{"id":100954,"date":"2026-10-17T13:00:38","date_gmt":"2026-10-17T13:00:38","guid":{"rendered":"https:\/\/skyplanner.ai\/?page_id=100954"},"modified":"2026-10-17T13:00:38","modified_gmt":"2026-10-17T13:00:38","slug":"terminiranje-proizvodnje","status":"publish","type":"page","link":"https:\/\/skyplanner.ai\/sl\/integracije\/erp\/business-central\/terminiranje-proizvodnje\/","title":{"rendered":"Ali Business Central podpira terminiranje proizvodnje? Capacity Constrained Resources v primerjavi s SkyPlanner APS"},"content":{"rendered":"\n<div class=\"wp-block-group sp-industry-page sp-industry sp-page sp-erp-page\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<section class=\"wp-block-group fx-hero\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__grid\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__copy sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-eyebrow ind-crumbs\"><span><a href=\"\/sl\/integracije\/\">Integracije<\/a> \/ <a href=\"\/sl\/integracije\/erp\/\">ERP<\/a> \/ Microsoft Dynamics 365 Business Central<\/span><\/p>\n\n\n<h1 class=\"wp-block-heading fx-hero__title\">Ali Business Central podpira terminiranje proizvodnje? <span class=\"hl\">Capacity Constrained Resources v primerjavi s SkyPlanner APS<\/span><\/h1>\n\n\n<p class=\"fx-hero__sub\">Microsoft Dynamics 365 Business Central pri terminiranju proizvodnje upo\u0161teva dejanske kapacitete strojev in zaposlenih le za delovne in strojne centre, ki jih vnesete v Capacity Constrained Resources. Vse drugo, vklju\u010dno z MRP, planira ob predpostavki neomejenih kapacitet. Microsoft rezultat imenuje grobi terminski plan. Obrati, ki potrebujejo <a href=\"\/sl\/viri\/planiranje-z-omejenimi-kapacitetami\/\">terminiranje celotne proizvodnje<\/a> ob upo\u0161tevanju dejanskih kapacitet, ob sistemu Business Central uporabljajo SkyPlanner APS.<\/p>\n\n\n<div class=\"wp-block-buttons fx-hero__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/sl\/preizkus\/\">Za\u010dnite brezpla\u010dni preizkus<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/sl\/kontaktna-prodaja\/\">Rezervirajte predstavitev<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-hero__media sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"fx-shot\"><div class=\"fx-shot__bar\" aria-hidden=\"true\"><i><\/i><i><\/i><i><\/i><span>skyplanner.ai \u00b7 Terminiranje proizvodnje<\/span><\/div><img fetchpriority=\"high\" decoding=\"async\" loading=\"eager\" width=\"1024\" height=\"685\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/20-d7d44cbc-5430-4f97-99f5-fca4632862ef.png\" alt=\"Ganttov prikaz v SkyPlanner APS z operacijami, razporejenimi po delovnih centrih, in seznamom naro\u010dil spodaj.\"><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--intro\" id=\"overview\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Microsoftova funkcija za terminiranje proizvodnje v Planning Optimization je del sistema Dynamics 365 Supply Chain Management, ki je drug izdelek. Za Business Central ne velja.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"how-business-central-plans-capacity-step-by-step\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Kako Business Central planira kapacitete, korak za korakom<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Funkcionalnosti proizvodnje so vidne le v uporabni\u0161ki izku\u0161nji <strong>Premium<\/strong>. Ta po Microsoftovih besedah &#8220;shows all actions and fields for all business functionality, including Manufacturing and Service Management.&#8221; (prika\u017ee vsa dejanja in polja za vse poslovne funkcionalnosti, vklju\u010dno s proizvodnjo in upravljanjem storitev). V izku\u0161nji Essentials ni na voljo noben od spodaj opisanih zaslonov.<\/p>\n\n\n<h3 class=\"wp-block-heading\">1. Mati\u010dni podatki o kapacitetah<\/h3>\n\n\n<p>Kapacitete so modelirane na treh ravneh: <strong>Work Center Group<\/strong>, <strong>Work Center<\/strong> in <strong>Machine Center<\/strong>. Za vsak delovni in strojni center so dolo\u010deni <strong>Shop Calendar Code<\/strong>, <strong>Capacity<\/strong>, <strong>Efficiency<\/strong>, <strong>Queue Time<\/strong> in <strong>Unit of Measure Code<\/strong>. Proizvodni koledar vsebuje izmene (<strong>Work Shifts<\/strong>), delovne dni in praznike. Vnosi <strong>Absence<\/strong> zmanj\u0161ajo kapaciteto posameznega dne.<\/p>\n\n\n<p>Dokler za izbrano datumsko obdobje ne za\u017eenete <strong>Calculate Work Center Calendar<\/strong> in <strong>Calculate Machine Center Calendar<\/strong>, ni mogo\u010de terminirati ni\u010desar.<\/p>\n\n\n<p>S tem ustvarite koledarske vnose, ki po Microsoftovih besedah dolo\u010dajo &#8220;the detailed scheduling of operations performed at the work center.&#8221; (podrobno terminiranje operacij, ki se izvajajo v delovnem centru). Polje <strong>Calendar Entries Available Until<\/strong> prikazuje, do kdaj so vnosi na voljo. Ko je ta datum pred delovnim datumom, se polje prika\u017ee v opozorilnem slogu. (<a href=\"https:\/\/learn.microsoft.com\/en-us\/dynamics365\/business-central\/production-how-to-create-work-center-calendars\">vir<\/a>)<\/p>\n\n\n<h3 class=\"wp-block-heading\">2. Tehnolo\u0161ki postopki in kosovnice<\/h3>\n\n\n<p>Tehnolo\u0161ki postopek (<strong>Routing<\/strong>) je zaporedni (Serial) ali vzporedni (Parallel) in mora imeti status Certified. Za vsako operacijo so dolo\u010deni:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Operation No.<\/strong> in <strong>Type<\/strong> (Work Center ali Machine Center)<\/li>\n\n\n<li><strong>Setup Time<\/strong>, <strong>Run Time<\/strong>, <strong>Wait Time<\/strong> in <strong>Move Time<\/strong><\/li>\n\n\n<li><strong>Concurrent Capacities<\/strong>, <strong>Send-Ahead Quantity<\/strong> in <strong>Routing Link Code<\/strong><\/li>\n\n<\/ul>\n\n\n<p>Tudi proizvodna kosovnica (<strong>Production BOM<\/strong>) mora imeti status Certified, preden jo sistem lahko uporabi pri planiranju.<\/p>\n\n\n<h3 class=\"wp-block-heading\">3. MPS in MRP v Planning Worksheet<\/h3>\n\n\n<p>V <strong>Planning Worksheet<\/strong> za\u017eenete <strong>Calculate Regenerative Plan<\/strong> ali <strong>Calculate Net Change Plan<\/strong>. Sistem uskladi povpra\u0161evanje in oskrbo glede na politiko ponovnega naro\u010danja posameznega artikla. S sporo\u010dili o ukrepih predlaga nabavne naloge, naloge za prenos, monta\u017eo in proizvodnjo.<\/p>\n\n\n<p>Microsoft je glede kapacitet tu jasen: &#8220;With each planned method, Business Central generates worksheet entries that assume infinite capacity. When you develop schedules, work center and machine center capacity isn&#8217;t considered.&#8221; (Pri vsaki metodi planiranja Business Central ustvari vnose v delovnem listu ob predpostavki neomejenih kapacitet. Pri izdelavi terminskih planov ne upo\u0161teva kapacitet delovnih in strojnih centrov.) (<a href=\"https:\/\/learn.microsoft.com\/en-us\/dynamics365\/business-central\/production-how-to-run-mps-and-mrp\">vir<\/a>)<\/p>\n\n\n<h3 class=\"wp-block-heading\">4. Proizvodni nalogi, Refresh in Replan<\/h3>\n\n\n<p>Proizvodni nalogi prehajajo skozi statuse <strong>Simulated<\/strong>, <strong>Planned<\/strong>, <strong>Firm Planned<\/strong>, <strong>Released<\/strong> in <strong>Finished<\/strong>. Dejanje <strong>Refresh<\/strong> izra\u010duna vrstice, tehnolo\u0161ke postopke in potrebe po komponentah, pri \u010demer je smer terminiranja (<strong>Scheduling Direction<\/strong>) nastavljena na Forward ali Backward. <strong>Replan<\/strong> naredi enako, vendar zajame tudi ni\u017eje ravni kosovnice. Datumi operacij v <strong>Prod. Order Routing<\/strong> izhajajo iz koledarjev delovnih centrov.<\/p>\n\n\n<p>Privzeto se kapacitete obravnavajo kot neomejene: &#8220;By default, Business Central uses infinite capacity scheduling.&#8221; (Business Central privzeto uporablja terminiranje z neomejenimi kapacitetami.) (<a href=\"https:\/\/learn.microsoft.com\/en-us\/dynamics365\/business-central\/production-how-to-view-the-load-on-work-centers\">vir<\/a>) Dva naloga sta tako lahko razporejena na isti stroj ob isti uri.<\/p>\n\n\n<h3 class=\"wp-block-heading\">5. Capacity Constrained Resources: kje sistem upo\u0161teva omejene kapacitete<\/h3>\n\n\n<p>To je vgrajena funkcija za razporejanje dela ob upo\u0161tevanju omejenih kapacitet. Na strani <strong>Capacity Constrained Resources<\/strong> dodate vir z naslednjimi podatki:<\/p>\n\n\n<figure class=\"wp-block-table ind-table\"><table><thead><tr><th>Polje<\/th><th>Namen<\/th><\/tr><\/thead><tbody><tr><td>Capacity Type<\/td><td>Work Center ali Machine Center<\/td><\/tr><tr><td>Capacity No.<\/td><td>Vir, katerega kapaciteto \u017eelite omejiti<\/td><\/tr><tr><td>Critical Load %<\/td><td>Raven obremenitve, ki je sistem pri terminiranju ne sme prese\u010di<\/td><\/tr><tr><td>Dampener (% of Total Capacity)<\/td><td>Toleranca, ki sistemu pri terminiranju dovoli manj\u0161o prekora\u010ditev kriti\u010dne obremenitve, da se izogne delitvi operacije<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>Pri viru z omejeno kapaciteto sistem vsako operacijo uvrsti v najbli\u017eji prosti \u010dasovni interval. \u010ce je ta prekratek, operacijo razdeli na dva ali ve\u010d delov. Pri razdeljeni operaciji se pripravljalni \u010das dodeli le enkrat, &#8220;because it&#8217;s assumed that some manual adjustment is done to optimize the schedule.&#8221; (ker se predpostavlja, da bo terminski plan za optimizacijo \u0161e ro\u010dno prilagojen). (<a href=\"https:\/\/learn.microsoft.com\/en-us\/dynamics365\/business-central\/production-how-to-set-up-work-and-machine-centers#to-set-up-a-capacity-constrained-machine-or-work-center\">vir<\/a>)<\/p>\n\n\n<h3 class=\"wp-block-heading\">6. Pregled obremenitev in ro\u010dno premikanje nalogov<\/h3>\n\n\n<p>Planer preveri rezultat na treh mestih:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li>v pogledu <strong>Load<\/strong> za delovni center (View by: Day, Week, Month, Quarter, Year ali Accounting Period; View as: Net Change ali Balance at Date)<\/li>\n\n\n<li>na seznamu <strong>Work Center Task List<\/strong><\/li>\n\n\n<li>v matriki <strong>Work Center Calendar<\/strong><\/li>\n\n<\/ul>\n\n\n<p>\u010ce je v <strong>Manufacturing Setup<\/strong> omogo\u010dena mo\u017enost <strong>Manual Scheduling<\/strong>, lahko planer premakne datum za\u010detka ali rok dokon\u010danja naloga. Pri tem se upo\u0161teva \u010dasovna rezerva iz polja <strong>Safety Lead Time for Manual Scheduling<\/strong>.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"where-business-central-stops\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Kje so meje sistema Business Central<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ul class=\"wp-block-list\">\n\n<li><strong>\u017de v osnovi le grobi terminski plan.<\/strong> &#8220;Business Central doesn&#8217;t support detailed shop floor control. It plans for a feasible utilization of resources by providing a rough-cut schedule, but doesn&#8217;t automatically create and maintain detailed schedules based on priorities or optimization rules.&#8221; (Business Central ne podpira podrobnega vodenja proizvodnje. Z grobim terminskim planom na\u010drtuje izvedljivo izkori\u0161\u010denost virov, ne ustvarja in vzdr\u017euje pa samodejno podrobnih terminskih planov na podlagi prednostnih nalog ali optimizacijskih pravil.) (<a href=\"https:\/\/learn.microsoft.com\/en-us\/dynamics365\/business-central\/production-how-to-set-up-work-and-machine-centers\">vir<\/a>)<\/li>\n\n\n<li><strong>MRP ne upo\u0161teva kapacitet.<\/strong> Planning Worksheet ob vsakem zagonu predpostavlja neomejene kapacitete, ne glede na to, ali so viri ozna\u010deni kot omejeni ali ne (glejte zgornji navedek).<\/li>\n\n\n<li><strong>Omejitve veljajo le tam, kjer jih ozna\u010dite.<\/strong> Vsak delovni center, ki ni na strani Capacity Constrained Resources, \u0161e naprej velja za neomejenega. Operacije na istem viru se zato lahko \u010dasovno prekrivajo.<\/li>\n\n\n<li><strong>Zaporedno planiranje.<\/strong> &#8220;Operations on work centers or machine centers that are set up as constrained resources are always planned serially.&#8221; (Operacije v delovnih ali strojnih centrih, nastavljenih kot viri z omejeno kapaciteto, se vedno planirajo zaporedno.) Delovni center z omejeno kapaciteto in nastavitvijo Capacity 3 torej v planu ne izvaja treh operacij vzporedno.<\/li>\n\n\n<li><strong>Brez samodejne izbire alternativnega tehnolo\u0161kega postopka.<\/strong> &#8220;The alternate work center is for information only, and isn&#8217;t automatically included in planning processes.&#8221; (Alternativni delovni center je zgolj informativen in se ne vklju\u010di samodejno v postopke planiranja.)<\/li>\n\n\n<li><strong>Strojni centri lahko izpadejo iz planiranja.<\/strong> &#8220;If you turn off the Consolidated Calendar toggle, only the capacity of the work center is assigned in the planning. The machine center capacity is excluded.&#8221; (\u010ce izklopite stikalo Consolidated Calendar, se pri planiranju dodeli le kapaciteta delovnega centra. Kapaciteta strojnega centra je izklju\u010dena.)<\/li>\n\n\n<li><strong>Nalogi s statusom Planned ne ohranijo terminskega plana.<\/strong> Za proizvodne naloge s statusom Planned Microsoft navaja: &#8220;Business Central deletes them the next time you run planning.&#8221; (Business Central jih izbri\u0161e ob naslednjem zagonu planiranja.) (<a href=\"https:\/\/learn.microsoft.com\/en-us\/dynamics365\/business-central\/production-about-production-orders\">vir<\/a>)<\/li>\n\n\n<li><strong>Ponovno planiranje pomeni ponovno terminiranje dela.<\/strong> &#8220;Changes implemented with the Replan action probably change the capacity need of the production order. You might have to reschedule operations afterwards.&#8221; (Spremembe, izvedene z dejanjem Replan, bodo verjetno spremenile potrebe proizvodnega naloga po kapacitetah. Zatem bo morda treba operacije ponovno terminirati.) (<a href=\"https:\/\/learn.microsoft.com\/en-us\/dynamics365\/business-central\/production-how-to-replan-refresh-production-orders\">vir<\/a>)<\/li>\n\n\n<li><strong>Pripravljalni \u010dasi niso odvisni od zaporedja.<\/strong> Setup Time je fiksna vrednost za vsako vrstico tehnolo\u0161kega postopka, ki se obra\u010duna za vsak proizvodni nalog. Menjava z izdelka A na B traja enako kot menjava s C na B, zato sistem nima razloga, da bi operacije razvrstil tako, da bi skraj\u0161al pripravljalne \u010dase. Sistem z delitvijo operacij zapolnjuje proste \u010dasovne intervale, ne dolo\u010da pa zaporedja operacij. Microsoft pri\u010dakuje, da bo planer razdeljene operacije ro\u010dno uredil.<\/li>\n\n\n<li><strong>Orodja in posamezni delavci nimajo kapacitet.<\/strong> Vrstice Routing Tool in Routing Personnel bele\u017eijo, kaj operacija potrebuje, nimajo pa koledarja ali kapacitete. Ni\u010d ne prepre\u010duje, da bi dve operaciji hkrati zahtevali isto vpenjalo ali istega strokovnjaka. Mo\u017enost <strong>Concurrent Capacities<\/strong> omogo\u010da, da ve\u010d enot enega delovnega ali strojnega centra skupaj izvaja operacijo, kar skraj\u0161a njen \u010das izvajanja. Ne rezervira pa posameznih delavcev z njihovimi izmenami.<\/li>\n\n<\/ul>\n\n\n<p>V praksi to pomeni preobremenjene stroje, ki niso ozka grla, ro\u010dno spreminjanje zaporedja in vzporedni terminski plan v Excelu.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"when-business-central-s-native-scheduling-is-eno\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Kdaj vgrajeno terminiranje v sistemu Business Central zadostuje<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Capacity Constrained Resources skupaj s pogledom Load zadostuje, kadar:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li>Imate eno ali dve pravi ozki grli, preostala proizvodnja pa ima proste kapacitete.<\/li>\n\n\n<li>So tehnolo\u0161ki postopki kratki in stabilni, ve\u010dinoma pa izdelujete na zalogo ali ponujate dolge dobavne roke.<\/li>\n\n\n<li>Planirate tedensko in planer potrebuje le grobo preverjanje izvedljivosti.<\/li>\n\n\n<li>Je dolo\u010danje zaporedja dovolj preprosto, da ga vodja dolo\u010di ob stroju.<\/li>\n\n\n<li>Skupna orodja, razpolo\u017eljivost operaterjev in prihod materiala ne omejujejo vrstnega reda dela.<\/li>\n\n\n<li>Proizvodnja predstavlja majhen del poslovanja in \u017eelite ostati pri enem sistemu.<\/li>\n\n<\/ul>\n\n\n<p>\u010ce to velja za va\u0161 obrat, skrbno nastavite vire z omejeno kapaciteto. Poskrbite, da bodo koledarji izra\u010dunani za obdobje, ki sega precej dlje od va\u0161ega planskega horizonta, in vklopite Consolidated Calendar tam, kjer so pomembni strojni centri. To je vse.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"when-you-need-a-finite-capacity-scheduler\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Kdaj potrebujete orodje za terminiranje proizvodnje<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Vgrajena funkcija ne zado\u0161\u010da ve\u010d, ko za va\u0161o proizvodnjo velja ve\u010d od naslednjega:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li>Glede na nabor izdelkov se ozka grla pojavljajo na ve\u010d kot dveh virih.<\/li>\n\n\n<li>Dobavni roki se zamikajo, \u010deprav je tedenska obremenitev v pogledu Load videti ustrezna.<\/li>\n\n\n<li>\u010cas menjave je odvisen od predhodno izdelanega izdelka, zato zaporedje operacij vpliva na obseg proizvodnje.<\/li>\n\n\n<li>Zaposleni, izmene in odsotnosti omejujejo plan prav toliko kot stroji, nekatere operacije pa zahtevajo dva ali tri operaterje hkrati.<\/li>\n\n\n<li>Ve\u010d strojev uporablja ista preoblikovalna orodja, kalupe ali vpenjala.<\/li>\n\n\n<li>Razpolo\u017eljivost materiala dolo\u010da, katera operacija se lahko za\u010dne.<\/li>\n\n\n<li>Imate stroje, ki lahko dejansko nadomestijo druge, in \u017eelite, da jih plan izkoristi.<\/li>\n\n\n<li>Nujna naro\u010dila in okvare zahtevajo ponovno planiranje ve\u010dkrat na teden.<\/li>\n\n<\/ul>\n\n\n<h3 class=\"wp-block-heading\">Na kaj bodite pozorni<\/h3>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>So\u010dasno upo\u0161tevanje omejenih kapacitet vseh virov<\/strong>, ne le ozna\u010dene podskupine.<\/li>\n\n\n<li><strong>Dolo\u010danje zaporedja na ravni operacij<\/strong> glede na prioritete in roke.<\/li>\n\n\n<li><strong>Matrika \u010dasov menjav<\/strong>: asimetri\u010dni \u010dasi menjav med izdelki, odvisni od zaporedja, s katerimi algoritem minimizira skupni pripravljalni \u010das.<\/li>\n\n\n<li><strong>Orodja kot skupni viri z omejeno kapaciteto<\/strong>, da isto vpenjalo nikoli ni na dveh strojih hkrati.<\/li>\n\n\n<li><strong>Operacije z ve\u010d operaterji<\/strong>: operaciji, ki na istem delovnem centru potrebuje ve\u010d ljudi, se ti dodelijo ob upo\u0161tevanju izmene vsakega od njih.<\/li>\n\n\n<li><strong>Omejitve glede zaposlenih in izmen<\/strong>, vklju\u010dno z odsotnostmi in nadurami.<\/li>\n\n\n<li><strong>Terminiranje glede na razpolo\u017eljivost materiala<\/strong> s preverjanjem zalog in pri\u010dakovanih dobav.<\/li>\n\n\n<li><strong>Nadomestni stroji in zaposleni<\/strong>, ki jih algoritem dejansko uporabi, kadar primarni vir ni na voljo.<\/li>\n\n\n<li><strong>Vizualno urejanje na Ganttovem diagramu<\/strong>, pri katerem premik ene operacije ohrani usklajenost preostalih.<\/li>\n\n\n<li><strong>Samodejno ponovno terminiranje<\/strong> ob spremembah poteka proizvodnje ali naro\u010dil.<\/li>\n\n\n<li><strong>Jasna razmejitev odgovornosti za podatke med orodjem za terminiranje in sistemom Business Central.<\/strong> Termine zapisujte v naloge s statusom Firm Planned ali Released, nikoli v naloge s statusom Planned, in dolo\u010dite, kateri sistem upravlja datume operacij.<\/li>\n\n\n<li><strong>Jasno dolo\u010den povratni zapis prek standardnih vmesnikov.<\/strong> Standardni Business Central API v2.0 nima entitet za proizvodne naloge, tehnolo\u0161ke postopke, kosovnice ali delovne centre. Business Central omogo\u010da objavo lastnih proizvodnih strani kot spletnih storitev OData v4 brez programiranja, objavljena stran, ki omogo\u010da urejanje, pa sprejema posodobitve. Vsakega ponudnika vpra\u0161ajte, kako za\u010detni in kon\u010dni datumi operacij pridejo v Prod. Order Routing Line. Vpra\u0161ajte tudi, ali je za to potrebna koda po meri v va\u0161em sistemu Business Central in kdo zanjo skrbi po prehodu v produkcijsko uporabo.<\/li>\n\n<\/ul>\n\n\n<p>Mo\u017enosti se delijo v \u0161tiri skupine:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Vgrajeno planiranje v Business Central<\/strong> obravnava ozna\u010dena ozka grla znotraj enega sistema.<\/li>\n\n\n<li><strong>Planske table v odjemalcu Business Central<\/strong> prika\u017eejo proizvodne naloge na vizualni tabli, na kateri jih upravlja planer.<\/li>\n\n\n<li><strong>Obse\u017ene re\u0161itve APS za velika podjetja<\/strong> se pove\u017eejo v okviru uvedbenega projekta, upravlja pa jih namenska ekipa za planiranje.<\/li>\n\n\n<li><strong>APS v oblaku s izvajanjem v proizvodnji<\/strong>, kamor sodi SkyPlanner, samodejno terminira vse vire ob sistemu Business Central. Ob spremembah v proizvodnji sproti prilagaja terminski plan in ga daje na voljo operaterjem.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"where-skyplanner-fits\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Kje se vklju\u010di SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>SkyPlanner APS zapolni vse zgoraj navedene vrzeli. Upo\u0161teva omejeno kapaciteto vsakega delovnega centra, ne le ozna\u010dene podskupine. Pogon Arcturus AI v nekaj sekundah izdela terminski plan na ravni operacij in dolo\u010di njihovo zaporedje glede na va\u0161e prioritete in roke. Planerju operacij ni ve\u010d treba ro\u010dno deliti in urejati.<\/p>\n\n\n<p>Matrika \u010dasov menjav vsebuje \u010das menjave med vsakim parom izdelkov v obeh smereh, algoritem pa izbere zaporedje z najmanj pripravljalnega \u010dasa. Orodja so skupni viri z omejeno kapaciteto, posamezna operacija pa lahko potrebuje ve\u010d operaterjev hkrati. Ko stroj ali zaposleni ni na voljo, algoritem delo prenese na nadomestne vire, ki jih dolo\u010dite.<\/p>\n\n\n<p>Terminiranje glede na material simulira prihodnje zaloge na podlagi trenutnih zalog in pri\u010dakovanih nabavnih naro\u010dil. Naro\u010deni material se \u0161teje za razpolo\u017eljivega na datum dobave, zato se delo planira \u0161ele takrat, ko je material na voljo.<\/p>\n\n\n<p>Model vklju\u010duje skupine delovnih centrov in njihovo u\u010dinkovitost, posamezno operacijo pa je mogo\u010de razdeliti med ve\u010d delovnih centrov. Prioritete dolo\u010dajo prioriteta operacije, datum dokon\u010danja, prioriteta stranke ter funkciji Fast Track in Dynamic Priorities, Running Time Lock pa ohranja termine operacij, ki \u017ee potekajo.<\/p>\n\n\n<p>Autopilot ob spremembah v proizvodnji samodejno prilagodi terminski plan v okviru va\u0161ih zaklepov in prioritet, zato Replan, okvara ali nujno naro\u010dilo ne pomenijo ve\u010d ro\u010dnega ponovnega terminiranja operacij. Planerji operacije prilagajajo na interaktivnem Ganttovem diagramu. Operaterji na telefonu ali tablici vidijo svojo \u010dakalno vrsto in bele\u017eijo delo s funkcijami Mobile Confirmations, Production Timer in Quick Log Mode, zato sta terminiranje in izvajanje v proizvodnji zdru\u017eena v enem orodju.<\/p>\n\n\n<p><strong>Izberite SkyPlanner, ko<\/strong> se ozka grla spreminjajo z naborom izdelkov in bi morali v Capacity Constrained Resources vklju\u010diti polovico proizvodnje.<\/p>\n\n\n<p><strong>Izberite SkyPlanner, ko<\/strong> so menjave odvisne od zaporedja ali ko skupna orodja in operacije z ve\u010d operaterji dolo\u010dajo, kaj se lahko izvaja naslednje.<\/p>\n\n\n<p><strong>Izberite SkyPlanner, ko<\/strong> ponovno planirate ve\u010dkrat na teden in \u017eelite uporaben terminski plan za lastno proizvodnjo v nekaj tednih, ne \u0161ele po dolgem projektu.<\/p>\n\n\n<p>Za\u010dnite z izvozom CSV ali Excel v okviru <a href=\"\/sl\/preizkus\/\">30-dnevnega brezpla\u010dnega preizkusa<\/a> (do 20 delovnih centrov, brez kreditne kartice). Nato je cena od 199 \u20ac na mesec za 5 vklju\u010denih delovnih centrov, z mese\u010dnim obra\u010dunavanjem in mo\u017enostjo odpovedi kadar koli. Ponudbo za integracijo pripravimo vnaprej glede na va\u0161 proces in potrebe, skupaj s ponudbo za paket, tako da pred za\u010detkom poznate celotne stro\u0161ke. Uvedba je obi\u010dajno zaklju\u010dena v nekaj tednih od za\u010detka uvajanja.<\/p>\n\n\n<p>SkyPlanner se dvosmerno povezuje z Business Central prek njegovih lastnih spletnih storitev. Planirani za\u010detni in kon\u010dni \u010dasi se zapisujejo v Prod. Order Routing Lines, zapisi delovnega \u010dasa operaterjev pa se vra\u010dajo za poro\u010danje o proizvodnji. Ekipa SkyPlanner med uvajanjem nastavi integracijo in zanjo zagotavlja podporo po prehodu v produkcijsko uporabo. Va\u0161 partner ali interni razvijalci lahko dokumentirani REST API (<a href=\"https:\/\/integration.skyplanner.app\/api\/swagger\">referen\u010dna dokumentacija API<\/a>) uporabljajo zgolj s klju\u010dem API, dokumentacija izdelka pa je javno dostopna na strani <a href=\"\/sl\/docs\/ucbenik-za-integracijo\/\">Dokumentacija SkyPlanner<\/a>.<\/p>\n\n\n<p>Kako se posamezni deli povezujejo, preberite na strani <a href=\"\/sl\/integracije\/erp\/business-central\/\">SkyPlanner za Business Central<\/a> ali odprite neposredno <a href=\"\/sl\/integracije\/erp\/business-central\/vodnik-za-integracijo\/\">vodnik za integracijo z Business Central<\/a>.<\/p>\n\n\n<div class=\"wp-block-buttons ind-prose__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/sl\/preizkus\/\">Za\u010dnite brezpla\u010dni preizkus<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/sl\/kontaktna-prodaja\/\">Rezervirajte predstavitev<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"customers\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Mnenja proizvodnih podjetij o re\u0161itvi SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-custs\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/22-d7d6bcdf-ecf7-48d2-9750-66253ccf9aa7-crop.jpg\" alt=\"Kalle Kalliom\u00e4ki, strokovnjak za oskrbovalno verigo v podjetju UTU, v proizvodnji elektri\u010dnih razdelilnikov v Ulvili\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/23-beca6df2-3fa2-4315-80e8-7c38a9e3d2e1.png\" alt=\"UTU\" width=\"69\" height=\"59\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>2 h<\/b><span>prihranka vsak teden<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u00bbS SkyPlanner smo pri planiranju proizvodnje pre\u0161li z Excelovih preglednic na optimizacijo proizvodnje v realnem \u010dasu.\u00ab<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Kalle Kalliom\u00e4ki, strokovnjak za oskrbovalno verigo<\/b><br>UTU \u00b7 Elektri\u010dni razdelilniki in stikalne naprave<\/p>\n\n\n<p class=\"ind-cust__result\">Pri planiranju proizvodnje vsak teden prihranijo 2 uri delovnega \u010dasa, nova \u010dakalna vrsta operacij pa do proizvodne linije prispe v nekaj sekundah.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/sl\/zgodbe-strank\/utu\/\">Preberite mnenje podjetja UTU<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-35ce8dff-f7d0-4cf3-9e71-0fe7e7ff88d3.jpg\" alt=\"Operaterji v oblekah za \u010diste prostore ob liniji za polnjenje steklenic v farmacevtski tovarni podjetja Laboratory &amp; Allied v Nairobiju\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/09-8c2deb57-ac1c-468b-ad64-fafb9debd7eb.png\" alt=\"Laboratory &amp; Allied\" width=\"71\" height=\"44\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>+90%<\/b><span>u\u010dinkovitost proizvodnje<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u00bbU\u010dinkovitost v proizvodnji se je pove\u010dala za 90%.\u00ab<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Abdul Rucyinga, vodja IT<\/b><br>Laboratory &amp; Allied \u00b7 Farmacevtska proizvodnja<\/p>\n\n\n<p class=\"ind-cust__result\">U\u010dinkovitost proizvodnje se je pove\u010dala za 90%, optimiziran trimese\u010dni plan za vse delovne centre pa pripravijo v manj kot 30 minutah.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/sl\/zgodbe-strank\/laboratory-allied\/\">Preberite mnenje podjetja Laboratory &amp; Allied<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/02-3a675468-ac30-4369-b781-b03bbf3f9d21.jpg\" alt=\"Pogled iz zraka na tovarno stre\u0161nih varnostnih sistemov podjetja Piristeel v Kauhavi\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/07-cec60b32-3b28-48a8-9520-1f12fd8061ee.png\" alt=\"Piristeel\" width=\"96\" height=\"46\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>99,2%<\/b><span>zanesljivost dobav<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u00bbSkyPlanner nam je omogo\u010dil bolj\u0161i pregled nad ozkimi grli in jasnej\u0161e vodenje proizvodnje.\u00ab<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Toni Tuori, vodja proizvodnje<\/b><br>Piristeel \u00b7 Stre\u0161ni varnostni sistemi in sistemi za odvajanje de\u017eevnice<\/p>\n\n\n<p class=\"ind-cust__result\">Zanesljivost dobav je letos dosegla 99,2%, pri terminiranju pa prihranijo do \u0161tiri ure delovnega \u010dasa na dan.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/sl\/zgodbe-strank\/piristeel\/\">Preberite mnenje podjetja Piristeel<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/25-73c14230-f628-43c7-9890-005acea9125f.jpg\" alt=\"Hannu Ryyn\u00e4nen, direktor podjetja Mamec, v proizvodni hali podjetja v Lohji\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/26-733d2728-780d-4b41-b834-e23619dad50c.png\" alt=\"Mamec\" width=\"106\" height=\"20\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>Ve\u010d 1.000<\/b><span>samodejno terminiranih delovnih nalogov<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u00bbProizvodnjo imamo pod nadzorom na druga\u010den na\u010din, na\u0161e razumevanje kapacitet pa je na povsem drugi ravni.\u00ab<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Hannu Ryyn\u00e4nen, direktor<\/b><br>Mamec \u00b7 Industrijska me\u0161ala, \u010drpalke in visokotehnolo\u0161ka pogodbena proizvodnja<\/p>\n\n\n<p class=\"ind-cust__result\">Na tiso\u010de delovnih nalogov se terminira samodejno, celotna organizacija pa ima vpogled v proizvodnjo v realnem \u010dasu.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/sl\/zgodbe-strank\/mamec\/\">Preberite mnenje podjetja Mamec<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Pogosta vpra\u0161anja<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group sp-faq fx-faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Ali ima Business Central orodje za terminiranje?<\/summary>\n<p class=\"sp-faq__a\">Da. Proizvodni nalogi se terminirajo naprej ali nazaj na podlagi koledarjev delovnih centrov, Capacity Constrained Resources pa na izbranih ozkih grlih doda obremenjevanje z upo\u0161tevanjem omejenih kapacitet. Microsoft rezultat opisuje kot grob terminski plan, ne kot podrobno upravljanje proizvodnje.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Ali MRP v Business Central upo\u0161teva kapacitete?<\/summary>\n<p class=\"sp-faq__a\">Ne. Funkciji Calculate Regenerative Plan in Calculate Net Change Plan v Planning Worksheet ustvarita vnose ob predpostavki neomejenih kapacitet. Omejitve kapacitet se upo\u0161tevajo \u0161ele pri terminiranju proizvodnih nalogov.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Katera licenca za Business Central vklju\u010duje proizvodnjo?<\/summary>\n<p class=\"sp-faq__a\">Premium. Strani in polja za proizvodnjo so na voljo samo v uporabni\u0161ki izku\u0161nji Premium. Uporabniki z licenco Essentials se ne morejo prijaviti v podjetje, ki uporablja to izku\u0161njo. Microsoft navaja ceno $110 na uporabnika na mesec za Premium in $80 za Essentials (cenik za ZDA, letno pla\u010dilo).<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>\u010cemu sta namenjeni polji Critical Load % in Dampener?<\/summary>\n<p class=\"sp-faq__a\">Critical Load % dolo\u010da najve\u010dji dele\u017e kapacitete omejenega vira, ki ga lahko razporejevalnik dodeli operacijam; vrednost 90 pu\u0161\u010da 10% rezerve. Dampener (% of Total Capacity) omogo\u010da, da razporejevalnik to mejo nekoliko prese\u017ee, \u010de se s tem izogne delitvi operacije. Operacije, ki jih \u0161e vedno ni mogo\u010de umestiti, se razdelijo med najbli\u017eje proste \u010dasovne termine.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Kako se SkyPlanner APS pove\u017ee s sistemom Business Central?<\/summary>\n<p class=\"sp-faq__a\">SkyPlanner omogo\u010da dvosmerno povezavo s sistemom Business Central, ki jo ekipa SkyPlanner nastavi med uvajanjem. Naro\u010dila, tehnolo\u0161ki postopki, delovni centri, artikli in nabavni nalogi se uva\u017eajo prek API v2.0 in standardnih strani za proizvodnjo, objavljenih kot spletne storitve OData v4, brez programiranja. Datumi operacij se prek objavljene strani vra\u010dajo v Prod. Order Routing Line, spletni kavlji pa sproti po\u0161iljajo spremembe terminskega plana. Evidentirane ure se vra\u010dajo za poro\u010danje o proizvedenih koli\u010dinah. \u010ce \u017eelite, se lahko proizvedene koli\u010dine in poraba knji\u017eijo samodejno.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Ali Business Central upo\u0161teva pripravljalne \u010dase, odvisne od zaporedja operacij?<\/summary>\n<p class=\"sp-faq__a\">Ne. Setup Time je fiksna vrednost za vsako vrstico tehnolo\u0161kega postopka, ki se obra\u010duna enkrat na proizvodni nalog, ne glede na to, kaj se je pred tem izdelovalo na stroju. SkyPlanner APS namesto tega uporablja matriko pripravljalnih \u010dasov. V njej so shranjeni \u010dasi menjav med pari izdelkov (z modrega na rde\u010dega 30 minut, z rde\u010dega na modrega 60), operacije pa razvr\u0161\u010da tako, da so ti \u010dasi \u010dim kraj\u0161i.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Ali lahko SkyPlanner preizkusim, preden ga pove\u017eem s sistemom Business Central?<\/summary>\n<p class=\"sp-faq__a\">Da. Iz sistema Business Central izvozite proizvodne naloge, tehnolo\u0161ke postopke in delovne centre v Excel, jih med 30-dnevnim preizkusom uvozite v SkyPlanner ter primerjajte terminski plan s svojim trenutnim planom. Kreditna kartica ni potrebna. Oglejte si <a href=\"\/sl\/oblikovanje-cen\/\">cenik<\/a>, <a href=\"\/sl\/preizkus\/\">za\u010dnite preizkus<\/a> ali <a href=\"\/sl\/kontaktna-prodaja\/\">stopite v stik s prodajo<\/a>.<\/p>\n<\/details>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n<\/div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Integracije \/ ERP \/ Microsoft Dynamics 365 Business Central Ali Business Central podpira terminiranje proizvodnje? Capacity Constrained Resources v primerjavi s SkyPlanner APS Microsoft Dynamics 365 Business Central pri terminiranju proizvodnje upo\u0161teva dejanske kapacitete strojev in zaposlenih le za delovne in strojne centre, ki jih vnesete v Capacity Constrained Resources. Vse drugo, vklju\u010dno z MRP, &#8230; <a title=\"Ali Business Central podpira terminiranje proizvodnje? Capacity Constrained Resources v primerjavi s SkyPlanner APS\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/sl\/integracije\/erp\/business-central\/terminiranje-proizvodnje\/\" aria-label=\"Read more about Ali Business Central podpira terminiranje proizvodnje? Capacity Constrained Resources v primerjavi s SkyPlanner APS\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":0,"parent":100716,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"class_list":["post-100954","page","type-page","status-publish"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Ali Business Central podpira terminiranje proizvodnje?<\/title>\n<meta name=\"description\" content=\"Business Central omejuje obremenitev le za Capacity Constrained Resources, v grobem planu. Kaj zmore, kje so meje in kdaj potrebujete APS.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/sl\/integracije\/erp\/business-central\/terminiranje-proizvodnje\/\" \/>\n<meta property=\"og:locale\" content=\"sl_SI\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Ali Business Central podpira terminiranje proizvodnje? Capacity Constrained Resources v primerjavi s SkyPlanner APS\" \/>\n<meta property=\"og:description\" content=\"Business Central omejuje obremenitev le za Capacity Constrained Resources, v grobem planu. Kaj zmore, kje so meje in kdaj potrebujete APS.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/sl\/integracije\/erp\/business-central\/terminiranje-proizvodnje\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"16 minut\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/integracije\\\/erp\\\/business-central\\\/terminiranje-proizvodnje\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/integracije\\\/erp\\\/business-central\\\/terminiranje-proizvodnje\\\/\",\"name\":\"Ali Business Central podpira terminiranje proizvodnje?\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#website\"},\"datePublished\":\"2026-10-17T13:00:38+00:00\",\"description\":\"Business Central omejuje obremenitev le za Capacity Constrained Resources, v grobem planu. Kaj zmore, kje so meje in kdaj potrebujete APS.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/integracije\\\/erp\\\/business-central\\\/terminiranje-proizvodnje\\\/#breadcrumb\"},\"inLanguage\":\"sl-SI\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/integracije\\\/erp\\\/business-central\\\/terminiranje-proizvodnje\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/integracije\\\/erp\\\/business-central\\\/terminiranje-proizvodnje\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Integracije programske opreme ERP in MES s SkyPlannerjem\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/integracije\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"SkyPlanner APS za va\u0161 ERP\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/integracije\\\/erp\\\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"SkyPlanner APS za Business Central: terminiranje proizvodnje\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/integracije\\\/erp\\\/business-central\\\/\"},{\"@type\":\"ListItem\",\"position\":5,\"name\":\"Ali Business Central podpira terminiranje proizvodnje? Capacity Constrained Resources v primerjavi s SkyPlanner APS\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"sl-SI\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"sl-SI\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Ali Business Central podpira terminiranje proizvodnje?","description":"Business Central omejuje obremenitev le za Capacity Constrained Resources, v grobem planu. Kaj zmore, kje so meje in kdaj potrebujete APS.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/sl\/integracije\/erp\/business-central\/terminiranje-proizvodnje\/","og_locale":"sl_SI","og_type":"article","og_title":"Ali Business Central podpira terminiranje proizvodnje? Capacity Constrained Resources v primerjavi s SkyPlanner APS","og_description":"Business Central omejuje obremenitev le za Capacity Constrained Resources, v grobem planu. Kaj zmore, kje so meje in kdaj potrebujete APS.","og_url":"https:\/\/skyplanner.ai\/sl\/integracije\/erp\/business-central\/terminiranje-proizvodnje\/","og_site_name":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"16 minut"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/sl\/integracije\/erp\/business-central\/terminiranje-proizvodnje\/","url":"https:\/\/skyplanner.ai\/sl\/integracije\/erp\/business-central\/terminiranje-proizvodnje\/","name":"Ali Business Central podpira terminiranje proizvodnje?","isPartOf":{"@id":"https:\/\/skyplanner.ai\/sl\/#website"},"datePublished":"2026-10-17T13:00:38+00:00","description":"Business Central omejuje obremenitev le za Capacity Constrained Resources, v grobem planu. Kaj zmore, kje so meje in kdaj potrebujete APS.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/sl\/integracije\/erp\/business-central\/terminiranje-proizvodnje\/#breadcrumb"},"inLanguage":"sl-SI","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/sl\/integracije\/erp\/business-central\/terminiranje-proizvodnje\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/sl\/integracije\/erp\/business-central\/terminiranje-proizvodnje\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/sl\/"},{"@type":"ListItem","position":2,"name":"Integracije programske opreme ERP in MES s SkyPlannerjem","item":"https:\/\/skyplanner.ai\/sl\/integracije\/"},{"@type":"ListItem","position":3,"name":"SkyPlanner APS za va\u0161 ERP","item":"https:\/\/skyplanner.ai\/sl\/integracije\/erp\/"},{"@type":"ListItem","position":4,"name":"SkyPlanner APS za Business Central: terminiranje proizvodnje","item":"https:\/\/skyplanner.ai\/sl\/integracije\/erp\/business-central\/"},{"@type":"ListItem","position":5,"name":"Ali Business Central podpira terminiranje proizvodnje? Capacity Constrained Resources v primerjavi s SkyPlanner APS"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/sl\/#website","url":"https:\/\/skyplanner.ai\/sl\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/sl\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/sl\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"sl-SI"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/sl\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/sl\/","logo":{"@type":"ImageObject","inLanguage":"sl-SI","@id":"https:\/\/skyplanner.ai\/sl\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/sl\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]}]}},"uagb_featured_image_src":{"full":false,"thumbnail":false,"medium":false,"medium_large":false,"large":false,"1536x1536":false,"2048x2048":false,"betterdocs-category-thumb":false},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/sl\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Integracije \/ ERP \/ Microsoft Dynamics 365 Business Central Ali Business Central podpira terminiranje proizvodnje? Capacity Constrained Resources v primerjavi s SkyPlanner APS Microsoft Dynamics 365 Business Central pri terminiranju proizvodnje upo\u0161teva dejanske kapacitete strojev in zaposlenih le za delovne in strojne centre, ki jih vnesete v Capacity Constrained Resources. Vse drugo, vklju\u010dno z MRP,&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/pages\/100954","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/comments?post=100954"}],"version-history":[{"count":0,"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/pages\/100954\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/pages\/100716"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/media?parent=100954"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}