{"id":96568,"date":"2026-10-08T07:20:14","date_gmt":"2026-10-08T07:20:14","guid":{"rendered":"https:\/\/skyplanner.ai\/?p=96568"},"modified":"2026-10-19T14:43:17","modified_gmt":"2026-10-19T14:43:17","slug":"smed","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/sk\/zdroje-sk\/smed\/","title":{"rendered":"SMED: Krat\u0161ie pretypovanie, viac \u010dasu na z\u00e1kazky"},"content":{"rendered":"<div class=\"gb-container gb-container-article01 article-main-content-container\">\n\n<h1 class=\"wp-block-heading\">SMED: Krat\u0161ie pretypovanie, viac \u010dasu na z\u00e1kazky<\/h1>\n\n\n<p>\u010eal\u0161ia z\u00e1kazka je pripraven\u00e1, ale stroj e\u0161te nie. Obsluha potrebuje spr\u00e1vne n\u00e1stroje, treba skontrolova\u0165 nastavenia a schv\u00e1li\u0165 prv\u00e9 diely. K\u00fdm sa to v\u0161etko dokon\u010d\u00ed, ostatn\u00e9 z\u00e1kazky \u010dakaj\u00fa.<\/p>\n\n\n<p>Dlh\u00e9 pretypovania zvy\u0161uj\u00fa n\u00e1klady spojen\u00e9 s ka\u017ed\u00fdm rozhodnut\u00edm pri rozvrhovan\u00ed v\u00fdroby. Ak prejdete na in\u00fd v\u00fdrobok, aby ste dodr\u017eali term\u00edn dodania, strat\u00edte v\u00fdrobn\u00fd \u010das. Ak ponech\u00e1te rovnak\u00e9 nastavenie dlh\u0161ie, m\u00f4\u017eete vyr\u00e1ba\u0165 diely, ktor\u00e9 e\u0161te nie s\u00fa potrebn\u00e9, zatia\u013e \u010do naliehavej\u0161ia z\u00e1kazka \u010dak\u00e1. Pri <a href=\"\/sk\/zdroje-sk\/davkova-vyroba\/\">d\u00e1vkovej v\u00fdrobe<\/a> tento kompromis ovplyv\u0148uje ve\u013ekos\u0165 d\u00e1vok aj poradie ich v\u00fdroby.<\/p>\n\n\n<p>SMED pom\u00e1ha prekona\u0165 tento kompromis t\u00fdm, \u017ee skracuje samotn\u00e9 pretypovanie. SkyPlanner v\u00e1m pom\u00e1ha vyu\u017ei\u0165 takto z\u00edskan\u00fd \u010das: pri rozvrhovan\u00ed zoh\u013ead\u0148uje \u010dasy nastavenia a dok\u00e1\u017ee zoskupova\u0165 kompatibiln\u00e9 oper\u00e1cie, pri\u010dom do v\u00fdpo\u010dtu na\u010falej zah\u0155\u0148a priority dod\u00e1vok. Spolu v\u00e1m d\u00e1vaj\u00fa v\u00e4\u010d\u0161iu vo\u013enos\u0165 vyr\u00e1ba\u0165 z\u00e1kazky, ktor\u00e9 va\u0161i z\u00e1kazn\u00edci skuto\u010dne potrebuj\u00fa ako \u010fal\u0161ie v porad\u00ed. Krat\u0161ie \u010dasy nastavenia tie\u017e u\u013eah\u010duj\u00fa opakovan\u00fa v\u00fdrobu men\u0161\u00edch d\u00e1vok v r\u00e1mci <a href=\"\/sk\/zdroje-sk\/heijunka\/\">vyrovn\u00e1vania v\u00fdroby<\/a>.<\/p>\n\n\n<h2 class=\"wp-block-heading\">\u010co je SMED vo v\u00fdrobe?<\/h2>\n\n\n<p>Skratka SMED poch\u00e1dza z anglick\u00e9ho Single-Minute Exchange of Die, teda v\u00fdmeny n\u00e1stroja v jednocifernom po\u010dte min\u00fat. Je to met\u00f3da na skr\u00e1tenie \u010dasu potrebn\u00e9ho na pretypovanie v\u00fdrobn\u00e9ho zariadenia z jednej oper\u00e1cie alebo v\u00fdrobku na in\u00fd. N\u00e1zov vyjadruje cie\u013e dosta\u0165 sa pod desa\u0165 min\u00fat, nie pr\u00eds\u013eub pretypovania za jednu min\u00fatu.<\/p>\n\n\n<p>Z\u00e1kladom je rozli\u0161ova\u0165 medzi <strong>intern\u00fdm nastaven\u00edm<\/strong>, ktor\u00e9 si vy\u017eaduje zastavenie stroja, a <strong>extern\u00fdm nastaven\u00edm<\/strong>, ktor\u00e9 mo\u017eno vykona\u0165 po\u010das jeho chodu. T\u00edm pres\u00fava vhodn\u00e9 pr\u00edpravn\u00e9 \u00fakony mimo odst\u00e1vky a zjednodu\u0161uje pr\u00e1cu, ktor\u00fa je nevyhnutn\u00e9 vykona\u0165 po\u010das nej.<\/p>\n\n\n<p>Tento princ\u00edp sa d\u00e1 vyu\u017ei\u0165 aj pri in\u00fdch \u010dinnostiach ne\u017e pri v\u00fdmene n\u00e1strojov. V\u00fdrobca ho m\u00f4\u017ee uplatni\u0165 pri \u010fal\u0161\u00edch opakovan\u00fdch prechodoch medzi v\u00fdrobkami, napr\u00edklad pri zmene n\u00e1strojov\u00e9ho vybavenia alebo form\u00e1tu.<\/p>\n\n\n<p>SMED je met\u00f3da zlep\u0161ovania; \u010das nastavenia je doba, ktor\u00fa sa sna\u017e\u00edte skr\u00e1ti\u0165. Rozvrhovanie predstavuje samostatn\u00fd n\u00e1stroj: m\u00f4\u017ee zn\u00ed\u017ei\u0165 po\u010det pretypovan\u00ed medzi nekompatibiln\u00fdmi oper\u00e1ciami. Dobr\u00fd pl\u00e1n vyu\u017e\u00edva oba pr\u00edstupy a nespolieha sa na to, \u017ee zoskupovanie oper\u00e1ci\u00ed vyrie\u0161i zbyto\u010dne dlh\u00e9 pretypovanie.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Za\u010dnite tam, kde krat\u0161ie pretypovanie pom\u00f4\u017ee z\u00e1kazke<\/h2>\n\n\n<p>Vyberte pracovisko, na ktorom \u010das straten\u00fd nastavovan\u00edm ohrozuje dodanie, nie automaticky stroj s najdlh\u0161\u00edm zaznamenan\u00fdm pretypovan\u00edm. Pozrite sa, pri ktorom rade \u010dakaj\u00facich z\u00e1kaziek mus\u00edte pravidelne voli\u0165 medzi v\u00fdmenou n\u00e1strojov a dokon\u010den\u00edm naliehavej pr\u00e1ce.<\/p>\n\n\n<p>Dobr\u00fdm pr\u00edkladom je vy\u0165a\u017een\u00fd oh\u00fdbac\u00ed stroj. Ak na \u0148om pred exped\u00edciou treba spracova\u0165 viacero z\u00e1kaziek, z\u00edskan\u00fd \u010das m\u00f4\u017ee pom\u00f4c\u0165 posun\u00fa\u0165 v\u00fdrobu \u010falej. Rovnak\u00e1 \u00faspora min\u00fat na m\u00e1lo vy\u0165a\u017eenom stroji m\u00f4\u017ee by\u0165 tento t\u00fd\u017ede\u0148 menej u\u017eito\u010dn\u00e1. <a href=\"\/sk\/zdroje-sk\/vyrobny-postup\/\">Technologick\u00fd postup<\/a> ukazuje, ktor\u00e9 z\u00e1kazky z\u00e1visia od dan\u00e9ho pracoviska a kam pokra\u010duj\u00fa \u010falej.<\/p>\n\n\n<p>Vyberte jedno opakovan\u00e9 pretypovanie, ktor\u00e9 obsluha dobre pozn\u00e1. Prejdite si ho s \u013eu\u010fmi, ktor\u00ed ho vykon\u00e1vaj\u00fa, a zapojte aj kolegov z \u00fadr\u017eby \u010di kvality, ak ich \u00falohy ovplyv\u0148uj\u00fa pripravenos\u0165 stroja. U\u017eito\u010dn\u00e1 ot\u00e1zka neznie \u201epre\u010do v\u00e1m to tak dlho trv\u00e1?\u201c, ale \u201e\u010do sa mus\u00ed sta\u0165, aby tento stroj mohol vyrobi\u0165 \u010fal\u0161\u00ed vyhovuj\u00faci diel?\u201c<\/p>\n\n\n<p>Tak\u00e1to ot\u00e1zka pres\u00fava pozornos\u0165 z r\u00fdchlosti na pr\u00edpravu, poradie \u00fakonov a opakovate\u013enos\u0165.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Vytvorte postup SMED, ktor\u00fd t\u00edm dok\u00e1\u017ee opakovane dodr\u017ea\u0165<\/h2>\n\n\n<h3 class=\"wp-block-heading\">1. Sledujte cel\u00e9 pretypovanie<\/h3>\n\n\n<p>Merajte v\u017edy rovnako: od posledn\u00e9ho vyhovuj\u00faceho dielu predch\u00e1dzaj\u00facej s\u00e9rie vyroben\u00e9ho pri be\u017enej v\u00fdrobnej r\u00fdchlosti po prv\u00fd vyhovuj\u00faci diel \u010fal\u0161ej s\u00e9rie pri be\u017enej v\u00fdrobnej r\u00fdchlosti. Stroj, ktor\u00fd sa u\u017e rozbehol, ale st\u00e1le vyr\u00e1ba sk\u00fa\u0161obn\u00e9 alebo nevyhovuj\u00face diely, sa e\u0161te nevr\u00e1til k vyu\u017eite\u013enej v\u00fdrobe.<\/p>\n\n\n<p>Zaznamenajte \u00fakony aj \u010dakanie medzi t\u00fdmito dvoma bodmi. Pozna\u010dte si, kto vykon\u00e1va ka\u017ed\u00fd \u00fakon, \u010do na\u0148 potrebuje a \u010di naozaj vy\u017eaduje zastaven\u00e9 zariadenie. Ak je to mo\u017en\u00e9, sledujte viacero pretypovan\u00ed: jedno mimoriadne hladk\u00e9 pretypovanie nie je spo\u013eahliv\u00fdm z\u00e1kladom na to, aby ste s\u013e\u00fabili, \u010do v\u00fdroba zvl\u00e1dne nabud\u00face.<\/p>\n\n\n<p>Sledujte osobitne dve veli\u010diny: \u010das odst\u00e1vky stroja a \u010das pr\u00e1ce potrebnej na pr\u00edpravu \u010fal\u0161ej s\u00e9rie. Ak pr\u00edpravu vykon\u00e1te sk\u00f4r, z\u00edskate viac dostupn\u00e9ho \u010dasu stroja, samotn\u00e1 pr\u00edpravn\u00e1 pr\u00e1ca v\u0161ak nemus\u00ed zmizn\u00fa\u0165.<\/p>\n\n\n<h3 class=\"wp-block-heading\">2. Odde\u013ete \u00fakony vy\u017eaduj\u00face odst\u00e1vku od ostatn\u00fdch<\/h3>\n\n\n<p>\u00dakon vykon\u00e1van\u00fd po\u010das dne\u0161nej odst\u00e1vky automaticky nepatr\u00ed k intern\u00e9mu nastaveniu. T\u00edm mo\u017eno zhroma\u017e\u010fuje dokument\u00e1ciu k \u010fal\u0161ej oper\u00e1cii a\u017e po zastaven\u00ed stroja len preto, \u017ee nikto nevedel, ktor\u00e1 oper\u00e1cia bude nasledova\u0165.<\/p>\n\n\n<p>Predstavte si opakovan\u00e9 pretypovanie s t\u00fdmto zjednodu\u0161en\u00fdm z\u00e1znamom \u00fakonov. V s\u00fa\u010dasnosti sa v\u0161etky \u0161tyri vykon\u00e1vaj\u00fa postupne a\u017e po zastaven\u00ed v\u00fdroby:<\/p>\n\n\n<figure class=\"wp-block-table\"><table>\n<thead>\n<tr>\n<th>\u00dakon<\/th>\n<th>S\u00fa\u010dasn\u00fd \u010das odst\u00e1vky<\/th>\n<th>\u010cas odst\u00e1vky po \u00faprave<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>Vyzdvihnutie a kontrola n\u00e1strojov pre \u010fal\u0161iu oper\u00e1ciu<\/td>\n<td>8 min\u00fat<\/td>\n<td>0 min\u00fat: pripraven\u00e9 vopred<\/td>\n<\/tr>\n<tr>\n<td>Z\u00edskanie a overenie pracovn\u00fdch pokynov<\/td>\n<td>7 min\u00fat<\/td>\n<td>0 min\u00fat: pripraven\u00e9 vopred<\/td>\n<\/tr>\n<tr>\n<td>Demont\u00e1\u017e a mont\u00e1\u017e n\u00e1strojov<\/td>\n<td>18 min\u00fat<\/td>\n<td>15 min\u00fat<\/td>\n<\/tr>\n<tr>\n<td>Nastavenie a schv\u00e1lenie prv\u00fdch vyhovuj\u00facich dielov<\/td>\n<td>12 min\u00fat<\/td>\n<td>10 min\u00fat<\/td>\n<\/tr>\n<tr>\n<td><strong>Celkov\u00fd \u010das odst\u00e1vky stroja<\/strong><\/td>\n<td><strong>45 min\u00fat<\/strong><\/td>\n<td><strong>25 min\u00fat<\/strong><\/td>\n<\/tr>\n<\/tbody>\n<\/table><\/figure>\n\n\n<p>Ide o ilustra\u010dn\u00e9 \u010d\u00edsla, nie o v\u00fdsledok dosiahnut\u00fd u z\u00e1kazn\u00edka. Prv\u00e9 dve \u00fapravy pres\u00favaj\u00fa p\u00e4tn\u00e1s\u0165 min\u00fat pr\u00edpravy mimo odst\u00e1vky. Zvy\u0161n\u00fdch p\u00e4\u0165 min\u00fat sa u\u0161etr\u00ed zlep\u0161en\u00edm intern\u00e9ho postupu.<\/p>\n\n\n<p>Extern\u00fa pr\u00e1cu mus\u00ed st\u00e1le niekto vykona\u0165. Dohodnite sa, kto a kedy priprav\u00ed n\u00e1stroje a pokyny pre \u010fal\u0161iu oper\u00e1ciu. Voz\u00edk ozna\u010den\u00fd ako \u201epripraven\u00fd\u201c m\u00e1 zmysel len vtedy, ke\u010f je vybavenie pre \u010fal\u0161iu oper\u00e1ciu skuto\u010dne kompletn\u00e9 a skontrolovan\u00e9.<\/p>\n\n\n<p>H\u013eadajte aj intern\u00e9 \u00fakony, ktor\u00e9 by sa pri inom usporiadan\u00ed dali vykona\u0165 externe. N\u00e1hradn\u00fd pr\u00edpravok m\u00f4\u017ee napr\u00edklad umo\u017eni\u0165 pr\u00edpravu a vyrovnanie dielu pre \u010fal\u0161iu oper\u00e1ciu mimo be\u017eiaceho stroja, tak\u017ee po\u010das odst\u00e1vky zostane u\u017e len v\u00fdmena pr\u00edpravku. Pred takouto zmenou pos\u00fa\u010fte n\u00e1klady, vhodnos\u0165 zariadenia a bezpe\u010dn\u00fd pracovn\u00fd postup.<\/p>\n\n\n<h3 class=\"wp-block-heading\">3. Zlep\u0161ite intern\u00e9 \u00fakony bez zbyto\u010dn\u00e9ho n\u00e1hlenia<\/h3>\n\n\n<p>Pri \u00fakonoch, ktor\u00e9 zostan\u00fa intern\u00e9, h\u013eadajte opakovate\u013en\u00e9 sp\u00f4soby, ako odstr\u00e1ni\u0165 h\u013eadanie, duplicitn\u00e9 kontroly a zbyto\u010dn\u00e9 nastavovanie. Ka\u017ed\u00fa zmenu pr\u00edpravkov, upevnenia alebo poradia \u00fakonov by mali pos\u00fadi\u0165 \u013eudia zodpovedn\u00ed za zariadenie. \u010casov\u00fd cie\u013e nesmie by\u0165 z\u00e1mienkou na obch\u00e1dzanie postupov bezpe\u010dn\u00e9ho zastavenia ani schva\u013eovania kvality.<\/p>\n\n\n<p>V pr\u00edklade trv\u00e1 upraven\u00fd postup mont\u00e1\u017ee a nastavenia dvadsa\u0165p\u00e4\u0165 min\u00fat. Aj to je hodnotn\u00e9 zlep\u0161enie, hoci sa \u010das e\u0161te nedostal pod desa\u0165 min\u00fat. Prv\u00fdm cie\u013eom je spo\u013eahliv\u00e9 zlep\u0161enie, ktor\u00e9 dok\u00e1\u017eete zopakova\u0165, nie p\u00f4sobiv\u00e9 \u010d\u00edslo z jedn\u00e9ho v\u00fdnimo\u010dn\u00e9ho priebehu.<\/p>\n\n\n<p>Zdokumentujte upraven\u00fd postup, zabezpe\u010dte dostupnos\u0165 potrebn\u00fdch pom\u00f4cok a kontrolujte \u010fal\u0161ie pretypovania. Ak poradie \u00fakonov z\u00e1vis\u00ed od toho, \u010di je \u010fal\u0161ia z\u00e1kazka zn\u00e1ma dostato\u010dne vopred, v\u00fdrobn\u00fd rozvrh sa st\u00e1va s\u00fa\u010das\u0165ou fungovania tejto met\u00f3dy.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Krat\u0161ie pretypovanie roz\u0161iruje mo\u017enosti pri vo\u013ebe poradia oper\u00e1ci\u00ed<\/h2>\n\n\n<p>Pozrime sa na rovnak\u00fd stroj po zlep\u0161en\u00ed. Predstavte si \u0161tyri pripraven\u00e9 oper\u00e1cie: A1, B1, A2 a B2. Ka\u017ed\u00e1 si vy\u017eaduje dvadsa\u0165 min\u00fat spracovania. Oper\u00e1cie A pou\u017e\u00edvaj\u00fa jednu skupinu n\u00e1strojov, oper\u00e1cie B in\u00fa. Prechod medzi skupinami trv\u00e1 dvadsa\u0165p\u00e4\u0165 min\u00fat v oboch smeroch. Po sebe id\u00face oper\u00e1cie v r\u00e1mci jednej skupiny nevy\u017eaduj\u00fa \u010fal\u0161ie pretypovanie medzi skupinami.<\/p>\n\n\n<p>V tomto pr\u00edklade stroj za\u010d\u00edna o 08:00 s u\u017e namontovan\u00fdmi n\u00e1strojmi skupiny A. V\u0161etok materi\u00e1l aj obsluha s\u00fa k dispoz\u00edcii, bez prest\u00e1vok a \u010fal\u0161\u00edch nastavovac\u00edch \u00fakonov. Oper\u00e1cia B1 sa mus\u00ed na tomto stroji dokon\u010di\u0165 do 09:10. Ostatn\u00e9 oper\u00e1cie maj\u00fa neskor\u0161ie term\u00edny, ktor\u00e9 umo\u017e\u0148uj\u00fa nasleduj\u00face poradia.<\/p>\n\n\n<figure class=\"wp-block-table\"><table>\n<thead>\n<tr>\n<th>Poradie<\/th>\n<th>Po\u010det prechodov medzi skupinami<\/th>\n<th>Celkov\u00fd \u010das pretypovania medzi skupinami<\/th>\n<th>Dokon\u010denie B1<\/th>\n<th>Dokon\u010denie poslednej oper\u00e1cie<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>A1 \u2192 B1 \u2192 A2 \u2192 B2<\/td>\n<td>3<\/td>\n<td>75 min\u00fat<\/td>\n<td>09:05<\/td>\n<td>10:35<\/td>\n<\/tr>\n<tr>\n<td>A1 \u2192 A2 \u2192 B1 \u2192 B2<\/td>\n<td>1<\/td>\n<td>25 min\u00fat<\/td>\n<td>09:25<\/td>\n<td>09:45<\/td>\n<\/tr>\n<tr>\n<td>A1 \u2192 B1 \u2192 B2 \u2192 A2<\/td>\n<td>2<\/td>\n<td>50 min\u00fat<\/td>\n<td>09:05<\/td>\n<td>10:10<\/td>\n<\/tr>\n<\/tbody>\n<\/table><\/figure>\n\n\n<p>Ak zoskup\u00edte v\u0161etky oper\u00e1cie A a po nich v\u0161etky oper\u00e1cie B, cel\u00e1 skupina sa dokon\u010d\u00ed najsk\u00f4r, ale B1 nestihne po\u017eadovan\u00fd \u010das dokon\u010denia. Ak ponech\u00e1te B1 na skor\u0161ej poz\u00edcii a hne\u010f po nej vykon\u00e1te B2, u\u0161etr\u00edte oproti striedaniu skup\u00edn jedno pretypovanie a z\u00e1rove\u0148 dodr\u017e\u00edte term\u00edn B1.<\/p>\n\n\n<p>Pr\u00e1ve tu je priestor na lep\u0161ie pl\u00e1novanie. Nemus\u00edte si vybera\u0165 medzi zoskupen\u00edm v\u0161etk\u00e9ho a \u00fapln\u00fdm ignorovan\u00edm nastaven\u00ed. Potrebujete zoskupova\u0165 v takej miere, ak\u00e1 vyhovuje aktu\u00e1lnym z\u00e1kazk\u00e1m.<\/p>\n\n\n<p>D\u00f4le\u017eit\u00e9 je aj zlep\u0161enie samotn\u00e9ho pretypovania. Pred zaveden\u00edm SMED si striedav\u00e9 poradie vy\u017eadovalo tri pretypovania po \u0161tyridsa\u0165p\u00e4\u0165 min\u00fat, teda 135 min\u00fat odst\u00e1vky. Pri rovnakom porad\u00ed po zaveden\u00ed SMED tento \u010das klesne na 75 min\u00fat. Tretie poradie, ktor\u00e9 dodr\u017e\u00ed po\u017eadovan\u00fd term\u00edn, ho n\u00e1sledne zn\u00ed\u017ei na 50 min\u00fat. Met\u00f3da u\u0161etr\u00ed \u0161es\u0165desiat min\u00fat a upraven\u00e9 poradie \u010fal\u0161\u00edch dvadsa\u0165p\u00e4\u0165.<\/p>\n\n\n<p>Pri skuto\u010dn\u00fdch z\u00e1kazk\u00e1ch treba zoh\u013eadni\u0165 aj nadv\u00e4znosti, <a href=\"\/sk\/zdroje-sk\/cas-cyklu-vo-vyrobe\/\">r\u00f4zne \u010dasy spracovania<\/a> a \u010fal\u0161ie zdroje. Po dokon\u010den\u00ed oper\u00e1cie na tomto stroji m\u00f4\u017ee by\u0165 pred exped\u00edciou e\u0161te potrebn\u00e9 zv\u00e1ranie alebo kontrola. Pri <a href=\"\/sk\/zdroje-sk\/vyroba-na-objednavku\/\">v\u00fdrobe na z\u00e1kazku<\/a> je podstatn\u00e9 uvo\u013eni\u0165 kapacitu v\u010das na vybavenie z\u00e1kazn\u00edkovej objedn\u00e1vky, nielen preh\u013eadne zoradi\u0165 oper\u00e1cie na stroji.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Zoh\u013eadnite pretypovanie aj priority dodania pomocou SkyPlanner<\/h2>\n\n\n<p>Urobi\u0165 to raz pre \u0161tyri oper\u00e1cie je jednoduch\u00e9. N\u00e1ro\u010dn\u00e9 je udr\u017ea\u0165 spr\u00e1vnu rovnov\u00e1hu pri neust\u00e1le sa meniacich z\u00e1kazk\u00e1ch. Nov\u00e1 urgentn\u00e1 z\u00e1kazka, oneskoren\u00fd materi\u00e1l alebo nedostupn\u00fd stroj m\u00f4\u017eu znehodnoti\u0165 poradie, ktor\u00e9 ste pr\u00e1ve zostavili.<\/p>\n\n\n<p>SkyPlanner APS pri ur\u010dovan\u00ed poradia oper\u00e1ci\u00ed v r\u00e1mci <a href=\"\/sk\/zdroje-sk\/co-je-planovanie-vyroby\/\">rozvrhovania v\u00fdroby<\/a> zoh\u013ead\u0148uje aj nastavenia. Jeho umel\u00e1 inteligencia Arcturus rozvrhuje pr\u00e1cu pod\u013ea nastaven\u00fdch kapac\u00edt, nadv\u00e4znost\u00ed oper\u00e1ci\u00ed a prior\u00edt. Vy ur\u010dujete, \u010do je d\u00f4le\u017eit\u00e9; umel\u00e1 inteligencia vytv\u00e1ra rozvrh pod\u013ea t\u00fdchto pokynov.<\/p>\n\n\n<p>Na pracovisku, kde pretypovanie z\u00e1vis\u00ed od pou\u017eit\u00fdch n\u00e1strojov, definujte pri produktoch pr\u00edslu\u0161n\u00fa vlastnos\u0165 n\u00e1strojov\u00e9ho vybavenia. Oper\u00e1cie, ktor\u00e9 m\u00f4\u017eu vyu\u017e\u00edva\u0165 rovnak\u00e9 nastavenie, by mali ma\u0165 zhodn\u00fa hodnotu tejto vlastnosti. Pre dan\u00e9 pracovisko zapnite podobnos\u0165 a v Dynamic Priorities nastavte v\u00e1hu podobn\u00fdch oper\u00e1ci\u00ed. Pravidlo podobnosti v SkyPlanner v\u00e1m umo\u017e\u0148uje vybra\u0165 vlastnos\u0165, zada\u0165 \u010das nastavenia pri prechode medzi odli\u0161n\u00fdmi oper\u00e1ciami a ur\u010di\u0165, ak\u00e9 d\u00f4le\u017eit\u00e9 je vykon\u00e1va\u0165 podobn\u00e9 oper\u00e1cie za sebou.<\/p>\n\n\n<p>V\u00fdhodou v praxi je, \u017ee rozvrhovac\u00ed syst\u00e9m m\u00f4\u017ee pri v\u00fdpo\u010dte pl\u00e1nu zoh\u013eadni\u0165 preferovan\u00e9 zoskupovanie oper\u00e1ci\u00ed, tak\u017ee nemus\u00edte ru\u010dne preusporad\u00fava\u0165 v\u0161etky fronty oper\u00e1ci\u00ed. Ak to zodpoved\u00e1 dan\u00e9mu procesu, vlastnos\u0165 pou\u017eit\u00e1 na ur\u010denie podobnosti m\u00f4\u017ee zachyt\u00e1va\u0165 aj in\u00fd podstatn\u00fd d\u00f4vod pretypovania, napr\u00edklad farbu alebo materi\u00e1l. Vyberte vlastnos\u0165, ktor\u00e1 vystihuje, <a href=\"\/sk\/zdroje-sk\/matica-casov-prestavenia\/\">\u010do na danom pracovisku skuto\u010dne vyvol\u00e1va pretypovanie<\/a>.<\/p>\n\n\n<p>Potom skontrolujte v\u00fdsledn\u00fd rozvrh v zobrazen\u00ed Gantt pod\u013ea svojich dodac\u00edch prior\u00edt. Ak zoskupovanie uber\u00e1 priestor urgentn\u00fdm oper\u00e1ci\u00e1m, upravte priority. Podobnos\u0165 nepova\u017eujte za z\u00e1v\u00e4zn\u00fd pokyn, ktor\u00fd m\u00e1 v\u017edy prednos\u0165. Pravidl\u00e1 a uzamknutia v\u00e1m umo\u017e\u0148uj\u00fa zachova\u0165 pl\u00e1novacie rozhodnutia, ktor\u00e9 sa nesm\u00fa meni\u0165.<\/p>\n\n\n<p>S postupn\u00fdm zlep\u0161ovan\u00edm v\u00fdroby aktualizujte aj \u010dasov\u00e9 \u00fadaje, z ktor\u00fdch pl\u00e1n vych\u00e1dza. Jednotliv\u00e9 kroky technologick\u00e9ho postupu maj\u00fa vlastn\u00e9 \u010dasy nastavenia a pravidlo podobnosti ur\u010duje \u010das pretypovania medzi odli\u0161n\u00fdmi oper\u00e1ciami. Overte, \u010di ka\u017ed\u00fd \u00fadaj zodpoved\u00e1 pr\u00edslu\u0161nej pr\u00e1ci a \u010di nezapo\u010d\u00edtavate ten ist\u00fd \u010das dvakr\u00e1t. \u010cas nastavenia je v zobrazen\u00ed Gantt zahrnut\u00fd do celkov\u00e9ho trvania oper\u00e1cie; nezobrazuje sa ako samostatn\u00fd farebn\u00fd \u00fasek.<\/p>\n\n\n<p>SkyPlanner nenahr\u00e1dza pr\u00e1cu t\u00edmu na fyzickom zlep\u0161ovan\u00ed pretypovania met\u00f3dou SMED. Umo\u017e\u0148uje v\u0161ak premietnu\u0165 jej v\u00fdsledky do pl\u00e1nu: krat\u0161ie \u010dasy nastavenia a vhodne zvolen\u00e9 vlastnosti ur\u010duj\u00face podobnos\u0165 sl\u00fa\u017eia ako vstupy do rozvrhu, ktor\u00fd zoh\u013ead\u0148uje aj zvy\u0161ok v\u00fdroby. <a href=\"\/sk\/funkcie\/\">Pozrite si funkcie rozvrhovania v SkyPlanner<\/a> a zistite, ako spolu s\u00favisia kapacita, priority a pl\u00e1n v zobrazen\u00ed Gantt.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Ako to funguje v KJH-Comp<\/h2>\n\n\n<p>KJH-Comp, f\u00ednsky z\u00e1kazkov\u00fd v\u00fdrobca plechov\u00fdch dielov, pl\u00e1noval t\u00fd\u017edenn\u00e9 vy\u0165a\u017eenie pomocou syst\u00e9mu C9000 ERP a tabuliek. Ved\u00faci pritom ru\u010dne pride\u013eovali oper\u00e1cie strojom na jednotliv\u00e9 dni. S rast\u00facim sortimentom bolo \u010doraz n\u00e1ro\u010dnej\u0161ie udr\u017eiava\u0165 tento ru\u010dn\u00fd rozvrh.<\/p>\n\n\n<p>So SkyPlanner sa z\u00e1kazky na\u010falej zad\u00e1vaj\u00fa do existuj\u00faceho ERP, no rozvrhovanie s oh\u013eadom na obmedzen\u00e9 kapacity a pride\u013eovanie oper\u00e1ci\u00ed strojom prebieha automaticky. Firma vo svojom pr\u00edbehu opisuje praktick\u00fd pr\u00ednos pri oh\u00fdban\u00ed: oper\u00e1cie s rovnak\u00fdmi n\u00e1strojmi a rovnakou hr\u00fabkou materi\u00e1lu sa vykon\u00e1vaj\u00fa za sebou, \u010do skracuje \u010dasy nastavenia a obmedzuje prestoje.<\/p>\n\n\n<p>Ten ist\u00fd pr\u00edbeh vysvet\u013euje aj to, pre\u010do samotn\u00e9 zoskupovanie nesta\u010d\u00ed. Pr\u00e1ca potrebn\u00e1 a\u017e o dva t\u00fd\u017edne u\u017e nevytl\u00e1\u010da z\u00e1kazku, ktor\u00e1 sa m\u00e1 expedova\u0165 zajtra, a ved\u00faci m\u00e1 preh\u013ead o vy\u0165a\u017een\u00ed \u0161tvormetrov\u00e9ho oh\u00fdbacieho stroja. Efekt\u00edvne nastavenie aj dodr\u017eanie term\u00ednu dodania s\u00fa s\u00fa\u010das\u0165ou toho ist\u00e9ho rozhodovania o v\u00fdrobe.<\/p>\n\n\n<p>Sk\u00fasenos\u0165 KJH-Comp je v tomto kontexte u\u017eito\u010dn\u00e1, preto\u017ee ukazuje zmenu v ka\u017edodennej pr\u00e1ci, nielen princ\u00edp rozvrhovania: menej ru\u010dn\u00e9ho pl\u00e1novania vy\u0165a\u017eenia, lep\u0161\u00ed preh\u013ead o \u00fazkych miestach a poradie oper\u00e1ci\u00ed, ktor\u00e9 lep\u0161ie vyu\u017e\u00edva u\u017e nain\u0161talovan\u00e9 n\u00e1stroje. <a href=\"\/sk\/pribehy-zakaznikov\/kjh-comp\/\">Pre\u010d\u00edtajte si o sk\u00fasenostiach KJH-Comp so SkyPlanner<\/a>.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Vyu\u017eite u\u0161etren\u00fd \u010das naplno<\/h2>\n\n\n<p>Po zlep\u0161en\u00ed pretypovania porovn\u00e1vajte rovnak\u00fd rozsah pr\u00e1ce s rovnak\u00fdm za\u010diatkom a koncom merania. Skontrolujte, ako dlho trvaj\u00fa potrebn\u00e9 pretypovania, ko\u013eko prechodov medzi skupinami v\u00fdrobkov si dan\u00e9 poradie vy\u017eaduje a \u010di sa urgentn\u00e9 z\u00e1kazky st\u00e1le dokon\u010dia v\u010das. Pri vyhodnoten\u00ed zoh\u013eadnite aj kvalitu pri n\u00e1behu v\u00fdroby a pracovn\u00fa z\u00e1\u0165a\u017e spojen\u00fa s externou pr\u00edpravou.<\/p>\n\n\n<p>Krat\u0161\u00ed priemern\u00fd \u010das nastavenia je pokrok. Skuto\u010dn\u00fd pr\u00ednos pre v\u00fdrobu v\u0161ak prin\u00e1\u0161a vtedy, ke\u010f v\u010faka nemu z\u00edskate priestor na dokon\u010denie \u010fal\u0161ej d\u00f4le\u017eitej z\u00e1kazky.<\/p>\n\n\n<p>SkyPlanner sa prostredn\u00edctvom svojho otvoren\u00e9ho REST API integruje s ak\u00fdmko\u013evek ERP alebo MES. M\u00f4\u017eete si tak ponecha\u0165 syst\u00e9my, v ktor\u00fdch evidujete z\u00e1kazky, a vyu\u017ei\u0165 ich v\u00fdrobn\u00e9 \u00fadaje pri rozvrhovan\u00ed, ktor\u00e9 zoh\u013ead\u0148uje \u010dasy nastavenia. Nemus\u00edte za\u010d\u00edna\u0165 v\u00fdmenou ERP, ktor\u00e9 u\u017e va\u0161ej firme vyhovuje.<\/p>\n\n\n<p>Ak chcete presk\u00fama\u0165 tento pr\u00ednos vo vlastnej v\u00fdrobe, <a href=\"\/sk\/kontakt-na-predaj\/\">dohodnite si uk\u00e1\u017eku SkyPlanner<\/a>. Pripravte si \u00fadaje o vy\u0165a\u017eenom pracovisku, vlastnosti, ktor\u00e1 rozhoduje o jeho pretypovan\u00ed, nameranom \u010dase nastavenia a nieko\u013ek\u00fdch z\u00e1kazk\u00e1ch s r\u00f4znymi term\u00ednmi. S\u00fa to podklady na u\u017eito\u010dn\u00fa diskusiu o tom, kde zoskupovanie pom\u00e1ha a kde mus\u00ed ma\u0165 prednos\u0165 term\u00edn dodania.<\/p>\n\n\n<p>Ak si chcete najprv prezrie\u0165 pl\u00e1novacie prostredie, <a href=\"\/sk\/skusobna-verzia\/\">vysk\u00fa\u0161ajte SkyPlanner s uk\u00e1\u017ekov\u00fdmi \u00fadajmi<\/a>.<\/p>\n\n<\/div>","protected":false},"excerpt":{"rendered":"<p>SMED: Krat\u0161ie pretypovanie, viac \u010dasu na z\u00e1kazky \u010eal\u0161ia z\u00e1kazka je pripraven\u00e1, ale stroj e\u0161te nie. Obsluha potrebuje spr\u00e1vne n\u00e1stroje, treba skontrolova\u0165 nastavenia a schv\u00e1li\u0165 prv\u00e9 diely. K\u00fdm sa to v\u0161etko dokon\u010d\u00ed, ostatn\u00e9 z\u00e1kazky \u010dakaj\u00fa. Dlh\u00e9 pretypovania zvy\u0161uj\u00fa n\u00e1klady spojen\u00e9 s ka\u017ed\u00fdm rozhodnut\u00edm pri rozvrhovan\u00ed v\u00fdroby. Ak prejdete na in\u00fd v\u00fdrobok, aby ste dodr\u017eali term\u00edn dodania, &#8230; <a title=\"SMED: Krat\u0161ie pretypovanie, viac \u010dasu na z\u00e1kazky\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/sk\/zdroje-sk\/smed\/\" aria-label=\"Pre\u010d\u00edtajte si viac o SMED: Krat\u0161ie pretypovanie, viac \u010dasu na z\u00e1kazky\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":97692,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[2538,318],"tags":[],"class_list":["post-96568","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-aps-a-rozvrhovanie","category-zdroje-sk","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>SMED: Krat\u0161ie pretypovanie, viac \u010dasu na z\u00e1kazky &#8211; SkyPlanner<\/title>\n<meta name=\"description\" content=\"Dlh\u00e9 pretypovanie uber\u00e1 \u010das na z\u00e1kazky. SMED a rozvrhovanie v SkyPlanner so zoh\u013eadnen\u00edm nastaven\u00ed pom\u00e1haj\u00fa uvo\u013eni\u0165 \u010das stroja a zachova\u0165 priority dodania.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/sk\/zdroje-sk\/smed\/\" \/>\n<meta property=\"og:locale\" content=\"sk_SK\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"SMED: Krat\u0161ie pretypovanie, viac \u010dasu na z\u00e1kazky\" \/>\n<meta property=\"og:description\" content=\"Dlh\u00e9 pretypovanie uber\u00e1 \u010das na z\u00e1kazky. SMED a rozvrhovanie v SkyPlanner so zoh\u013eadnen\u00edm nastaven\u00ed pom\u00e1haj\u00fa uvo\u013eni\u0165 \u010das stroja a zachova\u0165 priority dodania.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/sk\/zdroje-sk\/smed\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2026-10-08T07:20:14+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-19T14:43:17+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-setup-time-hero-1.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1672\" \/>\n\t<meta property=\"og:image:height\" content=\"941\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Autor\" \/>\n\t<meta name=\"twitter:data1\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n\t<meta name=\"twitter:label2\" content=\"Predpokladan\u00fd \u010das \u010d\u00edtania\" \/>\n\t<meta name=\"twitter:data2\" content=\"14 min\u00fat\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sk\\\/zdroje-sk\\\/smed\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sk\\\/zdroje-sk\\\/smed\\\/\"},\"author\":{\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sk\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\"},\"headline\":\"SMED: Krat\u0161ie pretypovanie, viac \u010dasu na z\u00e1kazky\",\"datePublished\":\"2026-10-08T07:20:14+00:00\",\"dateModified\":\"2026-10-19T14:43:17+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sk\\\/zdroje-sk\\\/smed\\\/\"},\"wordCount\":2735,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sk\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sk\\\/zdroje-sk\\\/smed\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/production-setup-time-hero-1.png\",\"articleSection\":[\"APS a rozvrhovanie\",\"zdroje\"],\"inLanguage\":\"sk-SK\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sk\\\/zdroje-sk\\\/smed\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/sk\\\/zdroje-sk\\\/smed\\\/\",\"name\":\"SMED: Krat\u0161ie pretypovanie, viac \u010dasu na z\u00e1kazky &#8211; SkyPlanner\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sk\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sk\\\/zdroje-sk\\\/smed\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sk\\\/zdroje-sk\\\/smed\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/production-setup-time-hero-1.png\",\"datePublished\":\"2026-10-08T07:20:14+00:00\",\"dateModified\":\"2026-10-19T14:43:17+00:00\",\"description\":\"Dlh\u00e9 pretypovanie uber\u00e1 \u010das na z\u00e1kazky. SMED a rozvrhovanie v SkyPlanner so zoh\u013eadnen\u00edm nastaven\u00ed pom\u00e1haj\u00fa uvo\u013eni\u0165 \u010das stroja a zachova\u0165 priority dodania.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sk\\\/zdroje-sk\\\/smed\\\/#breadcrumb\"},\"inLanguage\":\"sk-SK\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/sk\\\/zdroje-sk\\\/smed\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"sk-SK\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sk\\\/zdroje-sk\\\/smed\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/production-setup-time-hero-1.png\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/production-setup-time-hero-1.png\",\"width\":1672,\"height\":941,\"caption\":\"Bending machine beside tooling prepared on a cart for the next production changeover\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sk\\\/zdroje-sk\\\/smed\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/sk\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"SMED: Krat\u0161ie pretypovanie, viac \u010dasu na z\u00e1kazky\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sk\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/sk\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sk\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/sk\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"sk-SK\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sk\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/sk\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"sk-SK\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sk\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sk\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sk\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\",\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"sk-SK\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"caption\":\"Jussi M\u00e4ntyl\u00e4\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"SMED: Krat\u0161ie pretypovanie, viac \u010dasu na z\u00e1kazky &#8211; SkyPlanner","description":"Dlh\u00e9 pretypovanie uber\u00e1 \u010das na z\u00e1kazky. SMED a rozvrhovanie v SkyPlanner so zoh\u013eadnen\u00edm nastaven\u00ed pom\u00e1haj\u00fa uvo\u013eni\u0165 \u010das stroja a zachova\u0165 priority dodania.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/sk\/zdroje-sk\/smed\/","og_locale":"sk_SK","og_type":"article","og_title":"SMED: Krat\u0161ie pretypovanie, viac \u010dasu na z\u00e1kazky","og_description":"Dlh\u00e9 pretypovanie uber\u00e1 \u010das na z\u00e1kazky. SMED a rozvrhovanie v SkyPlanner so zoh\u013eadnen\u00edm nastaven\u00ed pom\u00e1haj\u00fa uvo\u013eni\u0165 \u010das stroja a zachova\u0165 priority dodania.","og_url":"https:\/\/skyplanner.ai\/sk\/zdroje-sk\/smed\/","og_site_name":"SkyPlanner","article_published_time":"2026-10-08T07:20:14+00:00","article_modified_time":"2026-10-19T14:43:17+00:00","og_image":[{"width":1672,"height":941,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-setup-time-hero-1.png","type":"image\/png"}],"author":"Jussi M\u00e4ntyl\u00e4","twitter_card":"summary_large_image","twitter_misc":{"Autor":"Jussi M\u00e4ntyl\u00e4","Predpokladan\u00fd \u010das \u010d\u00edtania":"14 min\u00fat"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/sk\/zdroje-sk\/smed\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/sk\/zdroje-sk\/smed\/"},"author":{"name":"Jussi M\u00e4ntyl\u00e4","@id":"https:\/\/skyplanner.ai\/sk\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5"},"headline":"SMED: Krat\u0161ie pretypovanie, viac \u010dasu na z\u00e1kazky","datePublished":"2026-10-08T07:20:14+00:00","dateModified":"2026-10-19T14:43:17+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/sk\/zdroje-sk\/smed\/"},"wordCount":2735,"publisher":{"@id":"https:\/\/skyplanner.ai\/sk\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/sk\/zdroje-sk\/smed\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-setup-time-hero-1.png","articleSection":["APS a rozvrhovanie","zdroje"],"inLanguage":"sk-SK"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/sk\/zdroje-sk\/smed\/","url":"https:\/\/skyplanner.ai\/sk\/zdroje-sk\/smed\/","name":"SMED: Krat\u0161ie pretypovanie, viac \u010dasu na z\u00e1kazky &#8211; SkyPlanner","isPartOf":{"@id":"https:\/\/skyplanner.ai\/sk\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/sk\/zdroje-sk\/smed\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/sk\/zdroje-sk\/smed\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-setup-time-hero-1.png","datePublished":"2026-10-08T07:20:14+00:00","dateModified":"2026-10-19T14:43:17+00:00","description":"Dlh\u00e9 pretypovanie uber\u00e1 \u010das na z\u00e1kazky. SMED a rozvrhovanie v SkyPlanner so zoh\u013eadnen\u00edm nastaven\u00ed pom\u00e1haj\u00fa uvo\u013eni\u0165 \u010das stroja a zachova\u0165 priority dodania.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/sk\/zdroje-sk\/smed\/#breadcrumb"},"inLanguage":"sk-SK","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/sk\/zdroje-sk\/smed\/"]}]},{"@type":"ImageObject","inLanguage":"sk-SK","@id":"https:\/\/skyplanner.ai\/sk\/zdroje-sk\/smed\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-setup-time-hero-1.png","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-setup-time-hero-1.png","width":1672,"height":941,"caption":"Bending machine beside tooling prepared on a cart for the next production changeover"},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/sk\/zdroje-sk\/smed\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/sk\/"},{"@type":"ListItem","position":2,"name":"SMED: Krat\u0161ie pretypovanie, viac \u010dasu na z\u00e1kazky"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/sk\/#website","url":"https:\/\/skyplanner.ai\/sk\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/sk\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/sk\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"sk-SK"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/sk\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/sk\/","logo":{"@type":"ImageObject","inLanguage":"sk-SK","@id":"https:\/\/skyplanner.ai\/sk\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/sk\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]},{"@type":"Person","@id":"https:\/\/skyplanner.ai\/sk\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5","name":"Jussi M\u00e4ntyl\u00e4","image":{"@type":"ImageObject","inLanguage":"sk-SK","@id":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","caption":"Jussi M\u00e4ntyl\u00e4"}}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-setup-time-hero-1.png",1672,941,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-setup-time-hero-1-150x150.png",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-setup-time-hero-1-300x169.png",300,169,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-setup-time-hero-1-768x432.png",768,432,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-setup-time-hero-1-1024x576.png",1024,576,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-setup-time-hero-1-1536x864.png",1536,864,true],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-setup-time-hero-1.png",1672,941,false],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-setup-time-hero-1-360x203.png",360,203,true]},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/sk\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"SMED: Krat\u0161ie pretypovanie, viac \u010dasu na z\u00e1kazky \u010eal\u0161ia z\u00e1kazka je pripraven\u00e1, ale stroj e\u0161te nie. Obsluha potrebuje spr\u00e1vne n\u00e1stroje, treba skontrolova\u0165 nastavenia a schv\u00e1li\u0165 prv\u00e9 diely. K\u00fdm sa to v\u0161etko dokon\u010d\u00ed, ostatn\u00e9 z\u00e1kazky \u010dakaj\u00fa. Dlh\u00e9 pretypovania zvy\u0161uj\u00fa n\u00e1klady spojen\u00e9 s ka\u017ed\u00fdm rozhodnut\u00edm pri rozvrhovan\u00ed v\u00fdroby. Ak prejdete na in\u00fd v\u00fdrobok, aby ste dodr\u017eali term\u00edn dodania,&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/sk\/wp-json\/wp\/v2\/posts\/96568","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/sk\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/sk\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/sk\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/sk\/wp-json\/wp\/v2\/comments?post=96568"}],"version-history":[{"count":2,"href":"https:\/\/skyplanner.ai\/sk\/wp-json\/wp\/v2\/posts\/96568\/revisions"}],"predecessor-version":[{"id":96767,"href":"https:\/\/skyplanner.ai\/sk\/wp-json\/wp\/v2\/posts\/96568\/revisions\/96767"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/sk\/wp-json\/wp\/v2\/media\/97692"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/sk\/wp-json\/wp\/v2\/media?parent=96568"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/sk\/wp-json\/wp\/v2\/categories?post=96568"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/sk\/wp-json\/wp\/v2\/tags?post=96568"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}