{"id":109401,"date":"2026-10-25T02:10:34","date_gmt":"2026-10-25T02:10:34","guid":{"rendered":"https:\/\/skyplanner.ai\/?p=109401"},"modified":"2026-10-25T02:11:54","modified_gmt":"2026-10-25T02:11:54","slug":"tvorba-cenovych-ponuk-vo-vyrobe","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/sk\/zdroje-sk\/tvorba-cenovych-ponuk-vo-vyrobe\/","title":{"rendered":"Tvorba cenov\u00fdch pon\u00fak vo v\u00fdrobe: Oce\u0148te z\u00e1kazku, ktor\u00fa dok\u00e1\u017eete doda\u0165"},"content":{"rendered":"<div class=\"gb-container gb-container-article01 article-main-content-container\">\n\n<h1 class=\"wp-block-heading\">Tvorba cenov\u00fdch pon\u00fak vo v\u00fdrobe: Oce\u0148te z\u00e1kazku, ktor\u00fa dok\u00e1\u017eete doda\u0165<\/h1>\n\n<div class=\"gb-container gb-container-article02\">\n\n<p><a href=\"\/sk\/\">Domov<\/a> &raquo; <a href=\"https:\/\/skyplanner.ai\/sk\/zdroje\/\">Zdroje<\/a> &raquo; Tvorba cenov\u00fdch pon\u00fak vo v\u00fdrobe: Oce\u0148te z\u00e1kazku, ktor\u00fa dok\u00e1\u017eete doda\u0165<\/p>\n\n\n<p class=\"yoast-reading-time__wrapper\"><span class=\"yoast-reading-time__icon\"><svg aria-hidden=\"true\" focusable=\"false\" data-icon=\"clock\" width=\"20\" height=\"20\" fill=\"none\" stroke=\"currentColor\" style=\"display:inline-block;vertical-align:-0.1em\" role=\"img\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewBox=\"0 0 24 24\"><path stroke-linecap=\"round\" stroke-linejoin=\"round\" stroke-width=\"2\" d=\"M12 8v4l3 3m6-3a9 9 0 11-18 0 9 9 0 0118 0z\"><\/path><\/svg><\/span><span class=\"yoast-reading-time__spacer\" style=\"display:inline-block;width:1em\"><\/span><span class=\"yoast-reading-time__descriptive-text\">Odhadovan\u00fd \u010das \u010d\u00edtania: <\/span><span class=\"yoast-reading-time__reading-time\">11<\/span><span class=\"yoast-reading-time__time-unit\"> min\u00fat<\/span><\/p>\n\n<\/div>\n<div class=\"gb-container gb-container-article03\">\n\n<p>Z\u00e1kazka m\u00f4\u017ee pri pon\u00fakanej jednotkovej cene vyzera\u0165 ziskovo, a predsa nemus\u00ed by\u0165 spr\u00e1vne ju prija\u0165. Kalkul\u00e1cia m\u00f4\u017ee po\u010d\u00edta\u0165 s jedn\u00fdm nastaven\u00edm stroja, hoci z\u00e1kazn\u00edk potrebuje dve \u010diastkov\u00e9 dod\u00e1vky. M\u00f4\u017ee v nej ch\u00fdba\u0165 dokon\u010dovacia oper\u00e1cia alebo m\u00f4\u017ee s\u013eubova\u0165 term\u00edn, ktor\u00fd si vy\u017eiada nad\u010dasy, s ktor\u00fdmi nikto v cene nepo\u010d\u00edtal.<\/p>\n\n\n<p>Dobr\u00e1 <strong>tvorba cenov\u00fdch pon\u00fak vo v\u00fdrobe<\/strong> tieto rozhodnutia prep\u00e1ja. Vymedz\u00edte rozsah pr\u00e1c, odhadnete spotrebu zdrojov, ur\u010d\u00edte cenu a over\u00edte, \u010di v\u00fdroba dok\u00e1\u017ee s\u013eub splni\u0165. Z\u00e1kazn\u00edk dostane jasn\u00fa ponuku a v\u00e1\u0161 podnik z\u00e1kazku, pri ktorej vie, ako ju za dan\u00fa cenu zrealizova\u0165.<\/p>\n\n\n<p>SkyPlanner APS v\u00e1m pri tomto rozhodovan\u00ed pom\u00e1ha pos\u00fadi\u0165 v\u00fdrobn\u00fa str\u00e1nku z\u00e1kazky. Potenci\u00e1lnu z\u00e1kazku m\u00f4\u017eete vyhodnoti\u0165 spolu s existuj\u00facimi z\u00e1v\u00e4zkami. Pl\u00e1nova\u010d tak nemus\u00ed zaka\u017ed\u00fdm nanovo zis\u0165ova\u0165 poradie pr\u00e1c na strojoch, ke\u010f obchodn\u00e9 oddelenie potrebuje term\u00edn. V\u00fdkazy v\u00fdrobn\u00fdch \u010dasov potom pom\u00e1haj\u00fa spres\u0148ova\u0165 predpoklady pre \u010fal\u0161iu ponuku.<\/p>\n\n\n<h2 class=\"wp-block-heading\">\u010co je tvorba cenov\u00fdch pon\u00fak vo v\u00fdrobe?<\/h2>\n\n\n<p>Tvorba cenov\u00fdch pon\u00fak vo v\u00fdrobe je proces, pri ktorom sa zo \u017eiadosti z\u00e1kazn\u00edka o cenov\u00fa ponuku, ozna\u010dovanej aj ako RFQ, vytv\u00e1ra ponuka na dodanie konkr\u00e9tnych v\u00fdrobkov za stanoven\u00fa cenu, v danom mno\u017estve, term\u00edne a za ur\u010den\u00fdch podmienok. Sp\u00e1ja pos\u00fadenie technickej uskuto\u010dnite\u013enosti, odhad n\u00e1kladov a obchodn\u00e9 rozhodnutie o tom, \u010di sa z\u00e1kazku oplat\u00ed prija\u0165.<\/p>\n\n\n<p>Kalkul\u00e1cia je podkladom pre cenov\u00fa ponuku, nie celou ponukou. Opisuje o\u010dak\u00e1van\u00e9 n\u00e1klady a \u010dasov\u00fa n\u00e1ro\u010dnos\u0165. Cenov\u00e1 ponuka z\u00e1kazn\u00edkovi hovor\u00ed, \u010do mu pon\u00fakate a z ak\u00fdch predpokladov pritom vych\u00e1dzate.<\/p>\n\n\n<p>Predbe\u017en\u00fd cenov\u00fd odhad m\u00e1 in\u00fd \u00fa\u010del. Ak je \u0161pecifik\u00e1cia ne\u00fapln\u00e1, cenov\u00e9 rozp\u00e4tie s uveden\u00fdmi v\u00fdhradami m\u00f4\u017ee pom\u00f4c\u0165 zisti\u0165, \u010di sa oplat\u00ed pr\u00edle\u017eitos\u0165 \u010falej rozpracova\u0165. Jasne ho ozna\u010dte, uve\u010fte, \u010do e\u0161te nie je dorie\u0161en\u00e9, a neprezentujte neist\u00e9 rozp\u00e4tie ako plne preveren\u00fa ponuku.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Za\u010dnite \u00fadajmi z dopytu, ktor\u00e9 m\u00f4\u017eu zmeni\u0165 va\u0161u ponuku<\/h2>\n\n\n<p>Sk\u00f4r ne\u017e str\u00e1vite hodiny podrobnou kalkul\u00e1ciou, overte si, \u010di m\u00e1te dos\u0165 inform\u00e1ci\u00ed na vymedzenie z\u00e1kazky. Zo samotn\u00e9ho CAD modelu nemus\u00ed by\u0165 zrejm\u00e9, ak\u00e1 povrchov\u00e1 \u00faprava a ak\u00e9 z\u00e1znamy z kontroly sa vy\u017eaduj\u00fa ani ak\u00e9 n\u00e1hrady s\u00fa povolen\u00e9.<\/p>\n\n\n<p>V obr\u00e1bacej dielni alebo pri z\u00e1kazkovej v\u00fdrobe si ujasnite:<\/p>\n\n\n<ul class=\"wp-block-list\"><li><strong>V\u00fdrobok a rev\u00edzia:<\/strong> \u010d\u00edslo dielu, aktu\u00e1lny v\u00fdkres a model a to, ktor\u00e1 \u0161pecifik\u00e1cia m\u00e1 prednos\u0165, ak si navz\u00e1jom odporuj\u00fa.<\/li><li><strong>Materi\u00e1l a kvalita:<\/strong> akos\u0165 materi\u00e1lu, tolerancie, povrchov\u00e1 \u00faprava, certifik\u00e1ty, kontrola a pr\u00edpadn\u00e9 po\u017eiadavky na prv\u00fd kus.<\/li><li><strong>Mno\u017estvo a \u010diastkov\u00e9 dod\u00e1vky:<\/strong> po\u010det vyhovuj\u00facich hotov\u00fdch kusov, ve\u013ekosti d\u00e1vok, rozdelenie dod\u00e1vok a to, \u010di s\u00fa opakovan\u00e9 odbery z\u00e1v\u00e4zne potvrden\u00e9 alebo len mo\u017en\u00e9.<\/li><li><strong>Term\u00edn a rozsah dod\u00e1vky:<\/strong> po\u017eadovan\u00fd d\u00e1tum prijatia alebo exped\u00edcie, kooper\u00e1cie, balenie, preprava a polo\u017eky dod\u00e1van\u00e9 z\u00e1kazn\u00edkom.<\/li><\/ul>\n\n\n<p>P\u00fdtajte sa na pou\u017eitie v\u00fdrobku, ak to pom\u00f4\u017ee vyrie\u0161i\u0165 v\u00fdrobn\u00fa ot\u00e1zku. \u00dazka tolerancia pri funk\u010dnom ulo\u017een\u00ed si vy\u017eaduje in\u00fa diskusiu ne\u017e \u00fazka tolerancia automaticky prenesen\u00e1 na ka\u017ed\u00fd rozmer. Ak je to vhodn\u00e9, navrhnite zmenu, ale dajte si ju schv\u00e1li\u0165. Nenace\u0148ujte vlastn\u00fd, neschv\u00e1len\u00fd v\u00fdklad po\u017eiadaviek.<\/p>\n\n\n<p>Pos\u00fa\u010fte aj samotn\u00fa obchodn\u00fa pr\u00edle\u017eitos\u0165. Dok\u00e1\u017eete vo svojom podniku vykona\u0165 k\u013e\u00fa\u010dov\u00e9 oper\u00e1cie? Je cenov\u00e9 rozp\u00e4tie, ktor\u00e9 z\u00e1kazn\u00edk o\u010dak\u00e1va, aspo\u0148 pribli\u017ene zlu\u010dite\u013en\u00e9 s predpokladan\u00fdm rozsahom pr\u00e1c? R\u00fdchle vyjasnenie po\u017eiadaviek alebo n\u00e1vrh alternat\u00edvy s\u00fa u\u017eito\u010dnej\u0161ie ne\u017e podrobn\u00e1 ponuka na z\u00e1kazku, ktor\u00fa nedok\u00e1\u017eete zodpovedne doda\u0165.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Kalkulujte pod\u013ea v\u00fdrobn\u00e9ho postupu, nielen pod\u013ea podobn\u00e9ho dielu<\/h2>\n\n\n<p>Predch\u00e1dzaj\u00faca z\u00e1kazka je u\u017eito\u010dn\u00fdm v\u00fdchodiskom, ak jej predpoklady st\u00e1le platia. Sk\u00f4r ne\u017e prevezmete jej jednotkov\u00fa cenu, skontrolujte rozdiely v materi\u00e1li, geometrii, mno\u017estve, nastaveniach strojov, kontrole, extern\u00fdch slu\u017eb\u00e1ch a aktu\u00e1lnych n\u00e1kupn\u00fdch cen\u00e1ch.<\/p>\n\n\n<p>Zostavte predpokladan\u00fd v\u00fdrobn\u00fd postup od vstupn\u00e9ho materi\u00e1lu a\u017e po vyhovuj\u00faci hotov\u00fd diel. Zahr\u0148te programovanie a pr\u00edpravu, nastavenie strojov, v\u00fdrobn\u00e9 oper\u00e1cie, odihlenie alebo dokon\u010dovacie pr\u00e1ce, kontrolu aj pr\u00edpadn\u00e9 kooper\u00e1cie. Overte, ktor\u00e9 zdroje dok\u00e1\u017eu pr\u00e1cu vykona\u0165 a ktor\u00e9 oper\u00e1cie z\u00e1visia od in\u00fdch.<\/p>\n\n\n<p>Potom odde\u013ete n\u00e1klady na cel\u00fa d\u00e1vku od n\u00e1kladov, ktor\u00e9 sa opakuj\u00fa pri ka\u017edom kuse.<\/p>\n\n\n<p><strong>Programovanie, pr\u00edprava up\u00ednania a nastavenie strojov<\/strong> m\u00f4\u017eu by\u0165 pre pon\u00fakan\u00fa v\u00fdrobn\u00fa d\u00e1vku preva\u017ene jednorazov\u00fdmi n\u00e1kladmi. Ich v\u00fd\u0161ka na jeden diel sa men\u00ed pod\u013ea mno\u017estva. Pri opakovanej objedn\u00e1vke automaticky nezanikaj\u00fa: in\u00fd stroj, revidovan\u00fd v\u00fdkres alebo rozdelenie dod\u00e1vky m\u00f4\u017eu vyvola\u0165 potrebu op\u00e4tovnej pr\u00edpravy.<\/p>\n\n\n<p><strong>Spotreba materi\u00e1lu a n\u00e1klady na spracovanie jednotliv\u00fdch kusov<\/strong> z\u00e1visia od mno\u017estva a sp\u00f4sobu v\u00fdroby. Zoh\u013eadnite rozmery vstupn\u00e9ho materi\u00e1lu, straty pri delen\u00ed, re\u00e1lnu v\u00fd\u0165a\u017enos\u0165 a minim\u00e1lne n\u00e1kupn\u00e9 mno\u017estv\u00e1. Ur\u010dite, \u010di \u010dasov\u00fd odhad vyjadruje obsadenie stroja alebo priame \u010dlovekohodiny. Bezobslu\u017en\u00fd cyklus nemus\u00ed znamena\u0165 rovnak\u00fd \u010das pr\u00e1ce obsluhy.<\/p>\n\n\n<p><strong>Kooper\u00e1cie a osobitn\u00e9 po\u017eiadavky z\u00e1kazky<\/strong> m\u00f4\u017eu zah\u0155\u0148a\u0165 tepeln\u00e9 spracovanie, povrchov\u00e9 \u00fapravy, \u0161peci\u00e1lne n\u00e1stroje, sk\u00fa\u0161ky, certifik\u00e1ty a balenie. Okrem cien za kus overte aj minim\u00e1lne \u00fa\u010dtovan\u00e9 sumy. Cena a dodacia lehota dod\u00e1vate\u013ea sa maj\u00fa vz\u0165ahova\u0165 na t\u00fa ist\u00fa d\u00e1vku a tie ist\u00e9 po\u017eiadavky, ak\u00e9 pon\u00fakate z\u00e1kazn\u00edkovi.<\/p>\n\n\n<p>Pou\u017e\u00edvajte n\u00e1kladov\u00e9 sadzby schv\u00e1len\u00e9 pre dan\u00fa kalkul\u00e1ciu. Ak s\u00fahrnn\u00e1 v\u00fdrobn\u00e1 sadzba u\u017e zah\u0155\u0148a priamu pr\u00e1cu a <a href=\"https:\/\/skyplanner.ai\/sk\/zdroje-sk\/vyrobna-rezia\/\">v\u00fdrobn\u00fa r\u00e9\u017eiu<\/a>, nepripo\u010d\u00edtavajte tieto n\u00e1klady znova. Ak n\u00e1klady na pr\u00e1cu a stroje po\u010d\u00edtate oddelene, ka\u017ed\u00fa sadzbu uplatnite na pr\u00edslu\u0161n\u00fd po\u010det hod\u00edn. S kalkul\u00e1ciou uchovajte aj podklad pre sadzby a ich d\u00e1tum, aby v\u00fdpo\u010dtu rozumel aj \u010fal\u0161\u00ed kalkulant.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Pr\u00edklad cenovej ponuky vo v\u00fdrobe: od n\u00e1kladov na d\u00e1vku k predajnej cene<\/h2>\n\n\n<p>Predstavte si podnik, ktor\u00fd pripravuje ponuku na <strong>100 vyhovuj\u00facich obr\u00e1ban\u00fdch dielov<\/strong> vyroben\u00fdch v jednej d\u00e1vke. V\u00fdrobn\u00fd postup si vy\u017eaduje jedno nastavenie stroja, 12 min\u00fat spracovania ka\u017ed\u00e9ho dielu a extern\u00fa dokon\u010dovaciu \u00fapravu. Tieto ilustra\u010dn\u00e9 \u00fadaje s\u00fa v americk\u00fdch dol\u00e1roch a nepredstavuj\u00fa referen\u010dn\u00e9 v\u00fdrobn\u00e9 sadzby.<\/p>\n\n\n<p>Podnik pou\u017e\u00edva n\u00e1kladov\u00fa sadzbu $80 za hodinu na nastavenie aj spracovanie. V tomto pr\u00edklade sadzba zah\u0155\u0148a pr\u00edslu\u0161n\u00e9 n\u00e1klady na pr\u00e1cu aj v\u00fdrobn\u00fa r\u00e9\u017eiu; ani jedna z t\u00fdchto polo\u017eiek sa ne\u00fa\u010dtuje osobitne. \u010cas na spracovanie je vyjadren\u00fd na jeden vyhovuj\u00faci hotov\u00fd diel a zah\u0155\u0148a o\u010dak\u00e1van\u00e9 be\u017en\u00e9 v\u00fdrobn\u00e9 straty. Programovanie, pr\u00edprava, v\u00fdstupn\u00e1 kontrola a balenie s\u00fa zahrnut\u00e9 v samostatnej polo\u017eke z\u00e1kazky uvedenej ni\u017e\u0161ie a neprekr\u00fdvaj\u00fa sa s hodinami nastavenia ani spracovania.<\/p>\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>N\u00e1kladov\u00e1 polo\u017eka<\/th><th>Odhad pre pon\u00fakan\u00fa v\u00fdrobn\u00fa d\u00e1vku<\/th><th>N\u00e1klady na d\u00e1vku<\/th><\/tr><\/thead><tbody><tr><td>Materi\u00e1l vr\u00e1tane pl\u00e1novan\u00fdch str\u00e1t pri delen\u00ed a zoh\u013eadnenia v\u00fd\u0165a\u017enosti<\/td><td>Dostatok materi\u00e1lu na 100 vyhovuj\u00facich hotov\u00fdch dielov<\/td><td>$700<\/td><\/tr><tr><td>Nastavenie stroja<\/td><td>3 hodiny \u00d7 $80<\/td><td>$240<\/td><\/tr><tr><td>Spracovanie jednotliv\u00fdch kusov<\/td><td>100 \u00d7 12 min\u00fat = 20 hod\u00edn; 20 \u00d7 $80<\/td><td>$1 600<\/td><\/tr><tr><td>Extern\u00e1 dokon\u010dovacia \u00faprava<\/td><td>Cena dod\u00e1vate\u013ea za t\u00fato d\u00e1vku<\/td><td>$300<\/td><\/tr><tr><td>Ostatn\u00e9 pr\u00e1ce s\u00favisiace so z\u00e1kazkou<\/td><td>Programovanie, pr\u00edprava, v\u00fdstupn\u00e1 kontrola a balenie<\/td><td>$160<\/td><\/tr><tr><td><strong>Celkov\u00e9 odhadovan\u00e9 n\u00e1klady na z\u00e1kazku<\/strong><\/td><td><strong>100 vyhovuj\u00facich dielov<\/strong><\/td><td><strong>$3 000<\/strong><\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>Odhadovan\u00e9 n\u00e1klady s\u00fa <strong>$30 na jeden vyhovuj\u00faci diel<\/strong>. Z\u00e1le\u017e\u00ed na tom, ak\u00e9 mno\u017estvo je v menovateli: delen\u00edm po\u010dtom nak\u00fapen\u00fdch polotovarov by ste podhodnotili n\u00e1klady na kusy, ktor\u00e9 z\u00e1kazn\u00edk skuto\u010dne dostane.<\/p>\n\n\n<p>Predpokladajme, \u017ee podnik chce dosiahnu\u0165 <strong>mar\u017eu 25 % z predajnej ceny po odpo\u010d\u00edtan\u00ed uveden\u00fdch n\u00e1kladov<\/strong>. V\u00fdpo\u010det je nasleduj\u00faci:<\/p>\n\n\n<p><strong>Predajn\u00e1 cena = odhadovan\u00e9 n\u00e1klady \u00f7 (1 \u2212 cie\u013eov\u00e1 mar\u017ea)<\/strong><\/p>\n\n\n<p>Pri tejto z\u00e1kazke vych\u00e1dza z v\u00fdpo\u010dtu $3 000 \u00f7 0,75 predajn\u00e1 cena d\u00e1vky <strong>$4 000<\/strong>, teda <strong>$40 za diel<\/strong>. Po odpo\u010d\u00edtan\u00ed odhadovan\u00fdch n\u00e1kladov na z\u00e1kazku zost\u00e1va $1 000. Nejde o \u010dist\u00fd zisk: st\u00e1le treba pokry\u0165 n\u00e1klady na predaj, administrat\u00edvu a v\u0161etky \u010fal\u0161ie podnikov\u00e9 n\u00e1klady, ktor\u00e9 nie s\u00fa zahrnut\u00e9 vy\u0161\u0161ie. Dane a osobitne \u00fa\u010dtovan\u00e1 preprava s\u00fa mimo tohto pr\u00edkladu.<\/p>\n\n\n<p>Nezamie\u0148ajte si mar\u017eu s prir\u00e1\u017ekou. Ak k n\u00e1kladom $30 pripo\u010d\u00edtate 25 %, dostanete cenu $37,50 a na ka\u017ed\u00fd diel zostane $7,50. To predstavuje <strong>mar\u017eu 20 % z tr\u017eieb<\/strong>, nie 25 %.<\/p>\n\n\n<p>V\u00fdpo\u010dtom z\u00edskate cenu vych\u00e1dzaj\u00facu z n\u00e1kladov, ktor\u00fa treba pos\u00fadi\u0165. Nie je to d\u00f4kaz, \u017ee z\u00e1kazn\u00edk ponuku prijme ani \u017ee z\u00e1kazka predstavuje najlep\u0161ie vyu\u017eitie va\u0161ej v\u00fdroby. Porovnajte ponuku s potrebami z\u00e1kazn\u00edka, konkuren\u010dn\u00fdmi alternat\u00edvami a kapacitou, ktor\u00fa by z\u00e1kazka spotrebovala. Ak cena nevyhovuje, prehodno\u0165te \u0161pecifik\u00e1ciu, mno\u017estvo, technologick\u00fd postup alebo sp\u00f4sob dodania namiesto toho, aby ste z kalkul\u00e1cie potichu vynechali nevyhnutn\u00e9 n\u00e1klady.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Pred schv\u00e1len\u00edm ceny overte pl\u00e1n dodania<\/h2>\n\n\n<p>Pr\u00edklad po\u010d\u00edta s jednou nepreru\u0161enou v\u00fdrobnou d\u00e1vkou. Teraz si predstavte, \u017ee z\u00e1kazn\u00edk po\u017eaduje ur\u00fdchlen\u00e9 dodanie prvej \u010dasti a zvy\u0161ok nesk\u00f4r, pri\u010dom stroj medzi t\u00fdmito dvoma d\u00e1vkami nem\u00f4\u017ee zosta\u0165 nastaven\u00fd.<\/p>\n\n\n<p>Ak si to vy\u017eiada \u010fal\u0161ie trojhodinov\u00e9 nastavenie stroja, odhadovan\u00e9 n\u00e1klady na z\u00e1kazku sa zv\u00fd\u0161ia o 240 $ na <strong>3 240 $<\/strong>. Pri rovnakej mar\u017ei 25 % bude cena d\u00e1vky <strong>4 320 $<\/strong>, a to e\u0161te bez pr\u00edpadn\u00fdch dodato\u010dn\u00fdch n\u00e1kladov na dopravu, manipul\u00e1ciu \u010di poplatkov dod\u00e1vate\u013eov. Rozdelen\u00e9 dodanie m\u00f4\u017ee st\u00e1le prinies\u0165 v\u00fdhodn\u00fa z\u00e1kazku, ide v\u0161ak o in\u00fa ponuku, ne\u017e pre ak\u00fa bola vytvoren\u00e1 p\u00f4vodn\u00e1 kalkul\u00e1cia.<\/p>\n\n\n<p>Rovnak\u00fd princ\u00edp plat\u00ed aj pre term\u00edn. Dvadsa\u0165 hod\u00edn spracovania neznamen\u00e1, \u017ee z\u00e1kazka bude hotov\u00e1 o dvadsa\u0165 hod\u00edn. Potrebn\u00fd stroj m\u00f4\u017ee by\u0165 obsaden\u00fd, materi\u00e1l m\u00f4\u017ee dorazi\u0165 nesk\u00f4r a dokon\u010dovacie oper\u00e1cie aj kontrola nasleduj\u00fa a\u017e po obr\u00e1ban\u00ed, nie s\u00fabe\u017ene s n\u00edm.<\/p>\n\n\n<p>Pr\u00e1ve tu SkyPlanner poskytuje kalkulantovi a pl\u00e1nova\u010dovi spo\u013eahlivej\u0161\u00ed spolo\u010dn\u00fd podklad na rozhodovanie. Zadajte pri navrhovanej z\u00e1kazke mno\u017estvo, technologick\u00fd postup, \u010dasy nastavenia a trvanie oper\u00e1ci\u00ed a zahr\u0148te ju do <a href=\"https:\/\/skyplanner.ai\/sk\/zdroje-sk\/co-je-planovanie-vyroby\/\">rozvrhovania v\u00fdroby<\/a> e\u0161te ako nepotvrden\u00fa z\u00e1kazku. M\u00f4\u017eete ju tak pos\u00fadi\u0165 sk\u00f4r, ne\u017e sa z obchodnej pr\u00edle\u017eitosti stane z\u00e1v\u00e4zn\u00e1 objedn\u00e1vka.<\/p>\n\n\n<p>Arcturus, umel\u00e1 inteligencia na rozvrhovanie v\u00fdroby v syst\u00e9me SkyPlanner, vypo\u010d\u00edta rozvrh pod\u013ea nastaven\u00fdch zdrojov, zmien, nadv\u00e4znost\u00ed a prior\u00edt. Ak je zapnut\u00e9 zoh\u013ead\u0148ovanie materi\u00e1lu pri rozvrhovan\u00ed, v\u00fdpo\u010det ovplyvn\u00ed aj jeho dostupnos\u0165. Ganttov diagram zobraz\u00ed v\u00fdsledn\u00e9 poradie spolu s pr\u00e1cou, ku ktorej ste sa u\u017e zaviazali.<\/p>\n\n\n<p>Menej \u010dasu str\u00e1vite dohadovan\u00edm poradia pri jednotliv\u00fdch strojoch a viac v\u00fdberom realizovate\u013enej ponuky. Ak navrhovan\u00e1 z\u00e1kazka potrebuje vy\u0161\u0161iu prioritu, aby sa dokon\u010dila sk\u00f4r, prepo\u010d\u00edtajte rozvrh a skontrolujte, \u010do \u010fal\u0161ie sa posunie. Priority ur\u010dujete vy a svoje rozhodnutia o rozvrhu chr\u00e1nite z\u00e1mkami; Arcturus sa star\u00e1 o v\u00fdpo\u010det rozvrhu.<\/p>\n\n\n<p><a href=\"https:\/\/skyplanner.ai\/sk\/zdroje-sk\/capable-to-promise\/\">Ak po\u017eadovan\u00fd term\u00edn nie je realizovate\u013en\u00fd<\/a>, pon\u00faknite obchodn\u00e9mu oddeleniu pou\u017eite\u013en\u00fa alternat\u00edvu:<\/p>\n\n\n<ul class=\"wp-block-list\"><li>Neskor\u0161ie dodanie celej z\u00e1kazky pri zachovan\u00ed existuj\u00facich z\u00e1v\u00e4zkov.<\/li><li>Skor\u0161ie dodanie men\u0161ej \u010dasti so zapo\u010d\u00edtan\u00edm opakovan\u00e9ho nastavovania a manipul\u00e1cie tam, kde s\u00fa potrebn\u00e9.<\/li><li>Zmenen\u00fd technologick\u00fd postup alebo schv\u00e1len\u00e9 dodato\u010dn\u00e9 kapacity s overen\u00fdmi n\u00e1kladmi a \u010dasov\u00fdm priebehom.<\/li><li>Vedom\u00e1 v\u00fdnimka v priorit\u00e1ch, schv\u00e1len\u00e1 so znalos\u0165ou jej vplyvu na ostatn\u00e9 z\u00e1kazky.<\/li><\/ul>\n\n\n<p>Rozli\u0161ujte medzi dokon\u010den\u00edm v\u00fdroby, exped\u00edciou a prevzat\u00edm z\u00e1kazn\u00edkom. Do s\u013e\u00faben\u00e9ho term\u00ednu zahr\u0148te kontrolu, balenie, extern\u00e9 slu\u017eby aj dopravu, \u010di u\u017e ako rozvrhnut\u00e9 \u010dinnosti, alebo ako v\u00fdslovne uveden\u00fd \u010das navy\u0161e.<\/p>\n\n\n<p>SkyPlanner zvidite\u013e\u0148uje d\u00f4sledky pre v\u00fdrobu; cenu a mar\u017eu schva\u013euje v\u00e1\u0161 t\u00edm. T\u00e1to kombin\u00e1cia v\u00e1m pom\u00e1ha vyhn\u00fa\u0165 sa situ\u00e1cii, ke\u010f z\u00edskate zdanlivo atrakt\u00edvnu z\u00e1kazku, no do jej ceny nezahrniete naru\u0161enie ostatnej v\u00fdroby.<\/p>\n\n\n<h2 class=\"wp-block-heading\">V ponuke z\u00e1kazn\u00edkovi uve\u010fte rozsah, predpoklady a podmienky<\/h2>\n\n\n<p>U\u017eito\u010dn\u00e1 cenov\u00e1 ponuka vo v\u00fdrobe nemus\u00ed odha\u013eova\u0165 va\u0161e intern\u00e9 hodinov\u00e9 sadzby. Mus\u00ed v\u0161ak jasne uv\u00e1dza\u0165, \u010do si z\u00e1kazn\u00edk m\u00f4\u017ee objedna\u0165 a \u010do by si u\u017e vy\u017eadovalo \u00fapravu ponuky.<\/p>\n\n\n<p>Uve\u010fte identifik\u00e1ciu z\u00e1kazn\u00edka a ponuky, rev\u00edziu ponuky, v\u00fdrobok a rev\u00edziu v\u00fdkresu, mno\u017estvo, jednotkov\u00e9 aj celkov\u00e9 ceny a v\u0161etky samostatne \u00fa\u010dtovan\u00e9 jednorazov\u00e9 poplatky. Uve\u010fte menu a vysvetlite, ako s\u00fa v ponuke zoh\u013eadnen\u00e9 dane, doprava a balenie.<\/p>\n\n\n<p>Potom presne vymedzte, \u010do s\u013eubujete doda\u0165 a kedy. Znamen\u00e1 uveden\u00fd term\u00edn pripravenos\u0165 na vyzdvihnutie, exped\u00edciu alebo doru\u010denie? Ak priebe\u017en\u00e1 doba v\u00fdroby za\u010d\u00edna plyn\u00fa\u0165 a\u017e po schv\u00e1len\u00ed v\u00fdkresu, prijat\u00ed materi\u00e1lu od z\u00e1kazn\u00edka alebo splnen\u00ed in\u00e9ho predpokladu, t\u00fato udalos\u0165 pomenujte. Uve\u010fte platnos\u0165 ponuky, platobn\u00e9 podmienky, \u010do je a \u010do nie je zahrnut\u00e9 v cene a ako sa bud\u00fa posudzova\u0165 zmeny mno\u017estva \u010di \u0161pecifik\u00e1cie.<\/p>\n\n\n<p>Pri modelovej z\u00e1kazke na 100 kusov je d\u00f4le\u017eit\u00fdm predpokladom v\u00fdroba v jednej d\u00e1vke pod\u013ea dohodnutej rev\u00edzie. Ak z\u00e1kazn\u00edk nesk\u00f4r po\u017eiada o dve \u010diastkov\u00e9 dod\u00e1vky alebo dodato\u010dn\u00fa kontrolu, kalkulant m\u00e1 jasn\u00fd d\u00f4vod prehodnoti\u0165 cenu aj term\u00edn. Bez tak\u00e9hoto z\u00e1znamu sa intern\u00fd predpoklad m\u00f4\u017ee po prijat\u00ed objedn\u00e1vky zmeni\u0165 na n\u00e1kladn\u00fd spor.<\/p>\n\n\n<p>Pre technick\u00e9, n\u00e1kupn\u00e9, v\u00fdrobn\u00e9 a obchodn\u00e9 v\u00fdnimky ur\u010dte konkr\u00e9tnych schva\u013eovate\u013eov. Nie ka\u017ed\u00e1 opakovan\u00e1 ponuka si vy\u017eaduje ve\u013ek\u00fa poradu, no nezn\u00e1my materi\u00e1l, nepodlo\u017een\u00fd term\u00edn \u010di cena pod cie\u013eovou \u00farov\u0148ou by nemali prejs\u0165 bez pov\u0161imnutia len rutinn\u00fdm kliknut\u00edm na schv\u00e1lenie.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Ke\u010f sa ponuka zmen\u00ed na objedn\u00e1vku, zachovajte p\u00f4vodn\u00fa kalkul\u00e1ciu<\/h2>\n\n\n<p>Prijatie ponuky m\u00e1 prenies\u0165 dohodnut\u00e9 po\u017eiadavky do v\u00fdroby, nie spusti\u0165 nov\u00fd v\u00fdklad dopytu RFQ. Uchov\u00e1vajte prijat\u00fa ponuku, \u0161pecifik\u00e1ciu, predpoklady technologick\u00e9ho postupu a p\u00f4vodn\u00fa kalkul\u00e1ciu spolo\u010dne. Overte, \u010di im objedn\u00e1vka zodpoved\u00e1, vr\u00e1tane mno\u017estiev v \u010diastkov\u00fdch dod\u00e1vkach a polo\u017eiek dod\u00e1van\u00fdch z\u00e1kazn\u00edkom.<\/p>\n\n\n<p>Ak z\u00e1kazn\u00edk prijme ponuku a\u017e po zmene vy\u0165a\u017eenia v\u00fdroby alebo dostupnosti materi\u00e1lu, rozvrh znova overte. Vo\u013en\u00e1 kapacita, ktor\u00fa ste videli pri pr\u00edprave ponuky, u\u017e nemus\u00ed umo\u017e\u0148ova\u0165 rovnak\u00fd term\u00edn. Ka\u017edej rozvrhnutej nepotvrdenej z\u00e1kazke prira\u010fte zodpovedn\u00fa osobu a term\u00edn kontroly, aby neaktu\u00e1lne obchodn\u00e9 pr\u00edle\u017eitosti neskres\u013eovali pl\u00e1novanie.<\/p>\n\n\n<p>SkyPlanner podporuje zmenu nepotvrdenej z\u00e1kazky na z\u00e1v\u00e4zn\u00fa objedn\u00e1vku. Prostredn\u00edctvom svojho otvoren\u00e9ho REST API sa tie\u017e <a href=\"https:\/\/skyplanner.ai\/sk\/integracie\/\">integruje s \u013eubovo\u013en\u00fdm syst\u00e9mom ERP alebo MES<\/a>, tak\u017ee pri rozvrhovan\u00ed v\u00fdroby m\u00f4\u017eete vyu\u017e\u00edva\u0165 prepojenie so syst\u00e9mami, ktor\u00e9 u\u017e pou\u017e\u00edvate na objedn\u00e1vky a kalkul\u00e1ciu n\u00e1kladov. V\u00fdhodou je kontinuita: z\u00e1kazku pos\u00faden\u00fa pri tvorbe ponuky mo\u017eno n\u00e1sledne napl\u00e1nova\u0165 do v\u00fdroby bez vytv\u00e1rania novej sady navz\u00e1jom nes\u00favisiacich odhadov.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Vyu\u017eite dokon\u010den\u00e9 z\u00e1kazky na spresnenie \u010fal\u0161ej ponuky<\/h2>\n\n\n<p>Po v\u00fdrobe <a href=\"https:\/\/skyplanner.ai\/sk\/zdroje-sk\/kalkulacia-nakladov-na-zakazku\/\">porovnajte p\u00f4vodne kalkulovan\u00e9 hodnoty so skuto\u010dnos\u0165ou<\/a>. Za\u010dnite predpokladom o oper\u00e1cii alebo materi\u00e1li, ktor\u00fd sa zmenil, nielen v\u00fdslednou mar\u017eou.<\/p>\n\n\n<p>Preh\u013ead oper\u00e1ci\u00ed v syst\u00e9me SkyPlanner zobrazuje \u010das zaznamenan\u00fd pri ka\u017edej oper\u00e1cii spolu s pracovn\u00edkom a pracoviskom. Pom\u00e1ha tak porovn\u00e1va\u0165 pl\u00e1novan\u00e9 a skuto\u010dn\u00e9 trvanie jednotliv\u00fdch krokov technologick\u00e9ho postupu. Preh\u013ead polo\u017eiek objedn\u00e1vky poskytuje poh\u013ead na jednotliv\u00e9 riadky objedn\u00e1vky. Tieto z\u00e1znamy d\u00e1vaj\u00fa kalkulantovi lep\u0161\u00ed v\u00fdchodiskov\u00fd podklad, ne\u017e ke\u010f sa po mesiacoch p\u00fdta kolegov, \u010do si pam\u00e4taj\u00fa z podobnej z\u00e1kazky.<\/p>\n\n\n<p>Rozli\u0161ujte medzi nepresnou kalkul\u00e1ciou, zmenou rozsahu a naru\u0161en\u00edm v\u00fdroby, ktor\u00e9mu sa dalo pred\u00eds\u0165. Vynechan\u00e9 odihlovanie dopl\u0148te do \u010fal\u0161ieho technologick\u00e9ho postupu. Kontrola dodato\u010dne po\u017eadovan\u00e1 z\u00e1kazn\u00edkom si vy\u017eaduje riadenie zmien. Opakovan\u00e9 nastavenie stroja sp\u00f4soben\u00e9 preru\u0161en\u00edm v\u00fdroby m\u00f4\u017ee by\u0165 d\u00f4vodom na lep\u0161ie zoradenie oper\u00e1ci\u00ed, nie na trval\u00e9 nav\u00fd\u0161enie normovan\u00e9ho \u010dasu.<\/p>\n\n\n<p>S rovnakou d\u00f4slednos\u0165ou vyhodnocujte aj \u00faspe\u0161nos\u0165 tvorby pon\u00fak. R\u00fdchlos\u0165 odpovede je d\u00f4le\u017eit\u00e1, no rovnako d\u00f4le\u017eit\u00e9 je, ak\u00fd podiel pon\u00fak na vhodn\u00e9 z\u00e1kazky sa premen\u00ed na objedn\u00e1vky, ak\u00e9 s\u00fa d\u00f4vody \u00faprav a ak\u00fd je rozdiel medzi odhadovan\u00fdmi a skuto\u010dn\u00fdmi n\u00e1kladmi. R\u00fdchlej\u0161ia odpove\u010f m\u00e1 hodnotu vtedy, ke\u010f v\u00e1m pom\u00e1ha z\u00edska\u0165 z\u00e1kazky, ktor\u00e9 sa oplat\u00ed realizova\u0165.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Otestujte so SkyPlanner jeden skuto\u010dn\u00fd dopyt RFQ<\/h2>\n\n\n<p>Vyberte ponuku, pri ktorej je \u0165a\u017ek\u00e9 dohodn\u00fa\u0165 cenu a term\u00edn dodania, napr\u00edklad preto, \u017ee z\u00e1kazka vyu\u017e\u00edva rovnak\u00e9 \u00fazke miesto ako in\u00e9 z\u00e1kazky, dod\u00e1vka sa mo\u017eno rozdel\u00ed alebo z\u00e1kazn\u00edk \u017eiada skor\u0161\u00ed term\u00edn.<\/p>\n\n\n<p>Pripravte si rev\u00edziu v\u00fdkresu, mno\u017estvo, technologick\u00fd postup a predpoklady pre nastavenie stroja a spracovanie, ako aj potvrden\u00e9 z\u00e1kazky, ktor\u00e9 s\u00fa\u0165a\u017eia o rovnak\u00e9 zdroje. <strong><a href=\"https:\/\/skyplanner.ai\/sk\/kontakt-na-predaj\/\">Rezervujte si uk\u00e1\u017eku SkyPlanner<\/a><\/strong> a presk\u00famajte, ako navrhovan\u00e1 z\u00e1kazka zapadne do v\u00fdroby, \u010do sa zmen\u00ed pri \u00faprave ponuky a ako by skuto\u010dn\u00e9 v\u00fdrobn\u00e9 \u00fadaje mohli spresni\u0165 va\u0161u \u010fal\u0161iu kalkul\u00e1ciu. Z\u00edskate konkr\u00e9tny podklad na pos\u00fadenie, ako by SkyPlanner mohol obmedzi\u0165 manu\u00e1lnu pr\u00e1cu pri pl\u00e1novan\u00ed, z ktor\u00e9ho vych\u00e1dzaj\u00fa va\u0161e ponuky.<\/p>\n\n\n<p>Ak sa chcete najprv zozn\u00e1mi\u0165 s prostred\u00edm, <strong><a href=\"https:\/\/skyplanner.ai\/sk\/skusobna-verzia\/\">vysk\u00fa\u0161ajte SkyPlanner s uk\u00e1\u017ekov\u00fdmi \u00fadajmi<\/a><\/strong>. Cie\u013e zost\u00e1va rovnak\u00fd: oceni\u0165 jasne definovan\u00fa z\u00e1kazku a da\u0165 z\u00e1kazn\u00edkovi pr\u00eds\u013eub, ktor\u00fd va\u0161a v\u00fdroba dok\u00e1\u017ee splni\u0165.<\/p>\n\n<\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>Tvorba cenov\u00fdch pon\u00fak vo v\u00fdrobe: Oce\u0148te z\u00e1kazku, ktor\u00fa dok\u00e1\u017eete doda\u0165 Domov &raquo; Zdroje &raquo; Tvorba cenov\u00fdch pon\u00fak vo v\u00fdrobe: Oce\u0148te z\u00e1kazku, ktor\u00fa dok\u00e1\u017eete doda\u0165 Z\u00e1kazka m\u00f4\u017ee pri pon\u00fakanej jednotkovej cene vyzera\u0165 ziskovo, a predsa nemus\u00ed by\u0165 spr\u00e1vne ju prija\u0165. Kalkul\u00e1cia m\u00f4\u017ee po\u010d\u00edta\u0165 s jedn\u00fdm nastaven\u00edm stroja, hoci z\u00e1kazn\u00edk potrebuje dve \u010diastkov\u00e9 dod\u00e1vky. M\u00f4\u017ee v nej &#8230; <a title=\"Tvorba cenov\u00fdch pon\u00fak vo v\u00fdrobe: Oce\u0148te z\u00e1kazku, ktor\u00fa dok\u00e1\u017eete doda\u0165\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/sk\/zdroje-sk\/tvorba-cenovych-ponuk-vo-vyrobe\/\" aria-label=\"Pre\u010d\u00edtajte si viac o Tvorba cenov\u00fdch pon\u00fak vo v\u00fdrobe: Oce\u0148te z\u00e1kazku, ktor\u00fa dok\u00e1\u017eete doda\u0165\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":109414,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[2538,318],"tags":[],"class_list":["post-109401","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-aps-a-rozvrhovanie","category-zdroje-sk","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Tvorba cenov\u00fdch pon\u00fak vo v\u00fdrobe: Oce\u0148te zvl\u00e1dnute\u013en\u00fa z\u00e1kazku<\/title>\n<meta name=\"description\" content=\"Zostavte ponuku pod\u013ea re\u00e1lnych n\u00e1kladov, jasnej mar\u017ee a pl\u00e1nu dodania. Preme\u0148te dopyt na z\u00e1kazku, ktor\u00fa dok\u00e1\u017eete so ziskom prija\u0165 a doda\u0165.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/sk\/zdroje-sk\/tvorba-cenovych-ponuk-vo-vyrobe\/\" \/>\n<meta property=\"og:locale\" content=\"sk_SK\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Tvorba cenov\u00fdch pon\u00fak vo v\u00fdrobe: Oce\u0148te z\u00e1kazku, ktor\u00fa dok\u00e1\u017eete doda\u0165\" \/>\n<meta property=\"og:description\" content=\"Zostavte ponuku pod\u013ea re\u00e1lnych n\u00e1kladov, jasnej mar\u017ee a pl\u00e1nu dodania. Preme\u0148te dopyt na z\u00e1kazku, ktor\u00fa dok\u00e1\u017eete so ziskom prija\u0165 a doda\u0165.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/sk\/zdroje-sk\/tvorba-cenovych-ponuk-vo-vyrobe\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2026-10-25T02:10:34+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-25T02:11:54+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/manufacturing-quoting-hero.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1774\" \/>\n\t<meta property=\"og:image:height\" content=\"998\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Autor\" \/>\n\t<meta name=\"twitter:data1\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n\t<meta name=\"twitter:label2\" content=\"Predpokladan\u00fd \u010das \u010d\u00edtania\" \/>\n\t<meta name=\"twitter:data2\" content=\"16 min\u00fat\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sk\\\/zdroje-sk\\\/tvorba-cenovych-ponuk-vo-vyrobe\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sk\\\/zdroje-sk\\\/tvorba-cenovych-ponuk-vo-vyrobe\\\/\"},\"author\":{\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sk\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\"},\"headline\":\"Tvorba cenov\u00fdch pon\u00fak vo v\u00fdrobe: Oce\u0148te z\u00e1kazku, ktor\u00fa dok\u00e1\u017eete doda\u0165\",\"datePublished\":\"2026-10-25T02:10:34+00:00\",\"dateModified\":\"2026-10-25T02:11:54+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sk\\\/zdroje-sk\\\/tvorba-cenovych-ponuk-vo-vyrobe\\\/\"},\"wordCount\":3174,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sk\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sk\\\/zdroje-sk\\\/tvorba-cenovych-ponuk-vo-vyrobe\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/manufacturing-quoting-hero.png\",\"articleSection\":[\"APS a rozvrhovanie\",\"zdroje\"],\"inLanguage\":\"sk-SK\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sk\\\/zdroje-sk\\\/tvorba-cenovych-ponuk-vo-vyrobe\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/sk\\\/zdroje-sk\\\/tvorba-cenovych-ponuk-vo-vyrobe\\\/\",\"name\":\"Tvorba cenov\u00fdch pon\u00fak vo v\u00fdrobe: Oce\u0148te zvl\u00e1dnute\u013en\u00fa z\u00e1kazku\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sk\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sk\\\/zdroje-sk\\\/tvorba-cenovych-ponuk-vo-vyrobe\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sk\\\/zdroje-sk\\\/tvorba-cenovych-ponuk-vo-vyrobe\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/manufacturing-quoting-hero.png\",\"datePublished\":\"2026-10-25T02:10:34+00:00\",\"dateModified\":\"2026-10-25T02:11:54+00:00\",\"description\":\"Zostavte ponuku pod\u013ea re\u00e1lnych n\u00e1kladov, jasnej mar\u017ee a pl\u00e1nu dodania. Preme\u0148te dopyt na z\u00e1kazku, ktor\u00fa dok\u00e1\u017eete so ziskom prija\u0165 a doda\u0165.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sk\\\/zdroje-sk\\\/tvorba-cenovych-ponuk-vo-vyrobe\\\/#breadcrumb\"},\"inLanguage\":\"sk-SK\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/sk\\\/zdroje-sk\\\/tvorba-cenovych-ponuk-vo-vyrobe\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"sk-SK\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sk\\\/zdroje-sk\\\/tvorba-cenovych-ponuk-vo-vyrobe\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/manufacturing-quoting-hero.png\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/manufacturing-quoting-hero.png\",\"width\":1774,\"height\":998,\"caption\":\"A blank quotation connects material and cost inputs to a batch of finished machined parts\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sk\\\/zdroje-sk\\\/tvorba-cenovych-ponuk-vo-vyrobe\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/sk\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Tvorba cenov\u00fdch pon\u00fak vo v\u00fdrobe: Oce\u0148te z\u00e1kazku, ktor\u00fa dok\u00e1\u017eete doda\u0165\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sk\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/sk\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sk\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/sk\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"sk-SK\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sk\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/sk\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"sk-SK\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sk\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sk\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sk\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\",\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"sk-SK\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"caption\":\"Jussi M\u00e4ntyl\u00e4\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Tvorba cenov\u00fdch pon\u00fak vo v\u00fdrobe: Oce\u0148te zvl\u00e1dnute\u013en\u00fa z\u00e1kazku","description":"Zostavte ponuku pod\u013ea re\u00e1lnych n\u00e1kladov, jasnej mar\u017ee a pl\u00e1nu dodania. Preme\u0148te dopyt na z\u00e1kazku, ktor\u00fa dok\u00e1\u017eete so ziskom prija\u0165 a doda\u0165.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/sk\/zdroje-sk\/tvorba-cenovych-ponuk-vo-vyrobe\/","og_locale":"sk_SK","og_type":"article","og_title":"Tvorba cenov\u00fdch pon\u00fak vo v\u00fdrobe: Oce\u0148te z\u00e1kazku, ktor\u00fa dok\u00e1\u017eete doda\u0165","og_description":"Zostavte ponuku pod\u013ea re\u00e1lnych n\u00e1kladov, jasnej mar\u017ee a pl\u00e1nu dodania. Preme\u0148te dopyt na z\u00e1kazku, ktor\u00fa dok\u00e1\u017eete so ziskom prija\u0165 a doda\u0165.","og_url":"https:\/\/skyplanner.ai\/sk\/zdroje-sk\/tvorba-cenovych-ponuk-vo-vyrobe\/","og_site_name":"SkyPlanner","article_published_time":"2026-10-25T02:10:34+00:00","article_modified_time":"2026-10-25T02:11:54+00:00","og_image":[{"width":1774,"height":998,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/manufacturing-quoting-hero.png","type":"image\/png"}],"author":"Jussi M\u00e4ntyl\u00e4","twitter_card":"summary_large_image","twitter_misc":{"Autor":"Jussi M\u00e4ntyl\u00e4","Predpokladan\u00fd \u010das \u010d\u00edtania":"16 min\u00fat"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/sk\/zdroje-sk\/tvorba-cenovych-ponuk-vo-vyrobe\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/sk\/zdroje-sk\/tvorba-cenovych-ponuk-vo-vyrobe\/"},"author":{"name":"Jussi M\u00e4ntyl\u00e4","@id":"https:\/\/skyplanner.ai\/sk\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5"},"headline":"Tvorba cenov\u00fdch pon\u00fak vo v\u00fdrobe: Oce\u0148te z\u00e1kazku, ktor\u00fa dok\u00e1\u017eete doda\u0165","datePublished":"2026-10-25T02:10:34+00:00","dateModified":"2026-10-25T02:11:54+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/sk\/zdroje-sk\/tvorba-cenovych-ponuk-vo-vyrobe\/"},"wordCount":3174,"publisher":{"@id":"https:\/\/skyplanner.ai\/sk\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/sk\/zdroje-sk\/tvorba-cenovych-ponuk-vo-vyrobe\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/manufacturing-quoting-hero.png","articleSection":["APS a rozvrhovanie","zdroje"],"inLanguage":"sk-SK"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/sk\/zdroje-sk\/tvorba-cenovych-ponuk-vo-vyrobe\/","url":"https:\/\/skyplanner.ai\/sk\/zdroje-sk\/tvorba-cenovych-ponuk-vo-vyrobe\/","name":"Tvorba cenov\u00fdch pon\u00fak vo v\u00fdrobe: Oce\u0148te zvl\u00e1dnute\u013en\u00fa z\u00e1kazku","isPartOf":{"@id":"https:\/\/skyplanner.ai\/sk\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/sk\/zdroje-sk\/tvorba-cenovych-ponuk-vo-vyrobe\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/sk\/zdroje-sk\/tvorba-cenovych-ponuk-vo-vyrobe\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/manufacturing-quoting-hero.png","datePublished":"2026-10-25T02:10:34+00:00","dateModified":"2026-10-25T02:11:54+00:00","description":"Zostavte ponuku pod\u013ea re\u00e1lnych n\u00e1kladov, jasnej mar\u017ee a pl\u00e1nu dodania. Preme\u0148te dopyt na z\u00e1kazku, ktor\u00fa dok\u00e1\u017eete so ziskom prija\u0165 a doda\u0165.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/sk\/zdroje-sk\/tvorba-cenovych-ponuk-vo-vyrobe\/#breadcrumb"},"inLanguage":"sk-SK","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/sk\/zdroje-sk\/tvorba-cenovych-ponuk-vo-vyrobe\/"]}]},{"@type":"ImageObject","inLanguage":"sk-SK","@id":"https:\/\/skyplanner.ai\/sk\/zdroje-sk\/tvorba-cenovych-ponuk-vo-vyrobe\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/manufacturing-quoting-hero.png","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/manufacturing-quoting-hero.png","width":1774,"height":998,"caption":"A blank quotation connects material and cost inputs to a batch of finished machined parts"},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/sk\/zdroje-sk\/tvorba-cenovych-ponuk-vo-vyrobe\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/sk\/"},{"@type":"ListItem","position":2,"name":"Tvorba cenov\u00fdch pon\u00fak vo v\u00fdrobe: Oce\u0148te z\u00e1kazku, ktor\u00fa dok\u00e1\u017eete doda\u0165"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/sk\/#website","url":"https:\/\/skyplanner.ai\/sk\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/sk\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/sk\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"sk-SK"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/sk\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/sk\/","logo":{"@type":"ImageObject","inLanguage":"sk-SK","@id":"https:\/\/skyplanner.ai\/sk\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/sk\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]},{"@type":"Person","@id":"https:\/\/skyplanner.ai\/sk\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5","name":"Jussi M\u00e4ntyl\u00e4","image":{"@type":"ImageObject","inLanguage":"sk-SK","@id":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","caption":"Jussi M\u00e4ntyl\u00e4"}}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/manufacturing-quoting-hero.png",1774,998,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/manufacturing-quoting-hero-150x150.png",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/manufacturing-quoting-hero-300x169.png",300,169,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/manufacturing-quoting-hero-768x432.png",768,432,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/manufacturing-quoting-hero-1024x576.png",1024,576,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/manufacturing-quoting-hero-1536x864.png",1536,864,true],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/manufacturing-quoting-hero.png",1774,998,false],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/manufacturing-quoting-hero-360x203.png",360,203,true]},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/sk\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Tvorba cenov\u00fdch pon\u00fak vo v\u00fdrobe: Oce\u0148te z\u00e1kazku, ktor\u00fa dok\u00e1\u017eete doda\u0165 Domov &raquo; Zdroje &raquo; Tvorba cenov\u00fdch pon\u00fak vo v\u00fdrobe: Oce\u0148te z\u00e1kazku, ktor\u00fa dok\u00e1\u017eete doda\u0165 Z\u00e1kazka m\u00f4\u017ee pri pon\u00fakanej jednotkovej cene vyzera\u0165 ziskovo, a predsa nemus\u00ed by\u0165 spr\u00e1vne ju prija\u0165. Kalkul\u00e1cia m\u00f4\u017ee po\u010d\u00edta\u0165 s jedn\u00fdm nastaven\u00edm stroja, hoci z\u00e1kazn\u00edk potrebuje dve \u010diastkov\u00e9 dod\u00e1vky. M\u00f4\u017ee v nej&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/sk\/wp-json\/wp\/v2\/posts\/109401","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/sk\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/sk\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/sk\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/sk\/wp-json\/wp\/v2\/comments?post=109401"}],"version-history":[{"count":1,"href":"https:\/\/skyplanner.ai\/sk\/wp-json\/wp\/v2\/posts\/109401\/revisions"}],"predecessor-version":[{"id":109465,"href":"https:\/\/skyplanner.ai\/sk\/wp-json\/wp\/v2\/posts\/109401\/revisions\/109465"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/sk\/wp-json\/wp\/v2\/media\/109414"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/sk\/wp-json\/wp\/v2\/media?parent=109401"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/sk\/wp-json\/wp\/v2\/categories?post=109401"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/sk\/wp-json\/wp\/v2\/tags?post=109401"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}