{"id":99674,"date":"2026-10-16T05:16:05","date_gmt":"2026-10-16T05:16:05","guid":{"rendered":"https:\/\/skyplanner.ai\/?p=99674"},"modified":"2026-10-16T05:17:16","modified_gmt":"2026-10-16T05:17:16","slug":"konfiguracia-na-objednavku","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/sk\/zdroje-sk\/konfiguracia-na-objednavku\/","title":{"rendered":"Konfigur\u00e1cia na objedn\u00e1vku: Od v\u00fdberu z\u00e1kazn\u00edka po dodanie"},"content":{"rendered":"<div class=\"gb-container gb-container-article01 article-main-content-container\">\n\n<h1 class=\"wp-block-heading\">Konfigur\u00e1cia na objedn\u00e1vku: Od v\u00fdberu z\u00e1kazn\u00edka po dodanie<\/h1>\n\n<div class=\"gb-container gb-container-article02\">\n\n<p><a href=\"\/sk\/\">Domov<\/a> &raquo; <a href=\"https:\/\/skyplanner.ai\/sk\/zdroje\/\">Zdroje<\/a> &raquo; Konfigur\u00e1cia na objedn\u00e1vku: Od v\u00fdberu z\u00e1kazn\u00edka po dodanie<\/p>\n\n\n<p class=\"yoast-reading-time__wrapper\"><span class=\"yoast-reading-time__icon\"><svg aria-hidden=\"true\" focusable=\"false\" data-icon=\"clock\" width=\"20\" height=\"20\" fill=\"none\" stroke=\"currentColor\" style=\"display:inline-block;vertical-align:-0.1em\" role=\"img\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewBox=\"0 0 24 24\"><path stroke-linecap=\"round\" stroke-linejoin=\"round\" stroke-width=\"2\" d=\"M12 8v4l3 3m6-3a9 9 0 11-18 0 9 9 0 0118 0z\"><\/path><\/svg><\/span><span class=\"yoast-reading-time__spacer\" style=\"display:inline-block;width:1em\"><\/span><span class=\"yoast-reading-time__descriptive-text\">Odhadovan\u00fd \u010das \u010d\u00edtania: <\/span><span class=\"yoast-reading-time__reading-time\">8<\/span><span class=\"yoast-reading-time__time-unit\"> min\u00fat<\/span><\/p>\n\n<\/div>\n<div class=\"gb-container gb-container-article03\">\n\n<p>Konfigur\u00e1cia na objedn\u00e1vku (CTO) znamen\u00e1, \u017ee sa v\u00fdrobok vyr\u00e1ba pod\u013ea toho, \u010do si z\u00e1kazn\u00edk vyberie z vopred ur\u010den\u00fdch, vz\u00e1jomne kompatibiln\u00fdch mo\u017enost\u00ed. Z\u00e1kazn\u00edk dostane kombin\u00e1ciu, ktor\u00e1 vyhovuje jeho potreb\u00e1m. V\u00fdrobca pritom vyu\u017e\u00edva osved\u010den\u00e9 kon\u0161truk\u010dn\u00e9 rie\u0161enia a pravidl\u00e1 pre dan\u00fd v\u00fdrobok namiesto toho, aby ka\u017ed\u00fa z\u00e1kazku navrhoval od za\u010diatku.<\/p>\n\n\n<p>V\u00fdhodou je mo\u017enos\u0165 v\u00fdberu bez opakovan\u00fdch n\u00e1kladov na rie\u0161enie rovnak\u00fdch kon\u0161truk\u010dn\u00fdch ot\u00e1zok. Aj schv\u00e1len\u00e1 kombin\u00e1cia v\u0161ak potrebuje spr\u00e1vne materi\u00e1ly, v\u00fdrobn\u00e9 oper\u00e1cie a \u010das vo v\u00fdrobe. To, \u017ee sa v\u00fdrobok m\u00f4\u017ee pred\u00e1va\u0165, e\u0161te automaticky neznamen\u00e1, \u017ee ho mo\u017eno doda\u0165 u\u017e bud\u00faci piatok.<\/p>\n\n\n<p>Pr\u00e1ve s touto druhou \u00falohou v\u00e1m pom\u00e1ha SkyPlanner APS. Jeho umel\u00e1 inteligencia na rozvrhovanie Arcturus vypo\u010d\u00edta, kedy mo\u017eno potrebn\u00e9 pr\u00e1ce vykona\u0165 popri ostatn\u00fdch z\u00e1kazk\u00e1ch. V\u00fdsledok vid\u00edte v Ganttovom diagrame a riadite priority namiesto toho, aby ste pri ka\u017edej zmene skladby z\u00e1kaziek nanovo zostavovali poradie pr\u00e1c na ka\u017edom pracovisku.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Kedy ide o konfigur\u00e1ciu v\u00fdrobku na objedn\u00e1vku?<\/h2>\n\n\n<p>CTO sa za\u010d\u00edna e\u0161te predt\u00fdm, ne\u017e z\u00e1kazn\u00edk zad\u00e1 objedn\u00e1vku. Kon\u0161truk\u010dn\u00e9 oddelenie definuje z\u00e1kladn\u00e9 prvky v\u00fdrobku, povolen\u00e9 mo\u017enosti a pravidl\u00e1 ich vz\u00e1jomnej kompatibility. Obchodn\u00e9 oddelenie potom vyber\u00e1 v r\u00e1mci tohto schv\u00e1len\u00e9ho rozsahu.<\/p>\n\n\n<p>Predstavme si v\u00fdrobcu modul\u00e1rnych dopravn\u00edkov. Z\u00e1kazn\u00edci si vyberaj\u00fa zo \u0161tandardn\u00fdch \u0161\u00edrok a d\u013a\u017eok, typov p\u00e1su, materi\u00e1lov r\u00e1mu, pohonov a zost\u00e1v sn\u00edma\u010dov. Pravidl\u00e1 ur\u010duj\u00fa, ktor\u00e9 pohony s\u00fa vhodn\u00e9 pre dan\u00e9 za\u0165a\u017eenie a r\u00fdchlos\u0165, ktor\u00e9 p\u00e1sy sa hodia na konkr\u00e9tne pou\u017eitie a ak\u00e9 usporiadania sn\u00edma\u010dov s\u00fa k dispoz\u00edcii. Platn\u00e1 kombin\u00e1cia predstavuje overen\u00e9 rie\u0161enie, nie nevyrie\u0161en\u00fa kon\u0161truk\u010dn\u00fa ot\u00e1zku.<\/p>\n\n\n<p>Aj tak\u00fdto v\u00fdber m\u00f4\u017ee znamena\u0165 zna\u010dn\u00fd objem v\u00fdrobnej pr\u00e1ce. R\u00e1m z nehrdzavej\u00facej ocele m\u00f4\u017ee by\u0165 potrebn\u00e9 pred mont\u00e1\u017eou dopravn\u00edka vyrobi\u0165 a vyle\u0161ti\u0165. CTO neznamen\u00e1, \u017ee ka\u017ed\u00fd diel u\u017e le\u017e\u00ed na sklade ani \u017ee z\u00e1kazka vy\u017eaduje iba kone\u010dn\u00fa mont\u00e1\u017e.<\/p>\n\n\n<p>Hranicu tvor\u00ed rozsah schv\u00e1len\u00fdch kon\u0161truk\u010dn\u00fdch rie\u0161en\u00ed. Ak z\u00e1kazn\u00edk po\u017eaduje za\u0165a\u017eenie alebo sklon mimo tohto rozsahu, po\u017eiadavku mus\u00ed pos\u00fadi\u0165 kon\u0161truk\u010dn\u00e9 oddelenie. M\u00f4\u017eete pon\u00faknu\u0165 \u0161tandardn\u00fa alternat\u00edvu alebo v\u00fdnimku rie\u0161i\u0165 ako kon\u0161truk\u010dn\u00fa \u00falohu, namiesto toho, aby ste ju nen\u00e1padne pretla\u010dili procesom konfigur\u00e1cie.<\/p>\n\n\n<h3 class=\"wp-block-heading\">CTO, ETO, MTO a ATO opisuj\u00fa r\u00f4zne aspekty z\u00e1kazky<\/h3>\n\n\n<p>Tieto pojmy pom\u00e1haj\u00fa charakterizova\u0165 z\u00e1kazku, no nie v\u017edy sa navz\u00e1jom vylu\u010duj\u00fa:<\/p>\n\n\n<ul class=\"wp-block-list\"><li><strong>Konfigur\u00e1cia na objedn\u00e1vku:<\/strong> \u010co si m\u00f4\u017ee z\u00e1kazn\u00edk vybra\u0165? V\u00fdrobok sa zostavuje v\u00fdberom z vopred ur\u010den\u00fdch, vz\u00e1jomne kompatibiln\u00fdch mo\u017enost\u00ed.<\/li><li><strong><a href=\"https:\/\/skyplanner.ai\/sk\/zdroje-sk\/engineer-to-order\/\">Kon\u0161trukcia a v\u00fdroba na z\u00e1kazku (ETO)<\/a>:<\/strong> Vy\u017eaduje po\u017eiadavka nov\u00e9 kon\u0161truk\u010dn\u00e9 rie\u0161enie? Treba vyvin\u00fa\u0165 rie\u0161enie pre konkr\u00e9tneho z\u00e1kazn\u00edka, pr\u00edpadne aj s vyu\u017eit\u00edm \u0161tandardn\u00fdch dielov.<\/li><li><strong><a href=\"https:\/\/skyplanner.ai\/sk\/zdroje-sk\/vyroba-na-objednavku\/\">V\u00fdroba na z\u00e1kazku (MTO)<\/a>:<\/strong> \u010co sp\u00fa\u0161\u0165a v\u00fdrobu? V\u00fdroba sa za\u010d\u00edna po prijat\u00ed objedn\u00e1vky z\u00e1kazn\u00edka a m\u00f4\u017ee vyu\u017e\u00edva\u0165 osved\u010den\u00e9 kon\u0161truk\u010dn\u00e9 rie\u0161enie.<\/li><li><strong><a href=\"https:\/\/skyplanner.ai\/sk\/zdroje-sk\/montaz-na-objednavku\/\">Mont\u00e1\u017e na objedn\u00e1vku (ATO)<\/a>:<\/strong> \u010co je pripraven\u00e9 vopred? Komponenty alebo podzostavy s\u00fa pripraven\u00e9 u\u017e pred prijat\u00edm objedn\u00e1vky. Zvolen\u00fd hotov\u00fd v\u00fdrobok sa zmontuje a\u017e n\u00e1sledne.<\/li><\/ul>\n\n\n<p>Dopravn\u00edk mo\u017eno nakonfigurova\u0165 na objedn\u00e1vku a n\u00e1sledne na z\u00e1kazku vyrobi\u0165. Pri inom produktovom rade mo\u017eno vyu\u017e\u00edva\u0165 rovnak\u00fd princ\u00edp konfigur\u00e1cie, ale v\u00fdrobky montova\u0165 na objedn\u00e1vku z modulov na sklade. Konfigur\u00e1cia opisuje v\u00fdber; v\u00fdrobn\u00e1 strat\u00e9gia ur\u010duje, ak\u00e9 pr\u00e1ce po tomto v\u00fdbere e\u0161te zost\u00e1vaj\u00fa.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Kedy sa konfigur\u00e1cia na objedn\u00e1vku oplat\u00ed?<\/h2>\n\n\n<p>CTO sa dobre hod\u00ed tam, kde z\u00e1kazn\u00edci potrebuj\u00fa zmyslupln\u00fd v\u00fdber variantov, no ve\u013ek\u00e1 \u010das\u0165 kon\u0161truk\u010dnej pr\u00e1ce sa opakuje. Najvhodnej\u0161ie s\u00fa produktov\u00e9 rady, pri ktor\u00fdch sa d\u00e1 zvl\u00e1dnute\u013en\u00fdm po\u010dtom modulov a pravidiel pokry\u0165 podstatn\u00e1 \u010das\u0165 dopytu.<\/p>\n\n\n<p>Pozrite sa na ned\u00e1vne z\u00e1kazky. Ktor\u00e9 rozdiely skuto\u010dne prin\u00e1\u0161aj\u00fa z\u00e1kazn\u00edkovi hodnotu? Ktor\u00e9 ved\u00fa k tomu, \u017ee sa kon\u0161truk\u010dn\u00e9mu oddeleniu st\u00e1le vracaj\u00fa rovnak\u00e9 ot\u00e1zky? Opakuj\u00face sa vo\u013eby rozmerov, materi\u00e1lu, v\u00fdkonu \u010di pr\u00edslu\u0161enstva s\u00fa vhodn\u00e9 na \u0161tandardiz\u00e1ciu, ak mo\u017eno ich kombin\u00e1cie overi\u0165 vopred.<\/p>\n\n\n<p>Pr\u00ednosy vypl\u00fdvaj\u00fa z odstr\u00e1nenia opakovanej pr\u00e1ce. Obchodn\u00e9 oddelenie m\u00f4\u017ee pon\u00faka\u0165 schv\u00e1len\u00e9 kombin\u00e1cie s men\u0161ou potrebou dodato\u010dn\u00e9ho vyjas\u0148ovania. Kon\u0161trukt\u00e9ri m\u00f4\u017eu venova\u0165 viac \u010dasu nov\u00fdm rie\u0161eniam a skuto\u010dn\u00fdm v\u00fdnimk\u00e1m. N\u00e1kup a v\u00fdroba dost\u00e1vaj\u00fa po\u017eiadavky, ktor\u00e9 sa \u010dastej\u0161ie opakuj\u00fa. M\u00f4\u017eete tak pon\u00faknu\u0165 \u0161ir\u0161\u00ed sortiment bez toho, aby sa ka\u017ed\u00fd predaj rie\u0161il ako nov\u00fd v\u00fdvojov\u00fd projekt.<\/p>\n\n\n<p>Tieto pr\u00ednosy si v\u0161ak vy\u017eaduj\u00fa invest\u00edciu. Niekto mus\u00ed navrhn\u00fa\u0165 moduly, udr\u017eiava\u0165 pravidl\u00e1 kompatibility a pri zmen\u00e1ch dielov \u010di kon\u0161trukcie zabezpe\u010di\u0165 s\u00falad v\u00fdrobn\u00fdch \u00fadajov. Variant, ktor\u00fd sa pred\u00e1va zriedka, ale vy\u017eaduje osobitn\u00fd dod\u00e1vate\u013esk\u00fd re\u0165azec a jedine\u010dn\u00fd v\u00fdrobn\u00fd postup, m\u00f4\u017ee st\u00e1\u0165 viac, ne\u017e zarob\u00ed. V\u00e4\u010d\u0161\u00ed v\u00fdber automaticky neznamen\u00e1 lep\u0161iu ponuku.<\/p>\n\n\n<p>Za\u010dnite jedn\u00fdm produktov\u00fdm radom, pri ktorom je opakovanie zrejm\u00e9. Ur\u010dte podporovan\u00e9 mo\u017enosti a postup pri v\u00fdnimk\u00e1ch. Potom overte, \u010di obchodn\u00e9 oddelenie, kon\u0161trukcia a v\u00fdroba ch\u00e1pu rovnak\u00fd v\u00fdber rovnako. \u0160tandardizujte to, \u010do z\u00e1kazn\u00edci opakovane kupuj\u00fa, nie ka\u017ed\u00fa osobitn\u00fa po\u017eiadavku, ktor\u00fa ste kedy dostali.<\/p>\n\n\n<p>CTO je menej v\u00fdhodn\u00e9, ak v\u00e4\u010d\u0161ina z\u00e1kaziek vy\u017eaduje skuto\u010dne nov\u00e9 kon\u0161truk\u010dn\u00e9 rie\u0161enie alebo ak z\u00e1kazn\u00edci nie s\u00fa ochotn\u00ed \u010daka\u0165 na zost\u00e1vaj\u00facu v\u00fdrobu. \u017diadan\u00e9 v\u00fdrobky, ktor\u00e9 z\u00e1kazn\u00edci potrebuj\u00fa okam\u017eite, m\u00f4\u017ee by\u0165 vhodnej\u0161ie dod\u00e1va\u0165 zo skladu hotov\u00fdch v\u00fdrobkov. Jednotliv\u00e9 produktov\u00e9 rady m\u00f4\u017eu vyu\u017e\u00edva\u0165 r\u00f4zne pr\u00edstupy bez toho, aby t\u00fdm celkov\u00e1 strat\u00e9gia z\u00e1vodu stratila s\u00fadr\u017enos\u0165.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Preme\u0148te zvolen\u00e9 mo\u017enosti na z\u00e1kazku pripraven\u00fa na v\u00fdrobu<\/h2>\n\n\n<p>Konfigur\u00e1cia m\u00e1 v\u00fdrobe jasne poveda\u0165, \u010do m\u00e1 vyrobi\u0165. Pl\u00e1nova\u010d by to nemal musie\u0165 sp\u00e4tne zis\u0165ova\u0165 z cenovej ponuky. Pri odovzdan\u00ed z\u00e1kazky treba poskytn\u00fa\u0165 zvolen\u00fa \u0161pecifik\u00e1ciu a zodpovedaj\u00face materi\u00e1lov\u00e9 po\u017eiadavky, poradie oper\u00e1ci\u00ed, ich trvanie a vhodn\u00e9 v\u00fdrobn\u00e9 zdroje.<\/p>\n\n\n<p>Konfigur\u00e1tor v\u00fdrobkov overuje platnos\u0165 zvolen\u00fdch mo\u017enost\u00ed. Softv\u00e9r na konfigur\u00e1ciu, tvorbu cien a cenov\u00fdch pon\u00fak (CPQ) m\u00f4\u017ee podporova\u0165 aj cenotvorbu a pr\u00edpravu ponuky. ERP m\u00f4\u017ee uchov\u00e1va\u0165 prijat\u00fa objedn\u00e1vku a v\u00fdrobn\u00e9 \u00fadaje. Podrobn\u00e9 rozvrhovanie potom zarad\u00ed potrebn\u00e9 pr\u00e1ce do dostupn\u00fdch \u010dasov\u00fdch \u00fasekov. Tieto \u00falohy spolu s\u00favisia: samotn\u00e9 overenie kombin\u00e1cie e\u0161te nerezervuje v\u00fdrobn\u00fa kapacitu.<\/p>\n\n\n<p>U n\u00e1\u0161ho modelov\u00e9ho v\u00fdrobcu dopravn\u00edkov by vplyv na pl\u00e1novanie mohol vyzera\u0165 takto:<\/p>\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Vo\u013eba z\u00e1kazn\u00edka<\/th><th>Vplyv na pr\u00e1ce alebo z\u00e1sobovanie<\/th><th>\u010co mus\u00ed rozvrh zoh\u013eadni\u0165<\/th><\/tr><\/thead><tbody><tr><td>R\u00e1m z nehrdzavej\u00facej ocele<\/td><td>In\u00fd materi\u00e1l, v\u00fdroba r\u00e1mu a le\u0161tenie<\/td><td>Dostupnos\u0165 pr\u00edslu\u0161n\u00e9ho materi\u00e1lu a potrebn\u00e9 oper\u00e1cie<\/td><\/tr><tr><td>Oce\u013eov\u00fd r\u00e1m s povrchovou \u00fapravou<\/td><td>V\u00fdroba r\u00e1mu a n\u00e1sledn\u00e1 povrchov\u00e1 \u00faprava pod\u013ea schv\u00e1len\u00e9ho postupu<\/td><td>\u010cas spracovania, pr\u00edpravy a pr\u00edpadn\u00e9ho nevyhnutn\u00e9ho \u010dakania<\/td><\/tr><tr><td>V\u00e4\u010d\u0161\u00ed schv\u00e1len\u00fd pohon<\/td><td>In\u00fd nakupovan\u00fd komponent a odli\u0161n\u00e9 po\u017eiadavky na mont\u00e1\u017e<\/td><td>Dostupnos\u0165 komponentu a zodpovedaj\u00face trvanie oper\u00e1ci\u00ed<\/td><\/tr><tr><td>Volite\u013en\u00e1 zostava sn\u00edma\u010dov<\/td><td>Dodato\u010dn\u00e1 in\u0161tal\u00e1cia a kontrola<\/td><td>Dodato\u010dn\u00e9 pr\u00e1ce a zdroje potrebn\u00e9 pred dokon\u010den\u00edm<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>Premietnite do z\u00e1kazky d\u00f4sledky ka\u017edej zvolenej mo\u017enosti. Ak zmen\u00edte iba popis a predvolen\u00fd v\u00fdrobn\u00fd postup nech\u00e1te nedotknut\u00fd, \u010das\u0165 pr\u00e1ve predanej pr\u00e1ce zostane skryt\u00e1.<\/p>\n\n\n<p>Zabezpe\u010dte, aby bola zvolen\u00e1 konfigur\u00e1cia jednozna\u010dne identifikovate\u013en\u00e1 pri uvo\u013enen\u00ed do v\u00fdroby aj pri neskor\u0161\u00edch zmen\u00e1ch. Dohodnite sa, kto aktualizuje materi\u00e1lov\u00e9 po\u017eiadavky a potrebn\u00e9 pr\u00e1ce, ak z\u00e1kazn\u00edk zmen\u00ed svoj v\u00fdber. Zmena p\u00e1su alebo r\u00e1mu m\u00f4\u017ee ovplyvni\u0165 nakupovan\u00e9 diely, u\u017e rozpracovan\u00fa v\u00fdrobu aj term\u00edn dokon\u010denia. Pristupujte k nej ako k zmene z\u00e1kazky, ktor\u00fa treba pos\u00fadi\u0165, nie iba ako k nov\u00e9mu riadku v cenovej ponuke.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Rozvrhujte konkr\u00e9tny variant, nie priemern\u00fd v\u00fdrobok<\/h2>\n\n\n<p>Vr\u00e1\u0165me sa k v\u00fdrobcovi dopravn\u00edkov. Obchodn\u00e9 oddelenie dostane nieko\u013eko objedn\u00e1vok na verziu z nehrdzavej\u00facej ocele. Po\u010det dopravn\u00edkov je be\u017en\u00fd, ale viac z nich teraz potrebuje le\u0161tenie. \u0160tandardn\u00e1 priebe\u017en\u00e1 doba v\u00fdroby v z\u00e1vode sa nezmenila, zmenilo sa v\u0161ak za\u0165a\u017eenie zdroja na le\u0161tenie.<\/p>\n\n\n<p>Ak pl\u00e1nova\u010d rozvrhuje ka\u017ed\u00fd dopravn\u00edk ako priemern\u00fd kus, dodato\u010dn\u00e9 oper\u00e1cie m\u00f4\u017eu zosta\u0165 skryt\u00e9, k\u00fdm na ne vo v\u00fdrobe nepr\u00edde rad. R\u00e1my m\u00f4\u017eu by\u0165 r\u00fdchlo vyroben\u00e9, no potom \u010dakaj\u00fa na le\u0161tenie. Spustenie v\u00fdroby \u010fal\u0161\u00edch r\u00e1mov kapacitu le\u0161tenia nezv\u00fd\u0161i.<\/p>\n\n\n<p>Pri posudzovan\u00ed dodania je preto podstatn\u00e1 ot\u00e1zka: kedy mo\u017eno dokon\u010di\u0165 skuto\u010dn\u00e9 pr\u00e1ce na tejto z\u00e1kazke vzh\u013eadom na materi\u00e1ly a <a href=\"https:\/\/skyplanner.ai\/sk\/zdroje-sk\/planovanie-s-obmedzenou-kapacitou\/\">kapacitu u\u017e vyhraden\u00e9 pre in\u00fdch z\u00e1kazn\u00edkov<\/a>?<\/p>\n\n\n<p>SkyPlanner zarad\u00ed tieto pr\u00e1ce do prepojen\u00e9ho v\u00fdrobn\u00e9ho rozvrhu. Vy definujete kroky procesu, ich trvanie, pracovisk\u00e1, zmeny a po\u017eiadavky na zdroje. Opakovane pou\u017e\u00edvan\u00e9 v\u00fdrobky m\u00f4\u017eu ma\u0165 priraden\u00e9 osved\u010den\u00e9 v\u00fdrobn\u00e9 postupy a polo\u017eky z\u00e1kaziek predstavuj\u00fa pr\u00e1ce, ktor\u00e9 treba rozvrhn\u00fa\u0165. Nakonfigurovan\u00e1 z\u00e1kazka mus\u00ed do pl\u00e1novania pr\u00eds\u0165 s oper\u00e1ciami a materi\u00e1lmi zodpovedaj\u00facimi zvolen\u00e9mu variantu.<\/p>\n\n\n<p>Arcturus vypo\u010d\u00edta poradie pr\u00e1c naprie\u010d z\u00e1kazkami pod\u013ea kapac\u00edt, nadv\u00e4znost\u00ed a pravidiel rozvrhovania, ktor\u00e9 ste definovali. V Ganttovom diagrame m\u00f4\u017eete sledova\u0165 pr\u00e1ce na jednotliv\u00fdch zdrojoch a vidie\u0165 vplyv ostatn\u00fdch z\u00e1kaziek, ktor\u00e9 potrebuj\u00fa rovnak\u00e9 kapacity. Rad pr\u00e1c \u010dakaj\u00facich na le\u0161tenie sa tak zoh\u013eadn\u00ed pri posudzovan\u00ed term\u00ednu dodania sk\u00f4r, ne\u017e sa z neho stane prekvapenie v dielni.<\/p>\n\n\n<p>Ak je zapnut\u00e9 rozvrhovanie so zoh\u013eadnen\u00edm materi\u00e1lov, do v\u00fdpo\u010dtu vstupuje aj ich dostupnos\u0165. S nakupovan\u00fdm pohonom, ktor\u00e9ho dodanie sa o\u010dak\u00e1va nesk\u00f4r, nemo\u017eno po\u010d\u00edta\u0165 rovnako ako s t\u00fdm, ktor\u00fd je u\u017e k dispoz\u00edcii. \u00dadaje o dod\u00e1vkach udr\u017eiavajte aktu\u00e1lne a pri ich zmene rozvrh prepo\u010d\u00edtajte.<\/p>\n\n\n<p>O priorit\u00e1ch rozhodujete vy a prijat\u00e9 rozhodnutia v rozvrhu chr\u00e1nite uzamknut\u00edm. Ak dostane prednos\u0165 urgentn\u00fd dopravn\u00edk, Arcturus prepo\u010d\u00edta rozvrh v r\u00e1mci t\u00fdchto pokynov. Vy potom skontrolujete aj v\u00fdsledn\u00e9 term\u00edny ostatn\u00fdch z\u00e1kaziek. Pr\u00ednosom je menej ru\u010dn\u00fdch \u00faprav poradia pr\u00e1c a jasnej\u0161\u00ed podklad na rozhodovanie, ktor\u00e9 z\u00e1v\u00e4zky treba chr\u00e1ni\u0165.<\/p>\n\n\n<p>SkyPlanner sa prostredn\u00edctvom svojho <a href=\"https:\/\/skyplanner.ai\/sk\/integracie\/\">otvoren\u00e9ho REST API<\/a> integruje s ak\u00fdmko\u013evek syst\u00e9mom ERP alebo MES. Namiesto toho, aby ste za\u010d\u00ednali v\u00fdmenou ERP, prepojte svoje existuj\u00face \u00fadaje o z\u00e1kazk\u00e1ch, v\u00fdrobkoch a v\u00fdrobe s podrobn\u00fdm rozvrhovan\u00edm. Pri zav\u00e1dzan\u00ed CTO zmapujte, ako sa v tomto toku \u00fadajov zvolen\u00fd variant premietne do spr\u00e1vnych materi\u00e1lov\u00fdch \u00fadajov a \u00fadajov o oper\u00e1ci\u00e1ch. Tak vznik\u00e1 praktick\u00e9 prepojenie medzi v\u00fdrobkom, ktor\u00fd ste predali, a pr\u00e1cou, ktor\u00fa Arcturus rozvrhuje.<\/p>\n\n\n<h2 class=\"wp-block-heading\">\u010co zmenilo prepojen\u00e9 rozvrhovanie v UTU<\/h2>\n\n\n<p>UTU vyr\u00e1ba elektrick\u00e9 rozv\u00e1dza\u010de a sp\u00ednacie zariadenia. Pred zaveden\u00edm SkyPlanner si jednotliv\u00e9 oddelenia viedli samostatn\u00e9 pl\u00e1ny v Exceli a zmeny poradia v ERP sa nie v\u017edy dostali a\u017e do dielne. Re\u00e1lnu kapacitu bolo \u0165a\u017ek\u00e9 zisti\u0165, preto si dodr\u017eanie s\u013e\u00faben\u00fdch term\u00ednov dodania vy\u017eadovalo opakovan\u00e9 \u00fapravy pl\u00e1nov.<\/p>\n\n\n<p>V\u010faka integr\u00e1cii SkyPlanner s Oracle NetSuite a mzdov\u00fdm syst\u00e9mom spolo\u010dnos\u0165 UTU spojila v\u00fdrobn\u00e9 linky a oddelenia svojho z\u00e1vodu do jedn\u00e9ho pl\u00e1novacieho syst\u00e9mu. Jej t\u00edm vyzdvihuje kombin\u00e1ciu automatick\u00e9ho rozvrhovania a Ganttovho zobrazenia: kapacitu, vy\u0165a\u017eenie aj poradie pr\u00e1c vid\u00ed na jednom mieste.<\/p>\n\n\n<p>V <a href=\"https:\/\/skyplanner.ai\/sk\/pribehy-zakaznikov\/utu\/\">recenzii SkyPlanner od spolo\u010dnosti UTU<\/a> firma uv\u00e1dza, \u017ee t\u00fd\u017edenne u\u0161etr\u00ed pribli\u017ene dve hodiny, ktor\u00e9 predt\u00fdm venovala aktualiz\u00e1cii tabuliek. Opisuje aj presnej\u0161ie pl\u00e1novanie term\u00ednov dodania projektov a to, \u017ee aktualizovan\u00e9 poradie pr\u00e1c sa dostane na v\u00fdrobn\u00fa linku v priebehu sek\u00fand. Pr\u00e1ve v tom spo\u010d\u00edva pr\u00ednos prepojenia objedn\u00e1vky s pr\u00e1cou, ktor\u00fa \u013eudia skuto\u010dne vykon\u00e1vaj\u00fa: menej \u00fasilia pri udr\u017eiavan\u00ed samostatn\u00fdch pl\u00e1nov a preh\u013eadnej\u0161ia koordin\u00e1cia pri zmen\u00e1ch poradia.<\/p>\n\n\n<h2 class=\"wp-block-heading\">U\u013eah\u010dite dodanie v\u00fdrobku pod\u013ea v\u00fdberu z\u00e1kazn\u00edka<\/h2>\n\n\n<p>Pr\u00ednos CTO spo\u010d\u00edva v tom, \u017ee opakuj\u00face sa potreby z\u00e1kazn\u00edkov premie\u0148a na mo\u017enosti, z ktor\u00fdch si m\u00f4\u017eu opakovane vybera\u0165. Zachovajte t\u00fato v\u00fdhodu po\u010das celej v\u00fdroby: vych\u00e1dzajte zo spr\u00e1vnych po\u017eiadaviek na pr\u00e1cu pre zvolen\u00fd variant a pri posudzovan\u00ed term\u00ednu dodania zoh\u013eadnite zdroje, ktor\u00e9 vyu\u017e\u00edvaj\u00fa aj in\u00e9 z\u00e1kazky.<\/p>\n\n\n<p>Vyberte si SkyPlanner, ke\u010f si t\u00e1to koordin\u00e1cia vy\u017eaduje ka\u017edodenn\u00e9 pr\u00e1cne prepl\u00e1novanie. Arcturus sa postar\u00e1 o v\u00fdpo\u010det rozvrhu, Ganttovo zobrazenie uk\u00e1\u017ee d\u00f4sledky a vy si ponech\u00e1te kontrolu nad prioritami. Viac \u010dasu tak m\u00f4\u017eete venova\u0165 rie\u0161eniu skuto\u010dn\u00e9ho obmedzenia a menej pres\u00favaniu pr\u00e1c, aby ich poradie na jednotliv\u00fdch pracovisk\u00e1ch zostalo zos\u00faladen\u00e9.<\/p>\n\n\n<p><a href=\"https:\/\/skyplanner.ai\/sk\/kontakt-na-predaj\/\">Rezervujte si uk\u00e1\u017eku SkyPlanner<\/a> a pripravte si dve be\u017en\u00e9 konfigur\u00e1cie, oper\u00e1cie, v ktor\u00fdch sa l\u00ed\u0161ia, a zdroj, ktor\u00fd obe vyu\u017e\u00edvaj\u00fa. S\u00fa to u\u017eito\u010dn\u00e9 v\u00fdchodisk\u00e1 na pos\u00fadenie, ako by jednotliv\u00e9 varianty v\u00e1\u0161ho v\u00fdrobku zapadli do realistick\u00e9ho v\u00fdrobn\u00e9ho rozvrhu. Ak si chcete syst\u00e9m najprv prezrie\u0165 sami, <a href=\"https:\/\/skyplanner.ai\/sk\/skusobna-verzia\/\">vysk\u00fa\u0161ajte SkyPlanner s uk\u00e1\u017ekov\u00fdmi d\u00e1tami<\/a>.<\/p>\n\n<\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>Konfigur\u00e1cia na objedn\u00e1vku: Od v\u00fdberu z\u00e1kazn\u00edka po dodanie Domov &raquo; Zdroje &raquo; Konfigur\u00e1cia na objedn\u00e1vku: Od v\u00fdberu z\u00e1kazn\u00edka po dodanie Konfigur\u00e1cia na objedn\u00e1vku (CTO) znamen\u00e1, \u017ee sa v\u00fdrobok vyr\u00e1ba pod\u013ea toho, \u010do si z\u00e1kazn\u00edk vyberie z vopred ur\u010den\u00fdch, vz\u00e1jomne kompatibiln\u00fdch mo\u017enost\u00ed. Z\u00e1kazn\u00edk dostane kombin\u00e1ciu, ktor\u00e1 vyhovuje jeho potreb\u00e1m. V\u00fdrobca pritom vyu\u017e\u00edva osved\u010den\u00e9 kon\u0161truk\u010dn\u00e9 rie\u0161enia a &#8230; <a title=\"Konfigur\u00e1cia na objedn\u00e1vku: Od v\u00fdberu z\u00e1kazn\u00edka po dodanie\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/sk\/zdroje-sk\/konfiguracia-na-objednavku\/\" aria-label=\"Pre\u010d\u00edtajte si viac o Konfigur\u00e1cia na objedn\u00e1vku: Od v\u00fdberu z\u00e1kazn\u00edka po dodanie\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":99687,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[2538,318],"tags":[],"class_list":["post-99674","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-aps-a-rozvrhovanie","category-zdroje-sk","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Konfigur\u00e1cia na objedn\u00e1vku: Od v\u00fdberu z\u00e1kazn\u00edka po dodanie<\/title>\n<meta name=\"description\" content=\"Pon\u00faknite v\u00fdber bez navrhovania ka\u017edej z\u00e1kazky od nuly. Zistite, kedy sa CTO hod\u00ed a ako SkyPlanner rozvrhuje pr\u00e1ce pre jednotliv\u00e9 konfigur\u00e1cie.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/sk\/zdroje-sk\/konfiguracia-na-objednavku\/\" \/>\n<meta property=\"og:locale\" content=\"sk_SK\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Konfigur\u00e1cia na objedn\u00e1vku: Od v\u00fdberu z\u00e1kazn\u00edka po dodanie\" \/>\n<meta property=\"og:description\" content=\"Pon\u00faknite v\u00fdber bez navrhovania ka\u017edej z\u00e1kazky od nuly. Zistite, kedy sa CTO hod\u00ed a ako SkyPlanner rozvrhuje pr\u00e1ce pre jednotliv\u00e9 konfigur\u00e1cie.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/sk\/zdroje-sk\/konfiguracia-na-objednavku\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2026-10-16T05:16:05+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-16T05:17:16+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/configure-to-order-hero.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1672\" \/>\n\t<meta property=\"og:image:height\" content=\"941\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Autor\" \/>\n\t<meta name=\"twitter:data1\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n\t<meta name=\"twitter:label2\" content=\"Predpokladan\u00fd \u010das \u010d\u00edtania\" \/>\n\t<meta name=\"twitter:data2\" content=\"12 min\u00fat\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sk\\\/zdroje-sk\\\/konfiguracia-na-objednavku\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sk\\\/zdroje-sk\\\/konfiguracia-na-objednavku\\\/\"},\"author\":{\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sk\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\"},\"headline\":\"Konfigur\u00e1cia na objedn\u00e1vku: Od v\u00fdberu z\u00e1kazn\u00edka po dodanie\",\"datePublished\":\"2026-10-16T05:16:05+00:00\",\"dateModified\":\"2026-10-16T05:17:16+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sk\\\/zdroje-sk\\\/konfiguracia-na-objednavku\\\/\"},\"wordCount\":2474,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sk\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sk\\\/zdroje-sk\\\/konfiguracia-na-objednavku\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/configure-to-order-hero.png\",\"articleSection\":[\"APS a rozvrhovanie\",\"zdroje\"],\"inLanguage\":\"sk-SK\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sk\\\/zdroje-sk\\\/konfiguracia-na-objednavku\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/sk\\\/zdroje-sk\\\/konfiguracia-na-objednavku\\\/\",\"name\":\"Konfigur\u00e1cia na objedn\u00e1vku: Od v\u00fdberu z\u00e1kazn\u00edka po dodanie\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sk\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sk\\\/zdroje-sk\\\/konfiguracia-na-objednavku\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sk\\\/zdroje-sk\\\/konfiguracia-na-objednavku\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/configure-to-order-hero.png\",\"datePublished\":\"2026-10-16T05:16:05+00:00\",\"dateModified\":\"2026-10-16T05:17:16+00:00\",\"description\":\"Pon\u00faknite v\u00fdber bez navrhovania ka\u017edej z\u00e1kazky od nuly. Zistite, kedy sa CTO hod\u00ed a ako SkyPlanner rozvrhuje pr\u00e1ce pre jednotliv\u00e9 konfigur\u00e1cie.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sk\\\/zdroje-sk\\\/konfiguracia-na-objednavku\\\/#breadcrumb\"},\"inLanguage\":\"sk-SK\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/sk\\\/zdroje-sk\\\/konfiguracia-na-objednavku\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"sk-SK\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sk\\\/zdroje-sk\\\/konfiguracia-na-objednavku\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/configure-to-order-hero.png\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/configure-to-order-hero.png\",\"width\":1672,\"height\":941,\"caption\":\"A modular conveyor with alternative belts, drive modules and a sensor bracket for predefined product choices.\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sk\\\/zdroje-sk\\\/konfiguracia-na-objednavku\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/sk\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Konfigur\u00e1cia na objedn\u00e1vku: Od v\u00fdberu z\u00e1kazn\u00edka po dodanie\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sk\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/sk\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sk\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/sk\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"sk-SK\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sk\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/sk\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"sk-SK\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sk\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sk\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sk\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\",\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"sk-SK\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"caption\":\"Jussi M\u00e4ntyl\u00e4\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Konfigur\u00e1cia na objedn\u00e1vku: Od v\u00fdberu z\u00e1kazn\u00edka po dodanie","description":"Pon\u00faknite v\u00fdber bez navrhovania ka\u017edej z\u00e1kazky od nuly. Zistite, kedy sa CTO hod\u00ed a ako SkyPlanner rozvrhuje pr\u00e1ce pre jednotliv\u00e9 konfigur\u00e1cie.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/sk\/zdroje-sk\/konfiguracia-na-objednavku\/","og_locale":"sk_SK","og_type":"article","og_title":"Konfigur\u00e1cia na objedn\u00e1vku: Od v\u00fdberu z\u00e1kazn\u00edka po dodanie","og_description":"Pon\u00faknite v\u00fdber bez navrhovania ka\u017edej z\u00e1kazky od nuly. Zistite, kedy sa CTO hod\u00ed a ako SkyPlanner rozvrhuje pr\u00e1ce pre jednotliv\u00e9 konfigur\u00e1cie.","og_url":"https:\/\/skyplanner.ai\/sk\/zdroje-sk\/konfiguracia-na-objednavku\/","og_site_name":"SkyPlanner","article_published_time":"2026-10-16T05:16:05+00:00","article_modified_time":"2026-10-16T05:17:16+00:00","og_image":[{"width":1672,"height":941,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/configure-to-order-hero.png","type":"image\/png"}],"author":"Jussi M\u00e4ntyl\u00e4","twitter_card":"summary_large_image","twitter_misc":{"Autor":"Jussi M\u00e4ntyl\u00e4","Predpokladan\u00fd \u010das \u010d\u00edtania":"12 min\u00fat"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/sk\/zdroje-sk\/konfiguracia-na-objednavku\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/sk\/zdroje-sk\/konfiguracia-na-objednavku\/"},"author":{"name":"Jussi M\u00e4ntyl\u00e4","@id":"https:\/\/skyplanner.ai\/sk\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5"},"headline":"Konfigur\u00e1cia na objedn\u00e1vku: Od v\u00fdberu z\u00e1kazn\u00edka po dodanie","datePublished":"2026-10-16T05:16:05+00:00","dateModified":"2026-10-16T05:17:16+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/sk\/zdroje-sk\/konfiguracia-na-objednavku\/"},"wordCount":2474,"publisher":{"@id":"https:\/\/skyplanner.ai\/sk\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/sk\/zdroje-sk\/konfiguracia-na-objednavku\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/configure-to-order-hero.png","articleSection":["APS a rozvrhovanie","zdroje"],"inLanguage":"sk-SK"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/sk\/zdroje-sk\/konfiguracia-na-objednavku\/","url":"https:\/\/skyplanner.ai\/sk\/zdroje-sk\/konfiguracia-na-objednavku\/","name":"Konfigur\u00e1cia na objedn\u00e1vku: Od v\u00fdberu z\u00e1kazn\u00edka po dodanie","isPartOf":{"@id":"https:\/\/skyplanner.ai\/sk\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/sk\/zdroje-sk\/konfiguracia-na-objednavku\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/sk\/zdroje-sk\/konfiguracia-na-objednavku\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/configure-to-order-hero.png","datePublished":"2026-10-16T05:16:05+00:00","dateModified":"2026-10-16T05:17:16+00:00","description":"Pon\u00faknite v\u00fdber bez navrhovania ka\u017edej z\u00e1kazky od nuly. Zistite, kedy sa CTO hod\u00ed a ako SkyPlanner rozvrhuje pr\u00e1ce pre jednotliv\u00e9 konfigur\u00e1cie.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/sk\/zdroje-sk\/konfiguracia-na-objednavku\/#breadcrumb"},"inLanguage":"sk-SK","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/sk\/zdroje-sk\/konfiguracia-na-objednavku\/"]}]},{"@type":"ImageObject","inLanguage":"sk-SK","@id":"https:\/\/skyplanner.ai\/sk\/zdroje-sk\/konfiguracia-na-objednavku\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/configure-to-order-hero.png","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/configure-to-order-hero.png","width":1672,"height":941,"caption":"A modular conveyor with alternative belts, drive modules and a sensor bracket for predefined product choices."},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/sk\/zdroje-sk\/konfiguracia-na-objednavku\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/sk\/"},{"@type":"ListItem","position":2,"name":"Konfigur\u00e1cia na objedn\u00e1vku: Od v\u00fdberu z\u00e1kazn\u00edka po dodanie"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/sk\/#website","url":"https:\/\/skyplanner.ai\/sk\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/sk\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/sk\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"sk-SK"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/sk\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/sk\/","logo":{"@type":"ImageObject","inLanguage":"sk-SK","@id":"https:\/\/skyplanner.ai\/sk\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/sk\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]},{"@type":"Person","@id":"https:\/\/skyplanner.ai\/sk\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5","name":"Jussi M\u00e4ntyl\u00e4","image":{"@type":"ImageObject","inLanguage":"sk-SK","@id":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","caption":"Jussi M\u00e4ntyl\u00e4"}}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/configure-to-order-hero.png",1672,941,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/configure-to-order-hero-150x150.png",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/configure-to-order-hero-300x169.png",300,169,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/configure-to-order-hero-768x432.png",768,432,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/configure-to-order-hero-1024x576.png",1024,576,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/configure-to-order-hero-1536x864.png",1536,864,true],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/configure-to-order-hero.png",1672,941,false],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/configure-to-order-hero-360x203.png",360,203,true]},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/sk\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Konfigur\u00e1cia na objedn\u00e1vku: Od v\u00fdberu z\u00e1kazn\u00edka po dodanie Domov &raquo; Zdroje &raquo; Konfigur\u00e1cia na objedn\u00e1vku: Od v\u00fdberu z\u00e1kazn\u00edka po dodanie Konfigur\u00e1cia na objedn\u00e1vku (CTO) znamen\u00e1, \u017ee sa v\u00fdrobok vyr\u00e1ba pod\u013ea toho, \u010do si z\u00e1kazn\u00edk vyberie z vopred ur\u010den\u00fdch, vz\u00e1jomne kompatibiln\u00fdch mo\u017enost\u00ed. Z\u00e1kazn\u00edk dostane kombin\u00e1ciu, ktor\u00e1 vyhovuje jeho potreb\u00e1m. V\u00fdrobca pritom vyu\u017e\u00edva osved\u010den\u00e9 kon\u0161truk\u010dn\u00e9 rie\u0161enia a&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/sk\/wp-json\/wp\/v2\/posts\/99674","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/sk\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/sk\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/sk\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/sk\/wp-json\/wp\/v2\/comments?post=99674"}],"version-history":[{"count":1,"href":"https:\/\/skyplanner.ai\/sk\/wp-json\/wp\/v2\/posts\/99674\/revisions"}],"predecessor-version":[{"id":99732,"href":"https:\/\/skyplanner.ai\/sk\/wp-json\/wp\/v2\/posts\/99674\/revisions\/99732"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/sk\/wp-json\/wp\/v2\/media\/99687"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/sk\/wp-json\/wp\/v2\/media?parent=99674"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/sk\/wp-json\/wp\/v2\/categories?post=99674"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/sk\/wp-json\/wp\/v2\/tags?post=99674"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}