguage":"sl-SI","@id":"https:\/\/skyplanner.ai\/sl\/viri\/kaizen-v-proizvodnji\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/kaizen-manufacturing-hero.png","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/kaizen-manufacturing-hero.png","width":1672,"height":941,"caption":"Scattered tooling becomes an organized preparation trolley beside a bending cell for repeatable changeovers"},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/sl\/viri\/kaizen-v-proizvodnji\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/sl\/"},{"@type":"ListItem","position":2,"name":"Kaizen v proizvodnji: poskrbite, da se izbolj\u0161ave ohranijo"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/sl\/#website","url":"https:\/\/skyplanner.ai\/sl\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/sl\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/sl\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"sl-SI"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/sl\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/sl\/","logo":{"@type":"ImageObject","inLanguage":"sl-SI","@id":"https:\/\/skyplanner.ai\/sl\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/sl\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]},{"@type":"Person","@id":"https:\/\/skyplanner.ai\/sl\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5","name":"Jussi M\u00e4ntyl\u00e4","image":{"@type":"ImageObject","inLanguage":"sl-SI","@id":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","caption":"Jussi M\u00e4ntyl\u00e4"}}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/kaizen-manufacturing-hero.png",1672,941,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/kaizen-manufacturing-hero-150x150.png",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/kaizen-manufacturing-hero-300x169.png",300,169,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/kaizen-manufacturing-hero-768x432.png",768,432,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/kaizen-manufacturing-hero-1024x576.png",1024,576,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/kaizen-manufacturing-hero-1536x864.png",1536,864,true],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/kaizen-manufacturing-hero.png",1672,941,false],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/kaizen-manufacturing-hero-360x203.png",360,203,true]},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/sl\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Kaizen v proizvodnji: poskrbite, da se izbolj\u0161ave ohranijo Domov &raquo; Viri &raquo; Kaizen v proizvodnji: poskrbite, da se izbolj\u0161ave ohranijo Delavnica za izbolj\u0161ave se kon\u010da z bolje urejenim delovnim centrom, kraj\u0161o menjavo in ekipo, zadovoljno z dose\u017eenim. Nato se spremeni nabor izdelkov, delo prevzame druga izmena in stara te\u017eava se vrne. Zamisel je bila koristna,&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/posts\/110227","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/comments?post=110227"}],"version-history":[{"count":1,"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/posts\/110227\/revisions"}],"predecessor-version":[{"id":110290,"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/posts\/110227\/revisions\/110290"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/media\/110245"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/media?parent=110227"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/categories?post=110227"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/tags?post=110227"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}