{"id":104883,"date":"2026-10-21T10:20:06","date_gmt":"2026-10-21T10:20:06","guid":{"rendered":"https:\/\/skyplanner.ai\/?p=104883"},"modified":"2026-10-21T10:21:24","modified_gmt":"2026-10-21T10:21:24","slug":"oee","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/sl\/viri\/oee\/","title":{"rendered":"Celovita u\u010dinkovitost opreme: izra\u010dun in uporaba OEE"},"content":{"rendered":"<div class=\"gb-container gb-container-article01 article-main-content-container\">\n\n<h1 class=\"wp-block-heading\">Celovita u\u010dinkovitost opreme: izra\u010dun in uporaba OEE<\/h1>\n\n<div class=\"gb-container gb-container-article02\">\n\n<p><a href=\"\/sl\/\">Domov<\/a> &raquo; <a href=\"https:\/\/skyplanner.ai\/sl\/viri\/\">Viri<\/a> &raquo; Celovita u\u010dinkovitost opreme: izra\u010dun in uporaba OEE<\/p>\n\n\n<p class=\"yoast-reading-time__wrapper\"><span class=\"yoast-reading-time__icon\"><svg aria-hidden=\"true\" focusable=\"false\" data-icon=\"clock\" width=\"20\" height=\"20\" fill=\"none\" stroke=\"currentColor\" style=\"display:inline-block;vertical-align:-0.1em\" role=\"img\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewBox=\"0 0 24 24\"><path stroke-linecap=\"round\" stroke-linejoin=\"round\" stroke-width=\"2\" d=\"M12 8v4l3 3m6-3a9 9 0 11-18 0 9 9 0 0118 0z\"><\/path><\/svg><\/span><span class=\"yoast-reading-time__spacer\" style=\"display:inline-block;width:1em\"><\/span><span class=\"yoast-reading-time__descriptive-text\">Predviden \u010das branja: <\/span><span class=\"yoast-reading-time__reading-time\">10<\/span><span class=\"yoast-reading-time__time-unit\"> minut<\/span><\/p>\n\n<\/div>\n<div class=\"gb-container gb-container-article03\">\n\n<p>Celovita u\u010dinkovitost opreme (OEE) meri, kolik\u0161en dele\u017e na\u010drtovanega proizvodnega \u010dasa se pretvori v dobre izdelke pri idealni hitrosti procesa. Zdru\u017euje tri dejavnike: razpolo\u017eljivost, zmogljivost in kakovost. Stroj lahko obratuje ve\u010dino izmene, pa ima kljub temu nizek OEE, ker deluje po\u010dasi ali izdeluje kose, ki jih je treba dodelati.<\/p>\n\n\n<p>OEE je zato uporaben, kadar v proizvodnji vsi delajo s polno paro, dobave pa vseeno zamujajo. Lo\u010di izgube zaradi zastojev od izgub zaradi zmanj\u0161ane hitrosti in kosov, ki niso ustrezni \u017ee v prvem prehodu. Tako dobite bolj\u0161e izhodi\u0161\u010de za ukrepanje, kot \u010de bi od ekipe zgolj zahtevali ve\u010djo proizvodnjo.<\/p>\n\n\n<p>Naslednji korak je ukrepanje glede ugotovljenih izgub. SkyPlanner v pregled proizvodnje poleg kapacitet in obremenitve vklju\u010duje tudi kazalnik OEE, v istem okolju pa omogo\u010da terminiranje z umetno inteligenco. Rezultat lahko razi\u0161\u010dete, upo\u0161tevate potrjeno spremembo kapacitet in prilagodite povezan proizvodni na\u010drt, ne da bi morali ro\u010dno na novo razporejati operacije na vsakem stroju.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Kako izra\u010dunati OEE<\/h2>\n\n\n<p>Formula je:<\/p>\n\n\n<p><strong>OEE = razpolo\u017eljivost \u00d7 zmogljivost \u00d7 kakovost<\/strong><\/p>\n\n\n<p>Pri mno\u017eenju uporabite decimalne dele\u017ee, nato rezultat izrazite v odstotkih. Vrednosti teh treh dejavnikov ne se\u0161tevajte in ne ra\u010dunajte njihovega povpre\u010dja: vsak dejavnik zmanj\u0161a tisto, kar ostane po predhodni izgubi.<\/p>\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Dejavnik<\/th><th>Izra\u010dun<\/th><th>Na katero vpra\u0161anje odgovarja<\/th><\/tr><\/thead><tbody><tr><td>Razpolo\u017eljivost<\/td><td>\u010cas obratovanja \u00f7 na\u010drtovani proizvodni \u010das<\/td><td>Ali je proces potekal takrat, ko smo ga na\u010drtovali?<\/td><\/tr><tr><td>Zmogljivost<\/td><td>Idealni \u010das cikla \u00d7 skupno \u0161tevilo kosov \u00f7 \u010das obratovanja<\/td><td>Ali je proizvodnja med obratovanjem potekala z idealno hitrostjo?<\/td><\/tr><tr><td>Kakovost<\/td><td>\u0160tevilo dobrih kosov v prvem prehodu \u00f7 skupno \u0161tevilo kosov<\/td><td>Kolik\u0161en del proizvodnje je izpolnil zahteve brez dodelave?<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>Podatki o \u010dasu in koli\u010dinah se morajo nana\u0161ati na isto opremo, isto proizvodno obdobje in isti obseg procesa. Rezultat strojne obdelave ni samodejno tudi rezultat celotnega proizvodnega postopka, ki vklju\u010duje \u0161e kon\u010dno obdelavo in monta\u017eo.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Razpolo\u017eljivost: \u010das, izgubljen zaradi zastojev<\/h3>\n\n\n<p>Najprej dolo\u010dite na\u010drtovani proizvodni \u010das: \u010das, v katerem naj bi oprema proizvajala. Izklju\u010dite obdobja, v katerih proizvodnja ni predvidena, na primer izmeno brez osebja ali odmor, med katerim je na\u010drtovana ustavitev procesa.<\/p>\n\n\n<p>Nato od tega \u010dasa od\u0161tejte zastoje v obravnavanem proizvodnem obdobju, da dobite \u010das obratovanja. Razpolo\u017eljivosti ne zmanj\u0161ujejo le okvare, temve\u010d tudi na\u010drtovane menjave v tem obdobju. \u010ce za pripravo stroja veste vnaprej, to \u0161e ne pomeni, da \u010das, ki ga zahteva, lahko izklju\u010dite iz na\u010drtovanega proizvodnega \u010dasa.<\/p>\n\n\n<p>Dogovorite se za enotno pravilo, katere prekinitve boste evidentirali kot zastoje. Dalj\u0161e prekinitve obi\u010dajno sodijo med izgube razpolo\u017eljivosti, kratke prekinitve, ki niso posebej zabele\u017eene, pa ostanejo del izgub zmogljivosti. Vsako prekinitev upo\u0161tevajte le enkrat, ne pri obeh dejavnikih.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Zmogljivost: izgubljena proizvodnja med obratovanjem<\/h3>\n\n\n<p>Idealni \u010das cikla je najkraj\u0161i dosegljivi \u010das izdelave ene enote dolo\u010denega izdelka v optimalnih pogojih. To ni ponujeni preto\u010dni \u010das niti \u010das za terminiranje, podalj\u0161an z dodatki za zastoje in pripravo stroja.<\/p>\n\n\n<p>Idealni \u010das cikla pomno\u017eite s skupno proizvedeno koli\u010dino, vklju\u010dno z neustreznimi kosi, in delite s \u010dasom obratovanja. Pri celotnem izra\u010dunu uporabljajte iste \u010dasovne enote. Po\u010dasnej\u0161i cikli in kratke prekinitve zmanj\u0161ujejo rezultat, tudi kadar je videti, da oprema obratuje normalno.<\/p>\n\n\n<p>\u010ce zmogljivost presega 100 %, preverite idealni \u010das cikla ter podatke o koli\u010dinah in \u010dasu. S podalj\u0161anjem idealnega \u010dasa cikla polep\u0161ate kazalnik, ne da bi proces dejansko pospe\u0161ili.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Kakovost: izdelki, ki so ustrezni \u017ee prvi\u010d<\/h3>\n\n\n<p>\u0160tevilo dobrih kosov zajema izdelke, ki so izpolnili dogovorjene zahteve brez dodelave. Zavrnjeni kos, ki po dodelavi postane ustrezen, je sicer re\u0161en, vendar pri prvotnem proizvodnem rezultatu ne \u0161teje kot dober kos v prvem prehodu.<\/p>\n\n\n<p>Lo\u010deno vodite skupno proizvedeno koli\u010dino, koli\u010dino kosov, sprejetih v prvem prehodu, izmet in koli\u010dino za dodelavo. Sicer lahko zadovoljiva kon\u010dna koli\u010dina sprejetih kosov prikrije dodaten strojni \u010das, potreben zanjo. <a href=\"https:\/\/skyplanner.ai\/sl\/viri\/izkoristek-prvega-prehoda\/\">Izkoristek prvega prehoda<\/a> podrobneje obravnava ta vidik kakovosti, OEE pa ga zdru\u017euje z izgubami \u010dasa in hitrosti.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Primer izra\u010duna OEE: kam je \u0161el \u010das izmene?<\/h2>\n\n\n<p>Predstavljajte si stroj, ki v osemurni izmeni ves \u010das izdeluje isti sestavni del. Med 30-minutnim odmorom proizvodnja ni predvidena. Preostali podatki so:<\/p>\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Podatek o izmeni<\/th><th>Vrednost<\/th><\/tr><\/thead><tbody><tr><td>Trajanje izmene<\/td><td>480 minut<\/td><\/tr><tr><td>Na\u010drtovani odmor brez proizvodnje<\/td><td>30 minut<\/td><\/tr><tr><td>Na\u010drtovani proizvodni \u010das<\/td><td>450 minut<\/td><\/tr><tr><td>Zabele\u017eeni zastoji, vklju\u010dno z menjavami<\/td><td>90 minut<\/td><\/tr><tr><td>\u010cas obratovanja<\/td><td>360 minut<\/td><\/tr><tr><td>Idealni \u010das cikla<\/td><td>0,5 minute na kos<\/td><\/tr><tr><td>Skupno \u0161tevilo izdelanih kosov<\/td><td>600<\/td><\/tr><tr><td>Kosi, sprejeti brez dodelave<\/td><td>570<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>Razpolo\u017eljivost je <strong>360 \u00f7 450 = 80 %<\/strong>.<\/p>\n\n\n<p>Zmogljivost je <strong>(0,5 \u00d7 600) \u00f7 360 = 83,33 %<\/strong>.<\/p>\n\n\n<p>Kakovost je <strong>570 \u00f7 600 = 95 %<\/strong>.<\/p>\n\n\n<p>\u010ce pomno\u017eimo nezaokro\u017eene vrednosti dejavnikov, dobimo <strong>OEE 63,33 %<\/strong>. Rezultat lahko preverite s kraj\u0161o, enakovredno formulo:<\/p>\n\n\n<p><strong>OEE = \u0161tevilo dobrih kosov \u00d7 idealni \u010das cikla \u00f7 na\u010drtovani proizvodni \u010das<\/strong><\/p>\n\n\n<p>Za to izmeno je izra\u010dun <strong>570 \u00d7 0,5 \u00f7 450 = 63,33 %<\/strong>.<\/p>\n\n\n<p>570 dobrih kosov predstavlja 285 minut proizvodnje pri idealnem \u010dasu cikla. Preostalih 165 minut na\u010drtovanega proizvodnega \u010dasa je bilo izgubljenih zaradi zastojev, zmanj\u0161ane hitrosti in neustreznih kosov. Vse te izgube niso zastoji.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Izgube primerjajte v minutah, ne le v odstotkih<\/h3>\n\n\n<p>Odstotki treh dejavnikov imajo razli\u010dne imenovalce. \u010ce vsakega od\u0161tejete od 100 %, ne dobite treh neposredno primerljivih dele\u017eev izmene. Prera\u010dunajte jih na isto osnovo \u2013 idealni proizvodni \u010das:<\/p>\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Izguba<\/th><th>Izra\u010dun<\/th><th>Izgubljene minute<\/th><\/tr><\/thead><tbody><tr><td>Izguba razpolo\u017eljivosti<\/td><td>450 minut na\u010drtovane proizvodnje \u2212 360 minut obratovanja<\/td><td>90<\/td><\/tr><tr><td>Izguba zmogljivosti<\/td><td>360 minut obratovanja \u2212 (600 kosov \u00d7 0,5 minute)<\/td><td>60<\/td><\/tr><tr><td>Izguba kakovosti<\/td><td>30 kosov, ki niso bili sprejeti v prvem prehodu \u00d7 0,5 minute<\/td><td>15<\/td><\/tr><tr><td>Skupna izguba<\/td><td>90 + 60 + 15<\/td><td>165<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>15 minut izgube zaradi kakovosti je prera\u010dun na idealni \u010das, ne izmerjeni \u010das potrebne dodelave. Dodelava teh kosov bi lahko trajala precej dlje ali zahtevala drug vir.<\/p>\n\n\n<p>V tem primeru najve\u010djo \u010dasovno izgubo predstavljajo zabele\u017eeni zastoji. Najprej preu\u010dite njihove vzroke in trajanje. \u010ce je ve\u010dji del od 90 minut posledica ponavljajo\u010de se te\u017eave pri menjavi, se je smiselno posvetiti <a href=\"https:\/\/skyplanner.ai\/sl\/viri\/smed\/\">izbolj\u0161anju priprave stroja<\/a>. \u010ce pa je izgubo povzro\u010dila ena sama okvara in stroj \u0161e vedno ni na voljo, je takoj\u0161nja odlo\u010ditev pri planiranju druga\u010dna: poskrbeti morate za prizadete dobave, medtem ko vzdr\u017eevanje stroj usposablja za obratovanje.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Na podlagi dejavnikov OEE izberite izbolj\u0161ave<\/h2>\n\n\n<p>Razpolo\u017eljivost, zmogljivost in kakovost povedo, kak\u0161na izguba je nastala. Ne razkrijejo pa njenega temeljnega vzroka.<\/p>\n\n\n<p>Smiselna analiza pove\u017ee dejavnik z opa\u017eenim dogodkom. Okvare opreme ter izgube pri pripravi ali nastavitvah vplivajo na razpolo\u017eljivost. Kratke prekinitve in zmanj\u0161ana hitrost vplivajo na zmogljivost. Izmet ob zagonu in neustrezni kosi med proizvodnjo vplivajo na kakovost. Te pojave obi\u010dajno zdru\u017eujemo v \u0161est velikih izgub.<\/p>\n\n\n<p>Pri iskanju natan\u010dnej\u0161e razlage se opirajte na evidence opreme in izku\u0161nje ljudi, ki z njo delajo. Ponavljajo\u010de se kratke prekinitve so lahko posledica te\u017eav z dovajanjem, po\u010dasnej\u0161i cikel pa lahko ka\u017ee na obrabljeno orodje ali zahtevnej\u0161o razli\u010dico izdelka. Za enakim odstotkom se lahko skrivajo zelo razli\u010dne te\u017eave.<\/p>\n\n\n<p>Pri izbiri ukrepa poleg velikosti izgube upo\u0161tevajte tudi njene posledice za proizvodnjo. Ponavljajo\u010da se izguba na viru, ki omejuje pravo\u010dasno izvedbo naro\u010dila, lahko zahteva pozornost prej kot ve\u010dja izguba na stroju z veliko prostimi kapacitetami. Ve\u010dji obseg proizvodnje je koristen, kadar ga lahko izkoristijo nadaljnje operacije in kadar zanj obstaja povpra\u0161evanje. Izdelovanje nepotrebnih kosov zgolj zaradi izbolj\u0161anja kazalnika posameznega stroja ustvarja zaloge, ne pa bolj\u0161e zanesljivosti dobav.<\/p>\n\n\n<p>Za izbrani ukrep dolo\u010dite odgovorno osebo in predvidite preverjanje u\u010dinka pri primerljivi proizvodnji. Z vzdr\u017eevanjem, bolj\u0161im postopkom menjave ali popravkom procesa odpravljate samo izgubo. S terminiranjem pa razporejate delo glede na kapacitete, ki so na voljo med izvajanjem izbolj\u0161ave. Kadar te\u017eava z opremo ogro\u017ea naro\u010dilo z \u017ee obljubljenim rokom, potrebujete oboje.<\/p>\n\n\n<h2 class=\"wp-block-heading\">OEE in izkori\u0161\u010denost: zaseden stroj ni nujno u\u010dinkovit<\/h2>\n\n\n<p><a href=\"https:\/\/skyplanner.ai\/sl\/viri\/optimalna-uporaba-virov-povecajte-svojo-ucinkovitost\/\">Izkori\u0161\u010denost<\/a> pove, kolik\u0161en del opredeljene kapacitete vira je izkori\u0161\u010den. Imenovalec so lahko razpolo\u017eljive ure izmene ali druga navedena \u010dasovna osnova. OEE pa poka\u017ee, kako u\u010dinkovito smo \u010das, namenjen proizvodnji, pretvorili v ustrezne izdelke pri idealni hitrosti.<\/p>\n\n\n<p>Tudi zelo obremenjen stroj ima zato lahko nizek OEE. Ve\u010dino \u010dasa obratovanja lahko proizvaja po\u010dasi ali izdeluje neustrezne kose. Po drugi strani lahko stroj med na\u010drtovanim \u010dasom proizvodnje dosega visok OEE, zunaj tega \u010dasa pa ostaja neizkori\u0161\u010den, ker ni povpra\u0161evanja.<\/p>\n\n\n<p>OEE sam po sebi ne meri izkori\u0161\u010denosti vseh koledarskih ur. Skupna efektivnost opreme glede na koledarski \u010das (TEEP) raz\u0161iri pogled na celoten koledarski \u010das, saj vklju\u010duje tudi dele\u017e \u010dasa, predvidenega za proizvodnjo. Pri vsakodnevnem odlo\u010danju zato jasno lo\u010dite vpra\u0161anji: ali imamo dovolj povpra\u0161evanja in na\u010drtovanega dela ter koliko ustreznih izdelkov dejansko pridobimo v \u010dasu, ko nameravamo proizvajati?<\/p>\n\n\n<h3 class=\"wp-block-heading\">Je OEE 85 % primeren cilj?<\/h3>\n\n\n<p>Pogosto omenjenih 85 % je uveljavljena referen\u010dna vrednost v diskretni proizvodnji, ne pa univerzalna meja sprejemljivosti. Stroja, ki izdeluje veliko razli\u010dnih izdelkov in zahteva pogoste nujne menjave, ni mogo\u010de neposredno primerjati z namensko linijo za en sam izdelek.<\/p>\n\n\n<p>Za\u010dnite z zanesljivim izhodi\u0161\u010dnim stanjem lastnega procesa. Dosledno uporabljajte enako opredelitev proizvodnega \u010dasa, idealne \u010dase cikla in merila sprejemljivosti, nato pa se osredoto\u010dite na potrjeno izgubo, ki jo lahko zmanj\u0161ate. Bolj\u0161i rezultat, dose\u017een z izlo\u010danjem problemati\u010dnih obdobij ali s \u0161tetjem dodelanih kosov med kose, ustrezne \u017ee v prvem prehodu, ne pomeni izbolj\u0161anja proizvodnje.<\/p>\n\n\n<p>Kadar imajo izdelki razli\u010dne idealne \u010dase cikla, njihov prispevek k produktivnemu \u010dasu izra\u010dunajte s pravilno hitrostjo za vsak izdelek posebej. Zdru\u017eujte osnovne podatke o \u010dasu in proizvedenih koli\u010dinah, namesto da izra\u010dunate preprosto povpre\u010dje nepovezanih odstotkov OEE za razli\u010dne izmene ali stroje.<\/p>\n\n\n<h2 class=\"wp-block-heading\">S SkyPlanner pove\u017eite OEE z naslednjim proizvodnim na\u010drtom<\/h2>\n\n\n<p>Pregled izmene je uporabnej\u0161i, \u010de rezultate opreme obravnavate skupaj z obljubljenimi dobavnimi roki. <a href=\"https:\/\/skyplanner.ai\/sl\/viri\/nadzorna-plosca-proizvodnje\/\">Nadzorna plo\u0161\u010da Home<\/a> v SkyPlanner poleg OEE vklju\u010duje klju\u010dne kazalnike kapacitet, obremenitve in stanja proizvodnje. Poro\u010dila o operacijah ter primerjava na\u010drtovanega in realiziranega vam pomagajo podrobneje pregledati delo, ki stoji za skupnim prikazom, Timer pa bele\u017ei delovni \u010das ter koli\u010dine izdelanih ali neustreznih kosov.<\/p>\n\n\n<p>Ko izgubo razumete, konkretno dolo\u010dite, kaj pomeni za planiranje. Pri nerazpolo\u017eljivem stroju je treba spremeniti razpolo\u017eljivost. Pri procesu, ki se ponavljajo\u010de izvaja po\u010dasneje, je treba dolo\u010diti realno trajanje operacije. Za odobreno dodelavo je treba posebej rezervirati \u010das na potrebnih virih. En sam sestavljeni odstotek ne pove, katero od teh sprememb morate izvesti.<\/p>\n\n\n<p>Za obravnavano izmeno predpostavimo, da vzdr\u017eevalci potrdijo, da bo stroj jutri potreboval \u0161e dveurno popravilo. Ta \u010das nerazpolo\u017eljivosti v SkyPlanner vnesite kot izjemo za delovni center. Izjema prepre\u010di terminiranje v tem obdobju. Arcturus, umetna inteligenca za terminiranje v SkyPlanner, lahko nato ponovno izra\u010duna razpored prizadetih operacij glede na nastavljene kapacitete, odvisnosti med operacijami in prioritete. Diagram Gantt prika\u017ee nastalo zaporedje in datume zaklju\u010dka.<\/p>\n\n\n<p>Tako vidite, kaj izgubljeni \u010das pomeni za naslednje operacije in druga naro\u010dila na istem stroju, namesto da bi zgolj premaknili prvo jutri\u0161njo operacijo in nadaljnje posledice odkrivali \u0161ele pozneje. \u010ce je za izvedbo ustrezen tudi drug nastavljen delovni center, lahko razpored upo\u0161teva tudi njegove kapacitete. Nadzor nad prioritetami in za\u0161\u010ditenimi odlo\u010ditvami ohranite vi, Arcturus pa izra\u010duna razpored medsebojno povezanih operacij.<\/p>\n\n\n<p>Idealno hitrost, ki je referenca za OEE, lo\u010dujte od realnih trajanj, s katerimi na\u010drtujete delo. \u010ce razpored \u017ee upo\u0161teva dejanske hitrosti obdelave, pripravljalni \u010das in znane zastoje, lahko z dodatno uporabo celotnega odstotka OEE iste izgube upo\u0161tevate dvakrat. Namesto tega posodobite vhodni podatek, ki odra\u017ea potrjeno te\u017eavo.<\/p>\n\n\n<p>SkyPlanner se prek odprtega vmesnika REST API pove\u017ee s katerim koli sistemom ERP ali MES. Tako lahko <a href=\"https:\/\/skyplanner.ai\/sl\/viri\/kaj-je-terminiranje-proizvodnje\/\">obstoje\u010de podatke o naro\u010dilih in proizvodnji pove\u017eete s terminiranjem z omejenimi kapacitetami<\/a>, zmanj\u0161ate lo\u010deno administrativno delo s klju\u010dnimi kazalniki in porabite manj \u010dasa za popravljanje \u010dakalnih vrst na strojih ob spremembah kapacitet.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Kaj je bolj\u0161e zaporedje operacij spremenilo v podjetju Mamec<\/h3>\n\n\n<p>Mamec, proizvajalec me\u0161alne tehnike in pogodbeni proizvajalec, je prej dolo\u010dal prioritete za ve\u010d tiso\u010d medsebojno odvisnih operacij s papirnimi delovnimi nalogi in togimi funkcijami planiranja v sistemu ERP. Celotno obremenitev je bilo te\u017eko pregledati, breme usklajevanja zaporedja pa je nosila slu\u017eba za vodenje proizvodnje.<\/p>\n\n\n<p>S povezavo sistema SkyPlanner s sistemom Oscar ERP je Mamec pre\u0161el na terminiranje z omejenimi kapacitetami s pomo\u010djo umetne inteligence ter skupen pregled nad naro\u010dili in obremenitvijo. Podjetje poro\u010da o kraj\u0161ih zastojih delovnih centrov zaradi optimiziranega zaporedja operacij in <a href=\"https:\/\/skyplanner.ai\/sl\/zgodbe-strank\/mamec\/\">ob\u010dutno manj\u0161i obremenitvi pri planiranju<\/a>.<\/p>\n\n\n<p>To je prakti\u010den razlog za povezovanje u\u010dinkovitosti opreme s terminiranjem: naslednja operacija in njene odvisnosti postanejo del sproti posodobljenega na\u010drta, namesto \u0161e enega niza lo\u010denih odlo\u010ditev, ki jih je treba uskladiti.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Preverite, kaj izgube na va\u0161i opremi pomenijo za dobave<\/h2>\n\n\n<p>Izberite en stroj, na katerem izgubljeni \u010das redno ovira izvedbo \u017ee obljubljenih naro\u010dil. Za predstavitev SkyPlanner pripravite podatke o njegovem proizvodnem \u010dasovnem oknu, idealnem \u010dasu cikla, koli\u010dinah in glavnih vzrokih zastojev ter o prizadetem naro\u010dilu in njegovih preostalih operacijah.<\/p>\n\n\n<p>Na tem primeru preverite celoten postopek: ugotovite, kaj pomeni rezultat OEE, zabele\u017eite potrjeno spremembo kapacitet in si oglejte, kako spremenjeni razpored vpliva na dobave. <a href=\"https:\/\/skyplanner.ai\/sl\/kontaktna-prodaja\/\">Rezervirajte predstavitev SkyPlanner<\/a> in se pogovorite o svoji proizvodnji ali pa najprej <a href=\"https:\/\/skyplanner.ai\/sl\/preizkus\/\">preizkusite SkyPlanner z vzor\u010dnimi podatki<\/a>.<\/p>\n\n<\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>Celovita u\u010dinkovitost opreme: izra\u010dun in uporaba OEE Domov &raquo; Viri &raquo; Celovita u\u010dinkovitost opreme: izra\u010dun in uporaba OEE Celovita u\u010dinkovitost opreme (OEE) meri, kolik\u0161en dele\u017e na\u010drtovanega proizvodnega \u010dasa se pretvori v dobre izdelke pri idealni hitrosti procesa. Zdru\u017euje tri dejavnike: razpolo\u017eljivost, zmogljivost in kakovost. Stroj lahko obratuje ve\u010dino izmene, pa ima kljub temu nizek OEE, &#8230; <a title=\"Celovita u\u010dinkovitost opreme: izra\u010dun in uporaba OEE\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/sl\/viri\/oee\/\" aria-label=\"Read more about Celovita u\u010dinkovitost opreme: izra\u010dun in uporaba OEE\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":104895,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[2710,302],"tags":[],"class_list":["post-104883","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-erp-sl","category-viri","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Celovita u\u010dinkovitost opreme: izra\u010dun in uporaba OEE<\/title>\n<meta name=\"description\" content=\"Stroj obratuje, a je dobrih kosov premalo. Izra\u010dunajte OEE, ugotovite, katere izgube se skrivajo za odstotkom, in pripravite realen proizvodni na\u010drt.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/sl\/viri\/oee\/\" \/>\n<meta property=\"og:locale\" content=\"sl_SI\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Celovita u\u010dinkovitost opreme: izra\u010dun in uporaba OEE\" \/>\n<meta property=\"og:description\" content=\"Stroj obratuje, a je dobrih kosov premalo. Izra\u010dunajte OEE, ugotovite, katere izgube se skrivajo za odstotkom, in pripravite realen proizvodni na\u010drt.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/sl\/viri\/oee\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2026-10-21T10:20:06+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-21T10:21:24+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/overall-equipment-effectiveness-hero.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1672\" \/>\n\t<meta property=\"og:image:height\" content=\"941\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"11 minut\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/oee\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/oee\\\/\"},\"author\":{\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\"},\"headline\":\"Celovita u\u010dinkovitost opreme: izra\u010dun in uporaba OEE\",\"datePublished\":\"2026-10-21T10:20:06+00:00\",\"dateModified\":\"2026-10-21T10:21:24+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/oee\\\/\"},\"wordCount\":2226,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/oee\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/overall-equipment-effectiveness-hero.png\",\"articleSection\":[\"ERP\",\"viri\"],\"inLanguage\":\"sl-SI\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/oee\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/oee\\\/\",\"name\":\"Celovita u\u010dinkovitost opreme: izra\u010dun in uporaba OEE\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/oee\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/oee\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/overall-equipment-effectiveness-hero.png\",\"datePublished\":\"2026-10-21T10:20:06+00:00\",\"dateModified\":\"2026-10-21T10:21:24+00:00\",\"description\":\"Stroj obratuje, a je dobrih kosov premalo. Izra\u010dunajte OEE, ugotovite, katere izgube se skrivajo za odstotkom, in pripravite realen proizvodni na\u010drt.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/oee\\\/#breadcrumb\"},\"inLanguage\":\"sl-SI\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/oee\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"sl-SI\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/oee\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/overall-equipment-effectiveness-hero.png\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/overall-equipment-effectiveness-hero.png\",\"width\":1672,\"height\":941,\"caption\":\"A machining station with finished parts and a rejected component illustrates equipment effectiveness losses.\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/oee\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Celovita u\u010dinkovitost opreme: izra\u010dun in uporaba OEE\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"sl-SI\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"sl-SI\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\",\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"sl-SI\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"caption\":\"Jussi M\u00e4ntyl\u00e4\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Celovita u\u010dinkovitost opreme: izra\u010dun in uporaba OEE","description":"Stroj obratuje, a je dobrih kosov premalo. Izra\u010dunajte OEE, ugotovite, katere izgube se skrivajo za odstotkom, in pripravite realen proizvodni na\u010drt.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/sl\/viri\/oee\/","og_locale":"sl_SI","og_type":"article","og_title":"Celovita u\u010dinkovitost opreme: izra\u010dun in uporaba OEE","og_description":"Stroj obratuje, a je dobrih kosov premalo. Izra\u010dunajte OEE, ugotovite, katere izgube se skrivajo za odstotkom, in pripravite realen proizvodni na\u010drt.","og_url":"https:\/\/skyplanner.ai\/sl\/viri\/oee\/","og_site_name":"SkyPlanner","article_published_time":"2026-10-21T10:20:06+00:00","article_modified_time":"2026-10-21T10:21:24+00:00","og_image":[{"width":1672,"height":941,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/overall-equipment-effectiveness-hero.png","type":"image\/png"}],"author":"Jussi M\u00e4ntyl\u00e4","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Jussi M\u00e4ntyl\u00e4","Est. reading time":"11 minut"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/sl\/viri\/oee\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/sl\/viri\/oee\/"},"author":{"name":"Jussi M\u00e4ntyl\u00e4","@id":"https:\/\/skyplanner.ai\/sl\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5"},"headline":"Celovita u\u010dinkovitost opreme: izra\u010dun in uporaba OEE","datePublished":"2026-10-21T10:20:06+00:00","dateModified":"2026-10-21T10:21:24+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/sl\/viri\/oee\/"},"wordCount":2226,"publisher":{"@id":"https:\/\/skyplanner.ai\/sl\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/sl\/viri\/oee\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/overall-equipment-effectiveness-hero.png","articleSection":["ERP","viri"],"inLanguage":"sl-SI"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/sl\/viri\/oee\/","url":"https:\/\/skyplanner.ai\/sl\/viri\/oee\/","name":"Celovita u\u010dinkovitost opreme: izra\u010dun in uporaba OEE","isPartOf":{"@id":"https:\/\/skyplanner.ai\/sl\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/sl\/viri\/oee\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/sl\/viri\/oee\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/overall-equipment-effectiveness-hero.png","datePublished":"2026-10-21T10:20:06+00:00","dateModified":"2026-10-21T10:21:24+00:00","description":"Stroj obratuje, a je dobrih kosov premalo. Izra\u010dunajte OEE, ugotovite, katere izgube se skrivajo za odstotkom, in pripravite realen proizvodni na\u010drt.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/sl\/viri\/oee\/#breadcrumb"},"inLanguage":"sl-SI","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/sl\/viri\/oee\/"]}]},{"@type":"ImageObject","inLanguage":"sl-SI","@id":"https:\/\/skyplanner.ai\/sl\/viri\/oee\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/overall-equipment-effectiveness-hero.png","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/overall-equipment-effectiveness-hero.png","width":1672,"height":941,"caption":"A machining station with finished parts and a rejected component illustrates equipment effectiveness losses."},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/sl\/viri\/oee\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/sl\/"},{"@type":"ListItem","position":2,"name":"Celovita u\u010dinkovitost opreme: izra\u010dun in uporaba OEE"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/sl\/#website","url":"https:\/\/skyplanner.ai\/sl\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/sl\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/sl\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"sl-SI"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/sl\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/sl\/","logo":{"@type":"ImageObject","inLanguage":"sl-SI","@id":"https:\/\/skyplanner.ai\/sl\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/sl\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]},{"@type":"Person","@id":"https:\/\/skyplanner.ai\/sl\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5","name":"Jussi M\u00e4ntyl\u00e4","image":{"@type":"ImageObject","inLanguage":"sl-SI","@id":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","caption":"Jussi M\u00e4ntyl\u00e4"}}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/overall-equipment-effectiveness-hero.png",1672,941,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/overall-equipment-effectiveness-hero-150x150.png",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/overall-equipment-effectiveness-hero-300x169.png",300,169,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/overall-equipment-effectiveness-hero-768x432.png",768,432,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/overall-equipment-effectiveness-hero-1024x576.png",1024,576,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/overall-equipment-effectiveness-hero-1536x864.png",1536,864,true],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/overall-equipment-effectiveness-hero.png",1672,941,false],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/overall-equipment-effectiveness-hero-360x203.png",360,203,true]},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/sl\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Celovita u\u010dinkovitost opreme: izra\u010dun in uporaba OEE Domov &raquo; Viri &raquo; Celovita u\u010dinkovitost opreme: izra\u010dun in uporaba OEE Celovita u\u010dinkovitost opreme (OEE) meri, kolik\u0161en dele\u017e na\u010drtovanega proizvodnega \u010dasa se pretvori v dobre izdelke pri idealni hitrosti procesa. Zdru\u017euje tri dejavnike: razpolo\u017eljivost, zmogljivost in kakovost. Stroj lahko obratuje ve\u010dino izmene, pa ima kljub temu nizek OEE,&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/posts\/104883","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/comments?post=104883"}],"version-history":[{"count":2,"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/posts\/104883\/revisions"}],"predecessor-version":[{"id":104976,"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/posts\/104883\/revisions\/104976"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/media\/104895"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/media?parent=104883"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/categories?post=104883"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/tags?post=104883"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}