{"id":102534,"date":"2026-10-20T13:56:48","date_gmt":"2026-10-20T13:56:48","guid":{"rendered":"https:\/\/skyplanner.ai\/?p=102534"},"modified":"2026-10-20T13:58:05","modified_gmt":"2026-10-20T13:58:05","slug":"nedokoncana-proizvodnja","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/sl\/viri\/nedokoncana-proizvodnja\/","title":{"rendered":"Nedokon\u010dana proizvodnja: koli\u010dina, stro\u0161ki in obvladovanje"},"content":{"rendered":"<div class=\"gb-container gb-container-article01 article-main-content-container\">\n\n<h1 class=\"wp-block-heading\">Nedokon\u010dana proizvodnja: koli\u010dina, stro\u0161ki in obvladovanje<\/h1>\n\n<div class=\"gb-container gb-container-article02\">\n\n<p><a href=\"\/sl\/\">Domov<\/a> &raquo; <a href=\"https:\/\/skyplanner.ai\/sl\/viri\/\">Viri<\/a> &raquo; Nedokon\u010dana proizvodnja: koli\u010dina, stro\u0161ki in obvladovanje<\/p>\n\n\n<p class=\"yoast-reading-time__wrapper\"><span class=\"yoast-reading-time__icon\"><svg aria-hidden=\"true\" focusable=\"false\" data-icon=\"clock\" width=\"20\" height=\"20\" fill=\"none\" stroke=\"currentColor\" style=\"display:inline-block;vertical-align:-0.1em\" role=\"img\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewBox=\"0 0 24 24\"><path stroke-linecap=\"round\" stroke-linejoin=\"round\" stroke-width=\"2\" d=\"M12 8v4l3 3m6-3a9 9 0 11-18 0 9 9 0 0118 0z\"><\/path><\/svg><\/span><span class=\"yoast-reading-time__spacer\" style=\"display:inline-block;width:1em\"><\/span><span class=\"yoast-reading-time__descriptive-text\">Predviden \u010das branja: <\/span><span class=\"yoast-reading-time__reading-time\">9<\/span><span class=\"yoast-reading-time__time-unit\"> minut<\/span><\/p>\n\n<\/div>\n<div class=\"gb-container gb-container-article03\">\n\n<p>Nedokon\u010dana proizvodnja (WIP) zajema izdelke, ki so \u017ee vstopili v proizvodnjo, vendar \u0161e niso dokon\u010dani. Sem sodijo tako kosi v obdelavi kot nedokon\u010dani izdelki, ki \u010dakajo med operacijami. V ra\u010dunovodstvu izraz pomeni tudi proizvodne stro\u0161ke, ki so se doslej nabrali v teh nedokon\u010danih izdelkih.<\/p>\n\n\n<p>Ta dva pogleda odgovarjata na razli\u010dni vpra\u0161anji. \u0160tevilo kosov pove, koliko izdelkov je nedokon\u010danih, vrednost pa, koliko proizvodnih stro\u0161kov je vezanih nanje. Noben podatek sam zase ne pojasni, zakaj serija \u010daka \u017ee od ponedeljka ali kdaj bo kon\u010dno lahko zapustila proizvodnjo.<\/p>\n\n\n<p>Za vodjo proizvodnje je prav to naslednje pomembno vpra\u0161anje. SkyPlanner APS pove\u017ee preostale operacije z zmogljivostmi, razpolo\u017eljivostjo materiala in prednostnimi nalogami. Tako vam pomaga dokon\u010devati delo, namesto da bi vedno znova podalj\u0161evali \u010dakalne vrste. Bolj\u0161e \u010dasovno usklajevanje zmanj\u0161uje nepotrebno nedokon\u010dano proizvodnjo in kapital, vezan vanjo.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Kaj \u0161tejemo med nedokon\u010dano proizvodnjo?<\/h2>\n\n\n<p>Zaloge si oglejmo na treh to\u010dkah proizvodnega toka:<\/p>\n\n\n<ul class=\"wp-block-list\"><li><strong>Surovine in material:<\/strong> material in kupljeni sestavni deli, ki \u010dakajo na uporabo v proizvodnji.<\/li><li><strong>Nedokon\u010dana proizvodnja:<\/strong> izdelki, katerih proizvodnja se je \u017ee za\u010dela, vendar \u0161e potrebujejo obdelavo, monta\u017eo ali obvezne kon\u010dne preglede.<\/li><li><strong>Gotovi izdelki:<\/strong> dokon\u010dani izdelki, tudi \u010de \u0161e niso prodani ali odpremljeni.<\/li><\/ul>\n\n\n<p>Strojno obdelano ohi\u0161je, ki \u010daka na nanos premaza, sodi v nedokon\u010dano proizvodnjo. Enako velja za sestavljen izdelek, ki \u010daka na kon\u010dni pregled, potreben za dokon\u010danje. Dokon\u010dan in prevzet izdelek, ki \u010daka na dostavni tovornjak, pa sodi med gotove izdelke, ne v nedokon\u010dano proizvodnjo.<\/p>\n\n\n<p>Tudi nedokon\u010dan izdelek, ki \u010daka, je treba upo\u0161tevati pri \u0161tetju. \u010cakanje v vrstah, premiki med operacijami in zadr\u017eanja lahko predstavljajo velik del \u010dasa, ki ga izdelek pre\u017eivi v proizvodnji, \u010deprav ga v tistem trenutku ne obdeluje noben stroj.<\/p>\n\n\n<p>Sre\u010dali boste tudi izraz <strong>delo v teku<\/strong>. Raba se med podjetji in panogami razlikuje. V tem vodniku WIP pomeni zaloge nedokon\u010danih izdelkov v proizvodnji, ne obra\u010duna projektnega dela ali \u0161tevila nalog na tabli ekipe za razvoj programske opreme.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Kako izmeriti fizi\u010dno koli\u010dino nedokon\u010dane proizvodnje<\/h2>\n\n\n<p>Najprej jasno dolo\u010dite meje spremljanja: na primer eno dru\u017eino izdelkov od prve proizvodne operacije do kon\u010dnega prevzema. Nato ob dolo\u010denem \u010dasu pre\u0161tejte vse nedokon\u010dane kose znotraj teh meja. Pri proizvodnji razsutih snovi ali teko\u010din je lahko primerneje meriti v kilogramih ali litrih kot v kosih.<\/p>\n\n\n<p>Predstavljajte si tovarno, ki spremlja eno dru\u017eino enakih ohi\u0161ij. Ob koncu petkove izmene ugotovi naslednje stanje:<\/p>\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Trenutna faza<\/th><th>Nedokon\u010dana ohi\u0161ja<\/th><th>Preostalo delo<\/th><\/tr><\/thead><tbody><tr><td>V strojni obdelavi<\/td><td>20<\/td><td>Dokon\u010dati strojno obdelavo, povr\u0161insko obdelati in pregledati<\/td><\/tr><tr><td>\u010cakajo na povr\u0161insko obdelavo<\/td><td>60<\/td><td>Povr\u0161insko obdelati in pregledati<\/td><\/tr><tr><td>\u010cakajo na kon\u010dni pregled<\/td><td>20<\/td><td>Pregledati in prevzeti<\/td><\/tr><tr><td><strong>Skupaj nedokon\u010dana proizvodnja<\/strong><\/td><td><strong>100<\/strong><\/td><td><strong>Preostali obseg dela je razli\u010den<\/strong><\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>Vsako ohi\u0161je pre\u0161tejte samo enkrat, na mestu, kjer je trenutno. Iste serije ne \u0161tejte znova za vsako operacijo, ki jo po proizvodnem postopku \u0161e \u010daka.<\/p>\n\n\n<p>Stanje lahko preverite tudi z bilanco vhodov v nedokon\u010dano proizvodnjo in izhodov iz nje. Predpostavimo, da je bilo na za\u010detku tedna 120 nedokon\u010danih ohi\u0161ij, v proizvodnjo jih je vstopilo \u0161e 480, dokon\u010danih pa je bilo 500. \u010ce ni bilo izmeta ali drugih premikov:<\/p>\n\n\n<p><strong>Kon\u010dno stanje nedokon\u010dane proizvodnje = 120 + 480 \u2212 500 = 100 ohi\u0161ij<\/strong><\/p>\n\n\n<p>\u010ce se rezultat ne ujema s fizi\u010dnim \u0161tetjem, najprej preverite, ali so evidentirani vsi dokon\u010dani kosi, prenosi in izmet ter ali je bil uporabljen isti \u010dasovni presek. \u0160ele nato sklepajte o uspe\u0161nosti proizvodnje.<\/p>\n\n\n<h3 class=\"wp-block-heading\">\u0160tevilo kosov ni isto kot preostali obseg dela<\/h3>\n\n\n<p>V tabeli je 100 nedokon\u010danih kosov, vendar je za 20 kosov, ki \u010dakajo na kontrolo, potrebnega precej manj dela kot za 20 kosov, ki so \u0161e v strojni obdelavi. Dve enako veliki \u010dakalni vrsti lahko zato zelo razli\u010dno obremenjujeta zmogljivosti.<\/p>\n\n\n<p>V tovarni z raznolikim proizvodnim programom \u0161tevilo delovnih nalogov pove \u0161e manj: pri enem je potrebna le kratka kontrola, pri drugem pa ve\u010d dni dela na razli\u010dnih virih. Koli\u010dine spremljajte po izdelkih ali smiselno oblikovanih dru\u017einah izdelkov, obremenitev pa ugotavljajte na podlagi trajanja preostalih operacij. To obremenitev izrazite v urah; ne gre za drugo poimenovanje koli\u010dine ali vrednosti nedokon\u010dane proizvodnje.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Formula za izra\u010dun vrednosti nedokon\u010dane proizvodnje<\/h2>\n\n\n<p>Poenostavljena bilanca stro\u0161kov v obdobju je:<\/p>\n\n\n<p><strong>Kon\u010dna vrednost nedokon\u010dane proizvodnje = za\u010detna vrednost nedokon\u010dane proizvodnje + dodani proizvajalni stro\u0161ki \u2212 proizvajalni stro\u0161ki dokon\u010danih proizvodov<\/strong><\/p>\n\n\n<p>Dodani proizvajalni stro\u0161ki vklju\u010dujejo porabljeni neposredni material, neposredno delo in razporejene posredne proizvajalne stro\u0161ke. <strong>Proizvajalni stro\u0161ki dokon\u010danih proizvodov (COGM)<\/strong> so stro\u0161ki, ki se ob dokon\u010danju proizvodnje prenesejo iz nedokon\u010dane proizvodnje. To ni prodajna cena niti stro\u0161kovna vrednost proizvodov, prodanih v tem obdobju.<\/p>\n\n\n<p>Poglejmo lo\u010den primer mese\u010dnega obra\u010duna stro\u0161kov. Za\u010detna vrednost nedokon\u010dane proizvodnje je 18.000 $, v proizvodnji nastane \u0161e 72.000 $ stro\u0161kov, dokon\u010dani proizvodi v stro\u0161kovni vrednosti 65.000 $ pa se prenesejo v zalogo dokon\u010danih proizvodov. \u010ce ni drugih prilagoditev:<\/p>\n\n\n<p><strong>18.000 $ + 72.000 $ \u2212 65.000 $ = 25.000 $ kon\u010dne vrednosti nedokon\u010dane proizvodnje<\/strong><\/p>\n\n\n<p>To je stanje po stro\u0161kovni vrednosti, ne 25.000 kosov ali 25.000 $ prihodnjega dobi\u010dka. Ta primer je lo\u010den od zgornjega \u0161tetja ohi\u0161ij.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Zakaj \u0161tevilo kosov ne pove njihove vrednosti<\/h3>\n\n\n<p>Nedokon\u010danemu izdelku so pripisani le stro\u0161ki, ki so mu bili dodeljeni do tega trenutka. \u010ce vsak nedokon\u010dan kos ovrednotite po polni stro\u0161kovni vrednosti dokon\u010danega izdelka, lahko stanje precenite. Tudi \u00bbna polovici proizvodnega postopka\u00ab ne pomeni nujno polovice skupnih stro\u0161kov: drag material je lahko porabljen \u017ee na za\u010detku, stro\u0161ki dela in obdelave pa nastajajo pozneje.<\/p>\n\n\n<p>Uporabljajte evidence stro\u0161kov in ra\u010dunovodske usmeritve, ki jih uporablja va\u0161a finan\u010dna slu\u017eba. Bilanca za\u010detnega stanja, pove\u010danj in zmanj\u0161anj pojasni gibanje stro\u0161kov; za ra\u010dunovodsko poro\u010danje so lahko potrebne tudi prilagoditve vrednotenja v skladu z veljavnim ra\u010dunovodskim okvirom.<\/p>\n\n\n<p>Pri odlo\u010danju v proizvodnji je klju\u010dna razlika preprostej\u0161a: doslej nastali stro\u0161ki povedo, kaj je bilo v delo \u017ee vlo\u017eeno. Preostali del proizvodnega postopka pa pove, kaj je \u0161e potrebno za dokon\u010danje. Potrebujete oba pogleda; eden ne more nadomestiti drugega.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Kaj dejansko pove visok ali nizek obseg nedokon\u010dane proizvodnje<\/h2>\n\n\n<p>Velik obseg nedokon\u010dane proizvodnje je razlog za preverjanje, ne pa \u017ee celovita diagnoza. Lahko je posledica ve\u010djega povpra\u0161evanja, druga\u010dne sestave proizvodnega programa, namernega zagotavljanja nemotene izrabe zmogljivosti ali kopi\u010denja dela zaradi prekinitve. Majhen obseg lahko pomeni nemoten pretok, lahko pa tudi, da ima klju\u010dni vir premalo dela, pripravljenega za izvedbo.<\/p>\n\n\n<p>Cilj ni odpraviti vso nedokon\u010dano proizvodnjo. Cilj je imeti dovolj ustreznega dela za zanesljivo dokon\u010devanje, brez nepotrebnih prezgodnjih za\u010detkov, \u010dakanja in manipulacij.<\/p>\n\n\n<p>Vrnimo se k 60 ohi\u0161jem, ki \u010dakajo na kon\u010dno obdelavo. \u010ce so bila strojno obdelana danes zjutraj, kon\u010dna obdelava pa je predvidena za danes popoldne, je lahko tak\u0161na \u010dakalna vrsta povsem smiselna. \u010ce tam stojijo \u017ee teden dni, medtem ko vir za kon\u010dno obdelavo obdeluje druge naloge, enako \u0161tevilo kosov ka\u017ee na druga\u010dno te\u017eavo.<\/p>\n\n\n<p>Za presojo te \u010dakalne vrste ugotovite:<\/p>\n\n\n<p>1. <strong>Starost serije:<\/strong> kdaj je serija vstopila v proizvodnjo in kako dolgo \u017ee \u010daka na tem mestu?<\/p>\n\n\n<p>2. <strong>Naslednjo operacijo:<\/strong> kateri vir, material ali odobritev potrebuje za nadaljevanje?<\/p>\n\n\n<p>3. <strong>Na\u010drtovani zaklju\u010dek:<\/strong> kdaj je mogo\u010de v terminski plan umestiti preostale operacije in ali bo s tem izpolnjen obljubljeni rok naro\u010dila?<\/p>\n\n\n<p>4. <strong>Razlog za \u010dakanje:<\/strong> gre za na\u010drtovano vmesno zalogo, zasedenost zmogljivosti z drugimi nalogi, manjkajo\u010di material, zadr\u017eanje zaradi kakovosti ali drugo prekinitev?<\/p>\n\n\n<p>Tako lahko ugotovitev \u00bbimamo preve\u010d nedokon\u010dane proizvodnje\u00ab pretvorite v odlo\u010ditev, na podlagi katere je mogo\u010de ukrepati. Manjkajo\u010da kupljena komponenta zahteva druga\u010den odziv kot preobremenjeno delovno mesto za kon\u010dno obdelavo. Strojna obdelava \u0161e ene serije ne bo re\u0161ila nobene od teh te\u017eav.<\/p>\n\n\n<p>Nedokon\u010dano proizvodnjo spremljajte skupaj z <a href=\"https:\/\/skyplanner.ai\/sl\/viri\/pretocnost-proizvodnje\/\">obsegom dokon\u010dane proizvodnje<\/a> in uspe\u0161nostjo dobav. \u010ce v proizvodnjo vstopi ve\u010d kosov, kot jih iz nje izstopi v obliki dokon\u010danih proizvodov, drugih izhodov pa ni, se zaloga nedokon\u010dane proizvodnje pove\u010duje. \u010ce se zmanj\u0161a zgolj zato, ker proizvodnja ne prejema ve\u010d naro\u010dil, to ni dokaz bolj\u0161ega procesa. Primerjajte podobna obdobja in dru\u017eine izdelkov, da spremembe v sestavi proizvodnega programa ne bi zamenjali za izbolj\u0161anje.<\/p>\n\n\n<h2 class=\"wp-block-heading\">S sistemom SkyPlanner na\u010drtujte pot od nedokon\u010danega dela do dokon\u010danega izdelka<\/h2>\n\n\n<p>Ko veste, kje delo \u010daka, postane vpra\u0161anje terminiranja konkretno: kako preostale operacije uskladiti z vsem drugim delom, ki ga mora tovarna dokon\u010dati?<\/p>\n\n\n<p>SkyPlanner zdru\u017euje delovna mesta, izmene, operaterje, korake proizvodnega postopka in njihovo trajanje v <a href=\"https:\/\/skyplanner.ai\/sl\/viri\/kaj-je-terminiranje-proizvodnje\/\">skupnem terminskem planu proizvodnje<\/a>. Arcturus, njegova umetna inteligenca za terminiranje, razporeja operacije glede na nastavljene zmogljivosti, odvisnosti in prioritete. Namesto da bi vsak oddelek vzdr\u017eeval svojo \u010dakalno vrsto, Ganttov prikaz poka\u017ee tako dolo\u010deno zaporedje dela na razli\u010dnih virih.<\/p>\n\n\n<p>Pri ohi\u0161jih, ki \u010dakajo, lahko operacijo kon\u010dne obdelave pregledate v povezavi z delom pred njo in po njej. Ali je vir zaseden zaradi predhodno dogovorjenega dela? Ali je zatem na voljo termin za kontrolo? Bi za\u010detek obdelave nove serije ohi\u0161ij zdaj zgolj pove\u010dal koli\u010dino dela, ki \u010daka?<\/p>\n\n\n<p>\u010ce je omogo\u010deno terminiranje z upo\u0161tevanjem materiala, Arcturus upo\u0161teva tudi zaloge in razpolo\u017eljivost prihajajo\u010dega materiala. To je pomembno, kadar je za poznej\u0161o operacijo potrebna kupljena komponenta: prost prvi stroj ni dovolj, \u010de naloga ni mogo\u010de izvesti do konca monta\u017ee.<\/p>\n\n\n<p>Podatki o napredku zagotavljajo, da na\u010drt ostaja uporaben. Timer v sistemu SkyPlanner bele\u017ei za\u010detke in prekinitve dela ter izdelane koli\u010dine, odprti REST API pa omogo\u010da povezavo s katerim koli sistemom ERP ali MES. Ko se spremenijo napredek, razpolo\u017eljivost ali prednostne naloge, lahko Arcturus na podlagi posodobljenih podatkov znova izra\u010duna terminski na\u010drt. Vi dolo\u010dite prednostne naloge, umetna inteligenca pa poskrbi za izra\u010dun razporeda.<\/p>\n\n\n<p>Tako je manj vsakodnevnega popravljanja \u010dakalnih vrst na posameznih strojih, odlo\u010ditve o tem, katera dela naj se nadaljujejo, pa temeljijo na jasnej\u0161ih podatkih. Izognete se lahko prezgodnjemu vlaganju dodatnega materiala in dela v naloge ter se osredoto\u010dite na nedokon\u010dana dela, ki so potrebna za dobavo.<\/p>\n\n\n<p>Sam zaklju\u010dek proizvodnje \u0161e ne sprosti denarnih sredstev: s prenosom iz nedokon\u010dane proizvodnje v zalogo dokon\u010danih proizvodov se spremeni status izdelkov, vendar ti \u0161e vedno ostajajo v zalogi. Finan\u010dna korist izhaja iz zmanj\u0161anja nepotrebnih zalog in dokon\u010danja pravih nalog za zadovoljevanje povpra\u0161evanja kupcev, ne zgolj iz zmanj\u0161anja postavke nedokon\u010dane proizvodnje.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Kaj je bolj\u0161e terminiranje spremenilo v podjetju Mamec<\/h2>\n\n\n<p>Mamec, finski proizvajalec industrijske me\u0161alne opreme in visokotehnolo\u0161kih izdelkov po naro\u010dilu, je prej dolo\u010dal prednostni vrstni red ve\u010d tiso\u010d medsebojno odvisnih delovnih nalogov na podlagi dobavnih rokov na papirnih nalogih. Planiranje v sistemu ERP ni omogo\u010dalo celovitega pregleda, vodstvo pa se je pri presoji obremenjenosti proizvodnje opiralo na subjektivne ocene.<\/p>\n\n\n<p>S povezavo sistema SkyPlanner z okoljem Oscar ERP je Mamec pridobil mo\u017enost terminiranja z omejenimi kapacitetami ter skupen pregled nad stanjem in razporedom nalogov. Zaposleni so lahko preverili posamezen nalog, namesto da bi se zana\u0161ali na razli\u010dne razlage trenutnega stanja.<\/p>\n\n\n<p><a href=\"https:\/\/skyplanner.ai\/sl\/zgodbe-strank\/mamec\/\">Mamec poro\u010da<\/a> o bolj smiselnih preto\u010dnih \u010dasih, manj\u0161i obremenitvi pri planiranju in manj obratnega kapitala, ki je po nepotrebnem vezan v nedokon\u010dani proizvodnji, saj se dela za\u010dnejo ob pravem \u010dasu. To je prakti\u010dna povezava med nedokon\u010dano proizvodnjo in terminiranjem: v tovarni so \u0161e vedno izdelki v izdelavi, vendar ima podjetje bolj\u0161o podlago za odlo\u010danje, kdaj morajo biti v proizvodnji.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Za\u010dnite z eno serijo, ki \u010daka \u017ee predolgo<\/h2>\n\n\n<p>Izberite nedokon\u010dan nalog, katerega zamudo va\u0161a ekipa dobro pozna. Za predstavitev sistema SkyPlanner pripravite podatke o tem, kje je nalog trenutno, katere operacije \u0161e ostajajo, kak\u0161ne so potrebe po materialu in kak\u0161en dobavni rok ste obljubili. Smiselno je preveriti, ali lahko dobite usklajen na\u010drt za njegovo dokon\u010danje, ki upo\u0161teva tudi druge naloge, ki potrebujejo iste vire.<\/p>\n\n\n<p><a href=\"https:\/\/skyplanner.ai\/sl\/kontaktna-prodaja\/\">Rezervirajte predstavitev sistema SkyPlanner<\/a> in razi\u0161\u010dite tak na\u010drt na primeru svoje proizvodnje ali pa najprej <a href=\"https:\/\/skyplanner.ai\/sl\/preizkus\/\">preizkusite SkyPlanner z vzor\u010dnimi podatki<\/a>. Izbolj\u0161anje stanja nedokon\u010dane proizvodnje se za\u010dne z razumevanjem del, ki \u0161e niso kon\u010dana. Bolj\u0161i terminski na\u010drt proizvodnje vam pomaga tudi ukrepati.<\/p>\n\n<\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>Nedokon\u010dana proizvodnja: koli\u010dina, stro\u0161ki in obvladovanje Domov &raquo; Viri &raquo; Nedokon\u010dana proizvodnja: koli\u010dina, stro\u0161ki in obvladovanje Nedokon\u010dana proizvodnja (WIP) zajema izdelke, ki so \u017ee vstopili v proizvodnjo, vendar \u0161e niso dokon\u010dani. Sem sodijo tako kosi v obdelavi kot nedokon\u010dani izdelki, ki \u010dakajo med operacijami. V ra\u010dunovodstvu izraz pomeni tudi proizvodne stro\u0161ke, ki so se doslej &#8230; <a title=\"Nedokon\u010dana proizvodnja: koli\u010dina, stro\u0161ki in obvladovanje\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/sl\/viri\/nedokoncana-proizvodnja\/\" aria-label=\"Read more about Nedokon\u010dana proizvodnja: koli\u010dina, stro\u0161ki in obvladovanje\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":102580,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[2567,302],"tags":[],"class_list":["post-102534","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-ucinkovitost-proizvodnje","category-viri","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Nedokon\u010dana proizvodnja: koli\u010dina, stro\u0161ki in obvladovanje<\/title>\n<meta name=\"description\" content=\"Spoznajte nedokon\u010dano proizvodnjo, izra\u010dunajte stro\u0161ke in odkrijte ovire za dokon\u010danje ter preverite, kako SkyPlanner pomaga zmanj\u0161ati njen nepotrebni obseg.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/sl\/viri\/nedokoncana-proizvodnja\/\" \/>\n<meta property=\"og:locale\" content=\"sl_SI\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Nedokon\u010dana proizvodnja: koli\u010dina, stro\u0161ki in obvladovanje\" \/>\n<meta property=\"og:description\" content=\"Spoznajte nedokon\u010dano proizvodnjo, izra\u010dunajte stro\u0161ke in odkrijte ovire za dokon\u010danje ter preverite, kako SkyPlanner pomaga zmanj\u0161ati njen nepotrebni obseg.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/sl\/viri\/nedokoncana-proizvodnja\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2026-10-20T13:56:48+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-20T13:58:05+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/work-in-process-inventory-hero-1.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1984\" \/>\n\t<meta property=\"og:image:height\" content=\"1116\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"10 minut\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/nedokoncana-proizvodnja\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/nedokoncana-proizvodnja\\\/\"},\"author\":{\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\"},\"headline\":\"Nedokon\u010dana proizvodnja: koli\u010dina, stro\u0161ki in obvladovanje\",\"datePublished\":\"2026-10-20T13:56:48+00:00\",\"dateModified\":\"2026-10-20T13:58:05+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/nedokoncana-proizvodnja\\\/\"},\"wordCount\":2086,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/nedokoncana-proizvodnja\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/work-in-process-inventory-hero-1.png\",\"articleSection\":[\"U\u010dinkovitost proizvodnje\",\"viri\"],\"inLanguage\":\"sl-SI\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/nedokoncana-proizvodnja\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/nedokoncana-proizvodnja\\\/\",\"name\":\"Nedokon\u010dana proizvodnja: koli\u010dina, stro\u0161ki in obvladovanje\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/nedokoncana-proizvodnja\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/nedokoncana-proizvodnja\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/work-in-process-inventory-hero-1.png\",\"datePublished\":\"2026-10-20T13:56:48+00:00\",\"dateModified\":\"2026-10-20T13:58:05+00:00\",\"description\":\"Spoznajte nedokon\u010dano proizvodnjo, izra\u010dunajte stro\u0161ke in odkrijte ovire za dokon\u010danje ter preverite, kako SkyPlanner pomaga zmanj\u0161ati njen nepotrebni obseg.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/nedokoncana-proizvodnja\\\/#breadcrumb\"},\"inLanguage\":\"sl-SI\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/nedokoncana-proizvodnja\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"sl-SI\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/nedokoncana-proizvodnja\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/work-in-process-inventory-hero-1.png\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/work-in-process-inventory-hero-1.png\",\"width\":1984,\"height\":1116,\"caption\":\"Unfinished metal housings wait between machining and finishing, illustrating work-in-process inventory.\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/nedokoncana-proizvodnja\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Nedokon\u010dana proizvodnja: koli\u010dina, stro\u0161ki in obvladovanje\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"sl-SI\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"sl-SI\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\",\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"sl-SI\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"caption\":\"Jussi M\u00e4ntyl\u00e4\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Nedokon\u010dana proizvodnja: koli\u010dina, stro\u0161ki in obvladovanje","description":"Spoznajte nedokon\u010dano proizvodnjo, izra\u010dunajte stro\u0161ke in odkrijte ovire za dokon\u010danje ter preverite, kako SkyPlanner pomaga zmanj\u0161ati njen nepotrebni obseg.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/sl\/viri\/nedokoncana-proizvodnja\/","og_locale":"sl_SI","og_type":"article","og_title":"Nedokon\u010dana proizvodnja: koli\u010dina, stro\u0161ki in obvladovanje","og_description":"Spoznajte nedokon\u010dano proizvodnjo, izra\u010dunajte stro\u0161ke in odkrijte ovire za dokon\u010danje ter preverite, kako SkyPlanner pomaga zmanj\u0161ati njen nepotrebni obseg.","og_url":"https:\/\/skyplanner.ai\/sl\/viri\/nedokoncana-proizvodnja\/","og_site_name":"SkyPlanner","article_published_time":"2026-10-20T13:56:48+00:00","article_modified_time":"2026-10-20T13:58:05+00:00","og_image":[{"width":1984,"height":1116,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/work-in-process-inventory-hero-1.png","type":"image\/png"}],"author":"Jussi M\u00e4ntyl\u00e4","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Jussi M\u00e4ntyl\u00e4","Est. reading time":"10 minut"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/sl\/viri\/nedokoncana-proizvodnja\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/sl\/viri\/nedokoncana-proizvodnja\/"},"author":{"name":"Jussi M\u00e4ntyl\u00e4","@id":"https:\/\/skyplanner.ai\/sl\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5"},"headline":"Nedokon\u010dana proizvodnja: koli\u010dina, stro\u0161ki in obvladovanje","datePublished":"2026-10-20T13:56:48+00:00","dateModified":"2026-10-20T13:58:05+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/sl\/viri\/nedokoncana-proizvodnja\/"},"wordCount":2086,"publisher":{"@id":"https:\/\/skyplanner.ai\/sl\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/sl\/viri\/nedokoncana-proizvodnja\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/work-in-process-inventory-hero-1.png","articleSection":["U\u010dinkovitost proizvodnje","viri"],"inLanguage":"sl-SI"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/sl\/viri\/nedokoncana-proizvodnja\/","url":"https:\/\/skyplanner.ai\/sl\/viri\/nedokoncana-proizvodnja\/","name":"Nedokon\u010dana proizvodnja: koli\u010dina, stro\u0161ki in obvladovanje","isPartOf":{"@id":"https:\/\/skyplanner.ai\/sl\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/sl\/viri\/nedokoncana-proizvodnja\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/sl\/viri\/nedokoncana-proizvodnja\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/work-in-process-inventory-hero-1.png","datePublished":"2026-10-20T13:56:48+00:00","dateModified":"2026-10-20T13:58:05+00:00","description":"Spoznajte nedokon\u010dano proizvodnjo, izra\u010dunajte stro\u0161ke in odkrijte ovire za dokon\u010danje ter preverite, kako SkyPlanner pomaga zmanj\u0161ati njen nepotrebni obseg.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/sl\/viri\/nedokoncana-proizvodnja\/#breadcrumb"},"inLanguage":"sl-SI","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/sl\/viri\/nedokoncana-proizvodnja\/"]}]},{"@type":"ImageObject","inLanguage":"sl-SI","@id":"https:\/\/skyplanner.ai\/sl\/viri\/nedokoncana-proizvodnja\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/work-in-process-inventory-hero-1.png","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/work-in-process-inventory-hero-1.png","width":1984,"height":1116,"caption":"Unfinished metal housings wait between machining and finishing, illustrating work-in-process inventory."},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/sl\/viri\/nedokoncana-proizvodnja\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/sl\/"},{"@type":"ListItem","position":2,"name":"Nedokon\u010dana proizvodnja: koli\u010dina, stro\u0161ki in obvladovanje"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/sl\/#website","url":"https:\/\/skyplanner.ai\/sl\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/sl\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/sl\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"sl-SI"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/sl\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/sl\/","logo":{"@type":"ImageObject","inLanguage":"sl-SI","@id":"https:\/\/skyplanner.ai\/sl\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/sl\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]},{"@type":"Person","@id":"https:\/\/skyplanner.ai\/sl\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5","name":"Jussi M\u00e4ntyl\u00e4","image":{"@type":"ImageObject","inLanguage":"sl-SI","@id":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","caption":"Jussi M\u00e4ntyl\u00e4"}}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/work-in-process-inventory-hero-1.png",1984,1116,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/work-in-process-inventory-hero-1-150x150.png",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/work-in-process-inventory-hero-1-300x169.png",300,169,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/work-in-process-inventory-hero-1-768x432.png",768,432,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/work-in-process-inventory-hero-1-1024x576.png",1024,576,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/work-in-process-inventory-hero-1-1536x864.png",1536,864,true],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/work-in-process-inventory-hero-1.png",1984,1116,false],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/work-in-process-inventory-hero-1-360x203.png",360,203,true]},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/sl\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Nedokon\u010dana proizvodnja: koli\u010dina, stro\u0161ki in obvladovanje Domov &raquo; Viri &raquo; Nedokon\u010dana proizvodnja: koli\u010dina, stro\u0161ki in obvladovanje Nedokon\u010dana proizvodnja (WIP) zajema izdelke, ki so \u017ee vstopili v proizvodnjo, vendar \u0161e niso dokon\u010dani. Sem sodijo tako kosi v obdelavi kot nedokon\u010dani izdelki, ki \u010dakajo med operacijami. V ra\u010dunovodstvu izraz pomeni tudi proizvodne stro\u0161ke, ki so se doslej&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/posts\/102534","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/comments?post=102534"}],"version-history":[{"count":2,"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/posts\/102534\/revisions"}],"predecessor-version":[{"id":102653,"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/posts\/102534\/revisions\/102653"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/media\/102580"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/media?parent=102534"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/categories?post=102534"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/tags?post=102534"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}