{"id":101531,"date":"2026-10-18T07:22:16","date_gmt":"2026-10-18T07:22:16","guid":{"rendered":"https:\/\/skyplanner.ai\/?p=101531"},"modified":"2026-10-18T07:23:36","modified_gmt":"2026-10-18T07:23:36","slug":"diskretna-in-procesna-proizvodnja","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/sl\/viri\/diskretna-in-procesna-proizvodnja\/","title":{"rendered":"Diskretna in procesna proizvodnja: kaj mora podpirati va\u0161 sistem"},"content":{"rendered":"<div class=\"gb-container gb-container-article01 article-main-content-container\">\n\n<h1 class=\"wp-block-heading\">Diskretna in procesna proizvodnja: kaj mora podpirati va\u0161 sistem<\/h1>\n\n<div class=\"gb-container gb-container-article02\">\n\n<p><a href=\"\/sl\/\">Domov<\/a> &raquo; <a href=\"https:\/\/skyplanner.ai\/sl\/viri\/\">Viri<\/a> &raquo; Diskretna in procesna proizvodnja: kaj mora podpirati va\u0161 sistem<\/p>\n\n\n<p class=\"yoast-reading-time__wrapper\"><span class=\"yoast-reading-time__icon\"><svg aria-hidden=\"true\" focusable=\"false\" data-icon=\"clock\" width=\"20\" height=\"20\" fill=\"none\" stroke=\"currentColor\" style=\"display:inline-block;vertical-align:-0.1em\" role=\"img\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewBox=\"0 0 24 24\"><path stroke-linecap=\"round\" stroke-linejoin=\"round\" stroke-width=\"2\" d=\"M12 8v4l3 3m6-3a9 9 0 11-18 0 9 9 0 0118 0z\"><\/path><\/svg><\/span><span class=\"yoast-reading-time__spacer\" style=\"display:inline-block;width:1em\"><\/span><span class=\"yoast-reading-time__descriptive-text\">Predviden \u010das branja: <\/span><span class=\"yoast-reading-time__reading-time\">9<\/span><span class=\"yoast-reading-time__time-unit\"> minut<\/span><\/p>\n\n<\/div>\n<div class=\"gb-container gb-container-article03\">\n\n<p>Pri diskretni proizvodnji nastajajo posamezni prepoznavni izdelki, kot so \u010drpalke, tiskana vezja in strojno obdelani sestavni deli. Pri procesni proizvodnji se materiali predelujejo po dolo\u010deni formulaciji ali recepturi, na primer pri izdelavi barv, pija\u010d in specialnih kemikalij. Ta razlika vpliva na to, kako opredelite izdelke, evidentirate proizvodnjo in nadzorujete kakovost.<\/p>\n\n\n<p>Za proizvodno podjetje, ki izbira programsko opremo, je to izhodi\u0161\u010de, ne pa edino merilo za odlo\u010ditev. Sistem lahko vsebuje pravilno kosovnico ali recepturo, pa mora planer \u0161e vedno sam ugotavljati, katera operacija je lahko naslednja na vrsti na opremi, ki jo uporablja ve\u010d naro\u010dil.<\/p>\n\n\n<p>Najprej razjasnite razliko med obema vrstama proizvodnje. Nato lo\u010dite evidence, ki jih podjetje potrebuje, od terminiranja, ki ga va\u0161a ekipa ne \u017eeli ve\u010d opravljati ro\u010dno. SkyPlanner APS prevzame izra\u010dun terminov in pripravi povezan proizvodni plan, vi pa ohranite nadzor nad prednostnimi nalogami.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Kak\u0161na je razlika med diskretno in procesno proizvodnjo?<\/h2>\n\n\n<p>Pri <strong>diskretni proizvodnji<\/strong> se proizvodnja na\u010drtuje in izvaja po posameznih sestavnih delih in kon\u010dnih izdelkih. \u010crpalko sestavljajo ohi\u0161je, teka\u010d, gred in drugi sestavni deli. Kosovnica dolo\u010da, kaj je potrebno zanjo, tehnolo\u0161ki postopek pa opredeljuje operacije za njeno izdelavo in sestavljanje.<\/p>\n\n\n<p>Diskretna proizvodnja ne zajema le sestavljanja, temve\u010d tudi strojno obdelavo in druge postopke izdelave delov. Del, izrezan iz kovinskega surovca, je \u0161e vedno prepoznaven posamezen kos, \u010deprav ga ni mogo\u010de spremeniti nazaj v prvotni surovec. Mo\u017enost razstavljanja izdelka je uporabna ponazoritev, ne pa zanesljivo merilo za razvr\u0161\u010danje proizvodnje.<\/p>\n\n\n<p>Pri <strong>procesni proizvodnji<\/strong> se materiali pretvarjajo s postopki, kot so me\u0161anje, kemijske reakcije, segrevanje ali priprava zmesi. Formulacija dolo\u010da razmerja med sestavinami, receptura pa lahko vsebuje tudi navodila in pogoje za izvedbo postopka. Proizvedene koli\u010dine se pogosto vodijo po masi ali prostornini, preden se zapakirajo v prodajne enote.<\/p>\n\n\n<p>Tablete ali stekleni\u010dke \u0161ampona lahko pre\u0161tejemo, vendar to \u0161e ne pomeni, da je njihova izdelava po recepturi diskretna proizvodnja. Upo\u0161tevajte, kako izdelek nastane, ne le, kako se prodaja.<\/p>\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Primerjava<\/th><th>Diskretna proizvodnja<\/th><th>Procesna proizvodnja<\/th><th>Kaj preveriti pri programski opremi<\/th><\/tr><\/thead><tbody><tr><td>Opredelitev izdelka<\/td><td>Sestavni deli, sklopi, razli\u010dice in revizije<\/td><td>Formulacije, razmerja med sestavinami in navodila za izvedbo postopka<\/td><td>Ali sistem omogo\u010da vzdr\u017eevanje potrjene opredelitve izdelka in pravilen prenos sprememb v proizvodnjo?<\/td><\/tr><tr><td>Proizvodne koli\u010dine<\/td><td>Kosi, sklopi ali serije sestavnih delov<\/td><td>Koli\u010dine nepakiranega izdelka, \u0161ar\u017ee in pakirane koli\u010dine<\/td><td>Ali lahko pove\u017ee merske enote, v katerih nabavljate, porabljate, proizvajate in prodajate?<\/td><\/tr><tr><td>Potek proizvodnje<\/td><td>Operacije, kot so strojna obdelava, izdelava delov, sestavljanje in presku\u0161anje<\/td><td>Faze, kot so me\u0161anje, predelava, zadr\u017eevanje in polnjenje<\/td><td>Ali lahko prika\u017ee dejansko zaporedje, predaje med fazami in potrebe po virih?<\/td><\/tr><tr><td>Evidence proizvodnje in kakovosti<\/td><td>Poraba sestavnih delov ali serij, kontrole in po potrebi evidence serijskih \u0161tevilk<\/td><td>Serije sestavin, rezultati procesa, status \u0161ar\u017e in po potrebi rok uporabnosti<\/td><td>Ali lahko zagotovite zahtevano sledljivost vhodnih materialov in prepre\u010dite, da bi neodobreni izdelki pre\u0161li v naslednjo fazo?<\/td><\/tr><tr><td>Proizvedene koli\u010dine in izgube<\/td><td>Dokon\u010dani izdelki, izmet in dodelave<\/td><td>Dejanski izkoristek, izgube in v\u010dasih ve\u010d razli\u010dnih izdelkov iz enega procesa<\/td><td>Ali lahko sistem uskladi dejansko porabo, uporabno proizvedeno koli\u010dino in proizvodne stro\u0161ke?<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>Gre za razli\u010dne poudarke, ne za medsebojno izklju\u010dujo\u010de se sezname funkcionalnosti. Tudi v procesni proizvodnji se lahko uporabljajo kosovnice, pri diskretni proizvodnji pa so lahko potrebni sledljivost serij, roki uporabnosti ali podrobne evidence kakovosti. Zahteve dolo\u010data va\u0161 dejanski izdelek in proizvodni proces.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Proizvodnja v serijah, neprekinjena proizvodnja in izdelava po naro\u010dilu opisujejo razli\u010dne stvari<\/h2>\n\n\n<p>Pri poimenovanju proizvodnje hitro pome\u0161amo tri lo\u010dene odlo\u010ditve.<\/p>\n\n\n<p>Razlika med <strong>diskretno in procesno proizvodnjo<\/strong> opisuje naravo proizvodnega dela. Razlika med <strong>proizvodnjo v serijah in neprekinjeno proizvodnjo<\/strong> pa opisuje njegov potek. V obdelovalnici lahko izdelajo serijo enakih nosilcev, proizvajalec barv pa \u0161ar\u017eo po dolo\u010deni formulaciji. <a href=\"https:\/\/skyplanner.ai\/sl\/viri\/proizvodnja-v-serijah\/\">Proizvodnja v serijah<\/a> je mogo\u010da pri obeh vrstah proizvodnje.<\/p>\n\n\n<p>Pri neprekinjenem procesu tok te\u010de nepretrgoma, namesto da bi se zaklju\u010devale posamezne, koli\u010dinsko omejene \u0161ar\u017ee. Kljub temu lahko poznej\u0161e polnjenje ali pakiranje poteka po lo\u010denih nalogih. Obrat zato lahko potrebuje nadzor neprekinjenega procesa v za\u010detnih fazah in terminiranje posameznih operacij v poznej\u0161ih.<\/p>\n\n\n<p><strong>Izdelava po naro\u010dilu, izdelava na zalogo in sestavljanje po naro\u010dilu<\/strong> opisujejo, kako povpra\u0161evanje spro\u017ei proizvodnjo. Proizvajalec v diskretni proizvodnji lahko izdeluje standardne \u010drpalke na zalogo ali po\u010daka na naro\u010dilo kupca. Proizvajalec v procesni proizvodnji lahko standardno formulacijo proizvaja na zalogo ali izdela \u0161ar\u017eo za dolo\u010denega kupca. Te strategije ne nadome\u0161\u010dajo razlikovanja med diskretno in procesno proizvodnjo.<\/p>\n\n\n<p>To je pomembno pri izbiri programske opreme: izjava \u00bbizdelujemo na zalogo\u00ab dobavitelju nekaj pove o va\u0161i politiki planiranja, zelo malo pa o tem, ali potrebujete upravljanje formulacij, revizije sestavnih delov ali prera\u010dunavanje koli\u010din iz nepakiranega izdelka v pakirane enote.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Ali lahko v enem obratu potekata obe vrsti proizvodnje?<\/h2>\n\n\n<p>Da. Razli\u010dni izdelki ali faze v istem obratu imajo lahko razli\u010dne proizvodne zahteve. Podjetje lahko v enem oddelku pripravlja material po formulaciji, v drugem pa izdeluje sklop, v katerem ta material uporabi. Nekateri sistemi ERP podpirajo oba na\u010dina v istem obratu.<\/p>\n\n\n<p>Samo pakiranje \u0161e ne dolo\u010da vrste proizvodnje. Polnjenje izdelka, pripravljenega po formulaciji, v embala\u017eo prina\u0161a zahteve glede embala\u017enih komponent, koli\u010din in zmogljivosti linije. Ne odpravi pa potrebe po upravljanju formulacije in zgodovine njegove proizvodnje.<\/p>\n\n\n<p>Pri me\u0161ani proizvodnji sledite predajam med fazami. Kak\u0161na koli\u010dina zapusti predhodno fazo? Kdaj je na voljo za naslednjo? Kateri podatki o razli\u010dici izdelka, seriji materiala ali statusu kakovosti jo morajo spremljati? Programska oprema mora ohraniti to povezavo, ne pa vsakemu oddelku ponuditi na videz prepri\u010dljivega, a nepovezanega prikaza.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Iz primerjave izpeljite zahteve za svoj obrat<\/h2>\n\n\n<p>Izberite zna\u010dilen izdelek in mu sledite od potrjene opredelitve do zaloge kon\u010dnih izdelkov. Vklju\u010dite tudi razli\u010dico, ki redno povzro\u010da te\u017eave, namesto da bi prikazali le najpreprostej\u0161e ponavljajo\u010de se naro\u010dilo.<\/p>\n\n\n<p>Predstavljajte si primerjavo dveh proizvajalcev. Prvi izdeluje industrijske \u010drpalke. Drugi po formulaciji me\u0161a \u010distilo in ga polni v embala\u017eo razli\u010dnih velikosti.<\/p>\n\n\n<p>Pri proizvajalcu \u010drpalk je pomemben preizkus revizija sestavnega dela. Sistem mora dolo\u010diti, katera razli\u010dica sodi v nalog, prikazati potrebne sestavne dele in tehnolo\u0161ki postopek ter ohraniti proizvodne evidence, potrebne za posamezno \u010drpalko. \u010ce manjka kupljeni del, plan sestavljanja ne sme predpostavljati, da se izdelava \u010drpalke lahko preprosto nadaljuje.<\/p>\n\n\n<p>Pri proizvajalcu \u010distila je bolj poveden preizkus povezave med odobreno formulacijo, dejansko proizvedeno koli\u010dino nepakiranega \u010distila in pakirano koli\u010dino. Ekipa lahko potrebuje tudi evidence serij sestavin, odobritev uporabe na podlagi kontrole kakovosti, upravljanje rokov uporabnosti ali obra\u010dun izkoristka. Zahtevajte prikaz, kako sistem izpolnjuje zahteve tega procesa; ne predpostavljajte, da jih zaslon z oznako \u00bb\u0161ar\u017ea\u00ab pokriva v celoti.<\/p>\n\n\n<p>V obeh primerih naj dobavitelj prika\u017ee celoten potek transakcije, ne le seznama modulov:<\/p>\n\n\n<ul class=\"wp-block-list\"><li><strong>Od opredelitve do naloga:<\/strong> Katera potrjena razli\u010dica se uporabi in kaj se zgodi, ko se spremeni?<\/li><li><strong>Od materiala do uporabnega izdelka:<\/strong> Kako se evidentirajo poraba, dokon\u010dane koli\u010dine, izgube in zahtevana sledljivost?<\/li><li><strong>Od odobritve do naslednje operacije:<\/strong> Kateri pogoji morajo biti izpolnjeni, da je delo dejansko pripravljeno za nadaljevanje, in kako se ta pripravljenost odrazi v planu?<\/li><li><strong>Od spremembe do dobave:<\/strong> Kdo ob spremembi razpolo\u017eljivosti materiala, zmogljivosti ali prednostnih nalog izra\u010duna vpliv na preostala naro\u010dila?<\/li><\/ul>\n\n\n<p>Prva tri vpra\u0161anja poka\u017eejo, ali proizvodni podatki in nadzor izvajanja ustrezajo va\u0161emu delu. \u010cetrto razkrije zahtevo glede terminiranja, na katero sama oznaka vrste proizvodnje ne more odgovoriti.<\/p>\n\n\n<p>To razliko \u0161e posebej jasno upo\u0161tevajte pri neprekinjeni proizvodnji. Usklajevanje lo\u010denih proizvodnih operacij ni isto kot krmiljenje neprekinjeno povezanega omre\u017eja reaktorjev ali rezervoarjev. \u010ce delovanje va\u0161ega obrata dolo\u010dajo omejitve neprekinjenega toka, jih izrecno vklju\u010dite v ocenjevanje sistema.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Poleg pravilnih proizvodnih evidenc potrebujete tudi izvedljiv terminski plan<\/h2>\n\n\n<p>Vrnimo se k obema tovarnama. Proizvajalec \u010drpalk ima pravo revizijo sestavnega dela in popolne delovne naloge. Proizvajalec \u010distil ima odobreno recepturo in vse potrebne proizvodne evidence. Kljub temu se lahko oba \u017ee zjutraj znajdeta pred isto te\u017eavo: nujno naro\u010dilo potrebuje zmogljivosti, ki so \u017ee dodeljene drugemu delu.<\/p>\n\n\n<p>Pri proizvajalcu \u010drpalk lahko premik obdelovalne operacije zamakne sestavljanje in preizku\u0161anje. Pri proizvajalcu \u010distil lahko sprememba predvidene razpolo\u017eljivosti nepakiranega izdelka poru\u0161i ve\u010d serij polnjenja. Ni dovolj pogledati le prvega prizadetega vira. Planer mora poznati posledice vzdol\u017e celotnega tehnolo\u0161kega postopka in za druga naro\u010dila, ki potrebujejo iste vire.<\/p>\n\n\n<p>Va\u0161 ERP ali MES morda \u017ee dobro izra\u010dunava tak terminski plan. \u010ce ga, izkoristite to zmo\u017enost. \u010ce pa ekipa \u0161e vedno izva\u017ea podatke o delu in po vsaki spremembi na novo sestavlja lo\u010dena zaporedja operacij, je to tehten razlog za uvedbo sistema SkyPlanner, ne pa za zamenjavo sicer ustreznega proizvodnega sistema.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Naj SkyPlanner izra\u010duna terminski plan, vi pa dolo\u010dajte prioritete<\/h3>\n\n\n<p>SkyPlanner zdru\u017ei delovna mesta, izmene, operaterje, materiale in prioritete v enoten <a href=\"https:\/\/skyplanner.ai\/sl\/viri\/kaj-je-terminiranje-proizvodnje\/\">terminski plan proizvodnje<\/a>. Vi dolo\u010dite operacije, primerna delovna mesta, trajanja in odvisnosti. Arcturus, njegova umetna inteligenca za terminiranje, nato na podlagi nastavljenih zmogljivosti in pravil izra\u010duna, kdaj naj se delo izvede.<\/p>\n\n\n<p>Ganttov diagram poka\u017ee izra\u010dunano zaporedje operacij po virih. Namesto da popravljate zaporedje za vsak stroj posebej, vidite, na katere dogovorjene obveznosti sprememba vpliva, in se odlo\u010dite, kako ukrepati: ohraniti prednost naro\u010dila z visoko prioriteto, izkoristiti proste zmogljivosti drugje ali se pogovoriti o druga\u010dnem dobavnem roku.<\/p>\n\n\n<p>Terminiranje, ki upo\u0161teva materiale, v izra\u010dun vklju\u010di evidentirano razpolo\u017eljivost materiala. Tako prost termin na stroju ne pomeni samodejno tudi za\u010detka dela, ki ga ni mogo\u010de izvesti. Podatki o pripravljenosti za proizvodnjo, uporabljeni pri planiranju, morajo \u0161e vedno odra\u017eati zahtevane odobritve kontrole kakovosti: material na zalogi ni nujno tudi material, odobren za uporabo.<\/p>\n\n\n<p>Delovanje sistema Arcturus usmerjate s prioritetami in zaklepanjem razporeda. Ko se razmere v proizvodnji spremenijo, znova izra\u010duna terminski plan v okviru teh navodil. To pomeni manj ro\u010dnega usklajevanja in jasnej\u0161o podlago za odlo\u010ditve o zmogljivostih in dobavnih rokih, ne glede na to, ali se z razporejenimi operacijami izdelujejo posamezni sestavni deli ali pa so te operacije del procesne proizvodnje.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Kako to deluje v podjetju Opes Corporation<\/h2>\n\n\n<p>Opes Corporation deluje na sti\u010di\u0161\u010du kemi\u010dne in \u017eivilske proizvodnje. Kartice z aromami izdeluje na zalogo, ve\u010dinoma na podlagi predvidljivih dogovorov z odjemalci. Pred uvedbo sistema SkyPlanner so proizvodnjo planirali v Excelu in lo\u010deni skladi\u0161\u010dni aplikaciji, podatki pa niso bili povezani s finan\u010dno slu\u017ebo in nabavo.<\/p>\n\n\n<p>Ob prenovi sistema ERP je podjetje Opes za planiranje proizvodnje izbralo SkyPlanner in ga povezalo s sistemom Visma Nova. Uvajanje je potekalo po fazah, zato so se zaposleni lahko postopno u\u010dili in preizku\u0161ali delo s sistemom. Pri vsakodnevnem delu delavci poro\u010dajo o izdelanih koli\u010dinah, porabljenih surovinah in razlogih za odpad, ekipa pa ima skupen pregled nad zmogljivostmi.<\/p>\n\n\n<p>Tak pregled je pomemben, ko je treba v proizvodnjo vklju\u010diti razvojne serije ali nujna manj\u0161a naro\u010dila. V podjetju Opes pojasnjujejo, da se proizvodni plan samodejno posodablja in poka\u017ee vpliv sprememb na dobavne roke. Planerji tako vidijo, kdaj bodo operacije kon\u010dane, in lahko hitreje prilagodijo plan.<\/p>\n\n\n<p>Nauk te izku\u0161nje ni, da vsak procesni proizvajalec potrebuje enako re\u0161itev. Poka\u017ee pa, da je mogo\u010de evidence, prilagojene proizvodnji, in bolj\u0161e terminiranje povezati z obstoje\u010dim sistemom ERP. Opes je dobil jasnej\u0161o sliko proizvodnje, ne da bi moral zaradi potreb pri planiranju zamenjati celoten ERP.<\/p>\n\n\n<p>Celotno izku\u0161njo preberite v <a href=\"https:\/\/skyplanner.ai\/sl\/zgodbe-strank\/opes-corporation\/\">oceni sistema SkyPlanner, ki jo je podalo podjetje Opes Corporation<\/a>.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Izberite ustrezen sistem, nato se razbremenite terminiranja<\/h2>\n\n\n<p>Dobra primerjava se kon\u010da z zahtevami, ne z oznako vrste proizvodnje. Opredelitev izdelka, koli\u010dine, sledljivost in nadzor nad izvajanjem morajo ustrezati va\u0161emu na\u010dinu proizvodnje. Terminski plan mora nato uskladiti dejanske vire, potrebne za izvedbo tega dela.<\/p>\n\n\n<p>Izberite SkyPlanner, \u010de je to usklajevanje \u0161e vedno odvisno od planerjevega ro\u010dnega sestavljanja zaporedij operacij. <strong>SkyPlanner se prek svojega odprtega vmesnika REST API pove\u017ee s katerim koli sistemom ERP ali MES<\/strong>, zato lahko ohranite sisteme, ki ustrezajo va\u0161emu poslovanju, proizvodnji pa zagotovite zmogljivej\u0161e orodje za izra\u010dun terminskega plana. Arcturus poskrbi za izra\u010dun, vi pa dolo\u010date prioritete in preverjate posledice v prikazu Gantt.<\/p>\n\n\n<p><a href=\"https:\/\/skyplanner.ai\/sl\/kontaktna-prodaja\/\">Rezervirajte predstavitev sistema SkyPlanner<\/a> in nanjo prinesite zna\u010dilen primer proizvodnega toka, ozko grlo, ki si ga deli z drugimi tokovi, ter nedavno spremembo, ki jo je bilo te\u017eko vklju\u010diti v terminski plan. Tako se lahko pogovor osredoto\u010di na bistveno: katero delo bi SkyPlanner prevzel od va\u0161e ekipe in kako bi videli posledice, preden obljubite naslednji dobavni rok? \u010ce \u017eelite sistem najprej raziskati sami, <a href=\"https:\/\/skyplanner.ai\/sl\/preizkus\/\">preizkusite SkyPlanner s predstavitvenimi podatki<\/a>.<\/p>\n\n<\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>Diskretna in procesna proizvodnja: kaj mora podpirati va\u0161 sistem Domov &raquo; Viri &raquo; Diskretna in procesna proizvodnja: kaj mora podpirati va\u0161 sistem Pri diskretni proizvodnji nastajajo posamezni prepoznavni izdelki, kot so \u010drpalke, tiskana vezja in strojno obdelani sestavni deli. Pri procesni proizvodnji se materiali predelujejo po dolo\u010deni formulaciji ali recepturi, na primer pri izdelavi barv, &#8230; <a title=\"Diskretna in procesna proizvodnja: kaj mora podpirati va\u0161 sistem\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/sl\/viri\/diskretna-in-procesna-proizvodnja\/\" aria-label=\"Read more about Diskretna in procesna proizvodnja: kaj mora podpirati va\u0161 sistem\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":101548,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[2567,302],"tags":[],"class_list":["post-101531","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-ucinkovitost-proizvodnje","category-viri","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Diskretna in procesna proizvodnja: zahteve za va\u0161 sistem<\/title>\n<meta name=\"description\" content=\"Primerjajte diskretno in procesno proizvodnjo, opredelite zahteve za programsko opremo in spoznajte, kako SkyPlanner olaj\u0161a vsakodnevno terminiranje.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/sl\/viri\/diskretna-in-procesna-proizvodnja\/\" \/>\n<meta property=\"og:locale\" content=\"sl_SI\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Diskretna in procesna proizvodnja: kaj mora podpirati va\u0161 sistem\" \/>\n<meta property=\"og:description\" content=\"Primerjajte diskretno in procesno proizvodnjo, opredelite zahteve za programsko opremo in spoznajte, kako SkyPlanner olaj\u0161a vsakodnevno terminiranje.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/sl\/viri\/diskretna-in-procesna-proizvodnja\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2026-10-18T07:22:16+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-18T07:23:36+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/discrete-vs-process-manufacturing-hero.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1776\" \/>\n\t<meta property=\"og:image:height\" content=\"999\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"11 minut\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/diskretna-in-procesna-proizvodnja\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/diskretna-in-procesna-proizvodnja\\\/\"},\"author\":{\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\"},\"headline\":\"Diskretna in procesna proizvodnja: kaj mora podpirati va\u0161 sistem\",\"datePublished\":\"2026-10-18T07:22:16+00:00\",\"dateModified\":\"2026-10-18T07:23:36+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/diskretna-in-procesna-proizvodnja\\\/\"},\"wordCount\":2149,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/diskretna-in-procesna-proizvodnja\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/discrete-vs-process-manufacturing-hero.png\",\"articleSection\":[\"U\u010dinkovitost proizvodnje\",\"viri\"],\"inLanguage\":\"sl-SI\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/diskretna-in-procesna-proizvodnja\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/diskretna-in-procesna-proizvodnja\\\/\",\"name\":\"Diskretna in procesna proizvodnja: zahteve za va\u0161 sistem\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/diskretna-in-procesna-proizvodnja\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/diskretna-in-procesna-proizvodnja\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/discrete-vs-process-manufacturing-hero.png\",\"datePublished\":\"2026-10-18T07:22:16+00:00\",\"dateModified\":\"2026-10-18T07:23:36+00:00\",\"description\":\"Primerjajte diskretno in procesno proizvodnjo, opredelite zahteve za programsko opremo in spoznajte, kako SkyPlanner olaj\u0161a vsakodnevno terminiranje.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/diskretna-in-procesna-proizvodnja\\\/#breadcrumb\"},\"inLanguage\":\"sl-SI\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/diskretna-in-procesna-proizvodnja\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"sl-SI\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/diskretna-in-procesna-proizvodnja\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/discrete-vs-process-manufacturing-hero.png\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/discrete-vs-process-manufacturing-hero.png\",\"width\":1776,\"height\":999,\"caption\":\"Separate pump components and a mixing vessel contrast discrete units with process manufacturing.\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/diskretna-in-procesna-proizvodnja\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Diskretna in procesna proizvodnja: kaj mora podpirati va\u0161 sistem\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"sl-SI\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"sl-SI\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\",\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"sl-SI\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"caption\":\"Jussi M\u00e4ntyl\u00e4\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Diskretna in procesna proizvodnja: zahteve za va\u0161 sistem","description":"Primerjajte diskretno in procesno proizvodnjo, opredelite zahteve za programsko opremo in spoznajte, kako SkyPlanner olaj\u0161a vsakodnevno terminiranje.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/sl\/viri\/diskretna-in-procesna-proizvodnja\/","og_locale":"sl_SI","og_type":"article","og_title":"Diskretna in procesna proizvodnja: kaj mora podpirati va\u0161 sistem","og_description":"Primerjajte diskretno in procesno proizvodnjo, opredelite zahteve za programsko opremo in spoznajte, kako SkyPlanner olaj\u0161a vsakodnevno terminiranje.","og_url":"https:\/\/skyplanner.ai\/sl\/viri\/diskretna-in-procesna-proizvodnja\/","og_site_name":"SkyPlanner","article_published_time":"2026-10-18T07:22:16+00:00","article_modified_time":"2026-10-18T07:23:36+00:00","og_image":[{"width":1776,"height":999,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/discrete-vs-process-manufacturing-hero.png","type":"image\/png"}],"author":"Jussi M\u00e4ntyl\u00e4","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Jussi M\u00e4ntyl\u00e4","Est. reading time":"11 minut"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/sl\/viri\/diskretna-in-procesna-proizvodnja\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/sl\/viri\/diskretna-in-procesna-proizvodnja\/"},"author":{"name":"Jussi M\u00e4ntyl\u00e4","@id":"https:\/\/skyplanner.ai\/sl\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5"},"headline":"Diskretna in procesna proizvodnja: kaj mora podpirati va\u0161 sistem","datePublished":"2026-10-18T07:22:16+00:00","dateModified":"2026-10-18T07:23:36+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/sl\/viri\/diskretna-in-procesna-proizvodnja\/"},"wordCount":2149,"publisher":{"@id":"https:\/\/skyplanner.ai\/sl\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/sl\/viri\/diskretna-in-procesna-proizvodnja\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/discrete-vs-process-manufacturing-hero.png","articleSection":["U\u010dinkovitost proizvodnje","viri"],"inLanguage":"sl-SI"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/sl\/viri\/diskretna-in-procesna-proizvodnja\/","url":"https:\/\/skyplanner.ai\/sl\/viri\/diskretna-in-procesna-proizvodnja\/","name":"Diskretna in procesna proizvodnja: zahteve za va\u0161 sistem","isPartOf":{"@id":"https:\/\/skyplanner.ai\/sl\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/sl\/viri\/diskretna-in-procesna-proizvodnja\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/sl\/viri\/diskretna-in-procesna-proizvodnja\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/discrete-vs-process-manufacturing-hero.png","datePublished":"2026-10-18T07:22:16+00:00","dateModified":"2026-10-18T07:23:36+00:00","description":"Primerjajte diskretno in procesno proizvodnjo, opredelite zahteve za programsko opremo in spoznajte, kako SkyPlanner olaj\u0161a vsakodnevno terminiranje.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/sl\/viri\/diskretna-in-procesna-proizvodnja\/#breadcrumb"},"inLanguage":"sl-SI","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/sl\/viri\/diskretna-in-procesna-proizvodnja\/"]}]},{"@type":"ImageObject","inLanguage":"sl-SI","@id":"https:\/\/skyplanner.ai\/sl\/viri\/diskretna-in-procesna-proizvodnja\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/discrete-vs-process-manufacturing-hero.png","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/discrete-vs-process-manufacturing-hero.png","width":1776,"height":999,"caption":"Separate pump components and a mixing vessel contrast discrete units with process manufacturing."},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/sl\/viri\/diskretna-in-procesna-proizvodnja\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/sl\/"},{"@type":"ListItem","position":2,"name":"Diskretna in procesna proizvodnja: kaj mora podpirati va\u0161 sistem"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/sl\/#website","url":"https:\/\/skyplanner.ai\/sl\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/sl\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/sl\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"sl-SI"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/sl\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/sl\/","logo":{"@type":"ImageObject","inLanguage":"sl-SI","@id":"https:\/\/skyplanner.ai\/sl\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/sl\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]},{"@type":"Person","@id":"https:\/\/skyplanner.ai\/sl\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5","name":"Jussi M\u00e4ntyl\u00e4","image":{"@type":"ImageObject","inLanguage":"sl-SI","@id":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","caption":"Jussi M\u00e4ntyl\u00e4"}}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/discrete-vs-process-manufacturing-hero.png",1776,999,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/discrete-vs-process-manufacturing-hero-150x150.png",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/discrete-vs-process-manufacturing-hero-300x169.png",300,169,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/discrete-vs-process-manufacturing-hero-768x432.png",768,432,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/discrete-vs-process-manufacturing-hero-1024x576.png",1024,576,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/discrete-vs-process-manufacturing-hero-1536x864.png",1536,864,true],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/discrete-vs-process-manufacturing-hero.png",1776,999,false],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/discrete-vs-process-manufacturing-hero-360x203.png",360,203,true]},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/sl\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Diskretna in procesna proizvodnja: kaj mora podpirati va\u0161 sistem Domov &raquo; Viri &raquo; Diskretna in procesna proizvodnja: kaj mora podpirati va\u0161 sistem Pri diskretni proizvodnji nastajajo posamezni prepoznavni izdelki, kot so \u010drpalke, tiskana vezja in strojno obdelani sestavni deli. Pri procesni proizvodnji se materiali predelujejo po dolo\u010deni formulaciji ali recepturi, na primer pri izdelavi barv,&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/posts\/101531","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/comments?post=101531"}],"version-history":[{"count":1,"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/posts\/101531\/revisions"}],"predecessor-version":[{"id":101593,"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/posts\/101531\/revisions\/101593"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/media\/101548"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/media?parent=101531"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/categories?post=101531"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/tags?post=101531"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}