{"id":101438,"date":"2026-10-17T17:00:34","date_gmt":"2026-10-17T17:00:34","guid":{"rendered":"https:\/\/skyplanner.ai\/?p=101438"},"modified":"2026-10-17T17:01:54","modified_gmt":"2026-10-17T17:01:54","slug":"meranie-prace-vo-vyrobe","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/sk\/zdroje-sk\/meranie-prace-vo-vyrobe\/","title":{"rendered":"Meranie pr\u00e1ce vo v\u00fdrobe: ur\u010dite pou\u017eite\u013en\u00fd normovan\u00fd \u010das"},"content":{"rendered":"<div class=\"gb-container gb-container-article01 article-main-content-container\">\n\n<h1 class=\"wp-block-heading\">Meranie pr\u00e1ce vo v\u00fdrobe: ur\u010dite pou\u017eite\u013en\u00fd normovan\u00fd \u010das<\/h1>\n\n<div class=\"gb-container gb-container-article02\">\n\n<p><a href=\"\/sk\/\">Domov<\/a> &raquo; <a href=\"https:\/\/skyplanner.ai\/sk\/zdroje\/\">Zdroje<\/a> &raquo; Meranie pr\u00e1ce vo v\u00fdrobe: ur\u010dite pou\u017eite\u013en\u00fd normovan\u00fd \u010das<\/p>\n\n\n<p class=\"yoast-reading-time__wrapper\"><span class=\"yoast-reading-time__icon\"><svg aria-hidden=\"true\" focusable=\"false\" data-icon=\"clock\" width=\"20\" height=\"20\" fill=\"none\" stroke=\"currentColor\" style=\"display:inline-block;vertical-align:-0.1em\" role=\"img\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewBox=\"0 0 24 24\"><path stroke-linecap=\"round\" stroke-linejoin=\"round\" stroke-width=\"2\" d=\"M12 8v4l3 3m6-3a9 9 0 11-18 0 9 9 0 0118 0z\"><\/path><\/svg><\/span><span class=\"yoast-reading-time__spacer\" style=\"display:inline-block;width:1em\"><\/span><span class=\"yoast-reading-time__descriptive-text\">Odhadovan\u00fd \u010das \u010d\u00edtania: <\/span><span class=\"yoast-reading-time__reading-time\">11<\/span><span class=\"yoast-reading-time__time-unit\"> min\u00fat<\/span><\/p>\n\n<\/div>\n<div class=\"gb-container gb-container-article03\">\n\n<p>Meranie pr\u00e1ce vo v\u00fdrobe sl\u00fa\u017ei na ur\u010denie toho, ako dlho m\u00e1 presne vymedzen\u00e1 pr\u00e1ca trva\u0165 za stanoven\u00fdch podmienok. Pri priamom meran\u00ed stopkami rozdel\u00edte pr\u00e1cu na prvky, zmeriate ich trvanie, pod\u013ea potreby zoh\u013eadn\u00edte norm\u00e1lne pracovn\u00e9 tempo a prid\u00e1te od\u00f4vodnen\u00e9 \u010dasov\u00e9 prir\u00e1\u017eky. Tak z\u00edskate normovan\u00fd \u010das.<\/p>\n\n\n<p>D\u00f4le\u017eit\u00e9 je slovn\u00e9 spojenie <strong>presne vymedzen\u00e1<\/strong>. Priemer \u010dasov vyk\u00e1zan\u00fdch na oper\u00e1cie za minul\u00fd mesiac m\u00f4\u017ee zah\u0155\u0148a\u0165 r\u00f4zne pracovn\u00e9 postupy, \u010dakanie na materi\u00e1l aj \u010das na zau\u010denie. Meran\u00edm najr\u00fdchlej\u0161ieho oper\u00e1tora z\u00edskate in\u00e9 \u010d\u00edslo, nie v\u0161ak nevyhnutne lep\u0161iu normu.<\/p>\n\n\n<p>Dobre vykonan\u00e9 meranie poskytne \u010das, ktor\u00fd dok\u00e1\u017eete zd\u00f4vodni\u0165, overi\u0165 a pri zmene pr\u00e1ce aktualizova\u0165. SkyPlanner v\u00e1m potom pom\u00f4\u017ee vyu\u017ei\u0165 realistick\u00e9 \u010dasy oper\u00e1ci\u00ed pri pl\u00e1novan\u00ed v\u0161etk\u00fdch nevybaven\u00fdch objedn\u00e1vok namiesto toho, aby ste iba opravili \u010d\u00edslo v ERP a ru\u010dne upravovali poradie oper\u00e1ci\u00ed na ka\u017edom dotknutom stroji.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Nameran\u00fd \u010das, norm\u00e1lny \u010das a normovan\u00fd \u010das<\/h2>\n\n\n<p>Tieto tri hodnoty odpovedaj\u00fa na odli\u0161n\u00e9 ot\u00e1zky:<\/p>\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>\u010cas<\/th><th>\u010co vyjadruje<\/th><th>\u010co treba pozna\u0165<\/th><\/tr><\/thead><tbody><tr><td>Nameran\u00fd \u010das<\/td><td>Ako dlho sledovan\u00e1 pr\u00e1ca skuto\u010dne trvala<\/td><td>Pracovn\u00fd postup, okamih za\u010diatku a konca merania a podmienky po\u010das pozorovania<\/td><\/tr><tr><td>Norm\u00e1lny \u010das<\/td><td>\u010cas na vykonanie vymedzenej pr\u00e1ce pri referen\u010dnom pracovnom tempe<\/td><td>Od\u00f4vodnen\u00e9 hodnotenie pracovn\u00e9ho tempa pri ru\u010dnej pr\u00e1ci, ktorej trvanie z\u00e1vis\u00ed od tempa<\/td><\/tr><tr><td>Normovan\u00fd \u010das<\/td><td>Norm\u00e1lny \u010das vr\u00e1tane pr\u00edslu\u0161n\u00fdch \u010dasov\u00fdch prir\u00e1\u017eok<\/td><td>Ktor\u00e9 \u010dasov\u00e9 prir\u00e1\u017eky sa uplat\u0148uj\u00fa a ako sa po\u010d\u00edtaj\u00fa<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>Normovan\u00fd \u010das nie je r\u00fdchlostn\u00fd rekord. Vyjadruje \u010das na pr\u00e1cu pod\u013ea stanoven\u00e9ho postupu, ktor\u00fa vykon\u00e1va za\u0161kolen\u00fd a zru\u010dn\u00fd pracovn\u00edk pri referen\u010dnom tempe, vr\u00e1tane potrebn\u00fdch \u010dasov\u00fdch prir\u00e1\u017eok.<\/p>\n\n\n<p>Ani norma \u010dasu \u013eudskej pr\u00e1ce automaticky neur\u010duje, na ako dlho treba rezervova\u0165 stroj. Stroj m\u00f4\u017ee pracova\u0165, k\u00fdm oper\u00e1tor kontroluje predch\u00e1dzaj\u00faci diel. Tento rozdiel majte na zreteli po\u010das cel\u00e9ho merania: najprv ur\u010dujete obsah pr\u00e1ce a a\u017e potom rozhodujete, ako za\u0165a\u017e\u00ed jednotliv\u00e9 zdroje.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Vyberte met\u00f3du merania pod\u013ea charakteru pr\u00e1ce<\/h2>\n\n\n<p>Priame meranie stopkami je vhodn\u00e9 pre ust\u00e1len\u00fa, opakuj\u00facu sa pr\u00e1cu, ktorej jednotliv\u00e9 prvky mo\u017eno pozorova\u0165. Je dobrou vo\u013ebou, ke\u010f potrebujete pochopi\u0165, pre\u010do je s\u00fa\u010dasn\u00e1 norma nespr\u00e1vna, a nie ju len nahradi\u0165 \u010fal\u0161\u00edm odhadom.<\/p>\n\n\n<p>In\u00e9 situ\u00e1cie si vy\u017eaduj\u00fa odli\u0161n\u00fd pr\u00edstup:<\/p>\n\n\n<ul class=\"wp-block-list\"><li><strong>Podobn\u00e9 oper\u00e1cie vyu\u017e\u00edvaj\u00fa rovnak\u00e9, u\u017e zn\u00e1me prvky.<\/strong> Overen\u00fd syst\u00e9m \u010dasov\u00fdch normat\u00edvov umo\u017e\u0148uje sklada\u0165 \u010das zo stanoven\u00fdch \u010dasov jednotliv\u00fdch prvkov, ak sa zhoduje pracovn\u00fd postup aj ovplyv\u0148uj\u00face faktory. Nesp\u00e1jajte rozdielne v\u00fdrobky do jedn\u00e9ho priemeru.<\/li><li><strong>Postup ru\u010dnej pr\u00e1ce sa navrhuje e\u0161te pred spusten\u00edm v\u00fdroby.<\/strong> Syst\u00e9m vopred ur\u010den\u00fdch \u010dasov pohybov umo\u017e\u0148uje zostavi\u0165 \u010das z definovan\u00fdch pohybov. Zvolen\u00fd syst\u00e9m mus\u00ed pou\u017e\u00edva\u0165 za\u0161kolen\u00fd odborn\u00edk; nejde o odhad pracovn\u00e9ho tempa pri meran\u00ed stopkami.<\/li><li><strong>Potrebujete zisti\u0165, ako sa vyu\u017e\u00edva \u010das po\u010das zmeny.<\/strong> Momentov\u00e9 pozorovanie umo\u017e\u0148uje odhadn\u00fa\u0165 podiel \u010dasu venovan\u00e9ho \u010dinnostiam alebo prestojom. M\u00f4\u017ee by\u0165 podkladom na pos\u00fadenie \u010dasov\u00fdch prir\u00e1\u017eok, samo osebe v\u0161ak neposkytuje podrobn\u00fd \u010das ka\u017ed\u00e9ho kr\u00e1tkeho pracovn\u00e9ho prvku.<\/li><li><strong>Trvanie ur\u010duje samotn\u00fd proces.<\/strong> Vypo\u010d\u00edtajte alebo overte strojov\u00fd \u010das pod\u013ea programu \u010di parametrov procesu a pr\u00e1cu oper\u00e1tora merajte samostatne.<\/li><\/ul>\n\n\n<p>Historick\u00e9 z\u00e1znamy o oper\u00e1ci\u00e1ch s\u00fa na\u010falej u\u017eito\u010dn\u00fdm podkladom. Sk\u00f4r ne\u017e ich pou\u017eijete ako normu, overte si, \u010do obsahuj\u00fa: vyk\u00e1zan\u00fd \u010das zah\u0155\u0148aj\u00faci \u010dakanie na ch\u00fdbaj\u00faci materi\u00e1l s\u00e1m osebe neprezrad\u00ed norm\u00e1lny \u010das potrebn\u00fd na ru\u010dn\u00fa pr\u00e1cu.<\/p>\n\n\n<p>Nasleduj\u00faci postup sa zameriava na priame meranie opakuj\u00facej sa pr\u00e1ce.<\/p>\n\n\n<h2 class=\"wp-block-heading\">1. Pred spusten\u00edm stopiek vymedzte pracovn\u00fd postup<\/h2>\n\n\n<p>Vyberte oper\u00e1ciu, pri ktorej vierohodnej\u0161ia norma ovplyvn\u00ed konkr\u00e9tne rozhodnutie. M\u00f4\u017ee \u00eds\u0165 napr\u00edklad o silne za\u0165a\u017een\u00e9 mont\u00e1\u017ene pracovisko alebo opakovan\u00fa oper\u00e1ciu, ktorej trvanie pl\u00e1nova\u010dov pravidelne prekvapuje.<\/p>\n\n\n<p>Op\u00ed\u0161te v\u00fdrobok a jeho rev\u00edziu, zariadenie, n\u00e1stroje a pr\u00edpravky, sp\u00f4sob pripravenia materi\u00e1lu, sled \u00fakonov a po\u017eadovan\u00e9 kontroly kvality. Ur\u010dite udalosti, ktor\u00fdmi sa meranie za\u010d\u00edna a kon\u010d\u00ed. Jasne uve\u010fte, \u010di sa v\u00fdsledok vz\u0165ahuje na kus, cyklus alebo d\u00e1vku, a jednorazov\u00e9 nastavenie evidujte oddelene.<\/p>\n\n\n<p>Prejdite si tento opis s \u013eu\u010fmi, ktor\u00ed oper\u00e1ciu vykon\u00e1vaj\u00fa. Vysvetlite im, pre\u010do sa meranie rob\u00ed a ako sa v\u00fdsledky pou\u017eij\u00fa. Ich sk\u00fasenosti \u010dasto odhalia nevyhnutn\u00e9 \u00fakony, ktor\u00e9 v doteraj\u0161om odhade ch\u00fdbaj\u00fa, napr\u00edklad doplnenie dielov do pr\u00edpravku alebo pravideln\u00fa kontrolu.<\/p>\n\n\n<p>Pozorujte za\u0161kolen\u00e9ho oper\u00e1tora, ktor\u00fd pou\u017e\u00edva zaveden\u00fd bezpe\u010dn\u00fd postup. Ak sa pr\u00edpravok e\u0161te upravuje alebo sa oper\u00e1tor iba u\u010d\u00ed sled \u00fakonov, najprv postup ust\u00e1\u013ete. \u010eal\u0161ie merania stopkami neurobia z neust\u00e1len\u00e9ho procesu spo\u013eahliv\u00fa normu.<\/p>\n\n\n<h2 class=\"wp-block-heading\">2. Zaznamenajte pracovn\u00e9 prvky, ich frekvenciu a v\u00fdnimky<\/h2>\n\n\n<p>Rozde\u013ete oper\u00e1ciu pod\u013ea jasn\u00fdch, pozorovate\u013en\u00fdch udalost\u00ed: teleso je osaden\u00e9 v pr\u00edpravku, spojovacie prvky s\u00fa dotiahnut\u00e9, kontrola je dokon\u010den\u00e1. Odde\u013ete ru\u010dn\u00fa pr\u00e1cu z\u00e1visl\u00fa od tempa od \u010dasu riaden\u00e9ho strojom. Pri \u00fakonoch, ktor\u00e9 sa vykon\u00e1vaj\u00fa len ob\u010das, napr\u00edklad pri v\u00fdmene prepravky, zaznamenajte ich frekvenciu. Nepo\u010d\u00edtajte ich tak, akoby sa vykon\u00e1vali pri ka\u017edom kuse.<\/p>\n\n\n<p>Pri ka\u017edom pozorovan\u00ed uchovajte \u010das pracovn\u00e9ho prvku, pr\u00edslu\u0161n\u00e9 podmienky a pr\u00edpadn\u00e9 hodnotenie pracovn\u00e9ho tempa. Preru\u0161enia zaznamen\u00e1vajte hne\u010f, ke\u010f nastan\u00fa. Ak ch\u00fdba s\u00fa\u010diastka alebo sa zlom\u00ed n\u00e1stroj, udalos\u0165 aj jej trvanie zap\u00ed\u0161te samostatne. Dlh\u00fa nameran\u00fa hodnotu nevyma\u017ete bez vysvetlenia ani ju neschovajte do priemeru be\u017enej pr\u00e1ce.<\/p>\n\n\n<p>Pozorovania zbierajte po\u010das reprezentat\u00edvneho priebehu v\u00fdroby, nielen pri jednej vhodnej s\u00e9rii bez preru\u0161en\u00ed. Overte, \u010di rovnak\u00fd postup za rovnak\u00fdch podmienok prin\u00e1\u0161a primerane konzistentn\u00e9 \u010dasy pracovn\u00fdch prvkov. Ak nie, h\u013eadajte pr\u00ed\u010dinu: odli\u0161n\u00fd sp\u00f4sob pripravenia materi\u00e1lu si m\u00f4\u017ee vy\u017eadova\u0165 samostatn\u00fd postup, zatia\u013e \u010do ojedinel\u00fa chybu merania treba zdokumentovane opravi\u0165.<\/p>\n\n\n<p><strong>Neexistuje univerz\u00e1lny po\u010det cyklov, ktor\u00fd zaru\u010d\u00ed dostato\u010dnos\u0165 merania.<\/strong> Po\u010det pozorovan\u00ed z\u00e1vis\u00ed od variability, po\u017eadovanej presnosti a rozhodnutia, na ktor\u00e9 m\u00e1 norma sl\u00fa\u017ei\u0165. Na \u00favodnej vzorke pos\u00fa\u010fte rozptyl a potom ur\u010dite potrebn\u00fd rozsah vzorky pod\u013ea zvolen\u00fdch krit\u00e9ri\u00ed spo\u013eahlivosti a presnosti. Toto pos\u00fadenie m\u00f4\u017ee vykona\u0165 vy\u0161kolen\u00fd odborn\u00edk na meranie pr\u00e1ce. Desa\u0165 takmer rovnak\u00fdch hodn\u00f4t z jednej neobvyklej s\u00e9rie nenahrad\u00ed reprezentat\u00edvne podklady.<\/p>\n\n\n<h2 class=\"wp-block-heading\">3. Prepo\u010d\u00edtajte nameran\u00e9 \u010dasy ru\u010dnej pr\u00e1ce na norm\u00e1lny \u010das<\/h2>\n\n\n<p>Pre ka\u017ed\u00fd pracovn\u00fd prvok vypo\u010d\u00edtajte z porovnate\u013en\u00fdch meran\u00ed reprezentat\u00edvny nameran\u00fd \u010das, zvy\u010dajne ich aritmetick\u00fd priemer. Uchovajte d\u00f4vody vyradenia ka\u017edej hodnoty. Ak sa tempo medzi pozorovaniami l\u00ed\u0161i, pr\u00edslu\u0161n\u00e9 \u010dasy najprv prepo\u010d\u00edtajte na norm\u00e1lne tempo a a\u017e potom ich spriemerujte. Nepou\u017e\u00edvajte priemern\u00e9 hodnotenie tempa, ktor\u00e9 nezodpoved\u00e1 jednotliv\u00fdm meraniam.<\/p>\n\n\n<p>Hodnotenie pracovn\u00e9ho tempa porovn\u00e1va pozorovan\u00e9 tempo ru\u010dnej pr\u00e1ce so stanoven\u00fdm referen\u010dn\u00fdm tempom. Pri stupnici, na ktorej norm\u00e1lne tempo predstavuje 100 %, plat\u00ed v\u00fdpo\u010det:<\/p>\n\n\n<p><strong>Norm\u00e1lny \u010das ru\u010dnej pr\u00e1ce = nameran\u00fd \u010das ru\u010dnej pr\u00e1ce \u00d7 koeficient hodnotenia tempa<\/strong><\/p>\n\n\n<p>Hodnoteniu 110 % zodpoved\u00e1 koeficient 1,10. Znamen\u00e1 to, \u017ee pozorovan\u00e1 pr\u00e1ca sa vykon\u00e1vala r\u00fdchlej\u0161ie ne\u017e pri referen\u010dnom tempe, a preto je jej norm\u00e1lny \u010das dlh\u0161\u00ed ne\u017e nameran\u00fd \u010das. Hodnotenie pod 100 % vedie k opa\u010dnej \u00faprave.<\/p>\n\n\n<p>Hodnotenie tempa nie je percento zvolen\u00e9 tak, aby v\u00fdsledok zodpovedal starej norme v ERP. Vy\u017eaduje si vy\u0161kolen\u00e9ho hodnotite\u013ea, jednotn\u00fa referenciu a pos\u00fadenie priamo po\u010das pozorovania pr\u00e1ce. Ak hodnotenie nedok\u00e1\u017eete zd\u00f4vodni\u0165, ponechajte v\u00fdsledok ako nameran\u00fa hodnotu a neprezentujte ho ako normu pri norm\u00e1lnom tempe.<\/p>\n\n\n<p>Hodnotenie tempa uplat\u0148ujte na pr\u00edslu\u0161n\u00e9 prvky ru\u010dnej pr\u00e1ce, nie plo\u0161ne na cel\u00fd uplynut\u00fd \u010das oper\u00e1cie. Automatick\u00fd trojmin\u00fatov\u00fd cyklus ohrevu sa nepred\u013a\u017ei preto, \u017ee pracovn\u00edk pri vkladan\u00ed dielov pracoval tempom 110 %. Ak sa tempo medzi pozorovaniami men\u00ed, uchov\u00e1vajte ka\u017ed\u00fd \u010das spolu s pr\u00edslu\u0161n\u00fdm hodnoten\u00edm, aby v\u00fdpo\u010det odr\u00e1\u017eal skuto\u010dne pozorovan\u00fa pr\u00e1cu.<\/p>\n\n\n<h2 class=\"wp-block-heading\">4. Pridajte \u010dasov\u00e9 prir\u00e1\u017eky s jasne ur\u010den\u00fdm z\u00e1kladom v\u00fdpo\u010dtu<\/h2>\n\n\n<p>Samotn\u00fd norm\u00e1lny \u010das pr\u00e1ce nepokr\u00fdva v\u0161etky opr\u00e1vnen\u00e9 \u010dasov\u00e9 n\u00e1roky po\u010das pracovn\u00e9ho d\u0148a. Osobn\u00e9 potreby, zotavenie z pracovnej z\u00e1\u0165a\u017ee a pr\u00edslu\u0161n\u00e9 nevyhnutn\u00e9 prestoje treba primerane zoh\u013eadni\u0165.<\/p>\n\n\n<p>Tieto \u010dasov\u00e9 prir\u00e1\u017eky ur\u010dte pod\u013ea podmienok danej pr\u00e1ce, pou\u017eitej met\u00f3dy merania a podkladov o pr\u00edslu\u0161n\u00fdch \u010dinnostiach \u010di preru\u0161eniach. Rozsiahlej\u0161ie pozorovanie alebo momentov\u00e9 pozorovanie m\u00f4\u017ee pom\u00f4c\u0165 ur\u010di\u0165 \u010das opakuj\u00facich sa podporn\u00fdch \u010dinnost\u00ed a prestojov. Potrebu zotavenia treba pos\u00fadi\u0165 pod\u013ea pr\u00e1ce a jej podmienok. Percento prevzat\u00e9 z in\u00e9ho z\u00e1vodu tak\u00e9to pos\u00fadenie nenahr\u00e1dza.<\/p>\n\n\n<p>Nezab\u00fadajte na potrebn\u00e9 \u00fakony, ktor\u00e9 sa vykon\u00e1vaj\u00fa len ob\u010das. Ak je pravideln\u00e1 v\u00fdmena prepravky u\u017e zahrnut\u00e1 ako pracovn\u00fd prvok, nezapo\u010d\u00edtavajte ju znova do v\u0161eobecnej prir\u00e1\u017eky na prestoje. Rovnako nezah\u0155\u0148ajte ka\u017ed\u00fa odstr\u00e1nite\u013en\u00fa poruchu \u010di \u010dakanie na materi\u00e1l natrvalo do obsahu pr\u00e1ce. Tieto straty evidujte, aby sa dali rie\u0161i\u0165, a jasne ur\u010dte, ako sa s nimi pracuje pri pl\u00e1novan\u00ed.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Pr\u00edklad v\u00fdpo\u010dtu: od nameran\u00fdch hodn\u00f4t k norme<\/h3>\n\n\n<p>Predstavte si ust\u00e1len\u00fa ru\u010dn\u00fa mont\u00e1\u017enu oper\u00e1ciu. Nasleduj\u00face hodnoty ilustruj\u00fa v\u00fdpo\u010det; hodnotenie tempa ani \u010dasov\u00e1 prir\u00e1\u017eka nie s\u00fa odpor\u00fa\u010dan\u00edm pre v\u00e1\u0161 z\u00e1vod. Predpokladajme, \u017ee uveden\u00e9 pracovn\u00e9 prvky prebiehaj\u00fa postupne, ka\u017ed\u00fd iba raz na jednu zostavu, a odborn\u00edk zd\u00f4vodnil hodnotenie pozorovanej ru\u010dnej pr\u00e1ce na \u00farovni 110 %.<\/p>\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Prvok ru\u010dnej pr\u00e1ce<\/th><th>Zvolen\u00fd nameran\u00fd \u010das<\/th><th>Koeficient hodnotenia tempa<\/th><th>Norm\u00e1lny \u010das<\/th><\/tr><\/thead><tbody><tr><td>Osadenie telesa<\/td><td>30 sek\u00fand<\/td><td>1,10<\/td><td>33 sek\u00fand<\/td><\/tr><tr><td>Spojenie zostavy<\/td><td>40 sek\u00fand<\/td><td>1,10<\/td><td>44 sek\u00fand<\/td><\/tr><tr><td>Kontrola a ulo\u017eenie do podnosu<\/td><td>20 sek\u00fand<\/td><td>1,10<\/td><td>22 sek\u00fand<\/td><\/tr><tr><td>Opakovan\u00e1 pr\u00e1ca spolu<\/td><td>90 sek\u00fand<\/td><td><\/td><td>99 sek\u00fand<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>Po ka\u017ed\u00fdch 20 zostav\u00e1ch je navy\u0161e potrebn\u00e9 vymeni\u0165 z\u00e1sobn\u00edk. Samostatne stanoven\u00fd norm\u00e1lny \u010das tejto v\u00fdmeny je 60 sek\u00fand, tak\u017ee na jednu zostavu pripad\u00e1 60 \u00f7 20 = 3 sekundy. Celkov\u00fd norm\u00e1lny \u010das pr\u00e1ce je teda <strong>102 sek\u00fand na zostavu<\/strong>.<\/p>\n\n\n<p>Teraz predpokladajme, \u017ee na z\u00e1klade merania stanov\u00edme \u010dasov\u00fa prir\u00e1\u017eku vo v\u00fd\u0161ke 15 % norm\u00e1lneho \u010dasu:<\/p>\n\n\n<p><strong>Normovan\u00fd \u010das = norm\u00e1lny \u010das \u00d7 (1 + \u010dasov\u00e1 prir\u00e1\u017eka)<\/strong><\/p>\n\n\n<p>102 \u00d7 1,15 = <strong>117,3 sekundy na zostavu<\/strong>.<\/p>\n\n\n<p>Z\u00e1le\u017e\u00ed na tom, z ak\u00e9ho z\u00e1kladu sa prir\u00e1\u017eka po\u010d\u00edta. Ak je namiesto toho vyjadren\u00e1 ako 15 % celkov\u00e9ho normovan\u00e9ho \u010dasu, pou\u017eite:<\/p>\n\n\n<p><strong>Normovan\u00fd \u010das = norm\u00e1lny \u010das \u00f7 (1 \u2212 \u010dasov\u00e1 prir\u00e1\u017eka)<\/strong><\/p>\n\n\n<p>102 \u00f7 0,85 = <strong>120 sek\u00fand na zostavu<\/strong>.<\/p>\n\n\n<p>V\u00fdsledky sa l\u00ed\u0161ia, preto\u017ee \u201e15 %\u201c vyjadruje dva rozdielne pomery. Zaznamenajte, z ak\u00e9ho z\u00e1kladu sa prir\u00e1\u017eka vo va\u0161ej norme po\u010d\u00edta. Pl\u00e1nova\u010d, ktor\u00fd bude normu nesk\u00f4r pou\u017e\u00edva\u0165, by to nemal musie\u0165 sp\u00e4tne zis\u0165ova\u0165 z v\u00fdsledn\u00e9ho \u010d\u00edsla.<\/p>\n\n\n<h2 class=\"wp-block-heading\">5. Overte a schv\u00e1\u013ete normu, ktor\u00fa budete m\u00f4c\u0165 priebe\u017ene aktualizova\u0165<\/h2>\n\n\n<p>Sk\u00f4r ne\u017e nahrad\u00edte s\u00fa\u010dasn\u00fa normu, overte v\u00fdsledok pri \u010fal\u0161\u00edch opakovaniach pr\u00e1ce rovnakou met\u00f3dou a za rovnak\u00fdch podmienok. Porovn\u00e1vajte zodpovedaj\u00face mno\u017estv\u00e1 a rovnako vymedzen\u00e9 \u010dasov\u00e9 \u00faseky vr\u00e1tane periodickej pr\u00e1ce a \u010dasov\u00fdch prir\u00e1\u017eok zahrnut\u00fdch v norme. Ak je jeden cyklus krat\u0161\u00ed ne\u017e normovan\u00fd \u010das zah\u0155\u0148aj\u00faci prir\u00e1\u017eky, neznamen\u00e1 to, \u017ee treba prir\u00e1\u017eku zru\u0161i\u0165.<\/p>\n\n\n<p>Nevysvetlen\u00e9 rozdiely prejdite s oper\u00e1torom a osobou zodpovednou za pracovn\u00fa met\u00f3du. Ak v\u00fdsledok neobstoj\u00ed preto, \u017ee ch\u00fdba podstatn\u00fd pracovn\u00fd \u00fakon, opravte meranie. Ak sa pracovn\u00e1 met\u00f3da l\u00ed\u0161i, definujte jej varianty. Nezvy\u0161ujte normovan\u00fd \u010das len preto, aby sa do\u0148 zmestili v\u0161etky historick\u00e9 \u010dasov\u00e9 z\u00e1znamy.<\/p>\n\n\n<p>Uchov\u00e1vajte doh\u013eadate\u013en\u00fd z\u00e1znam, ktor\u00fd obsahuje:<\/p>\n\n\n<ul class=\"wp-block-list\"><li>V\u00fdrobok, oper\u00e1ciu, verziu pracovnej met\u00f3dy a podmienky vyu\u017eitia zdrojov, na ktor\u00e9 sa norma vz\u0165ahuje.<\/li><li>P\u00f4vodn\u00e9 merania, frekvenciu pracovn\u00fdch \u00fakonov a sp\u00f4sob spracovania v\u00fdnimiek.<\/li><li>Pou\u017eit\u00fd syst\u00e9m hodnotenia pracovn\u00e9ho tempa, samotn\u00e9 hodnotenie a v\u00fdpo\u010det norm\u00e1lneho \u010dasu.<\/li><li>Kateg\u00f3rie \u010dasov\u00fdch prir\u00e1\u017eok, podklady na ich stanovenie, z\u00e1klad ich v\u00fdpo\u010dtu a v\u00fdsledn\u00fd normovan\u00fd \u010das.<\/li><li>V\u00fdsledok overenia, osobu zodpovedn\u00fa za kontrolu, d\u00e1tum \u00fa\u010dinnosti a podnety na rev\u00edziu.<\/li><\/ul>\n\n\n<p>Normu uvo\u013enite do pou\u017e\u00edvania prostredn\u00edctvom v\u00e1\u0161ho schva\u013eovacieho procesu v technickej pr\u00edprave v\u00fdroby. Schv\u00e1lenie potvrdzuje, \u017ee podklady a rozsah platnosti normy s\u00fa vhodn\u00e9 na pou\u017eitie; nenahr\u00e1dza meranie dohodnut\u00fdm \u010d\u00edslom.<\/p>\n\n\n<p>Normu znovu presk\u00famajte pri zmene n\u00e1strojov, materi\u00e1lu, kon\u0161trukcie, po\u017eiadaviek na kontrolu alebo pracovnej met\u00f3dy, ako aj vtedy, ke\u010f porovnate\u013en\u00e9 skuto\u010dn\u00e9 \u00fadaje dlhodobo vykazuj\u00fa nevysvetlen\u00fd rozdiel. Uchovajte predch\u00e1dzaj\u00facu verziu, aby ste vedeli odl\u00ed\u0161i\u0165 skuto\u010dn\u00e9 zlep\u0161enie pracovnej met\u00f3dy od zmeny sp\u00f4sobu evidencie \u010dasu.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Preve\u010fte normovan\u00fd \u010das na spr\u00e1vne za\u0165a\u017eenie zdrojov<\/h2>\n\n\n<p>Pred zadan\u00edm v\u00fdsledku do modelu rozvrhovania si polo\u017ete ot\u00e1zku: <strong>ktor\u00fd zdroj sa t\u00fdmto \u010dasom rezervuje?<\/strong><\/p>\n\n\n<p>V pr\u00edklade s v\u00fdlu\u010dne ru\u010dnou pr\u00e1cou norma opisuje mont\u00e1\u017e na jednom pracovisku. Pri obr\u00e1ban\u00ed sa v\u0161ak pr\u00e1ca oper\u00e1tora, automatick\u00fd chod stroja a kontrola m\u00f4\u017eu prekr\u00fdva\u0165. Ich jednoduch\u00fdm s\u010d\u00edtan\u00edm by ste nadhodnotili dobu obsadenia stroja. Ak by ste pou\u017eili iba \u010das rezania, mohli by ste vynecha\u0165 zakladanie obrobku, bez ktor\u00e9ho sa \u010fal\u0161\u00ed cyklus nem\u00f4\u017ee za\u010da\u0165.<\/p>\n\n\n<p>Ak je prekr\u00fdvanie \u010dinnost\u00ed d\u00f4le\u017eit\u00e9, zakreslite \u010dinnosti oper\u00e1tora a stroja na s\u00fabe\u017en\u00e9 \u010dasov\u00e9 osi. Ur\u010dte, kedy je ka\u017ed\u00fd zdroj obsaden\u00fd a \u010di oper\u00e1tor m\u00f4\u017ee po\u010das automatick\u00e9ho chodu skuto\u010dne vykon\u00e1va\u0165 in\u00fa oper\u00e1ciu. Nepredpokladajte, \u017ee chod bez obsluhy znamen\u00e1 neobmedzen\u00fa dostupnos\u0165 oper\u00e1tora.<\/p>\n\n\n<p>Zos\u00fala\u010fte aj \u010dasov\u00e9 prir\u00e1\u017eky s kalend\u00e1rom zdroja. Prest\u00e1vka, ktor\u00e1 u\u017e bola odpo\u010d\u00edtan\u00e1 z disponibiln\u00e9ho pracovn\u00e9ho \u010dasu, by nemala druh\u00fdkr\u00e1t zni\u017eova\u0165 kapacitu prostredn\u00edctvom prir\u00e1\u017eky za t\u00fa ist\u00fa prest\u00e1vku. Normovan\u00fd \u010das stanoven\u00fd meran\u00edm zachovajte, ale zdokumentujte, ako sa jeho jednotliv\u00e9 zlo\u017eky premietaj\u00fa do pl\u00e1novan\u00e9ho trvania a disponibilnej kapacity.<\/p>\n\n\n<p>Pri v\u00fdpo\u010dte \u010dasu na kus a samostatnom zoh\u013eadnen\u00ed \u010dasu nastavenia pre r\u00f4zne mno\u017estv\u00e1 v z\u00e1kazke vyu\u017eite n\u00e1\u0161ho <a href=\"https:\/\/skyplanner.ai\/sk\/zdroje-sk\/cas-cyklu-vo-vyrobe\/\">sprievodcu \u010dasom cyklu vo v\u00fdrobe<\/a>. Tu v\u0161ak rie\u0161ime ot\u00e1zku, ktor\u00e1 tomu predch\u00e1dza: \u010di v\u00fdchodiskov\u00fd normovan\u00fd \u010das v\u00f4bec zodpoved\u00e1 definovanej pr\u00e1ci.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Vyu\u017eite presnej\u0161ie \u010dasy pri pl\u00e1novan\u00ed so SkyPlanner<\/h2>\n\n\n<p>Opraven\u00fd \u010das trvania ovplyv\u0148uje aj in\u00e9 oper\u00e1cie ne\u017e t\u00fa, ktor\u00fa ste merali. Men\u00ed to, ko\u013eko \u010dasu treba pre \u0148u vyhradi\u0165 v rozvrhu stroja, kedy sa m\u00f4\u017eu za\u010da\u0165 nadv\u00e4zuj\u00face pr\u00e1ce a ako ostatn\u00e9 z\u00e1kazky s\u00faperia o rovnak\u00fa kapacitu. Aktualiz\u00e1ciou jednej hodnoty v kme\u0148ov\u00fdch \u00fadajoch sa t\u00e1to pl\u00e1novacia pr\u00e1ca iba za\u010d\u00edna.<\/p>\n\n\n<p>SkyPlanner umo\u017e\u0148uje definova\u0165 trvanie jednotliv\u00fdch oper\u00e1ci\u00ed, \u010dasy nastavenia a ukon\u010dovac\u00edch pr\u00e1c, vhodn\u00e9 pracovisk\u00e1 aj z\u00e1vislosti. Arcturus, jeho umel\u00e1 inteligencia na rozvrhovanie, <a href=\"https:\/\/skyplanner.ai\/sk\/zdroje-sk\/co-je-planovanie-vyroby\/\">vypo\u010d\u00edta v\u00fdrobn\u00fd rozvrh<\/a> pod\u013ea nastaven\u00fdch zdrojov a prior\u00edt a v\u00fdsledok zobraz\u00ed Ganttov diagram. M\u00f4\u017eete tak pos\u00fadi\u0165 vplyv realistickej\u0161\u00edch \u010dasov na v\u0161etky nevybaven\u00e9 objedn\u00e1vky namiesto ru\u010dn\u00e9ho preusporiadania ka\u017ed\u00e9ho dotknut\u00e9ho radu oper\u00e1ci\u00ed. Priority ur\u010dujete vy a svoje rozhodnutia chr\u00e1nite pravidlami a uzamknutiami.<\/p>\n\n\n<p>N\u00e1stroje Timer a ShopFloor v SkyPlanner podporuj\u00fa evidenciu \u010dasu a mno\u017estiev, v\u010faka \u010domu z\u00edskate skuto\u010dn\u00e9 v\u00fdrobn\u00e9 \u00fadaje na neskor\u0161ie presk\u00famanie. SkyPlanner pon\u00faka aj predikciu trvania oper\u00e1ci\u00ed na z\u00e1klade historick\u00fdch \u010dasov\u00fdch z\u00e1znamov. Pom\u00e1ha v\u00e1m tak udr\u017eiava\u0165 pl\u00e1novacie odhady v s\u00falade so sk\u00fasenos\u0165ami z v\u00fdroby. Meranie ur\u010duje, ko\u013eko \u010dasu by mala definovan\u00e1 pr\u00e1ca vy\u017eadova\u0165 pri norm\u00e1lnom pracovnom tempe; predikcia z historick\u00fdch \u00fadajov pom\u00e1ha odhadova\u0165 trvanie na z\u00e1klade zaznamenanej v\u00fdroby. Pri rozhodovan\u00ed, ktor\u00fd vstup pou\u017ei\u0165, tieto \u00fa\u010dely rozli\u0161ujte.<\/p>\n\n\n<p><a href=\"https:\/\/skyplanner.ai\/sk\/pribehy-zakaznikov\/mamec\/\">Sk\u00fasenosti spolo\u010dnosti Mamec<\/a> ukazuj\u00fa, pre\u010do je koordinovan\u00e9 rozvrhovanie d\u00f4le\u017eit\u00e9. Tento f\u00ednsky v\u00fdrobca mal tis\u00edce vz\u00e1jomne z\u00e1visl\u00fdch pracovn\u00fdch pr\u00edkazov a ich priority ur\u010doval pod\u013ea term\u00ednov dodania na papierov\u00fdch pr\u00edkazoch. SkyPlanner bol integrovan\u00fd s jeho syst\u00e9mom Oscar ERP a stal sa hlavnou platformou na pl\u00e1novanie v\u00fdroby. Mamec uv\u00e1dza, \u017ee z\u00edskal spolo\u010dn\u00fd preh\u013ead o v\u00fdrobe v re\u00e1lnom \u010dase a v\u00fdrazne sa mu zn\u00ed\u017eila z\u00e1\u0165a\u017e spojen\u00e1 s pl\u00e1novan\u00edm. Jeho pr\u00edbeh ukazuje hodnotu riadenia pl\u00e1nu ako celku namiesto samostatn\u00e9ho ru\u010dn\u00e9ho rozhodovania o ka\u017edom porad\u00ed oper\u00e1ci\u00ed.<\/p>\n\n\n<p><strong>Vyberte si SkyPlanner, ke\u010f chcete presnej\u0161ie \u010dasy oper\u00e1ci\u00ed premeni\u0165 na lep\u0161\u00ed v\u00fdrobn\u00fd rozvrh.<\/strong> Prostredn\u00edctvom otvoren\u00e9ho REST API sa integruje s \u013eubovo\u013en\u00fdm syst\u00e9mom ERP alebo MES. M\u00f4\u017eete si tak ponecha\u0165 existuj\u00face syst\u00e9my a z\u00e1rove\u0148 vyu\u017ei\u0165 realistick\u00e9 \u010dasy pri pl\u00e1novan\u00ed do obmedzen\u00fdch kapac\u00edt.<\/p>\n\n\n<p><a href=\"https:\/\/skyplanner.ai\/sk\/kontakt-na-predaj\/\">Rezervujte si uk\u00e1\u017eku SkyPlanner<\/a> a pripravte si aktu\u00e1lnu normu jednej oper\u00e1cie, z\u00e1znam z jej merania, ned\u00e1vne skuto\u010dn\u00e9 \u00fadaje a typick\u00fd technologick\u00fd postup z\u00e1kazky. Z\u00edskate t\u00fdm konkr\u00e9tny v\u00fdchodiskov\u00fd bod na pos\u00fadenie, ako m\u00f4\u017ee podlo\u017een\u00fd \u010das zlep\u0161i\u0165 pl\u00e1n, pod\u013ea ktor\u00e9ho va\u0161a v\u00fdroba pracuje. Ak sa chcete najprv zozn\u00e1mi\u0165 so syst\u00e9mom sami, <a href=\"https:\/\/skyplanner.ai\/sk\/skusobna-verzia\/\">vysk\u00fa\u0161ajte SkyPlanner s uk\u00e1\u017ekov\u00fdmi \u00fadajmi<\/a>.<\/p>\n\n<\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>Meranie pr\u00e1ce vo v\u00fdrobe: ur\u010dite pou\u017eite\u013en\u00fd normovan\u00fd \u010das Domov &raquo; Zdroje &raquo; Meranie pr\u00e1ce vo v\u00fdrobe: ur\u010dite pou\u017eite\u013en\u00fd normovan\u00fd \u010das Meranie pr\u00e1ce vo v\u00fdrobe sl\u00fa\u017ei na ur\u010denie toho, ako dlho m\u00e1 presne vymedzen\u00e1 pr\u00e1ca trva\u0165 za stanoven\u00fdch podmienok. Pri priamom meran\u00ed stopkami rozdel\u00edte pr\u00e1cu na prvky, zmeriate ich trvanie, pod\u013ea potreby zoh\u013eadn\u00edte norm\u00e1lne pracovn\u00e9 tempo &#8230; <a title=\"Meranie pr\u00e1ce vo v\u00fdrobe: ur\u010dite pou\u017eite\u013en\u00fd normovan\u00fd \u010das\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/sk\/zdroje-sk\/meranie-prace-vo-vyrobe\/\" aria-label=\"Pre\u010d\u00edtajte si viac o Meranie pr\u00e1ce vo v\u00fdrobe: ur\u010dite pou\u017eite\u013en\u00fd normovan\u00fd \u010das\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":101453,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[2566,318],"tags":[],"class_list":["post-101438","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-efektivita-vyroby-sk","category-zdroje-sk","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Meranie pr\u00e1ce vo v\u00fdrobe: ur\u010dite pou\u017eite\u013en\u00fd normovan\u00fd \u010das<\/title>\n<meta name=\"description\" content=\"Nahra\u010fte star\u00e9 odhady podlo\u017een\u00fdm normovan\u00fdm \u010dasom. Zistite, ako mera\u0165 pr\u00e1cu, hodnoti\u0165 tempo, ur\u010di\u0165 \u010dasov\u00e9 prir\u00e1\u017eky a pl\u00e1nova\u0165 so SkyPlanner.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/sk\/zdroje-sk\/meranie-prace-vo-vyrobe\/\" \/>\n<meta property=\"og:locale\" content=\"sk_SK\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Meranie pr\u00e1ce vo v\u00fdrobe: ur\u010dite pou\u017eite\u013en\u00fd normovan\u00fd \u010das\" \/>\n<meta property=\"og:description\" content=\"Nahra\u010fte star\u00e9 odhady podlo\u017een\u00fdm normovan\u00fdm \u010dasom. Zistite, ako mera\u0165 pr\u00e1cu, hodnoti\u0165 tempo, ur\u010di\u0165 \u010dasov\u00e9 prir\u00e1\u017eky a pl\u00e1nova\u0165 so SkyPlanner.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/sk\/zdroje-sk\/meranie-prace-vo-vyrobe\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2026-10-17T17:00:34+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-17T17:01:54+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/manufacturing-time-study-hero.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1672\" \/>\n\t<meta property=\"og:image:height\" content=\"941\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Autor\" \/>\n\t<meta name=\"twitter:data1\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n\t<meta name=\"twitter:label2\" content=\"Predpokladan\u00fd \u010das \u010d\u00edtania\" \/>\n\t<meta name=\"twitter:data2\" content=\"15 min\u00fat\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sk\\\/zdroje-sk\\\/meranie-prace-vo-vyrobe\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sk\\\/zdroje-sk\\\/meranie-prace-vo-vyrobe\\\/\"},\"author\":{\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sk\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\"},\"headline\":\"Meranie pr\u00e1ce vo v\u00fdrobe: ur\u010dite pou\u017eite\u013en\u00fd normovan\u00fd \u010das\",\"datePublished\":\"2026-10-17T17:00:34+00:00\",\"dateModified\":\"2026-10-17T17:01:54+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sk\\\/zdroje-sk\\\/meranie-prace-vo-vyrobe\\\/\"},\"wordCount\":3073,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sk\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sk\\\/zdroje-sk\\\/meranie-prace-vo-vyrobe\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/manufacturing-time-study-hero.png\",\"articleSection\":[\"Efektivita v\u00fdroby\",\"zdroje\"],\"inLanguage\":\"sk-SK\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sk\\\/zdroje-sk\\\/meranie-prace-vo-vyrobe\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/sk\\\/zdroje-sk\\\/meranie-prace-vo-vyrobe\\\/\",\"name\":\"Meranie pr\u00e1ce vo v\u00fdrobe: ur\u010dite pou\u017eite\u013en\u00fd normovan\u00fd \u010das\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sk\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sk\\\/zdroje-sk\\\/meranie-prace-vo-vyrobe\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sk\\\/zdroje-sk\\\/meranie-prace-vo-vyrobe\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/manufacturing-time-study-hero.png\",\"datePublished\":\"2026-10-17T17:00:34+00:00\",\"dateModified\":\"2026-10-17T17:01:54+00:00\",\"description\":\"Nahra\u010fte star\u00e9 odhady podlo\u017een\u00fdm normovan\u00fdm \u010dasom. Zistite, ako mera\u0165 pr\u00e1cu, hodnoti\u0165 tempo, ur\u010di\u0165 \u010dasov\u00e9 prir\u00e1\u017eky a pl\u00e1nova\u0165 so SkyPlanner.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sk\\\/zdroje-sk\\\/meranie-prace-vo-vyrobe\\\/#breadcrumb\"},\"inLanguage\":\"sk-SK\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/sk\\\/zdroje-sk\\\/meranie-prace-vo-vyrobe\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"sk-SK\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sk\\\/zdroje-sk\\\/meranie-prace-vo-vyrobe\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/manufacturing-time-study-hero.png\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/manufacturing-time-study-hero.png\",\"width\":1672,\"height\":941,\"caption\":\"Manual assembly in a fixture beside a stopwatch and observation records for a manufacturing time study.\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sk\\\/zdroje-sk\\\/meranie-prace-vo-vyrobe\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/sk\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Meranie pr\u00e1ce vo v\u00fdrobe: ur\u010dite pou\u017eite\u013en\u00fd normovan\u00fd \u010das\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sk\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/sk\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sk\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/sk\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"sk-SK\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sk\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/sk\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"sk-SK\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sk\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sk\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sk\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\",\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"sk-SK\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"caption\":\"Jussi M\u00e4ntyl\u00e4\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Meranie pr\u00e1ce vo v\u00fdrobe: ur\u010dite pou\u017eite\u013en\u00fd normovan\u00fd \u010das","description":"Nahra\u010fte star\u00e9 odhady podlo\u017een\u00fdm normovan\u00fdm \u010dasom. Zistite, ako mera\u0165 pr\u00e1cu, hodnoti\u0165 tempo, ur\u010di\u0165 \u010dasov\u00e9 prir\u00e1\u017eky a pl\u00e1nova\u0165 so SkyPlanner.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/sk\/zdroje-sk\/meranie-prace-vo-vyrobe\/","og_locale":"sk_SK","og_type":"article","og_title":"Meranie pr\u00e1ce vo v\u00fdrobe: ur\u010dite pou\u017eite\u013en\u00fd normovan\u00fd \u010das","og_description":"Nahra\u010fte star\u00e9 odhady podlo\u017een\u00fdm normovan\u00fdm \u010dasom. Zistite, ako mera\u0165 pr\u00e1cu, hodnoti\u0165 tempo, ur\u010di\u0165 \u010dasov\u00e9 prir\u00e1\u017eky a pl\u00e1nova\u0165 so SkyPlanner.","og_url":"https:\/\/skyplanner.ai\/sk\/zdroje-sk\/meranie-prace-vo-vyrobe\/","og_site_name":"SkyPlanner","article_published_time":"2026-10-17T17:00:34+00:00","article_modified_time":"2026-10-17T17:01:54+00:00","og_image":[{"width":1672,"height":941,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/manufacturing-time-study-hero.png","type":"image\/png"}],"author":"Jussi M\u00e4ntyl\u00e4","twitter_card":"summary_large_image","twitter_misc":{"Autor":"Jussi M\u00e4ntyl\u00e4","Predpokladan\u00fd \u010das \u010d\u00edtania":"15 min\u00fat"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/sk\/zdroje-sk\/meranie-prace-vo-vyrobe\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/sk\/zdroje-sk\/meranie-prace-vo-vyrobe\/"},"author":{"name":"Jussi M\u00e4ntyl\u00e4","@id":"https:\/\/skyplanner.ai\/sk\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5"},"headline":"Meranie pr\u00e1ce vo v\u00fdrobe: ur\u010dite pou\u017eite\u013en\u00fd normovan\u00fd \u010das","datePublished":"2026-10-17T17:00:34+00:00","dateModified":"2026-10-17T17:01:54+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/sk\/zdroje-sk\/meranie-prace-vo-vyrobe\/"},"wordCount":3073,"publisher":{"@id":"https:\/\/skyplanner.ai\/sk\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/sk\/zdroje-sk\/meranie-prace-vo-vyrobe\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/manufacturing-time-study-hero.png","articleSection":["Efektivita v\u00fdroby","zdroje"],"inLanguage":"sk-SK"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/sk\/zdroje-sk\/meranie-prace-vo-vyrobe\/","url":"https:\/\/skyplanner.ai\/sk\/zdroje-sk\/meranie-prace-vo-vyrobe\/","name":"Meranie pr\u00e1ce vo v\u00fdrobe: ur\u010dite pou\u017eite\u013en\u00fd normovan\u00fd \u010das","isPartOf":{"@id":"https:\/\/skyplanner.ai\/sk\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/sk\/zdroje-sk\/meranie-prace-vo-vyrobe\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/sk\/zdroje-sk\/meranie-prace-vo-vyrobe\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/manufacturing-time-study-hero.png","datePublished":"2026-10-17T17:00:34+00:00","dateModified":"2026-10-17T17:01:54+00:00","description":"Nahra\u010fte star\u00e9 odhady podlo\u017een\u00fdm normovan\u00fdm \u010dasom. Zistite, ako mera\u0165 pr\u00e1cu, hodnoti\u0165 tempo, ur\u010di\u0165 \u010dasov\u00e9 prir\u00e1\u017eky a pl\u00e1nova\u0165 so SkyPlanner.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/sk\/zdroje-sk\/meranie-prace-vo-vyrobe\/#breadcrumb"},"inLanguage":"sk-SK","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/sk\/zdroje-sk\/meranie-prace-vo-vyrobe\/"]}]},{"@type":"ImageObject","inLanguage":"sk-SK","@id":"https:\/\/skyplanner.ai\/sk\/zdroje-sk\/meranie-prace-vo-vyrobe\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/manufacturing-time-study-hero.png","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/manufacturing-time-study-hero.png","width":1672,"height":941,"caption":"Manual assembly in a fixture beside a stopwatch and observation records for a manufacturing time study."},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/sk\/zdroje-sk\/meranie-prace-vo-vyrobe\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/sk\/"},{"@type":"ListItem","position":2,"name":"Meranie pr\u00e1ce vo v\u00fdrobe: ur\u010dite pou\u017eite\u013en\u00fd normovan\u00fd \u010das"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/sk\/#website","url":"https:\/\/skyplanner.ai\/sk\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/sk\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/sk\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"sk-SK"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/sk\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/sk\/","logo":{"@type":"ImageObject","inLanguage":"sk-SK","@id":"https:\/\/skyplanner.ai\/sk\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/sk\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]},{"@type":"Person","@id":"https:\/\/skyplanner.ai\/sk\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5","name":"Jussi M\u00e4ntyl\u00e4","image":{"@type":"ImageObject","inLanguage":"sk-SK","@id":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","caption":"Jussi M\u00e4ntyl\u00e4"}}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/manufacturing-time-study-hero.png",1672,941,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/manufacturing-time-study-hero-150x150.png",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/manufacturing-time-study-hero-300x169.png",300,169,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/manufacturing-time-study-hero-768x432.png",768,432,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/manufacturing-time-study-hero-1024x576.png",1024,576,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/manufacturing-time-study-hero-1536x864.png",1536,864,true],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/manufacturing-time-study-hero.png",1672,941,false],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/manufacturing-time-study-hero-360x203.png",360,203,true]},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/sk\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Meranie pr\u00e1ce vo v\u00fdrobe: ur\u010dite pou\u017eite\u013en\u00fd normovan\u00fd \u010das Domov &raquo; Zdroje &raquo; Meranie pr\u00e1ce vo v\u00fdrobe: ur\u010dite pou\u017eite\u013en\u00fd normovan\u00fd \u010das Meranie pr\u00e1ce vo v\u00fdrobe sl\u00fa\u017ei na ur\u010denie toho, ako dlho m\u00e1 presne vymedzen\u00e1 pr\u00e1ca trva\u0165 za stanoven\u00fdch podmienok. Pri priamom meran\u00ed stopkami rozdel\u00edte pr\u00e1cu na prvky, zmeriate ich trvanie, pod\u013ea potreby zoh\u013eadn\u00edte norm\u00e1lne pracovn\u00e9 tempo&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/sk\/wp-json\/wp\/v2\/posts\/101438","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/sk\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/sk\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/sk\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/sk\/wp-json\/wp\/v2\/comments?post=101438"}],"version-history":[{"count":1,"href":"https:\/\/skyplanner.ai\/sk\/wp-json\/wp\/v2\/posts\/101438\/revisions"}],"predecessor-version":[{"id":101501,"href":"https:\/\/skyplanner.ai\/sk\/wp-json\/wp\/v2\/posts\/101438\/revisions\/101501"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/sk\/wp-json\/wp\/v2\/media\/101453"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/sk\/wp-json\/wp\/v2\/media?parent=101438"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/sk\/wp-json\/wp\/v2\/categories?post=101438"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/sk\/wp-json\/wp\/v2\/tags?post=101438"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}