{"id":109863,"date":"2026-10-25T12:08:29","date_gmt":"2026-10-25T12:08:29","guid":{"rendered":"https:\/\/skyplanner.ai\/?p=109863"},"modified":"2026-10-25T12:09:57","modified_gmt":"2026-10-25T12:09:57","slug":"metoda-5s","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/sl\/viri\/metoda-5s\/","title":{"rendered":"Metoda 5S v proizvodnji: kako ohraniti izbolj\u0161ave"},"content":{"rendered":"<div class=\"gb-container gb-container-article01 article-main-content-container\">\n\n<h1 class=\"wp-block-heading\">Metoda 5S v proizvodnji: kako ohraniti izbolj\u0161ave<\/h1>\n\n<div class=\"gb-container gb-container-article02\">\n\n<p><a href=\"\/sl\/\">Domov<\/a> &raquo; <a href=\"https:\/\/skyplanner.ai\/sl\/viri\/\">Viri<\/a> &raquo; Metoda 5S v proizvodnji: kako ohraniti izbolj\u0161ave<\/p>\n\n\n<p class=\"yoast-reading-time__wrapper\"><span class=\"yoast-reading-time__icon\"><svg aria-hidden=\"true\" focusable=\"false\" data-icon=\"clock\" width=\"20\" height=\"20\" fill=\"none\" stroke=\"currentColor\" style=\"display:inline-block;vertical-align:-0.1em\" role=\"img\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewBox=\"0 0 24 24\"><path stroke-linecap=\"round\" stroke-linejoin=\"round\" stroke-width=\"2\" d=\"M12 8v4l3 3m6-3a9 9 0 11-18 0 9 9 0 0118 0z\"><\/path><\/svg><\/span><span class=\"yoast-reading-time__spacer\" style=\"display:inline-block;width:1em\"><\/span><span class=\"yoast-reading-time__descriptive-text\">Predviden \u010das branja: <\/span><span class=\"yoast-reading-time__reading-time\">11<\/span><span class=\"yoast-reading-time__time-unit\"> minut<\/span><\/p>\n\n<\/div>\n<div class=\"gb-container gb-container-article03\">\n\n<p>Orodje ima ozna\u010deno mesto za shranjevanje. A ko ga naslednji operater potrebuje, ga tam ni. Nekdo ga i\u0161\u010de po sosednjih delovnih mizah, stroj \u010daka, vodja pa se spra\u0161uje, zakaj so prizadevanja za uvedbo metode 5S iz prej\u0161njega meseca \u017ee zvodenela.<\/p>\n\n\n<p>Cilj metode 5S v proizvodnji ni fotografija urejenega delovnega mesta. Cilj je delovno okolje, v katerem ljudje najdejo, kar potrebujejo, prepoznajo nepravilnosti in pustijo prostor pripravljen za naslednjo operacijo. Za to so potrebni prakti\u010dna razporeditev, dogovorjena rutina in \u010das za njeno ohranjanje.<\/p>\n\n\n<p>Pri tem zadnjem pomaga SkyPlanner. Kadar delovni center zaradi dogovorjenega \u010di\u0161\u010denja ali preurejanja ni na voljo, lahko ta \u010das vklju\u010dite v plan proizvodnje in delo za naro\u010dnike razporedite zunaj tega obdobja. Izbolj\u0161ava tako ni ve\u010d odvisna od proste vrzeli, za katero vsi upajo, da se bo pojavila med nujnimi naro\u010dili.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Kaj je metoda 5S v proizvodnji?<\/h2>\n\n\n<p>5S je metoda urejanja delovnega okolja, ki se uporablja v <a href=\"https:\/\/skyplanner.ai\/sl\/viri\/vitka-proizvodnja-ucinkovitost-odklenjena\/\">vitki proizvodnji<\/a>. Sestavlja jo pet povezanih praks: <strong>sortiranje, urejanje, \u010di\u0161\u010denje, standardizacija in ohranjanje<\/strong>. Ekipi skupaj pomagajo odstraniti nepotrebne predmete, olaj\u0161ati uporabo potrebnih pripomo\u010dkov, ohranjati prostor v jasno prepoznavnem stanju in vzdr\u017eevati tak na\u010din dela.<\/p>\n\n\n<p>Poimenovanje izhaja iz petih japonskih izrazov:<\/p>\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Praksa metode 5S<\/th><th>Japonski izraz<\/th><th>Vpra\u0161anje za prakso<\/th><\/tr><\/thead><tbody><tr><td>Sortiranje<\/td><td>Seiri<\/td><td>Kaj tukaj potrebujemo in kaj je treba odstraniti?<\/td><\/tr><tr><td>Urejanje<\/td><td>Seiton<\/td><td>Kam naj postavimo vsak potreben predmet, da bo delo la\u017eje?<\/td><\/tr><tr><td>\u010ci\u0161\u010denje<\/td><td>Seiso<\/td><td>Kako o\u010distimo prostor in prepoznamo odstopanja od obi\u010dajnega stanja?<\/td><\/tr><tr><td>Standardizacija<\/td><td>Seiketsu<\/td><td>Katero dogovorjeno razporeditev in rutino bodo upo\u0161tevale vse izmene?<\/td><\/tr><tr><td>Ohranjanje<\/td><td>Shitsuke<\/td><td>Kako bomo poskrbeli, da bo rutina ostala uporabna, in jo izbolj\u0161ali, ko se delo spremeni?<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>Ti koraki sodijo skupaj. Sortiranje brez rutine vra\u010danja predmetov sprosti prostor le za\u010dasno. Oznake brez uporabne razporeditve pomenijo dodatno hojo. \u010ce \u010distimo, ne da bi odpravili vir ponavljajo\u010de se umazanije, moramo isto delo opravljati znova in znova.<\/p>\n\n\n<p>Metodo 5S obravnavajte kot na\u010din, s katerim zaposleni sami izbolj\u0161ujejo svoje delovno okolje, ne kot lo\u010den program nadzora, ki jim je vsiljen. Merilo je, ali vsakdanje delo postane la\u017eje, ne pa, ali je na vsaki razpolo\u017eljivi povr\u0161ini oznaka.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Za\u010dnite z enim delovnim obmo\u010djem in eno dejansko izgubo<\/h2>\n\n\n<p>Za pilotni projekt izberite jasno omejeno obmo\u010dje: obdelovalno celico, monta\u017eno mizo ali pakirno mesto, kjer iskanje, navlaka ali nejasna mesta za shranjevanje redno prekinjajo delo. Meje dolo\u010dite dovolj jasno, da bo ekipa lahko spremenila razporeditev in jo tudi vzdr\u017eevala.<\/p>\n\n\n<p>Z operaterji iz izmen, ki uporabljajo obmo\u010dje, preglejte potek dejanskih operacij. Vpra\u0161ajte jih, kaj i\u0161\u010dejo, kam segajo, kaj jih ovira in pri iskanju \u010desa morajo prositi za pomo\u010d. \u010ce na rezultat vpliva tudi delo zaposlenih, ki obmo\u010dje oskrbujejo, \u010distijo ali vzdr\u017eujejo, vklju\u010dite \u0161e njih.<\/p>\n\n\n<p>Zabele\u017eite preprosto izhodi\u0161\u010dno stanje. Med zna\u010dilnimi menjavami lahko opazujete \u010das, porabljen za iskanje potrebnih orodij, pre\u0161tejete zamike pri za\u010detku dela zaradi manjkajo\u010dih predmetov ali zabele\u017eite, kako pogosto material kon\u010da na napa\u010dnem mestu. Pri poznej\u0161em pregledu pilotnega projekta uporabite enako opredelitev merila. Cilja prihrankov ne postavljajte, dokler ne razumete izgube.<\/p>\n\n\n<p>Dogovorite se, kdo je odgovoren za pilotni projekt, kdo lahko odobri spremembe in kdaj bo delo potekalo. Razporeditev naj sooblikujejo operaterji, vodja pa mora zagotoviti \u010das in podporo, da se bo obdr\u017eala. \u010ce je za projekt odgovoren le oddelek za izbolj\u0161ave, ga zaposleni pri vsakodnevnem delu v proizvodnji zlahka prezrejo.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Pet praks prilagodite dejanskemu poteku dela<\/h2>\n\n\n<h3 class=\"wp-block-heading\">1. Sortiranje: odlo\u010dite se, kaj sodi sem, namesto da navlako le prestavljate<\/h3>\n\n\n<p>Preglejte predmete na obmo\u010dju pilotnega projekta. Kar potrebujete za sedanje delo, lo\u010dite od zastarelih navodil, po\u0161kodovanih orodij, odve\u010dnih zabojnikov in stvari, ki sodijo drugam. Upo\u0161tevajte celoten nabor izdelkov: vpenjalna priprava za ob\u010dasno naro\u010dilo ni nepotrebna samo zato, ker je v\u010deraj nih\u010de ni uporabljal.<\/p>\n\n\n<p>Pri predmetih, za katere odlo\u010ditev \u0161e ni jasna, lahko pomaga za\u010dasno odlagalno mesto z rde\u010dimi oznakami. Za vsak predmet dolo\u010dite osebo, odgovorno za odlo\u010ditev, in datum pregleda, da za\u010dasno odlagali\u0161\u010de ne postane trajno skladi\u0161\u010de. Odlo\u010ditev je lahko vrnitev, premestitev, popravilo ali odstranitev po odobrenem postopku.<\/p>\n\n\n<p>Za izdelke, zadr\u017eane zaradi preverjanja kakovosti, zahteve glede sledljivosti, nadzorovano dokumentacijo in nevarne snovi \u0161e naprej uporabljajte obstoje\u010de nadzorne postopke. Akcija sortiranja nikomur ne daje pooblastila, da zavr\u017ee potrebno merilo ali neidentificirane kose pome\u0161a z uporabno zalogo.<\/p>\n\n\n<p>Koristen rezultat je manj navlake, ki ovira delo, in jasna odlo\u010ditev za vsak odstranjeni predmet. \u010ce vse prestavite v sosednji oddelek, ste le prestavili te\u017eavo.<\/p>\n\n\n<h3 class=\"wp-block-heading\">2. Urejanje: predmete razporedite tako, da jih bo preprosto uporabljati in vra\u010dati<\/h3>\n\n\n<p>Pogosto uporabljene predmete postavite tja, kjer jih pri delu potrebujete, na varno in priro\u010dno dosegljivo mesto. Redkeje uporabljeno opremo shranite tako, da ostane prepoznavna in dostopna, ne da bi zapolnila delovno obmo\u010dje. O tem se odlo\u010dajte skupaj z uporabniki orodij, ne na podlagi na videz urejenega na\u010drta, pripravljenega drugje.<\/p>\n\n\n<p>Jasno dolo\u010dena mesta za shranjevanje, oznake ali obrise uporabite tam, kjer pomagajo prepoznati pravi predmet in opaziti, kaj manjka. Pri potro\u0161nem materialu se dogovorite o ustrezni koli\u010dini in o tem, kaj spro\u017ei dopolnitev zaloge. Oznaka na zaboju ga \u0161e ne napolni.<\/p>\n\n\n<p>Predlagano razporeditev preizkusite pri dejanski operaciji. Ali lahko operater dobi potrebni predmet brez odve\u010dnega iskanja ali premikanja? Ali ga lahko nekdo iz naslednje izmene vrne na pravo mesto? Ali je za predmete, ki \u010dakajo na preverjanje stanja, predvideno lo\u010deno mesto, da jih ni mogo\u010de zamenjati z opremo, pripravljeno za uporabo?<\/p>\n\n\n<p>\u010ce si orodje deli ve\u010d delovnih centrov, se dogovorite, kako bodo zaposleni vedeli, kdo ga ima in kdaj bo vrnjeno. Dobro ozna\u010deno prazno mesto poka\u017ee, da orodja ni, ne razre\u0161i pa prekrivajo\u010dih se rezervacij. To je lo\u010deno <a href=\"https:\/\/skyplanner.ai\/sl\/viri\/upravljanje-orodij\/\">vpra\u0161anje upravljanja orodij<\/a>.<\/p>\n\n\n<h3 class=\"wp-block-heading\">3. \u010ci\u0161\u010denje: o\u010distite, da te\u017eave postanejo vidne<\/h3>\n\n\n<p>Dolo\u010dite, kaj je treba o\u010distiti, kdo to opravi, kdaj in v kak\u0161nem stanju mora prostor pustiti. Uporabljajte odobrene metode in varnostne postopke za posamezno opremo. Pri delih, ki zahtevajo zaustavitev, izolacijo virov energije ali dostop usposobljenega strokovnjaka, je treba te postopke upo\u0161tevati. Metoda 5S jih ne spremeni v naloge, ki jih lahko med obratovanjem opravi kdorkoli.<\/p>\n\n\n<p>\u010ci\u0161\u010denje je tudi prilo\u017enost, da ekipa opazi nepravilnosti, kot so pu\u0161\u010danje, po\u0161kodbe ali nenavadno nabiranje oblog. Dogovorite se, kako bodo ugotovitve pri\u0161le do osebe, odgovorne za ukrepanje. Od osebe, ki \u010disti, ne pri\u010dakujte, da bo ugotavljala vzroke napak ali izvajala popravila, za katera nima pooblastil.<\/p>\n\n\n<p>\u010ce se ista umazanija nenehno vra\u010da, razi\u0161\u010dite njen vir, namesto da vedno znova podalj\u0161ujete kontrolni seznam za \u010di\u0161\u010denje. Vzpostavitev ustreznega stanja je koristna; odprava vzroka za njegovo slab\u0161anje pa lahko olaj\u0161a ohranjanje rutine.<\/p>\n\n\n<h3 class=\"wp-block-heading\">4. Standardizacija: dogovorjeni na\u010din dela naj bo uporaben v vsaki izmeni<\/h3>\n\n\n<p>Razporeditev in rutino dokumentirajte v obliki, ki jo zaposleni lahko uporabljajo v delovnem centru. Jedrnat vizualni standard lahko prika\u017ee mesta za shranjevanje, koli\u010dine, mesta \u010di\u0161\u010denja in pri\u010dakovano stanje ob predaji izmene. Fotografija je lahko v pomo\u010d, vendar mora prikazovati uporabno ureditev, ne prizora, pripravljenega le za fotografiranje.<\/p>\n\n\n<p>Odgovornosti dolo\u010dite konkretno. Navodilo \u00bbSkrbite za urejenost prostora\u00ab je manj u\u010dinkovito kot dogovor o tem, kdo vra\u010da skupno opremo, kdo dopolnjuje zaboj in kdo ukrepa ob po\u0161kodovanem ali manjkajo\u010dem predmetu. Dolo\u010dite, kdaj se rutina izvaja in kam se sporo\u010dajo nere\u0161ene te\u017eave.<\/p>\n\n\n<p>Standard preizkusite z nekom, ki ni sodeloval pri njegovem oblikovanju. \u010ce potrebuje razlago pri vsakem koraku, izbolj\u0161ajte navodila ali razporeditev. V usposabljanje vklju\u010dite vse zadevne izmene in dolo\u010dite, kdo je odgovoren za posodobitev standarda ob spremembah nabora izdelkov, opreme ali na\u010dina dela.<\/p>\n\n\n<h3 class=\"wp-block-heading\">5. Ohranjanje: odpravljajte ovire, ne ostanite le pri bele\u017eenju neskladnosti<\/h3>\n\n\n<p>V redno delo vodij vklju\u010dite kratek pregled. Skupaj z uporabniki si oglejte delovno obmo\u010dje in vpra\u0161ajte, kaj je postalo te\u017eko vzdr\u017eevati. Orodje, pu\u0161\u010deno na mizi, je lahko posledica nepriro\u010dnega mesta za vra\u010danje, nejasnega pravila skupne uporabe ali po\u0161kodovanega dr\u017eala. Vsak od teh vzrokov zahteva druga\u010den odziv.<\/p>\n\n\n<p>Presoja ali kontrolni seznam lahko razkrije odstopanje od dogovorjenega stanja, a koristen rezultat je ukrep z dolo\u010deno odgovorno osebo, ki mu sledi preverjanje, ali je pomagal. Bolj\u0161a ocena ne odtehta tega, da operaterji \u0161e vedno i\u0161\u010dejo iste predmete.<\/p>\n\n\n<p>Dogovorjeno rutino ohranite tudi v obdobjih najve\u010dje obremenitve. \u010ce jo ekipa redno izpu\u0161\u010da, ker plan proizvodnje zapolni vsako razpolo\u017eljivo minuto, razre\u0161ite ta konflikt pri planiranju. Pozivanje k ve\u010dji disciplini ne bo ustvarilo manjkajo\u010dega \u010dasa.<\/p>\n\n\n<h2 class=\"wp-block-heading\">V proizvodnem planu jasno prika\u017eite \u010das za 5S<\/h2>\n\n\n<p>Nekatere izbolj\u0161ave lahko izvedete brez ustavitve stroja. Za druge potrebujete dolo\u010den termin: za pospravljanje celice, premestitev opreme ali dogovorjeno \u010di\u0161\u010denje, med katerim delovni center ni na voljo. Upo\u0161tevajte to razliko, namesto da za vsako manj\u0161o dejavnost rezervirate celotno izmeno ali predpostavljate, da skrb za urejenost ne zahteva \u010dasa in virov.<\/p>\n\n\n<p>Pri tem <strong>SkyPlanner APS olaj\u0161a vzdr\u017eevanje metode 5S ob hkratnem izpolnjevanju naro\u010dil kupcev<\/strong>. Med izjemami za delovne centre sta tudi <strong>\u010ci\u0161\u010denje<\/strong> in <strong>Premestitev\/urejanje<\/strong>, ki jima dolo\u010dite opis in \u010dasovni razpon. Dogovorjeno obdobje nerazpolo\u017eljivosti vnesite za zadevni delovni center, da te ure ne bodo obravnavane kot proste proizvodne kapacitete.<\/p>\n\n\n<p>Arcturus, umetna inteligenca za terminiranje v sistemu SkyPlanner, ponovno izra\u010duna proizvodni razpored ob upo\u0161tevanju te nerazpolo\u017eljivosti. Ganttov diagram prika\u017ee novo zaporedje, vklju\u010dno z delom, ki je povezano prek naslednjih operacij. Tako lahko preverite posledice za dobavo, ne da bi ro\u010dno sestavljali nova zaporedja operacij za posamezne stroje.<\/p>\n\n\n<p>Vi dolo\u010dite prioritete in odobreni termin, Arcturus pa opravi izra\u010dun razporeda. \u010ce novi plan razkrije neskladje, se lahko premi\u0161ljeno odlo\u010dite o terminu, razpolo\u017eljivih virih ali zavezi kupcu, namesto da bi skrb za urejenost ostala zunaj razporeda. Lo\u010deno upo\u0161tevajte tudi zaposlene in druge vire, ki medtem niso na voljo za proizvodnjo: \u010de za stroj vnesete izjemo, ista ekipa za ta \u010das ne sme ostati razporejena na drugo operacijo drugje.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Primer: obdelovalna celica, ki ostaja pripravljena na naslednjo operacijo<\/h3>\n\n\n<p>Predstavljajte si obdelovalno celico, v kateri operaterji vedno znova i\u0161\u010dejo orodja za pripravo stroja med pome\u0161anim orodjem in odve\u010dnimi posodami. Pilotna ekipa razvrsti predmete glede na to, kaj sodi v celico, potrebna orodja razporedi na mesta uporabe ter se dogovori, kako jih bo vra\u010dala in preverjala za naslednjo izmeno. O merilu, katerega ustreznost je vpra\u0161ljiva, odlo\u010di odgovorna oseba za kakovost; ne kon\u010da kar med odpadki.<\/p>\n\n\n<p>Ekipa se dogovori tudi za termin preureditve in \u010di\u0161\u010denja celice, med katerim delovni center ne bo na voljo. Planer ta termin vnese v SkyPlanner in ponovno izra\u010duna razpored. Naro\u010dilo, ki zahteva obdelavo v celici in nato kontrolo, je zdaj treba razporediti ob upo\u0161tevanju prekinitve, skupaj z drugim delom, ki potrebuje iste vire.<\/p>\n\n\n<p>Vodja pregleda rezultat, preden potrdi termin. \u010ce ta vpliva na pomembno dobavo, lahko ekipa znova pretehta odobreni termin ali drugo izvedljivo re\u0161itev v proizvodnji. Po dogovoru je obdobje nerazpolo\u017eljivosti vklju\u010deno v skupni plan, zato operaterjem ni treba izbirati med naslednjo operacijo in dogovorjenim delom za izbolj\u0161ave.<\/p>\n\n\n<p>Ekipa nato preveri, ali se orodja vra\u010dajo na svoje mesto in ali lahko naslednja izmena za\u010dne delo, ne da bi morala orodje iskati kot prej. \u010ce ureditev ne deluje, jo spremeni. Izbolj\u0161ave v delovnem okolju so rezultat izvajanja metode 5S v ekipi; SkyPlanner pa \u010das, potreben za to delo, usklajuje s preostalo proizvodnjo.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Izmerite, ali je delo postalo la\u017eje<\/h2>\n\n\n<p>Vrnite se k izgubam, zaradi katerih ste se odlo\u010dili za pilotni projekt. Primerjajte reprezentativne operacije pred spremembo in po njej ter upo\u0161tevajte razlike v naboru izdelkov in delovnih pogojih. Kraj\u0161e iskanje pri preprosti operaciji \u0161e ne dokazuje enake izbolj\u0161ave pri vsaki menjavi.<\/p>\n\n\n<p>Pri pregledu se osredoto\u010dite na nekaj koristnih vpra\u0161anj:<\/p>\n\n\n<ul class=\"wp-block-list\"><li>Ali zaposleni najdejo in vrnejo potrebne predmete, ne da bi morali spra\u0161evati sodelavce?<\/li><li>Ali manjkajo\u010di, zalo\u017eeni ali nepreverjeni predmeti \u0161e vedno zadr\u017eujejo za\u010detke dela ali menjave?<\/li><li>Ali sta \u010di\u0161\u010denje in vra\u010danje predmetov opravljena v za to predvidenem \u010dasu?<\/li><li>Ali informacije o odstopanjih dose\u017eejo nekoga, ki ukrepa?<\/li><li>Ali ureditev deluje tudi v razli\u010dnih izmenah, ob odsotnostih in v obdobjih pove\u010dane proizvodne obremenitve?<\/li><\/ul>\n\n\n<p>Ugotovitve presoj naj pomagajo pri odgovorih na ta vpra\u0161anja, ne pa jih nadomestijo. Nizka ocena naj vodi k razumevanju te\u017eav in njihovemu odpravljanju; visoka ocena pa ne sme kon\u010dati razprave o razporeditvi, ki ote\u017euje delo.<\/p>\n\n\n<p>Pristop raz\u0161irite, ko dogovorjeni na\u010din dela deluje ob obi\u010dajnih obremenitvah in zna ekipa pojasniti, zakaj. Na naslednje obmo\u010dje prenesite pridobljeno znanje, ne nujno enake razporeditve odlagalnih mest ali enakih intervalov \u010di\u0161\u010denja. Razli\u010dna dela zahtevajo razli\u010dne ureditve.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Izbolj\u0161ave delovnega okolja uskladite s proizvodnim razporedom<\/h2>\n\n\n<p>Metoda 5S omogo\u010da, da je potrebno delo la\u017eje prepoznati in opraviti. Zmanj\u0161a lahko \u010das, izgubljen zaradi iskanja, nepotrebnega premikanja in ponavljajo\u010dega se nereda. Vendar se ohrani le, \u010de jo zaposleni, ki uporabljajo delovno obmo\u010dje, vzamejo za svojo in \u010de ji proizvodnja nameni \u010das.<\/p>\n\n\n<p>Izberite SkyPlanner, kadar je najve\u010dji izziv uskladiti dogovorjeni \u010das z naro\u010dili kupcev. Termini \u010di\u0161\u010denja in preurejanja sodijo v isti plan kapacitet kot delo, na katero vplivajo. Arcturus poskrbi za ponovno terminiranje povezanih operacij, zato imate manj dela s popravljanjem njihovih zaporedij in jasnej\u0161o podlago za odlo\u010ditve o dobavi.<\/p>\n\n\n<p><a href=\"https:\/\/skyplanner.ai\/sl\/kontaktna-prodaja\/\">Rezervirajte predstavitev sistema SkyPlanner<\/a> za prikaz na primeru enega dogovorjenega termina za \u010di\u0161\u010denje ali urejanje in naro\u010dila, ki se izvaja na zadevnem delovnem centru. Oglejte si, kako se spremeni proizvodno zaporedje in kaj prekinitev pomeni za naslednje operacije in dobavo. \u010ce \u017eelite najprej sami raziskati okolje za planiranje, <a href=\"https:\/\/skyplanner.ai\/sl\/preizkus\/\">preizkusite SkyPlanner s predstavitvenimi podatki<\/a>.<\/p>\n\n<\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>Metoda 5S v proizvodnji: kako ohraniti izbolj\u0161ave Domov &raquo; Viri &raquo; Metoda 5S v proizvodnji: kako ohraniti izbolj\u0161ave Orodje ima ozna\u010deno mesto za shranjevanje. A ko ga naslednji operater potrebuje, ga tam ni. Nekdo ga i\u0161\u010de po sosednjih delovnih mizah, stroj \u010daka, vodja pa se spra\u0161uje, zakaj so prizadevanja za uvedbo metode 5S iz prej\u0161njega &#8230; <a title=\"Metoda 5S v proizvodnji: kako ohraniti izbolj\u0161ave\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/sl\/viri\/metoda-5s\/\" aria-label=\"Read more about Metoda 5S v proizvodnji: kako ohraniti izbolj\u0161ave\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":109875,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[2539,302],"tags":[],"class_list":["post-109863","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-aps-in-terminiranje","category-viri","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Metoda 5S v proizvodnji: kako ohraniti izbolj\u0161ave<\/title>\n<meta name=\"description\" content=\"Metoda 5S v proizvodnji ni le enkratno \u010di\u0161\u010denje. Skraj\u0161ajte iskanje, krepite odgovornost operaterjev in v planu proizvodnje zagotovite \u010das za ohranjanje reda.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/sl\/viri\/metoda-5s\/\" \/>\n<meta property=\"og:locale\" content=\"sl_SI\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Metoda 5S v proizvodnji: kako ohraniti izbolj\u0161ave\" \/>\n<meta property=\"og:description\" content=\"Metoda 5S v proizvodnji ni le enkratno \u010di\u0161\u010denje. Skraj\u0161ajte iskanje, krepite odgovornost operaterjev in v planu proizvodnje zagotovite \u010das za ohranjanje reda.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/sl\/viri\/metoda-5s\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2026-10-25T12:08:29+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-25T12:09:57+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/5s-manufacturing-hero.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1672\" \/>\n\t<meta property=\"og:image:height\" content=\"941\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"12 minut\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/metoda-5s\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/metoda-5s\\\/\"},\"author\":{\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\"},\"headline\":\"Metoda 5S v proizvodnji: kako ohraniti izbolj\u0161ave\",\"datePublished\":\"2026-10-25T12:08:29+00:00\",\"dateModified\":\"2026-10-25T12:09:57+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/metoda-5s\\\/\"},\"wordCount\":2346,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/metoda-5s\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/5s-manufacturing-hero.png\",\"articleSection\":[\"APS in terminiranje\",\"viri\"],\"inLanguage\":\"sl-SI\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/metoda-5s\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/metoda-5s\\\/\",\"name\":\"Metoda 5S v proizvodnji: kako ohraniti izbolj\u0161ave\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/metoda-5s\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/metoda-5s\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/5s-manufacturing-hero.png\",\"datePublished\":\"2026-10-25T12:08:29+00:00\",\"dateModified\":\"2026-10-25T12:09:57+00:00\",\"description\":\"Metoda 5S v proizvodnji ni le enkratno \u010di\u0161\u010denje. Skraj\u0161ajte iskanje, krepite odgovornost operaterjev in v planu proizvodnje zagotovite \u010das za ohranjanje reda.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/metoda-5s\\\/#breadcrumb\"},\"inLanguage\":\"sl-SI\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/metoda-5s\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"sl-SI\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/metoda-5s\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/5s-manufacturing-hero.png\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/5s-manufacturing-hero.png\",\"width\":1672,\"height\":941,\"caption\":\"Organized tools above a clear workbench show a practical 5S arrangement for use and return\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/metoda-5s\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Metoda 5S v proizvodnji: kako ohraniti izbolj\u0161ave\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"sl-SI\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"sl-SI\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\",\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"sl-SI\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"caption\":\"Jussi M\u00e4ntyl\u00e4\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Metoda 5S v proizvodnji: kako ohraniti izbolj\u0161ave","description":"Metoda 5S v proizvodnji ni le enkratno \u010di\u0161\u010denje. Skraj\u0161ajte iskanje, krepite odgovornost operaterjev in v planu proizvodnje zagotovite \u010das za ohranjanje reda.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/sl\/viri\/metoda-5s\/","og_locale":"sl_SI","og_type":"article","og_title":"Metoda 5S v proizvodnji: kako ohraniti izbolj\u0161ave","og_description":"Metoda 5S v proizvodnji ni le enkratno \u010di\u0161\u010denje. Skraj\u0161ajte iskanje, krepite odgovornost operaterjev in v planu proizvodnje zagotovite \u010das za ohranjanje reda.","og_url":"https:\/\/skyplanner.ai\/sl\/viri\/metoda-5s\/","og_site_name":"SkyPlanner","article_published_time":"2026-10-25T12:08:29+00:00","article_modified_time":"2026-10-25T12:09:57+00:00","og_image":[{"width":1672,"height":941,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/5s-manufacturing-hero.png","type":"image\/png"}],"author":"Jussi M\u00e4ntyl\u00e4","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Jussi M\u00e4ntyl\u00e4","Est. reading time":"12 minut"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/sl\/viri\/metoda-5s\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/sl\/viri\/metoda-5s\/"},"author":{"name":"Jussi M\u00e4ntyl\u00e4","@id":"https:\/\/skyplanner.ai\/sl\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5"},"headline":"Metoda 5S v proizvodnji: kako ohraniti izbolj\u0161ave","datePublished":"2026-10-25T12:08:29+00:00","dateModified":"2026-10-25T12:09:57+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/sl\/viri\/metoda-5s\/"},"wordCount":2346,"publisher":{"@id":"https:\/\/skyplanner.ai\/sl\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/sl\/viri\/metoda-5s\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/5s-manufacturing-hero.png","articleSection":["APS in terminiranje","viri"],"inLanguage":"sl-SI"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/sl\/viri\/metoda-5s\/","url":"https:\/\/skyplanner.ai\/sl\/viri\/metoda-5s\/","name":"Metoda 5S v proizvodnji: kako ohraniti izbolj\u0161ave","isPartOf":{"@id":"https:\/\/skyplanner.ai\/sl\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/sl\/viri\/metoda-5s\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/sl\/viri\/metoda-5s\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/5s-manufacturing-hero.png","datePublished":"2026-10-25T12:08:29+00:00","dateModified":"2026-10-25T12:09:57+00:00","description":"Metoda 5S v proizvodnji ni le enkratno \u010di\u0161\u010denje. Skraj\u0161ajte iskanje, krepite odgovornost operaterjev in v planu proizvodnje zagotovite \u010das za ohranjanje reda.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/sl\/viri\/metoda-5s\/#breadcrumb"},"inLanguage":"sl-SI","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/sl\/viri\/metoda-5s\/"]}]},{"@type":"ImageObject","inLanguage":"sl-SI","@id":"https:\/\/skyplanner.ai\/sl\/viri\/metoda-5s\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/5s-manufacturing-hero.png","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/5s-manufacturing-hero.png","width":1672,"height":941,"caption":"Organized tools above a clear workbench show a practical 5S arrangement for use and return"},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/sl\/viri\/metoda-5s\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/sl\/"},{"@type":"ListItem","position":2,"name":"Metoda 5S v proizvodnji: kako ohraniti izbolj\u0161ave"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/sl\/#website","url":"https:\/\/skyplanner.ai\/sl\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/sl\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/sl\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"sl-SI"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/sl\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/sl\/","logo":{"@type":"ImageObject","inLanguage":"sl-SI","@id":"https:\/\/skyplanner.ai\/sl\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/sl\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]},{"@type":"Person","@id":"https:\/\/skyplanner.ai\/sl\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5","name":"Jussi M\u00e4ntyl\u00e4","image":{"@type":"ImageObject","inLanguage":"sl-SI","@id":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","caption":"Jussi M\u00e4ntyl\u00e4"}}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/5s-manufacturing-hero.png",1672,941,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/5s-manufacturing-hero-150x150.png",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/5s-manufacturing-hero-300x169.png",300,169,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/5s-manufacturing-hero-768x432.png",768,432,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/5s-manufacturing-hero-1024x576.png",1024,576,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/5s-manufacturing-hero-1536x864.png",1536,864,true],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/5s-manufacturing-hero.png",1672,941,false],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/5s-manufacturing-hero-360x203.png",360,203,true]},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/sl\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Metoda 5S v proizvodnji: kako ohraniti izbolj\u0161ave Domov &raquo; Viri &raquo; Metoda 5S v proizvodnji: kako ohraniti izbolj\u0161ave Orodje ima ozna\u010deno mesto za shranjevanje. A ko ga naslednji operater potrebuje, ga tam ni. Nekdo ga i\u0161\u010de po sosednjih delovnih mizah, stroj \u010daka, vodja pa se spra\u0161uje, zakaj so prizadevanja za uvedbo metode 5S iz prej\u0161njega&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/posts\/109863","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/comments?post=109863"}],"version-history":[{"count":1,"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/posts\/109863\/revisions"}],"predecessor-version":[{"id":109924,"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/posts\/109863\/revisions\/109924"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/media\/109875"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/media?parent=109863"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/categories?post=109863"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/tags?post=109863"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}