{"id":105341,"date":"2026-10-21T21:17:22","date_gmt":"2026-10-21T21:17:22","guid":{"rendered":"https:\/\/skyplanner.ai\/?p=105341"},"modified":"2026-10-21T21:19:09","modified_gmt":"2026-10-21T21:19:09","slug":"abc-analiza-zalog","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/sl\/viri\/abc-analiza-zalog\/","title":{"rendered":"ABC analiza zalog: izra\u010dun razredov, uporabnih v praksi"},"content":{"rendered":"<div class=\"gb-container gb-container-article01 article-main-content-container\">\n\n<h1 class=\"wp-block-heading\">ABC analiza zalog: izra\u010dun razredov, uporabnih v praksi<\/h1>\n\n<div class=\"gb-container gb-container-article02\">\n\n<p><a href=\"\/sl\/\">Domov<\/a> &raquo; <a href=\"https:\/\/skyplanner.ai\/sl\/viri\/\">Viri<\/a> &raquo; ABC analiza zalog: izra\u010dun razredov, uporabnih v praksi<\/p>\n\n\n<p class=\"yoast-reading-time__wrapper\"><span class=\"yoast-reading-time__icon\"><svg aria-hidden=\"true\" focusable=\"false\" data-icon=\"clock\" width=\"20\" height=\"20\" fill=\"none\" stroke=\"currentColor\" style=\"display:inline-block;vertical-align:-0.1em\" role=\"img\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewBox=\"0 0 24 24\"><path stroke-linecap=\"round\" stroke-linejoin=\"round\" stroke-width=\"2\" d=\"M12 8v4l3 3m6-3a9 9 0 11-18 0 9 9 0 0118 0z\"><\/path><\/svg><\/span><span class=\"yoast-reading-time__spacer\" style=\"display:inline-block;width:1em\"><\/span><span class=\"yoast-reading-time__descriptive-text\">Predviden \u010das branja: <\/span><span class=\"yoast-reading-time__reading-time\">10<\/span><span class=\"yoast-reading-time__time-unit\"> minut<\/span><\/p>\n\n<\/div>\n<div class=\"gb-container gb-container-article03\">\n\n<p>ABC analiza zalog razvr\u0161\u010da artikle po letni vrednosti porabe: letno porabljeno koli\u010dino pomno\u017eimo s stro\u0161kom na enoto. Artikli razreda A predstavljajo najve\u010dji dele\u017e te vrednosti, artikli razreda B naslednji dele\u017e, artikli razreda C pa preostanek. Namen je prizadevanja za nadzor zalog usmeriti tja, kjer imajo najve\u010dji finan\u010dni u\u010dinek.<\/p>\n\n\n<p>Za proizvodno podjetje je pomembno \u0161e drugo vpra\u0161anje: kateri manjkajo\u010di artikel bi lahko ustavil izvedbo naro\u010dila? Poceni vijak lahko spada v razred C, a kljub temu zadr\u017ei celotno monta\u017eo. ABC poka\u017ee, za kaj porabite denar, ne pa tudi, katere operacije lahko za\u010dnete brez tveganja.<\/p>\n\n\n<p>Na podlagi razvrstitve dolo\u010dite smiselna pravila za nabavo in nadzor zalog. Nato s sistemom SkyPlanner APS pove\u017eite razpolo\u017eljivost materiala s terminskim planom proizvodnje. Tako bo poceni manjkajo\u010di sestavni del dele\u017een pozornosti, ko ogro\u017ea dobavo, ne le takrat, ko so letni izdatki zanj visoki.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Kaj razredi A, B in C dejansko pomenijo<\/h2>\n\n\n<p>Pri analizi vrednosti porabe razredi opisujejo, kako je porazdeljena finan\u010dna vrednost, ne pa kakovosti, dobi\u010dkovne mar\u017ee ali prednosti pri izvedbi v proizvodnji.<\/p>\n\n\n<ul class=\"wp-block-list\"><li><strong>Artikli razreda A<\/strong> predstavljajo prvi, najve\u010dji dele\u017e letne vrednosti porabe. Pri njih je treba skrbno spremljati to\u010dnost zalog, prevzete nabavne obveznosti in prese\u017ene zaloge.<\/li><li><strong>Artikli razreda B<\/strong> predstavljajo naslednji dele\u017e. Obi\u010dajni postopki nadzora in redni pregledi so navadno smiselnej\u0161i od obravnave vsakega artikla kot izjeme.<\/li><li><strong>Artikli razreda C<\/strong> predstavljajo preostali, manj\u0161i dele\u017e vrednosti porabe. Pri njih je pogosto mogo\u010de poenostaviti redno dopolnjevanje zalog in administracijo, ne da bi proizvodnjo izpostavili pomanjkanju, ki bi se mu lahko izognili.<\/li><\/ul>\n\n\n<p>Pogosto izhodi\u0161\u010de je, da v razred A uvrstimo pribli\u017eno 80 % vrednosti porabe, v razred B naslednjih 15 %, v razred C pa preostalih 5 %. To so izbrane meje razvr\u0161\u010danja, ne splo\u0161no veljavna pravila. Dejanska porazdelitev je lahko pri vas druga\u010dna.<\/p>\n\n\n<p>Znano na\u010delo 80\/20 opisuje, kako je lahko velik del vrednosti skoncentriran v razmeroma majhni skupini artiklov. Ne zahteva, da v razred A spada natanko 20 % \u0161ifer artiklov. Najprej izra\u010dunajte porazdelitev, namesto da bi \u0161tevilo artiklov na silo prilagajali vnaprej dolo\u010denemu vzorcu.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Kako izra\u010dunati razrede zalog ABC<\/h2>\n\n\n<p>Za\u010dnite z jasno opredeljeno skupino artiklov, na primer z nabavljenimi materiali in sestavnimi deli, ki jih uporablja obrat. Za vse uporabite isto dvanajstmese\u010dno obdobje in enako stro\u0161kovno osnovo. Porabe surovin in celotne vrednosti kon\u010dnih izdelkov ne zdru\u017eujte v eno razvrstitev, ne da bi upo\u0161tevali prekrivanje: tako bi lahko isto vrednost materiala \u0161teli dvakrat.<\/p>\n\n\n<h3 class=\"wp-block-heading\">1. Zberite podatke o porabi in stro\u0161kih na enoto<\/h3>\n\n\n<p>Za vsako \u0161ifro artikla zabele\u017eite koli\u010dino, porabljeno v izbranem obdobju, in stro\u0161ek na enoto. Pazite na usklajenost enot: \u010de je koli\u010dina izra\u017eena v kosih, potrebujete stro\u0161ek na kos, ne na \u0161katlo. Za celoten seznam uporabite isto valuto in enotno osnovo vrednotenja.<\/p>\n\n\n<p>Pretekla poraba je prakti\u010dno izhodi\u0161\u010de, vendar preverite, ali odra\u017ea delo, ki vas \u010daka. Izdelek, umaknjen iz proizvodnje, nova pogodba ali obdobje, v katerem je pomanjkanje omejevalo porabo, lahko pomenijo, da podatki preteklega leta zavajajo. \u010ce namesto tega uporabite napovedano letno porabo, jo jasno ozna\u010dite in dosledno uporabljajte.<\/p>\n\n\n<h3 class=\"wp-block-heading\">2. Izra\u010dunajte letno vrednost porabe<\/h3>\n\n\n<p><strong>Letna vrednost porabe = letna porabljena koli\u010dina \u00d7 stro\u0161ek na enoto<\/strong><\/p>\n\n\n<p>Gre za porabo v celotnem letu, ne za dana\u0161nje stanje zalog. Artikla je lahko na polici malo, pa kljub temu predstavlja velik letni izdatek, ker njegovo zalogo pogosto dopolnjujete.<\/p>\n\n\n<p>Prav tako ne gre za prodajno ceno ali prihodke od prodaje. Pri tej analizi materialov v proizvodnji artikle razvr\u0161\u010date po stro\u0161ku tistega, kar proizvodnja porabi.<\/p>\n\n\n<h3 class=\"wp-block-heading\">3. Razvrstite artikle od najve\u010dje do najmanj\u0161e vrednosti<\/h3>\n\n\n<p>Se\u0161tejte letne vrednosti porabe, da dobite skupno vrednost, nato pa vrstice z artikli razvrstite padajo\u010de. Ne razvr\u0161\u010dajte zgolj po ceni na enoto. Poceni material, ki ga porabite v zelo velikih koli\u010dinah, se lahko uvrsti pred drag del, ki ga uporabljate le ob\u010dasno.<\/p>\n\n\n<h3 class=\"wp-block-heading\">4. Izra\u010dunajte dele\u017e vsakega artikla in kumulativni dele\u017e<\/h3>\n\n\n<p><strong>Vrednostni dele\u017e artikla = letna vrednost porabe artikla \u00f7 skupna letna vrednost porabe \u00d7 100 %<\/strong><\/p>\n\n\n<p>Kumulativni dele\u017e je sprotna vsota dele\u017eev od vrha razvr\u0161\u010denega seznama do posamezne vrstice. Ta vsota poka\u017ee, kje postaviti meje med razredi.<\/p>\n\n\n<h3 class=\"wp-block-heading\">5. Dodelite razrede po jasno dolo\u010denem pravilu za dolo\u010danje mej med razredi<\/h3>\n\n\n<p>Pri pravilu 80\/15\/5 uvr\u0161\u010dajte artikle v razred A, dokler kumulativni dele\u017e vrednosti ne dose\u017ee ali prese\u017ee 80 %, nato pa v razred B, dokler ne dose\u017ee ali prese\u017ee 95 %. Preostali artikli spadajo v razred C. Posamezno \u0161ifro artikla v celoti uvrstite v en razred.<\/p>\n\n\n<p>Po tem dogovoru artikel, s katerim prese\u017eete mejo, ostane v razredu, ki ga trenutno zapolnjujete. \u010ce se dele\u017e razreda A z naslednjim artiklom pove\u010da z 79 % na 83 %, ta artikel ostane v razredu A, razred B pa se za\u010dne v naslednji vrstici. Uporabite lahko tudi druga\u010den dosleden dogovor; zapi\u0161ite ga, da bo lahko naslednji analitik ponovil izra\u010dun in dobil enak rezultat. Dosledno obravnavajte tudi artikle z enako vrednostjo, da spremenjen vrstni red razvr\u0161\u010danja ne bo povzro\u010dal nepojasnjenih prehodov med razredi.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Primer izra\u010duna: artikel razreda C lahko uporabite ve\u010d tiso\u010dkrat<\/h2>\n\n\n<p>Predstavljajte si proizvodno podjetje, ki analizira \u0161est nabavljenih materialov. Spodnje \u0161tevilke so ponazoritvene in niso rezultati stranke. Skupna letna vrednost porabe zna\u0161a <strong>100.000 $<\/strong>. Vrstice so razvr\u0161\u010dene po tej vrednosti; vrstici z enako vrednostjo ohranjata vrstni red s prvotnega seznama artiklov.<\/p>\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Material<\/th><th>Letna poraba<\/th><th>Stro\u0161ek na enoto<\/th><th>Letna vrednost porabe<\/th><th>Dele\u017e skupne vrednosti<\/th><th>Kumulativni dele\u017e<\/th><th>Razred<\/th><\/tr><\/thead><tbody><tr><td>Motorji<\/td><td>200<\/td><td>300,00 $<\/td><td>60.000 $<\/td><td>60 %<\/td><td>60 %<\/td><td>A<\/td><\/tr><tr><td>Ohi\u0161ja<\/td><td>400<\/td><td>50,00 $<\/td><td>20.000 $<\/td><td>20 %<\/td><td>80 %<\/td><td>A<\/td><\/tr><tr><td>Gredi<\/td><td>600<\/td><td>20,00 $<\/td><td>12.000 $<\/td><td>12 %<\/td><td>92 %<\/td><td>B<\/td><\/tr><tr><td>Tesnila<\/td><td>6.000<\/td><td>0,50 $<\/td><td>3.000 $<\/td><td>3 %<\/td><td>95 %<\/td><td>B<\/td><\/tr><tr><td>Vijaki<\/td><td>30.000<\/td><td>0,10 $<\/td><td>3.000 $<\/td><td>3 %<\/td><td>98 %<\/td><td>C<\/td><\/tr><tr><td>Etikete<\/td><td>100.000<\/td><td>0,02 $<\/td><td>2.000 $<\/td><td>2 %<\/td><td>100 %<\/td><td>C<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>Za ohi\u0161ja je izra\u010dun naslednji: 400 \u00d7 50 $ = 20.000 $. \u010ce to vrednost delimo s 100.000 $, dobimo dele\u017e 20 %. Ko ga pri\u0161tejemo k dele\u017eu motorjev, ki zna\u0161a 60 %, kumulativni dele\u017e dose\u017ee 80 % in razred A je zapolnjen.<\/p>\n\n\n<p>Gredi in tesnila prispevajo 15 %, s \u010dimer se razred B zaklju\u010di pri 95 %. Vijaki in etikete predstavljajo zadnjih 5 %, zato po tem pravilu spadajo v razred C.<\/p>\n\n\n<p>Bodite pozorni tudi na to, \u010desa izra\u010dun ne pove. Podjetje porabi 30.000 vijakov, vendar ti ostajajo v razredu C, ker je njihov letni stro\u0161ek razmeroma majhen. Razred C ne pomeni, da se artikel redko uporablja, da je zastarel ali da ga lahko brez posledic zmanjka. Prav tako razred A ne pomeni, da bi morali motorji samodejno dobiti prednost v \u010dakalni vrsti za obdelavo na stroju.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Razredom prilagodite na\u010din nadzora<\/h2>\n\n\n<p>Razvrstitev se izpla\u010da \u0161ele, ko spremeni na\u010din dela. Za vsak razred dolo\u010dite pravila nadzora, odgovorno osebo in postopek rednega pregledovanja, namesto da v mati\u010dne podatke artikla zgolj dodate \u010drko.<\/p>\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Razred<\/th><th>Na kaj se osredoto\u010diti pri nadzoru<\/th><th>\u010cemu se izogniti<\/th><\/tr><\/thead><tbody><tr><td>A<\/td><td>Skrbno pregledujte prevzete nabavne obveznosti in prese\u017ene zaloge. Pogosto preverjajte to\u010dnost zalog tam, kjer napake pomenijo veliko finan\u010dno tveganje. Spremljajte spremembe potreb in stro\u0161kov.<\/td><td>Kupovanju dodatnih zalog zgolj zato, ker artikel spada v razred A, ali tako mo\u010dnemu zmanj\u0161evanju zalog, da oskrba postane nezanesljiva.<\/td><\/tr><tr><td>B<\/td><td>Uporabljajte standardno politiko dopolnjevanja zalog in redno pregledujte odstopanja. Podrobneje preverite artikle, pri katerih se spreminjajo vrednost ali zna\u010dilnosti dobave.<\/td><td>Dopu\u0161\u010danju, da srednja skupina ostane brez ustreznega nadzora med strogimi ukrepi za razred A in preprostimi postopki za razred C.<\/td><\/tr><tr><td>C<\/td><td>Zmanj\u0161ajte obseg dela pri naro\u010danju in prevzemu z ustreznimi velikostmi pakiranj, dopolnjevanjem po sistemu dveh zabojnikov ali dogovori z dobavitelji. Ohranite zadostno za\u0161\u010dito glede na dejansko tveganje pri oskrbi.<\/td><td>Prepri\u010danju, da lahko zaradi majhne letne porabe v vrednostnem smislu zanemarite pomanjkanje, rok uporabnosti ali odvisnost proizvodnje od artikla.<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>Ustrezna pogostost popisovanja zalog in pregledovanja nabave je odvisna od va\u0161ega na\u010dina dela. Artikel s stabilno porabo in zanesljivimi evidencami zahteva druga\u010dno pozornost kot artikel s ponavljajo\u010dimi se razlikami v zalogi, tudi \u010de spadata v isti razred.<\/p>\n\n\n<p>Podobno je lahko ve\u010dje naro\u010dilo artikla razreda C gospodarno, \u010de zmanj\u0161a ponavljajo\u010de se delo pri nabavi in ravnanju z materialom, ne pa, \u010de materialu pote\u010de rok uporabnosti ali zastara. Analiza ABC pomaga usmerjati pozornost, ne izra\u010duna pa optimalne koli\u010dine naro\u010dila ali potrebne varnostne zaloge.<\/p>\n\n\n<p>O <a href=\"https:\/\/skyplanner.ai\/sl\/viri\/varnostna-zaloga\/\">varnostni zalogi odlo\u010dajte lo\u010deno<\/a>. Njeno vi\u0161ino dolo\u010dite glede na negotovost, \u010das dopolnitve zaloge in posledice pomanjkanja, namesto da bi za vse artikle razredov A, B in C uporabljali enak odstotek zaloge.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Pred spremembo politike zalog upo\u0161tevajte kriti\u010dnost za proizvodnjo<\/h2>\n\n\n<p>Preden zmanj\u0161ate nadzor nad artikli razreda C, se vpra\u0161ajte, kaj se zgodi, \u010de posamezni artikel ni na voljo. Preverite, ali obstaja odobren nadomestek, kako hitro lahko prispe nadomestna dobava in katera naro\u010dila kupcev so od njega odvisna.<\/p>\n\n\n<p>Poleg razreda ABC naj bo jasno razvidna tudi kriti\u010dnost artikla. Pomanjkanje vijaka razreda C brez odobrenega nadomestka lahko zahteva nujno ukrepanje, \u010deprav pri nabavi ne potrebuje enako strogega nadzora kot motor razreda A. Da bi prepoznali to tveganje, ga ni treba prerazvrstiti v razred A.<\/p>\n\n\n<p>Spremenljivost potreb je \u0161e en lo\u010den vidik. Dva artikla z enako letno vrednostjo porabe imata lahko povsem druga\u010den vzorec porabe: enega porabljate enakomerno, drugega pa ob\u010dasno potrebujete v velikih koli\u010dinah. Preden zanju dolo\u010dite enak postopek dopolnjevanja zalog, preverite ta vzorec.<\/p>\n\n\n<p>Predstavljajte si, da so motorji in ohi\u0161ja za monta\u017eni nalog na voljo, manjka pa potreben vijak. Z vrednostnega vidika se zdi, da je material za nalog dobro zagotovljen. V praksi pa monta\u017ee brez te komponente ni mogo\u010de dokon\u010dati. Prezgoden za\u010detek dela lahko povzro\u010di le kopi\u010denje nedokon\u010danih sklopov, dodatno preme\u0161\u010danje in novo \u010dakalno vrsto, ki jo je treba spremljati.<\/p>\n\n\n<p>Koristno naslednje vpra\u0161anje ni \u00bbV kateri razred spada vijak?\u00ab, temve\u010d \u00bbKdaj lahko ta nalog dejansko izvedemo in kaj lahko ekipa dela medtem?\u00ab<\/p>\n\n\n<h2 class=\"wp-block-heading\">S sistemom SkyPlanner pove\u017eite vse razrede materialov s terminskim na\u010drtom<\/h2>\n\n\n<p>SkyPlanner APS pri izra\u010dunu terminskega na\u010drta poleg delovnih mest, izmen, odvisnosti med operacijami in prioritet upo\u0161teva tudi razpolo\u017eljivost materiala. Ko je omogo\u010deno terminiranje z upo\u0161tevanjem materiala, Arcturus pri izra\u010dunu za\u010detkov operacij upo\u0161teva razpolo\u017eljive materiale in pri\u010dakovane dobave. Po teh pravilih za\u010detek operacije ni na\u010drtovan, preden so zanjo na voljo potrebni materiali.<\/p>\n\n\n<p>Manjkajo\u010di vijak tako postane omejitev pri terminiranju, ne le postavka majhne vrednosti v poro\u010dilu o zalogah. Na\u010drtovane operacije in njihov zaklju\u010dek lahko pregledate v Ganttovem prikazu, namesto da bi ro\u010dno primerjali stanje zalog z lo\u010denimi \u010dakalnimi vrstami na strojih. Tako je manj na\u010drtovanih za\u010detkov brez zagotovljenega materiala, te\u017eave z dobavo pa so vidne prej.<\/p>\n\n\n<p>Dobavni roki na nabavnih naro\u010dilih pomenijo pri\u010dakovano razpolo\u017eljivost. Ko potrdite, da je nabavno naro\u010dilo dobavljeno, se stanje zalog posodobi; pri\u010dakovani prejem ni isto kot material, ki je \u017ee na zalogi. \u010ce dobavitelj spremeni pri\u010dakovani datum, posodobite podatke in znova izra\u010dunajte terminski na\u010drt, da vidite vpliv na delo.<\/p>\n\n\n<p>O prioritetah \u0161e vedno odlo\u010date vi. Arcturus izra\u010duna zaporedje v okviru pravil in kapacitet, ki jih dolo\u010dite, zato lahko ocenite vpliv na dogovorjene roke, namesto da bi vsako operacijo premikali sami. Zato je SkyPlanner koristna dopolnitev upravljanja zalog po metodi ABC: pozornost \u0161e naprej namenjate finan\u010dno pomembnim artiklom, pri presoji pripravljenosti za proizvodnjo pa upo\u0161tevate komponente, ki jih posamezna operacija dejansko potrebuje.<\/p>\n\n\n<p>SkyPlanner se prek <a href=\"https:\/\/skyplanner.ai\/sl\/integracije\/\">odprtega vmesnika REST API<\/a> pove\u017ee s katerim koli sistemom ERP ali MES. Obdr\u017eite lahko sistem, v katerem vodite nabavne podatke in podatke o artiklih, ter ga pove\u017eete s <a href=\"https:\/\/skyplanner.ai\/sl\/viri\/kaj-je-terminiranje-proizvodnje\/\">terminskim na\u010drtom proizvodnje, ki upo\u0161teva razpolo\u017eljivost materiala<\/a>.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Kaj je bolj\u0161i pregled nad materiali spremenil v podjetju Eskomatic<\/h3>\n\n\n<p>Podjetje Eskomatic, ki izvaja strojno obdelavo po naro\u010dilu, se je prej pri delu s starej\u0161im sistemom ERP in vodenju proizvodnje zana\u0161alo na prete\u017eno ro\u010dno urejene \u010dakalne vrste operacij. Pridobivanje celovitega pregleda je zahtevalo precej dela, zaradi omejenega vpogleda v razpolo\u017eljivost materiala pa so lahko pomanjkanje odkrili \u0161ele tik pred na\u010drtovanim za\u010detkom operacije.<\/p>\n\n\n<p>S povezavo re\u0161itve SkyPlanner z obstoje\u010dim sistemom ERP je ekipa dobila vizualni prikaz \u010dakalne vrste operacij v Ganttovem diagramu, samodejno na\u010drtovanje obremenitev in jasnej\u0161i pregled nad pomanjkanjem materiala. Eskomatic v <a href=\"https:\/\/skyplanner.ai\/sl\/zgodbe-strank\/eskomatic\/\">svoji zgodbi o uporabi re\u0161itve SkyPlanner<\/a> poro\u010da o manj zastojih proizvodnje zaradi manjkajo\u010dih materialov in natan\u010dnej\u0161em dolo\u010danju dobavnih rokov.<\/p>\n\n\n<p>Ta izku\u0161nja ka\u017ee izbolj\u0161avo v praksi, ki presega samo razvr\u0161\u010danje: planer vidi te\u017eavo z materialom v povezavi z delom, na katero vpliva. To je razlog, da upravljanje zalog pove\u017eete s terminiranjem, namesto da pri\u010dakujete, da bo oznaka ABC sama po sebi zagotovila pravo\u010dasno dobavo.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Za\u010dnite z eno skupino materialov in enim dejanskim primerom pomanjkanja<\/h2>\n\n\n<p>Izberite jasno opredeljeno skupino materialov, izra\u010dunajte vrednosti porabe in se dogovorite o mejah med razredi. Uvedite ustrezne ukrepe za upravljanje zalog, nato pa pri artiklih razreda C preverite kriti\u010dnost za proizvodnjo, preden poenostavite njihovo dopolnjevanje. Razvrstitev znova preglejte, ko se spremenijo potrebe, stro\u0161ki ali nabor izdelkov. Nove artikle in artikle brez porabe obravnavajte posebej, namesto da predpostavljate, da pretekla poraba pove vse.<\/p>\n\n\n<p>Z analizo ABC usmerite pozornost tja, kjer je to finan\u010dno najpomembnej\u0161e. Z re\u0161itvijo SkyPlanner pa na podlagi razpolo\u017eljivosti materiala in kapacitet pripravite na\u010drt, po katerem lahko proizvodnja dela.<\/p>\n\n\n<p><a href=\"https:\/\/skyplanner.ai\/sl\/kontaktna-prodaja\/\">Rezervirajte predstavitev re\u0161itve SkyPlanner<\/a> in za primer izberite nedavni monta\u017eni nalog, ki je zamujal zaradi manjkajo\u010de komponente. Pripravite podatke o materialnih potrebah, pri\u010dakovanem prejemu in proizvodnem postopku ter si oglejte, kako pomanjkanje spremeni na\u010drtovani za\u010detek in zaklju\u010dek ob upo\u0161tevanju preostalega dela. \u010ce \u017eelite re\u0161itev najprej raziskati sami, <a href=\"https:\/\/skyplanner.ai\/sl\/preizkus\/\">preizkusite SkyPlanner z demonstracijskimi podatki<\/a>.<\/p>\n\n<\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>ABC analiza zalog: izra\u010dun razredov, uporabnih v praksi Domov &raquo; Viri &raquo; ABC analiza zalog: izra\u010dun razredov, uporabnih v praksi ABC analiza zalog razvr\u0161\u010da artikle po letni vrednosti porabe: letno porabljeno koli\u010dino pomno\u017eimo s stro\u0161kom na enoto. Artikli razreda A predstavljajo najve\u010dji dele\u017e te vrednosti, artikli razreda B naslednji dele\u017e, artikli razreda C pa preostanek. &#8230; <a title=\"ABC analiza zalog: izra\u010dun razredov, uporabnih v praksi\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/sl\/viri\/abc-analiza-zalog\/\" aria-label=\"Read more about ABC analiza zalog: izra\u010dun razredov, uporabnih v praksi\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":105353,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[2567,302],"tags":[],"class_list":["post-105341","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-ucinkovitost-proizvodnje","category-viri","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>ABC analiza zalog: izra\u010dun razredov, uporabnih v praksi<\/title>\n<meta name=\"description\" content=\"Nadzor zalog usmerite tja, kjer so stro\u0161ki najve\u010dji, ne da bi poceni del ustavil proizvodnjo. Izra\u010dunajte razrede ABC in jim prilagodite nadzor.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/sl\/viri\/abc-analiza-zalog\/\" \/>\n<meta property=\"og:locale\" content=\"sl_SI\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"ABC analiza zalog: izra\u010dun razredov, uporabnih v praksi\" \/>\n<meta property=\"og:description\" content=\"Nadzor zalog usmerite tja, kjer so stro\u0161ki najve\u010dji, ne da bi poceni del ustavil proizvodnjo. Izra\u010dunajte razrede ABC in jim prilagodite nadzor.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/sl\/viri\/abc-analiza-zalog\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2026-10-21T21:17:22+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-21T21:19:09+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/abc-inventory-analysis-hero.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1774\" \/>\n\t<meta property=\"og:image:height\" content=\"887\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"11 minut\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/abc-analiza-zalog\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/abc-analiza-zalog\\\/\"},\"author\":{\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\"},\"headline\":\"ABC analiza zalog: izra\u010dun razredov, uporabnih v praksi\",\"datePublished\":\"2026-10-21T21:17:22+00:00\",\"dateModified\":\"2026-10-21T21:19:09+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/abc-analiza-zalog\\\/\"},\"wordCount\":2299,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/abc-analiza-zalog\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/abc-inventory-analysis-hero.png\",\"articleSection\":[\"U\u010dinkovitost proizvodnje\",\"viri\"],\"inLanguage\":\"sl-SI\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/abc-analiza-zalog\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/abc-analiza-zalog\\\/\",\"name\":\"ABC analiza zalog: izra\u010dun razredov, uporabnih v praksi\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/abc-analiza-zalog\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/abc-analiza-zalog\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/abc-inventory-analysis-hero.png\",\"datePublished\":\"2026-10-21T21:17:22+00:00\",\"dateModified\":\"2026-10-21T21:19:09+00:00\",\"description\":\"Nadzor zalog usmerite tja, kjer so stro\u0161ki najve\u010dji, ne da bi poceni del ustavil proizvodnjo. Izra\u010dunajte razrede ABC in jim prilagodite nadzor.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/abc-analiza-zalog\\\/#breadcrumb\"},\"inLanguage\":\"sl-SI\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/abc-analiza-zalog\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"sl-SI\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/abc-analiza-zalog\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/abc-inventory-analysis-hero.png\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/abc-inventory-analysis-hero.png\",\"width\":1774,\"height\":887,\"caption\":\"Motors, shafts and bolts in separate trays beside an assembly awaiting a small bolt.\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/abc-analiza-zalog\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"ABC analiza zalog: izra\u010dun razredov, uporabnih v praksi\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"sl-SI\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"sl-SI\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\",\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"sl-SI\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"caption\":\"Jussi M\u00e4ntyl\u00e4\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"ABC analiza zalog: izra\u010dun razredov, uporabnih v praksi","description":"Nadzor zalog usmerite tja, kjer so stro\u0161ki najve\u010dji, ne da bi poceni del ustavil proizvodnjo. Izra\u010dunajte razrede ABC in jim prilagodite nadzor.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/sl\/viri\/abc-analiza-zalog\/","og_locale":"sl_SI","og_type":"article","og_title":"ABC analiza zalog: izra\u010dun razredov, uporabnih v praksi","og_description":"Nadzor zalog usmerite tja, kjer so stro\u0161ki najve\u010dji, ne da bi poceni del ustavil proizvodnjo. Izra\u010dunajte razrede ABC in jim prilagodite nadzor.","og_url":"https:\/\/skyplanner.ai\/sl\/viri\/abc-analiza-zalog\/","og_site_name":"SkyPlanner","article_published_time":"2026-10-21T21:17:22+00:00","article_modified_time":"2026-10-21T21:19:09+00:00","og_image":[{"width":1774,"height":887,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/abc-inventory-analysis-hero.png","type":"image\/png"}],"author":"Jussi M\u00e4ntyl\u00e4","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Jussi M\u00e4ntyl\u00e4","Est. reading time":"11 minut"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/sl\/viri\/abc-analiza-zalog\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/sl\/viri\/abc-analiza-zalog\/"},"author":{"name":"Jussi M\u00e4ntyl\u00e4","@id":"https:\/\/skyplanner.ai\/sl\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5"},"headline":"ABC analiza zalog: izra\u010dun razredov, uporabnih v praksi","datePublished":"2026-10-21T21:17:22+00:00","dateModified":"2026-10-21T21:19:09+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/sl\/viri\/abc-analiza-zalog\/"},"wordCount":2299,"publisher":{"@id":"https:\/\/skyplanner.ai\/sl\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/sl\/viri\/abc-analiza-zalog\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/abc-inventory-analysis-hero.png","articleSection":["U\u010dinkovitost proizvodnje","viri"],"inLanguage":"sl-SI"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/sl\/viri\/abc-analiza-zalog\/","url":"https:\/\/skyplanner.ai\/sl\/viri\/abc-analiza-zalog\/","name":"ABC analiza zalog: izra\u010dun razredov, uporabnih v praksi","isPartOf":{"@id":"https:\/\/skyplanner.ai\/sl\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/sl\/viri\/abc-analiza-zalog\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/sl\/viri\/abc-analiza-zalog\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/abc-inventory-analysis-hero.png","datePublished":"2026-10-21T21:17:22+00:00","dateModified":"2026-10-21T21:19:09+00:00","description":"Nadzor zalog usmerite tja, kjer so stro\u0161ki najve\u010dji, ne da bi poceni del ustavil proizvodnjo. Izra\u010dunajte razrede ABC in jim prilagodite nadzor.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/sl\/viri\/abc-analiza-zalog\/#breadcrumb"},"inLanguage":"sl-SI","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/sl\/viri\/abc-analiza-zalog\/"]}]},{"@type":"ImageObject","inLanguage":"sl-SI","@id":"https:\/\/skyplanner.ai\/sl\/viri\/abc-analiza-zalog\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/abc-inventory-analysis-hero.png","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/abc-inventory-analysis-hero.png","width":1774,"height":887,"caption":"Motors, shafts and bolts in separate trays beside an assembly awaiting a small bolt."},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/sl\/viri\/abc-analiza-zalog\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/sl\/"},{"@type":"ListItem","position":2,"name":"ABC analiza zalog: izra\u010dun razredov, uporabnih v praksi"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/sl\/#website","url":"https:\/\/skyplanner.ai\/sl\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/sl\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/sl\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"sl-SI"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/sl\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/sl\/","logo":{"@type":"ImageObject","inLanguage":"sl-SI","@id":"https:\/\/skyplanner.ai\/sl\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/sl\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]},{"@type":"Person","@id":"https:\/\/skyplanner.ai\/sl\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5","name":"Jussi M\u00e4ntyl\u00e4","image":{"@type":"ImageObject","inLanguage":"sl-SI","@id":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","caption":"Jussi M\u00e4ntyl\u00e4"}}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/abc-inventory-analysis-hero.png",1774,887,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/abc-inventory-analysis-hero-150x150.png",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/abc-inventory-analysis-hero-300x150.png",300,150,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/abc-inventory-analysis-hero-768x384.png",768,384,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/abc-inventory-analysis-hero-1024x512.png",1024,512,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/abc-inventory-analysis-hero-1536x768.png",1536,768,true],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/abc-inventory-analysis-hero.png",1774,887,false],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/abc-inventory-analysis-hero-360x180.png",360,180,true]},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/sl\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"ABC analiza zalog: izra\u010dun razredov, uporabnih v praksi Domov &raquo; Viri &raquo; ABC analiza zalog: izra\u010dun razredov, uporabnih v praksi ABC analiza zalog razvr\u0161\u010da artikle po letni vrednosti porabe: letno porabljeno koli\u010dino pomno\u017eimo s stro\u0161kom na enoto. Artikli razreda A predstavljajo najve\u010dji dele\u017e te vrednosti, artikli razreda B naslednji dele\u017e, artikli razreda C pa preostanek.&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/posts\/105341","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/comments?post=105341"}],"version-history":[{"count":1,"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/posts\/105341\/revisions"}],"predecessor-version":[{"id":105406,"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/posts\/105341\/revisions\/105406"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/media\/105353"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/media?parent=105341"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/categories?post=105341"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/tags?post=105341"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}