{"id":110044,"date":"2026-10-25T16:06:25","date_gmt":"2026-10-25T16:06:25","guid":{"rendered":"https:\/\/skyplanner.ai\/?p=110044"},"modified":"2026-10-25T16:07:52","modified_gmt":"2026-10-25T16:07:52","slug":"belezenje-casa-v-proizvodnji","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/sl\/viri\/belezenje-casa-v-proizvodnji\/","title":{"rendered":"Bele\u017eenje \u010dasa v proizvodnji: izkoristite dejanske ure"},"content":{"rendered":"<div class=\"gb-container gb-container-article01 article-main-content-container\">\n\n<h1 class=\"wp-block-heading\">Bele\u017eenje \u010dasa v proizvodnji: izkoristite dejanske ure<\/h1>\n\n<div class=\"gb-container gb-container-article02\">\n\n<p><a href=\"\/sl\/\">Domov<\/a> &raquo; <a href=\"https:\/\/skyplanner.ai\/sl\/viri\/\">Viri<\/a> &raquo; Bele\u017eenje \u010dasa v proizvodnji: izkoristite dejanske ure<\/p>\n\n\n<p class=\"yoast-reading-time__wrapper\"><span class=\"yoast-reading-time__icon\"><svg aria-hidden=\"true\" focusable=\"false\" data-icon=\"clock\" width=\"20\" height=\"20\" fill=\"none\" stroke=\"currentColor\" style=\"display:inline-block;vertical-align:-0.1em\" role=\"img\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewBox=\"0 0 24 24\"><path stroke-linecap=\"round\" stroke-linejoin=\"round\" stroke-width=\"2\" d=\"M12 8v4l3 3m6-3a9 9 0 11-18 0 9 9 0 0118 0z\"><\/path><\/svg><\/span><span class=\"yoast-reading-time__spacer\" style=\"display:inline-block;width:1em\"><\/span><span class=\"yoast-reading-time__descriptive-text\">Predviden \u010das branja: <\/span><span class=\"yoast-reading-time__reading-time\">10<\/span><span class=\"yoast-reading-time__time-unit\"> minut<\/span><\/p>\n\n<\/div>\n<div class=\"gb-container gb-container-article03\">\n\n<p>Vsi so zabele\u017eili polno izmeno, planerji pa \u0161e vedno ne znajo pojasniti, zakaj ponovljena operacija traja dlje od ocene. Nekatere ure so pripisane celotnemu naro\u010dilu, druge oddelku, operater, ki se spomni prekinitve, pa je \u017ee od\u0161el domov.<\/p>\n\n\n<p>Bele\u017eenje \u010dasa v proizvodnji naj bi odpravilo to negotovost. Dejanski \u010das pove\u017ee z nalogom in operacijo, pri kateri je delo potekalo, ter zagotovi dovolj podatkov za naslednjo odlo\u010ditev. Cilj ni zgolj obra\u010dunati v\u010deraj\u0161nje ure, temve\u010d odpraviti nenehno iskanje pojasnil in za jutri\u0161nje delo predvideti realnej\u0161e trajanje.<\/p>\n\n\n<p>SkyPlanner tako bele\u017eenje pove\u017ee s proizvodnim planom. Operaterji bele\u017eijo \u010das po operacijah, planerji lahko pregledajo dejanske \u010dase, podatki iz pretekle proizvodnje pa so podlaga za bolj\u0161e ocene trajanja posameznih korakov. Arcturus, umetna inteligenca za terminiranje v sistemu SkyPlanner, nato izra\u010duna, kako delo umestiti med druga naro\u010dila, ki potrebujejo iste kapacitete.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Kaj je bele\u017eenje \u010dasa v proizvodnji?<\/h2>\n\n\n<p>Bele\u017eenje \u010dasa v proizvodnji pomeni zapisovanje \u010dasa, porabljenega za proizvodno delo, in njegovo povezovanje s konkretnim nalogom ali operacijo naro\u010dila. Uporaben zapis pove, kaj je bilo opravljeno, kje je delo potekalo ter kateri dogodki dolo\u010dajo za\u010detek in konec merjenega \u010dasa. Koli\u010dine in podrobnosti o prekinitvah pomagajo pojasniti, kaj zabele\u017eeni \u010das dejansko zajema.<\/p>\n\n\n<p>S tem odgovarjamo na druga\u010dno vpra\u0161anje kot z evidenco prisotnosti. Podatek, da je bil nekdo prisoten vso izmeno, ne pove, koliko \u010dasa je trajalo upogibanje ali koliko \u010dasa bo potrebovala naslednja serija.<\/p>\n\n\n<p>Naslednje vrste \u010dasa obravnavajte lo\u010deno:<\/p>\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Vrsta \u010dasa<\/th><th>Kaj pove<\/th><th>\u010cesa sama po sebi ne pove<\/th><\/tr><\/thead><tbody><tr><td>\u010cas prisotnosti<\/td><td>Kako dolgo je bila oseba prisotna oziroma je imela evidentirano prisotnost<\/td><td>Za katere proizvodne operacije je bil ta \u010das porabljen<\/td><\/tr><tr><td>Zabele\u017eeni \u010das dela zaposlenih<\/td><td>Koliko ur dela zaposlenih je pripisanih operaciji ali dejavnosti<\/td><td>Kako dolgo je bil stroj zaseden<\/td><\/tr><tr><td>\u010cas delovanja stroja<\/td><td>Kako dolgo je oprema delovala<\/td><td>Koliko \u010dasa so vzeli nalaganje, priprava ali \u010dakanje, ki so vplivali na operacijo<\/td><\/tr><tr><td>Prete\u010deni \u010das operacije<\/td><td>\u010cas med opredeljenima za\u010detnim in kon\u010dnim dogodkom, vklju\u010dno z vmesnimi prekinitvami<\/td><td>Kolik\u0161en del tega obdobja je potekalo dejansko delo<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>\u010ce dve osebi skupaj delata eno uro, opravita dve uri dela. Stroj lahko deluje tudi takrat, ko njegov operater dela drugje. \u010ce bi vse zabele\u017eene ure se\u0161teli in za toliko \u010dasa naslednji\u010d rezervirali stroj, bi ure dela zaposlenih zamenjali s prete\u010denim \u010dasom operacije.<\/p>\n\n\n<p>Pred uvedbo novega sistema bele\u017eenja dolo\u010dite, na katero vpra\u0161anje morajo podatki odgovoriti. Za planiranje proizvodnje je obi\u010dajno klju\u010dno naslednje: koliko \u010dasa ta operacija potrebuje na virih, ki jo morajo izvesti?<\/p>\n\n\n<h2 class=\"wp-block-heading\">Vsak zapis \u010dasa pove\u017eite z nalogom in operacijo ter jasno dolo\u010dite, kaj pomeni<\/h2>\n\n\n<p>Za\u010dnite z eno ponavljajo\u010do se operacijo, pri kateri ocena trajanja redno povzro\u010da te\u017eave. Sledite zapisu od delovnega centra do osebe, ki posodobi naslednji plan. Kje postane njegov pomen nejasen?<\/p>\n\n\n<p>Sama \u0161tevilka naro\u010dila morda ne bo dovolj. Isto naro\u010dilo lahko vklju\u010duje razrez, upogibanje in monta\u017eo, pri \u010demer vsaka operacija potrebuje druge vire in traja razli\u010dno dolgo. \u010cas bele\u017eite na ravni operacije, da se prekora\u010ditev \u010dasa pri monta\u017ei ne izgubi v skupnem se\u0161tevku naro\u010dila.<\/p>\n\n\n<p>Pri bele\u017eenju ohranite naslednje podatke:<\/p>\n\n\n<ul class=\"wp-block-list\"><li>Oznako naloga ali naro\u010dila in konkretno operacijo.<\/li><li>Delovni center in osebo oziroma osebe, ki opravljajo delo.<\/li><li>Dogodke za\u010detka, prekinitve, nadaljevanja in zaklju\u010dka, kadar so relevantni.<\/li><li>Dokon\u010dano koli\u010dino in ustrezne podatke o seriji ali izdelku.<\/li><li>Pojasnilo prekinitve ali popravka, kadar ta vpliva na razlago zabele\u017eenega \u010dasa.<\/li><\/ul>\n\n\n<p>Z ljudmi, ki delo opravljajo, se dogovorite, kaj ti dogodki pomenijo. Ali za\u010detek operacije vklju\u010duje pripravo ali se obdelava za\u010dne \u0161ele po njej? Kaj se zgodi, ko se delo ustavi zaradi manjkajo\u010dega sestavnega dela? Kako se operacija preda naslednji izmeni? \u010ce imajo ekipe razli\u010dne odgovore, skupni \u010dasi ne bodo primerljivi, tudi \u010de bodo vsi vnosi popolni.<\/p>\n\n\n<p>Kadar se velikosti serij razlikujejo, naj bo pripravljalni \u010das razviden lo\u010deno. Majhna in velika serija lahko zahtevata podobno pripravo, a zelo razli\u010den \u010das obdelave. \u010ce oboje zdru\u017eite v en povpre\u010den \u010das na kos, se lahko zdi naslednje majhno naro\u010dilo precej manj zahtevno, kot je v resnici.<\/p>\n\n\n<p>Enako skrbno obravnavajte delo na ve\u010d strojih ali delo ve\u010d oseb. \u010ce en operater stre\u017ee ve\u010d strojem, se dogovorite, kako pripisati njegov \u010das, ne da bi isto uro njegovega dela \u0161teli ve\u010dkrat. \u010ce pri eni operaciji sodeluje ve\u010d ljudi, njihove ure dela lo\u010dite od prete\u010denega \u010dasa, ko je bil delovni center zaseden.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Bele\u017eenje naj bo del dela, ne obujanje spomina ob koncu tedna<\/h2>\n\n\n<p>Papirni obrazci in naknadno izpolnjene evidence ur so lahko izhodi\u0161\u010de, vendar od ljudi zahtevajo, da se spomnijo podrobnosti, ko te niso ve\u010d tako jasne. Zaokro\u017een se\u0161tevek, vnesen v petek, le redko pojasni kratko prekinitev v torek.<\/p>\n\n\n<p>Namesto tega uvedite kratek postopek bele\u017eenja dogodkov neposredno pri operaciji. V sistemu SkyPlanner lahko delavci v proizvodnji s funkcijo Timer pri svojih operacijah bele\u017eijo dogodke Start, Paused, Continued in Finished. Tako se \u010das pove\u017ee s korakom proizvodnega postopka, nadrejenemu pa pozneje ni treba ugotavljati, kateremu naro\u010dilu pripadajo ure brez jasne povezave.<\/p>\n\n\n<p>Postopek v praksi je preprost: izberite pravo operacijo, za\u010dnite bele\u017eiti ob dogovorjenem za\u010detku dela, bele\u017eenje prekinite, kadar to zahtevajo pravila, ga nadaljujte ob ponovnem za\u010detku dela in zaklju\u010dite, ko je operacija kon\u010dana. Pravila pojasnite na primeru dejanske operacije v delovnem centru, vklju\u010dno s prekinitvijo in predajo izmene. Prikaz zgolj neprekinjenega poteka dela ne razre\u0161i zahtevnej\u0161ih primerov.<\/p>\n\n\n<p>Posebno pozornost namenite izbiri prave operacije. Tudi povsem natan\u010dno izmerjen \u010das, pripisan napa\u010dni operaciji, poslab\u0161a oceno za obe operaciji. Preverite, ali delavci znajo prepoznati delo, ki ga izbirajo, in vedo, koga vpra\u0161ati, kadar oznaka ni jasna.<\/p>\n\n\n<p>Prav tu digitalno bele\u017eenje po operacijah zmanj\u0161a administrativno delo. Zapis je \u017ee povezan z delom, ki ga opisuje, zato je manj zbiranja obrazcev, razbiranja rokopisa in poizvedovanja, kateremu naro\u010dilu pripada dolo\u010den sklop ur. Dosledno bele\u017eenje je pomembnej\u0161e od izpolnjevanja vseh mo\u017enih polj.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Preden spremenite oceno, preglejte zapis<\/h2>\n\n\n<p>Predstavljajte si ponovljeno monta\u017eno operacijo, za katero sta za dolo\u010deno serijo predvideni pol ure priprave in dve uri obdelave. En operater za\u010dne ob 08:00, pripravo kon\u010da ob 08:30 in dela do 10:00. Nato se delo za pol ure ustavi zaradi manjkajo\u010dega sestavnega dela. Operater nadaljuje ob 10:30 in serijo dokon\u010da ob 11:00.<\/p>\n\n\n<p>\u010ce je bele\u017eenje med prekinitvijo za\u010dasno ustavljeno in je pripravljalni \u010das razviden lo\u010deno, zapis poka\u017ee tri razli\u010dne vidike:<\/p>\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Vidik operacije<\/th><th>\u010cas<\/th><th>Pomen za planiranje<\/th><\/tr><\/thead><tbody><tr><td>Od za\u010detka do zaklju\u010dka<\/td><td>Tri ure<\/td><td>Serija je bila dokon\u010dana tri ure po za\u010detku dela<\/td><\/tr><tr><td>Zabele\u017eeno delo, vklju\u010dno s pripravo<\/td><td>Dve uri in pol<\/td><td>Zabele\u017eeno delo je ustrezalo skupnemu predvidenemu \u010dasu priprave in obdelave<\/td><\/tr><tr><td>Prekinitev zaradi manjkajo\u010dega sestavnega dela<\/td><td>Pol ure<\/td><td>Preverite pripravljenost za delo in ali je delovni center ostal zaseden<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>\u010ce bi celotne tri ure \u0161teli kot \u010das obdelave, bi precenili trajanje ob naslednji izvedbi iste operacije. \u010ce pa bi prekinitev povsem prezrli, ne bi bilo razvidno, zakaj je serija do naslednje operacije pri\u0161la pozneje, kot je bilo pri\u010dakovano.<\/p>\n\n\n<p>Preverite, kaj se je med prekinitvijo dogajalo z delovnim centrom. Je bilo na njem mogo\u010de izvajati drugo operacijo ali je nedokon\u010dani sklop to prepre\u010deval? Odgovor vpliva na razpolo\u017eljive kapacitete, \u010deprav operater med prekinitvijo ni aktivno delal na tej seriji.<\/p>\n\n\n<p>Dalj\u0161i \u010das od za\u010detka do konca ni dokaz, da je operater delal neu\u010dinkovito. Pomeni, da je treba razjasniti zapis in razmere v proizvodnji. To storite, preden spremenite trajanje ali ocenjujete uspe\u0161nost dela.<\/p>\n\n\n<h2 class=\"wp-block-heading\">S preverjenimi dejanskimi \u010dasi natan\u010dneje ocenite trajanje ponavljajo\u010dih se operacij<\/h2>\n\n\n<p>Odstopanja preglejte, dokler jih udele\u017eeni \u0161e lahko pojasnijo. Preverite manjkajo\u010de zaklju\u010dke, prekrivajo\u010de se vnose, neverjetna trajanja in zapise, pripisane napa\u010dni operaciji. Ve\u010d koristi kot tedensko poro\u010dilo, polno nepojasnjenih odstopanj, prinese oseba, odgovorna za njihovo razre\u0161evanje.<\/p>\n\n\n<p>SkyPlanner omogo\u010da tak pregled na ve\u010d ravneh podrobnosti. Job Report prikazuje dejanski \u010das, zabele\u017een za operacijo, osebo in delovni center, ter pomaga primerjati planirano in dejansko trajanje operacij. All Timelogs Report prika\u017ee dogodke s \u010dasovnimi oznakami, iz katerih je sestavljen skupni \u010das. Order Item Report pa poka\u017ee \u0161e, kako je postavka naro\u010dila napredovala skozi proizvodnjo.<\/p>\n\n\n<p>S podrobnimi zapisi najprej pojasnite razliko, nato pa primerjajte ponovne izvedbe dela pod primerljivimi pogoji. Preverite operacijo, koli\u010dino v seriji, vir, na\u010din dela ter na\u010din upo\u0161tevanja priprave in prekinitev. Spremenjena sestava proizvodnega programa sama po sebi \u0161e ne pomeni po\u010dasnej\u0161ega procesa.<\/p>\n\n\n<p>Polje za \u010das koraka proizvodnega postopka v sistemu SkyPlanner vklju\u010duje funkcijo Graph, ki na podlagi preteklih podatkov oceni trajanje. Za to potrebuje podatke o preteklih naro\u010dilih. Planerji lahko tako prakti\u010dno uporabijo zbrane proizvodne izku\u0161nje, namesto da vedno znova prepisujejo optimisti\u010dno za\u010detno oceno.<\/p>\n\n\n<p>Pretekli podatki so uporabnej\u0161i, kadar zapisi opisujejo primerljivo delo. Oceno uporabite v kontekstu operacije, ki jo planirate; raznovrstnih \u010dasovnih zapisov operacij ne obravnavajte samoumevno kot uradni delovni normativ. <a href=\"https:\/\/skyplanner.ai\/sl\/viri\/merjenje-casa-v-proizvodnji\/\">Merjenje \u010dasa v proizvodnji<\/a> ima drug namen: dolo\u010diti normirani \u010das za natan\u010dno opredeljeno delo.<\/p>\n\n\n<p>Natan\u010dnej\u0161o oceno trajanja je treba vklju\u010diti tudi v <a href=\"https:\/\/skyplanner.ai\/sl\/viri\/kaj-je-terminiranje-proizvodnje\/\">celoten terminski plan proizvodnje<\/a>. V sistemu SkyPlanner dolo\u010dite korake proizvodnega postopka, trajanja, ustrezne delovne centre in odvisnosti. Arcturus razporedi delo glede na nastavljene kapacitete in prioritete, rezultat pa je prikazan na Ganttovem diagramu. Prioritete usmerjate sami, sprejete odlo\u010ditve pa ohranite s pravili in zaklepi.<\/p>\n\n\n<p>Koristi niso omejene na operacijo, ki jo pregledujete. Realnej\u0161e trajanje spremeni \u010das, ki na istem viru ostane za druge operacije, in dolo\u010da, kdaj se lahko za\u010dnejo naslednje operacije. SkyPlanner pri izra\u010dunu terminskega plana upo\u0161teva te povezave, zato je manj ro\u010dnega preurejanja zaporedja, ki bi sicer sledilo vsakemu popravku.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Nov na\u010din dela uvedite z usmerjenim pilotnim preizkusom v proizvodnji<\/h2>\n\n\n<p>Za\u010dnite s ponavljajo\u010do se operacijo, delovnim centrom, na katerem se obi\u010dajno izvaja, in ljudmi, ki njen \u010das bele\u017eijo in uporabljajo. Vklju\u010dite planerja, ki skrbi za oceno trajanja, in vodjo, ki lahko razjasni nepopolne zapise. Jasno pojasnite namen: manj naknadnega poizvedovanja po izmeni, pravi\u010dnej\u0161e primerjave in plan, ki odra\u017ea dejansko delo.<\/p>\n\n\n<p>Med pilotnim preizkusom spremljajte ve\u010d reprezentativnih izvedb, vklju\u010dno z obi\u010dajno prekinitvijo ali predajo dela. Preverite celoten potek:<\/p>\n\n\n<p>1. Ali lahko operater prepozna pravo operacijo in zanjo zabele\u017ei \u010das, ne da bi vsaki\u010d potreboval dodatno razlago?<\/p>\n\n\n<p>2. Ali dogodki, koli\u010dina in na\u010din upo\u0161tevanja priprave odra\u017eajo dejanski potek dela?<\/p>\n\n\n<p>3. Ali lahko vodja razjasni vpra\u0161ljiv vnos, dokler so podrobnosti \u0161e na voljo?<\/p>\n\n\n<p>4. Ali lahko planer primerja podobne izvedbe in pojasni, kaj je treba spremeniti pri naslednji oceni?<\/p>\n\n\n<p>5. Ali popravljeno trajanje omogo\u010da izvedljiv terminski plan ob upo\u0161tevanju drugih naro\u010dil?<\/p>\n\n\n<p>Spremljajte, ali porabite manj \u010dasa za pridobivanje manjkajo\u010dih vnosov ter ali je manj nepojasnjenih ali napa\u010dno pripisanih zapisov. Preverite tudi, ali novi na\u010din dela v delovnem centru zahteva nepotrebne korake. Nejasno oznako ali pravilo bele\u017eenja popravite, preden na\u010din dela raz\u0161irite na druge oddelke.<\/p>\n\n\n<p>Bele\u017eenje \u010dasa v proizvodnji pridobi zaupanje, ko ekipa vidi, da se podatki uporabljajo smiselno. \u010ce vsak zapis dalj\u0161ega trajanja vodi v obto\u017eevanje, imajo ljudje razlog za prikrivanje prekinitev. \u010ce pa zapisi pomagajo pravo\u010dasno pripraviti komponente in realno dolo\u010diti jutri\u0161njo obremenitev, je njihovo vrednost la\u017eje razumeti.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Izberite bele\u017eenje \u010dasa, ki pomaga pri naslednji odlo\u010ditvi v proizvodnji<\/h2>\n\n\n<p>Pri ocenjevanju programske opreme za bele\u017eenje \u010dasa v proizvodnji ne preverjajte le registracije prihoda na delo. Dobavitelja prosite, naj na primeru resni\u010dne operacije poka\u017ee celoten potek: od bele\u017eenja dogodkov prek primerjave planiranih in dejanskih \u010dasov do naslednjega terminskega plana. Vklju\u010dite prekinitev, druga\u010dno velikost serije in drugo naro\u010dilo, ki \u010daka na isti vir.<\/p>\n\n\n<p>Zato je SkyPlanner dobra izbira za proizvodna podjetja, ki potrebujejo tako dejanske \u010dase po operacijah kot terminiranje proizvodnje. \u010casovnik, poro\u010dila in ocenjevanje trajanja na podlagi preteklih podatkov imajo skupen namen: zagotoviti verodostojne podatke o \u010dasu, ki pomagajo pri planiranju dela in zahtevajo manj usklajevanja nepovezanih zapisov.<\/p>\n\n\n<p>Obdr\u017eite lahko tudi sisteme, s katerimi \u017ee vodite poslovanje. SkyPlanner se prek odprtega vmesnika REST API povezuje s katerim koli sistemom ERP ali MES, prek vmesnika API pa je mogo\u010de po\u0161iljati tudi \u010dasovne zapise. Pove\u017eite ustrezne proizvodne podatke, namesto da ro\u010dni prenos postane \u0161e ena stalna naloga.<\/p>\n\n\n<p><a href=\"https:\/\/skyplanner.ai\/sl\/zgodbe-strank\/piristeel\/\">Izku\u0161nja podjetja Piristeel<\/a> ka\u017ee prakti\u010dno vrednost tak\u0161nega pristopa. Proizvajalec stre\u0161nih varnostnih elementov se je prej zana\u0161al na preglednice in natisnjene delovne naloge, za pokalkulacijo pa je imel malo podatkov. S postopnim uvajanjem sistema SkyPlanner, ob so\u010dasnem razvoju sistema ERP in integraciji s sistemom Visma Nova, je povezal proizvodne podatke in podrobno terminiranje. Piristeel poro\u010da, da v proizvodnji porabijo manj delovnega \u010dasa za bele\u017eenje dela in poro\u010danje. Sprememba ni prinesla le popolnej\u0161e evidence \u010dasa, temve\u010d je olaj\u0161ala tudi uporabo proizvodnih podatkov pri vsakodnevnem vodenju.<\/p>\n\n\n<p><a href=\"https:\/\/skyplanner.ai\/sl\/kontaktna-prodaja\/\">Rezervirajte predstavitev sistema SkyPlanner<\/a> in pripravite primer ponavljajo\u010de se operacije, njeno trenutno oceno trajanja ter nekaj nedavnih \u010dasovnih zapisov. Vklju\u010dite tudi druge operacije, ki uporabljajo isti delovni center. Tako boste na konkretnem primeru videli, kako lahko jasnej\u0161i podatki o dejanskih \u010dasih izbolj\u0161ajo naslednjo oceno in z njo povezan plan. \u010ce \u017eelite sistem najprej raziskati sami, <a href=\"https:\/\/skyplanner.ai\/sl\/preizkus\/\">preizkusite SkyPlanner s predstavitvenimi podatki<\/a>.<\/p>\n\n<\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>Bele\u017eenje \u010dasa v proizvodnji: izkoristite dejanske ure Domov &raquo; Viri &raquo; Bele\u017eenje \u010dasa v proizvodnji: izkoristite dejanske ure Vsi so zabele\u017eili polno izmeno, planerji pa \u0161e vedno ne znajo pojasniti, zakaj ponovljena operacija traja dlje od ocene. Nekatere ure so pripisane celotnemu naro\u010dilu, druge oddelku, operater, ki se spomni prekinitve, pa je \u017ee od\u0161el domov. &#8230; <a title=\"Bele\u017eenje \u010dasa v proizvodnji: izkoristite dejanske ure\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/sl\/viri\/belezenje-casa-v-proizvodnji\/\" aria-label=\"Read more about Bele\u017eenje \u010dasa v proizvodnji: izkoristite dejanske ure\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":110056,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[2539,302],"tags":[],"class_list":["post-110044","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-aps-in-terminiranje","category-viri","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Bele\u017eenje \u010dasa v proizvodnji: izkoristite dejanske ure<\/title>\n<meta name=\"description\" content=\"Bele\u017eite \u010dase operacij za planiranje. Manj iskanja ur, primerjava dejanskih \u010dasov pod enakimi pogoji in realnej\u0161a trajanja ponovljenih operacij.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/sl\/viri\/belezenje-casa-v-proizvodnji\/\" \/>\n<meta property=\"og:locale\" content=\"sl_SI\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Bele\u017eenje \u010dasa v proizvodnji: izkoristite dejanske ure\" \/>\n<meta property=\"og:description\" content=\"Bele\u017eite \u010dase operacij za planiranje. Manj iskanja ur, primerjava dejanskih \u010dasov pod enakimi pogoji in realnej\u0161a trajanja ponovljenih operacij.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/sl\/viri\/belezenje-casa-v-proizvodnji\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2026-10-25T16:06:25+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-25T16:07:52+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/manufacturing-time-tracking-hero.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1672\" \/>\n\t<meta property=\"og:image:height\" content=\"941\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"11 minut\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/belezenje-casa-v-proizvodnji\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/belezenje-casa-v-proizvodnji\\\/\"},\"author\":{\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\"},\"headline\":\"Bele\u017eenje \u010dasa v proizvodnji: izkoristite dejanske ure\",\"datePublished\":\"2026-10-25T16:06:25+00:00\",\"dateModified\":\"2026-10-25T16:07:52+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/belezenje-casa-v-proizvodnji\\\/\"},\"wordCount\":2280,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/belezenje-casa-v-proizvodnji\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/manufacturing-time-tracking-hero.png\",\"articleSection\":[\"APS in terminiranje\",\"viri\"],\"inLanguage\":\"sl-SI\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/belezenje-casa-v-proizvodnji\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/belezenje-casa-v-proizvodnji\\\/\",\"name\":\"Bele\u017eenje \u010dasa v proizvodnji: izkoristite dejanske ure\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/belezenje-casa-v-proizvodnji\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/belezenje-casa-v-proizvodnji\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/manufacturing-time-tracking-hero.png\",\"datePublished\":\"2026-10-25T16:06:25+00:00\",\"dateModified\":\"2026-10-25T16:07:52+00:00\",\"description\":\"Bele\u017eite \u010dase operacij za planiranje. Manj iskanja ur, primerjava dejanskih \u010dasov pod enakimi pogoji in realnej\u0161a trajanja ponovljenih operacij.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/belezenje-casa-v-proizvodnji\\\/#breadcrumb\"},\"inLanguage\":\"sl-SI\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/belezenje-casa-v-proizvodnji\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"sl-SI\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/belezenje-casa-v-proizvodnji\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/manufacturing-time-tracking-hero.png\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/manufacturing-time-tracking-hero.png\",\"width\":1672,\"height\":941,\"caption\":\"A stopwatch beside a tagged assembly job links recorded time to specific production work\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/belezenje-casa-v-proizvodnji\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Bele\u017eenje \u010dasa v proizvodnji: izkoristite dejanske ure\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"sl-SI\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"sl-SI\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\",\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"sl-SI\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"caption\":\"Jussi M\u00e4ntyl\u00e4\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Bele\u017eenje \u010dasa v proizvodnji: izkoristite dejanske ure","description":"Bele\u017eite \u010dase operacij za planiranje. Manj iskanja ur, primerjava dejanskih \u010dasov pod enakimi pogoji in realnej\u0161a trajanja ponovljenih operacij.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/sl\/viri\/belezenje-casa-v-proizvodnji\/","og_locale":"sl_SI","og_type":"article","og_title":"Bele\u017eenje \u010dasa v proizvodnji: izkoristite dejanske ure","og_description":"Bele\u017eite \u010dase operacij za planiranje. Manj iskanja ur, primerjava dejanskih \u010dasov pod enakimi pogoji in realnej\u0161a trajanja ponovljenih operacij.","og_url":"https:\/\/skyplanner.ai\/sl\/viri\/belezenje-casa-v-proizvodnji\/","og_site_name":"SkyPlanner","article_published_time":"2026-10-25T16:06:25+00:00","article_modified_time":"2026-10-25T16:07:52+00:00","og_image":[{"width":1672,"height":941,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/manufacturing-time-tracking-hero.png","type":"image\/png"}],"author":"Jussi M\u00e4ntyl\u00e4","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Jussi M\u00e4ntyl\u00e4","Est. reading time":"11 minut"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/sl\/viri\/belezenje-casa-v-proizvodnji\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/sl\/viri\/belezenje-casa-v-proizvodnji\/"},"author":{"name":"Jussi M\u00e4ntyl\u00e4","@id":"https:\/\/skyplanner.ai\/sl\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5"},"headline":"Bele\u017eenje \u010dasa v proizvodnji: izkoristite dejanske ure","datePublished":"2026-10-25T16:06:25+00:00","dateModified":"2026-10-25T16:07:52+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/sl\/viri\/belezenje-casa-v-proizvodnji\/"},"wordCount":2280,"publisher":{"@id":"https:\/\/skyplanner.ai\/sl\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/sl\/viri\/belezenje-casa-v-proizvodnji\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/manufacturing-time-tracking-hero.png","articleSection":["APS in terminiranje","viri"],"inLanguage":"sl-SI"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/sl\/viri\/belezenje-casa-v-proizvodnji\/","url":"https:\/\/skyplanner.ai\/sl\/viri\/belezenje-casa-v-proizvodnji\/","name":"Bele\u017eenje \u010dasa v proizvodnji: izkoristite dejanske ure","isPartOf":{"@id":"https:\/\/skyplanner.ai\/sl\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/sl\/viri\/belezenje-casa-v-proizvodnji\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/sl\/viri\/belezenje-casa-v-proizvodnji\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/manufacturing-time-tracking-hero.png","datePublished":"2026-10-25T16:06:25+00:00","dateModified":"2026-10-25T16:07:52+00:00","description":"Bele\u017eite \u010dase operacij za planiranje. Manj iskanja ur, primerjava dejanskih \u010dasov pod enakimi pogoji in realnej\u0161a trajanja ponovljenih operacij.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/sl\/viri\/belezenje-casa-v-proizvodnji\/#breadcrumb"},"inLanguage":"sl-SI","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/sl\/viri\/belezenje-casa-v-proizvodnji\/"]}]},{"@type":"ImageObject","inLanguage":"sl-SI","@id":"https:\/\/skyplanner.ai\/sl\/viri\/belezenje-casa-v-proizvodnji\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/manufacturing-time-tracking-hero.png","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/manufacturing-time-tracking-hero.png","width":1672,"height":941,"caption":"A stopwatch beside a tagged assembly job links recorded time to specific production work"},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/sl\/viri\/belezenje-casa-v-proizvodnji\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/sl\/"},{"@type":"ListItem","position":2,"name":"Bele\u017eenje \u010dasa v proizvodnji: izkoristite dejanske ure"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/sl\/#website","url":"https:\/\/skyplanner.ai\/sl\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/sl\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/sl\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"sl-SI"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/sl\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/sl\/","logo":{"@type":"ImageObject","inLanguage":"sl-SI","@id":"https:\/\/skyplanner.ai\/sl\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/sl\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]},{"@type":"Person","@id":"https:\/\/skyplanner.ai\/sl\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5","name":"Jussi M\u00e4ntyl\u00e4","image":{"@type":"ImageObject","inLanguage":"sl-SI","@id":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","caption":"Jussi M\u00e4ntyl\u00e4"}}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/manufacturing-time-tracking-hero.png",1672,941,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/manufacturing-time-tracking-hero-150x150.png",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/manufacturing-time-tracking-hero-300x169.png",300,169,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/manufacturing-time-tracking-hero-768x432.png",768,432,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/manufacturing-time-tracking-hero-1024x576.png",1024,576,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/manufacturing-time-tracking-hero-1536x864.png",1536,864,true],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/manufacturing-time-tracking-hero.png",1672,941,false],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/manufacturing-time-tracking-hero-360x203.png",360,203,true]},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/sl\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Bele\u017eenje \u010dasa v proizvodnji: izkoristite dejanske ure Domov &raquo; Viri &raquo; Bele\u017eenje \u010dasa v proizvodnji: izkoristite dejanske ure Vsi so zabele\u017eili polno izmeno, planerji pa \u0161e vedno ne znajo pojasniti, zakaj ponovljena operacija traja dlje od ocene. Nekatere ure so pripisane celotnemu naro\u010dilu, druge oddelku, operater, ki se spomni prekinitve, pa je \u017ee od\u0161el domov.&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/posts\/110044","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/comments?post=110044"}],"version-history":[{"count":1,"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/posts\/110044\/revisions"}],"predecessor-version":[{"id":110106,"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/posts\/110044\/revisions\/110106"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/media\/110056"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/media?parent=110044"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/categories?post=110044"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/tags?post=110044"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}