{"id":99761,"date":"2026-10-16T07:53:34","date_gmt":"2026-10-16T07:53:34","guid":{"rendered":"https:\/\/skyplanner.ai\/?p=99761"},"modified":"2026-10-16T10:12:25","modified_gmt":"2026-10-16T10:12:25","slug":"capable-to-promise","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/sk\/zdroje-sk\/capable-to-promise\/","title":{"rendered":"Capable to promise: Overte z\u00e1kazku, k\u00fdm potvrd\u00edte term\u00edn"},"content":{"rendered":"<div class=\"gb-container gb-container-article01 article-main-content-container\">\n\n<h1 class=\"wp-block-heading\">Capable to promise: Overte z\u00e1kazku, k\u00fdm potvrd\u00edte term\u00edn<\/h1>\n\n<div class=\"gb-container gb-container-article02\">\n\n<p><a href=\"\/sk\/\">Domov<\/a> &raquo; <a href=\"\/sk\/zdroje\/\">Zdroje<\/a> &raquo; Capable to promise: Overte z\u00e1kazku, k\u00fdm potvrd\u00edte term\u00edn<\/p>\n\n\n<p class=\"yoast-reading-time__wrapper\"><span class=\"yoast-reading-time__icon\"><svg aria-hidden=\"true\" focusable=\"false\" data-icon=\"clock\" width=\"20\" height=\"20\" fill=\"none\" stroke=\"currentColor\" style=\"display:inline-block;vertical-align:-0.1em\" role=\"img\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewBox=\"0 0 24 24\"><path stroke-linecap=\"round\" stroke-linejoin=\"round\" stroke-width=\"2\" d=\"M12 8v4l3 3m6-3a9 9 0 11-18 0 9 9 0 0118 0z\"><\/path><\/svg><\/span><span class=\"yoast-reading-time__spacer\" style=\"display:inline-block;width:1em\"><\/span><span class=\"yoast-reading-time__descriptive-text\">Odhadovan\u00fd \u010das \u010d\u00edtania: <\/span><span class=\"yoast-reading-time__reading-time\">7<\/span><span class=\"yoast-reading-time__time-unit\"> min\u00fat<\/span><\/p>\n\n<\/div>\n<div class=\"gb-container gb-container-article03\">\n\n<p>Met\u00f3da capable to promise (CTP) overuje, \u010di a kedy dok\u00e1\u017eete vyrobi\u0165 po\u017eadovan\u00e9 mno\u017estvo. Zoh\u013ead\u0148uje pritom dostupnos\u0165 materi\u00e1lu aj v\u00fdrobn\u00e9 kapacity potrebn\u00e9 na jeho spracovanie. Obchodu poskytuje podklad na potvrdenie term\u00ednu dodania vtedy, ke\u010f tovar nie je mo\u017en\u00e9 jednoducho expedova\u0165 zo skladu.<\/p>\n\n\n<p>Rozhoduj\u00face je overi\u0165 si mo\u017enosti e\u0161te predt\u00fdm, ne\u017e poviete \u00e1no. Term\u00edn po\u017eadovan\u00fd z\u00e1kazn\u00edkom v\u00e1m hovor\u00ed, \u010do by pomohlo z\u00edska\u0165 z\u00e1kazku. \u0160tandardn\u00e1 priebe\u017en\u00e1 doba v\u00fdroby zase hovor\u00ed, ako to zvy\u010dajne prebieha. Ani jeden z t\u00fdchto \u00fadajov v\u0161ak neukazuje, \u010di sa t\u00e1to konkr\u00e9tna z\u00e1kazka zmest\u00ed do pl\u00e1nu popri pr\u00e1ci, ku ktorej ste sa u\u017e zaviazali.<\/p>\n\n\n<p>SkyPlanner APS v\u00e1m s t\u00fdmto overen\u00edm pom\u00f4\u017ee prostredn\u00edctvom funkcie Job Prospects na pl\u00e1novanie predbe\u017en\u00fdch objedn\u00e1vok: umo\u017en\u00ed v\u00e1m simulova\u0165 re\u00e1lne term\u00edny dodania potenci\u00e1lnych objedn\u00e1vok sk\u00f4r, ne\u017e sa zavia\u017eete k ich v\u00fdrobe. Rozvrhnite predbe\u017en\u00fa objedn\u00e1vku s oh\u013eadom na aktu\u00e1lne vy\u0165a\u017eenie, skontrolujte pl\u00e1novan\u00e9 \u010dasy jej dokon\u010denia a pozrite si okolit\u00e9 oper\u00e1cie v Ganttovom diagrame. Namiesto zis\u0165ovania poradia oper\u00e1ci\u00ed na jednotliv\u00fdch strojoch, aby ste mohli odpoveda\u0165 obchodn\u00e9mu oddeleniu, sa m\u00f4\u017eete s\u00fastredi\u0165 na ponuku, ktor\u00fa v\u00e1\u0161 z\u00e1vod dok\u00e1\u017ee splni\u0165.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Capable to promise a available to promise: ak\u00fd je rozdiel?<\/h2>\n\n\n<p>Met\u00f3da available to promise (ATP) zis\u0165uje, ak\u00e9 mno\u017estvo zost\u00e1va k dispoz\u00edcii pre nov\u00fa z\u00e1kazku po zoh\u013eadnen\u00ed existuj\u00faceho dopytu. Zah\u0155\u0148a\u0165 m\u00f4\u017ee z\u00e1soby, ktor\u00e9 e\u0161te nie s\u00fa viazan\u00e9 na in\u00e9 z\u00e1kazky, aj pl\u00e1novan\u00e9 pr\u00edjmy \u2014 nielen to, \u010do je dnes fyzicky na sklade.<\/p>\n\n\n<p>CTP k tomu prid\u00e1va ot\u00e1zku v\u00fdroby: ak hotov\u00e9 v\u00fdrobky nie s\u00fa k dispoz\u00edcii, dok\u00e1\u017eete ich vyrobi\u0165 v po\u017eadovanom \u010dase s dostupn\u00fdm materi\u00e1lom a kapacitami?<\/p>\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Ot\u00e1zka<\/th><th>Available to promise (ATP)<\/th><th>Capable to promise (CTP)<\/th><\/tr><\/thead><tbody><tr><td>Z \u010doho vych\u00e1dza odpove\u010f?<\/td><td>Z vo\u013en\u00fdch z\u00e1sob a pl\u00e1novan\u00fdch pr\u00edjmov<\/td><td>Z dostupnosti materi\u00e1lu a kapac\u00edt potrebn\u00fdch na v\u00fdrobu<\/td><\/tr><tr><td>\u010co pom\u00e1ha obchodu pon\u00faknu\u0165?<\/td><td>Mno\u017estvo a term\u00edn pod\u013ea dostupn\u00fdch z\u00e1sob a pl\u00e1novan\u00fdch pr\u00edjmov<\/td><td>Mno\u017estvo a term\u00edn, ktor\u00e9 umo\u017en\u00ed dodato\u010dn\u00e1 v\u00fdroba<\/td><\/tr><tr><td>Kedy sa tento rozdiel uplatn\u00ed?<\/td><td>Ke\u010f mo\u017eno tovar doda\u0165 zo skladu alebo z o\u010dak\u00e1van\u00fdch pr\u00edjmov<\/td><td>Ke\u010f z\u00e1kazka e\u0161te vy\u017eaduje v\u00fdrobu alebo mont\u00e1\u017e na zdrojoch vyu\u017e\u00edvan\u00fdch aj in\u00fdmi z\u00e1kazkami<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>ATP je u\u017eito\u010dn\u00e9, ke\u010f m\u00f4\u017eete z\u00e1kazku vybavi\u0165 z dostupn\u00fdch z\u00e1sob a pr\u00edjmov. CTP m\u00e1 osobitn\u00fd v\u00fdznam pri <a href=\"\/sk\/zdroje-sk\/vyroba-na-objednavku\/\">v\u00fdrobe na z\u00e1kazku<\/a> a <a href=\"\/sk\/zdroje-sk\/montaz-na-objednavku\/\">mont\u00e1\u017ei na z\u00e1kazku<\/a>, kde prijat\u00edm objedn\u00e1vky vznik\u00e1 pr\u00e1ca, ktor\u00fa treba zaradi\u0165 do v\u00fdroby.<\/p>\n\n\n<p>To, \u017ee m\u00e1te v\u0161etky komponenty, e\u0161te neznamen\u00e1, \u017ee m\u00e1te kapacitu na ich mont\u00e1\u017e. Rovnako v\u0161ak pr\u00e1zdny sklad hotov\u00fdch v\u00fdrobkov neznamen\u00e1, \u017ee mus\u00edte z\u00e1kazn\u00edka odmietnu\u0165. CTP v\u00e1m pom\u00f4\u017ee n\u00e1js\u0165 obchodn\u00fa pr\u00edle\u017eitos\u0165 medzi t\u00fdmito dvoma predpokladmi.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Nov\u00fd pr\u00eds\u013eub m\u00f4\u017ee ohrozi\u0165 ten predch\u00e1dzaj\u00faci<\/h2>\n\n\n<p>Predstavte si stroj\u00e1rsku firmu so z\u00e1kazkovou v\u00fdrobou, ktor\u00e1 pripravuje ponuku na s\u00fapravu hriade\u013eov a mont\u00e1\u017enych dosiek. Materi\u00e1l je k dispoz\u00edcii a obchod by r\u00e1d pon\u00fakol exped\u00edciu v piatok.<\/p>\n\n\n<p>Hriadele sa daj\u00fa vys\u00fastru\u017ei\u0165 a skontrolova\u0165 do \u0161tvrtka. Dosky v\u0161ak treba fr\u00e9zova\u0165 na obr\u00e1bacom centre, ktor\u00e9 je u\u017e obsaden\u00e9 potvrden\u00fdmi z\u00e1kazkami. Pri s\u00fa\u010dasnom porad\u00ed sa dokon\u010dia a\u017e nasleduj\u00faci t\u00fd\u017ede\u0148.<\/p>\n\n\n<p>Z\u00e1kazka nie je pripraven\u00e1 na exped\u00edciu len preto, \u017ee je hotov\u00e1 jej najjednoduch\u0161ia polo\u017eka. Ak z\u00e1kazn\u00edk potrebuje cel\u00fa s\u00fapravu, o term\u00edne jej exped\u00edcie rozhoduj\u00fa dosky. Kontrola skladu by neodhalila \u010dakaj\u00face pr\u00e1ce na fr\u00e9zovan\u00ed a \u0161tandardn\u00e1 priebe\u017en\u00e1 doba v\u00fdroby by nezoh\u013eadnila ich aktu\u00e1lny objem.<\/p>\n\n\n<p>Predsunutie dosiek v porad\u00ed by mo\u017eno umo\u017enilo piatkov\u00fa exped\u00edciu, no mohlo by aj oneskori\u0165 z\u00e1kazku existuj\u00faceho z\u00e1kazn\u00edka. To nie je vo\u013en\u00e1 kapacita. Je to rozhodnutie, ktor\u00fd z\u00e1v\u00e4zok dostane prednos\u0165.<\/p>\n\n\n<p>U\u017eito\u010dn\u00e9 overenie pomocou CTP preto odpoved\u00e1 na dve ot\u00e1zky naraz: <strong>kedy mo\u017eno t\u00fato z\u00e1kazku dokon\u010di\u0165 a ako jej zaradenie ovplyvn\u00ed pr\u00e1cu, ku ktorej sme sa u\u017e zaviazali?<\/strong> Ke\u010f pozn\u00e1te obe odpovede, m\u00e1te \u0161ancu z\u00edska\u0165 nov\u00fa z\u00e1kazku bez toho, aby ste jej skuto\u010dn\u00fa cenu zistili a\u017e po potvrden\u00ed.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Overte potenci\u00e1lnu z\u00e1kazku v SkyPlanner<\/h2>\n\n\n<p>SkyPlanner prevedie t\u00fato ot\u00e1zku do konkr\u00e9tneho rozvrhu v\u00fdroby. Jeho umel\u00e1 inteligencia na rozvrhovanie, Arcturus, vypo\u010d\u00edta zaradenie oper\u00e1ci\u00ed pod\u013ea nastaven\u00fdch <a href=\"\/sk\/zdroje-sk\/co-je-planovanie-vyroby\/\">v\u00fdrobn\u00fdch zdrojov, z\u00e1vislost\u00ed a prior\u00edt<\/a>. V\u00fdsledn\u00fd rozvrh tak m\u00e1te pred sebou bez toho, aby ste museli ka\u017ed\u00fa oper\u00e1ciu zara\u010fova\u0165 ru\u010dne.<\/p>\n\n\n<p>Pri rozhodovan\u00ed o potvrden\u00ed term\u00ednu z\u00e1kazky je postup jednoduch\u00fd.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Rozvrhnite pr\u00e1cu, ktor\u00fa obchod skuto\u010dne pon\u00faka<\/h3>\n\n\n<p>Vytvorte objedn\u00e1vku a navrhovan\u00e9 polo\u017eky ozna\u010dte ako predbe\u017en\u00e9 (prospects). Zadajte po\u017eadovan\u00e9 polo\u017eky, mno\u017estv\u00e1 a potrebn\u00e9 kroky v\u00fdrobn\u00e9ho postupu namiesto toho, aby ste sk\u00fa\u0161ali v\u0161eobecn\u00fa oper\u00e1ciu s priemern\u00fdm trvan\u00edm. Rozvrhnite pr\u00e1cu a pred prijat\u00edm pl\u00e1nu skontrolujte jej navrhovan\u00e9 umiestnenie na \u010dasovej osi. Re\u00e1lny term\u00edn dokon\u010denia tak m\u00f4\u017eete pos\u00fadi\u0165 e\u0161te pri predbe\u017enej objedn\u00e1vke, sk\u00f4r ne\u017e potvrd\u00edte predaj.<\/p>\n\n\n<p>D\u00f4le\u017eit\u00e9 s\u00fa vstupy, ktor\u00e9 m\u00f4\u017eu zmeni\u0165 va\u0161u odpove\u010f: ktor\u00e9 zdroje dok\u00e1\u017eu pr\u00e1cu vykona\u0165, trvanie oper\u00e1ci\u00ed a prestavieb, pracovn\u00e9 zmeny, pripravenos\u0165 materi\u00e1lu a z\u00e1kazky, ktor\u00e9 u\u017e kapacitu vyu\u017e\u00edvaj\u00fa. Ak je zapnut\u00e9 rozvrhovanie so zoh\u013eadnen\u00edm materi\u00e1lu, Arcturus pri v\u00fdpo\u010dte berie do \u00favahy aj jeho dostupnos\u0165.<\/p>\n\n\n<p>V na\u0161om pr\u00edklade to znamen\u00e1 rozvrhn\u00fa\u0165 v\u00fdrobu hriade\u013eov aj dosiek. Ak by ste vynechali pomal\u0161\u00ed v\u00fdrobn\u00fd postup, navrhovan\u00fd term\u00edn by s\u00edce vyzeral l\u00e1kavo, no cel\u00fa z\u00e1kazku by v \u0148om nebolo mo\u017en\u00e9 doda\u0165.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Sledujte \u010dasy dokon\u010denia, nielen po\u017eadovan\u00fd term\u00edn<\/h3>\n\n\n<p>Po rozvrhnut\u00ed predbe\u017enej objedn\u00e1vky skontrolujte pl\u00e1novan\u00fd \u010das ukon\u010denia ka\u017edej jej polo\u017eky. Najneskor\u0161\u00ed z t\u00fdchto \u010dasov ur\u010duje, kedy bude pri aktu\u00e1lnom vy\u0165a\u017een\u00ed dokon\u010den\u00e1 v\u00fdroba celej objedn\u00e1vky. Z neho m\u00f4\u017eete vych\u00e1dza\u0165 pri stanoven\u00ed term\u00ednu dodania kompletnej objedn\u00e1vky.<\/p>\n\n\n<p>Tento v\u00fdsledok nezamie\u0148ajte s d\u00e1tumom, ke\u010f z\u00e1kazn\u00edk tovar prevezme. Pripo\u010d\u00edtajte \u010das na kontrolu, balenie, exped\u00edciu \u010di prepravu, pokia\u013e u\u017e nie je zahrnut\u00fd v pl\u00e1ne. Obchod aj v\u00fdroba musia ma\u0165 jasno v tom, \u010di pon\u00fakan\u00fd term\u00edn znamen\u00e1 pripravenos\u0165 na vyzdvihnutie, exped\u00edciu alebo doru\u010denie.<\/p>\n\n\n<p>V tom je rozdiel medzi zadan\u00edm \u017eelan\u00e9ho term\u00ednu a overen\u00edm, \u010di ho v\u00fdroba dok\u00e1\u017ee splni\u0165. Za z\u00e1v\u00e4zok vo\u010di z\u00e1kazn\u00edkovi zodpoved\u00e1te vy. SkyPlanner poskytuje pl\u00e1novan\u00e9 \u010dasy dokon\u010denia, o ktor\u00e9 m\u00f4\u017eete oprie\u0165 d\u00f4veryhodn\u00fd pr\u00eds\u013eub.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Skontrolujte aj ostatn\u00e9 z\u00e1v\u00e4zky<\/h3>\n\n\n<p>V <a href=\"\/sk\/zdroje-sk\/ganttov-diagram-pre-planovanie-vyroby\/\">Ganttovom diagrame<\/a> si pozrite navrhovan\u00fa pr\u00e1cu spolu s existuj\u00facimi z\u00e1kazkami. Ak zmen\u00edte jej prioritu, aby sa dokon\u010dila sk\u00f4r, pred ods\u00fahlasen\u00edm ponuky prepo\u010d\u00edtajte rozvrh a skontrolujte, \u010do \u010fal\u0161ie sa posunulo.<\/p>\n\n\n<p>Priority ur\u010dujete vy a prijat\u00e9 rozhodnutia o rozvrhu m\u00f4\u017eete chr\u00e1ni\u0165 uzamknut\u00edm. Arcturus vykon\u00e1 v\u00fdpo\u010det v medziach t\u00fdchto pokynov. Pri rozhovore sa tak m\u00f4\u017eete venova\u0165 tomu, \u010di sa oplat\u00ed prija\u0165 urgentn\u00fa z\u00e1kazku, namiesto ru\u010dn\u00e9ho preskupovania pr\u00e1c len preto, aby ste zistili, ktor\u00e9 z nich by sa museli posun\u00fa\u0165.<\/p>\n\n\n<p>SkyPlanner sa prostredn\u00edctvom svojho <a href=\"\/sk\/integracie\/\">otvoren\u00e9ho REST API<\/a> integruje s ak\u00fdmko\u013evek ERP alebo MES. M\u00f4\u017eete si ponecha\u0165 existuj\u00faci syst\u00e9m na spr\u00e1vu z\u00e1kaziek a prepoji\u0165 ho s rozvrhom v\u00fdroby, ktor\u00fd potrebujete pri rozhodovan\u00ed o term\u00ednoch dodania.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Preme\u0148te v\u00fdsledok na ponuku, nielen na \u00e1no alebo nie<\/h2>\n\n\n<p>Ak sa po\u017eadovan\u00e9 mno\u017estvo d\u00e1 vyrobi\u0165 do po\u017eadovan\u00e9ho term\u00ednu bez neprijate\u013en\u00e9ho vplyvu na existuj\u00facu pr\u00e1cu, m\u00e1te pevnej\u0161\u00ed podklad na potvrdenie z\u00e1kazky. Ak nie, u\u017eito\u010dnou odpove\u010fou je alternat\u00edva, ktor\u00fa si z\u00e1kazn\u00edk m\u00f4\u017ee objedna\u0165.<\/p>\n\n\n<p>Pri na\u0161ej modelovej stroj\u00e1rskej z\u00e1kazke by to mohlo vyzera\u0165 takto:<\/p>\n\n\n<ul class=\"wp-block-list\"><li><strong>Pon\u00faknite neskor\u0161ie dodanie celej z\u00e1kazky.<\/strong> Zachovajte existuj\u00face z\u00e1v\u00e4zky a pon\u00faknite term\u00edn, ktor\u00fd umo\u017e\u0148uje pomal\u0161\u00ed v\u00fdrobn\u00fd postup dosiek.<\/li><li><strong>Prediskutujte rozdelenie dod\u00e1vky.<\/strong> Ak z\u00e1kazn\u00edk dok\u00e1\u017ee hriadele pou\u017ei\u0165 samostatne, pon\u00faknite ich dodanie ako prv\u00e9 a dosky dodajte nesk\u00f4r. Sk\u00f4r ne\u017e vznikne dodato\u010dn\u00e1 manipul\u00e1cia a preprava, overte si, \u017ee \u010diasto\u010dn\u00e1 dod\u00e1vka m\u00e1 pre z\u00e1kazn\u00edka zmysel.<\/li><li><strong>Pos\u00fa\u010fte skor\u0161\u00ed term\u00edn po zmene pl\u00e1nu.<\/strong> Pom\u00f4c\u0165 m\u00f4\u017ee schv\u00e1len\u00e1 dodato\u010dn\u00e1 zmena alebo in\u00fd vhodn\u00fd zdroj. Sk\u00f4r ne\u017e pon\u00faknete skor\u0161\u00ed term\u00edn, aktualizujte predpoklady o kapacit\u00e1ch a prepo\u010d\u00edtajte rozvrh.<\/li><li><strong>V\u00fdslovne sa dohodnite, \u010do zmena prior\u00edt ovplyvn\u00ed.<\/strong> Ak vedenie rozhodne o uprednostnen\u00ed tejto z\u00e1kazky, ur\u010dte, ktor\u00fdch z\u00e1v\u00e4zkov sa to dotkne, a vedome rie\u0161te d\u00f4sledky.<\/li><\/ul>\n\n\n<p>S\u00fa to obchodn\u00e9 rozhodnutia, nielen \u00fapravy rozvrhu. Urgentn\u00e1 z\u00e1kazka, ktor\u00e1 si vy\u017eiada nad\u010dasy nezahrnut\u00e9 v cene, drah\u0161iu prepravu alebo naru\u0161\u00ed v\u00fdrobu, m\u00f4\u017ee by\u0165 menej ziskov\u00e1, ne\u017e sa zd\u00e1. Overenie pred prijat\u00edm v\u00e1m d\u00e1va priestor premietnu\u0165 dodato\u010dn\u00e9 n\u00e1klady do ceny alebo dohodn\u00fa\u0165 vhodnej\u0161\u00ed term\u00edn.<\/p>\n\n\n<h2 class=\"wp-block-heading\">S\u013eubovan\u00fd term\u00edn mus\u00ed vych\u00e1dza\u0165 z aktu\u00e1lneho vy\u0165a\u017eenia<\/h2>\n\n\n<p>Ponuka zalo\u017een\u00e1 na v\u010deraj\u0161om rozvrhu u\u017e nemus\u00ed by\u0165 splnite\u013en\u00e1, ak medzit\u00fdm prijmete \u010fal\u0161iu z\u00e1kazku alebo sa oneskor\u00ed dod\u00e1vka materi\u00e1lu. Ak sa pred potvrden\u00edm z\u00e1kazn\u00edkom zmenia predpoklady, z ktor\u00fdch term\u00edn vych\u00e1dzal, potenci\u00e1lnu z\u00e1kazku znovu overte.<\/p>\n\n\n<p>Rozvrhnut\u00e9 predbe\u017en\u00e9 objedn\u00e1vky sa zapo\u010d\u00edtavaj\u00fa do pl\u00e1novan\u00e9ho vy\u0165a\u017eenia a rezervuj\u00fa kapacitu. Obchodn\u00e9 oddelenie tak m\u00f4\u017ee zoh\u013eadni\u0165 potenci\u00e1lne objedn\u00e1vky namiesto toho, aby pri ka\u017edej ponuke po\u010d\u00edtalo s tou istou zdanlivo vo\u013enou kapacitou. Dohodnite sa, ktor\u00e9 obchodn\u00e9 pr\u00edle\u017eitosti budete rozvrhova\u0165, kto ich bude priebe\u017ene aktualizova\u0165 a kedy m\u00e1 neprijat\u00e1 ponuka presta\u0165 ovplyv\u0148ova\u0165 pl\u00e1n. Ke\u010f z\u00e1kazn\u00edk objedn\u00e1vku potvrd\u00ed, zru\u0161te ozna\u010denie predbe\u017enej objedn\u00e1vky a rozvrhnite ju ako potvrden\u00fa. Ponuka tak zostane prepojen\u00e1 so z\u00e1v\u00e4zkom v\u00fdroby bez toho, aby neaktu\u00e1lne ponuky skres\u013eovali preh\u013ead o vyu\u017eite\u013enej kapacite.<\/p>\n\n\n<p>Po potvrden\u00ed z\u00e1kazky udr\u017eiavajte priority, dostupnos\u0165 zdrojov a \u00fadaje o materi\u00e1li aktu\u00e1lne. Pr\u00eds\u013eub podlo\u017een\u00fd v\u00fdpo\u010dtom m\u00e1 hodnotu vtedy, ke\u010f vych\u00e1dza zo skuto\u010dn\u00fdch podmienok vo v\u00fdrobe, nie z pl\u00e1nu, ktor\u00fd predpoklad\u00e1, \u017ee ka\u017ed\u00e1 zmena aj dod\u00e1vka prebehne pod\u013ea p\u00f4vodn\u00fdch o\u010dak\u00e1van\u00ed.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Presnej\u0161ie ur\u010dovanie term\u00ednov dodania v ka\u017edodennej praxi<\/h2>\n\n\n<p>F\u00ednska spolo\u010dnos\u0165 Eskomatic, ktor\u00e1 sa zaober\u00e1 z\u00e1kazkov\u00fdm obr\u00e1ban\u00edm, v minulosti udr\u017eiavala poradie pr\u00e1c preva\u017ene ru\u010dne v star\u0161om ERP a syst\u00e9me riadenia v\u00fdroby. Z\u00edska\u0165 celkov\u00fd preh\u013ead trvalo dlho a pre obmedzen\u00fd preh\u013ead o materi\u00e1li sa jeho nedostatok mohol odhali\u0165 a\u017e tesne pred za\u010diatkom oper\u00e1cie.<\/p>\n\n\n<p>So SkyPlanner z\u00edskal t\u00edm vizu\u00e1lny preh\u013ead poradia pr\u00e1c v Ganttovom diagrame a automatick\u00e9 rozvrhovanie pod\u013ea vy\u0165a\u017eenia, prepojen\u00e9 s existuj\u00facimi \u00fadajmi z ERP. <a href=\"\/sk\/pribehy-zakaznikov\/eskomatic\/\">Pod\u013ea sk\u00fasenost\u00ed spolo\u010dnosti Eskomatic<\/a> im lep\u0161\u00ed preh\u013ead o vy\u0165a\u017een\u00ed v\u00fdroby u\u013eah\u010duje ur\u010di\u0165 re\u00e1lne term\u00edny dodania a poskytova\u0165 z\u00e1kazn\u00edkom presnej\u0161ie d\u00e1tumy. Ved\u00faci pl\u00e1novania v\u00fdroby Tommi M\u00e4nnist\u00f6 ozna\u010duje ur\u010dovanie term\u00ednov dodania za jednu z hlavn\u00fdch prednost\u00ed pri ka\u017edodennom pou\u017e\u00edvan\u00ed.<\/p>\n\n\n<p>Pr\u00e1ve to je praktick\u00fd d\u00f4vod, pre\u010do si na rie\u0161enie tohto probl\u00e9mu vybra\u0165 SkyPlanner: obchod dostane odpove\u010f podlo\u017een\u00fa rozvrhom v\u00fdroby a pl\u00e1nova\u010d ju nemus\u00ed pr\u00e1cne zostavova\u0165 ru\u010dne.<\/p>\n\n\n<p><a href=\"\/sk\/kontakt-na-predaj\/\">Rezervujte si uk\u00e1\u017eku SkyPlanner<\/a> a pripravte si potenci\u00e1lnu z\u00e1kazku, po\u017eadovan\u00fd term\u00edn a zdroj, ktor\u00fd ju s najv\u00e4\u010d\u0161ou pravdepodobnos\u0165ou zdr\u017e\u00ed. Spolo\u010dne prediskutujeme, ako by ste mohli ponuku pred potvrden\u00edm overi\u0165 vzh\u013eadom na existuj\u00face z\u00e1v\u00e4zky. Ak sa rad\u0161ej najprv zozn\u00e1mite so syst\u00e9mom sami, <a href=\"\/sk\/skusobna-verzia\/\">vysk\u00fa\u0161ajte SkyPlanner s uk\u00e1\u017ekov\u00fdmi \u00fadajmi<\/a>.<\/p>\n\n<\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>Capable to promise: Overte z\u00e1kazku, k\u00fdm potvrd\u00edte term\u00edn Domov &raquo; Zdroje &raquo; Capable to promise: Overte z\u00e1kazku, k\u00fdm potvrd\u00edte term\u00edn Met\u00f3da capable to promise (CTP) overuje, \u010di a kedy dok\u00e1\u017eete vyrobi\u0165 po\u017eadovan\u00e9 mno\u017estvo. Zoh\u013ead\u0148uje pritom dostupnos\u0165 materi\u00e1lu aj v\u00fdrobn\u00e9 kapacity potrebn\u00e9 na jeho spracovanie. Obchodu poskytuje podklad na potvrdenie term\u00ednu dodania vtedy, ke\u010f tovar nie &#8230; <a title=\"Capable to promise: Overte z\u00e1kazku, k\u00fdm potvrd\u00edte term\u00edn\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/sk\/zdroje-sk\/capable-to-promise\/\" aria-label=\"Pre\u010d\u00edtajte si viac o Capable to promise: Overte z\u00e1kazku, k\u00fdm potvrd\u00edte term\u00edn\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":99840,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[2538,318],"tags":[],"class_list":["post-99761","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-aps-a-rozvrhovanie","category-zdroje-sk","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Capable to promise: Overte z\u00e1kazku, k\u00fdm potvrd\u00edte term\u00edn<\/title>\n<meta name=\"description\" content=\"Zvl\u00e1dnete nov\u00fa z\u00e1kazku bez zdr\u017eania in\u00fdch z\u00e1kazn\u00edkov? S capable to promise a SkyPlanner over\u00edte kapacity pred potvrden\u00edm term\u00ednu dodania.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/sk\/zdroje-sk\/capable-to-promise\/\" \/>\n<meta property=\"og:locale\" content=\"sk_SK\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Capable to promise: Overte z\u00e1kazku, k\u00fdm potvrd\u00edte term\u00edn\" \/>\n<meta property=\"og:description\" content=\"Zvl\u00e1dnete nov\u00fa z\u00e1kazku bez zdr\u017eania in\u00fdch z\u00e1kazn\u00edkov? S capable to promise a SkyPlanner over\u00edte kapacity pred potvrden\u00edm term\u00ednu dodania.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/sk\/zdroje-sk\/capable-to-promise\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2026-10-16T07:53:34+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-16T10:12:25+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/capable-to-promise-hero-1.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1536\" \/>\n\t<meta property=\"og:image:height\" content=\"864\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Autor\" \/>\n\t<meta name=\"twitter:data1\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n\t<meta name=\"twitter:label2\" content=\"Predpokladan\u00fd \u010das \u010d\u00edtania\" \/>\n\t<meta name=\"twitter:data2\" content=\"11 min\u00fat\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sk\\\/zdroje-sk\\\/capable-to-promise\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sk\\\/zdroje-sk\\\/capable-to-promise\\\/\"},\"author\":{\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sk\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\"},\"headline\":\"Capable to promise: Overte z\u00e1kazku, k\u00fdm potvrd\u00edte term\u00edn\",\"datePublished\":\"2026-10-16T07:53:34+00:00\",\"dateModified\":\"2026-10-16T10:12:25+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sk\\\/zdroje-sk\\\/capable-to-promise\\\/\"},\"wordCount\":2207,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sk\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sk\\\/zdroje-sk\\\/capable-to-promise\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/capable-to-promise-hero-1.png\",\"articleSection\":[\"APS a rozvrhovanie\",\"zdroje\"],\"inLanguage\":\"sk-SK\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sk\\\/zdroje-sk\\\/capable-to-promise\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/sk\\\/zdroje-sk\\\/capable-to-promise\\\/\",\"name\":\"Capable to promise: Overte z\u00e1kazku, k\u00fdm potvrd\u00edte term\u00edn\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sk\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sk\\\/zdroje-sk\\\/capable-to-promise\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sk\\\/zdroje-sk\\\/capable-to-promise\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/capable-to-promise-hero-1.png\",\"datePublished\":\"2026-10-16T07:53:34+00:00\",\"dateModified\":\"2026-10-16T10:12:25+00:00\",\"description\":\"Zvl\u00e1dnete nov\u00fa z\u00e1kazku bez zdr\u017eania in\u00fdch z\u00e1kazn\u00edkov? S capable to promise a SkyPlanner over\u00edte kapacity pred potvrden\u00edm term\u00ednu dodania.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sk\\\/zdroje-sk\\\/capable-to-promise\\\/#breadcrumb\"},\"inLanguage\":\"sk-SK\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/sk\\\/zdroje-sk\\\/capable-to-promise\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"sk-SK\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sk\\\/zdroje-sk\\\/capable-to-promise\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/capable-to-promise-hero-1.png\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/capable-to-promise-hero-1.png\",\"width\":1536,\"height\":864,\"caption\":\"Turned shafts await a mounting plate beside a milling machine before the complete order can ship.\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sk\\\/zdroje-sk\\\/capable-to-promise\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/sk\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Capable to promise: Overte z\u00e1kazku, k\u00fdm potvrd\u00edte term\u00edn\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sk\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/sk\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sk\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/sk\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"sk-SK\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sk\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/sk\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"sk-SK\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sk\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sk\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sk\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\",\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"sk-SK\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"caption\":\"Jussi M\u00e4ntyl\u00e4\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Capable to promise: Overte z\u00e1kazku, k\u00fdm potvrd\u00edte term\u00edn","description":"Zvl\u00e1dnete nov\u00fa z\u00e1kazku bez zdr\u017eania in\u00fdch z\u00e1kazn\u00edkov? S capable to promise a SkyPlanner over\u00edte kapacity pred potvrden\u00edm term\u00ednu dodania.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/sk\/zdroje-sk\/capable-to-promise\/","og_locale":"sk_SK","og_type":"article","og_title":"Capable to promise: Overte z\u00e1kazku, k\u00fdm potvrd\u00edte term\u00edn","og_description":"Zvl\u00e1dnete nov\u00fa z\u00e1kazku bez zdr\u017eania in\u00fdch z\u00e1kazn\u00edkov? S capable to promise a SkyPlanner over\u00edte kapacity pred potvrden\u00edm term\u00ednu dodania.","og_url":"https:\/\/skyplanner.ai\/sk\/zdroje-sk\/capable-to-promise\/","og_site_name":"SkyPlanner","article_published_time":"2026-10-16T07:53:34+00:00","article_modified_time":"2026-10-16T10:12:25+00:00","og_image":[{"width":1536,"height":864,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/capable-to-promise-hero-1.png","type":"image\/png"}],"author":"Jussi M\u00e4ntyl\u00e4","twitter_card":"summary_large_image","twitter_misc":{"Autor":"Jussi M\u00e4ntyl\u00e4","Predpokladan\u00fd \u010das \u010d\u00edtania":"11 min\u00fat"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/sk\/zdroje-sk\/capable-to-promise\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/sk\/zdroje-sk\/capable-to-promise\/"},"author":{"name":"Jussi M\u00e4ntyl\u00e4","@id":"https:\/\/skyplanner.ai\/sk\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5"},"headline":"Capable to promise: Overte z\u00e1kazku, k\u00fdm potvrd\u00edte term\u00edn","datePublished":"2026-10-16T07:53:34+00:00","dateModified":"2026-10-16T10:12:25+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/sk\/zdroje-sk\/capable-to-promise\/"},"wordCount":2207,"publisher":{"@id":"https:\/\/skyplanner.ai\/sk\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/sk\/zdroje-sk\/capable-to-promise\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/capable-to-promise-hero-1.png","articleSection":["APS a rozvrhovanie","zdroje"],"inLanguage":"sk-SK"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/sk\/zdroje-sk\/capable-to-promise\/","url":"https:\/\/skyplanner.ai\/sk\/zdroje-sk\/capable-to-promise\/","name":"Capable to promise: Overte z\u00e1kazku, k\u00fdm potvrd\u00edte term\u00edn","isPartOf":{"@id":"https:\/\/skyplanner.ai\/sk\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/sk\/zdroje-sk\/capable-to-promise\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/sk\/zdroje-sk\/capable-to-promise\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/capable-to-promise-hero-1.png","datePublished":"2026-10-16T07:53:34+00:00","dateModified":"2026-10-16T10:12:25+00:00","description":"Zvl\u00e1dnete nov\u00fa z\u00e1kazku bez zdr\u017eania in\u00fdch z\u00e1kazn\u00edkov? S capable to promise a SkyPlanner over\u00edte kapacity pred potvrden\u00edm term\u00ednu dodania.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/sk\/zdroje-sk\/capable-to-promise\/#breadcrumb"},"inLanguage":"sk-SK","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/sk\/zdroje-sk\/capable-to-promise\/"]}]},{"@type":"ImageObject","inLanguage":"sk-SK","@id":"https:\/\/skyplanner.ai\/sk\/zdroje-sk\/capable-to-promise\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/capable-to-promise-hero-1.png","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/capable-to-promise-hero-1.png","width":1536,"height":864,"caption":"Turned shafts await a mounting plate beside a milling machine before the complete order can ship."},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/sk\/zdroje-sk\/capable-to-promise\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/sk\/"},{"@type":"ListItem","position":2,"name":"Capable to promise: Overte z\u00e1kazku, k\u00fdm potvrd\u00edte term\u00edn"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/sk\/#website","url":"https:\/\/skyplanner.ai\/sk\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/sk\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/sk\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"sk-SK"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/sk\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/sk\/","logo":{"@type":"ImageObject","inLanguage":"sk-SK","@id":"https:\/\/skyplanner.ai\/sk\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/sk\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]},{"@type":"Person","@id":"https:\/\/skyplanner.ai\/sk\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5","name":"Jussi M\u00e4ntyl\u00e4","image":{"@type":"ImageObject","inLanguage":"sk-SK","@id":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","caption":"Jussi M\u00e4ntyl\u00e4"}}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/capable-to-promise-hero-1.png",1536,864,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/capable-to-promise-hero-1-150x150.png",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/capable-to-promise-hero-1-300x169.png",300,169,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/capable-to-promise-hero-1-768x432.png",768,432,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/capable-to-promise-hero-1-1024x576.png",1024,576,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/capable-to-promise-hero-1.png",1536,864,false],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/capable-to-promise-hero-1.png",1536,864,false],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/capable-to-promise-hero-1-360x203.png",360,203,true]},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/sk\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Capable to promise: Overte z\u00e1kazku, k\u00fdm potvrd\u00edte term\u00edn Domov &raquo; Zdroje &raquo; Capable to promise: Overte z\u00e1kazku, k\u00fdm potvrd\u00edte term\u00edn Met\u00f3da capable to promise (CTP) overuje, \u010di a kedy dok\u00e1\u017eete vyrobi\u0165 po\u017eadovan\u00e9 mno\u017estvo. Zoh\u013ead\u0148uje pritom dostupnos\u0165 materi\u00e1lu aj v\u00fdrobn\u00e9 kapacity potrebn\u00e9 na jeho spracovanie. Obchodu poskytuje podklad na potvrdenie term\u00ednu dodania vtedy, ke\u010f tovar nie&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/sk\/wp-json\/wp\/v2\/posts\/99761","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/sk\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/sk\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/sk\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/sk\/wp-json\/wp\/v2\/comments?post=99761"}],"version-history":[{"count":1,"href":"https:\/\/skyplanner.ai\/sk\/wp-json\/wp\/v2\/posts\/99761\/revisions"}],"predecessor-version":[{"id":99884,"href":"https:\/\/skyplanner.ai\/sk\/wp-json\/wp\/v2\/posts\/99761\/revisions\/99884"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/sk\/wp-json\/wp\/v2\/media\/99840"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/sk\/wp-json\/wp\/v2\/media?parent=99761"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/sk\/wp-json\/wp\/v2\/categories?post=99761"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/sk\/wp-json\/wp\/v2\/tags?post=99761"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}