{"id":107900,"date":"2026-10-23T19:50:04","date_gmt":"2026-10-23T19:50:04","guid":{"rendered":"https:\/\/skyplanner.ai\/?p=107900"},"modified":"2026-10-23T19:51:25","modified_gmt":"2026-10-23T19:51:25","slug":"optimalna-velkost-objednavky","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/sk\/zdroje-sk\/optimalna-velkost-objednavky\/","title":{"rendered":"Optim\u00e1lna ve\u013ekos\u0165 objedn\u00e1vky: vypo\u010d\u00edtajte v\u00fdhodnej\u0161ie n\u00e1kupn\u00e9 mno\u017estvo"},"content":{"rendered":"<div class=\"gb-container gb-container-article01 article-main-content-container\">\n\n<h1 class=\"wp-block-heading\">Optim\u00e1lna ve\u013ekos\u0165 objedn\u00e1vky: vypo\u010d\u00edtajte v\u00fdhodnej\u0161ie n\u00e1kupn\u00e9 mno\u017estvo<\/h1>\n\n<div class=\"gb-container gb-container-article02\">\n\n<p><a href=\"\/sk\/\">Domov<\/a> &raquo; <a href=\"https:\/\/skyplanner.ai\/sk\/zdroje\/\">Zdroje<\/a> &raquo; Optim\u00e1lna ve\u013ekos\u0165 objedn\u00e1vky: vypo\u010d\u00edtajte v\u00fdhodnej\u0161ie n\u00e1kupn\u00e9 mno\u017estvo<\/p>\n\n\n<p class=\"yoast-reading-time__wrapper\"><span class=\"yoast-reading-time__icon\"><svg aria-hidden=\"true\" focusable=\"false\" data-icon=\"clock\" width=\"20\" height=\"20\" fill=\"none\" stroke=\"currentColor\" style=\"display:inline-block;vertical-align:-0.1em\" role=\"img\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewBox=\"0 0 24 24\"><path stroke-linecap=\"round\" stroke-linejoin=\"round\" stroke-width=\"2\" d=\"M12 8v4l3 3m6-3a9 9 0 11-18 0 9 9 0 0118 0z\"><\/path><\/svg><\/span><span class=\"yoast-reading-time__spacer\" style=\"display:inline-block;width:1em\"><\/span><span class=\"yoast-reading-time__descriptive-text\">Odhadovan\u00fd \u010das \u010d\u00edtania: <\/span><span class=\"yoast-reading-time__reading-time\">10<\/span><span class=\"yoast-reading-time__time-unit\"> min\u00fat<\/span><\/p>\n\n<\/div>\n<div class=\"gb-container gb-container-article03\">\n\n<p><strong>Optim\u00e1lna ve\u013ekos\u0165 objedn\u00e1vky (EOQ) je mno\u017estvo na doplnenie z\u00e1sob, pri ktorom s\u00fa v z\u00e1kladnom modeli EOQ s\u00fahrnn\u00e9 n\u00e1klady na objedn\u00e1vanie a dr\u017ebu z\u00e1sob najni\u017e\u0161ie.<\/strong> V\u00fdrobcovi, ktor\u00fd pravidelne nakupuje ur\u010dit\u00fd komponent, odpoved\u00e1 na ot\u00e1zku: ko\u013eko m\u00e1me zaka\u017ed\u00fdm objedna\u0165 vzh\u013eadom na na\u0161u spotrebu a n\u00e1klady?<\/p>\n\n\n<p>V\u00fdpo\u010det vych\u00e1dza zo vzorca <strong>EOQ = \u221a(2 \u00d7 D \u00d7 S \/ H)<\/strong>, kde D je ro\u010dn\u00e1 spotreba v kusoch, S s\u00fa fixn\u00e9 n\u00e1klady na jednu objedn\u00e1vku a H s\u00fa n\u00e1klady na dr\u017ebu jedn\u00e9ho kusa za rok.<\/p>\n\n\n<p>V\u00fdsledok je u\u017eito\u010dn\u00fdm v\u00fdchodiskom, nie kone\u010dn\u00fdm rozhodnut\u00edm o n\u00e1kupe. Ve\u013ekos\u0165 balenia alebo minim\u00e1lna objedn\u00e1vka dod\u00e1vate\u013ea m\u00f4\u017eu zmeni\u0165 mno\u017estvo, ktor\u00e9 sa d\u00e1 skuto\u010dne objedna\u0165. A ani ekonomicky v\u00fdhodn\u00fd n\u00e1kup nepom\u00f4\u017ee zajtraj\u0161ej v\u00fdrobe, ak doraz\u00ed a\u017e bud\u00faci t\u00fd\u017ede\u0148. SkyPlanner APS prep\u00e1ja o\u010dak\u00e1van\u00e9 dod\u00e1vky materi\u00e1lu s v\u00fdrobn\u00fdmi pr\u00edkazmi, ktor\u00e9 od nich z\u00e1visia. N\u00e1kup a v\u00fdroba tak m\u00f4\u017eu pracova\u0165 pod\u013ea spolo\u010dn\u00e9ho harmonogramu namiesto zos\u00fala\u010fovania samostatn\u00fdch zoznamov.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Pre\u010do m\u00f4\u017ee v\u00e4\u010d\u0161ia objedn\u00e1vka st\u00e1\u0165 viac<\/h2>\n\n\n<p>Ka\u017ed\u00e9 doplnenie z\u00e1sob prin\u00e1\u0161a n\u00e1klady aj nad r\u00e1mec ceny samotn\u00fdch komponentov: vystavenie n\u00e1kupnej objedn\u00e1vky, spracovanie pr\u00edjmu a manipul\u00e1ciu s dod\u00e1vkou. Pri n\u00e1kupe v\u00e4\u010d\u0161\u00edch mno\u017estiev treba objedn\u00e1va\u0165 menej \u010dasto, tak\u017ee tieto fixn\u00e9 n\u00e1klady vznikaj\u00fa menejkr\u00e1t.<\/p>\n\n\n<p>V\u00e4\u010d\u0161ie dod\u00e1vky v\u0161ak z\u00e1rove\u0148 znamenaj\u00fa vy\u0161\u0161ie z\u00e1soby medzi jednotliv\u00fdmi doplneniami. V z\u00e1sob\u00e1ch s\u00fa viazan\u00e9 peniaze a vznikaj\u00fa n\u00e1klady na skladovanie, poistenie aj zastar\u00e1vanie. N\u00e1kup dvojn\u00e1sobn\u00e9ho mno\u017estva nie je automaticky v\u00fdhodn\u00fd len preto, \u017ee zn\u00ed\u017ei po\u010det objedn\u00e1vok na polovicu.<\/p>\n\n\n<p>EOQ h\u013ead\u00e1 rovnov\u00e1hu medzi t\u00fdmito dvoma vplyvmi. V z\u00e1kladnom modeli je cel\u00e1 dod\u00e1vka k dispoz\u00edcii na pou\u017eitie naraz a z\u00e1soba potom rovnomerne kles\u00e1, ako ju v\u00fdroba spotreb\u00fava. Priemern\u00e1 be\u017en\u00e1 z\u00e1soba preto predstavuje polovicu objednan\u00e9ho mno\u017estva. Ak je potrebn\u00e1 bezpe\u010dnostn\u00e1 z\u00e1soba, prid\u00e1va sa navy\u0161e a do v\u00fdpo\u010dtu priemernej be\u017enej z\u00e1soby ako polovice objednan\u00e9ho mno\u017estva sa nezah\u0155\u0148a.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Spr\u00e1vne ur\u010dte tri vstupy do v\u00fdpo\u010dtu EOQ<\/h2>\n\n\n<p>Pou\u017e\u00edvajte jednotn\u00e9 mern\u00e9 jednotky a rovnak\u00e9 \u010dasov\u00e9 obdobie. K ro\u010dnej spotrebe patria ro\u010dn\u00e9 n\u00e1klady na dr\u017ebu z\u00e1sob; mesa\u010dn\u00e9 n\u00e1klady nemo\u017eno do toho ist\u00e9ho v\u00fdpo\u010dtu dosadi\u0165 bez prepo\u010dtu.<\/p>\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Vstup<\/th><th>V\u00fdznam pri nakupovanom komponente<\/th><th>Jednotka<\/th><\/tr><\/thead><tbody><tr><td>D<\/td><td>O\u010dak\u00e1van\u00e1 ro\u010dn\u00e1 spotreba komponentu<\/td><td>Kusy\/rok<\/td><\/tr><tr><td>S<\/td><td>Fixn\u00e9 n\u00e1klady na vystavenie jednej objedn\u00e1vky na doplnenie z\u00e1sob a pr\u00edjem dod\u00e1vky<\/td><td>Pe\u0148a\u017en\u00e9 jednotky\/objedn\u00e1vka<\/td><\/tr><tr><td>H<\/td><td>N\u00e1klady na dr\u017ebu jedn\u00e9ho kusa po\u010das jedn\u00e9ho roka<\/td><td>Pe\u0148a\u017en\u00e9 jednotky\/kus\/rok<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<h3 class=\"wp-block-heading\">D: pou\u017eite spotrebu komponentu, nie tr\u017eby z predaja<\/h3>\n\n\n<p>Pri nakupovan\u00fdch lo\u017eisk\u00e1ch je D po\u010det lo\u017e\u00edsk, ktor\u00e9 sa pod\u013ea o\u010dak\u00e1van\u00ed spotrebuj\u00fa vo v\u00fdrobe za rok. Nejde o predajn\u00fa hodnotu strojov, v ktor\u00fdch sa pou\u017e\u00edvaj\u00fa, ani nevyhnutne o mno\u017estvo nak\u00fapen\u00e9 v minulom roku: pod\u013ea objemu n\u00e1kupov mohli z\u00e1soby nar\u00e1s\u0165 alebo sa zn\u00ed\u017ei\u0165.<\/p>\n\n\n<p>Zahr\u0148te potreby v\u0161etk\u00fdch v\u00fdrobkov, v ktor\u00fdch sa komponent pou\u017e\u00edva, a primerane zoh\u013eadnite o\u010dak\u00e1van\u00e9 straty vo v\u00fdrobnom procese. Overte, \u010di ro\u010dn\u00fd s\u00fa\u010det zodpoved\u00e1 pribli\u017ene rovnomernej spotrebe. Ak sa komponent pou\u017e\u00edva iba na dva ve\u013ek\u00e9 z\u00e1kazn\u00edcke projekty, potrebuje n\u00e1kupn\u00fd pl\u00e1n s konkr\u00e9tnymi term\u00ednmi, nie umelo vytvoren\u00fa rovnomern\u00fa spotrebu z ro\u010dn\u00e9ho s\u00fa\u010dtu.<\/p>\n\n\n<h3 class=\"wp-block-heading\">S: odde\u013ete n\u00e1klady na objednanie od n\u00e1kupnej ceny<\/h3>\n\n\n<p>S zah\u0155\u0148a fixn\u00e9 n\u00e1klady na pr\u00e1cu alebo poplatky spojen\u00e9 s ka\u017ed\u00fdm doplnen\u00edm z\u00e1sob, napr\u00edklad administrat\u00edvu objedn\u00e1vky, pevn\u00fd poplatok za doru\u010denie a pr\u00e1cu pri pr\u00edjme. Nejde o fakturovan\u00fa hodnotu v\u0161etk\u00fdch komponentov v objedn\u00e1vke.<\/p>\n\n\n<p>Pou\u017eite n\u00e1klady, ktor\u00e9 viete pre dan\u00e9 doplnenie z\u00e1sob zd\u00f4vodni\u0165. Ak sa viacero polo\u017eiek objedn\u00e1va spolo\u010dne alebo prepravuje jedn\u00fdm vozidlom, priradenie celej ceny prepravy ka\u017edej polo\u017eke nadhodnot\u00ed S. Ani prepravn\u00e9 z\u00e1visl\u00e9 od hmotnosti nemo\u017eno jednoducho pova\u017eova\u0165 za fixn\u00fd n\u00e1klad na objedn\u00e1vku. Odhad prisp\u00f4sobte podmienkam dod\u00e1vate\u013ea a sp\u00f4sobu pr\u00edjmu tovaru.<\/p>\n\n\n<h3 class=\"wp-block-heading\">H: prepo\u010d\u00edtajte percentu\u00e1lnu sadzbu na pe\u0148a\u017en\u00fa sumu<\/h3>\n\n\n<p>Ak komponent stoj\u00ed 20 $ a ro\u010dn\u00e1 sadzba n\u00e1kladov na dr\u017ebu z\u00e1sob je 25 %, zodpovedaj\u00face n\u00e1klady na dr\u017ebu s\u00fa:<\/p>\n\n\n<p><strong>H = 20 $ \u00d7 0,25 = 5 $ na komponent za rok<\/strong><\/p>\n\n\n<p>Do vzorca EOQ dosa\u010fte 5 $, nie 25 ani 0,25. Do z\u00e1kladu pre v\u00fdpo\u010det n\u00e1kladov na dr\u017ebu zahr\u0148te pr\u00edslu\u0161n\u00e9 n\u00e1klady na kapit\u00e1l, skladovanie a rizik\u00e1 spojen\u00e9 so z\u00e1sobami. Dbajte na to, aby ste \u017eiadny n\u00e1klad nezapo\u010d\u00edtali dvakr\u00e1t.<\/p>\n\n\n<p>\u00da\u010dtovne priraden\u00e9 n\u00e1klady neznamenaj\u00fa automaticky \u00fasporu pe\u0148az\u00ed pri n\u00e1kupe men\u0161ieho mno\u017estva. V\u00fdpo\u010det je naju\u017eito\u010dnej\u0161\u00ed vtedy, ke\u010f sa n\u00e1kup a finan\u010dn\u00e9 oddelenie zhodn\u00fa na tom, ktor\u00e9 n\u00e1klady skuto\u010dne z\u00e1visia od rozhodnutia o mno\u017estve.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Pr\u00edklad v\u00fdpo\u010dtu: n\u00e1kup lo\u017e\u00edsk pre v\u00fdrobu<\/h2>\n\n\n<p>Predstavme si v\u00fdrobcu, ktor\u00fd nakupuje \u0161tandardn\u00e9 lo\u017eisko pou\u017e\u00edvan\u00e9 vo viacer\u00fdch v\u00fdrobkoch. Pri pl\u00e1novan\u00ed vych\u00e1dza z t\u00fdchto predpokladov:<\/p>\n\n\n<ul class=\"wp-block-list\"><li>Ro\u010dn\u00e1 spotreba D: <strong>12 000 lo\u017e\u00edsk<\/strong>.<\/li><li>Fixn\u00e9 n\u00e1klady na objedn\u00e1vku S: <strong>75 $ na jedno doplnenie z\u00e1sob<\/strong>.<\/li><li>N\u00e1kupn\u00e1 cena za kus: <strong>20 $<\/strong>.<\/li><li>Ro\u010dn\u00e1 sadzba n\u00e1kladov na dr\u017ebu z\u00e1sob: <strong>25 %<\/strong>, z \u010doho vypl\u00fdva H vo v\u00fd\u0161ke <strong>5 $ na lo\u017eisko<\/strong>.<\/li><\/ul>\n\n\n<p>Ide o ilustra\u010dn\u00e9 vstupy, nie o referen\u010dn\u00e9 hodnoty v\u00fdrobn\u00fdch n\u00e1kladov ani o v\u00fdsledok z\u00e1kazn\u00edka SkyPlanner.<\/p>\n\n\n<p><strong>EOQ = \u221a[(2 \u00d7 12 000 \u00d7 75) \/ 5] = \u221a360 000 = 600 lo\u017e\u00edsk<\/strong><\/p>\n\n\n<p>Pri objedn\u00e1vke 600 lo\u017e\u00edsk vych\u00e1dza pod\u013ea modelu 12 000 \/ 600 = <strong>20 objedn\u00e1vok ro\u010dne<\/strong> a priemern\u00e1 be\u017en\u00e1 z\u00e1soba 600 \/ 2 = <strong>300 lo\u017e\u00edsk<\/strong>.<\/p>\n\n\n<p>Pre\u010do je 600 ekonomicky v\u00fdhodn\u00e9 mno\u017estvo, uk\u00e1\u017ee porovnanie ro\u010dn\u00fdch n\u00e1kladov, ktor\u00e9 sa menia s ve\u013ekos\u0165ou objedn\u00e1vky Q:<\/p>\n\n\n<p><strong>Ro\u010dn\u00e9 n\u00e1klady na objedn\u00e1vanie = (D \/ Q) \u00d7 S<\/strong><\/p>\n\n\n<p><strong>Ro\u010dn\u00e9 n\u00e1klady na dr\u017ebu be\u017enej z\u00e1soby = (Q \/ 2) \u00d7 H<\/strong><\/p>\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Ve\u013ekos\u0165 objedn\u00e1vky<\/th><th>Ro\u010dn\u00e9 n\u00e1klady na objedn\u00e1vanie<\/th><th>Ro\u010dn\u00e9 n\u00e1klady na dr\u017ebu be\u017enej z\u00e1soby<\/th><th>S\u00fahrnn\u00e9 ro\u010dn\u00e9 n\u00e1klady<\/th><\/tr><\/thead><tbody><tr><td>300 lo\u017e\u00edsk<\/td><td>3 000 $<\/td><td>750 $<\/td><td>3 750 $<\/td><\/tr><tr><td>600 lo\u017e\u00edsk<\/td><td>1 500 $<\/td><td>1 500 $<\/td><td>3 000 $<\/td><\/tr><tr><td>900 lo\u017e\u00edsk<\/td><td>1 000 $<\/td><td>2 250 $<\/td><td>3 250 $<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>Pri optim\u00e1lnom mno\u017estve bez obmedzen\u00ed sa n\u00e1klady na objedn\u00e1vanie rovnaj\u00fa n\u00e1kladom na dr\u017ebu be\u017enej z\u00e1soby. Zv\u00fd\u0161enie mno\u017estva na 900 s\u00edce zn\u00ed\u017ei n\u00e1klady na objedn\u00e1vanie, no n\u00e1klady na dr\u017ebu vzrast\u00fa viac, ne\u017e sa u\u0161etr\u00ed.<\/p>\n\n\n<p>Suma 3 000 $ <strong>nie je celkov\u00fdm ro\u010dn\u00fdm n\u00e1kladom na n\u00e1kup lo\u017e\u00edsk<\/strong>. Za samotn\u00e9 lo\u017eisk\u00e1 sa st\u00e1le zaplat\u00ed 12 000 \u00d7 20 $ = 240 000 $ ro\u010dne. T\u00e1to suma sa v na\u0161om pr\u00edklade s ve\u013ekos\u0165ou objedn\u00e1vky nemen\u00ed, a preto neovplyv\u0148uje optim\u00e1lne Q. Ak sa cena za kus men\u00ed pod\u013ea mno\u017estva, treba ju do porovnania op\u00e4\u0165 zahrn\u00fa\u0165.<\/p>\n\n\n<p>Ide o odhady ro\u010dn\u00fdch n\u00e1kladov z dlhodob\u00e9ho h\u013eadiska. V\u00fdsledok 13,33 objedn\u00e1vky ro\u010dne pri objedn\u00e1van\u00ed po 900 kusoch vyjadruje priemern\u00fa frekvenciu, nie po\u017eiadavku vystavi\u0165 zlomok n\u00e1kupnej objedn\u00e1vky.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Prisp\u00f4sobte vypo\u010d\u00edtan\u00e9 mno\u017estvo podmienkam dod\u00e1vate\u013ea<\/h2>\n\n\n<p>Z\u00e1kladn\u00fd model EOQ predpoklad\u00e1 zn\u00e1mu a rovnomern\u00fa spotrebu, stabiln\u00e9 n\u00e1klady na objedn\u00e1vanie a dr\u017ebu z\u00e1sob, st\u00e1lu dodaciu lehotu pri dop\u013a\u0148an\u00ed z\u00e1sob, dod\u00e1vky pou\u017eite\u013en\u00e9 v celom rozsahu naraz a \u017eiadne nedostatky z\u00e1sob. Z\u00e1rove\u0148 nepo\u010d\u00edta s mno\u017estevn\u00fdmi z\u013eavami ani so z\u00e1v\u00e4zn\u00fdmi obmedzeniami mno\u017estva. Najspo\u013eahlivej\u0161ie ho vyu\u017eijete pri pravidelne nakupovan\u00fdch polo\u017ek\u00e1ch, ktor\u00fdch n\u00e1kupn\u00fd re\u017eim sa t\u00fdmto podmienkam pribli\u017euje.<\/p>\n\n\n<p>Potom porovnajte mno\u017estv\u00e1, ktor\u00e9 m\u00f4\u017eete skuto\u010dne nak\u00fapi\u0165.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Ve\u013ekosti balen\u00ed a minim\u00e1lne objedn\u00e1van\u00e9 mno\u017estv\u00e1<\/h3>\n\n\n<p>Predpokladajme, \u017ee dod\u00e1vate\u013e pred\u00e1va lo\u017eisk\u00e1 v baleniach po 250 kusoch. Objedn\u00e1vka 600 lo\u017e\u00edsk teda nie je mo\u017en\u00e1. Rovnakou n\u00e1kladovou rovnicou porovnajte najbli\u017e\u0161ie mno\u017estv\u00e1 zodpovedaj\u00face cel\u00fdm baleniam:<\/p>\n\n\n<ul class=\"wp-block-list\"><li><strong>500 lo\u017e\u00edsk:<\/strong> 1 800 $ na objedn\u00e1vanie + 1 250 $ na dr\u017ebu z\u00e1sob = <strong>3 050 $ ro\u010dne<\/strong>.<\/li><li><strong>750 lo\u017e\u00edsk:<\/strong> 1 200 $ na objedn\u00e1vanie + 1 875 $ na dr\u017ebu z\u00e1sob = <strong>3 075 $ ro\u010dne<\/strong>.<\/li><\/ul>\n\n\n<p>Ak neplat\u00ed \u010fal\u0161ie obmedzenie, v tomto modeli je lacnej\u0161ia objedn\u00e1vka 500 kusov. Pri automatickom zaokr\u00fahlen\u00ed nahor by ste t\u00fato mo\u017enos\u0165 prehliadli.<\/p>\n\n\n<p>Teraz predpokladajme, \u017ee dod\u00e1vate\u013e z\u00e1rove\u0148 vy\u017eaduje minim\u00e1lnu objedn\u00e1vku 750 kusov. Mo\u017enos\u0165 objedna\u0165 500 kusov t\u00fdm odpad\u00e1. Pri mno\u017estve 750 kusov s\u00fa ro\u010dn\u00e9 n\u00e1klady oproti optimu bez obmedzen\u00ed vy\u0161\u0161ie o 75 $, teda v tomto modeli o 2,5 %. To je jasn\u00fd podklad na pos\u00fadenie, \u010di sa oplat\u00ed vyjedn\u00e1va\u0165 ni\u017e\u0161ie minim\u00e1lne mno\u017estvo.<\/p>\n\n\n<p>MOQ je minim\u00e1lne mno\u017estvo stanoven\u00e9 dod\u00e1vate\u013eom. EOQ je vypo\u010d\u00edtan\u00e9 mno\u017estvo s najni\u017e\u0161\u00edmi n\u00e1kladmi pre kupuj\u00faceho. Ka\u017ed\u00e9 teda odpoved\u00e1 na in\u00fa ot\u00e1zku.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Mno\u017estevn\u00e9 z\u013eavy a dohody o dod\u00e1vkach<\/h3>\n\n\n<p>Ni\u017e\u0161ia cena za kus m\u00f4\u017ee z v\u00e4\u010d\u0161ej objedn\u00e1vky urobi\u0165 v\u00fdhodnej\u0161iu vo\u013ebu, treba v\u0161ak porovna\u0165 celkov\u00fd vplyv: ro\u010dn\u00e9 n\u00e1klady na n\u00e1kup, objedn\u00e1vanie, dr\u017ebu z\u00e1sob aj pr\u00edpadn\u00e9 prepravn\u00e9 z\u00e1visl\u00e9 od mno\u017estva. Vych\u00e1dzajte zo skuto\u010dn\u00fdch podmienok z\u013eavy. Cena platn\u00e1 pre v\u0161etky kusy nie je to ist\u00e9 ako z\u013eava len na kusy nad stanovenou hranicou.<\/p>\n\n\n<p>Pri r\u00e1mcovej objedn\u00e1vke s viacer\u00fdmi odvol\u00e1vkami sa men\u00ed aj to, \u010do sa pova\u017euje za zadanie objedn\u00e1vky a ak\u00e9 z\u00e1soby skuto\u010dne dr\u017e\u00edte. Ak dod\u00e1vky a \u00fa\u010dtovanie prebiehaj\u00fa samostatne, nepova\u017eujte cel\u00e9 zmluvn\u00e9 mno\u017estvo za jeden okam\u017eit\u00fd pr\u00edjem.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Skladovanie, trvanlivos\u0165 a nerovnomern\u00e1 spotreba<\/h3>\n\n\n<p>Overte, \u010di sa d\u00e1vka zmest\u00ed do vyu\u017eite\u013en\u00fdch skladov\u00fdch priestorov a \u010di ju mo\u017eno spotrebova\u0165 pred uplynut\u00edm trvanlivosti, zmenou kon\u0161trukcie alebo t\u00fdm, ako ju z\u00e1kazn\u00edk prestane potrebova\u0165. Mno\u017estvo, ktor\u00e9 nemo\u017eno vyu\u017ei\u0165, nie je hospod\u00e1rne len preto, \u017ee pod\u013ea zjednodu\u0161enej n\u00e1kladovej krivky prin\u00e1\u0161a najni\u017e\u0161ie n\u00e1klady.<\/p>\n\n\n<p>Ak je spotreba sez\u00f3nna alebo prebieha vo ve\u013ek\u00fdch nepravideln\u00fdch odberoch, vych\u00e1dzajte z potrieb rozvrhnut\u00fdch v \u010dase a zvo\u013ete vhodn\u00fd sp\u00f4sob dop\u013a\u0148ania z\u00e1sob. Pri neistej spotrebe alebo neist\u00fdch term\u00ednoch dod\u00e1vok posudzujte bezpe\u010dnostn\u00fa z\u00e1sobu samostatne. Zv\u00fd\u0161enie EOQ nenahr\u00e1dza pos\u00fadenie rizika nedostatku.<\/p>\n\n\n<h2 class=\"wp-block-heading\">EOQ ur\u010duje, ko\u013eko objedna\u0165, nie kedy<\/h2>\n\n\n<p>V pr\u00edklade s lo\u017eiskami sa za 250 pracovn\u00fdch dn\u00ed spotrebuje 12 000 kusov, teda <strong>48 lo\u017e\u00edsk za pracovn\u00fd de\u0148<\/strong>. D\u00e1vka 600 lo\u017e\u00edsk pri tejto spotrebe vysta\u010d\u00ed na <strong>12,5 pracovn\u00e9ho d\u0148a<\/strong>. Ide o cyklus spotreby d\u00e1vky, nie o dodaciu lehotu dod\u00e1vate\u013ea.<\/p>\n\n\n<p>Pri priebe\u017enom sledovan\u00ed z\u00e1sob sa objedn\u00e1vka zvy\u010dajne zad\u00e1va pri dosiahnut\u00ed tejto \u00farovne:<\/p>\n\n\n<p><strong>Objedn\u00e1vac\u00ed bod = o\u010dak\u00e1van\u00e1 spotreba po\u010das dodacej lehoty doplnenia z\u00e1sob + bezpe\u010dnostn\u00e1 z\u00e1soba<\/strong><\/p>\n\n\n<p>Ak je dod\u00e1vka na doplnenie z\u00e1sob k dispoz\u00edcii na pou\u017eitie za osem pracovn\u00fdch dn\u00ed a nez\u00e1visle od toho si pre ilustr\u00e1ciu zvol\u00edte rezervu 96 lo\u017e\u00edsk:<\/p>\n\n\n<p><strong>Objedn\u00e1vac\u00ed bod = (48 \u00d7 8) + 96 = 480 lo\u017e\u00edsk<\/strong><\/p>\n\n\n<p>Teraz ide o dve odli\u0161n\u00e9 rozhodnutia: pod\u013ea tohto pravidla objedn\u00e1te <strong>600<\/strong> kusov, ke\u010f z\u00e1sobov\u00e1 poz\u00edcia klesne na <strong>480<\/strong>. Rezerva 96 kusov bola zvolen\u00e1 len na ilustr\u00e1ciu; v\u00fdpo\u010det EOQ ju neur\u010dil. Pri posudzovan\u00ed rezervy na neistotu v\u00e1m pom\u00f4\u017ee <a href=\"https:\/\/skyplanner.ai\/sk\/zdroje-sk\/bezpecnostna-zasoba\/\">sprievodca bezpe\u010dnostnou z\u00e1sobou<\/a>.<\/p>\n\n\n<p>Objedn\u00e1vac\u00ed bod porovn\u00e1vajte so z\u00e1sobovou poz\u00edciou: k pou\u017eite\u013enej z\u00e1sobe na sklade pripo\u010d\u00edtajte objednan\u00e9, zatia\u013e nedodan\u00e9 mno\u017estvo a odpo\u010d\u00edtajte nesplnen\u00e9 alebo u\u017e pridelen\u00e9 po\u017eiadavky pod\u013ea svojich pravidiel evidencie z\u00e1sob. Dbajte na to, aby ste t\u00fa ist\u00fa po\u017eiadavku nezapo\u010d\u00edtali dvakr\u00e1t. Ak sledujete len fyzick\u00fd stav na sklade, m\u00f4\u017eete objedna\u0165 znova aj vtedy, ke\u010f je dod\u00e1vka u\u017e na ceste.<\/p>\n\n\n<p>Objednan\u00fd materi\u00e1l v\u0161ak e\u0161te nie je k dispoz\u00edcii na pou\u017eitie. N\u00e1kupn\u00e1 objedn\u00e1vka m\u00f4\u017ee udr\u017ea\u0165 z\u00e1sobov\u00fa poz\u00edciu nad objedn\u00e1vac\u00edm bodom, hoci o\u010dak\u00e1van\u00fd term\u00edn pr\u00edjmu je na splnenie z\u00e1kazn\u00edckej objedn\u00e1vky pr\u00edli\u0161 neskor\u00fd. Mno\u017estvo a term\u00edn pr\u00edjmu preto treba kontrolova\u0165 spolo\u010dne.<\/p>\n\n\n<h2 class=\"wp-block-heading\">\u010co ak si d\u00e1vku na doplnenie z\u00e1sob vyr\u00e1bate sami?<\/h2>\n\n\n<p>Model <a href=\"https:\/\/skyplanner.ai\/sk\/zdroje-sk\/ekonomicka-vyrobna-davka\/\">ekonomickej v\u00fdrobnej d\u00e1vky<\/a> (EPQ) pou\u017eite vtedy, ke\u010f sa z\u00e1soby dop\u013a\u0148aj\u00fa postupne a z\u00e1rove\u0148 pokra\u010duje ich spotreba. Pr\u00edkladom je opakovane vyr\u00e1ban\u00fd komponent, ktor\u00fd sa priebe\u017ene uvo\u013e\u0148uje na sklad. EPQ zoh\u013ead\u0148uje vz\u0165ah medzi tempom v\u00fdroby a spotreby; z\u00e1kladn\u00fd model EOQ predpoklad\u00e1, \u017ee cel\u00e1 d\u00e1vka bude k dispoz\u00edcii naraz.<\/p>\n\n\n<p>Rozhoduj\u00face je, ako sa z\u00e1soba st\u00e1va pou\u017eite\u013enou, nie iba to, \u010di je objedn\u00e1vka ozna\u010den\u00e1 ako intern\u00e1 alebo extern\u00e1. \u010ciastkov\u00e9 dod\u00e1vky od dod\u00e1vate\u013ea alebo v\u00fdrobn\u00e1 d\u00e1vka zadr\u017ean\u00e1 a\u017e do kone\u010dn\u00e9ho schv\u00e1lenia kvality m\u00f4\u017eu vy\u017eadova\u0165 in\u00fd model, ne\u017e by nazna\u010dovalo samotn\u00e9 ozna\u010denie.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Prepojte zvolen\u00fa dod\u00e1vku s v\u00fdrobou pomocou SkyPlanner<\/h2>\n\n\n<p>Predstavte si, \u017ee pr\u00edjem 600 lo\u017e\u00edsk o\u010dak\u00e1vate v pondelok. Potrebujete ich pre dve z\u00e1kazn\u00edcke objedn\u00e1vky, ktor\u00e9 navy\u0161e spolu s \u010fal\u0161\u00edmi z\u00e1kazkami s\u00faperia o kapacity obr\u00e1bania a mont\u00e1\u017ee. Dod\u00e1vate\u013e posunie dod\u00e1vku na \u0161tvrtok. Objednan\u00e9 mno\u017estvo sa nemen\u00ed, ale pondelkov\u00fd pl\u00e1n v\u00fdroby u\u017e nie je re\u00e1lny.<\/p>\n\n\n<p>Samotn\u00e1 aktualiz\u00e1cia n\u00e1kupn\u00e9ho zoznamu nezos\u00falad\u00ed poradie pr\u00e1ce na strojoch so s\u013e\u00faben\u00fdmi term\u00ednmi dodania. SkyPlanner zoh\u013ead\u0148uje tieto v\u00e4zby v <a href=\"https:\/\/skyplanner.ai\/sk\/zdroje-sk\/co-je-planovanie-vyroby\/\">spolo\u010dnom v\u00fdrobnom rozvrhu<\/a>.<\/p>\n\n\n<p>N\u00e1kupn\u00e9 objedn\u00e1vky obsahuj\u00fa mno\u017estv\u00e1 materi\u00e1lu a term\u00edny dodania. Term\u00edn dodania predstavuje o\u010dak\u00e1van\u00fa dostupnos\u0165 materi\u00e1lu; potvrden\u00edm pr\u00edjmu so stavom Dodan\u00e9 sa aktualizuje stav z\u00e1sob. Ak je zapnut\u00e9 rozvrhovanie so zoh\u013eadnen\u00edm materi\u00e1lu, jeho dostupnos\u0165 ovplyv\u0148uje Arcturus, umel\u00fa inteligenciu syst\u00e9mu SkyPlanner na rozvrhovanie v\u00fdroby. Arcturus pritom rozvrhuje pr\u00e1cu pod\u013ea nastaven\u00fdch kapac\u00edt, v\u00e4zieb medzi oper\u00e1ciami a prior\u00edt.<\/p>\n\n\n<p>Zaznamenajte nov\u00fd term\u00edn pr\u00edjmu a prepo\u010d\u00edtajte rozvrh. Dotknut\u00e9 pracovn\u00e9 pr\u00edkazy sa tak m\u00f4\u017eu zos\u00faladi\u0165 s term\u00ednom dod\u00e1vate\u013ea a Ganttov diagram zobraz\u00ed ich term\u00edny spolu s ostatn\u00fdmi v\u00fdrobn\u00fdmi \u00falohami. Namiesto pres\u00favania ka\u017edej nadv\u00e4zuj\u00facej oper\u00e1cie medzi samostatn\u00fdmi frontmi \u00faloh sa pl\u00e1nova\u010d m\u00f4\u017ee s\u00fastredi\u0165 na rozhodnutie: ur\u00fdchli\u0165 dod\u00e1vku komponentu, zmeni\u0165 priority, n\u00e1js\u0165 n\u00e1hradn\u00fd zdroj dod\u00e1vky alebo upravi\u0165 dohodnut\u00fd term\u00edn dodania z\u00e1kazn\u00edkovi.<\/p>\n\n\n<p>Pr\u00e1ve preto sa oplat\u00ed doplni\u0165 pravidl\u00e1 n\u00e1kupu o SkyPlanner: <strong>menej ru\u010dn\u00e9ho zos\u00fala\u010fovania materi\u00e1lov\u00e9ho pl\u00e1nu s v\u00fdrobn\u00fdm rozvrhom a skor\u0161\u00ed preh\u013ead o tom, \u010do zmena term\u00ednu pr\u00edjmu znamen\u00e1 pre z\u00e1kazn\u00edcke objedn\u00e1vky.<\/strong> N\u00e1kup ur\u010d\u00ed hospod\u00e1rnu ve\u013ekos\u0165 d\u00e1vky, ktor\u00e1 sp\u013a\u0148a zmluvn\u00e9 podmienky. Spolo\u010dn\u00fd rozvrh uk\u00e1\u017ee jej d\u00f4sledky pre v\u00fdrobu.<\/p>\n\n\n<p><a href=\"https:\/\/skyplanner.ai\/sk\/pribehy-zakaznikov\/eskomatic\/\">Hodnotenie syst\u00e9mu SkyPlanner od spolo\u010dnosti Eskomatic<\/a> ukazuje, pre\u010do je tak\u00fdto preh\u013ead d\u00f4le\u017eit\u00fd. T\u00e1to spolo\u010dnos\u0165 poskytuj\u00faca z\u00e1kazkov\u00e9 obr\u00e1banie sa predt\u00fdm spoliehala preva\u017ene na ru\u010dne spravovan\u00e9 poradie pr\u00e1ce. Nedostatok materi\u00e1lu sa niekedy uk\u00e1zal a\u017e tesne pred pl\u00e1novan\u00fdm za\u010diatkom. Spolo\u010dnos\u0165 uv\u00e1dza, \u017ee v\u010faka rozvrhovaniu pomocou Ganttovho diagramu prepojen\u00e9mu s ERP a lep\u0161iemu preh\u013eadu o materi\u00e1li m\u00e1 menej preru\u0161en\u00ed v\u00fdroby pre ch\u00fdbaj\u00faci materi\u00e1l a presnej\u0161ie stanovuje term\u00edny dodania. Lep\u0161\u00ed preh\u013ead o materi\u00e1li d\u00e1va t\u00edmu spo\u013eahlivej\u0161\u00ed z\u00e1klad pre denn\u00fd pl\u00e1n.<\/p>\n\n\n<p>SkyPlanner sa prostredn\u00edctvom svojho otvoren\u00e9ho REST API integruje s ak\u00fdmko\u013evek syst\u00e9mom ERP alebo MES. \u00dadaje o n\u00e1kupe a objedn\u00e1vkach z va\u0161ich existuj\u00facich syst\u00e9mov tak m\u00f4\u017eu sl\u00fa\u017ei\u0165 ako podklad pre tento prepojen\u00fd rozvrh.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Vyu\u017eite zvolen\u00fa ve\u013ekos\u0165 objedn\u00e1vky v praxi<\/h2>\n\n\n<p>Pri dop\u013a\u0148an\u00ed z\u00e1sob n\u00e1kupom za\u010dnite v\u00fdpo\u010dtom EOQ, porovnajte mno\u017estv\u00e1, ktor\u00e9 mo\u017eno od dod\u00e1vate\u013ea skuto\u010dne objedna\u0165, a samostatne nastavte objedn\u00e1vac\u00ed bod. Potom udr\u017eujte pr\u00edjem prepojen\u00fd s objedn\u00e1vkami, ktor\u00e9 dodan\u00fd materi\u00e1l spotrebuj\u00fa. <a href=\"https:\/\/skyplanner.ai\/sk\/kontakt-na-predaj\/\">Dohodnite si uk\u00e1\u017eku SkyPlanner<\/a> na pr\u00edklade jedn\u00e9ho nakupovan\u00e9ho komponentu, jeho o\u010dak\u00e1van\u00e9ho pr\u00edjmu a dvoch nadv\u00e4zuj\u00facich z\u00e1kazn\u00edckych objedn\u00e1vok. Uvid\u00edte, ako toto prepojenie men\u00ed pl\u00e1n v\u00fdroby. Ak si chcete syst\u00e9m najprv prezrie\u0165 sami, <a href=\"https:\/\/skyplanner.ai\/sk\/skusobna-verzia\/\">vysk\u00fa\u0161ajte SkyPlanner s uk\u00e1\u017ekov\u00fdmi \u00fadajmi<\/a>.<\/p>\n\n<\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>Optim\u00e1lna ve\u013ekos\u0165 objedn\u00e1vky: vypo\u010d\u00edtajte v\u00fdhodnej\u0161ie n\u00e1kupn\u00e9 mno\u017estvo Domov &raquo; Zdroje &raquo; Optim\u00e1lna ve\u013ekos\u0165 objedn\u00e1vky: vypo\u010d\u00edtajte v\u00fdhodnej\u0161ie n\u00e1kupn\u00e9 mno\u017estvo Optim\u00e1lna ve\u013ekos\u0165 objedn\u00e1vky (EOQ) je mno\u017estvo na doplnenie z\u00e1sob, pri ktorom s\u00fa v z\u00e1kladnom modeli EOQ s\u00fahrnn\u00e9 n\u00e1klady na objedn\u00e1vanie a dr\u017ebu z\u00e1sob najni\u017e\u0161ie. V\u00fdrobcovi, ktor\u00fd pravidelne nakupuje ur\u010dit\u00fd komponent, odpoved\u00e1 na ot\u00e1zku: ko\u013eko m\u00e1me zaka\u017ed\u00fdm objedna\u0165 &#8230; <a title=\"Optim\u00e1lna ve\u013ekos\u0165 objedn\u00e1vky: vypo\u010d\u00edtajte v\u00fdhodnej\u0161ie n\u00e1kupn\u00e9 mno\u017estvo\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/sk\/zdroje-sk\/optimalna-velkost-objednavky\/\" aria-label=\"Pre\u010d\u00edtajte si viac o Optim\u00e1lna ve\u013ekos\u0165 objedn\u00e1vky: vypo\u010d\u00edtajte v\u00fdhodnej\u0161ie n\u00e1kupn\u00e9 mno\u017estvo\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":107916,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[2566,318],"tags":[],"class_list":["post-107900","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-efektivita-vyroby-sk","category-zdroje-sk","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Optim\u00e1lna ve\u013ekos\u0165 objedn\u00e1vky: v\u00fdpo\u010det n\u00e1kupn\u00e9ho mno\u017estva<\/title>\n<meta name=\"description\" content=\"Ur\u010dte v\u00fdhodn\u00e9 mno\u017estvo pravidelne nakupovan\u00e9ho komponentu, overte obmedzenia dod\u00e1vate\u013ea a prepojte dodanie s v\u00fdrobn\u00fdmi pr\u00edkazmi, ktor\u00e9 ho potrebuj\u00fa.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/sk\/zdroje-sk\/optimalna-velkost-objednavky\/\" \/>\n<meta property=\"og:locale\" content=\"sk_SK\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Optim\u00e1lna ve\u013ekos\u0165 objedn\u00e1vky: vypo\u010d\u00edtajte v\u00fdhodnej\u0161ie n\u00e1kupn\u00e9 mno\u017estvo\" \/>\n<meta property=\"og:description\" content=\"Ur\u010dte v\u00fdhodn\u00e9 mno\u017estvo pravidelne nakupovan\u00e9ho komponentu, overte obmedzenia dod\u00e1vate\u013ea a prepojte dodanie s v\u00fdrobn\u00fdmi pr\u00edkazmi, ktor\u00e9 ho potrebuj\u00fa.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/sk\/zdroje-sk\/optimalna-velkost-objednavky\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2026-10-23T19:50:04+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-23T19:51:25+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/economic-order-quantity-hero.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1776\" \/>\n\t<meta property=\"og:image:height\" content=\"999\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Autor\" \/>\n\t<meta name=\"twitter:data1\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n\t<meta name=\"twitter:label2\" content=\"Predpokladan\u00fd \u010das \u010d\u00edtania\" \/>\n\t<meta name=\"twitter:data2\" content=\"15 min\u00fat\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sk\\\/zdroje-sk\\\/optimalna-velkost-objednavky\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sk\\\/zdroje-sk\\\/optimalna-velkost-objednavky\\\/\"},\"author\":{\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sk\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\"},\"headline\":\"Optim\u00e1lna ve\u013ekos\u0165 objedn\u00e1vky: vypo\u010d\u00edtajte v\u00fdhodnej\u0161ie n\u00e1kupn\u00e9 mno\u017estvo\",\"datePublished\":\"2026-10-23T19:50:04+00:00\",\"dateModified\":\"2026-10-23T19:51:25+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sk\\\/zdroje-sk\\\/optimalna-velkost-objednavky\\\/\"},\"wordCount\":2959,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sk\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sk\\\/zdroje-sk\\\/optimalna-velkost-objednavky\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/economic-order-quantity-hero.png\",\"articleSection\":[\"Efektivita v\u00fdroby\",\"zdroje\"],\"inLanguage\":\"sk-SK\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sk\\\/zdroje-sk\\\/optimalna-velkost-objednavky\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/sk\\\/zdroje-sk\\\/optimalna-velkost-objednavky\\\/\",\"name\":\"Optim\u00e1lna ve\u013ekos\u0165 objedn\u00e1vky: v\u00fdpo\u010det n\u00e1kupn\u00e9ho mno\u017estva\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sk\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sk\\\/zdroje-sk\\\/optimalna-velkost-objednavky\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sk\\\/zdroje-sk\\\/optimalna-velkost-objednavky\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/economic-order-quantity-hero.png\",\"datePublished\":\"2026-10-23T19:50:04+00:00\",\"dateModified\":\"2026-10-23T19:51:25+00:00\",\"description\":\"Ur\u010dte v\u00fdhodn\u00e9 mno\u017estvo pravidelne nakupovan\u00e9ho komponentu, overte obmedzenia dod\u00e1vate\u013ea a prepojte dodanie s v\u00fdrobn\u00fdmi pr\u00edkazmi, ktor\u00e9 ho potrebuj\u00fa.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sk\\\/zdroje-sk\\\/optimalna-velkost-objednavky\\\/#breadcrumb\"},\"inLanguage\":\"sk-SK\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/sk\\\/zdroje-sk\\\/optimalna-velkost-objednavky\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"sk-SK\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sk\\\/zdroje-sk\\\/optimalna-velkost-objednavky\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/economic-order-quantity-hero.png\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/economic-order-quantity-hero.png\",\"width\":1776,\"height\":999,\"caption\":\"A balance scale weighs a delivery parcel and purchase paperwork against boxes of components and a bearing.\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sk\\\/zdroje-sk\\\/optimalna-velkost-objednavky\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/sk\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Optim\u00e1lna ve\u013ekos\u0165 objedn\u00e1vky: vypo\u010d\u00edtajte v\u00fdhodnej\u0161ie n\u00e1kupn\u00e9 mno\u017estvo\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sk\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/sk\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sk\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/sk\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"sk-SK\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sk\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/sk\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"sk-SK\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sk\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sk\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sk\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\",\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"sk-SK\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"caption\":\"Jussi M\u00e4ntyl\u00e4\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Optim\u00e1lna ve\u013ekos\u0165 objedn\u00e1vky: v\u00fdpo\u010det n\u00e1kupn\u00e9ho mno\u017estva","description":"Ur\u010dte v\u00fdhodn\u00e9 mno\u017estvo pravidelne nakupovan\u00e9ho komponentu, overte obmedzenia dod\u00e1vate\u013ea a prepojte dodanie s v\u00fdrobn\u00fdmi pr\u00edkazmi, ktor\u00e9 ho potrebuj\u00fa.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/sk\/zdroje-sk\/optimalna-velkost-objednavky\/","og_locale":"sk_SK","og_type":"article","og_title":"Optim\u00e1lna ve\u013ekos\u0165 objedn\u00e1vky: vypo\u010d\u00edtajte v\u00fdhodnej\u0161ie n\u00e1kupn\u00e9 mno\u017estvo","og_description":"Ur\u010dte v\u00fdhodn\u00e9 mno\u017estvo pravidelne nakupovan\u00e9ho komponentu, overte obmedzenia dod\u00e1vate\u013ea a prepojte dodanie s v\u00fdrobn\u00fdmi pr\u00edkazmi, ktor\u00e9 ho potrebuj\u00fa.","og_url":"https:\/\/skyplanner.ai\/sk\/zdroje-sk\/optimalna-velkost-objednavky\/","og_site_name":"SkyPlanner","article_published_time":"2026-10-23T19:50:04+00:00","article_modified_time":"2026-10-23T19:51:25+00:00","og_image":[{"width":1776,"height":999,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/economic-order-quantity-hero.png","type":"image\/png"}],"author":"Jussi M\u00e4ntyl\u00e4","twitter_card":"summary_large_image","twitter_misc":{"Autor":"Jussi M\u00e4ntyl\u00e4","Predpokladan\u00fd \u010das \u010d\u00edtania":"15 min\u00fat"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/sk\/zdroje-sk\/optimalna-velkost-objednavky\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/sk\/zdroje-sk\/optimalna-velkost-objednavky\/"},"author":{"name":"Jussi M\u00e4ntyl\u00e4","@id":"https:\/\/skyplanner.ai\/sk\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5"},"headline":"Optim\u00e1lna ve\u013ekos\u0165 objedn\u00e1vky: vypo\u010d\u00edtajte v\u00fdhodnej\u0161ie n\u00e1kupn\u00e9 mno\u017estvo","datePublished":"2026-10-23T19:50:04+00:00","dateModified":"2026-10-23T19:51:25+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/sk\/zdroje-sk\/optimalna-velkost-objednavky\/"},"wordCount":2959,"publisher":{"@id":"https:\/\/skyplanner.ai\/sk\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/sk\/zdroje-sk\/optimalna-velkost-objednavky\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/economic-order-quantity-hero.png","articleSection":["Efektivita v\u00fdroby","zdroje"],"inLanguage":"sk-SK"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/sk\/zdroje-sk\/optimalna-velkost-objednavky\/","url":"https:\/\/skyplanner.ai\/sk\/zdroje-sk\/optimalna-velkost-objednavky\/","name":"Optim\u00e1lna ve\u013ekos\u0165 objedn\u00e1vky: v\u00fdpo\u010det n\u00e1kupn\u00e9ho mno\u017estva","isPartOf":{"@id":"https:\/\/skyplanner.ai\/sk\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/sk\/zdroje-sk\/optimalna-velkost-objednavky\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/sk\/zdroje-sk\/optimalna-velkost-objednavky\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/economic-order-quantity-hero.png","datePublished":"2026-10-23T19:50:04+00:00","dateModified":"2026-10-23T19:51:25+00:00","description":"Ur\u010dte v\u00fdhodn\u00e9 mno\u017estvo pravidelne nakupovan\u00e9ho komponentu, overte obmedzenia dod\u00e1vate\u013ea a prepojte dodanie s v\u00fdrobn\u00fdmi pr\u00edkazmi, ktor\u00e9 ho potrebuj\u00fa.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/sk\/zdroje-sk\/optimalna-velkost-objednavky\/#breadcrumb"},"inLanguage":"sk-SK","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/sk\/zdroje-sk\/optimalna-velkost-objednavky\/"]}]},{"@type":"ImageObject","inLanguage":"sk-SK","@id":"https:\/\/skyplanner.ai\/sk\/zdroje-sk\/optimalna-velkost-objednavky\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/economic-order-quantity-hero.png","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/economic-order-quantity-hero.png","width":1776,"height":999,"caption":"A balance scale weighs a delivery parcel and purchase paperwork against boxes of components and a bearing."},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/sk\/zdroje-sk\/optimalna-velkost-objednavky\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/sk\/"},{"@type":"ListItem","position":2,"name":"Optim\u00e1lna ve\u013ekos\u0165 objedn\u00e1vky: vypo\u010d\u00edtajte v\u00fdhodnej\u0161ie n\u00e1kupn\u00e9 mno\u017estvo"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/sk\/#website","url":"https:\/\/skyplanner.ai\/sk\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/sk\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/sk\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"sk-SK"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/sk\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/sk\/","logo":{"@type":"ImageObject","inLanguage":"sk-SK","@id":"https:\/\/skyplanner.ai\/sk\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/sk\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]},{"@type":"Person","@id":"https:\/\/skyplanner.ai\/sk\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5","name":"Jussi M\u00e4ntyl\u00e4","image":{"@type":"ImageObject","inLanguage":"sk-SK","@id":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","caption":"Jussi M\u00e4ntyl\u00e4"}}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/economic-order-quantity-hero.png",1776,999,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/economic-order-quantity-hero-150x150.png",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/economic-order-quantity-hero-300x169.png",300,169,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/economic-order-quantity-hero-768x432.png",768,432,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/economic-order-quantity-hero-1024x576.png",1024,576,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/economic-order-quantity-hero-1536x864.png",1536,864,true],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/economic-order-quantity-hero.png",1776,999,false],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/economic-order-quantity-hero-360x203.png",360,203,true]},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/sk\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Optim\u00e1lna ve\u013ekos\u0165 objedn\u00e1vky: vypo\u010d\u00edtajte v\u00fdhodnej\u0161ie n\u00e1kupn\u00e9 mno\u017estvo Domov &raquo; Zdroje &raquo; Optim\u00e1lna ve\u013ekos\u0165 objedn\u00e1vky: vypo\u010d\u00edtajte v\u00fdhodnej\u0161ie n\u00e1kupn\u00e9 mno\u017estvo Optim\u00e1lna ve\u013ekos\u0165 objedn\u00e1vky (EOQ) je mno\u017estvo na doplnenie z\u00e1sob, pri ktorom s\u00fa v z\u00e1kladnom modeli EOQ s\u00fahrnn\u00e9 n\u00e1klady na objedn\u00e1vanie a dr\u017ebu z\u00e1sob najni\u017e\u0161ie. V\u00fdrobcovi, ktor\u00fd pravidelne nakupuje ur\u010dit\u00fd komponent, odpoved\u00e1 na ot\u00e1zku: ko\u013eko m\u00e1me zaka\u017ed\u00fdm objedna\u0165&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/sk\/wp-json\/wp\/v2\/posts\/107900","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/sk\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/sk\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/sk\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/sk\/wp-json\/wp\/v2\/comments?post=107900"}],"version-history":[{"count":1,"href":"https:\/\/skyplanner.ai\/sk\/wp-json\/wp\/v2\/posts\/107900\/revisions"}],"predecessor-version":[{"id":107963,"href":"https:\/\/skyplanner.ai\/sk\/wp-json\/wp\/v2\/posts\/107900\/revisions\/107963"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/sk\/wp-json\/wp\/v2\/media\/107916"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/sk\/wp-json\/wp\/v2\/media?parent=107900"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/sk\/wp-json\/wp\/v2\/categories?post=107900"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/sk\/wp-json\/wp\/v2\/tags?post=107900"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}