{"id":113355,"date":"2026-10-30T09:55:28","date_gmt":"2026-10-30T09:55:28","guid":{"rendered":"https:\/\/skyplanner.ai\/?p=113355"},"modified":"2026-10-30T09:56:48","modified_gmt":"2026-10-30T09:56:48","slug":"protokol-o-nezhode","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/sk\/zdroje-sk\/protokol-o-nezhode\/","title":{"rendered":"Protokol o nezhode: od zistenia po rozhodnutie o rie\u0161en\u00ed"},"content":{"rendered":"<div class=\"gb-container gb-container-article01 article-main-content-container\">\n\n<h1 class=\"wp-block-heading\">Protokol o nezhode: od zistenia po rozhodnutie o rie\u0161en\u00ed<\/h1>\n\n<div class=\"gb-container gb-container-article02\">\n\n<p><a href=\"\/sk\/\">Domov<\/a> &raquo; <a href=\"https:\/\/skyplanner.ai\/sk\/zdroje\/\">Zdroje<\/a> &raquo; Protokol o nezhode: od zistenia po rozhodnutie o rie\u0161en\u00ed<\/p>\n\n\n<p class=\"yoast-reading-time__wrapper\"><span class=\"yoast-reading-time__icon\"><svg aria-hidden=\"true\" focusable=\"false\" data-icon=\"clock\" width=\"20\" height=\"20\" fill=\"none\" stroke=\"currentColor\" style=\"display:inline-block;vertical-align:-0.1em\" role=\"img\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewBox=\"0 0 24 24\"><path stroke-linecap=\"round\" stroke-linejoin=\"round\" stroke-width=\"2\" d=\"M12 8v4l3 3m6-3a9 9 0 11-18 0 9 9 0 0118 0z\"><\/path><\/svg><\/span><span class=\"yoast-reading-time__spacer\" style=\"display:inline-block;width:1em\"><\/span><span class=\"yoast-reading-time__descriptive-text\">Odhadovan\u00fd \u010das \u010d\u00edtania: <\/span><span class=\"yoast-reading-time__reading-time\">12<\/span><span class=\"yoast-reading-time__time-unit\"> min\u00fat<\/span><\/p>\n\n<\/div>\n<div class=\"gb-container gb-container-article03\">\n\n<p><strong>Protokol o nezhode (NCR)<\/strong> zaznamen\u00e1va nesplnenie po\u017eiadavky a sleduje opatrenia na kontrolu dotknut\u00e9ho v\u00fdrobku alebo pr\u00e1ce, ich pos\u00fadenie a rie\u0161enie nezhody. Vo v\u00fdrobe prep\u00e1ja d\u00f4kazy o probl\u00e9me s rozhodnut\u00edm opr\u00e1vnenej osoby o \u010fal\u0161om postupe a n\u00e1sledne uchov\u00e1va d\u00f4kazy o vykonan\u00ed tohto rozhodnutia.<\/p>\n\n\n<p>Je to d\u00f4le\u017eit\u00e9 vtedy, ke\u010f sa nevyhovuj\u00faci diel st\u00e1le zapo\u010d\u00edtava do dostupn\u00fdch z\u00e1sob, d\u00e1vka \u010dak\u00e1 na rozhodnutie technick\u00e9ho oddelenia alebo schv\u00e1len\u00e9 prepracovanie potrebuje \u010das na stroji, ktor\u00fd je u\u017e vyhraden\u00fd pre in\u00fa z\u00e1kazku. Zaznamenanie chyby je len za\u010diatok.<\/p>\n\n\n<p>Dobre spracovan\u00fd protokol o nezhode umo\u017e\u0148uje sp\u00e4tne doh\u013eada\u0165 rozhodnutie o kvalite. SkyPlanner APS v\u00e1m pom\u00f4\u017ee za\u010dleni\u0165 schv\u00e1len\u00e9 nadv\u00e4zuj\u00face pr\u00e1ce do v\u00fdrobn\u00e9ho pl\u00e1nu, ktor\u00fd zoh\u013ead\u0148uje materi\u00e1l, kapacity aj \u010fal\u0161ie dod\u00e1vky vy\u017eaduj\u00face tie ist\u00e9 zdroje.<\/p>\n\n\n<h2 class=\"wp-block-heading\">\u010co m\u00e1 obsahova\u0165 protokol o nezhode?<\/h2>\n\n\n<p>Protokol m\u00e1 aj \u010dloveku, ktor\u00fd pri zisten\u00ed nebol pr\u00edtomn\u00fd, umo\u017eni\u0165 pochopi\u0165 po\u017eiadavku, sp\u00f4sob jej nesplnenia a presne ur\u010di\u0165, ktor\u00e9 v\u00fdstupy treba rie\u0161i\u0165. Pou\u017eite schv\u00e1len\u00fd formul\u00e1r alebo syst\u00e9m va\u0161ej organiz\u00e1cie a dodr\u017ete aj pr\u00edpadn\u00fd form\u00e1t po\u017eadovan\u00fd z\u00e1kazn\u00edkom. V protokole o nezhode vo v\u00fdrobe by mali by\u0165 \u013eahko dostupn\u00e9 tieto \u00fadaje:<\/p>\n\n\n<ul class=\"wp-block-list\"><li><strong>Identifika\u010dn\u00e9 \u00fadaje:<\/strong> jedine\u010dn\u00e9 \u010d\u00edslo protokolu, d\u00e1tum, osoba, ktor\u00e1 nezhodu nahl\u00e1sila, a osoba zodpovedn\u00e1 za jej rie\u0161enie.<\/li><li><strong>Dotknut\u00e9 v\u00fdstupy:<\/strong> \u010d\u00edslo dielu alebo v\u00fdrobku, rev\u00edzia, v\u00fdrobn\u00fd pr\u00edkaz, identifik\u00e1cia d\u00e1vky alebo s\u00e9riov\u00e9 \u010d\u00edsla, mno\u017estvo a aktu\u00e1lne umiestnenie.<\/li><li><strong>Po\u017eiadavka a d\u00f4kazy:<\/strong> pr\u00edslu\u0161n\u00fd v\u00fdkres, \u0161pecifik\u00e1cia alebo pokyn, skuto\u010dn\u00e9 zistenie alebo nameran\u00e1 hodnota a podporn\u00e9 z\u00e1znamy \u010di fotografie.<\/li><li><strong>Zamedzenie \u0161\u00edreniu nezhody a jej rozsah:<\/strong> pri ktor\u00fdch v\u00fdstupoch je nezhoda potvrden\u00e1, ktor\u00e9 zost\u00e1vaj\u00fa podozriv\u00e9, \u010do bolo oddelen\u00e9 a kto preveruje \u010fal\u0161ie mo\u017en\u00e9 dotknut\u00e9 v\u00fdstupy.<\/li><li><strong>Rozhodnutie o rie\u0161en\u00ed:<\/strong> navrhnut\u00fd a schv\u00e1len\u00fd sp\u00f4sob nakladania s nezhodn\u00fdmi v\u00fdstupmi, dotknut\u00e9 mno\u017estv\u00e1, osoba, ktor\u00e1 rozhodla, a pr\u00edpadn\u00fd odkaz na s\u00fahlas z\u00e1kazn\u00edka alebo povolen\u00fa v\u00fdnimku.<\/li><li><strong>Vykonanie a overenie:<\/strong> pracovn\u00e9 pokyny, zodpovedn\u00e9 osoby, v\u00fdsledky nadv\u00e4zuj\u00facich pr\u00e1c a d\u00f4kazy o prijat\u00ed alebo inom kone\u010dnom sp\u00f4sobe nalo\u017eenia s v\u00fdstupmi.<\/li><li><strong>Uzavretie a s\u00favisiace opatrenia:<\/strong> kto a kedy z\u00e1znam uzavrel, kone\u010dn\u00fd stav jednotliv\u00fdch mno\u017estiev a odkazy na pr\u00edpadn\u00e9 samostatn\u00e9 vy\u0161etrovanie kore\u0148ovej pr\u00ed\u010diny alebo n\u00e1pravn\u00e9 opatrenie.<\/li><\/ul>\n\n\n<p>Ide o prakticky potrebn\u00e9 inform\u00e1cie, nie o univerz\u00e1lny povinn\u00fd formul\u00e1r. Zaznamenajte rozhodnutie a schv\u00e1lenia vy\u017eadovan\u00e9 va\u0161\u00edm procesom a z\u00e1kazn\u00edkom, nielen opis chyby.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Pri z\u00e1pise zistenia porovnajte po\u017eiadavku so skuto\u010dnos\u0165ou<\/h3>\n\n\n<p>Z\u00e1pis \u201eNespr\u00e1vne rozmery\u201c n\u00fati \u010fal\u0161ieho \u010dloveka p\u00e1tra\u0165 po skuto\u010dnom probl\u00e9me. Jasn\u00fd opis uv\u00e1dza konkr\u00e9tny znak, po\u017eiadavku na\u0148 a d\u00f4kaz o odch\u00fdlke.<\/p>\n\n\n<p>Napr\u00edklad: \u201eV\u00fdkres v rev\u00edzii C predpisuje priemer otvoru 20,00\u201320,05 mm. Pri oper\u00e1cii 30 boli na dieloch S041\u2013S046 zaznamenanou kontrolnou met\u00f3dou nameran\u00e9 hodnoty 19,92\u201319,96 mm. V\u00fdsledky kontroly s\u00fa prilo\u017een\u00e9.\u201c<\/p>\n\n\n<p>Odde\u013ete zistenie od neoveren\u00e9ho vysvetlenia. Tvrdenie \u201eChybu sp\u00f4sobilo opotrebovanie n\u00e1stroja\u201c je z\u00e1ver, ktor\u00fd treba presk\u00fama\u0165, nie skuto\u010dnos\u0165 preuk\u00e1zan\u00e1 samotnou kontrolou rozmeru. Presne zaznamenan\u00e9 d\u00f4kazy poskytuj\u00fa technick\u00e9mu oddeleniu a oddeleniu kvality lep\u0161\u00ed podklad na rozhodnutie, ako mo\u017eno s dielmi bezpe\u010dne nalo\u017ei\u0165.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Najprv zabezpe\u010dte kontrolu nad dotknut\u00fdmi a podozriv\u00fdmi v\u00fdstupmi<\/h2>\n\n\n<p>Opatrenia na zamedzenie \u0161\u00edreniu nezhody br\u00e1nia pou\u017eitiu alebo dodaniu podozriv\u00fdch v\u00fdstupov, k\u00fdm sa situ\u00e1cia posudzuje. Jasne ich ozna\u010dte, odde\u013ete alebo uplatnite vhodn\u00e9 kontroln\u00e9 opatrenia. Ich stav mus\u00ed by\u0165 zrejm\u00fd \u013eu\u010fom, ktor\u00ed by ich mohli premiestni\u0165, pou\u017ei\u0165 alebo expedova\u0165.<\/p>\n\n\n<p>\u0160es\u0165 dielov, ktor\u00e9 ste zmerali, nemus\u00ed predstavova\u0165 v\u0161etky dotknut\u00e9 kusy. Preverte hist\u00f3riu v\u00fdroby: ktor\u00e9 diely sa vyr\u00e1bali pri rovnakom nastaven\u00ed stroja, z rovnakej \u0161ar\u017ee materi\u00e1lu, pri rovnakom stave n\u00e1stroja alebo v rovnakom rozsahu procesn\u00fdch podmienok? Zaznamenajte, na z\u00e1klade \u010doho ste vymedzili dotknut\u00e9 kusy, a odl\u00ed\u0161te potvrden\u00e9 nezhody od kusov, ktor\u00e9 e\u0161te \u010dakaj\u00fa na kontrolu. Rozsah priebe\u017ene aktualizujte pod\u013ea nov\u00fdch d\u00f4kazov.<\/p>\n\n\n<p>Zahr\u0148te nedokon\u010den\u00fa v\u00fdrobu, z\u00e1soby hotov\u00fdch v\u00fdrobkov aj pr\u00edslu\u0161n\u00e9 zostavy, nielen prepravku pri stroji. Ak u\u017e bol potenci\u00e1lne dotknut\u00fd v\u00fdrobok dodan\u00fd, postupujte pod\u013ea pr\u00edslu\u0161n\u00e9ho procesu informovania z\u00e1kazn\u00edka a eskal\u00e1cie. Samotn\u00e9 zablokovanie z\u00e1sob v sklade nerie\u0161i v\u00fdrobky, ktor\u00e9 u\u017e m\u00e1 z\u00e1kazn\u00edk.<\/p>\n\n\n<p>Rovnak\u00e9 rozl\u00ed\u0161enie stavov potrebuje aj pl\u00e1novanie v\u00fdroby. Paleta m\u00f4\u017ee by\u0165 fyzicky na mieste, no pre \u010fal\u0161iu z\u00e1kazku nemus\u00ed by\u0165 dostupn\u00e1. Mno\u017estvo dostupn\u00e9 na pl\u00e1novanie udr\u017eiavajte v s\u00falade s t\u00fdm, \u010do sa skuto\u010dne smie pou\u017ei\u0165. Kusy \u010dakaj\u00face na rozhodnutie sa nesm\u00fa automaticky pova\u017eova\u0165 za vyhovuj\u00face z\u00e1soby.<\/p>\n\n\n<h2 class=\"wp-block-heading\">\u010co znamen\u00e1 rozhodnutie o rie\u0161en\u00ed v protokole o nezhode?<\/h2>\n\n\n<p><strong>Ide o rozhodnutie opr\u00e1vnenej osoby, ako nalo\u017ei\u0165 s nezhodn\u00fdm v\u00fdstupom.<\/strong> Nesta\u010d\u00ed teda len ur\u010di\u0165 osobu, ktor\u00e1 m\u00e1 presk\u00fama\u0165 pr\u00ed\u010dinu, alebo term\u00edn uzavretia protokolu.<\/p>\n\n\n<p>Be\u017en\u00e9 mo\u017enosti s\u00fa:<\/p>\n\n\n<ul class=\"wp-block-list\"><li><strong>Prepracovanie:<\/strong> vykona\u0165 pr\u00e1ce s cie\u013eom uvies\u0165 v\u00fdstup do zhody s p\u00f4vodn\u00fdmi po\u017eiadavkami a n\u00e1sledne overi\u0165 v\u00fdsledok.<\/li><li><strong>Oprava:<\/strong> vykona\u0165 schv\u00e1len\u00fd z\u00e1sah, v\u010faka ktor\u00e9mu bude polo\u017eka prijate\u013en\u00e1 na zam\u00fd\u0161\u013ean\u00e9 pou\u017eitie, hoci nemus\u00ed vo v\u0161etk\u00fdch oh\u013eadoch sp\u013a\u0148a\u0165 p\u00f4vodn\u00fa po\u017eiadavku.<\/li><li><strong>Pou\u017eitie v danom stave:<\/strong> prija\u0165 zisten\u00fa odch\u00fdlku bez \u010fal\u0161\u00edch pr\u00e1c na z\u00e1klade po\u017eadovan\u00e9ho s\u00fahlasu.<\/li><li><strong>Vyradenie:<\/strong> vyl\u00fa\u010di\u0165 v\u00fdstup zo zam\u00fd\u0161\u013ean\u00e9ho pou\u017eitia a zabezpe\u010di\u0165, aby sa nemohol omylom vr\u00e1ti\u0165 medzi pou\u017eite\u013en\u00e9 z\u00e1soby.<\/li><li><strong>Vr\u00e1tenie dod\u00e1vate\u013eovi:<\/strong> vr\u00e1ti\u0165 dotknut\u00fd nak\u00fapen\u00fd materi\u00e1l dod\u00e1vate\u013eovi pod\u013ea dohodnut\u00e9ho postupu. Zaznamenajte, ako sa nalo\u017e\u00ed s vr\u00e1ten\u00fdm mno\u017estvom a \u010di je potrebn\u00fd n\u00e1hradn\u00fd materi\u00e1l.<\/li><\/ul>\n\n\n<p>Prepracovanie a oprava nie s\u00fa zamenite\u013en\u00e9 pojmy. Dodato\u010dn\u00e9 obrobenie pr\u00edli\u0161 mal\u00e9ho otvoru na predp\u00edsan\u00fd rozmer je nie\u010do in\u00e9 ako prijatie opravy, po ktorej zost\u00e1va odch\u00fdlka od v\u00fdkresu. Tento rozdiel ovplyv\u0148uje krit\u00e9ri\u00e1 prijatia aj to, kto m\u00f4\u017ee dan\u00fd postup schv\u00e1li\u0165.<\/p>\n\n\n<p><strong>V\u00fdnimka<\/strong> je povolenie pou\u017ei\u0165 alebo uvo\u013eni\u0165 konkr\u00e9tne nezhodn\u00e9 v\u00fdstupy za dohodnut\u00fdch podmienok. Neznamen\u00e1, \u017ee nevyhovuj\u00faci znak sa t\u00fdm st\u00e1va zhodn\u00fdm, ani neude\u013euje neobmedzen\u00e9 povolenie pre bud\u00face d\u00e1vky. Jej rozsah a podmienky musia zosta\u0165 jednozna\u010dne prepojen\u00e9 s konkr\u00e9tnymi polo\u017ekami, na ktor\u00e9 sa vz\u0165ahuje.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Kto m\u00f4\u017ee schv\u00e1li\u0165 sp\u00f4sob rie\u0161enia nezhody?<\/h3>\n\n\n<p>Rozhodova\u0165 mus\u00ed osoba alebo org\u00e1n s pr\u00e1vomocou stanovenou va\u0161\u00edm procesom kvality, zmluvou a po\u017eiadavkami z\u00e1kazn\u00edka. Niektor\u00e9 organiz\u00e1cie vyu\u017e\u00edvaj\u00fa komisiu na posudzovanie nezhodn\u00e9ho materi\u00e1lu (MRB), ktor\u00e1 zdru\u017euje pr\u00edslu\u0161n\u00fdch z\u00e1stupcov kvality, technick\u00e9ho oddelenia a \u010fal\u0161ie osoby s rozhodovacou pr\u00e1vomocou. Samotn\u00fd n\u00e1zov tejto skupiny jej v\u0161ak ned\u00e1va opr\u00e1vnenie prija\u0165 odch\u00fdlku od z\u00e1kazn\u00edkovho v\u00fdkresu.<\/p>\n\n\n<p>Po\u017eiadavky z\u00e1kazn\u00edka m\u00f4\u017eu rozli\u0161ova\u0165 medzi postupmi, ktor\u00e9 smiete schv\u00e1li\u0165 interne, a t\u00fdmi, ktor\u00e9 vy\u017eaduj\u00fa jeho s\u00fahlas. Napr\u00edklad zverejnen\u00e1 <a href=\"https:\/\/qaexternal.jpl.nasa.gov\/qcprint.php?clause=QC120\">zmluvn\u00e1 dolo\u017eka JPL o spracovan\u00ed nezh\u00f4d a posudzovan\u00ed materi\u00e1lu<\/a> odli\u0161uje delegovan\u00fa pr\u00e1vomoc schva\u013eova\u0165 prepracovanie od rozhodnut\u00ed o oprave a pou\u017eit\u00ed v danom stave, ktor\u00e9 vy\u017eaduj\u00fa s\u00fahlas JPL. Je to konkr\u00e9tny pr\u00edklad v\u00fdznamu pr\u00edslu\u0161nej zmluvy, nie pravidlo, ktor\u00e9 treba prevzia\u0165 do ka\u017edej tov\u00e1rne.<\/p>\n\n\n<p>Pred za\u010dat\u00edm pr\u00e1c, ktor\u00e9 vy\u017eaduj\u00fa schv\u00e1lenie, zaznamenajte schv\u00e1len\u00fd postup, polo\u017eky a mno\u017estv\u00e1, na ktor\u00e9 sa vz\u0165ahuje, pr\u00edpadn\u00e9 podmienky aj osobu, ktor\u00e1 ho schv\u00e1lila. N\u00e1vrh opravy uveden\u00fd v protokole o nezhode nie je schv\u00e1len\u00fdm pokynom na opravu.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Vykonajte schv\u00e1len\u00fd postup, overte v\u00fdsledok a uzavrite z\u00e1znam<\/h2>\n\n\n<p>Po schv\u00e1len\u00ed sp\u00f4sobu rie\u0161enia ur\u010dte osobu zodpovedn\u00fa za vykonanie pr\u00e1c a jasn\u00e9 krit\u00e9ri\u00e1 prijatia. Prepracovanie m\u00f4\u017ee vy\u017eadova\u0165 riaden\u00fd pracovn\u00fd pokyn, \u010fal\u0161iu obr\u00e1baciu oper\u00e1ciu a opakovan\u00fa kontrolu. V\u00fdroba n\u00e1hradn\u00fdch kusov potrebuje materi\u00e1l a kapacity. Pri vyraden\u00ed treba zaznamena\u0165 \u00fapravu mno\u017estva v evidencii a zabezpe\u010di\u0165 primeran\u00e9 fyzick\u00e9 opatrenia.<\/p>\n\n\n<p>Pred uzavret\u00edm protokolu o nezhode skontrolujte, \u010di z\u00e1znam poskytuje \u00fapln\u00fd obraz:<\/p>\n\n\n<ul class=\"wp-block-list\"><li>V\u0161etky dotknut\u00e9 kusy s\u00fa podchyten\u00e9 vr\u00e1tane pr\u00edpadn\u00e9ho roz\u0161\u00edrenia p\u00f4vodn\u00e9ho rozsahu.<\/li><li>Pri spr\u00e1vnych polo\u017ek\u00e1ch a mno\u017estv\u00e1ch sa postupovalo schv\u00e1len\u00fdm sp\u00f4sobom.<\/li><li>V\u00fdsledky overenia podporuj\u00fa kone\u010dn\u00e9 rozhodnutie o prijat\u00ed alebo je dolo\u017een\u00e9 zo\u0161rotovanie, vr\u00e1tenie \u010di in\u00fd sp\u00f4sob nalo\u017eenia.<\/li><li>Identifik\u00e1cia v\u00fdrobkov, stav z\u00e1sob a s\u00favisiace v\u00fdrobn\u00e9 z\u00e1znamy zodpovedaj\u00fa kone\u010dn\u00e9mu v\u00fdsledku.<\/li><li>Po\u017eadovan\u00e9 schv\u00e1lenia, komunik\u00e1cia so z\u00e1kazn\u00edkom a nadv\u00e4zuj\u00face opatrenia s\u00fa doh\u013eadate\u013en\u00e9.<\/li><\/ul>\n\n\n<p>Dokon\u010denie prepracovania nie je to ist\u00e9 ako prijatie jeho v\u00fdsledku. Overenie aj rozhodnutie o uvo\u013enen\u00ed musia by\u0165 jasne zaznamenan\u00e9. \u010casov\u00fd \u00fadaj o dokon\u010den\u00ed v\u00fdroby nepova\u017eujte za d\u00f4kaz prijatia z h\u013eadiska kvality.<\/p>\n\n\n<p>Ani uzavretie rie\u0161enia dotknutej d\u00e1vky nedokazuje, \u017ee bola odstr\u00e1nen\u00e1 pr\u00ed\u010dina nezhody. V\u00e1\u0161 proces m\u00f4\u017ee ponecha\u0165 protokol o nezhode otvoren\u00fd a\u017e do dokon\u010denia n\u00e1pravn\u00e9ho opatrenia alebo uzavrie\u0165 rie\u0161enie nezhodn\u00e9ho v\u00fdrobku, k\u00fdm s\u00favisiace vy\u0161etrovanie pokra\u010duje. V oboch pr\u00edpadoch mus\u00ed by\u0165 jasn\u00e9, kto zodpoved\u00e1 za zost\u00e1vaj\u00face \u00falohy, \u010do treba vykona\u0165 a ako sa to over\u00ed.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Pr\u00edklad: protokol o nezhode pri obr\u00e1ban\u00ed s r\u00f4znymi sp\u00f4sobmi rie\u0161enia pre jednotliv\u00e9 kusy<\/h2>\n\n\n<p>Predstavte si v\u00fdrobn\u00fd pr\u00edkaz na 60 obr\u00e1ban\u00fdch telies. Pri medziopera\u010dnej kontrole priemeru nevyhovie \u0161es\u0165 otvorov a t\u00edm zadr\u017e\u00ed v\u0161etk\u00fdch 60 telies, k\u00fdm zist\u00ed rozsah nezhody. \u010eal\u0161ia kontrola potvrd\u00ed, \u017ee \u0161es\u0165 telies vy\u017eaduje prepracovanie a zvy\u0161n\u00fdch 54 sp\u013a\u0148a pr\u00edslu\u0161n\u00e9 krit\u00e9ri\u00e1 prijatia.<\/p>\n\n\n<p>Stru\u010dn\u00fd z\u00e1znam m\u00f4\u017ee vyzera\u0165 takto:<\/p>\n\n\n<ul class=\"wp-block-list\"><li><strong>Zistenie:<\/strong> \u0161es\u0165 kusov s identifikovan\u00fdmi s\u00e9riov\u00fdmi \u010d\u00edslami m\u00e1 otvory s men\u0161\u00edm priemerom, ne\u017e predpisuje rev\u00edzia C v\u00fdkresu; v\u00fdsledky merania s\u00fa prilo\u017een\u00e9.<\/li><li><strong>Opatrenia na zamedzenie \u010fal\u0161ieho pou\u017eitia:<\/strong> v\u0161etk\u00fdch 60 telies bolo identifikovan\u00fdch a zadr\u017ean\u00fdch do vykonania kontroly; miesta zadr\u017eania aj zodpovedn\u00e1 osoba s\u00fa zaznamenan\u00e9.<\/li><li><strong>V\u00fdsledok ur\u010denia rozsahu:<\/strong> kontrola podchytila v\u0161etk\u00fdch 60 s\u00e9riov\u00fdch \u010d\u00edsel. Opr\u00e1vnen\u00e1 osoba uvo\u013e\u0148uje 54 zhodn\u00fdch telies; zvy\u0161n\u00fdch \u0161es\u0165 zost\u00e1va pod kontrolou.<\/li><li><strong>Schv\u00e1len\u00fd sp\u00f4sob nalo\u017eenia:<\/strong> prepracova\u0165 \u0161es\u0165 otvorov pod\u013ea schv\u00e1len\u00e9ho n\u00e1vodu a n\u00e1sledne vykona\u0165 predp\u00edsan\u00e9 overenie. Rozhodnutie aj odkaz na schv\u00e1lenie s\u00fa zaznamenan\u00e9.<\/li><li><strong>D\u00f4sledok pre v\u00fdrobu:<\/strong> \u0161es\u0165 telies potrebuje \u010fal\u0161iu oper\u00e1ciu obr\u00e1bania a kapacitu na kontrolu. Pri pl\u00e1novan\u00ed ich zatia\u013e nemo\u017eno zapo\u010d\u00edta\u0165 ako dostupn\u00e9 hotov\u00e9 teles\u00e1.<\/li><li><strong>Doklady na uzavretie:<\/strong> prilo\u017ete v\u00fdsledky prepracovania a overenia, zaznamenajte kone\u010dn\u00fd stav ka\u017ed\u00e9ho dotknut\u00e9ho telesa a pripojte odkaz na v\u0161etky po\u017eadovan\u00e9 opatrenia proti opakovaniu nezhody.<\/li><\/ul>\n\n\n<p>Protokol nepredpoved\u00e1, \u017ee v\u0161etk\u00fdch \u0161es\u0165 kusov pri opakovanej kontrole vyhovie. Ur\u010duje, \u010do je schv\u00e1len\u00e9 a ak\u00e9 doklady bud\u00fa potrebn\u00e9 v \u010fal\u0161om kroku. Ak diel op\u00e4\u0165 nevyhovie alebo bude potrebn\u00fd in\u00fd sp\u00f4sob nalo\u017eenia, nechajte rozhodnutie zmeni\u0165 pr\u00edslu\u0161nou opr\u00e1vnenou osobou namiesto toho, aby ste bez vysvetlenia upravili kone\u010dn\u00e9 mno\u017estvo.<\/p>\n\n\n<p>Pr\u00e1ve tu m\u00f4\u017ee ma\u0165 v\u00fdroba \u0165a\u017ekosti aj pri dobre vedenom protokole o nezhode. Zoznam prepracovan\u00ed hovor\u00ed, \u010do treba urobi\u0165, ale nie to, kam zaradi\u0165 dodato\u010dn\u00e9 obr\u00e1banie a kontrolu medzi z\u00e1kazky s u\u017e stanoven\u00fdmi term\u00ednmi.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Je protokol o nezhode to ist\u00e9 ako spr\u00e1va 8D alebo n\u00e1pravn\u00e9 opatrenie?<\/h2>\n\n\n<p>Nie. Protokol o nezhode sl\u00fa\u017ei na zaznamenanie a riadenie konkr\u00e9tnej nezhody a jej rie\u0161enia. <strong><a href=\"https:\/\/skyplanner.ai\/sk\/zdroje-sk\/metoda-8d\/\">8D je \u0161trukt\u00farovan\u00e1 met\u00f3da rie\u0161enia probl\u00e9mov<\/a><\/strong>, ktor\u00e1 zah\u0155\u0148a vy\u0161etrovanie pr\u00ed\u010din, zav\u00e1dzanie trval\u00fdch n\u00e1pravn\u00fdch opatren\u00ed a overovanie ich \u00fa\u010dinnosti. Protokol o nezhode m\u00f4\u017ee podnieti\u0165 rie\u0161enie met\u00f3dou 8D alebo na\u0148 odkazova\u0165, no tieto dva z\u00e1znamy plnia odli\u0161n\u00e9 \u00falohy.<\/p>\n\n\n<p>Rovnako u\u017eito\u010dn\u00e9 je rozli\u0161ova\u0165 medzi <strong>n\u00e1pravou<\/strong> a <strong>n\u00e1pravn\u00fdm opatren\u00edm<\/strong>. N\u00e1prava dotknut\u00fdch telies rie\u0161i tento konkr\u00e9tny v\u00fdskyt nezhody. Zmena procesu, ktor\u00e1 odstr\u00e1ni overen\u00fa pr\u00ed\u010dinu a zabr\u00e1ni opakovaniu, je n\u00e1pravn\u00e9 opatrenie. Samotn\u00fd z\u00e1znam o zo\u0161rotovan\u00ed ani \u00faspe\u0161n\u00e9 prepracovanie nedokazuj\u00fa, \u017ee sa zabr\u00e1nilo opakovaniu nezhody.<\/p>\n\n\n<p>Rozsah potrebn\u00e9ho vy\u0161etrovania a \u00farove\u0148 eskal\u00e1cie ur\u010dte pod\u013ea rizika, opakovan\u00e9ho v\u00fdskytu a pr\u00edslu\u0161n\u00fdch po\u017eiadaviek. Nepredpokladajte, \u017ee ka\u017ed\u00fd protokol o nezhode vy\u017eaduje rovnak\u00fd \u00fapln\u00fd postup 8D, ani \u017ee pri zdanlivo malej odch\u00fdlke mo\u017eno vynecha\u0165 po\u017eadovan\u00e9 schv\u00e1lenie z\u00e1kazn\u00edkom.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Zara\u010fte schv\u00e1len\u00e9 pr\u00e1ce z protokolu o nezhode do pl\u00e1nu v\u00fdroby pomocou SkyPlanner<\/h2>\n\n\n<p>Rozhodnutie v oblasti kvality ur\u010duje, ako mo\u017eno s v\u00fdrobkami nalo\u017ei\u0165. Pri pl\u00e1novan\u00ed potom treba vyrie\u0161i\u0165, ako schv\u00e1len\u00e9 pr\u00e1ce dokon\u010di\u0165 popri v\u0161etk\u00fdch ostatn\u00fdch z\u00e1v\u00e4zkoch v\u00fdrobn\u00e9ho z\u00e1vodu.<\/p>\n\n\n<p><strong>SkyPlanner APS zarad\u00ed tieto pr\u00e1ce do <a href=\"https:\/\/skyplanner.ai\/sk\/zdroje-sk\/co-je-planovanie-vyroby\/\">rovnak\u00e9ho pl\u00e1nu v\u00fdroby<\/a> ako va\u0161e z\u00e1kazn\u00edcke objedn\u00e1vky.<\/strong> Namodelujte schv\u00e1len\u00fd postup kontroly, prepracovania alebo n\u00e1hradnej v\u00fdroby vr\u00e1tane jednotliv\u00fdch krokov, ich trvania, vhodn\u00fdch pracov\u00edsk a vz\u00e1jomn\u00fdch z\u00e1vislost\u00ed. Ak je zapnut\u00e9 pl\u00e1novanie so zoh\u013eadnen\u00edm materi\u00e1lu a \u00fadaje o dostupn\u00fdch mno\u017estv\u00e1ch s\u00fa udr\u017eiavan\u00e9 aktu\u00e1lne, SkyPlanner zoh\u013ead\u0148uje aj materi\u00e1l potrebn\u00fd na vykonanie pr\u00e1c.<\/p>\n\n\n<p>Arcturus, umel\u00e1 inteligencia na pl\u00e1novanie v\u00fdroby, rozvrhne pr\u00e1ce pod\u013ea nastaven\u00fdch zmien, kapacity pracov\u00edsk, materi\u00e1lov a prior\u00edt. Poradie pr\u00e1c si skontrolujete v Ganttovom diagrame namiesto ru\u010dn\u00e9ho zos\u00fala\u010fovania samostatn\u00e9ho zoznamu \u00faloh z protokolu o nezhode s porad\u00edm z\u00e1kaziek na ka\u017edom stroji. \u0160etr\u00ed to pr\u00e1cu pri pl\u00e1novan\u00ed a poskytuje jasnej\u0161\u00ed preh\u013ead o d\u00f4sledkoch pre dod\u00e1vky.<\/p>\n\n\n<p>V pr\u00edklade s telesami sa dodato\u010dn\u00e9 obr\u00e1banie del\u00ed o kapacitu s ostatn\u00fdmi z\u00e1kazkami na obr\u00e1banie a overenie s ostatn\u00fdmi kontroln\u00fdmi \u00falohami. Ke\u010f tieto oper\u00e1cie vid\u00edte v spolo\u010dnom pl\u00e1ne, m\u00f4\u017eete pos\u00fadi\u0165, \u010di pom\u00f4\u017ee zmena priority alebo in\u00fd dostupn\u00fd zdroj a ktor\u00e9 \u010fal\u0161ie z\u00e1v\u00e4zky to ovplyvn\u00ed. O upravenom term\u00edne dodania tak m\u00f4\u017eete rokova\u0165 s preh\u013eadom o zost\u00e1vaj\u00facich pr\u00e1cach namiesto predpokladu, \u017ee schv\u00e1len\u00e9 prepracovanie mo\u017eno vykona\u0165 okam\u017eite.<\/p>\n\n\n<p>Schv\u00e1len\u00e9 rozhodnutie o kvalite a doklady o uvo\u013enen\u00ed ponechajte v dohodnutom procese riadenia kvality. Do pl\u00e1novania preneste schv\u00e1len\u00e9 pr\u00e1ce a spr\u00e1vne \u00fadaje o pou\u017eite\u013en\u00fdch mno\u017estv\u00e1ch. Zaznamenan\u00e9 mno\u017estvo chybn\u00fdch kusov nie je schv\u00e1len\u00edm sp\u00f4sobu nalo\u017eenia s dotknut\u00fdmi v\u00fdrobkami ani pokynom na automatick\u00e9 vytvorenie n\u00e1hradnej v\u00fdroby.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Ponechajte si s\u00fa\u010dasn\u00e9 syst\u00e9my a zabezpe\u010dte u\u017eito\u010dn\u00e9 odovzd\u00e1vanie \u00fadajov<\/h3>\n\n\n<p>SkyPlanner sa prostredn\u00edctvom otvoren\u00e9ho REST API integruje s ak\u00fdmko\u013evek syst\u00e9mom ERP alebo MES. M\u00f4\u017eete si ponecha\u0165 syst\u00e9my, v ktor\u00fdch vediete objedn\u00e1vky a z\u00e1znamy o kvalite, a z\u00e1rove\u0148 poskytn\u00fa\u0165 v\u00fdrobe pl\u00e1n zoh\u013ead\u0148uj\u00faci obmedzen\u00e9 kapacity, zalo\u017een\u00fd na priebe\u017ene aktualizovan\u00fdch \u00fadajoch o objedn\u00e1vkach, pr\u00e1cach a materi\u00e1loch.<\/p>\n\n\n<p>Dohodnite sa, ktor\u00fd syst\u00e9m bude vies\u0165 \u00fadaje o pou\u017eite\u013enom mno\u017estve a ako sa zmena stavu kvality prenesie do pl\u00e1novania. T\u00fdm zabr\u00e1nite tomu, aby sa d\u00e1vka v karant\u00e9ne javila ako dostupn\u00e1 len preto, \u017ee je st\u00e1le na sklade. Pr\u00ednosom je jednotn\u00fd obraz pre pl\u00e1novanie, nie \u010fal\u0161\u00ed zoznam, ktor\u00fd mus\u00ed pl\u00e1nova\u010d aktualizova\u0165 samostatne.<\/p>\n\n\n<p>Pracova\u0165 m\u00f4\u017eete aj prostredn\u00edctvom vlastn\u00e9ho asistenta s umelou inteligenciou, napr\u00edklad <strong>Claude, ChatGPT alebo Microsoft Copilot<\/strong>, prepojen\u00e9ho so SkyPlanner cez MCP. Toto prepojenie umo\u017e\u0148uje asistentovi vyu\u017e\u00edva\u0165 znalosti o produkte SkyPlanner a povolen\u00e9 funkcie. Op\u00ed\u0161te schv\u00e1len\u00e9 nadv\u00e4zuj\u00face pr\u00e1ce a po\u017eiadajte o pomoc s pos\u00faden\u00edm pr\u00edslu\u0161n\u00e9ho pracovn\u00e9ho za\u0165a\u017eenia. S opr\u00e1vnen\u00edm na z\u00e1pis m\u00f4\u017ee asistent pom\u00f4c\u0165 aktualizova\u0165 v\u00fdrobn\u00e9 \u00fadaje a sp\u00fa\u0161\u0165a\u0165 funkcie pl\u00e1novania. Priority a rozhodnutia ur\u010dujete vy, zatia\u013e \u010do Arcturus vypo\u010d\u00edtava poradie v\u00fdroby.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Ako vyzer\u00e1 lep\u0161\u00ed preh\u013ead o materi\u00e1loch a dod\u00e1vkach<\/h3>\n\n\n<p>Spolo\u010dnos\u0165 Eskomatic, ktor\u00e1 sa venuje z\u00e1kazkov\u00e9mu obr\u00e1baniu, predt\u00fdm zostavovala poradie pr\u00e1c preva\u017ene ru\u010dne a nedostatok materi\u00e1lu nedok\u00e1zala odhali\u0165 dostato\u010dne v\u010das. Vo svojom <a href=\"https:\/\/skyplanner.ai\/sk\/pribehy-zakaznikov\/eskomatic\/\">hodnoten\u00ed SkyPlanner<\/a> opisuje preh\u013eadnej\u0161ie vizu\u00e1lne zobrazenie poradia pr\u00e1c, presnej\u0161ie stanovovanie term\u00ednov dodania a menej preru\u0161en\u00ed v\u00fdroby sp\u00f4soben\u00fdch nedostatkom materi\u00e1lu.<\/p>\n\n\n<p>T\u00e1to sk\u00fasenos\u0165 ilustruje pr\u00ednos pre pl\u00e1novanie, ktor\u00fd je d\u00f4le\u017eit\u00fd aj tu: ke\u010f prepoj\u00edte dostupnos\u0165 materi\u00e1lu s pr\u00e1cami, ktor\u00e9 ho potrebuj\u00fa, \u013eah\u0161ie pos\u00fadite, \u010do mo\u017eno vykona\u0165 \u010falej. Ak protokol o nezhode zmen\u00ed dostupn\u00e9 mno\u017estvo alebo prid\u00e1 \u010fal\u0161iu oper\u00e1ciu, rovnak\u00fd spolo\u010dn\u00fd preh\u013ead je ove\u013ea u\u017eito\u010dnej\u0161\u00ed ne\u017e oddelen\u00fd zoznam nadv\u00e4zuj\u00facich \u00faloh.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Preberte pri pl\u00e1novan\u00ed jeden skuto\u010dn\u00fd pr\u00edpad nezhody<\/h2>\n\n\n<p>Dobre spracovan\u00fd protokol o nezhode uv\u00e1dza, \u010do nevyhovelo, ktor\u00e9 v\u00fdrobky s\u00fa dotknut\u00e9, kto m\u00f4\u017ee rozhodn\u00fa\u0165 o nalo\u017een\u00ed s nimi a ako sa v\u00fdsledok over\u00ed. U\u017eito\u010dn\u00fd pl\u00e1n v\u00fdroby ukazuje, ako schv\u00e1len\u00e9 pr\u00e1ce zapadaj\u00fa medzi skuto\u010dn\u00e9 z\u00e1v\u00e4zky z\u00e1vodu. Na prechod od zdokumentovania probl\u00e9mu k dokon\u010deniu jeho rie\u0161enia potrebujete oboje.<\/p>\n\n\n<p><a href=\"https:\/\/skyplanner.ai\/sk\/kontakt-na-predaj\/\">Dohodnite si uk\u00e1\u017eku SkyPlanner<\/a> a pripravte si jeden ned\u00e1vny pr\u00edpad v\u00fdrobnej nezhody, schv\u00e1len\u00fd postup nalo\u017eenia s dotknut\u00fdmi v\u00fdrobkami, zmenen\u00e9 pou\u017eite\u013en\u00e9 mno\u017estvo a \u010fal\u0161ie z\u00e1kazky, ktor\u00e9 potrebuj\u00fa rovnak\u00fd zdroj. Pozrite sa, ako mo\u017eno nadv\u00e4zuj\u00face pr\u00e1ce zaradi\u0165 do spolo\u010dn\u00e9ho pl\u00e1nu a \u010do to znamen\u00e1 pre v\u00e1\u0161 pl\u00e1n dod\u00e1vok.<\/p>\n\n\n<p>Ak sa chcete najprv zorientova\u0165 sami, <a href=\"https:\/\/skyplanner.ai\/sk\/skusobna-verzia\/\">vysk\u00fa\u0161ajte SkyPlanner s uk\u00e1\u017ekov\u00fdmi \u00fadajmi<\/a> alebo vyu\u017eite sprievodcu prv\u00fdmi krokmi s podporou umelej inteligencie v SkyPlanner Assistant. Za\u010dnite probl\u00e9mom pl\u00e1novania, ktor\u00fd treba pri protokole o nezhode vyrie\u0161i\u0165: ako schv\u00e1len\u00e9 pr\u00e1ce re\u00e1lne zaradi\u0165 do denn\u00e9ho pl\u00e1nu v\u00fdroby.<\/p>\n\n<\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>Protokol o nezhode: od zistenia po rozhodnutie o rie\u0161en\u00ed Domov &raquo; Zdroje &raquo; Protokol o nezhode: od zistenia po rozhodnutie o rie\u0161en\u00ed Protokol o nezhode (NCR) zaznamen\u00e1va nesplnenie po\u017eiadavky a sleduje opatrenia na kontrolu dotknut\u00e9ho v\u00fdrobku alebo pr\u00e1ce, ich pos\u00fadenie a rie\u0161enie nezhody. Vo v\u00fdrobe prep\u00e1ja d\u00f4kazy o probl\u00e9me s rozhodnut\u00edm opr\u00e1vnenej osoby o \u010fal\u0161om &#8230; <a title=\"Protokol o nezhode: od zistenia po rozhodnutie o rie\u0161en\u00ed\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/sk\/zdroje-sk\/protokol-o-nezhode\/\" aria-label=\"Pre\u010d\u00edtajte si viac o Protokol o nezhode: od zistenia po rozhodnutie o rie\u0161en\u00ed\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":113374,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[2538,318],"tags":[],"class_list":["post-113355","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-aps-a-rozvrhovanie","category-zdroje-sk","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Protokol o nezhode: od zistenia po rozhodnutie o rie\u0161en\u00ed<\/title>\n<meta name=\"description\" content=\"Vypracujte protokol o nezhode vo v\u00fdrobe s jasn\u00fdm rie\u0161en\u00edm a overen\u00fdm uzavret\u00edm. Zistite, ako zaradi\u0165 schv\u00e1len\u00e9 nadv\u00e4zuj\u00face pr\u00e1ce do v\u00fdrobn\u00e9ho pl\u00e1nu.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/sk\/zdroje-sk\/protokol-o-nezhode\/\" \/>\n<meta property=\"og:locale\" content=\"sk_SK\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Protokol o nezhode: od zistenia po rozhodnutie o rie\u0161en\u00ed\" \/>\n<meta property=\"og:description\" content=\"Vypracujte protokol o nezhode vo v\u00fdrobe s jasn\u00fdm rie\u0161en\u00edm a overen\u00fdm uzavret\u00edm. Zistite, ako zaradi\u0165 schv\u00e1len\u00e9 nadv\u00e4zuj\u00face pr\u00e1ce do v\u00fdrobn\u00e9ho pl\u00e1nu.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/sk\/zdroje-sk\/protokol-o-nezhode\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2026-10-30T09:55:28+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-30T09:56:48+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/nonconformance-report-manufacturing-hero.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1672\" \/>\n\t<meta property=\"og:image:height\" content=\"941\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Autor\" \/>\n\t<meta name=\"twitter:data1\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n\t<meta name=\"twitter:label2\" content=\"Predpokladan\u00fd \u010das \u010d\u00edtania\" \/>\n\t<meta name=\"twitter:data2\" content=\"16 min\u00fat\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sk\\\/zdroje-sk\\\/protokol-o-nezhode\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sk\\\/zdroje-sk\\\/protokol-o-nezhode\\\/\"},\"author\":{\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sk\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\"},\"headline\":\"Protokol o nezhode: od zistenia po rozhodnutie o rie\u0161en\u00ed\",\"datePublished\":\"2026-10-30T09:55:28+00:00\",\"dateModified\":\"2026-10-30T09:56:48+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sk\\\/zdroje-sk\\\/protokol-o-nezhode\\\/\"},\"wordCount\":3244,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sk\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sk\\\/zdroje-sk\\\/protokol-o-nezhode\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/nonconformance-report-manufacturing-hero.png\",\"articleSection\":[\"APS a rozvrhovanie\",\"zdroje\"],\"inLanguage\":\"sk-SK\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sk\\\/zdroje-sk\\\/protokol-o-nezhode\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/sk\\\/zdroje-sk\\\/protokol-o-nezhode\\\/\",\"name\":\"Protokol o nezhode: od zistenia po rozhodnutie o rie\u0161en\u00ed\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sk\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sk\\\/zdroje-sk\\\/protokol-o-nezhode\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sk\\\/zdroje-sk\\\/protokol-o-nezhode\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/nonconformance-report-manufacturing-hero.png\",\"datePublished\":\"2026-10-30T09:55:28+00:00\",\"dateModified\":\"2026-10-30T09:56:48+00:00\",\"description\":\"Vypracujte protokol o nezhode vo v\u00fdrobe s jasn\u00fdm rie\u0161en\u00edm a overen\u00fdm uzavret\u00edm. Zistite, ako zaradi\u0165 schv\u00e1len\u00e9 nadv\u00e4zuj\u00face pr\u00e1ce do v\u00fdrobn\u00e9ho pl\u00e1nu.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sk\\\/zdroje-sk\\\/protokol-o-nezhode\\\/#breadcrumb\"},\"inLanguage\":\"sk-SK\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/sk\\\/zdroje-sk\\\/protokol-o-nezhode\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"sk-SK\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sk\\\/zdroje-sk\\\/protokol-o-nezhode\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/nonconformance-report-manufacturing-hero.png\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/nonconformance-report-manufacturing-hero.png\",\"width\":1672,\"height\":941,\"caption\":\"Tagged housing in an isolated tray, an approved-work document and a machining station with other housings waiting.\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sk\\\/zdroje-sk\\\/protokol-o-nezhode\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/sk\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Protokol o nezhode: od zistenia po rozhodnutie o rie\u0161en\u00ed\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sk\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/sk\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sk\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/sk\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"sk-SK\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sk\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/sk\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"sk-SK\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sk\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sk\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sk\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\",\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"sk-SK\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"caption\":\"Jussi M\u00e4ntyl\u00e4\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Protokol o nezhode: od zistenia po rozhodnutie o rie\u0161en\u00ed","description":"Vypracujte protokol o nezhode vo v\u00fdrobe s jasn\u00fdm rie\u0161en\u00edm a overen\u00fdm uzavret\u00edm. Zistite, ako zaradi\u0165 schv\u00e1len\u00e9 nadv\u00e4zuj\u00face pr\u00e1ce do v\u00fdrobn\u00e9ho pl\u00e1nu.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/sk\/zdroje-sk\/protokol-o-nezhode\/","og_locale":"sk_SK","og_type":"article","og_title":"Protokol o nezhode: od zistenia po rozhodnutie o rie\u0161en\u00ed","og_description":"Vypracujte protokol o nezhode vo v\u00fdrobe s jasn\u00fdm rie\u0161en\u00edm a overen\u00fdm uzavret\u00edm. Zistite, ako zaradi\u0165 schv\u00e1len\u00e9 nadv\u00e4zuj\u00face pr\u00e1ce do v\u00fdrobn\u00e9ho pl\u00e1nu.","og_url":"https:\/\/skyplanner.ai\/sk\/zdroje-sk\/protokol-o-nezhode\/","og_site_name":"SkyPlanner","article_published_time":"2026-10-30T09:55:28+00:00","article_modified_time":"2026-10-30T09:56:48+00:00","og_image":[{"width":1672,"height":941,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/nonconformance-report-manufacturing-hero.png","type":"image\/png"}],"author":"Jussi M\u00e4ntyl\u00e4","twitter_card":"summary_large_image","twitter_misc":{"Autor":"Jussi M\u00e4ntyl\u00e4","Predpokladan\u00fd \u010das \u010d\u00edtania":"16 min\u00fat"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/sk\/zdroje-sk\/protokol-o-nezhode\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/sk\/zdroje-sk\/protokol-o-nezhode\/"},"author":{"name":"Jussi M\u00e4ntyl\u00e4","@id":"https:\/\/skyplanner.ai\/sk\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5"},"headline":"Protokol o nezhode: od zistenia po rozhodnutie o rie\u0161en\u00ed","datePublished":"2026-10-30T09:55:28+00:00","dateModified":"2026-10-30T09:56:48+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/sk\/zdroje-sk\/protokol-o-nezhode\/"},"wordCount":3244,"publisher":{"@id":"https:\/\/skyplanner.ai\/sk\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/sk\/zdroje-sk\/protokol-o-nezhode\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/nonconformance-report-manufacturing-hero.png","articleSection":["APS a rozvrhovanie","zdroje"],"inLanguage":"sk-SK"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/sk\/zdroje-sk\/protokol-o-nezhode\/","url":"https:\/\/skyplanner.ai\/sk\/zdroje-sk\/protokol-o-nezhode\/","name":"Protokol o nezhode: od zistenia po rozhodnutie o rie\u0161en\u00ed","isPartOf":{"@id":"https:\/\/skyplanner.ai\/sk\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/sk\/zdroje-sk\/protokol-o-nezhode\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/sk\/zdroje-sk\/protokol-o-nezhode\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/nonconformance-report-manufacturing-hero.png","datePublished":"2026-10-30T09:55:28+00:00","dateModified":"2026-10-30T09:56:48+00:00","description":"Vypracujte protokol o nezhode vo v\u00fdrobe s jasn\u00fdm rie\u0161en\u00edm a overen\u00fdm uzavret\u00edm. Zistite, ako zaradi\u0165 schv\u00e1len\u00e9 nadv\u00e4zuj\u00face pr\u00e1ce do v\u00fdrobn\u00e9ho pl\u00e1nu.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/sk\/zdroje-sk\/protokol-o-nezhode\/#breadcrumb"},"inLanguage":"sk-SK","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/sk\/zdroje-sk\/protokol-o-nezhode\/"]}]},{"@type":"ImageObject","inLanguage":"sk-SK","@id":"https:\/\/skyplanner.ai\/sk\/zdroje-sk\/protokol-o-nezhode\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/nonconformance-report-manufacturing-hero.png","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/nonconformance-report-manufacturing-hero.png","width":1672,"height":941,"caption":"Tagged housing in an isolated tray, an approved-work document and a machining station with other housings waiting."},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/sk\/zdroje-sk\/protokol-o-nezhode\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/sk\/"},{"@type":"ListItem","position":2,"name":"Protokol o nezhode: od zistenia po rozhodnutie o rie\u0161en\u00ed"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/sk\/#website","url":"https:\/\/skyplanner.ai\/sk\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/sk\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/sk\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"sk-SK"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/sk\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/sk\/","logo":{"@type":"ImageObject","inLanguage":"sk-SK","@id":"https:\/\/skyplanner.ai\/sk\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/sk\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]},{"@type":"Person","@id":"https:\/\/skyplanner.ai\/sk\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5","name":"Jussi M\u00e4ntyl\u00e4","image":{"@type":"ImageObject","inLanguage":"sk-SK","@id":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","caption":"Jussi M\u00e4ntyl\u00e4"}}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/nonconformance-report-manufacturing-hero.png",1672,941,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/nonconformance-report-manufacturing-hero-150x150.png",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/nonconformance-report-manufacturing-hero-300x169.png",300,169,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/nonconformance-report-manufacturing-hero-768x432.png",768,432,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/nonconformance-report-manufacturing-hero-1024x576.png",1024,576,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/nonconformance-report-manufacturing-hero-1536x864.png",1536,864,true],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/nonconformance-report-manufacturing-hero.png",1672,941,false],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/nonconformance-report-manufacturing-hero-360x203.png",360,203,true]},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/sk\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Protokol o nezhode: od zistenia po rozhodnutie o rie\u0161en\u00ed Domov &raquo; Zdroje &raquo; Protokol o nezhode: od zistenia po rozhodnutie o rie\u0161en\u00ed Protokol o nezhode (NCR) zaznamen\u00e1va nesplnenie po\u017eiadavky a sleduje opatrenia na kontrolu dotknut\u00e9ho v\u00fdrobku alebo pr\u00e1ce, ich pos\u00fadenie a rie\u0161enie nezhody. Vo v\u00fdrobe prep\u00e1ja d\u00f4kazy o probl\u00e9me s rozhodnut\u00edm opr\u00e1vnenej osoby o \u010fal\u0161om&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/sk\/wp-json\/wp\/v2\/posts\/113355","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/sk\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/sk\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/sk\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/sk\/wp-json\/wp\/v2\/comments?post=113355"}],"version-history":[{"count":1,"href":"https:\/\/skyplanner.ai\/sk\/wp-json\/wp\/v2\/posts\/113355\/revisions"}],"predecessor-version":[{"id":113418,"href":"https:\/\/skyplanner.ai\/sk\/wp-json\/wp\/v2\/posts\/113355\/revisions\/113418"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/sk\/wp-json\/wp\/v2\/media\/113374"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/sk\/wp-json\/wp\/v2\/media?parent=113355"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/sk\/wp-json\/wp\/v2\/categories?post=113355"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/sk\/wp-json\/wp\/v2\/tags?post=113355"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}