{"id":105248,"date":"2026-10-21T19:05:45","date_gmt":"2026-10-21T19:05:45","guid":{"rendered":"https:\/\/skyplanner.ai\/?p=105248"},"modified":"2026-10-21T19:07:22","modified_gmt":"2026-10-21T19:07:22","slug":"pretok-enega-kosa","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/sl\/viri\/pretok-enega-kosa\/","title":{"rendered":"Pretok enega kosa: kdaj deluje v proizvodnji"},"content":{"rendered":"<div class=\"gb-container gb-container-article01 article-main-content-container\">\n\n<h1 class=\"wp-block-heading\">Pretok enega kosa: kdaj deluje v proizvodnji<\/h1>\n\n<div class=\"gb-container gb-container-article02\">\n\n<p><a href=\"\/sl\/\">Domov<\/a> &raquo; <a href=\"https:\/\/skyplanner.ai\/sl\/viri\/\">Viri<\/a> &raquo; Pretok enega kosa: kdaj deluje v proizvodnji<\/p>\n\n\n<p class=\"yoast-reading-time__wrapper\"><span class=\"yoast-reading-time__icon\"><svg aria-hidden=\"true\" focusable=\"false\" data-icon=\"clock\" width=\"20\" height=\"20\" fill=\"none\" stroke=\"currentColor\" style=\"display:inline-block;vertical-align:-0.1em\" role=\"img\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewBox=\"0 0 24 24\"><path stroke-linecap=\"round\" stroke-linejoin=\"round\" stroke-width=\"2\" d=\"M12 8v4l3 3m6-3a9 9 0 11-18 0 9 9 0 0118 0z\"><\/path><\/svg><\/span><span class=\"yoast-reading-time__spacer\" style=\"display:inline-block;width:1em\"><\/span><span class=\"yoast-reading-time__descriptive-text\">Predviden \u010das branja: <\/span><span class=\"yoast-reading-time__reading-time\">10<\/span><span class=\"yoast-reading-time__time-unit\"> minut<\/span><\/p>\n\n<\/div>\n<div class=\"gb-container gb-container-article03\">\n\n<p>Pretok enega kosa pomeni, da vsak obdelan kos predate neposredno naslednji operaciji, namesto da bi \u010dakali, da se nabere celotna transportna serija. Naslednja operacija je pripravljena na obdelavo, zato kos nadaljuje pot po zaporedju operacij, ne da bi znova \u010dakal v vrsti.<\/p>\n\n\n<p>Prednost je jasna: kupec nima ni\u010d od tega, da skoraj kon\u010dano naro\u010dilo \u010daka, dokler se ne napolni paleta. Pogostej\u0161e predaje manj\u0161ih koli\u010din lahko skraj\u0161ajo \u010dakanje in prej razkrijejo te\u017eave s kakovostjo. Toda predajanje po enega kosa deluje le, \u010de ga naslednja operacija lahko sprejme.<\/p>\n\n\n<p>Za vodjo proizvodnje je pretok enega kosa zato vpra\u0161anje tako zasnove procesa kot terminiranja. Va\u0161a ekipa vzpostavi izvedljiv pretok, SkyPlanner APS pa operacije uskladi z zmogljivostmi in prednostnimi nalogami celotnega obrata. Tako zgodnej\u0161a predaja omogo\u010di zgodnej\u0161i zaklju\u010dek, ne le zgodnej\u0161ega prihoda do zasedenega stroja.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Po en kos ne pomeni le enega kosa na celotni liniji<\/h2>\n\n\n<p>V proizvodnji je lahko hkrati ve\u010d kosov. Eden je lahko v monta\u017ei, drugi na preizku\u0161anju, tretji pa pri pakiranju. Vsak nadaljuje pot posami\u010dno, ko je njegova operacija kon\u010dana in je naslednja pripravljena.<\/p>\n\n\n<p>Razlikujte med tremi koli\u010dinami:<\/p>\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Koli\u010dina<\/th><th>Kaj opisuje<\/th><th>Kaj spremeni pretok enega kosa<\/th><\/tr><\/thead><tbody><tr><td>Transportna serija<\/td><td>Koliko kosov skupaj preide na naslednjo operacijo<\/td><td>Cilj je en kos ob vsaki predaji<\/td><\/tr><tr><td>Proizvodna serija<\/td><td>Koliko kosov izdelate v eni seriji, preden zamenjate izdelek ali opravite novo nastavitev<\/td><td>\u0160e vedno lahko obsega ve\u010d kot en kos<\/td><\/tr><tr><td>Skupna nedokon\u010dana proizvodnja (WIP)<\/td><td>Vse nedokon\u010dane enote znotraj izbranega dela proizvodnje, tako tiste v obdelavi kot tiste, ki \u010dakajo<\/td><td>Manj \u010dakanja lahko zmanj\u0161a WIP, vendar celotna linija ni omejena na eno enoto<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>Z eno nastavitvijo stroja lahko obdelate serijo enakih nosilcev in vsak dokon\u010dan nosilec predate neposredno na raziglevanje. To ni isto, kot \u010de bi po vsakem nosilcu spremenili nastavitev stroja. Zmanj\u0161anje transportne serije ne zahteva samodejno tudi zmanj\u0161anja <a href=\"https:\/\/skyplanner.ai\/sl\/viri\/proizvodnja-v-serijah\/\">proizvodne serije<\/a> na enako velikost.<\/p>\n\n\n<p>V idealnem povezanem zaporedju med operacijami ni \u010dakalnih vrst. V praksi lahko proizvodni postopek poleg tak\u0161nega zaporedja vklju\u010duje tudi nadzorovano vmesno zalogo ali proces, ki mora potekati v serijah. Jasno dolo\u010dite, kje se neposredni pretok za\u010dne in kon\u010da. \u010ce celotno tovarno ozna\u010dite za proizvodnjo s pretokom enega kosa, to \u0161e ne pomeni, da bo vsaka predaja takoj\u0161nja.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Primer: enako obdelovalnega dela, precej manj \u010dakanja<\/h2>\n\n\n<p>Predstavljajte si naro\u010dilo za deset enakih enot, ki gredo skozi pripravo, monta\u017eo in preizku\u0161anje. Vsaka operacija traja dve minuti na enoto. Vsaka ima svojo delovno postajo z lastnim osebjem, vse tri postaje so na voljo in enota lahko nadaljuje pot takoj po obdelavi. V tem poenostavljenem primeru ni nastavitev, zamud zaradi transporta, okvar ali preverjanj za sprostitev v nadaljnjo obdelavo.<\/p>\n\n\n<p>Pri predaji celotne serije se priprava vseh desetih enot kon\u010da, preden se za\u010dne monta\u017ea. Tudi monta\u017ea obdela celotno serijo, preden jo preda na preizku\u0161anje. Pri predaji po enega kosa se monta\u017ea za\u010dne takoj, ko prispe prva pripravljena enota, preizku\u0161anje pa takoj, ko je ta enota sestavljena.<\/p>\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Rezultat<\/th><th>Predaja vseh desetih enot skupaj<\/th><th>Predaja po ene enote<\/th><\/tr><\/thead><tbody><tr><td>Preizku\u0161anje prve enote je kon\u010dano<\/td><td>Po 42 minutah<\/td><td>Po 6 minutah<\/td><\/tr><tr><td>Vseh deset enot je dokon\u010danih<\/td><td>Po 60 minutah<\/td><td>Po 24 minutah<\/td><\/tr><tr><td>Skupni \u010das obdelave ene enote na treh operacijah<\/td><td>6 minut<\/td><td>6 minut<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>Noben stroj ne deluje hitreje. Prihranek nastane zato, ker operacije na razli\u010dnih enotah potekajo so\u010dasno, namesto da bi vsaka postaja \u010dakala na celotno serijo. Ko se zaporedje s pretokom enega kosa zapolni, je v tem primeru vsaki dve minuti dokon\u010dana ena enota, hkrati pa se obdeluje ve\u010d enot.<\/p>\n\n\n<p>Zdaj predpostavimo, da je preizkusna postaja zasedena z drugim naro\u010dilom. Prve sestavljene enote ni mogo\u010de takoj preizkusiti. Zgodnej\u0161a predaja ne odpravi te zasedenosti. Uskladiti morate razpolo\u017eljivost sprejemne postaje, ne le zmanj\u0161ati \u0161tevila kosov na transportnem vozi\u010dku.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Zakaj si proizvajalci prizadevajo za pretok enega kosa<\/h2>\n\n\n<p>Najbolj neposredna korist je kraj\u0161i \u010das do prvega dokon\u010danega kosa. \u010ce pri predaji ni treba \u010dakati, da se nabere celotna serija, se lahko naslednje operacije za\u010dnejo prej. Manj \u010dakanja med operacijami pomeni tudi manj nedokon\u010dane proizvodnje, ki zaseda prostor in ve\u017ee denar.<\/p>\n\n\n<p>Tudi povratne informacije o kakovosti so na voljo prej. \u010ce preizku\u0161anje prvega kosa razkrije te\u017eavo pri monta\u017ei, jo lahko ekipa razi\u0161\u010de, preden v enakih razmerah nadaljuje izdelavo velike serije. Tako je manj kosov izpostavljenih ponavljajo\u010di se napaki, vendar to ne nadomesti kontrole ali sposobnega procesa.<\/p>\n\n\n<p>Predajanje manj\u0161ih koli\u010din lahko izbolj\u0161a tudi preglednost dela. Po\u010dasna operacija, ki jo je prej prikrivala \u010dakalna vrsta, se poka\u017ee kot vidna prekinitev pretoka. Ekipa tako dobi konkreten izziv za izbolj\u0161avo: nezanesljivo vpenjalo, neenakomerno razporejen obseg dela ali pomanjkanje materiala.<\/p>\n\n\n<p>Vendar so pri tem potrebni kompromisi. Z odpravo vmesne zaloge postanejo operacije bolj odvisne druga od druge. Zastoj lahko naslednjo postajo pusti brez dela ali prepre\u010di nadaljevanje dela na predhodni. Pogostej\u0161i prenosi lahko ob neustrezni razmestitvi opreme zahtevajo tudi ve\u010d dela pri ravnanju s kosi. Cilj je kraj\u0161a in zanesljivej\u0161a pot do kakovostnega kon\u010dnega izdelka, ne ve\u010d poti po obratu s posameznimi kosi v rokah.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Kdaj pretok enega kosa dobro deluje?<\/h2>\n\n\n<p>Izberite dru\u017eino izdelkov in preu\u010dite dejansko zaporedje operacij. Podobni proizvodni postopki so prednost, odlo\u010dilno pa je, ali si lahko operacije vedno znova predajajo kakovostno obdelane kose v ustreznem tempu.<\/p>\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Kaj preveriti<\/th><th>Obetavne razmere<\/th><th>Kaj odpraviti pred tesnej\u0161im povezovanjem operacij<\/th><\/tr><\/thead><tbody><tr><td>\u010casi obdelave<\/td><td>Obseg dela je ponovljiv, zaporedje operacij pa lahko zadosti povpra\u0161evanju kupcev<\/td><td>Precej po\u010dasnej\u0161a operacija ali pogosta nihanja povzro\u010dajo blokiranje postaj in \u010dakanje na kose<\/td><\/tr><tr><td>Kakovost<\/td><td>Vsaka operacija zanesljivo predaja ustrezno obdelane kose naslednji<\/td><td>Napake in popravila kosov vedno znova prekinjajo zaporedje<\/td><\/tr><tr><td>Oprema in osebje<\/td><td>Stroji in potrebni delavci so na voljo takrat, ko jih zaporedje operacij potrebuje<\/td><td>Okvare, pomanjkanje potrebnih znanj ali razporeditev na druge naloge ustavijo predajo<\/td><\/tr><tr><td>Ravnanje s kosi in oskrba<\/td><td>Varni prenosi na kratkih razdaljah in zanesljiva oskrba z materialom na mestu uporabe<\/td><td>Zaradi dolgih transportnih poti, nepriro\u010dnih bremen ali manjkajo\u010dih sestavnih delov je prena\u0161anje posameznih kosov neprakti\u010dno<\/td><\/tr><tr><td>Menjave in pravila sprostitve<\/td><td>Izbrani nabor izdelkov je mogo\u010de izdelovati brez mote\u010dih nastavitev ali obveznega zadr\u017eevanja serij<\/td><td>Zahteve glede \u010di\u0161\u010denja, utrjevanja, preizku\u0161anja ali sprostitve prepre\u010dujejo takoj\u0161njo predajo naprej<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>S <a href=\"https:\/\/skyplanner.ai\/sl\/viri\/taktni-cas\/\">taktnim \u010dasom<\/a>, torej razpolo\u017eljivim proizvodnim \u010dasom na zahtevano enoto, dolo\u010dite tempo, ki ga narekuje povpra\u0161evanje. Primerjajte ga s ponovljivimi \u010dasi operacij in dejansko razpolo\u017eljivimi viri. Linije ne uravnote\u017eite na podlagi najhitrej\u0161ega kadarkoli dose\u017eenega cikla.<\/p>\n\n\n<p>\u010ce ena operacija traja bistveno dlje, preu\u010dite obseg dela, zasedbo delovnih mest ali mo\u017enosti za ustrezne dodatne zmogljivosti. Pogostej\u0161e premikanje kosov ne bo odpravilo dejanskega ozkega grla. Prav tako naj predhodna postaja ne proizvaja naprej zgolj zato, da bi bila videti zaposlena, \u010de naslednja operacija njenih kosov ne more uporabiti.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Kdaj je manj\u0161a serija ali vmesna zaloga bolj\u0161a izbira<\/h3>\n\n\n<p>Polnitev pe\u010di, \u0161ar\u017eni me\u0161alnik ali obvezno zadr\u017eanje do odobritve kakovosti lahko zahteva obdelavo oziroma sprostitev celotne serije naenkrat. Pretok pred tak\u0161no mejo in za njo lahko \u0161e vedno izbolj\u0161ate. Celotnega proizvodnega postopka ni treba na silo prilagoditi enakemu na\u010dinu predaje.<\/p>\n\n\n<p>Skupni vir, ki slu\u017ei ve\u010d dru\u017einam izdelkov, pomeni druga\u010dno omejitev. Morda ga ni gospodarno nameniti le enemu zaporedju operacij. Majhna, jasno dolo\u010dena vmesna zaloga FIFO lahko ohranja vrstni red in bla\u017ei del nihanj, medtem ko usklajujete uporabo vira. Dolo\u010dite jasno omejitev koli\u010dine in pravilo dopolnjevanja, da vmesna zaloga ne preraste v nenadzorovano kopi\u010denje.<\/p>\n\n\n<p>Transportna serija z ve\u010d kosi sicer ni pretok enega kosa v dobesednem pomenu, vendar je lahko pomembna izbolj\u0161ava v primerjavi s prena\u0161anjem celotne proizvodne serije. Izberite najmanj\u0161o izvedljivo koli\u010dino za predajo, ki izbolj\u0161a celoten proizvodni postopek, nato pa odpravljajte razloge, zaradi katerih je \u0161e ne morete zmanj\u0161ati.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Predajo preizkusite v praksi, ne ostanite le pri poimenovanju<\/h2>\n\n\n<p>Za\u010dnite z jasno omejenim zaporedjem operacij in reprezentativnim naborom izdelkov. Vklju\u010dite tudi po\u010dasnej\u0161e razli\u010dice in vir, ki prevzema delo ter najpogosteje povzro\u010da zamude.<\/p>\n\n\n<p>1. <strong>Zabele\u017eite trenutni pretok.<\/strong> Izmerite \u010das do prvega dokon\u010danega kosa, \u010das do zaklju\u010dka naro\u010dila, \u010dakanje med operacijami, koli\u010dino nedokon\u010dane proizvodnje (WIP) in rezultate glede kakovosti. Pri celotni primerjavi uporabljajte iste za\u010detne in kon\u010dne to\u010dke.<\/p>\n\n\n<p>2. <strong>Dogovorite se o na\u010dinu dela.<\/strong> Dolo\u010dite, kdo prenese kos, kdaj ga lahko prevzame naslednja operacija, kako se dopolnjuje material in kaj se zgodi ob zaustavitvi delovne postaje. Ohranite varnost, sledljivost in zahtevana preverjanja pred odobritvijo za nadaljnjo obdelavo.<\/p>\n\n\n<p>3. <strong>Preizkusite dejansko razpolo\u017eljivost.<\/strong> Upo\u0161tevajte izmene, razpolo\u017eljivost operaterjev, menjave in druga naro\u010dila, ki uporabljajo opremo za naslednjo operacijo. \u010ce je naslednja delovna postaja med predstavitvijo prosta, to \u0161e ne dokazuje, da bo enako tudi v redni proizvodnji.<\/p>\n\n\n<p>4. <strong>Ocenite celoten rezultat.<\/strong> Preverite, ali se naro\u010dila zaklju\u010dijo prej, ne da bi se \u010dakalna vrsta preselila izven obmo\u010dja pilotnega preizkusa ali bi bilo potrebnih ve\u010d premikov in popravil. Preden zmanj\u0161ate \u0161e katero vmesno zalogo, razi\u0161\u010dite vzroke prekinitev.<\/p>\n\n\n<p>Pilotni preizkus naj poka\u017ee, katere operacije lahko neposredno pove\u017eete, med katerimi potrebujete nadzorovano vmesno zalogo in kaj morate spremeniti, da bo izbolj\u0161ava trajna.<\/p>\n\n\n<h2 class=\"wp-block-heading\">S sistemom SkyPlanner pove\u017eite izbrani pretok s terminskim planom celotne tovarne<\/h2>\n\n\n<p>Ko se dogovorite, kako naj delo poteka, vklju\u010dite to zaporedje v <a href=\"https:\/\/skyplanner.ai\/sl\/viri\/kaj-je-terminiranje-proizvodnje\/\">povezan terminski plan proizvodnje<\/a>. <a href=\"https:\/\/skyplanner.ai\/sl\/funkcije\/\">SkyPlanner omogo\u010da, da dolo\u010dite korake proizvodnega postopka izdelka<\/a>, ustrezne delovne postaje, trajanje in odvisnosti. Arcturus, njegova umetna inteligenca za terminiranje, razporedi delo glede na nastavljene zmogljivosti in prioritete. Ganttov prikaz poka\u017ee, kdaj so operacije na\u010drtovane na posameznih virih.<\/p>\n\n\n<p>To je \u0161e posebej uporabno, kadar delovna postaja, ki prevzema delo, obdeluje tudi druga naro\u010dila. Namesto da vodite lo\u010den seznam za pilotni preizkus pretoka in ga ro\u010dno prilagajate \u010dakalni vrsti oddelka za preizku\u0161anje, lahko operacije usklajujete v skupnem terminskem planu virov. Tako je manj usklajevanja seznamov in jasneje vidite, ali je ob zgodnej\u0161i predaji dejansko na voljo uporabna zmogljivost.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Na\u010drtujte prekrivanje, kjer ga proces dopu\u0161\u010da<\/h3>\n\n\n<p>Nastavitev najmanj\u0161e stopnje izdelanosti v sistemu SkyPlanner omogo\u010da, da se naslednja operacija za\u010dne, \u0161e preden je predhodna povsem kon\u010dana. Tako lahko terminski plan upo\u0161teva dovoljeno prekrivanje, namesto da bi morala vsaka operacija \u010dakati na zaklju\u010dek celotne predhodne serije.<\/p>\n\n\n<p>Prag dokon\u010danosti temelji na prete\u010denem delovnem \u010dasu. Obravnavajte ga kot model dogovorjenega procesa za potrebe terminiranja, ne kot fizi\u010dni signal, ki na podlagi \u0161tetja kosov potrjuje prihod posameznega kosa. Preverite, ali \u010dasovna razporeditev ustreza dejansko izdelani koli\u010dini, ravnanju s kosi in zahtevam za sprostitev na podlagi preverjanja kakovosti. Samo na\u010drtovano prekrivanje \u0161e ne pomeni, da imate linijo brez vmesnih zalog.<\/p>\n\n\n<p>Pri primeru z desetimi kosi je klju\u010dno vpra\u0161anje, ali lahko terminski plan predvidi prekrivanje priprave, monta\u017ee in preizku\u0161anja ter hkrati upo\u0161teva dejanske potrebe teh operacij po virih. \u010ce je preizku\u0161anje \u017ee zasedeno z drugim delom, mora isti plan upo\u0161tevati tudi to konkurenco za zmogljivosti.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Ohranite uporaben skupni plan tudi ob spremembah prioritet<\/h3>\n\n\n<p>Nujno naro\u010dilo, izpad izmene ali zamuda pri dobavi materiala lahko spremenijo mo\u017enosti za prekrivanje. Posodobite ustrezne prioritete ali razpolo\u017eljivost in prepustite ponovni izra\u010dun terminskega plana sistemu Arcturus. \u010ce je omogo\u010deno terminiranje z upo\u0161tevanjem materiala, na izra\u010dun vpliva tudi njegova razpolo\u017eljivost.<\/p>\n\n\n<p>Odlo\u010ditve o proizvodnji in prioritetah ostajajo v va\u0161ih rokah, SkyPlanner pa na njihovi podlagi izra\u010duna terminski plan. SkyPlanner se prek odprtega vmesnika REST API pove\u017ee s katerim koli sistemom ERP ali MES, zato lahko bolj\u0161e usklajevanje temelji na podatkih o naro\u010dilih in proizvodnji, ki jih \u017ee uporabljate.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Kaj je skupno zaporedje dela spremenilo v podjetju UTU<\/h2>\n\n\n<p>V tovarni podjetja UTU v Ulvili je planiranje proizvodnje prej temeljilo na lo\u010denih Excelovih preglednicah za posamezne oddelke. Spremembe zaporedja dela v sistemu ERP niso vedno pri\u0161le do proizvodnje, zato je ekipa porabljala \u010das za preverjanje, kaj mora narediti in v kak\u0161nem vrstnem redu.<\/p>\n\n\n<p>Z <a href=\"https:\/\/skyplanner.ai\/sl\/zgodbe-strank\/utu\/\">uvedbo re\u0161itve SkyPlanner v podjetju UTU<\/a> so vse linije in oddelke tovarne zdru\u017eili v en sistem, povezan s sistemom Oracle NetSuite in sistemom za obra\u010dun pla\u010d. V podjetju poudarjajo kombinacijo samodejnega terminiranja in pregledne Ganttove \u010dasovnice. Ko se zaporedje spremeni, posodobljena \u010dakalna vrsta del v nekaj sekundah dose\u017ee monterje. UTU poro\u010da tudi o pribli\u017eno dveh urah prihranka na teden, saj preglednic ne posodabljajo ve\u010d ro\u010dno.<\/p>\n\n\n<p>Ta izku\u0161nja ponazarja, kak\u0161no usklajevanje potrebujete ob spremembi na\u010dina predaje: zaposleni, ki delo predajajo in prevzemajo, potrebujejo skupno, a\u017eurno zaporedje, ne dveh lokalnih seznamov, ki se s\u010dasoma razhajata.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Pri odlo\u010ditvi upo\u0161tevajte tudi naslednjo operacijo<\/h2>\n\n\n<p>Pretok enega kosa je smiselno uvesti tam, kjer lahko ustrezni kosi neposredno prehajajo med zanesljivimi, primerno uravnote\u017eenimi operacijami. Lo\u010dujte med velikostjo proizvodne serije, koli\u010dino za prenos in skupno koli\u010dino nedokon\u010dane proizvodnje (WIP). Ohranite utemeljene meje serij tam, kjer jih proces zahteva.<\/p>\n\n\n<p>Izberite SkyPlanner, ko usklajevanje teh operacij s preostalo tovarno vzame preve\u010d \u010dasa za planiranje. Dobili boste skupen terminski plan za dogovorjeni pretok in drugo delo, ki uporablja iste vire. Va\u0161a ekipa se bo tako lahko posvetila odpravljanju omejitev namesto popravljanju lo\u010denih \u010dakalnih vrst.<\/p>\n\n\n<p><a href=\"https:\/\/skyplanner.ai\/sl\/kontaktna-prodaja\/\">Rezervirajte predstavitev re\u0161itve SkyPlanner<\/a> in pripravite proizvodni postopek ene dru\u017eine izdelkov, trenutne koli\u010dine za prenos ter skupni vir, pri katerem je tveganje za zamudo najve\u010dje. Prosite, naj vam poka\u017eejo, kako je mogo\u010de dovoljeno prekrivanje in drugo naro\u010dilo, ki potrebuje isti vir, vklju\u010diti v skupen terminski plan. \u010ce si \u017eelite najprej ogledati prikaz terminskega plana, <a href=\"https:\/\/skyplanner.ai\/sl\/preizkus\/\">preizkusite SkyPlanner z demo podatki<\/a>.<\/p>\n\n<\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>Pretok enega kosa: kdaj deluje v proizvodnji Domov &raquo; Viri &raquo; Pretok enega kosa: kdaj deluje v proizvodnji Pretok enega kosa pomeni, da vsak obdelan kos predate neposredno naslednji operaciji, namesto da bi \u010dakali, da se nabere celotna transportna serija. Naslednja operacija je pripravljena na obdelavo, zato kos nadaljuje pot po zaporedju operacij, ne da &#8230; <a title=\"Pretok enega kosa: kdaj deluje v proizvodnji\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/sl\/viri\/pretok-enega-kosa\/\" aria-label=\"Read more about Pretok enega kosa: kdaj deluje v proizvodnji\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":105260,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[2567,302],"tags":[],"class_list":["post-105248","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-ucinkovitost-proizvodnje","category-viri","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Pretok enega kosa: kdaj deluje v proizvodnji<\/title>\n<meta name=\"description\" content=\"Lahko naslednja operacija takoj sprejme izdelan kos? Spoznajte, kdaj pretok enega kosa skraj\u0161a \u010dakanje in kako ga povezati s terminiranjem proizvodnje.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/sl\/viri\/pretok-enega-kosa\/\" \/>\n<meta property=\"og:locale\" content=\"sl_SI\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Pretok enega kosa: kdaj deluje v proizvodnji\" \/>\n<meta property=\"og:description\" content=\"Lahko naslednja operacija takoj sprejme izdelan kos? Spoznajte, kdaj pretok enega kosa skraj\u0161a \u010dakanje in kako ga povezati s terminiranjem proizvodnje.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/sl\/viri\/pretok-enega-kosa\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2026-10-21T19:05:45+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-21T19:07:22+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/one-piece-flow-hero.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1672\" \/>\n\t<meta property=\"og:image:height\" content=\"941\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"11 minut\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/pretok-enega-kosa\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/pretok-enega-kosa\\\/\"},\"author\":{\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\"},\"headline\":\"Pretok enega kosa: kdaj deluje v proizvodnji\",\"datePublished\":\"2026-10-21T19:05:45+00:00\",\"dateModified\":\"2026-10-21T19:07:22+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/pretok-enega-kosa\\\/\"},\"wordCount\":2324,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/pretok-enega-kosa\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/one-piece-flow-hero.png\",\"articleSection\":[\"U\u010dinkovitost proizvodnje\",\"viri\"],\"inLanguage\":\"sl-SI\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/pretok-enega-kosa\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/pretok-enega-kosa\\\/\",\"name\":\"Pretok enega kosa: kdaj deluje v proizvodnji\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/pretok-enega-kosa\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/pretok-enega-kosa\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/one-piece-flow-hero.png\",\"datePublished\":\"2026-10-21T19:05:45+00:00\",\"dateModified\":\"2026-10-21T19:07:22+00:00\",\"description\":\"Lahko naslednja operacija takoj sprejme izdelan kos? Spoznajte, kdaj pretok enega kosa skraj\u0161a \u010dakanje in kako ga povezati s terminiranjem proizvodnje.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/pretok-enega-kosa\\\/#breadcrumb\"},\"inLanguage\":\"sl-SI\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/pretok-enega-kosa\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"sl-SI\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/pretok-enega-kosa\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/one-piece-flow-hero.png\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/one-piece-flow-hero.png\",\"width\":1672,\"height\":941,\"caption\":\"Several blue brackets move individually through three connected manufacturing workstations.\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/pretok-enega-kosa\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Pretok enega kosa: kdaj deluje v proizvodnji\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"sl-SI\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"sl-SI\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\",\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"sl-SI\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"caption\":\"Jussi M\u00e4ntyl\u00e4\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Pretok enega kosa: kdaj deluje v proizvodnji","description":"Lahko naslednja operacija takoj sprejme izdelan kos? Spoznajte, kdaj pretok enega kosa skraj\u0161a \u010dakanje in kako ga povezati s terminiranjem proizvodnje.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/sl\/viri\/pretok-enega-kosa\/","og_locale":"sl_SI","og_type":"article","og_title":"Pretok enega kosa: kdaj deluje v proizvodnji","og_description":"Lahko naslednja operacija takoj sprejme izdelan kos? Spoznajte, kdaj pretok enega kosa skraj\u0161a \u010dakanje in kako ga povezati s terminiranjem proizvodnje.","og_url":"https:\/\/skyplanner.ai\/sl\/viri\/pretok-enega-kosa\/","og_site_name":"SkyPlanner","article_published_time":"2026-10-21T19:05:45+00:00","article_modified_time":"2026-10-21T19:07:22+00:00","og_image":[{"width":1672,"height":941,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/one-piece-flow-hero.png","type":"image\/png"}],"author":"Jussi M\u00e4ntyl\u00e4","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Jussi M\u00e4ntyl\u00e4","Est. reading time":"11 minut"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/sl\/viri\/pretok-enega-kosa\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/sl\/viri\/pretok-enega-kosa\/"},"author":{"name":"Jussi M\u00e4ntyl\u00e4","@id":"https:\/\/skyplanner.ai\/sl\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5"},"headline":"Pretok enega kosa: kdaj deluje v proizvodnji","datePublished":"2026-10-21T19:05:45+00:00","dateModified":"2026-10-21T19:07:22+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/sl\/viri\/pretok-enega-kosa\/"},"wordCount":2324,"publisher":{"@id":"https:\/\/skyplanner.ai\/sl\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/sl\/viri\/pretok-enega-kosa\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/one-piece-flow-hero.png","articleSection":["U\u010dinkovitost proizvodnje","viri"],"inLanguage":"sl-SI"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/sl\/viri\/pretok-enega-kosa\/","url":"https:\/\/skyplanner.ai\/sl\/viri\/pretok-enega-kosa\/","name":"Pretok enega kosa: kdaj deluje v proizvodnji","isPartOf":{"@id":"https:\/\/skyplanner.ai\/sl\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/sl\/viri\/pretok-enega-kosa\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/sl\/viri\/pretok-enega-kosa\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/one-piece-flow-hero.png","datePublished":"2026-10-21T19:05:45+00:00","dateModified":"2026-10-21T19:07:22+00:00","description":"Lahko naslednja operacija takoj sprejme izdelan kos? Spoznajte, kdaj pretok enega kosa skraj\u0161a \u010dakanje in kako ga povezati s terminiranjem proizvodnje.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/sl\/viri\/pretok-enega-kosa\/#breadcrumb"},"inLanguage":"sl-SI","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/sl\/viri\/pretok-enega-kosa\/"]}]},{"@type":"ImageObject","inLanguage":"sl-SI","@id":"https:\/\/skyplanner.ai\/sl\/viri\/pretok-enega-kosa\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/one-piece-flow-hero.png","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/one-piece-flow-hero.png","width":1672,"height":941,"caption":"Several blue brackets move individually through three connected manufacturing workstations."},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/sl\/viri\/pretok-enega-kosa\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/sl\/"},{"@type":"ListItem","position":2,"name":"Pretok enega kosa: kdaj deluje v proizvodnji"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/sl\/#website","url":"https:\/\/skyplanner.ai\/sl\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/sl\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/sl\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"sl-SI"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/sl\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/sl\/","logo":{"@type":"ImageObject","inLanguage":"sl-SI","@id":"https:\/\/skyplanner.ai\/sl\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/sl\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]},{"@type":"Person","@id":"https:\/\/skyplanner.ai\/sl\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5","name":"Jussi M\u00e4ntyl\u00e4","image":{"@type":"ImageObject","inLanguage":"sl-SI","@id":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","caption":"Jussi M\u00e4ntyl\u00e4"}}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/one-piece-flow-hero.png",1672,941,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/one-piece-flow-hero-150x150.png",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/one-piece-flow-hero-300x169.png",300,169,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/one-piece-flow-hero-768x432.png",768,432,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/one-piece-flow-hero-1024x576.png",1024,576,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/one-piece-flow-hero-1536x864.png",1536,864,true],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/one-piece-flow-hero.png",1672,941,false],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/one-piece-flow-hero-360x203.png",360,203,true]},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/sl\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Pretok enega kosa: kdaj deluje v proizvodnji Domov &raquo; Viri &raquo; Pretok enega kosa: kdaj deluje v proizvodnji Pretok enega kosa pomeni, da vsak obdelan kos predate neposredno naslednji operaciji, namesto da bi \u010dakali, da se nabere celotna transportna serija. Naslednja operacija je pripravljena na obdelavo, zato kos nadaljuje pot po zaporedju operacij, ne da&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/posts\/105248","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/comments?post=105248"}],"version-history":[{"count":1,"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/posts\/105248\/revisions"}],"predecessor-version":[{"id":105312,"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/posts\/105248\/revisions\/105312"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/media\/105260"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/media?parent=105248"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/categories?post=105248"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/tags?post=105248"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}