{"id":108113,"date":"2026-10-23T23:53:08","date_gmt":"2026-10-23T23:53:08","guid":{"rendered":"https:\/\/skyplanner.ai\/?p=108113"},"modified":"2026-10-23T23:54:43","modified_gmt":"2026-10-23T23:54:43","slug":"standardizirano-delo","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/sl\/viri\/standardizirano-delo\/","title":{"rendered":"Standardizirano delo: vzpostavite metodo, ki se obnese"},"content":{"rendered":"<div class=\"gb-container gb-container-article01 article-main-content-container\">\n\n<h1 class=\"wp-block-heading\">Standardizirano delo: vzpostavite metodo, ki se obnese<\/h1>\n\n<div class=\"gb-container gb-container-article02\">\n\n<p><a href=\"\/sl\/\">Domov<\/a> &raquo; <a href=\"https:\/\/skyplanner.ai\/sl\/viri\/\">Viri<\/a> &raquo; Standardizirano delo: vzpostavite metodo, ki se obnese<\/p>\n\n\n<p class=\"yoast-reading-time__wrapper\"><span class=\"yoast-reading-time__icon\"><svg aria-hidden=\"true\" focusable=\"false\" data-icon=\"clock\" width=\"20\" height=\"20\" fill=\"none\" stroke=\"currentColor\" style=\"display:inline-block;vertical-align:-0.1em\" role=\"img\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewBox=\"0 0 24 24\"><path stroke-linecap=\"round\" stroke-linejoin=\"round\" stroke-width=\"2\" d=\"M12 8v4l3 3m6-3a9 9 0 11-18 0 9 9 0 0118 0z\"><\/path><\/svg><\/span><span class=\"yoast-reading-time__spacer\" style=\"display:inline-block;width:1em\"><\/span><span class=\"yoast-reading-time__descriptive-text\">Predviden \u010das branja: <\/span><span class=\"yoast-reading-time__reading-time\">10<\/span><span class=\"yoast-reading-time__time-unit\"> minut<\/span><\/p>\n\n<\/div>\n<div class=\"gb-container gb-container-article03\">\n\n<p><strong>Standardizirano delo dolo\u010da trenutno dogovorjeno metodo za ponovljivo delo operaterja: zaporedje opravil, njegovo usklajenost s povpra\u0161evanjem kupcev in medfazno zalogo, potrebno za nemoten potek dela.<\/strong> Vsem izmenam daje skupno izhodi\u0161\u010de za varno in enakomerno proizvodnjo ter izbolj\u0161ave.<\/p>\n\n\n<p>Izziv je dogovoriti se o metodi, ki deluje tudi v praksi, ne le med predstavitvijo. \u010ce en operater med cikli hodi po kose, drugi izpusti kontrolo, planski sistem pa \u0161e vedno uporablja trajanje, dolo\u010deno za staro vpenjalo, samo novo navodilo za delo ne bo odpravilo razlik.<\/p>\n\n\n<p>Za\u010dnite pri delu, kakr\u0161no dejansko poteka. Izbolj\u0161ano metodo preizkusite skupaj z ljudmi, ki delo opravljajo, jo uvedite v vse zadevne izmene in posodobite vhodne podatke za planiranje, ki so od nje odvisni. SkyPlanner vam pomaga izbolj\u0161avo prenesti v skupni terminski na\u010drt proizvodnje. Tako bolj\u0161a metoda spremeni na\u010din planiranja dela v tovarni, ne le vsebine, ki visi ob enem delovnem mestu.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Kaj mora opredeliti standardizirano delo<\/h2>\n\n\n<p>V vitki proizvodnji standardizirano delo zdru\u017euje tri elemente:<\/p>\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Element<\/th><th>Kaj morate dolo\u010diti<\/th><th>Kaj s tem prepre\u010dite<\/th><\/tr><\/thead><tbody><tr><td>Taktni \u010das<\/td><td>Proizvodni ritem, ki ga zahteva povpra\u0161evanje kupcev, glede na razpolo\u017eljivi proizvodni \u010das<\/td><td>Oblikovanje metode brez poznavanja zahtevanega tempa izdelave<\/td><\/tr><tr><td>Zaporedje dela<\/td><td>Dogovorjeni vrstni red operaterjevih opravil, vklju\u010dno z ravnanjem s kosi, gibanjem in potrebnimi kontrolami<\/td><td>Da bi si vsaka izmena dolo\u010dila svoje zaporedje ali izpu\u0161\u010dala nujna opravila<\/td><\/tr><tr><td>Standardna medfazna zaloga<\/td><td>Kosi, ki morajo biti na dolo\u010denih mestih, tudi v strojih, da se lahko zaporedje nemoteno ponavlja<\/td><td>Zastoje cikla zaradi pomanjkanja kosov ali kopi\u010denje nedokon\u010danih kosov, ki prikriva te\u017eavo<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p><a href=\"https:\/\/skyplanner.ai\/sl\/viri\/taktni-cas\/\">Taktni \u010das dolo\u010da povpra\u0161evanje<\/a>, ne meritev s \u0161toparico. \u010ce opazovana metoda ne omogo\u010da doseganja takta, zapis cilja v diagram ne bo ustvaril dodatnih zmogljivosti. Preu\u010diti je treba delo, kadrovsko zasedbo, opremo ali na\u010din razporeditve povpra\u0161evanja.<\/p>\n\n\n<p>Tudi standardna medfazna zaloga ni isto kot ciljna varnostna zaloga v skladi\u0161\u010du. Je del metode: kateri kosi morajo biti na katerih mestih, ko se cikel znova za\u010dne? Dolo\u010dite jo s preizku\u0161anjem zaporedja, ne tako, da sprejmete vse, kar se po naklju\u010dju nakopi\u010di ob delovnem mestu.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Metoda, normirani \u010das in navodilo za delo niso isto<\/h3>\n\n\n<p><strong>Metoda dolo\u010da, kako je delo organizirano. Normirani \u010das dolo\u010da, koliko \u010dasa naj bi opredeljeno delo zahtevalo v navedenih pogojih. Navodilo za delo pojasnjuje, kako nalogo pravilno izvesti.<\/strong> Biti morajo usklajeni, vendar odgovarjajo na razli\u010dna vpra\u0161anja.<\/p>\n\n\n<p>Z <a href=\"https:\/\/skyplanner.ai\/sl\/viri\/merjenje-casa-v-proizvodnji\/\">merjenjem \u010dasa v proizvodnji<\/a> lahko dolo\u010dite utemeljen \u010das, ko je metoda dovolj jasno opredeljena in stabilna. Merjenje pa ne pomeni, da so nevarno seganje, nezanesljivo vpenjalo ali manjkajo\u010da kontrola kakovosti sprejemljivi. Prav tako lahko lepo ilustrirano navodilo opisuje metodo, ki ni bila nikoli preizku\u0161ena pri obi\u010dajnem proizvodnem tempu.<\/p>\n\n\n<p>Tukaj je naloga vzpostaviti in vzdr\u017eevati metodo dela operaterja. Standardizirano delo vodij, ki ureja njihova redna opravila, je lo\u010dena uporaba standardizacije.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Skupaj z operaterji opazujte eno ponovljivo operacijo<\/h2>\n\n\n<p>Izberite operacijo, pri kateri imajo razlike v izvajanju vidne posledice: neenakomeren obseg izdelave med izmenami, pogosta vpra\u0161anja o zaporedju ali ponavljajo\u010da se odstopanja od na\u010drtovanega trajanja. Za\u010dnite z obvladljivo dru\u017eino izdelkov in jasno dolo\u010denimi pogoji, namesto da bi posku\u0161ali standardizirati celotno tovarno naenkrat.<\/p>\n\n\n<p>Dogovorite se o reviziji izdelka, opremi, orodjih, na\u010dinu priprave in razporeditve materiala ob delovnem mestu ter za\u010detni in kon\u010dni to\u010dki dela. Opazujte, kako usposobljeni operaterji delo dejansko opravijo. Vklju\u010dite razli\u010dne izmene, \u010de se njihovi pogoji razlikujejo. Pojasnite, da je namen vzpostaviti izvedljivo skupno metodo, ne pa zabele\u017eiti najhitrej\u0161i cikel posameznika in ga vsiliti vsem drugim.<\/p>\n\n\n<p>Opazujte dovolj ponovitev dela, da zajamete tudi opravila, ki se ne izvajajo v vsakem ciklu. Menjava pladnja, kontrola orodja ali dopolnjevanje materiala so lahko nujni, \u010deprav jih pri prvem opazovanju ne zaznate. Zabele\u017eite, kako pogosto se opravilo izvaja in kdo ga opravlja.<\/p>\n\n\n<p>Lo\u010dite nujno delo od prekinitev in zasilnih re\u0161itev. Hoja po manjkajo\u010do komponento ka\u017ee na te\u017eavo z oskrbo; ne sme neopazno postati del sprejete metode monta\u017ee. \u010ce pa je dopolnjevanje materiala na\u010drtovana odgovornost operaterja, ga mora metoda vklju\u010devati. Od tega razlikovanja sta odvisna tako potrebna izbolj\u0161ava kot obseg potrebnih zmogljivosti.<\/p>\n\n\n<p>Pri proizvodnji raznolikih izdelkov dolo\u010dite pogoje, v katerih velja posamezna metoda. Razli\u010dna vpenjala ali zahteve za kontrolo lahko upravi\u010dujejo lo\u010dene razli\u010dice. Standardizirajte ponovljivo delo znotraj teh pogojev, namesto da bi razli\u010dne operacije silili v eno zaporedje in en \u010das.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Oblikujte zaporedje, ki ga je mogo\u010de dejansko ponavljati<\/h2>\n\n\n<p>Predlagano metodo razvijte skupaj z operaterji, proizvodnimi tehnologi ter odgovornimi za varnost in kakovost. Ohranite vse zahtevane za\u0161\u010ditne ukrepe in kontrole izdelka. Metoda ni izbolj\u0161ava, \u010de je navidezno hitrej\u0161a le zato, ker jih izpu\u0161\u010da.<\/p>\n\n\n<p>Nazorno prika\u017eite gibanje operaterja, delovanje stroja in mesta za material. Pri odgovorih na razli\u010dna vpra\u0161anja pomagajo tri uveljavljena orodja:<\/p>\n\n\n<ul class=\"wp-block-list\"><li><strong>List zmogljivosti procesa<\/strong> omogo\u010da preverjanje, kaj oprema zmore, ob upo\u0161tevanju obdelave, ravnanja s kosi in potreb po ob\u010dasnih nastavitvah.<\/li><li><strong>Kombinacijska tabela standardiziranega dela<\/strong> na skupni \u010dasovni osi prika\u017ee ro\u010dno delo, hojo in samodejno delovanje stroja. Poka\u017ee, kje se opravila lahko prekrivajo in kje mora operater \u010dakati.<\/li><li><strong>Shema standardiziranega dela<\/strong> prikazuje zaporedje, gibanje in razporeditev potrebne medfazne zaloge v delovnem centru.<\/li><\/ul>\n\n\n<p>Uporabite prikaze, ki pomagajo razumeti va\u0161o operacijo. Namen je razkriti neskladja, ne izpolnjevati obrazcev zaradi njih samih. Ali lahko operater varno pride do naslednjega opravila? Ali se kontrola kakovosti izvede, preden bi se lahko kos z napako premaknil v naslednjo fazo? Ali je vpenjalo na voljo, ko ga zaporedje znova zahteva?<\/p>\n\n\n<p>Predlagani cikel primerjajte s taktnim \u010dasom. \u010ce dela ni mogo\u010de opraviti v tem \u010dasu, razi\u0161\u010dite omejitev, namesto da operaterjem naro\u010dite, naj delajo hitreje. Prerazporejanje dela med delovnimi mesti je <a href=\"https:\/\/skyplanner.ai\/sl\/viri\/uravnotezenje-proizvodne-linije\/\">odlo\u010ditev o uravnote\u017eenju proizvodne linije<\/a>; tudi po spremembi metode operaterja mora imeti vsako delovno mesto zaporedje, ki ga lahko izvede.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Metodo preizkusite, preden jo razglasite za standard<\/h2>\n\n\n<p>Pred za\u010detkom preizkusa dolo\u010dite, kaj mora dokazati, da bo uspe\u0161en. Metoda mora najmanj ohraniti varnost in kakovost, omogo\u010dati ponavljanje z dolgoro\u010dno vzdr\u017enim tempom ter zagotavljati nadzor nad predvideno razporeditvijo materiala. Upo\u0161tevati mora tudi ob\u010dasna opravila, ne le ciklov brez prekinitev.<\/p>\n\n\n<p>Usposobljen operater naj predlagano zaporedje izvede v pogojih, ki odra\u017eajo obi\u010dajno delo. Nato preverite, ali ga lahko ponovi \u0161e drug ustrezno usposobljen operater. Vklju\u010dite dopolnjevanje materiala, menjavo posod in obi\u010dajne predaje dela, kadar so del operacije. Odstopanja zabele\u017eite in jih obravnavajte na delovnem mestu, dokler je vzrok \u0161e viden.<\/p>\n\n\n<p>Ne preverjajte le povpre\u010dnega \u010dasa cikla. Zaporedje, ki deluje samo, kadar tehnolog dovaja kose ali dr\u017ei komponento na mestu, ni pripravljeno za redno delo. Prav tako ni pripravljeno zaporedje, ki dosega takt tako, da dopu\u0161\u010da kopi\u010denje nepregledanih kosov ob stroju.<\/p>\n\n\n<p>\u010ce preizkus ni uspe\u0161en, ugotovite, kje je te\u017eava: v metodi, stanju opreme, ureditvi oskrbe ali usposabljanju. Odpravite vzrok in preizkus ponovite. Ne uvajajte neizvedljivega zaporedja v pri\u010dakovanju, da bo nadzor nad delom nadomestil njegove pomanjkljivosti.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Primer: vklju\u010dite kontrolo v ponovljivi cikel<\/h3>\n\n\n<p>Predstavljajte si operaterja, ki vstavi ohi\u0161je v samodejno vpenjalo, po\u010daka na konec obdelave, nato pa ohi\u0161je vzame iz vpenjala in ga pregleda. Nekateri operaterji v razli\u010dnih izmenah pregled opravijo takoj, drugi pa kose zbirajo in pozneje pregledajo cel pladenj. Obseg izdelave se zato razlikuje, napake pa lahko dlje ostanejo neodkrite.<\/p>\n\n\n<p>Ekipa preizkusi dolo\u010deno zaporedje: iz vpenjala vzame obdelano ohi\u0161je, vstavi naslednje, za\u017eene samodejni cikel in nato na namenskem mestu pregleda prej\u0161nje ohi\u0161je. Jasen na\u010din ozna\u010devanja zagotavlja lo\u010devanje pregledanih in nepregledanih kosov. S preizkusom preveri, ali je pregled mogo\u010de kon\u010dati, preden se mora operater vrniti k stroju, in dolo\u010di, kje mora biti posamezen kos ob za\u010detku ponovitve zaporedja.<\/p>\n\n\n<p>To je ve\u010d kot le sprememba besedila v navodilu. Operaterjevo delo se prekriva s samodejnim ciklom, vendar to ne pomeni, da se \u010das strojne obdelave skraj\u0161a. Sprejeta metoda mora opisati prekrivanje, zahtevana mesta za zalogo in odziv na ugotovitve kontrole. Planiranje mora odra\u017eati dejansko zasedenost virov, ne pa od trajanja strojne obdelave od\u0161teti vsega navideznega \u010dakanja operaterja.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Metodo in spremembe pri planiranju uvedite hkrati<\/h2>\n\n\n<p>Po uspe\u0161nem preizkusu zagotovite, da je sprejeta metoda na voljo na mestu uporabe, in usposobite vse zadevne operaterje. Prosite jih, naj poka\u017eejo zaporedje ter klju\u010dne to\u010dke za kakovost in varnost. Samo branje in podpis ne dokazujeta, da metodo razumejo.<\/p>\n\n\n<p>Standardu dolo\u010dite skrbnika, revizijo in datum za\u010detka veljavnosti. Navedite, za katere izdelke, orodja in pogoje velja. Shranite prej\u0161njo razli\u010dico, da boste ob poznej\u0161em pregledu lahko lo\u010dili spremembo metode od spremembe na\u010dina bele\u017eenja dela.<\/p>\n\n\n<p>Pred datumom za\u010detka veljavnosti uskladite povezane posodobitve:<\/p>\n\n\n<ul class=\"wp-block-list\"><li>Prikaz delovne metode za delovni center in pripadajo\u010da navodila za delo.<\/li><li>Veljavni proizvodni postopek, ustrezni viri in odvisnosti med operacijami.<\/li><li>Potrjeni \u010dasi obdelave, priprave in drugi \u010dasi, ki se uporabljajo pri planiranju.<\/li><li>Na\u010din namestitve materiala ob delovnem mestu in odgovornosti za njegovo dopolnjevanje.<\/li><li>Usposabljanje in obravnava nalogov, ki so \u017ee v izvajanju.<\/li><\/ul>\n\n\n<p>Vsaka sprememba metode ne vpliva na vse navedene postavke. Bolj\u0161i polo\u017eaj rok morda ne spremeni proizvodnega postopka in trajanja, nova vpenjalna priprava ali dodatna faza kontrole pa lahko spremenita oboje. Premi\u0161ljeno dolo\u010dite obseg sprememb. Sicer bo proizvodnja delala po novi metodi, terminski plan pa bo \u0161e naprej rezerviral zmogljivosti za staro.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Pred spremembo standarda preu\u010dite odstopanja<\/h2>\n\n\n<p>Metodo spremljajte tudi po uvedbi, operaterjem pa omogo\u010dite preprosto sporo\u010danje te\u017eav in predlaganje izbolj\u0161av. Ponavljajo\u010de se odstopanje je razlog za preiskavo, ne pa \u017ee dokaz, da nekdo dela napa\u010dno.<\/p>\n\n\n<p>Ko dejansko delo odstopa od standarda, najprej preverite, ali je primerjava ustrezna. Je \u0161lo za isto razli\u010dico izdelka in isto revizijo metode? Sta bila priprava in \u010dakanje evidentirana na enak na\u010din? Je bil potrebni material na voljo?<\/p>\n\n\n<p>Nato izberite ukrep glede na ugotovitve:<\/p>\n\n\n<ul class=\"wp-block-list\"><li><strong>Z dogovorjeno metodo ni mogo\u010de zanesljivo dosegati zahtevane kakovosti ali tempa.<\/strong> Ponovno preu\u010dite njeno zasnovo in preizkusite spremembo.<\/li><li><strong>Metoda deluje, vendar delo prekinjajo manjkajo\u010di deli ali okvare opreme.<\/strong> Odpravite te vzroke, namesto da jih prikrijete s podalj\u0161anjem \u010dasa za izvedbo metode.<\/li><li><strong>Usposobljen operater je na\u0161el bolj\u0161i na\u010din dela.<\/strong> Skupaj z ekipo ga ocenite, preverite njegovo ustreznost in uvedite izbolj\u0161avo za vse.<\/li><li><strong>Metoda se ni spremenila, primerljivi \u010dasi izvedbe pa ve\u010dkrat odstopajo od planiranih.<\/strong> Preverite podlago za dolo\u010ditev \u010dasov in predpostavke o obremenitvi virov, nato popravite ustrezne vhodne podatke.<\/li><\/ul>\n\n\n<p>Ponovni pregled naj spro\u017eijo tudi spremembe konstrukcije izdelka, orodij, razporeditve delovnih mest, ritma povpra\u0161evanja ali zahtev za kontrolo. Standard naj ostane trenutno dogovorjena metoda, ne trajno pravilo, ki ovira bolj\u0161e delo.<\/p>\n\n\n<h2 class=\"wp-block-heading\">S SkyPlanner uvedite dogovorjeno metodo v celotno proizvodnjo<\/h2>\n\n\n<p>Izbolj\u0161ava metode na posameznem delovnem mestu spremeni potrebe naloga po proizvodnih zmogljivostih. Proizvodni postopek lahko zdaj vklju\u010duje drug vir, kraj\u0161o pripravo ali dodatno fazo kontrole. Te spremembe vplivajo tudi na druge naloge, ki uporabljajo iste zmogljivosti.<\/p>\n\n\n<p><strong>SkyPlanner APS te potrjene proizvodne podatke pretvori v <a href=\"https:\/\/skyplanner.ai\/sl\/viri\/kaj-je-terminiranje-proizvodnje\/\">enoten, usklajen terminski plan<\/a>.<\/strong> Dolo\u010dite trajanje posameznih operacij, ustrezne delovne centre in odvisnosti ter \u010dase priprave in razstavljanja po koncu operacije. Arcturus, umetna inteligenca za terminiranje v sistemu SkyPlanner, izra\u010duna terminski plan glede na nastavljene zmogljivosti, izmene, operaterje in prioritete. Terminiranje z upo\u0161tevanjem materiala v izra\u010dun vklju\u010di tudi njegovo razpolo\u017eljivost, nastali plan pa je prikazan v Ganttovem diagramu.<\/p>\n\n\n<p>Ob spremembi metode je zato manj ro\u010dnega usklajevanja lo\u010denih seznamov za posamezne delovne centre. Vidite lahko, kako se spremenjeno delo ujema z drugimi obveznostmi, namesto da izbolj\u0161ate le plan enega delovnega centra, usklajevanje \u010dakajo\u010dih nalogov v nadaljnjih fazah pa odlo\u017eite na pozneje. S pravili terminiranja in zaklepi usmerjate prioritete ter ohranjate sprejete odlo\u010ditve.<\/p>\n\n\n<p>SkyPlanner plan povezuje tudi s podatki o dejanskem poteku proizvodnje. Evidence \u010dasa in poro\u010dila o operacijah prikazujejo zabele\u017eeno delo, poro\u010dilo o primerjavi predvidenega in realiziranega pa omogo\u010da primerjavo planiranih \u010dasov z dejanskimi proizvodnimi \u010dasi. Kadar so na voljo pretekli podatki o nalogih, graf \u010dasov posamezne operacije poda oceno trajanja na podlagi teh podatkov. Z njimi ugotovite, katere vhodne podatke je smiselno pregledati, in jih preverite glede na metodo, ki je bila dejansko uporabljena.<\/p>\n\n\n<p><a href=\"https:\/\/skyplanner.ai\/sl\/zgodbe-strank\/utu\/\">Izku\u0161nja podjetja UTU s sistemom SkyPlanner<\/a> ka\u017ee, zakaj je skupen terminski plan pomemben. Proizvajalec elektri\u010dnih razdelilnikov je prej planiral z lo\u010denimi Excelovimi preglednicami za posamezne oddelke, spremembe zaporedja v sistemu ERP pa niso vedno dosegle proizvodnje. S povezavo med sistemoma SkyPlanner in Oracle NetSuite je tovarna v Ulvili zdru\u017eila svoje linije in oddelke v en sistem za planiranje. V podjetju UTU poro\u010dajo, da posodobljena \u010dakalna vrsta operacij dose\u017ee linijo v nekaj sekundah. Sprememba je koristna \u0161ele, ko zanjo izvedo ljudje, ki delo opravljajo.<\/p>\n\n\n<p>Izberite SkyPlanner, ko \u017eelite dogovorjene metode pretvoriti v proizvodni plan, ki mu lahko sledi celotna tovarna. Prek odprtega vmesnika REST API se pove\u017ee s katerim koli sistemom ERP ali MES. Tako lahko ohranite obstoje\u010de sisteme, hkrati pa potrjene proizvodne postopke, realne \u010dase izvedbe in skupne vire vklju\u010dite v usklajeno terminiranje.<\/p>\n\n\n<p><a href=\"https:\/\/skyplanner.ai\/sl\/kontaktna-prodaja\/\">Rezervirajte predstavitev sistema SkyPlanner<\/a> in pripravite primer ene potrjene metode, pripadajo\u010dega trenutnega proizvodnega postopka ter vira, ki ga uporabljajo tudi drugi nalogi. Oglejte si, kako sprememba metode vpliva na skupni plan in kako so lahko dejanski \u010dasi izvedbe podlaga za naslednji pregled. \u010ce \u017eelite sistem najprej raziskati sami, <a href=\"https:\/\/skyplanner.ai\/sl\/preizkus\/\">preizkusite SkyPlanner z vzor\u010dnimi podatki<\/a>.<\/p>\n\n<\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>Standardizirano delo: vzpostavite metodo, ki se obnese Domov &raquo; Viri &raquo; Standardizirano delo: vzpostavite metodo, ki se obnese Standardizirano delo dolo\u010da trenutno dogovorjeno metodo za ponovljivo delo operaterja: zaporedje opravil, njegovo usklajenost s povpra\u0161evanjem kupcev in medfazno zalogo, potrebno za nemoten potek dela. Vsem izmenam daje skupno izhodi\u0161\u010de za varno in enakomerno proizvodnjo ter izbolj\u0161ave. &#8230; <a title=\"Standardizirano delo: vzpostavite metodo, ki se obnese\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/sl\/viri\/standardizirano-delo\/\" aria-label=\"Read more about Standardizirano delo: vzpostavite metodo, ki se obnese\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":108125,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[2567,302],"tags":[],"class_list":["post-108113","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-ucinkovitost-proizvodnje","category-viri","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Standardizirano delo: vzpostavite metodo, ki se obnese<\/title>\n<meta name=\"description\" content=\"Za ponovljivo delo v vseh izmenah preizkusite in posodabljajte metodo operaterja ter zanesljive podatke o delu uporabite za bolj\u0161i proizvodni na\u010drt.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/sl\/viri\/standardizirano-delo\/\" \/>\n<meta property=\"og:locale\" content=\"sl_SI\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Standardizirano delo: vzpostavite metodo, ki se obnese\" \/>\n<meta property=\"og:description\" content=\"Za ponovljivo delo v vseh izmenah preizkusite in posodabljajte metodo operaterja ter zanesljive podatke o delu uporabite za bolj\u0161i proizvodni na\u010drt.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/sl\/viri\/standardizirano-delo\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2026-10-23T23:53:08+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-23T23:54:43+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/standardized-work-hero.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1672\" \/>\n\t<meta property=\"og:image:height\" content=\"941\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"11 minut\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/standardizirano-delo\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/standardizirano-delo\\\/\"},\"author\":{\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\"},\"headline\":\"Standardizirano delo: vzpostavite metodo, ki se obnese\",\"datePublished\":\"2026-10-23T23:53:08+00:00\",\"dateModified\":\"2026-10-23T23:54:43+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/standardizirano-delo\\\/\"},\"wordCount\":2280,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/standardizirano-delo\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/standardized-work-hero.png\",\"articleSection\":[\"U\u010dinkovitost proizvodnje\",\"viri\"],\"inLanguage\":\"sl-SI\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/standardizirano-delo\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/standardizirano-delo\\\/\",\"name\":\"Standardizirano delo: vzpostavite metodo, ki se obnese\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/standardizirano-delo\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/standardizirano-delo\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/standardized-work-hero.png\",\"datePublished\":\"2026-10-23T23:53:08+00:00\",\"dateModified\":\"2026-10-23T23:54:43+00:00\",\"description\":\"Za ponovljivo delo v vseh izmenah preizkusite in posodabljajte metodo operaterja ter zanesljive podatke o delu uporabite za bolj\u0161i proizvodni na\u010drt.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/standardizirano-delo\\\/#breadcrumb\"},\"inLanguage\":\"sl-SI\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/standardizirano-delo\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"sl-SI\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/standardizirano-delo\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/standardized-work-hero.png\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/standardized-work-hero.png\",\"width\":1672,\"height\":941,\"caption\":\"A fixture, inspection station and parts trays show a repeatable work sequence and designated material positions.\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/standardizirano-delo\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Standardizirano delo: vzpostavite metodo, ki se obnese\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"sl-SI\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"sl-SI\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\",\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"sl-SI\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"caption\":\"Jussi M\u00e4ntyl\u00e4\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Standardizirano delo: vzpostavite metodo, ki se obnese","description":"Za ponovljivo delo v vseh izmenah preizkusite in posodabljajte metodo operaterja ter zanesljive podatke o delu uporabite za bolj\u0161i proizvodni na\u010drt.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/sl\/viri\/standardizirano-delo\/","og_locale":"sl_SI","og_type":"article","og_title":"Standardizirano delo: vzpostavite metodo, ki se obnese","og_description":"Za ponovljivo delo v vseh izmenah preizkusite in posodabljajte metodo operaterja ter zanesljive podatke o delu uporabite za bolj\u0161i proizvodni na\u010drt.","og_url":"https:\/\/skyplanner.ai\/sl\/viri\/standardizirano-delo\/","og_site_name":"SkyPlanner","article_published_time":"2026-10-23T23:53:08+00:00","article_modified_time":"2026-10-23T23:54:43+00:00","og_image":[{"width":1672,"height":941,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/standardized-work-hero.png","type":"image\/png"}],"author":"Jussi M\u00e4ntyl\u00e4","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Jussi M\u00e4ntyl\u00e4","Est. reading time":"11 minut"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/sl\/viri\/standardizirano-delo\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/sl\/viri\/standardizirano-delo\/"},"author":{"name":"Jussi M\u00e4ntyl\u00e4","@id":"https:\/\/skyplanner.ai\/sl\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5"},"headline":"Standardizirano delo: vzpostavite metodo, ki se obnese","datePublished":"2026-10-23T23:53:08+00:00","dateModified":"2026-10-23T23:54:43+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/sl\/viri\/standardizirano-delo\/"},"wordCount":2280,"publisher":{"@id":"https:\/\/skyplanner.ai\/sl\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/sl\/viri\/standardizirano-delo\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/standardized-work-hero.png","articleSection":["U\u010dinkovitost proizvodnje","viri"],"inLanguage":"sl-SI"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/sl\/viri\/standardizirano-delo\/","url":"https:\/\/skyplanner.ai\/sl\/viri\/standardizirano-delo\/","name":"Standardizirano delo: vzpostavite metodo, ki se obnese","isPartOf":{"@id":"https:\/\/skyplanner.ai\/sl\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/sl\/viri\/standardizirano-delo\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/sl\/viri\/standardizirano-delo\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/standardized-work-hero.png","datePublished":"2026-10-23T23:53:08+00:00","dateModified":"2026-10-23T23:54:43+00:00","description":"Za ponovljivo delo v vseh izmenah preizkusite in posodabljajte metodo operaterja ter zanesljive podatke o delu uporabite za bolj\u0161i proizvodni na\u010drt.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/sl\/viri\/standardizirano-delo\/#breadcrumb"},"inLanguage":"sl-SI","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/sl\/viri\/standardizirano-delo\/"]}]},{"@type":"ImageObject","inLanguage":"sl-SI","@id":"https:\/\/skyplanner.ai\/sl\/viri\/standardizirano-delo\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/standardized-work-hero.png","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/standardized-work-hero.png","width":1672,"height":941,"caption":"A fixture, inspection station and parts trays show a repeatable work sequence and designated material positions."},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/sl\/viri\/standardizirano-delo\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/sl\/"},{"@type":"ListItem","position":2,"name":"Standardizirano delo: vzpostavite metodo, ki se obnese"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/sl\/#website","url":"https:\/\/skyplanner.ai\/sl\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/sl\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/sl\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"sl-SI"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/sl\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/sl\/","logo":{"@type":"ImageObject","inLanguage":"sl-SI","@id":"https:\/\/skyplanner.ai\/sl\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/sl\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]},{"@type":"Person","@id":"https:\/\/skyplanner.ai\/sl\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5","name":"Jussi M\u00e4ntyl\u00e4","image":{"@type":"ImageObject","inLanguage":"sl-SI","@id":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","caption":"Jussi M\u00e4ntyl\u00e4"}}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/standardized-work-hero.png",1672,941,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/standardized-work-hero-150x150.png",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/standardized-work-hero-300x169.png",300,169,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/standardized-work-hero-768x432.png",768,432,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/standardized-work-hero-1024x576.png",1024,576,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/standardized-work-hero-1536x864.png",1536,864,true],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/standardized-work-hero.png",1672,941,false],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/standardized-work-hero-360x203.png",360,203,true]},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/sl\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Standardizirano delo: vzpostavite metodo, ki se obnese Domov &raquo; Viri &raquo; Standardizirano delo: vzpostavite metodo, ki se obnese Standardizirano delo dolo\u010da trenutno dogovorjeno metodo za ponovljivo delo operaterja: zaporedje opravil, njegovo usklajenost s povpra\u0161evanjem kupcev in medfazno zalogo, potrebno za nemoten potek dela. Vsem izmenam daje skupno izhodi\u0161\u010de za varno in enakomerno proizvodnjo ter izbolj\u0161ave.&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/posts\/108113","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/comments?post=108113"}],"version-history":[{"count":1,"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/posts\/108113\/revisions"}],"predecessor-version":[{"id":108177,"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/posts\/108113\/revisions\/108177"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/media\/108125"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/media?parent=108113"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/categories?post=108113"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/tags?post=108113"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}