{"id":50274,"date":"2025-02-13T10:38:17","date_gmt":"2025-02-13T10:38:17","guid":{"rendered":"https:\/\/skyplanner.ai\/docs\/kako-dodeliti-preventivno-vzdrzevanje-vsem-delovnim-postajam\/"},"modified":"2025-10-07T08:47:30","modified_gmt":"2025-10-07T08:47:30","password":"","slug":"kako-dodeliti-preventivno-vzdrzevanje-vsem-delovnim-postajam","status":"publish","type":"docs","link":"https:\/\/skyplanner.ai\/sl\/docs\/kako-dodeliti-preventivno-vzdrzevanje-vsem-delovnim-postajam\/","title":{"rendered":"Kako dodeliti preventivno vzdr\u017eevanje vsem delovnim postajam"},"content":{"rendered":"\n<p>\u010ce ste na\u010drtovali preventivno vzdr\u017eevanje in ga \u017eelite na\u010drtovati v programu SkyPlanner, sledite naslednjim korakom:<\/p>\n\n<p><\/p>\n\n<figure class=\"wp-block-video\"><video height=\"930\" style=\"aspect-ratio: 1906 \/ 930;\" width=\"1906\" controls=\"\" src=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/02\/How-to-add-preventive-maintenance.mp4\"><\/video><\/figure>\n\n<p><\/p>\n\n<ul class=\"wp-block-list\">\n<li>Pojdite v <strong>Sredstva<\/strong> in izberite <strong>Delovne postaje<\/strong>.<\/li>\n\n\n\n<li>Odprla se bo nova plo\u0161\u010da.<strong> <\/strong>Izberite eno delovno postajo. Kliknite <strong>modro ikono svin\u010dnika<\/strong> na desni strani. <\/li>\n\n\n\n<li>Zdaj ste v plo\u0161\u010di za upravljanje te delovne postaje. Pomaknite se navzdol in kliknite<strong>&#8220;Dodaj izjemo delovne postaje<\/strong>&#8220;. <\/li>\n\n\n\n<li>Pojavile se bodo nove mo\u017enosti. Dodajte <strong>kratek opis, ki<\/strong> pojasnjuje razlog za vzdr\u017eevanje. <\/li>\n\n\n\n<li>Izberite <strong>\u010dasovni razpon<\/strong>, v katerem delovna postaja ne bo na voljo.<\/li>\n\n\n\n<li>Poleg tega potrdite polje<strong>&#8220;Nastavi za vse&#8221;<\/strong>.<\/li>\n\n\n\n<li>Kliknite <strong>Shrani<\/strong>, da potrdite obdobje vzdr\u017eevanja.<\/li>\n<\/ul>\n\n<p>Pojdite na <strong>\u010dasovnico GANTT<\/strong>, kjer bodo zmogljivosti delovnih postaj za ta dan prikazane v <strong>lososovi barvi<\/strong>, kar pomeni, da poteka vzdr\u017eevanje.<\/p>\n\n<p>Kon\u010dano! Delovna postaja je zdaj predvidena za vzdr\u017eevanje. <\/p>\n\n<p><strong>Pomembno:<\/strong> \u010ce \u017eelite posodobiti na\u010drt razporejanja, kliknite <strong>gumb King<\/strong>.<\/p>\n\n<p><\/p>\n","protected":false},"excerpt":{"rendered":"<p>\u010ce ste na\u010drtovali preventivno vzdr\u017eevanje in ga \u017eelite na\u010drtovati v programu SkyPlanner, sledite naslednjim korakom: Pojdite na \u010dasovnico GANTT, kjer bodo zmogljivosti delovnih postaj za ta dan prikazane v lososovi barvi, kar pomeni, da poteka vzdr\u017eevanje. Kon\u010dano! Delovna postaja je zdaj predvidena za vzdr\u017eevanje. Pomembno: \u010ce \u017eelite posodobiti na\u010drt razporejanja, kliknite gumb King.<\/p>\n","protected":false},"author":6,"featured_media":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"doc_category":[1860],"doc_tag":[],"class_list":["post-50274","docs","type-docs","status-publish","hentry","doc_category-delovne-postaje"],"acf":[],"year_month":"2026-11","word_count":144,"total_views":"152","reactions":{"happy":"0","normal":"0","sad":"0"},"author_info":{"name":"SkyPlanner","author_nicename":"bettina","author_url":"https:\/\/skyplanner.ai\/sl\/author\/bettina\/"},"doc_category_info":[{"term_name":"Delovne postaje","term_url":"https:\/\/skyplanner.ai\/sl\/docs-category\/delovne-postaje\/"}],"doc_tag_info":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Kako dodeliti preventivno vzdr\u017eevanje vsem delovnim postajam &#8211; SkyPlanner<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/sl\/docs\/kako-dodeliti-preventivno-vzdrzevanje-vsem-delovnim-postajam\/\" \/>\n<meta property=\"og:locale\" content=\"sl_SI\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Kako dodeliti preventivno vzdr\u017eevanje vsem delovnim postajam\" \/>\n<meta property=\"og:description\" content=\"\u010ce ste na\u010drtovali preventivno vzdr\u017eevanje in ga \u017eelite na\u010drtovati v programu SkyPlanner, sledite naslednjim korakom: Pojdite na \u010dasovnico GANTT, kjer bodo zmogljivosti delovnih postaj za ta dan prikazane v lososovi barvi, kar pomeni, da poteka vzdr\u017eevanje. Kon\u010dano! Delovna postaja je zdaj predvidena za vzdr\u017eevanje. Pomembno: \u010ce \u017eelite posodobiti na\u010drt razporejanja, kliknite gumb King.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/sl\/docs\/kako-dodeliti-preventivno-vzdrzevanje-vsem-delovnim-postajam\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:modified_time\" content=\"2025-10-07T08:47:30+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"1 minuta\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/docs\\\/kako-dodeliti-preventivno-vzdrzevanje-vsem-delovnim-postajam\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/docs\\\/kako-dodeliti-preventivno-vzdrzevanje-vsem-delovnim-postajam\\\/\",\"name\":\"Kako dodeliti preventivno vzdr\u017eevanje vsem delovnim postajam &#8211; SkyPlanner\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#website\"},\"datePublished\":\"2025-02-13T10:38:17+00:00\",\"dateModified\":\"2025-10-07T08:47:30+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/docs\\\/kako-dodeliti-preventivno-vzdrzevanje-vsem-delovnim-postajam\\\/#breadcrumb\"},\"inLanguage\":\"sl-SI\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/docs\\\/kako-dodeliti-preventivno-vzdrzevanje-vsem-delovnim-postajam\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/docs\\\/kako-dodeliti-preventivno-vzdrzevanje-vsem-delovnim-postajam\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Docs\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/docs\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Kako dodeliti preventivno vzdr\u017eevanje vsem delovnim postajam\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"sl-SI\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"sl-SI\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sl\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Kako dodeliti preventivno vzdr\u017eevanje vsem delovnim postajam &#8211; SkyPlanner","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/sl\/docs\/kako-dodeliti-preventivno-vzdrzevanje-vsem-delovnim-postajam\/","og_locale":"sl_SI","og_type":"article","og_title":"Kako dodeliti preventivno vzdr\u017eevanje vsem delovnim postajam","og_description":"\u010ce ste na\u010drtovali preventivno vzdr\u017eevanje in ga \u017eelite na\u010drtovati v programu SkyPlanner, sledite naslednjim korakom: Pojdite na \u010dasovnico GANTT, kjer bodo zmogljivosti delovnih postaj za ta dan prikazane v lososovi barvi, kar pomeni, da poteka vzdr\u017eevanje. Kon\u010dano! Delovna postaja je zdaj predvidena za vzdr\u017eevanje. Pomembno: \u010ce \u017eelite posodobiti na\u010drt razporejanja, kliknite gumb King.","og_url":"https:\/\/skyplanner.ai\/sl\/docs\/kako-dodeliti-preventivno-vzdrzevanje-vsem-delovnim-postajam\/","og_site_name":"SkyPlanner","article_modified_time":"2025-10-07T08:47:30+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"1 minuta"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/sl\/docs\/kako-dodeliti-preventivno-vzdrzevanje-vsem-delovnim-postajam\/","url":"https:\/\/skyplanner.ai\/sl\/docs\/kako-dodeliti-preventivno-vzdrzevanje-vsem-delovnim-postajam\/","name":"Kako dodeliti preventivno vzdr\u017eevanje vsem delovnim postajam &#8211; SkyPlanner","isPartOf":{"@id":"https:\/\/skyplanner.ai\/sl\/#website"},"datePublished":"2025-02-13T10:38:17+00:00","dateModified":"2025-10-07T08:47:30+00:00","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/sl\/docs\/kako-dodeliti-preventivno-vzdrzevanje-vsem-delovnim-postajam\/#breadcrumb"},"inLanguage":"sl-SI","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/sl\/docs\/kako-dodeliti-preventivno-vzdrzevanje-vsem-delovnim-postajam\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/sl\/docs\/kako-dodeliti-preventivno-vzdrzevanje-vsem-delovnim-postajam\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/sl\/"},{"@type":"ListItem","position":2,"name":"Docs","item":"https:\/\/skyplanner.ai\/sl\/docs\/"},{"@type":"ListItem","position":3,"name":"Kako dodeliti preventivno vzdr\u017eevanje vsem delovnim postajam"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/sl\/#website","url":"https:\/\/skyplanner.ai\/sl\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/sl\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/sl\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"sl-SI"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/sl\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/sl\/","logo":{"@type":"ImageObject","inLanguage":"sl-SI","@id":"https:\/\/skyplanner.ai\/sl\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/sl\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]}]}},"uagb_featured_image_src":{"full":false,"thumbnail":false,"medium":false,"medium_large":false,"large":false,"1536x1536":false,"2048x2048":false,"betterdocs-category-thumb":false},"uagb_author_info":{"display_name":"SkyPlanner","author_link":"https:\/\/skyplanner.ai\/sl\/author\/bettina\/"},"uagb_comment_info":0,"uagb_excerpt":"\u010ce ste na\u010drtovali preventivno vzdr\u017eevanje in ga \u017eelite na\u010drtovati v programu SkyPlanner, sledite naslednjim korakom: Pojdite na \u010dasovnico GANTT, kjer bodo zmogljivosti delovnih postaj za ta dan prikazane v lososovi barvi, kar pomeni, da poteka vzdr\u017eevanje. Kon\u010dano! Delovna postaja je zdaj predvidena za vzdr\u017eevanje. Pomembno: \u010ce \u017eelite posodobiti na\u010drt razporejanja, kliknite gumb King.","knowledge_base_info":[],"knowledge_base_slug":[],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/docs\/50274","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/docs"}],"about":[{"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/types\/docs"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/users\/6"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/comments?post=50274"}],"version-history":[{"count":0,"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/docs\/50274\/revisions"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/media?parent=50274"}],"wp:term":[{"taxonomy":"doc_category","embeddable":true,"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/doc_category?post=50274"},{"taxonomy":"doc_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/sl\/wp-json\/wp\/v2\/doc_tag?post=50274"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}