{"id":109679,"date":"2026-10-25T07:57:40","date_gmt":"2026-10-25T07:57:40","guid":{"rendered":"https:\/\/skyplanner.ai\/?p=109679"},"modified":"2026-10-25T07:59:09","modified_gmt":"2026-10-25T07:59:09","slug":"predaja-izmene-v-proizvodnji","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/sl\/viri\/predaja-izmene-v-proizvodnji\/","title":{"rendered":"Predaja izmene v proizvodnji: naj delo te\u010de naprej"},"content":{"rendered":"<div class=\"gb-container gb-container-article01 article-main-content-container\">\n\n<h1 class=\"wp-block-heading\">Predaja izmene v proizvodnji: naj delo te\u010de naprej<\/h1>\n\n<div class=\"gb-container gb-container-article02\">\n\n<p><a href=\"\/sl\/\">Domov<\/a> &raquo; <a href=\"https:\/\/skyplanner.ai\/sl\/viri\/\">Viri<\/a> &raquo; Predaja izmene v proizvodnji: naj delo te\u010de naprej<\/p>\n\n\n<p class=\"yoast-reading-time__wrapper\"><span class=\"yoast-reading-time__icon\"><svg aria-hidden=\"true\" focusable=\"false\" data-icon=\"clock\" width=\"20\" height=\"20\" fill=\"none\" stroke=\"currentColor\" style=\"display:inline-block;vertical-align:-0.1em\" role=\"img\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewBox=\"0 0 24 24\"><path stroke-linecap=\"round\" stroke-linejoin=\"round\" stroke-width=\"2\" d=\"M12 8v4l3 3m6-3a9 9 0 11-18 0 9 9 0 0118 0z\"><\/path><\/svg><\/span><span class=\"yoast-reading-time__spacer\" style=\"display:inline-block;width:1em\"><\/span><span class=\"yoast-reading-time__descriptive-text\">Predviden \u010das branja: <\/span><span class=\"yoast-reading-time__reading-time\">10<\/span><span class=\"yoast-reading-time__time-unit\"> minut<\/span><\/p>\n\n<\/div>\n<div class=\"gb-container gb-container-article03\">\n\n<p>Popoldansko izmeno pri\u010dakajo napol dokon\u010dano naro\u010dilo, ustavljen stroj in opomba \u00bbslu\u017eba kakovosti obve\u0161\u010dena\u00ab. Operater, ki kon\u010duje izmeno, ve, kateri kosi \u010dakajo na pregled. Planer ve, da je zdaj na vrsti drugo naro\u010dilo. Osebi, ki prevzema delo, pa ni jasno ne eno ne drugo.<\/p>\n\n\n<p><strong>Predaja izmene v proizvodnji pomeni prenos informacij o proizvodnji in odgovornosti z ene izmene na drugo.<\/strong> Ekipa, ki prevzema delo, bi morala po predaji znati odgovoriti na tri vpra\u0161anja: kak\u0161no je dejansko stanje dela, kaj se lahko nadaljuje in kdo je odgovoren za naslednji ukrep?<\/p>\n\n\n<p>SkyPlanner pomaga povezati predajo izmene z delom v proizvodnji. Opombe in priloge ostanejo pri ustreznih naro\u010dilih in operacijah, zapisi operacij prikazujejo prijavljeni napredek, skupni terminski plan pa naslednji izmeni zagotavlja a\u017eurno zaporedje dela. Tako je manj potrebe po sestavljanju informacij iz lo\u010denih seznamov, preden se lahko ekipa loti dela.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Za predajo ni dovolj le izmensko poro\u010dilo<\/h2>\n\n\n<p>Izmensko poro\u010dilo opisuje, kaj se je zgodilo. Pri predaji pa na podlagi teh informacij dolo\u010dite, kako bo naslednja ekipa nadaljevala delo. Poro\u010dilo je lahko popolno, pa pomembna odgovornost \u0161e vedno ni nikomur dodeljena.<\/p>\n\n\n<p>Poskrbite, da bodo usklajeni trije vidiki:<\/p>\n\n\n<ul class=\"wp-block-list\"><li><strong>Dejansko stanje v proizvodnji:<\/strong> stanje stroja, lokacija in oznake nedokon\u010danih kosov ter morebitne omejitve pri delu.<\/li><li><strong>Zabele\u017eeno stanje:<\/strong> oznaka naro\u010dila in operacije, prijavljene koli\u010dine, trenutno stanje, odprta vpra\u0161anja in veljavna navodila.<\/li><li><strong>Razumevanje ekipe, ki prevzema delo:<\/strong> kaj je oseba ob prevzemu preverila, kaj bo naredila najprej in za katere \u0161e neizvedene ukrepe je zdaj odgovorna.<\/li><\/ul>\n\n\n<p>\u010ce na zaslonu pi\u0161e \u00bbv teku\u00ab, stroj pa stoji, je treba preveriti zapis. \u010ce je v opombi navedeno zadr\u017eanje kosov, nih\u010de pa ne ve, v katerem zabojniku so, predaja v proizvodnji ni popolna. \u010ce je oboje jasno, a vsak vodja izmene misli, da bo slu\u017ebo kakovosti poklical drugi, odgovornost ni bila prenesena.<\/p>\n\n\n<p>Cilj ni dalj\u0161i pogovor, temve\u010d skupno razumevanje izhodi\u0161\u010dnega stanja, ki ljudem omogo\u010da delo brez ugibanja.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Pripravite informacije, ki jih bo naslednja izmena potrebovala<\/h2>\n\n\n<p>Proizvodne evidence sproti posodabljajte med izmeno, pred menjavo ekipe pa pripravite pregled nedokon\u010danega dela. \u010ce zadnji trenutek po spominu obnavljate ve\u010d ur dogajanja, je \u017ee tako zahtevna predaja \u0161e te\u017eja.<\/p>\n\n\n<p>Za vsako operacijo, ki poteka ali je prekinjena, navedite naro\u010dilo, izdelek ali serijo ter to\u010dno operacijo. Jasno lo\u010dite, kaj je pri tej operaciji \u017ee opravljeno in kaj je \u0161e treba narediti. Lo\u010dite potrjene ustrezne kose od tistih, ki \u010dakajo na odlo\u010ditev slu\u017ebe kakovosti; zgolj izdelana koli\u010dina \u0161e ne pomeni, da je vse pripravljeno za naslednji proces.<\/p>\n\n\n<p>Odstopanja zabele\u017eite tako, da bo jasno, kako ukrepati. Zapis \u00bbte\u017eava s strojem\u00ab naslednji ekipi pove zelo malo. Uporaben zapis navaja zadevni delovni center, opa\u017eanja, trenutno omejitev, koga ste \u017ee obvestili in naslednje dogovorjeno preverjanje. Preverjeno stanje jasno lo\u010dite od domneve ali pri\u010dakovanega \u010dasa popravila.<\/p>\n\n\n<p>Naslednji kontrolni seznam uporabite kot izhodi\u0161\u010de za predajo izmene v svoji proizvodnji. Prilagodite ga opremi, procesu in odgovornostim v svojem obratu.<\/p>\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Vsebina predaje<\/th><th>Kaj potrebuje naslednja izmena<\/th><\/tr><\/thead><tbody><tr><td>Izmena in obseg predaje<\/td><td>Datum, \u010das predaje, obmo\u010dje ali delovni center ter osebe, ki delo predajajo in prevzemajo<\/td><\/tr><tr><td>Omejitve zaradi varnosti in stanja opreme<\/td><td>Trenutne omejitve, zadevna oprema in ustrezna evidenca s podro\u010dja varnosti ali vzdr\u017eevanja<\/td><\/tr><tr><td>Nedokon\u010dana proizvodnja<\/td><td>Naro\u010dilo, serija in operacija; koli\u010dine potrjenih ustreznih, zadr\u017eanih in nedokon\u010danih kosov; njihove lokacije<\/td><\/tr><tr><td>Odstopanja pri kakovosti in procesu<\/td><td>Zadevni kosi, trenutna odlo\u010ditev o ravnanju z njimi, \u0161e potrebna preverjanja in oseba, poobla\u0161\u010dena za odlo\u010danje<\/td><\/tr><tr><td>Materiali, orodja in navodila<\/td><td>Vse, kar manjka ali se je spremenilo in vpliva na naslednjo operacijo, z navedbo ustreznega dokumenta ali zapisa<\/td><\/tr><tr><td>Nadaljnje zaporedje dela<\/td><td>Kaj naj se nadaljuje ali za\u010dne kot naslednje, kaj je blokirano in katere spremembe prioritet so dogovorjene<\/td><\/tr><tr><td>Odprti ukrepi<\/td><td>Ime odgovorne osebe, potreben ukrep, naslednje preverjanje ali rok ter kontakt za nadaljnjo obravnavo, \u010de te\u017eave ni mogo\u010de re\u0161iti<\/td><\/tr><tr><td>Preverjanje<\/td><td>Kdaj so bile pomembne okoli\u0161\u010dine nazadnje preverjene in kaj je potrdila oseba, ki prevzema delo<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>Zabele\u017eite \u010das zadevnega dogodka ali preverjanja, ne le \u010dasa, ko je nekdo odprl poro\u010dilo. Tudi pravkar odprta stran lahko \u0161e vedno prikazuje v\u010deraj\u0161nje nepopravljeno stanje operacije.<\/p>\n\n\n<p>Ta kontrolni seznam je pripomo\u010dek za sporazumevanje; ne daje dovoljenja za ponovni zagon opreme ali sprostitev zadr\u017eanih izdelkov in ne nadome\u0161\u010da varnostnih postopkov ter dovoljenj v va\u0161em obratu. Tak\u0161ne odlo\u010ditve se sprejemajo po veljavnem postopku in v okviru pristojnosti odgovornih oseb.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Pogovorite se o odstopanjih in potrdite naslednji ukrep<\/h2>\n\n\n<p>V delovni rutini namenite predaji \u010das, ki ga druge naloge ne bodo izrinile. Glede na stanje, ki ga predajate, na\u010drtujte dovolj prekrivanja izmen, namesto da predajo opravite s hitrim pogovorom pri izhodu.<\/p>\n\n\n<p>Smernice organizacije HSE za predajo izmene opisujejo pripravo, izmenjavo informacij in navzkri\u017eno preverjanje, ki ga opravi osebje ob prevzemu dela. Priporo\u010dajo dvosmerno komunikacijo iz o\u010di v o\u010di, podprto s pisnimi informacijami. To je uporabno izhodi\u0161\u010de za redno prakso: zapisi ohranijo podrobnosti, v pogovoru pa se razjasni tisto, kar mora razumeti oseba, ki prevzema delo.<\/p>\n\n\n<p>Za\u010dnite z omejitvami in neobi\u010dajnimi razmerami, nato preglejte nedokon\u010dane operacije in nadaljnje zaporedje dela. V pogovor vklju\u010dite vzdr\u017eevanje, slu\u017ebo kakovosti ali planiranje, kadar je od njihove odlo\u010ditve odvisno nadaljevanje dela. Vsake predaje ne spreminjajte v pregled vseh klju\u010dnih kazalnikov uspe\u0161nosti proizvodnje; osredoto\u010dite se na informacije, ki vplivajo na delo naslednje izmene.<\/p>\n\n\n<p>Jasno dolo\u010dite odgovornosti. Oseba, ki delo predaja, pojasni stanje in preostali ukrep. Oseba, ki delo prevzema, preveri pomembna dejstva in pove, kaj prevzema. Vodja izmene razre\u0161i nejasnosti in poskrbi, da je o zadevni spremembi obve\u0161\u010den planer ali odgovorni strokovnjak.<\/p>\n\n\n<p>Pri nere\u0161enem vpra\u0161anju zapis \u00bbslu\u017eba kakovosti ve\u00ab ni dovolj. Dogovorite se, kdo bo zahteval odlo\u010ditev, kaj mora ostati zadr\u017eano in kdaj bo vodja naslednje izmene znova preveril stanje. \u010ce oseba, pristojna za odlo\u010ditev, ni dosegljiva, dolo\u010dite, na koga se obrniti, namesto da predajate obljubo, za katero nih\u010de ne odgovarja.<\/p>\n\n\n<p>\u010ce se izmeni ne prekrivata, se izrecno dogovorite za preverjanje ob prevzemu in dolo\u010dite dosegljivo kontaktno osebo za nadaljnjo obravnavo te\u017eav. Predaje z ve\u010djim tveganjem ali nejasnostmi uredite skladno s postopki v svojem obratu; samo pisno sporo\u010dilo ne sme brez izrecne odlo\u010ditve postati dovoljenje za nadaljevanje dela v negotovih razmerah.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Primer: predaja naro\u010dila s prekinjeno strojno obdelavo<\/h2>\n\n\n<p>Predstavljajte si, da je treba pri naro\u010dilu P-418 strojno obdelati 240 kosov. Ob menjavi izmene je po tej operaciji 160 kosov potrjenih kot ustreznih, 20 jih je ozna\u010denih in zadr\u017eanih do odlo\u010ditve slu\u017ebe kakovosti, 60 pa jih \u0161e ni strojno obdelanih. Operacija je prekinjena zaradi pomisleka glede procesa, vodja izmene pa je ekipi naro\u010dil, naj je ne nadaljuje, dokler ni sprejeta zahtevana odlo\u010ditev.<\/p>\n\n\n<p>Pomanjkljiva predaja se glasi: \u00bb180 narejenih. Slu\u017eba kakovosti obve\u0161\u010dena. Najprej dokon\u010dajte to naro\u010dilo.\u00ab<\/p>\n\n\n<p>Tak povzetek zdru\u017euje potrjene ustrezne in zadr\u017eane kose, ne navaja pogoja za ponovni zagon in nikomur ne dodeli nadaljnjega ukrepanja. Naslednji operater bi lahko vse strojno obdelane kose obravnaval kot pripravljene za nadaljevanje ali domneval, da prvotno zaporedje dela \u0161e velja.<\/p>\n\n\n<p>Pri uporabni predaji je odlo\u010ditev jasno razvidna:<\/p>\n\n\n<ul class=\"wp-block-list\"><li>Operater, ki predaja delo, navede naro\u010dilo in operacijo strojne obdelave, poka\u017ee, kje so potrjeni ustrezni in zadr\u017eani kosi, ter potrdi, da je operacija prekinjena.<\/li><li>V zapisu so vse tri koli\u010dine navedene lo\u010deno, pojasnjeni pa so tudi nere\u0161eno vpra\u0161anje, omejitev in sklic na zapis slu\u017ebe kakovosti.<\/li><li>Vodja naslednje izmene prevzame odgovornost za pridobitev odlo\u010ditve slu\u017ebe kakovosti in se z vodjo predhodne izmene dogovori, kdaj bo znova preveril stanje.<\/li><li>Planer preveri vpliv prekinitve in potrdi, katero drugo delo, ki je pripravljeno za izvedbo, naj bo naslednje na vrsti. Delo na P-418 se nadaljuje \u0161ele po potrebni odobritvi in preverjanju pogojev za obratovanje.<\/li><\/ul>\n\n\n<p>Operater, ki prevzema delo, nato s svojimi besedami povzame izhodi\u0161\u010dno stanje: kateri kosi ostajajo zadr\u017eani, katera operacija je naslednja na vrsti in kdo bo sporo\u010dil morebitne spremembe pri P-418. \u010ce se dejansko \u0161tevilo ali stanje kosov ne ujema z evidenco, ekipa razhajanje razjasni, namesto da bi izbrala razli\u010dico, ki ji bolj ustreza.<\/p>\n\n\n<p>SkyPlanner olaj\u0161a povezovanje proizvodnih informacij. Ustrezno opombo in pripadajo\u010do datoteko je mogo\u010de prilo\u017eiti postavki naro\u010dila P-418 ali posamezni operaciji. Poro\u010dani napredek ostane povezan z operacijo, naslednja izmena pa uporablja posodobljen seznam operacij za delovni center. Vodji izmene tako ni treba iz lo\u010dene opombe ob predaji sestavljati \u0161e ro\u010dno napisanega seznama prednostnih nalog.<\/p>\n\n\n<h2 class=\"wp-block-heading\">S SkyPlanner pove\u017eite predajo izmene s planom nadaljnjega dela<\/h2>\n\n\n<p>Vrednost digitalne predaje izmene ni le v tem, da zvezek zamenjate z zaslonom. Pomembno je, da so informacije o operaciji na voljo skupaj z naslednjo odlo\u010ditvijo o poteku proizvodnje.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Pojasnila hranite skupaj s podatki o delu<\/h3>\n\n\n<p>SkyPlanner omogo\u010da dodajanje proizvodnih opomb in datote\u010dnih prilog naro\u010dilom, postavkam naro\u010dil in operacijam. Informacijo zabele\u017eite tam, kjer velja: zahtevo za celotno naro\u010dilo pri naro\u010dilu, posebnost posamezne operacije pa pri tej operaciji.<\/p>\n\n\n<p>Izmena, ki prevzema delo, lahko posebnost pove\u017ee z delom, na katero se nana\u0161a, namesto da bi jo iskala med sporo\u010dili in nato povezovala z lo\u010denim seznamom operacij. Priloge operacij so dostopne tudi prek aplikacije ShopFloor in orodja Timer. To je \u0161e posebej koristno, kadar so za razumevanje predaje potrebni risba, navodilo ali dodaten zapis.<\/p>\n\n\n<p>Za\u010dasna opa\u017eanja jasno lo\u010dite od odobrenih navodil. Zapis za\u010dasne re\u0161itve pri dana\u0161nji operaciji ni enak odlo\u010ditvi o spremembi standardnega postopka za prihodnja naro\u010dila.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Izhodi\u0161\u010dno stanje ugotovite na podlagi dejanskih podatkov<\/h3>\n\n\n<p>Timer v SkyPlanner omogo\u010da bele\u017eenje za\u010detka, prekinitve in zaklju\u010dka operacij ter koli\u010din izdelanih kosov in kosov z napako. Njegovi <a href=\"https:\/\/skyplanner.ai\/sl\/viri\/proizvodni-obrat\/\">seznami operacij za delovne centre in skupine delovnih centrov<\/a> prikazujejo terminirane operacije, po katerih operaterji izvajajo delo.<\/p>\n\n\n<p>Poro\u010dila o operacijah prikazujejo dejansko zabele\u017eeni \u010das, kdo je delal na operaciji in kateri delovni center je bil uporabljen. \u010casovno ozna\u010deni dogodki v evidenci dela in poro\u010dila o napredku postavk naro\u010dil pomagajo vodji izmene razjasniti nejasno stanje, ne da bi moral potek dela sestavljati iz spominov ve\u010d ljudi.<\/p>\n\n\n<p>Te evidence so uporabne, kadar ekipa dosledno bele\u017ei spremembe. Preden se ob predaji zanesete na zabele\u017eeno stanje, dopolnite manjkajo\u010de vnose in razjasnite nasprotja. \u010casovni \u017eig pomaga ugotoviti zaporedje zabele\u017eenih dogodkov, ne more pa potrditi spremembe, ki je ni nih\u010de zabele\u017eil.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Dogovorjene spremembe prenesite v skupno zaporedje dela<\/h3>\n\n\n<p>\u010ce se ob predaji poka\u017ee spremenjena prednostna naloga, nerazpolo\u017eljiv vir ali spremenjen termin, odobreno spremembo vklju\u010dite v <a href=\"https:\/\/skyplanner.ai\/sl\/viri\/kaj-je-terminiranje-proizvodnje\/\">proizvodni plan<\/a>. Ne pustite je zgolj v opisni opombi.<\/p>\n\n\n<p>Arcturus, umetna inteligenca za terminiranje proizvodnje v SkyPlanner, izra\u010duna zaporedje dela na podlagi nastavljenih zmogljivosti, prednostnih nalog, materialov, odvisnosti in pravil. Ganttov prikaz poka\u017ee izra\u010dunani plan, seznam operacij za delovni center pa terminirano delo prenese v proizvodnjo. \u010ce je omogo\u010den Autopilot, lahko ustrezne spremembe v proizvodnji spro\u017eijo ponovno terminiranje, pri \u010demer va\u0161a pravila in zaklepi ostanejo v veljavi.<\/p>\n\n\n<p>Vi dolo\u010dite prednostne naloge in pogoje, pod katerimi se delo lahko nadaljuje. Arcturus poskrbi za usklajen izra\u010dun terminov in zaporedja dela. Tako je manj dela s popravljanjem lo\u010denih seznamov operacij za posamezne stroje, ko izmena ugotovi, da v\u010deraj\u0161nje predpostavke ne veljajo ve\u010d.<\/p>\n\n\n<p>To ni pomembno le pri posamezni predaji izmene. Pri proizvajalcu elektri\u010dnih razdelilnikov in stikalnih naprav UTU so v proizvodnji uporabljali lo\u010dene Excelove preglednice po oddelkih, spremembe zaporedja v sistemu ERP pa niso vedno pri\u0161le do proizvodnje. Po povezavi SkyPlanner z obstoje\u010dimi sistemi v podjetju UTU poro\u010dajo, da posodobljen seznam operacij dose\u017ee monterje na liniji v nekaj sekundah. Njihova izku\u0161nja ka\u017ee, kako pomembno je v praksi, da spremenjeno zaporedje dose\u017ee ljudi, ki delo opravljajo, in ne ostane le v planski slu\u017ebi. Celotno izku\u0161njo preberite v <a href=\"https:\/\/skyplanner.ai\/sl\/zgodbe-strank\/utu\/\">oceni re\u0161itve SkyPlanner podjetja UTU<\/a>.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Preden dodate nova poro\u010dila, izbolj\u0161ajte predajo na enem podro\u010dju<\/h2>\n\n\n<p>Za\u010dnite na enem proizvodnem podro\u010dju, kjer se nedokon\u010dano delo redno prena\u0161a med izmenami. Dogovorite se, v kateri evidenci se vodi napredek operacij, kam se zapisujejo posebnosti in kdo sme spremeniti zaporedje nadaljnjega dela. Poskrbite, da obe izmeni enako razumeta, kaj v tem procesu pomenijo stanja \u00bbprekinjeno\u00ab, \u00bbzaklju\u010deno\u00ab in \u00bb\u010daka na odlo\u010ditev\u00ab.<\/p>\n\n\n<p>Postopek preizkusite pri ve\u010d predajah, tako ob obi\u010dajnem poteku dela kot ob motnjah. Izmeno, ki prevzema delo, vpra\u0161ajte, kaj je morala pred za\u010detkom \u0161e razjasniti: neozna\u010dene kose, nepojasnjeno prekinitev, nedosegljivo osebo, pristojno za odlo\u010ditev, ali seznam operacij, ki je bil v nasprotju z navodilom vodje izmene.<\/p>\n\n\n<p>Spremljajte te pomanjkljivosti in dodatno delo, ki so ga povzro\u010dile. Koristni kazalniki so \u010das, porabljen za razjasnitev izhodi\u0161\u010dnega stanja, predani ukrepi brez dolo\u010dene odgovorne osebe in ponavljajo\u010da se razhajanja med evidentiranim in dejanskim stanjem. Preu\u010dite vzroke, ne le \u0161tevila primerov. Kraj\u0161a predaja ni izbolj\u0161ava, \u010de se manjkajo\u010di pogovor zgolj prestavi v prvo uro proizvodnje.<\/p>\n\n\n<p>Odpravite podvojeno poro\u010danje tam, kjer so podatki \u017ee na voljo in so zanesljivi. Polje dodajte le, \u010de osebi, ki prevzema delo, pomaga sprejeti potrebno odlo\u010ditev. Dober postopek naslednji izmeni zagotovi dovolj informacij za nadaljevanje, ne da bi morala odhajajo\u010da izmena isto zgodbo zapisati na treh mestih.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Naslednji izmeni predajte plan, po katerem lahko nadaljuje delo<\/h2>\n\n\n<p>Izberite SkyPlanner, \u010de se ob predajah vedno znova poka\u017eejo iste nepovezane informacije: napredek je zabele\u017een na enem mestu, pojasnila na drugem, zaporedje nadaljnjega dela pa na seznamu, ki ga je treba na novo sestaviti. Ko te informacije zdru\u017eite v okolju za planiranje proizvodnje, zmanj\u0161ate delo z usklajevanjem in pomagate vsem izmenam, da za\u010dnejo z enakim razumevanjem stanja.<\/p>\n\n\n<p>Obstoje\u010de poslovne sisteme lahko obdr\u017eite. SkyPlanner se prek odprtega vmesnika REST API pove\u017ee s katerim koli sistemom ERP ali MES ter podatke o naro\u010dilih in izvedbi pove\u017ee s podrobnim terminiranjem proizvodnje.<\/p>\n\n\n<p><a href=\"https:\/\/skyplanner.ai\/sl\/kontaktna-prodaja\/\">Rezervirajte predstavitev re\u0161itve SkyPlanner<\/a> na primeru dejanske predaje izmene in nedokon\u010danega naro\u010dila. Pripravite trenutno stanje, eno nere\u0161eno vpra\u0161anje in prednostne naloge za naslednjo izmeno. Oglejte si, kako bi informacije, povezane z operacijo, poro\u010dani napredek in skupni terminski plan va\u0161i ekipi pomagali prevzeti delo z manj iskanja in ro\u010dnega popravljanja plana. \u010ce \u017eelite re\u0161itev najprej raziskati sami, <a href=\"https:\/\/skyplanner.ai\/sl\/preizkus\/\">preizkusite SkyPlanner z demonstracijskimi podatki<\/a>.<\/p>\n\n<\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>Predaja izmene v proizvodnji: naj delo te\u010de naprej Domov &raquo; Viri &raquo; Predaja izmene v proizvodnji: naj delo te\u010de naprej Popoldansko izmeno pri\u010dakajo napol dokon\u010dano naro\u010dilo, ustavljen stroj in opomba \u00bbslu\u017eba kakovosti obve\u0161\u010dena\u00ab. Operater, ki kon\u010duje izmeno, ve, kateri kosi \u010dakajo na pregled. Planer ve, da je zdaj na vrsti drugo naro\u010dilo. Osebi, ki prevzema &#8230; <a title=\"Predaja izmene v proizvodnji: naj delo te\u010de naprej\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/sl\/viri\/predaja-izmene-v-proizvodnji\/\" aria-label=\"Read more about Predaja izmene v proizvodnji: naj delo te\u010de naprej\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":109694,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[2539,302],"tags":[],"class_list":["post-109679","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-aps-in-terminiranje","category-viri","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Predaja izmene v proizvodnji: naj delo te\u010de naprej<\/title>\n<meta name=\"description\" content=\"Naj naslednja izmena ne ugiba, kaj je \u0161e nedokon\u010dano. Za la\u017ejo predajo pove\u017eite preverjeno stanje del, jasne odgovornosti in a\u017eurno zaporedje dela.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/sl\/viri\/predaja-izmene-v-proizvodnji\/\" \/>\n<meta property=\"og:locale\" content=\"sl_SI\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Predaja izmene v proizvodnji: naj delo te\u010de naprej\" \/>\n<meta property=\"og:description\" content=\"Naj naslednja izmena ne ugiba, kaj je \u0161e nedokon\u010dano. Za la\u017ejo predajo pove\u017eite preverjeno stanje del, jasne odgovornosti in a\u017eurno zaporedje dela.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/sl\/viri\/predaja-izmene-v-proizvodnji\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2026-10-25T07:57:40+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-25T07:59:09+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/shift-handover-manufacturing-hero.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1672\" \/>\n\t<meta property=\"og:image:height\" content=\"941\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"12 minut\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/predaja-izmene-v-proizvodnji\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/predaja-izmene-v-proizvodnji\\\/\"},\"author\":{\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\"},\"headline\":\"Predaja izmene v proizvodnji: naj delo te\u010de naprej\",\"datePublished\":\"2026-10-25T07:57:40+00:00\",\"dateModified\":\"2026-10-25T07:59:09+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/predaja-izmene-v-proizvodnji\\\/\"},\"wordCount\":2452,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/predaja-izmene-v-proizvodnji\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/shift-handover-manufacturing-hero.png\",\"articleSection\":[\"APS in terminiranje\",\"viri\"],\"inLanguage\":\"sl-SI\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/predaja-izmene-v-proizvodnji\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/predaja-izmene-v-proizvodnji\\\/\",\"name\":\"Predaja izmene v proizvodnji: naj delo te\u010de naprej\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/predaja-izmene-v-proizvodnji\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/predaja-izmene-v-proizvodnji\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/shift-handover-manufacturing-hero.png\",\"datePublished\":\"2026-10-25T07:57:40+00:00\",\"dateModified\":\"2026-10-25T07:59:09+00:00\",\"description\":\"Naj naslednja izmena ne ugiba, kaj je \u0161e nedokon\u010dano. Za la\u017ejo predajo pove\u017eite preverjeno stanje del, jasne odgovornosti in a\u017eurno zaporedje dela.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/predaja-izmene-v-proizvodnji\\\/#breadcrumb\"},\"inLanguage\":\"sl-SI\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/predaja-izmene-v-proizvodnji\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"sl-SI\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/predaja-izmene-v-proizvodnji\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/shift-handover-manufacturing-hero.png\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/shift-handover-manufacturing-hero.png\",\"width\":1672,\"height\":941,\"caption\":\"Two manufacturing workers check an unfinished part together, with held parts separated in an amber tray\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/predaja-izmene-v-proizvodnji\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Predaja izmene v proizvodnji: naj delo te\u010de naprej\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"sl-SI\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"sl-SI\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\",\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"sl-SI\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"caption\":\"Jussi M\u00e4ntyl\u00e4\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Predaja izmene v proizvodnji: naj delo te\u010de naprej","description":"Naj naslednja izmena ne ugiba, kaj je \u0161e nedokon\u010dano. Za la\u017ejo predajo pove\u017eite preverjeno stanje del, jasne odgovornosti in a\u017eurno zaporedje dela.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/sl\/viri\/predaja-izmene-v-proizvodnji\/","og_locale":"sl_SI","og_type":"article","og_title":"Predaja izmene v proizvodnji: naj delo te\u010de naprej","og_description":"Naj naslednja izmena ne ugiba, kaj je \u0161e nedokon\u010dano. Za la\u017ejo predajo pove\u017eite preverjeno stanje del, jasne odgovornosti in a\u017eurno zaporedje dela.","og_url":"https:\/\/skyplanner.ai\/sl\/viri\/predaja-izmene-v-proizvodnji\/","og_site_name":"SkyPlanner","article_published_time":"2026-10-25T07:57:40+00:00","article_modified_time":"2026-10-25T07:59:09+00:00","og_image":[{"width":1672,"height":941,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/shift-handover-manufacturing-hero.png","type":"image\/png"}],"author":"Jussi M\u00e4ntyl\u00e4","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Jussi M\u00e4ntyl\u00e4","Est. reading time":"12 minut"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/sl\/viri\/predaja-izmene-v-proizvodnji\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/sl\/viri\/predaja-izmene-v-proizvodnji\/"},"author":{"name":"Jussi M\u00e4ntyl\u00e4","@id":"https:\/\/skyplanner.ai\/sl\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5"},"headline":"Predaja izmene v proizvodnji: naj delo te\u010de naprej","datePublished":"2026-10-25T07:57:40+00:00","dateModified":"2026-10-25T07:59:09+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/sl\/viri\/predaja-izmene-v-proizvodnji\/"},"wordCount":2452,"publisher":{"@id":"https:\/\/skyplanner.ai\/sl\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/sl\/viri\/predaja-izmene-v-proizvodnji\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/shift-handover-manufacturing-hero.png","articleSection":["APS in terminiranje","viri"],"inLanguage":"sl-SI"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/sl\/viri\/predaja-izmene-v-proizvodnji\/","url":"https:\/\/skyplanner.ai\/sl\/viri\/predaja-izmene-v-proizvodnji\/","name":"Predaja izmene v proizvodnji: naj delo te\u010de naprej","isPartOf":{"@id":"https:\/\/skyplanner.ai\/sl\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/sl\/viri\/predaja-izmene-v-proizvodnji\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/sl\/viri\/predaja-izmene-v-proizvodnji\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/shift-handover-manufacturing-hero.png","datePublished":"2026-10-25T07:57:40+00:00","dateModified":"2026-10-25T07:59:09+00:00","description":"Naj naslednja izmena ne ugiba, kaj je \u0161e nedokon\u010dano. Za la\u017ejo predajo pove\u017eite preverjeno stanje del, jasne odgovornosti in a\u017eurno zaporedje dela.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/sl\/viri\/predaja-izmene-v-proizvodnji\/#breadcrumb"},"inLanguage":"sl-SI","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/sl\/viri\/predaja-izmene-v-proizvodnji\/"]}]},{"@type":"ImageObject","inLanguage":"sl-SI","@id":"https:\/\/skyplanner.ai\/sl\/viri\/predaja-izmene-v-proizvodnji\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/shift-handover-manufacturing-hero.png","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/shift-handover-manufacturing-hero.png","width":1672,"height":941,"caption":"Two manufacturing workers check an unfinished part together, with held parts separated in an amber tray"},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/sl\/viri\/predaja-izmene-v-proizvodnji\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/sl\/"},{"@type":"ListItem","position":2,"name":"Predaja izmene v proizvodnji: naj delo te\u010de naprej"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/sl\/#website","url":"https:\/\/skyplanner.ai\/sl\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/sl\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/sl\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"sl-SI"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/sl\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/sl\/","logo":{"@type":"ImageObject","inLanguage":"sl-SI","@id":"https:\/\/skyplanner.ai\/sl\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/sl\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]},{"@type":"Person","@id":"https:\/\/skyplanner.ai\/sl\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5","name":"Jussi M\u00e4ntyl\u00e4","image":{"@type":"ImageObject","inLanguage":"sl-SI","@id":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","caption":"Jussi M\u00e4ntyl\u00e4"}}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/shift-handover-manufacturing-hero.png",1672,941,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/shift-handover-manufacturing-hero-150x150.png",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/shift-handover-manufacturing-hero-300x169.png",300,169,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/shift-handover-manufacturing-hero-768x432.png",768,432,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/shift-handover-manufacturing-hero-1024x576.png",1024,576,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/shift-handover-manufacturing-hero-1536x864.png",1536,864,true],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/shift-handover-manufacturing-hero.png",1672,941,false],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/shift-handover-manufacturing-hero-360x203.png",360,203,true]},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/sl\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Predaja izmene v proizvodnji: naj delo te\u010de naprej Domov &raquo; Viri &raquo; Predaja izmene v proizvodnji: naj delo te\u010de naprej Popoldansko izmeno pri\u010dakajo napol dokon\u010dano naro\u010dilo, ustavljen stroj in opomba \u00bbslu\u017eba kakovosti obve\u0161\u010dena\u00ab. Operater, ki kon\u010duje izmeno, ve, kateri kosi \u010dakajo na pregled. Planer ve, da je zdaj na vrsti drugo naro\u010dilo. Osebi, ki prevzema&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/posts\/109679","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/comments?post=109679"}],"version-history":[{"count":1,"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/posts\/109679\/revisions"}],"predecessor-version":[{"id":109743,"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/posts\/109679\/revisions\/109743"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/media\/109694"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/media?parent=109679"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/categories?post=109679"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/tags?post=109679"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}