{"id":105435,"date":"2026-10-21T23:26:46","date_gmt":"2026-10-21T23:26:46","guid":{"rendered":"https:\/\/skyplanner.ai\/?p=105435"},"modified":"2026-10-21T23:28:51","modified_gmt":"2026-10-21T23:28:51","slug":"kanban-v-proizvodnji","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/sl\/viri\/kanban-v-proizvodnji\/","title":{"rendered":"Kanban v proizvodnji: signali, zanke in dimenzioniranje"},"content":{"rendered":"<div class=\"gb-container gb-container-article01 article-main-content-container\">\n\n<h1 class=\"wp-block-heading\">Kanban v proizvodnji: signali, zanke in dimenzioniranje<\/h1>\n\n<div class=\"gb-container gb-container-article02\">\n\n<p><a href=\"\/sl\/\">Domov<\/a> &raquo; <a href=\"https:\/\/skyplanner.ai\/sl\/viri\/\">Viri<\/a> &raquo; Kanban v proizvodnji: signali, zanke in dimenzioniranje<\/p>\n\n\n<p class=\"yoast-reading-time__wrapper\"><span class=\"yoast-reading-time__icon\"><svg aria-hidden=\"true\" focusable=\"false\" data-icon=\"clock\" width=\"20\" height=\"20\" fill=\"none\" stroke=\"currentColor\" style=\"display:inline-block;vertical-align:-0.1em\" role=\"img\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewBox=\"0 0 24 24\"><path stroke-linecap=\"round\" stroke-linejoin=\"round\" stroke-width=\"2\" d=\"M12 8v4l3 3m6-3a9 9 0 11-18 0 9 9 0 0118 0z\"><\/path><\/svg><\/span><span class=\"yoast-reading-time__spacer\" style=\"display:inline-block;width:1em\"><\/span><span class=\"yoast-reading-time__descriptive-text\">Predviden \u010das branja: <\/span><span class=\"yoast-reading-time__reading-time\">10<\/span><span class=\"yoast-reading-time__time-unit\"> minut<\/span><\/p>\n\n<\/div>\n<div class=\"gb-container gb-container-article03\">\n\n<p>Kanban v proizvodnji je <a href=\"https:\/\/skyplanner.ai\/sl\/viri\/potisna-in-vlecna-proizvodnja\/\">metoda vle\u010dnega vodenja<\/a>, pri kateri signal dovoljuje izdelavo ali premik dolo\u010dene koli\u010dine delov. Potreba nastane s porabo v naslednjem procesu, signal pa dobavnemu procesu sporo\u010di, kaj mora nadomestiti. To navodilo lahko posreduje kartica, prazna posoda ali elektronsko sporo\u010dilo.<\/p>\n\n\n<p>Prednost je jasno omejevanje dopolnjevanja zalog. Namesto da izdelate novo serijo zgolj zato, ker je stroj prost, nadomestite tisto, kar je naslednji proces dejansko prevzel. S tem zmanj\u0161ate nepotrebne zaloge in la\u017eje opazite, kadar dopolnitev manjka.<\/p>\n\n\n<p>Vendar signal ne ustvari dodatnega strojnega \u010dasa. \u010ce si deli, ki jih redno izdelujete, delijo stiskalnico, obdelovalni center ali upogibni stroj z naro\u010dili kupcev, mora tudi delo za dopolnjevanje zalog dobiti svoje mesto v razporedu. S kanbanom dolo\u010dite dovoljeno koli\u010dino, s sistemom SkyPlanner APS pa sprejeto delo razporedite glede na razpolo\u017eljive proizvodne zmogljivosti in materiale. Tako porabite manj \u010dasa za usklajevanje lo\u010denih \u010dakalnih vrst in opazite konflikte, preden v monta\u017ei zmanjka delov.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Proizvodni in odvzemni kanban dovoljujeta razli\u010dna dejanja<\/h2>\n\n\n<p>Kanban v proizvodnji ni le kartica, ki se po tabli premika med stolpci \u00bbZa izvedbo\u00ab, \u00bbV delu\u00ab in \u00bbKon\u010dano\u00ab. Dovoljuje konkretno dejanje pri dopolnjevanju zalog. Obi\u010dajno se dopolnjujeta dva signala:<\/p>\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Signal<\/th><th>Kaj dovoljuje<\/th><th>\u010cesa ne dovoljuje<\/th><\/tr><\/thead><tbody><tr><td>Proizvodni kanban<\/td><td>Dobavni proces izdela dolo\u010deno vrsto in koli\u010dino delov, da nadomesti odvzeto koli\u010dino.<\/td><td>Izdelave delov za dodatne posode zgolj zato, da bi bil stroj zaseden.<\/td><\/tr><tr><td>Odvzemni kanban, imenovan tudi transportni ali premikalni kanban<\/td><td>Delavec za oskrbo z materialom prenese dolo\u010deno koli\u010dino z dobavnega mesta na mesto porabe.<\/td><td>Izdelave nove serije zgolj zato, ker je bil zahtevan prevoz.<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p><strong>Supermarket<\/strong> je mesto z nadzorovano vmesno zalogo med procesi. Vsak del ima dolo\u010deno mesto in opredeljeno koli\u010dino za dopolnjevanje. Naslednji proces vzame, kar potrebuje, predhodni proces pa odvzeto koli\u010dino nadomesti.<\/p>\n\n\n<p>Kanban torej ne zahteva proizvodnje brez zalog. Zaloga v supermarketu zagotavlja razpolo\u017eljivost delov, medtem ko poteka dopolnjevanje. Bistveno je, da to zalogo nadzorujete, namesto da jo nenehno pove\u010dujete.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Spremljajte eno posodo skozi krogotok z dvema karticama<\/h2>\n\n\n<p>Predstavljajte si monta\u017eno linijo, ki redno porablja nosilec, izdelan na upogibnem stroju, ki slu\u017ei tudi drugim naro\u010dilom. Nosilci prihajajo v posodah po 20 kosov. Posode z izdelanimi nosilci \u010dakajo v supermarketu v bli\u017eini upogibnega stroja, monta\u017ea pa ima svojo zalogo na mestu porabe.<\/p>\n\n\n<p>V tem primeru se odvzemni signal spro\u017ei, ko v monta\u017ei odprejo novo posodo, in ne \u0161ele, ko porabijo zadnji nosilec. Tako ima oskrba z materialom \u010das, da pripelje naslednjo posodo, medtem ko monta\u017ea porablja nosilce iz odprte.<\/p>\n\n\n<p>1. <strong>V monta\u017ei za\u010dnejo porabljati nosilce iz posode.<\/strong> Delavec odstrani odvzemno kartico in jo odlo\u017ei na zbirno mesto. Kartica pomeni zahtevo za novo posodo z 20 nosilci iz supermarketa.<\/p>\n\n\n<p>2. <strong>Delavec za oskrbo z materialom prevzame zahtevo.<\/strong> V supermarketu vzame polno posodo ustreznih nosilcev. Z nje odstrani proizvodno kartico in jo odlo\u017ei na zbirno mesto za proizvodne kartice. Na posodo, ki jo odpelje v monta\u017eo, pritrdi odvzemno kartico.<\/p>\n\n\n<p>3. <strong>Na upogibanju prejmejo proizvodni signal.<\/strong> Vrnjena proizvodna kartica dovoljuje izdelavo 20 nosilcev za eno nadomestno posodo. Ne dovoljuje neomejene proizvodnje.<\/p>\n\n\n<p>4. <strong>Nadomestne nosilce izdelajo in pregledajo.<\/strong> Ko je pripravljena ustrezna koli\u010dina uporabnih nosilcev, se posoda skupaj s proizvodno kartico vrne na svoje mesto v supermarketu.<\/p>\n\n\n<p>5. <strong>Krogotok se ponavlja s porabo delov v monta\u017ei.<\/strong> \u010ce se ne vrne nobena dodatna proizvodna kartica, za to zanko ni dovoljeno izdelati ve\u010d delov.<\/p>\n\n\n<p>Na karticah so navedeni \u0161ifra dela, koli\u010dina, dobavno mesto in mesto porabe ter identifikator, ki posamezno dovoljenje lo\u010duje od drugih. Enako jasen mora biti tudi elektronski signal: dvoumno navodilo z digitalizacijo ne postane zanesljivo pravilo za dopolnjevanje zalog.<\/p>\n\n\n<p>Pri drugih izvedbah je spro\u017eilec prazna posoda. Tudi to lahko deluje, \u010de preostala zaloga zado\u0161\u010da za celoten odzivni \u010das. Dolo\u010dite, kateri dogodek spro\u017ei signal, in vse sodelujo\u010de usposobite za dosledno uporabo tega pravila. \u010ce izmeni\u010dno uporabljate spro\u017eilca \u00bbodprta posoda\u00ab in \u00bbprazna posoda\u00ab, se spreminja \u010das, ki ga ima zanka na voljo za odziv.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Izberite dele, katerih zalogo lahko zanesljivo dopolnjujete<\/h2>\n\n\n<p>Dobro izhodi\u0161\u010de je del, ki ga redno izdelujete in porabljate, ima stabilno specifikacijo ter razmeroma predvidljiv postopek dopolnjevanja zaloge. Standardni nosilec, ki se uporablja v ve\u010d sklopih, je lahko primernej\u0161i kandidat kot del po meri kupca, naro\u010den enkrat na leto.<\/p>\n\n\n<p>Pred uvedbo kartic preverite, ali dobavni proces lahko zadosti povpre\u010dnemu povpra\u0161evanju. \u010ce monta\u017ea stalno porablja dele hitreje, kot jih lahko na upogibanju izdelajo, ve\u010d kartic pomanjkanje le odlo\u017ei. Potrebujete odlo\u010ditev o zmogljivostih ali povpra\u0161evanju, ne ve\u010djega kupa dovoljenj za izdelavo.<\/p>\n\n\n<p>Pomemben je tudi pripravljalni \u010das. Ena kartica lahko predstavlja eno posodo, ne da bi morali stroj za vsako posodo posebej nastavljati. \u010ce ve\u010d vrnjenih kartic zdru\u017eujete v proizvodno serijo, dolo\u010dite, kaj spro\u017ei njeno izdelavo, in \u010dakanje vklju\u010dite v preto\u010dni \u010das dopolnjevanja zaloge. Serije ne dopolnjujte potihem z deli, za katere ni bilo zahteve.<\/p>\n\n\n<p>Pred za\u010detkom pilotnega preizkusa se dogovorite o pravilih dela:<\/p>\n\n\n<ul class=\"wp-block-list\"><li>Izdelujte ali premikajte le na podlagi ustreznega veljavnega signala in samo v koli\u010dini, ki jo dolo\u010da.<\/li><li>Zagotovite sledljivost dovoljenja, ko \u010daka na izvedbo, ko je v obdelavi in ko spremlja izdelane dele.<\/li><li>V naslednji proces ne po\u0161iljajte delov z napako in zaloge v karanteni ne \u0161tejte za uporabno dopolnitev.<\/li><li>Dolo\u010dite odgovorno osebo za pomanjkanje delov, izgubljene kartice in nujne izjeme. Pred izdajo nadomestnega dovoljenja preverite in uskladite stanje prvotnega, da iz ene potrebe ne nastaneta dve naro\u010dili.<\/li><li>\u0160tevilo kartic spreminjajte premi\u0161ljeno, namesto da ob vsaki te\u017eavi v zanki dodajate neuradne kartice.<\/li><\/ul>\n\n\n<p>Ta pravila dajejo omejitvi pravi pomen. Brez njih kanban postane le \u0161e en lokalni seznam poleg obstoje\u010dega proizvodnega na\u010drta.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Zanko dimenzionirajte glede na povpra\u0161evanje v \u010dasu dopolnjevanja<\/h2>\n\n\n<p>Za proizvodno zanko s stalno koli\u010dino delov na posodo je uporaben naslednji za\u010detni izra\u010dun:<\/p>\n\n\n<p><strong>\u0160tevilo proizvodnih kartic = zaokro\u017eitev navzgor [(D \u00d7 L + S) \u00f7 C]<\/strong><\/p>\n\n\n<p>Pri tem je:<\/p>\n\n\n<ul class=\"wp-block-list\"><li><strong>D<\/strong> povpre\u010dna stopnja povpra\u0161evanja na odvzemni to\u010dki zanke, izra\u017eena v kosih na \u010dasovno enoto.<\/li><li><strong>L<\/strong> preto\u010dni \u010das dopolnjevanja zaloge, izra\u017een v isti \u010dasovni enoti: od odvzema, ki spro\u017ei proizvodni signal, do trenutka, ko je uporabna nadomestna koli\u010dina na voljo v tem supermarketu.<\/li><li><strong>S<\/strong> dodatna varnostna zaloga v kosih za nihanja, ki jih \u017eelite pokriti.<\/li><li><strong>C<\/strong> \u0161tevilo uporabnih delov, ki jih predstavlja ena kartica ali posoda.<\/li><\/ul>\n\n\n<p>Logika je preprosta: pokrijte pri\u010dakovano porabo med dopolnjevanjem, pri\u0161tejte izbrano varnostno zalogo in nato koli\u010dino pretvorite v cele posode. Zaokro\u017eite navzgor, saj del kartice ne dovoljuje izdelave cele posode.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Primer izra\u010duna \u0161tevila proizvodnih kartic<\/h3>\n\n\n<p>Za proizvodno zanko nosilcev predpostavimo naslednje vhodne podatke za planiranje:<\/p>\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Vhodni podatek<\/th><th>Vrednost v primeru<\/th><\/tr><\/thead><tbody><tr><td>Povpre\u010dna stopnja odvzema iz supermarketa ob upogibnem stroju<\/td><td>40 nosilcev na obratovalno uro<\/td><\/tr><tr><td>Preto\u010dni \u010das od odvzema do razpolo\u017eljivosti uporabne nadomestne koli\u010dine<\/td><td>3 obratovalne ure<\/td><\/tr><tr><td>Dodatna varnostna zaloga<\/td><td>30 nosilcev<\/td><\/tr><tr><td>Koli\u010dina v posodi<\/td><td>20 nosilcev<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>Pri\u010dakovano povpra\u0161evanje med dopolnjevanjem zna\u0161a <strong>40 \u00d7 3 = 120 nosilcev<\/strong>. Pri\u0161tejemo varnostno zalogo 30 nosilcev in dobimo 150. Delimo z 20 ter <strong>7,5 zaokro\u017eimo navzgor na 8 proizvodnih kartic<\/strong>.<\/p>\n\n\n<p>Teh osem kartic predstavlja <strong>skupno dovoljeno koli\u010dino 160 nosilcev v proizvodni zanki<\/strong>. Razporejene so med zalogo izdelanih nosilcev v supermarketu in dopolnitvami, ki \u010dakajo na izdelavo ali so \u017ee v delu. Ne pomenijo 160 nosilcev na polici in \u0161e dodatnih 160 v proizvodnji. Ko polna posoda zapusti supermarket, se njena proizvodna kartica vrne in dovoli izdelavo nadomestne koli\u010dine; ne ustvarite nove stalne kartice.<\/p>\n\n\n<p>Ta izra\u010dun velja samo za proizvodno zanko upogibanja. Odvzemni krogotok za oskrbo monta\u017ee ima svoj transportni \u010das in svoje potrebe po zalogi na mestu porabe. Ne predpostavljajte, da teh istih osem kartic dolo\u010da tudi velikost zaloge na vseh nadaljnjih mestih ali obseg nedokon\u010dane proizvodnje v celotnem obratu.<\/p>\n\n\n<p>Varnostna zaloga 30 nosilcev je izbrana le za ponazoritev, ne predstavlja pa univerzalnega odstotka ali zagotovljene ravni oskrbe. Varnostno zalogo dolo\u010dite glede na dejanska nihanja povpra\u0161evanja in dopolnjevanja, posledice pomanjkanja ter zahtevano raven oskrbe. Ko proces postaja zanesljivej\u0161i, jo ponovno preverite.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Merite celoten odzivni \u010das, ne le \u010dasa rezanja ali upogibanja<\/h3>\n\n\n<p>Predpostavljeni triurni \u010das dopolnjevanja mora zajemati ve\u010d kot le \u010das obdelave na stroju. Vklju\u010dite zbiranje signalov, obdelavo nalogov, \u010dakanje na serijo ali vir, pripravo, obdelavo, kontrolo in vrnitev v vmesno zalogo tipa supermarket. Upo\u0161tevajte tudi vse prevozne in prevzemne dejavnosti znotraj meja, ki ste jih dolo\u010dili.<\/p>\n\n\n<p>\u010casovne osnove morajo biti usklajene. \u010ce je poraba izra\u017eena na obratovalno uro, mora preto\u010dni \u010das upo\u0161tevati obdobja obratovanja in premore med izmenami, ki vplivajo na dopolnjevanje. Dobaviteljevih dveh koledarskih dni ne morete povezati z urno porabo v monta\u017ei brez ustreznega prera\u010duna.<\/p>\n\n\n<p>Formula dolo\u010di za\u010detno omejitev. Merite dejanske odvzeme, \u010dase dopolnjevanja in primere pomanjkanja zaloge, da preverite, ali ta omejitev deluje. \u0160e tako natan\u010den izra\u010dun ne more odpraviti posledic spregledanih signalov pri zbiranju ali \u010dakalne vrste pred strojem, ki redno podvoji predpostavljeni odzivni \u010das.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Zagotovite realen preto\u010dni \u010das dopolnjevanja na strojih, na katerih se izvajajo tudi drugi nalogi<\/h2>\n\n\n<p>Vrnimo se k primeru nosilcev. Zanka je bila dimenzionirana za triurni odziv, vendar se na upogibnem stroju izvajajo tudi nalogi za naro\u010dila kupcev. \u010ce ti nalogi podalj\u0161ajo dopolnjevanje na pet ur, prvotni izra\u010dun ne opisuje ve\u010d dejanskega procesa.<\/p>\n\n\n<p>Pri enaki porabi in varnostni zalogi bi pet ur pomenilo za\u010detno potrebo po <strong>12 karticah<\/strong>, ne osmih. Ve\u010d kartic lahko za\u0161\u010diti oskrbo, vendar pomeni tudi ve\u010d zaloge za re\u0161evanje te\u017eave, katere vzrok je morda predolgo \u010dakanje. Najprej ugotovite, ali dodatni \u010das povzro\u010dajo neizogibne omejitve zmogljivosti, \u010dakanje, ki bi se mu lahko izognili, ali nezanesljiva izvedba.<\/p>\n\n\n<p>Tu pride do izraza vrednost re\u0161itve SkyPlanner. Potrjene naloge za dopolnjevanje vklju\u010dite v <a href=\"https:\/\/skyplanner.ai\/sl\/viri\/kaj-je-terminiranje-proizvodnje\/\">isti terminski plan z omejenimi kapacitetami<\/a> kot druge naloge, ki potrebujejo ta stroj. Dolo\u010dite njihove zahtevane roke dokon\u010danja, proizvodne postopke, koli\u010dine in prioritete. Arcturus, umetna inteligenca za terminiranje v re\u0161itvi SkyPlanner, izra\u010duna razporeditev na stroje in termine operacij glede na nastavljene zmogljivosti, izmene in odvisnosti. Zaporedje je pregledno prikazano v diagramu Gantt.<\/p>\n\n\n<p>Ko je omogo\u010deno terminiranje z upo\u0161tevanjem materiala, Arcturus upo\u0161teva tudi razpolo\u017eljivost materiala in pri\u010dakovane dobave. Nalog za dopolnitev nosilcev ne bi smel biti prikazan kot pripravljen za za\u010detek, \u010de potrebna plo\u010devina ni na voljo. SkyPlanner se prek odprtega vmesnika REST API povezuje s katerim koli sistemom ERP ali MES. Tako obstoje\u010de podatke o naro\u010dilih in proizvodnji pove\u017ee s terminskim planom, namesto da bi morali vzdr\u017eevati lo\u010deno plansko okolje.<\/p>\n\n\n<p>Prioritete dolo\u010date vi, Arcturus pa opravi izra\u010dun terminov. Ko se razmere spremenijo, s ponovnim izra\u010dunom la\u017eje vidite, kako uskladiti dopolnjevanje in druge naloge. Tako je manj ro\u010dnega dolo\u010danja zaporedja, navzkri\u017ene zahteve pa lahko razre\u0161ite, ne da bi pri tem neopazno ogrozili drugo dobavo.<\/p>\n\n\n<p>Pri dolo\u010danju terminov sta v re\u0161itvi SkyPlanner na voljo na\u010dina ASAP in JIT. ASAP i\u0161\u010de zgodnji prosti termin, JIT pa delo razporedi bli\u017eje roku dokon\u010danja. Nobena od teh nastavitev ni signal porabe. Pravila kanbana dolo\u010dajo, kaj je odobreno, terminiranje pa dolo\u010da, kdaj je mogo\u010de te potrjene naloge izvesti.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Kaj je dnevno terminiranje spremenilo v podjetju KJH-Comp<\/h3>\n\n\n<p><a href=\"https:\/\/skyplanner.ai\/sl\/zgodbe-strank\/kjh-comp\/\">KJH-Comp<\/a>, pogodbeni proizvajalec plo\u010devinastih izdelkov, je prej za grobo tedensko planiranje obremenitev uporabljal C9000 in preglednice. Dnevno razporejanje nalogov na stroje je ostalo ro\u010dno, pri \u010demer sta dva vodji vsak vsaj polovico svojega delovnega \u010dasa porabila za terminiranje.<\/p>\n\n\n<p>Podjetje je obdr\u017ealo svoj ERP in uvedlo SkyPlanner za terminiranje z omejenimi kapacitetami ter samodejno razporejanje nalogov na stroje. Po njihovih navedbah je zdaj jasneje vidno, kdaj se na \u0161tirimetrskem upogibnem stroju kopi\u010di obremenitev, manj pa je tudi primerov, ko prezgodaj za\u010deti nalogi izpodrivajo tiste z bli\u017ejim rokom odpreme. Za terminiranje je namesto dveh vodij postal odgovoren eden, drugi pa je prevzel druge naloge.<\/p>\n\n\n<p>Ta izku\u0161nja ponazarja, kak\u0161en izziv pri terminiranju pomeni obljuba dopolnjevanja: skupna tedenska obremenitev ne zadostuje za odlo\u010ditev, kateri nalog naj bo naslednji na stroju, na katerem se izvaja ve\u010d razli\u010dnih nalogov. SkyPlanner omogo\u010da obvladovanje dnevnega zaporedja tudi ob vse bolj raznolikem delu.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Za\u010dnite z eno zanko in preverite odzivni \u010das<\/h2>\n\n\n<p>Za pilotni preizkus izberite en del, ki se ponavljajo\u010de izdeluje, in vklju\u010dite ljudi, ki ga porabljajo, preva\u017eajo in izdelujejo. Ozna\u010dite lokacijo vmesne zaloge tipa supermarket, standardizirajte koli\u010dino v zabojniku, izdajte dogovorjene kartice in nedvoumno dolo\u010dite dogodek, ki spro\u017ei signal. Preverite za\u010detno zalogo in odprte naloge za dopolnjevanje, da bo zanka za\u010dela delovati z usklajenim stanjem.<\/p>\n\n\n<p>Spremljajte dejanski \u010das od signala do vrnitve, pomanjkanja, uporabno zalogo, odobrene dopolnitve, ki zamujajo, in nujne posege. Ob te\u017eavi preverite celotno zanko: ali je bil signal prevzet, ali je bilo dopolnjevanje vklju\u010deno v terminski plan, ali je bil material pripravljen in ali so ustrezni kosi prispeli na pravo lokacijo?<\/p>\n\n\n<p>\u010ce je zaloga stalno vi\u0161ja od potrebne, nadzorovano zmanj\u0161ajte \u0161tevilo kartic in spremljajte rezultat. \u010ce se pomanjkanje ponavlja, pred pove\u010danjem zaloge preverite predpostavke o \u010dasih in zmogljivostih. Zanko znova preglejte, ko se spremenijo poraba, velikost zabojnika, pravila priprave strojev ali izmene.<\/p>\n\n\n<p>\u010ce si v va\u0161em obratu ve\u010d nalogov deli iste vire, izberite SkyPlanner, da bodo odobreni nalogi za dopolnjevanje in naro\u010dila kupcev vklju\u010deni v enoten terminski plan proizvodnje. Za predstavitev pripravite primer dela, ki ga redno izdelujete, ter podatke o njegovi hitrosti porabe, koli\u010dini v zabojniku, proizvodnem postopku in drugih nalogih, ki potrebujejo iste stroje. Tako lahko poi\u0161\u010dete odgovor na vpra\u0161anje, od katerega je odvisno delovanje zanke: <strong>ali je mogo\u010de dopolnjevanje kon\u010dati, preden zmanjka zaloge, ki pokriva porabo?<\/strong><\/p>\n\n\n<p><a href=\"https:\/\/skyplanner.ai\/sl\/kontaktna-prodaja\/\">Rezervirajte predstavitev re\u0161itve SkyPlanner<\/a> in preu\u010dite primer tega dela v svoji proizvodnji ali <a href=\"https:\/\/skyplanner.ai\/sl\/preizkus\/\">preizkusite SkyPlanner z vzor\u010dnimi podatki<\/a>, da spoznate, kako deluje terminiranje.<\/p>\n\n<\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>Kanban v proizvodnji: signali, zanke in dimenzioniranje Domov &raquo; Viri &raquo; Kanban v proizvodnji: signali, zanke in dimenzioniranje Kanban v proizvodnji je metoda vle\u010dnega vodenja, pri kateri signal dovoljuje izdelavo ali premik dolo\u010dene koli\u010dine delov. Potreba nastane s porabo v naslednjem procesu, signal pa dobavnemu procesu sporo\u010di, kaj mora nadomestiti. To navodilo lahko posreduje kartica, &#8230; <a title=\"Kanban v proizvodnji: signali, zanke in dimenzioniranje\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/sl\/viri\/kanban-v-proizvodnji\/\" aria-label=\"Read more about Kanban v proizvodnji: signali, zanke in dimenzioniranje\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":105447,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[2567,302],"tags":[],"class_list":["post-105435","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-ucinkovitost-proizvodnje","category-viri","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Kanban v proizvodnji: signali, zanke in dimenzioniranje<\/title>\n<meta name=\"description\" content=\"Uredite dopolnjevanje zalog v proizvodnji: kaj dovoljuje izdelavo ali premik, kako dimenzionirati zanko kanban in na\u010drtovati potreben strojni \u010das.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/sl\/viri\/kanban-v-proizvodnji\/\" \/>\n<meta property=\"og:locale\" content=\"sl_SI\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Kanban v proizvodnji: signali, zanke in dimenzioniranje\" \/>\n<meta property=\"og:description\" content=\"Uredite dopolnjevanje zalog v proizvodnji: kaj dovoljuje izdelavo ali premik, kako dimenzionirati zanko kanban in na\u010drtovati potreben strojni \u010das.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/sl\/viri\/kanban-v-proizvodnji\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2026-10-21T23:26:46+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-21T23:28:51+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/kanban-in-manufacturing-hero.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1536\" \/>\n\t<meta property=\"og:image:height\" content=\"1024\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"12 minut\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/kanban-v-proizvodnji\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/kanban-v-proizvodnji\\\/\"},\"author\":{\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\"},\"headline\":\"Kanban v proizvodnji: signali, zanke in dimenzioniranje\",\"datePublished\":\"2026-10-21T23:26:46+00:00\",\"dateModified\":\"2026-10-21T23:28:51+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/kanban-v-proizvodnji\\\/\"},\"wordCount\":2333,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/kanban-v-proizvodnji\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/kanban-in-manufacturing-hero.png\",\"articleSection\":[\"U\u010dinkovitost proizvodnje\",\"viri\"],\"inLanguage\":\"sl-SI\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/kanban-v-proizvodnji\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/kanban-v-proizvodnji\\\/\",\"name\":\"Kanban v proizvodnji: signali, zanke in dimenzioniranje\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/kanban-v-proizvodnji\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/kanban-v-proizvodnji\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/kanban-in-manufacturing-hero.png\",\"datePublished\":\"2026-10-21T23:26:46+00:00\",\"dateModified\":\"2026-10-21T23:28:51+00:00\",\"description\":\"Uredite dopolnjevanje zalog v proizvodnji: kaj dovoljuje izdelavo ali premik, kako dimenzionirati zanko kanban in na\u010drtovati potreben strojni \u010das.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/kanban-v-proizvodnji\\\/#breadcrumb\"},\"inLanguage\":\"sl-SI\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/kanban-v-proizvodnji\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"sl-SI\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/kanban-v-proizvodnji\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/kanban-in-manufacturing-hero.png\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/kanban-in-manufacturing-hero.png\",\"width\":1536,\"height\":1024,\"caption\":\"Blue containers of metal brackets with blank kanban cards wait on a factory rack and a wheeled cart.\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/kanban-v-proizvodnji\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Kanban v proizvodnji: signali, zanke in dimenzioniranje\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"sl-SI\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"sl-SI\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\",\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"sl-SI\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"caption\":\"Jussi M\u00e4ntyl\u00e4\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Kanban v proizvodnji: signali, zanke in dimenzioniranje","description":"Uredite dopolnjevanje zalog v proizvodnji: kaj dovoljuje izdelavo ali premik, kako dimenzionirati zanko kanban in na\u010drtovati potreben strojni \u010das.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/sl\/viri\/kanban-v-proizvodnji\/","og_locale":"sl_SI","og_type":"article","og_title":"Kanban v proizvodnji: signali, zanke in dimenzioniranje","og_description":"Uredite dopolnjevanje zalog v proizvodnji: kaj dovoljuje izdelavo ali premik, kako dimenzionirati zanko kanban in na\u010drtovati potreben strojni \u010das.","og_url":"https:\/\/skyplanner.ai\/sl\/viri\/kanban-v-proizvodnji\/","og_site_name":"SkyPlanner","article_published_time":"2026-10-21T23:26:46+00:00","article_modified_time":"2026-10-21T23:28:51+00:00","og_image":[{"width":1536,"height":1024,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/kanban-in-manufacturing-hero.png","type":"image\/png"}],"author":"Jussi M\u00e4ntyl\u00e4","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Jussi M\u00e4ntyl\u00e4","Est. reading time":"12 minut"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/sl\/viri\/kanban-v-proizvodnji\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/sl\/viri\/kanban-v-proizvodnji\/"},"author":{"name":"Jussi M\u00e4ntyl\u00e4","@id":"https:\/\/skyplanner.ai\/sl\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5"},"headline":"Kanban v proizvodnji: signali, zanke in dimenzioniranje","datePublished":"2026-10-21T23:26:46+00:00","dateModified":"2026-10-21T23:28:51+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/sl\/viri\/kanban-v-proizvodnji\/"},"wordCount":2333,"publisher":{"@id":"https:\/\/skyplanner.ai\/sl\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/sl\/viri\/kanban-v-proizvodnji\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/kanban-in-manufacturing-hero.png","articleSection":["U\u010dinkovitost proizvodnje","viri"],"inLanguage":"sl-SI"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/sl\/viri\/kanban-v-proizvodnji\/","url":"https:\/\/skyplanner.ai\/sl\/viri\/kanban-v-proizvodnji\/","name":"Kanban v proizvodnji: signali, zanke in dimenzioniranje","isPartOf":{"@id":"https:\/\/skyplanner.ai\/sl\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/sl\/viri\/kanban-v-proizvodnji\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/sl\/viri\/kanban-v-proizvodnji\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/kanban-in-manufacturing-hero.png","datePublished":"2026-10-21T23:26:46+00:00","dateModified":"2026-10-21T23:28:51+00:00","description":"Uredite dopolnjevanje zalog v proizvodnji: kaj dovoljuje izdelavo ali premik, kako dimenzionirati zanko kanban in na\u010drtovati potreben strojni \u010das.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/sl\/viri\/kanban-v-proizvodnji\/#breadcrumb"},"inLanguage":"sl-SI","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/sl\/viri\/kanban-v-proizvodnji\/"]}]},{"@type":"ImageObject","inLanguage":"sl-SI","@id":"https:\/\/skyplanner.ai\/sl\/viri\/kanban-v-proizvodnji\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/kanban-in-manufacturing-hero.png","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/kanban-in-manufacturing-hero.png","width":1536,"height":1024,"caption":"Blue containers of metal brackets with blank kanban cards wait on a factory rack and a wheeled cart."},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/sl\/viri\/kanban-v-proizvodnji\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/sl\/"},{"@type":"ListItem","position":2,"name":"Kanban v proizvodnji: signali, zanke in dimenzioniranje"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/sl\/#website","url":"https:\/\/skyplanner.ai\/sl\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/sl\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/sl\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"sl-SI"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/sl\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/sl\/","logo":{"@type":"ImageObject","inLanguage":"sl-SI","@id":"https:\/\/skyplanner.ai\/sl\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/sl\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]},{"@type":"Person","@id":"https:\/\/skyplanner.ai\/sl\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5","name":"Jussi M\u00e4ntyl\u00e4","image":{"@type":"ImageObject","inLanguage":"sl-SI","@id":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","caption":"Jussi M\u00e4ntyl\u00e4"}}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/kanban-in-manufacturing-hero.png",1536,1024,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/kanban-in-manufacturing-hero-150x150.png",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/kanban-in-manufacturing-hero-300x200.png",300,200,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/kanban-in-manufacturing-hero-768x512.png",768,512,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/kanban-in-manufacturing-hero-1024x683.png",1024,683,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/kanban-in-manufacturing-hero.png",1536,1024,false],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/kanban-in-manufacturing-hero.png",1536,1024,false],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/kanban-in-manufacturing-hero-360x240.png",360,240,true]},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/sl\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Kanban v proizvodnji: signali, zanke in dimenzioniranje Domov &raquo; Viri &raquo; Kanban v proizvodnji: signali, zanke in dimenzioniranje Kanban v proizvodnji je metoda vle\u010dnega vodenja, pri kateri signal dovoljuje izdelavo ali premik dolo\u010dene koli\u010dine delov. Potreba nastane s porabo v naslednjem procesu, signal pa dobavnemu procesu sporo\u010di, kaj mora nadomestiti. To navodilo lahko posreduje kartica,&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/posts\/105435","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/comments?post=105435"}],"version-history":[{"count":1,"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/posts\/105435\/revisions"}],"predecessor-version":[{"id":105497,"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/posts\/105435\/revisions\/105497"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/media\/105447"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/media?parent=105435"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/categories?post=105435"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/tags?post=105435"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}