{"id":100530,"date":"2026-10-17T08:56:09","date_gmt":"2026-10-17T08:56:09","guid":{"rendered":"https:\/\/skyplanner.ai\/?p=100530"},"modified":"2026-10-17T08:57:28","modified_gmt":"2026-10-17T08:57:28","slug":"porocilo-o-proizvodnji","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/sl\/viri\/porocilo-o-proizvodnji\/","title":{"rendered":"Poro\u010dilo o proizvodnji: kaj bele\u017eiti in kako ukrepati"},"content":{"rendered":"<div class=\"gb-container gb-container-article01 article-main-content-container\">\n\n<h1 class=\"wp-block-heading\">Poro\u010dilo o proizvodnji: kaj bele\u017eiti in kako ukrepati<\/h1>\n\n<div class=\"gb-container gb-container-article02\">\n\n<p><a href=\"\/sl\/\">Domov<\/a> &raquo; <a href=\"https:\/\/skyplanner.ai\/sl\/viri\/\">Viri<\/a> &raquo; Poro\u010dilo o proizvodnji: kaj bele\u017eiti in kako ukrepati<\/p>\n\n\n<p class=\"yoast-reading-time__wrapper\"><span class=\"yoast-reading-time__icon\"><svg aria-hidden=\"true\" focusable=\"false\" data-icon=\"clock\" width=\"20\" height=\"20\" fill=\"none\" stroke=\"currentColor\" style=\"display:inline-block;vertical-align:-0.1em\" role=\"img\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewBox=\"0 0 24 24\"><path stroke-linecap=\"round\" stroke-linejoin=\"round\" stroke-width=\"2\" d=\"M12 8v4l3 3m6-3a9 9 0 11-18 0 9 9 0 0118 0z\"><\/path><\/svg><\/span><span class=\"yoast-reading-time__spacer\" style=\"display:inline-block;width:1em\"><\/span><span class=\"yoast-reading-time__descriptive-text\">Predviden \u010das branja: <\/span><span class=\"yoast-reading-time__reading-time\">9<\/span><span class=\"yoast-reading-time__time-unit\"> minut<\/span><\/p>\n\n<\/div>\n<div class=\"gb-container gb-container-article03\">\n\n<p>Poro\u010dilo o proizvodnji prikazuje, kaj je va\u0161a tovarna proizvedla v izmeni, dnevu ali drugem dolo\u010denem obdobju. Zdru\u017euje podatke o proizvedenih koli\u010dinah, \u010dasu proizvodnje in prekinitvah, obi\u010dajno tudi v primerjavi s planiranim delom. Tako vidite, kaj je bilo dokon\u010dano in kje proizvodnja ni dosegla plana.<\/p>\n\n\n<p>Skupna koli\u010dina je \u0161ele za\u010detek. \u010ce izmena poro\u010da o 80 kosih, mora naslednja ekipa vedeti, ali so to uporabni kosi, izlo\u010deni kosi ali kosi, ki \u0161e \u010dakajo na pregled. Sicer je lahko poro\u010dilo videti popolno, naslednji proizvodni plan pa \u017ee v izhodi\u0161\u010du temelji na napa\u010dnih podatkih.<\/p>\n\n\n<p>Uporabno poro\u010dilo dovolj jasno prika\u017ee preostalo delo, da lahko ukrepate. SkyPlanner povezuje bele\u017eenje \u010dasa in poro\u010dila iz proizvodnje s terminiranjem s pomo\u010djo umetne inteligence. Tako vam pomaga ugotovitve prenesti v bolj realisti\u010den plan, namesto da bi poro\u010dila vodili v lo\u010deni preglednici in ro\u010dno sestavljali novo zaporedje operacij na strojih.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Kaj naj vsebuje poro\u010dilo o proizvodnji?<\/h2>\n\n\n<p>Za vsako operacijo na delovnem centru v obdobju poro\u010danja pripravite svojo vrstico. Tako ostanejo rezultati razreza lo\u010deni od monta\u017ee, delno dokon\u010dan nalog pa ni prikazan kot zaklju\u010den. Vrstice lahko pozneje zdru\u017eite v povzetke po strojih, oddelkih ali izmenah.<\/p>\n\n\n<p>S spodnjo zasnovo si pomagajte pri odlo\u010ditvi, kaj mora vsebovati va\u0161e poro\u010dilo. Gre za prakti\u010dno strukturo poro\u010danja, ne za zahtevo, da zbirate vse mogo\u010de proizvodne kazalnike.<\/p>\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Podatek<\/th><th>Kaj bele\u017eiti<\/th><th>Zakaj je pomembno<\/th><\/tr><\/thead><tbody><tr><td>Obdobje poro\u010danja<\/td><td>Datum, izmena ter za\u010detni in kon\u010dni \u010das obdobja<\/td><td>Omogo\u010da primerjavo rezultatov in jasno dolo\u010da \u010dasovno mejo ob predaji dela<\/td><\/tr><tr><td>Oznaka dela<\/td><td>Nalog, izdelek in operacija; po potrebi tudi serija<\/td><td>Pove\u017ee rezultat z delom, ki mora \u0161e skozi proizvodnjo<\/td><\/tr><tr><td>Vir<\/td><td>Delovni center in odgovorna ekipa ali operater<\/td><td>Poka\u017ee, kje sta bila zabele\u017eena \u010das in proizvedena koli\u010dina<\/td><\/tr><tr><td>Izdani plan<\/td><td>Planirana koli\u010dina in \u010das za operacijo v obdobju<\/td><td>Zagotavlja izhodi\u0161\u010de za razumevanje rezultata<\/td><\/tr><tr><td>Dejansko proizvedena koli\u010dina<\/td><td>Lo\u010deno navedene koli\u010dine dokon\u010danih uporabnih kosov, kosov z napako in morebitnih kosov, ki \u0161e \u010dakajo na odlo\u010ditev<\/td><td>Prepre\u010duje, da bi izlo\u010dene ali zadr\u017eane kose \u0161teli kot pripravljene za nadaljnjo uporabo<\/td><\/tr><tr><td>Dejanski \u010das<\/td><td>Zabele\u017eeni \u010das dela, z lo\u010deno prikazanimi pripravami in prekinitvami, \u010de se ti podatki bele\u017eijo<\/td><td>Pomaga pojasniti odstopanja od planiranega trajanja<\/td><\/tr><tr><td>Stanje ob koncu obdobja<\/td><td>Ni za\u010deto, v teku, dokon\u010dano ali blokirano, z navedbo preostalega dela<\/td><td>Naslednji ekipi pove, kak\u0161no stanje prevzema<\/td><\/tr><tr><td>Izredni dogodek<\/td><td>Kaj se je zgodilo, kdaj in potrjeni vzrok, \u010de je znan<\/td><td>Lo\u010di pojasnilo od ugibanja<\/td><\/tr><tr><td>Nadaljnji ukrepi<\/td><td>Potreben ukrep, odgovorna oseba in naslednje preverjanje<\/td><td>Poskrbi, da je za odpravo prijavljene te\u017eave nekdo odgovoren<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>Pravila \u0161tetja naj bodo navedena ob poro\u010dilu. Ali \u00bbdokon\u010dano\u00ab pomeni, da je kon\u010dana ta operacija ali da je izdelek pripravljen za prodajo? Ali so izlo\u010deni kosi vklju\u010deni v skupno proizvedeno koli\u010dino? Dosleden odgovor je pomembnej\u0161i od imena stolpca.<\/p>\n\n\n<p>Istih kosov pri zaporednih operacijah ne se\u0161tevajte in vsote ne prikazujte kot koli\u010dino dokon\u010danih izdelkov. Za en sestavni del, ki gre skozi razrez, krivljenje in varjenje, nastanejo trije zapisi o operacijah, ne trije dokon\u010dani sestavni deli.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Primer: skupna koli\u010dina v izmeni ne pove vsega<\/h2>\n\n\n<p>Predstavljajte si operacijo strojne obdelave, pri kateri je treba za monta\u017eo izdelati 100 uporabnih kosov. Ob koncu izmene je ekipa obdelala 80 kosov: 72 jih je ustreznih, osem pa je izmeta. Preostalih 20 kosov \u0161e ni obdelanih. Zabele\u017eeni \u010das proizvodnje zna\u0161a sedem ur, planiranih pa je bilo \u0161est.<\/p>\n\n\n<p>Povzetek \u00bb80 izdelanih kosov\u00ab skrije tako manjkajo\u010do koli\u010dino kot odlo\u010ditev, ki jo je treba sprejeti.<\/p>\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Podatek iz poro\u010dila<\/th><th>Kaj pomeni<\/th><th>Kako ukrepati<\/th><\/tr><\/thead><tbody><tr><td>72 ustreznih kosov, osem kosov izmeta, 20 \u0161e neobdelanih<\/td><td>Za operacijo je treba izdelati \u0161e 28 uporabnih kosov, vklju\u010dno z nadomestili za izmet<\/td><td>Potrdite razpolo\u017eljivost materiala za nadomestne kose in \u010das, potreben za dokon\u010danje; to delo vklju\u010dite v naslednji plan<\/td><\/tr><tr><td>Zabele\u017eenih sedem ur namesto planiranih \u0161estih<\/td><td>Zabele\u017eeni \u010das je presegel oceno, vzrok pa \u0161e ni ugotovljen<\/td><td>Pred spremembo normiranega \u010dasa preverite priprave, prekinitve in \u010dasovne zapise<\/td><\/tr><tr><td>72 ustreznih kosov po strojni obdelavi<\/td><td>Pri teh kosih je kon\u010dana ta operacija, ne pa celoten nalog<\/td><td>Preverite, ali monta\u017ea lahko prevzame del serije in ali so drugi potrebni sestavni deli pripravljeni<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>Naslednja izmena ne bi smela dobiti zgolj informacije \u00bb\u0161e 20 kosov\u00ab. S tem bi spregledali izdelavo nadomestnih kosov. Prav tako monta\u017ei ne smemo obljubiti celotne serije samo zato, ker je bilo na strojni obdelavi zabele\u017eeno delo.<\/p>\n\n\n<p>Recimo, da operater zabele\u017ei \u0161e te\u017eavo z orodjem. Vodja ima zdaj dve povezani nalogi: odpraviti te\u017eavo z orodjem in planerjem zagotoviti zanesljiv pregled preostale strojne obdelave. Planerji lahko nato preverijo, kaj dodatna obremenitev pomeni za druge operacije na istem stroju in za poznej\u0161o monta\u017eo.<\/p>\n\n\n<p>V tem je vrednost poro\u010dila o proizvodnji: naslednja odlo\u010ditev postane konkretna. Namesto \u00bbpove\u010dajte proizvodnjo\u00ab dobimo \u00bbzagotovite kapacitete in material za \u0161e 28 uporabnih kosov ter potrdite, kdaj se monta\u017ea lahko nadaljuje\u00ab.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Kako pripraviti poro\u010dilo, na katero se naslednja izmena lahko zanese<\/h2>\n\n\n<h3 class=\"wp-block-heading\">Rezultate bele\u017eite sproti<\/h3>\n\n\n<p>Napredek bele\u017eite med izvajanjem operacije ali ob dogovorjeni predaji dela, dokler so podrobnosti \u0161e na voljo. Postopek naj bo dovolj kratek, da ga bodo ljudje lahko dosledno izvajali: prava operacija, koli\u010dine, \u010das in uporabna opomba ob izrednem dogodku.<\/p>\n\n\n<p>Dogovorite se, kdo zaklju\u010di poro\u010dilo in kdo dopolni nepopolne vnose. Prazno polje za koli\u010dino \u0161e ne pomeni, da ni bilo proizvedeno ni\u010d. Odprt \u010dasovni zapis ne dokazuje, da je stroj deloval vso izmeno. Podatke preverite z ekipo, preden jih uporabite za ocenjevanje uspe\u0161nosti ali rezervacijo kapacitet za jutri.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Uskladite koli\u010dine, \u010das in stanje<\/h3>\n\n\n<p>Vse tri podatke obravnavajte skupaj. \u010ce je operacija ozna\u010dena kot dokon\u010dana, uporabnih kosov pa je premalo, je potrebno pojasnilo. Velika koli\u010dina brez zabele\u017eenega \u010dasa lahko pomeni manjkajo\u010d \u010dasovni zapis, ne izjemne u\u010dinkovitosti. Delo, ki je bilo kon\u010dano pred koncem obdobja, vneseno pa pozneje, dosledno pripi\u0161ite obdobju, v katerem je bilo opravljeno.<\/p>\n\n\n<p>Enako jasno opredelite tudi \u010das. Delovne ure operaterjev, ure delovanja stroja in prete\u010deni \u010das od za\u010detka do konca niso isto. \u010ce dva \u010dloveka delata skupaj, je lahko skupno \u0161tevilo njunih delovnih ur ve\u010dje od \u010dasa delovanja stroja. Uporabite mero, ki ustreza vpra\u0161anju pri planiranju, namesto da vsako vsoto ur pretvarjate v odstotek izkori\u0161\u010denosti.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Lo\u010dite primerjalni plan od aktualnega terminskega plana<\/h3>\n\n\n<p>Shranite izdani plan, iz katerega izhajajo planirane vrednosti v poro\u010dilu. Za usmerjanje nedokon\u010dane proizvodnje uporabljajte posodobljeni terminski plan. \u010ce v\u010deraj\u0161nji cilj nadomestite z dana\u0161njo popravljeno koli\u010dino ali datumom, izgubite izhodi\u0161\u010de, ki pojasnjuje odstopanje.<\/p>\n\n\n<p>Poro\u010dilo je lahko podlaga za kazalnike, kot je <a href=\"https:\/\/skyplanner.ai\/sl\/viri\/izpolnjevanje-proizvodnega-plana\/\">upo\u0161tevanje terminskega plana proizvodnje<\/a>, vendar naj ne postane zgolj stran, polna odstotkov, za katerimi se skrijejo prizadete operacije. Pri dnevnem pregledu so najpomembnej\u0161a tista odstopanja, ki vplivajo na to, kaj se lahko izvaja v nadaljevanju.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Preglejte dana\u0161nja odstopanja in ponavljajo\u010de se vzorce<\/h3>\n\n\n<p>Ob predaji dela preverite, kaj \u0161e ni dokon\u010dano, kaj je pripravljeno za naslednjo operacijo in kaj se je spremenilo pri razpolo\u017eljivih kapacitetah. Za vsako pomembno odstopanje dolo\u010dite odgovorno osebo in naslednje preverjanje. Opomba \u00bbpomanjkanje materiala\u00ab je uporabnej\u0161a, \u010de nekdo pred ponovno sprostitvijo operacije preveri razpolo\u017eljivost materiala.<\/p>\n\n\n<p>S tedenskim pregledom spremljajte ponavljajo\u010da se prekora\u010denja \u010dasa, ponavljajo\u010d se izmet ali pogoste prekinitve. Primerjajte podobne izdelke in operacije; druga\u010dna sestava proizvodnega programa lahko spremeni skupne rezultate, ne da bi to pomenilo slab\u0161o uspe\u0161nost. Izbolj\u0161ajte osnovno oceno ali proces, namesto da od vsake izmene zahtevate pojasnilo istega odstopanja.<\/p>\n\n\n<h2 class=\"wp-block-heading\">S SkyPlanner pove\u017eite poro\u010dilo z naslednjim planom<\/h2>\n\n\n<p>Poro\u010danje je la\u017eje obvladovati, \u010de podatki ostanejo povezani z delom, na katero se nana\u0161ajo. SkyPlanner vam ob terminskem planu ponuja proizvodne zapise, podrobna poro\u010dila in prilagodljive nadzorne plo\u0161\u010de. Tako lahko pregledate rezultate in upo\u0161tevate njihove posledice pri planiranju, ne da bi to obravnavali kot dve lo\u010deni opravili.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Preverite, kaj je bilo zabele\u017eeno in za kaj je bil porabljen \u010das<\/h3>\n\n\n<p>Timer v SkyPlanner bele\u017ei \u010das dela ter koli\u010dine izdelanih kosov in kosov z napako. Poro\u010dilo All Timelogs zdru\u017euje podatke o opravilu, delovnem centru, operaciji, osebi, za\u010detnem in kon\u010dnem \u010dasu, dokon\u010danih koli\u010dinah in koli\u010dinah z napako, zabele\u017eenem \u010dasu ter opombah. V njem lahko zapise pregledate, uredite in odobrite.<\/p>\n\n\n<p>Pri rezultatu, kakr\u0161en je prikazan v primeru strojne obdelave, tako dobite podroben vpogled v skupni rezultat izmene. Preverite lahko konkretno delo, namesto da bi posku\u0161ali uskladiti \u0161tevilke brez jasnega izvora iz preglednic razli\u010dnih oddelkov.<\/p>\n\n\n<p>Poro\u010dili Job in Order Item dodata podatke o delovnem nalogu ali izdelku ter prika\u017eeta pri\u010dakovano trajanje, zabele\u017eeni \u010das in razliko med njima. Z njima prepoznate delo, ki ga je treba podrobneje pregledati. \u010casovno odstopanje naka\u017ee, kaj je treba preveriti; zapis o operaciji in ekipa pa ga pomagata pojasniti.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Pripravite pregleden prikaz proizvodnje<\/h3>\n\n\n<p>Na <a href=\"https:\/\/skyplanner.ai\/sl\/funkcije\/\">nadzornih plo\u0161\u010dah za poro\u010danje<\/a> v SkyPlanner lahko gradnike razporedite z na\u010dinom \u00bbpovleci in spusti\u00ab ter izberete \u010dasovno obdobje. Za razli\u010dne uporabnike lahko ustvarite razli\u010dne nadzorne plo\u0161\u010de in jih prika\u017eete na zaslonu v proizvodnji.<\/p>\n\n\n<p>Za pregled izmene naj bodo v ospredju delo v teku, zamude, obremenitev ter primerjava na\u010drtovane in dejanske u\u010dinkovitosti. Tako imajo vsi skupen pregled nad te\u017eavami, ki zahtevajo pozornost, namesto \u0161e enega poro\u010dila, ki ga mora nekdo za sestanek pripraviti na novo. Podrobni zapisi o operacijah naj ostanejo na voljo za vpra\u0161anja, ki jih odpre ta pregled.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Nedokon\u010dano delo realno umestite v terminski plan<\/h3>\n\n\n<p>Poro\u010dilo pove, kaj se je zgodilo. Naslednji plan mora upo\u0161tevati tudi preostalo delo in vire, ki so na voljo za njegovo dokon\u010danje.<\/p>\n\n\n<p>Arcturus, umetna inteligenca za terminiranje v SkyPlanner, izra\u010duna zaporedje dela ob upo\u0161tevanju delovnih centrov, izmen, operaterjev, odvisnosti med operacijami in prioritet. Tako nastali plan je prikazan na \u010dasovnici Gantt. Ko zaradi zaklju\u010denih operacij ali sprememb zmogljivosti plan ni ve\u010d aktualen, lahko samodejno ponovno terminiranje na novo razporedi delo, pri tem pa \u0161e naprej upo\u0161teva va\u0161a pravila in zaklenjene termine.<\/p>\n\n\n<p>Pretekli zapisi o opravljenem delu so tudi podlaga za napovedovanje trajanja posameznih korakov proizvodnega postopka. Z zbiranjem podatkov iz proizvodnje lahko tako izbolj\u0161ujete prihodnje \u010dasovne ocene, namesto da pri terminiranju vedno znova izhajate iz prvotne optimisti\u010dne predpostavke.<\/p>\n\n\n<p>V primeru strojne obdelave je prakti\u010dni cilj razporediti preostalo delo na podlagi verodostojnih podatkov o trajanju in razpolo\u017eljivosti ter nato videti, kako to vpliva na monta\u017eo in druge naloge. O prioritetah \u0161e naprej odlo\u010date vi, Arcturus pa poskrbi za <a href=\"https:\/\/skyplanner.ai\/sl\/viri\/kaj-je-terminiranje-proizvodnje\/\">izra\u010dun terminov<\/a> ob upo\u0161tevanju medsebojnih povezav.<\/p>\n\n\n<p>SkyPlanner se prek odprtega vmesnika REST API pove\u017ee s katerim koli sistemom ERP ali MES. \u010ce ti sistemi \u017ee vsebujejo va\u0161e naloge ali podatke o dejanski realizaciji proizvodnje, jih lahko pove\u017eete s terminiranjem v SkyPlanner, namesto da iste podatke znova vna\u0161ate lo\u010deno.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Kaj je bolj\u0161e poro\u010danje spremenilo v podjetju Piristeel<\/h2>\n\n\n<p>Piristeel, proizvajalec stre\u0161nih varnostnih elementov, se je prej zana\u0161al na preglednice in natisnjene delovne naloge. Informacije med oddelki niso dobro kro\u017eile, te\u017eko je bilo dobiti pregled nad obremenjenostjo zmogljivosti, proizvodnja pa je zagotavljala malo podatkov za odlo\u010danje.<\/p>\n\n\n<p>S postopnim uvajanjem SkyPlanner, ob so\u010dasnem razvoju sistema ERP in povezavi s sistemom Visma Nova, so podrobno terminiranje povezali s podatki iz proizvodnje. V podjetju Piristeel poro\u010dajo, da v proizvodnji porabijo manj \u010dasa za evidentiranje dela in poro\u010danje. Njihovi planerji vidijo prihodnjo obremenitev, pomanjkanje zmogljivosti pa obravnavajo, \u0161e preden preraste v ve\u010dje te\u017eave.<\/p>\n\n\n<p>Prav to je bistvena sprememba pri dnevnem poro\u010dilu o proizvodnji: manj dela z vodenjem evidenc in jasnej\u0161a podlaga za odlo\u010ditve o tem, kaj lahko proizvodnja naredi v nadaljevanju. <a href=\"https:\/\/skyplanner.ai\/sl\/zgodbe-strank\/piristeel\/\">Izku\u0161nja podjetja Piristeel s SkyPlanner<\/a> ka\u017ee, kako lahko poro\u010danje podpira vsakodnevno vodenje, namesto da se kon\u010da pri izpolnjenem obrazcu.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Naj bo va\u0161e naslednje poro\u010dilo o proizvodnji izhodi\u0161\u010de za nadaljnje delo<\/h2>\n\n\n<p>Izberite nedavno poro\u010dilo, ki vklju\u010duje nedokon\u010dano delo. Ali lahko iz njega razberete, katere koli\u010dine so uporabne, za katere operacije je treba predvideti \u0161e \u010das in kaj mora razre\u0161iti naslednja izmena? \u010ce morate za te odgovore znova pregledovati preglednice in opraviti ve\u010d telefonskih klicev, poro\u010danje planiranju \u0161e ne zagotavlja vsega, kar potrebuje.<\/p>\n\n\n<p><a href=\"https:\/\/skyplanner.ai\/sl\/kontaktna-prodaja\/\">Rezervirajte predstavitev SkyPlanner<\/a> in pripravite to poro\u010dilo, operacije, na katere se nana\u0161a, ter te\u017eavo z zmogljivostmi, ki je v ozadju. Oglejte si, kako lahko evidence iz proizvodnje, prikazi poro\u010dil in terminiranje z umetno inteligenco skupaj podprejo delo v va\u0161em obratu. \u010ce \u017eelite re\u0161itev najprej raziskati sami, <a href=\"https:\/\/skyplanner.ai\/sl\/preizkus\/\">preizkusite SkyPlanner s predstavitvenimi podatki<\/a>.<\/p>\n\n<\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>Poro\u010dilo o proizvodnji: kaj bele\u017eiti in kako ukrepati Domov &raquo; Viri &raquo; Poro\u010dilo o proizvodnji: kaj bele\u017eiti in kako ukrepati Poro\u010dilo o proizvodnji prikazuje, kaj je va\u0161a tovarna proizvedla v izmeni, dnevu ali drugem dolo\u010denem obdobju. Zdru\u017euje podatke o proizvedenih koli\u010dinah, \u010dasu proizvodnje in prekinitvah, obi\u010dajno tudi v primerjavi s planiranim delom. Tako vidite, kaj &#8230; <a title=\"Poro\u010dilo o proizvodnji: kaj bele\u017eiti in kako ukrepati\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/sl\/viri\/porocilo-o-proizvodnji\/\" aria-label=\"Read more about Poro\u010dilo o proizvodnji: kaj bele\u017eiti in kako ukrepati\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":100542,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[2567,302],"tags":[],"class_list":["post-100530","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-ucinkovitost-proizvodnje","category-viri","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Poro\u010dilo o proizvodnji: kaj bele\u017eiti in kako ukrepati<\/title>\n<meta name=\"description\" content=\"Poro\u010dilo o proizvodnji naj poka\u017ee uporabne kose, izgubljeni \u010das in nedokon\u010dano delo. Na podlagi ugotovitev s SkyPlanner na\u010drtujte naslednjo izmeno.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/sl\/viri\/porocilo-o-proizvodnji\/\" \/>\n<meta property=\"og:locale\" content=\"sl_SI\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Poro\u010dilo o proizvodnji: kaj bele\u017eiti in kako ukrepati\" \/>\n<meta property=\"og:description\" content=\"Poro\u010dilo o proizvodnji naj poka\u017ee uporabne kose, izgubljeni \u010das in nedokon\u010dano delo. Na podlagi ugotovitev s SkyPlanner na\u010drtujte naslednjo izmeno.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/sl\/viri\/porocilo-o-proizvodnji\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2026-10-17T08:56:09+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-17T08:57:28+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/manufacturing-production-report-hero.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1672\" \/>\n\t<meta property=\"og:image:height\" content=\"941\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"11 minut\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/porocilo-o-proizvodnji\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/porocilo-o-proizvodnji\\\/\"},\"author\":{\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\"},\"headline\":\"Poro\u010dilo o proizvodnji: kaj bele\u017eiti in kako ukrepati\",\"datePublished\":\"2026-10-17T08:56:09+00:00\",\"dateModified\":\"2026-10-17T08:57:28+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/porocilo-o-proizvodnji\\\/\"},\"wordCount\":2179,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/porocilo-o-proizvodnji\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/manufacturing-production-report-hero.png\",\"articleSection\":[\"U\u010dinkovitost proizvodnje\",\"viri\"],\"inLanguage\":\"sl-SI\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/porocilo-o-proizvodnji\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/porocilo-o-proizvodnji\\\/\",\"name\":\"Poro\u010dilo o proizvodnji: kaj bele\u017eiti in kako ukrepati\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/porocilo-o-proizvodnji\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/porocilo-o-proizvodnji\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/manufacturing-production-report-hero.png\",\"datePublished\":\"2026-10-17T08:56:09+00:00\",\"dateModified\":\"2026-10-17T08:57:28+00:00\",\"description\":\"Poro\u010dilo o proizvodnji naj poka\u017ee uporabne kose, izgubljeni \u010das in nedokon\u010dano delo. Na podlagi ugotovitev s SkyPlanner na\u010drtujte naslednjo izmeno.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/porocilo-o-proizvodnji\\\/#breadcrumb\"},\"inLanguage\":\"sl-SI\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/porocilo-o-proizvodnji\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"sl-SI\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/porocilo-o-proizvodnji\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/manufacturing-production-report-hero.png\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/manufacturing-production-report-hero.png\",\"width\":1672,\"height\":941,\"caption\":\"Separate trays of usable parts, faulty pieces and unfinished blanks beside a machine and production report.\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/viri\\\/porocilo-o-proizvodnji\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Poro\u010dilo o proizvodnji: kaj bele\u017eiti in kako ukrepati\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"sl-SI\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"sl-SI\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\",\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"sl-SI\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"caption\":\"Jussi M\u00e4ntyl\u00e4\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Poro\u010dilo o proizvodnji: kaj bele\u017eiti in kako ukrepati","description":"Poro\u010dilo o proizvodnji naj poka\u017ee uporabne kose, izgubljeni \u010das in nedokon\u010dano delo. Na podlagi ugotovitev s SkyPlanner na\u010drtujte naslednjo izmeno.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/sl\/viri\/porocilo-o-proizvodnji\/","og_locale":"sl_SI","og_type":"article","og_title":"Poro\u010dilo o proizvodnji: kaj bele\u017eiti in kako ukrepati","og_description":"Poro\u010dilo o proizvodnji naj poka\u017ee uporabne kose, izgubljeni \u010das in nedokon\u010dano delo. Na podlagi ugotovitev s SkyPlanner na\u010drtujte naslednjo izmeno.","og_url":"https:\/\/skyplanner.ai\/sl\/viri\/porocilo-o-proizvodnji\/","og_site_name":"SkyPlanner","article_published_time":"2026-10-17T08:56:09+00:00","article_modified_time":"2026-10-17T08:57:28+00:00","og_image":[{"width":1672,"height":941,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/manufacturing-production-report-hero.png","type":"image\/png"}],"author":"Jussi M\u00e4ntyl\u00e4","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Jussi M\u00e4ntyl\u00e4","Est. reading time":"11 minut"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/sl\/viri\/porocilo-o-proizvodnji\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/sl\/viri\/porocilo-o-proizvodnji\/"},"author":{"name":"Jussi M\u00e4ntyl\u00e4","@id":"https:\/\/skyplanner.ai\/sl\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5"},"headline":"Poro\u010dilo o proizvodnji: kaj bele\u017eiti in kako ukrepati","datePublished":"2026-10-17T08:56:09+00:00","dateModified":"2026-10-17T08:57:28+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/sl\/viri\/porocilo-o-proizvodnji\/"},"wordCount":2179,"publisher":{"@id":"https:\/\/skyplanner.ai\/sl\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/sl\/viri\/porocilo-o-proizvodnji\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/manufacturing-production-report-hero.png","articleSection":["U\u010dinkovitost proizvodnje","viri"],"inLanguage":"sl-SI"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/sl\/viri\/porocilo-o-proizvodnji\/","url":"https:\/\/skyplanner.ai\/sl\/viri\/porocilo-o-proizvodnji\/","name":"Poro\u010dilo o proizvodnji: kaj bele\u017eiti in kako ukrepati","isPartOf":{"@id":"https:\/\/skyplanner.ai\/sl\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/sl\/viri\/porocilo-o-proizvodnji\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/sl\/viri\/porocilo-o-proizvodnji\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/manufacturing-production-report-hero.png","datePublished":"2026-10-17T08:56:09+00:00","dateModified":"2026-10-17T08:57:28+00:00","description":"Poro\u010dilo o proizvodnji naj poka\u017ee uporabne kose, izgubljeni \u010das in nedokon\u010dano delo. Na podlagi ugotovitev s SkyPlanner na\u010drtujte naslednjo izmeno.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/sl\/viri\/porocilo-o-proizvodnji\/#breadcrumb"},"inLanguage":"sl-SI","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/sl\/viri\/porocilo-o-proizvodnji\/"]}]},{"@type":"ImageObject","inLanguage":"sl-SI","@id":"https:\/\/skyplanner.ai\/sl\/viri\/porocilo-o-proizvodnji\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/manufacturing-production-report-hero.png","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/manufacturing-production-report-hero.png","width":1672,"height":941,"caption":"Separate trays of usable parts, faulty pieces and unfinished blanks beside a machine and production report."},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/sl\/viri\/porocilo-o-proizvodnji\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/sl\/"},{"@type":"ListItem","position":2,"name":"Poro\u010dilo o proizvodnji: kaj bele\u017eiti in kako ukrepati"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/sl\/#website","url":"https:\/\/skyplanner.ai\/sl\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/sl\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/sl\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"sl-SI"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/sl\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/sl\/","logo":{"@type":"ImageObject","inLanguage":"sl-SI","@id":"https:\/\/skyplanner.ai\/sl\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/sl\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]},{"@type":"Person","@id":"https:\/\/skyplanner.ai\/sl\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5","name":"Jussi M\u00e4ntyl\u00e4","image":{"@type":"ImageObject","inLanguage":"sl-SI","@id":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","caption":"Jussi M\u00e4ntyl\u00e4"}}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/manufacturing-production-report-hero.png",1672,941,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/manufacturing-production-report-hero-150x150.png",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/manufacturing-production-report-hero-300x169.png",300,169,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/manufacturing-production-report-hero-768x432.png",768,432,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/manufacturing-production-report-hero-1024x576.png",1024,576,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/manufacturing-production-report-hero-1536x864.png",1536,864,true],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/manufacturing-production-report-hero.png",1672,941,false],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/manufacturing-production-report-hero-360x203.png",360,203,true]},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/sl\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Poro\u010dilo o proizvodnji: kaj bele\u017eiti in kako ukrepati Domov &raquo; Viri &raquo; Poro\u010dilo o proizvodnji: kaj bele\u017eiti in kako ukrepati Poro\u010dilo o proizvodnji prikazuje, kaj je va\u0161a tovarna proizvedla v izmeni, dnevu ali drugem dolo\u010denem obdobju. Zdru\u017euje podatke o proizvedenih koli\u010dinah, \u010dasu proizvodnje in prekinitvah, obi\u010dajno tudi v primerjavi s planiranim delom. Tako vidite, kaj&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/posts\/100530","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/comments?post=100530"}],"version-history":[{"count":1,"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/posts\/100530\/revisions"}],"predecessor-version":[{"id":100593,"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/posts\/100530\/revisions\/100593"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/media\/100542"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/media?parent=100530"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/categories?post=100530"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/tags?post=100530"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}