{"id":106941,"date":"2026-10-23T13:42:12","date_gmt":"2026-10-23T13:42:12","guid":{"rendered":"https:\/\/skyplanner.ai\/integracie\/erp\/qad-adaptive-erp\/sprievodca-integraciou\/"},"modified":"2026-10-23T13:42:12","modified_gmt":"2026-10-23T13:42:12","slug":"sprievodca-integraciou","status":"publish","type":"page","link":"https:\/\/skyplanner.ai\/sk\/integracie\/erp\/qad-adaptive-erp\/sprievodca-integraciou\/","title":{"rendered":"Sprievodca integr\u00e1ciou QAD Adaptive ERP na rozvrhovanie v\u00fdroby so SkyPlanner APS"},"content":{"rendered":"\n<div class=\"wp-block-group sp-industry-page sp-industry sp-page sp-erp-page\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<section class=\"wp-block-group fx-hero\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__grid\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__copy sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-eyebrow ind-crumbs\"><span><a href=\"\/sk\/integracie\/\">Integr\u00e1cie<\/a> \/ <a href=\"\/sk\/integracie\/erp\/\">ERP<\/a> \/ QAD Adaptive ERP<\/span><\/p>\n\n\n<h1 class=\"wp-block-heading fx-hero__title\">Sprievodca integr\u00e1ciou QAD Adaptive ERP <span class=\"hl\">na rozvrhovanie v\u00fdroby so SkyPlanner APS<\/span><\/h1>\n\n\n<div class=\"wp-block-group fx-hero__sub ind-hero__intro\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Tento sprievodca integr\u00e1ciou QAD Adaptive ERP ukazuje partnerom a IT t\u00edmom, ako prepoji\u0165 QAD Adaptive ERP vr\u00e1tane star\u0161\u00edch in\u0161tal\u00e1ci\u00ed QAD Enterprise Edition a MFG\/PRO so SkyPlanner APS. SkyPlanner sa s QAD Adaptive ERP integruje obojsmerne prostredn\u00edctvom vlastn\u00fdch rozhran\u00ed QAD:<\/p>\n\n\n<ul class=\"wp-block-list fxv-deliver__bul\">\n\n<li>Do SkyPlanner sa pren\u00e1\u0161aj\u00fa v\u00fdrobn\u00e9 pr\u00edkazy a ich oper\u00e1cie, polo\u017eky, \u0161trukt\u00fary v\u00fdrobkov, technologick\u00e9 postupy, pracovisk\u00e1, v\u00fdrobn\u00e9 kalend\u00e1re, z\u00e1soby a n\u00e1kupn\u00e9 objedn\u00e1vky.<\/li>\n\n\n<li>Napl\u00e1novan\u00e9 d\u00e1tumy uvo\u013enenia a dokon\u010denia sa zapisuj\u00fa sp\u00e4\u0165 do Work Order Maintenance (16.1).<\/li>\n\n\n<li>\u010casov\u00e9 z\u00e1znamy oper\u00e1torov sa zapisuj\u00fa sp\u00e4\u0165 cez Labor Feedback by Work Order (16.20.1) a dokon\u010den\u00e9 mno\u017estv\u00e1 cez Work Order Receipt (16.11).<\/li>\n\n\n<li>Webhooky SkyPlanner odosielaj\u00fa zmeny rozvrhu hne\u010f, ako nastan\u00fa.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-buttons fx-hero__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/sk\/skusobna-verzia\/\">Vysk\u00fa\u0161a\u0165 zadarmo<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/sk\/kontakt-na-predaj\/\">Rezervova\u0165 prezent\u00e1ciu<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-hero__media sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"fx-shot\"><div class=\"fx-shot__bar\" aria-hidden=\"true\"><i><\/i><i><\/i><i><\/i><span>skyplanner.ai \u00b7 Rozvrhovanie v\u00fdroby<\/span><\/div><img fetchpriority=\"high\" decoding=\"async\" loading=\"eager\" width=\"1024\" height=\"685\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/20-d7d44cbc-5430-4f97-99f5-fca4632862ef.png\" alt=\"Ganttov diagram SkyPlanner APS s oper\u00e1ciami rozvrhnut\u00fdmi na jednotliv\u00e9 pracovisk\u00e1 a so zoznamom z\u00e1kaziek pod n\u00edm.\"><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--intro\" id=\"overview\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>T\u00edm SkyPlanner po\u010das zav\u00e1dzania nakonfiguruje integr\u00e1ciu pod\u013ea v\u00e1\u0161ho nastavenia QAD a po spusten\u00ed ostrej prev\u00e1dzky poskytuje podporu. Tento sprievodca je ur\u010den\u00fd partnerom a v\u00fdvoj\u00e1rom, ktor\u00ed sa chc\u00fa zapoji\u0165 alebo sami vytvori\u0165 rie\u0161enie na z\u00e1klade zdokumentovan\u00e9ho REST API SkyPlanner (<a href=\"https:\/\/integration.skyplanner.app\/api\/swagger\">referen\u010dn\u00e1 dokument\u00e1cia API<\/a>).<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"qad-s-integration-interfaces\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Integra\u010dn\u00e9 rozhrania QAD<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>QAD pon\u00faka extern\u00e9mu rozvrhovaciemu syst\u00e9mu tri mo\u017enosti prepojenia:<\/p>\n\n\n<ol class=\"wp-block-list\">\n\n<li><strong>QAD QXtend Inbound (QXI).<\/strong> QAD ho opisuje ako &#8222;a Web services-based, SOAP-compliant, XML framework, enabling complete platform-independent access to QAD Enterprise Applications business functionality.&#8220; (R\u00e1mec XML zalo\u017een\u00fd na webov\u00fdch slu\u017eb\u00e1ch a kompatibiln\u00fd so SOAP, ktor\u00fd poskytuje \u00fapln\u00fd pr\u00edstup k podnikov\u00fdm funkci\u00e1m QAD Enterprise Applications nez\u00e1visle od platformy.) Ka\u017ed\u00e1 po\u017eiadavka m\u00e1 podobu dokumentu <strong>QDoc<\/strong>, ktor\u00fd spust\u00ed program QAD s rovnakou valid\u00e1ciou ako na jeho obrazovke. Na ka\u017ed\u00fa po\u017eiadavku sa vracia odpove\u010f vo forme dokumentu QDoc. Medzi vydan\u00e9 dokumenty QDoc patria <code>maintainItemMaster<\/code>, <code>maintainRouting<\/code> a <code>maintainPurchaseOrder<\/code>. Pre programy bez vydan\u00e9ho dokumentu QDoc sl\u00fa\u017ei n\u00e1stroj <strong>QGen<\/strong> od QAD, ktor\u00fd mapuje program z ponuky: &#8222;QGen is used to map custom programs or QAD Enterprise Applications programs that do not have released QDoc schemas and events files.&#8220; (QGen sa pou\u017e\u00edva na mapovanie vlastn\u00fdch programov alebo programov QAD Enterprise Applications, pre ktor\u00e9 neboli vydan\u00e9 sch\u00e9my QDoc a s\u00fabory udalost\u00ed.) T\u00fato mo\u017enos\u0165 vyu\u017e\u00edva aj samotn\u00fd QAD: &#8222;QAD Production Scheduler uses QAD QXtend to update work orders.&#8220; (QAD Production Scheduler pou\u017e\u00edva QAD QXtend na aktualiz\u00e1ciu v\u00fdrobn\u00fdch pr\u00edkazov.) (<a href=\"https:\/\/connect.qad.com\/documents\/2370665\/2370949\/Qxtend_UG_v0110.pdf\/093456b1-c885-de26-7e61-754987199fa7?t=1634559415409&amp;download=true\">Pr\u00edru\u010dka QXtend<\/a>)<\/li>\n\n\n<li><strong>QAD QXtend Outbound (QXO).<\/strong> QXO &#8222;exports user-configurable business objects as XML QDocs out of QAD products.&#8220; (Exportuje pou\u017e\u00edvate\u013esky konfigurovate\u013en\u00e9 podnikov\u00e9 objekty z produktov QAD ako dokumenty XML QDoc.) Medzi \u0161tandardn\u00e9 podnikov\u00e9 objekty patria Item, Product Structure, Routing, Work Center, Department, Inventory Transaction a Inventory Status.<\/li>\n\n\n<li><strong>REST API pre podnikov\u00e9 dokumenty.<\/strong> Od verzie Adaptive ERP 2022.1 plat\u00ed: &#8222;Query REST APIs are now available for business documents,&#8220; (Pre podnikov\u00e9 dokumenty s\u00fa teraz k dispoz\u00edcii dopytovacie rozhrania REST API.) Podporuj\u00fa filtrovanie, triedenie, str\u00e1nkovanie a na\u010d\u00edtanie \u010dasti \u00fadajov. Dokument\u00e1ciu n\u00e1jdete v n\u00e1stroji Swagger vo svojej in\u0161tancii (<a href=\"https:\/\/connect.qad.com\/documents\/2370665\/159231649\/QAD_Adaptive_ERP_Web_UI_RN_v2022_1.pdf\/602f6b29-ef47-decd-4825-127b06b25b16?t=1670945442202&amp;download=true\">pozn\u00e1mky k vydaniu<\/a>).<\/li>\n\n<\/ol>\n\n\n<p>Z\u00e1pis \u00fadajov zabezpe\u010duje QXtend. Na \u010d\u00edtanie sl\u00fa\u017eia QXO a dopytovacie rozhrania REST API.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"authentication-and-licensing\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Autentifik\u00e1cia a licencie<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ul class=\"wp-block-list\">\n\n<li><strong>QXtend Inbound.<\/strong> Ak je na prij\u00edma\u010di zapnut\u00e9 nastavenie Require Authentication, ka\u017ed\u00fd dokument QDoc obsahuje Session ID alebo pou\u017e\u00edvate\u013esk\u00e9 meno a heslo QAD. Pred spusten\u00edm programu QXI skontroluje pr\u00edstupov\u00e9 pr\u00e1va pou\u017e\u00edvate\u013ea k ponuke.<\/li>\n\n\n<li><strong>Integra\u010dn\u00fd pou\u017e\u00edvate\u013e.<\/strong> Vytvorte samostatn\u00e9ho pou\u017e\u00edvate\u013ea QAD s pr\u00edstupom len k t\u00fdm programom v ponuke, ktor\u00e9 integr\u00e1cia vol\u00e1: Work Order Maintenance, Labor Feedback by Work Order, Work Order Receipt a programy na spr\u00e1vu kme\u0148ov\u00fdch d\u00e1t.<\/li>\n\n\n<li><strong>Licencia QXtend.<\/strong> QXtend sa licencuje pod\u013ea agentov a prij\u00edma\u010dov. Pr\u00edru\u010dka QAD uv\u00e1dza, \u017ee komunik\u00e1cia webov\u00fdch slu\u017eieb s externou aplik\u00e1ciou v oboch smeroch nie je bezplatn\u00e1. Preto si licenciu QXtend overte e\u0161te pred za\u010diatkom projektu.<\/li>\n\n<\/ul>\n\n\n<p>Na strane SkyPlanner sa REST API autentifikuje tokenom API v hlavi\u010dke <code>Authorization-Token<\/code> (SkyPlanner Settings &gt; API). Dokument\u00e1cia je dostupn\u00e1 vo form\u00e1te Swagger\/OpenAPI. <a href=\"\/sk\/docs\/navod-na-integraciu\/\">Integra\u010dn\u00fd n\u00e1vod<\/a> v\u00e1s prevedie prv\u00fdmi volaniami.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"events-and-change-data\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Udalosti a zmeny \u00fadajov<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>QXtend Outbound je mechanizmus QAD na spracovanie zmien \u00fadajov. &#8222;A change occurs to watched data in QAD Enterprise Applications. Change notifications are written out to the qxevents database.&#8220; (V sledovan\u00fdch \u00fadajoch QAD Enterprise Applications nastane zmena. Ozn\u00e1menia o zmen\u00e1ch sa zap\u00ed\u0161u do datab\u00e1zy qxevents.) QXO potom vytvor\u00ed dokumenty QDoc a doru\u010d\u00ed ich &#8222;to a directory location where the subscriber polls for and picks up new QDocs,&#8220; (do adres\u00e1ra, v ktorom odberate\u013e pravidelne vyh\u013ead\u00e1va a preber\u00e1 nov\u00e9 dokumenty QDoc) alebo webovej slu\u017ebe, ktor\u00e1 prij\u00edma po\u017eiadavky na ur\u010ditej URL.<\/p>\n\n\n<p>SkyPlanner odober\u00e1 \u00fadaje publikovan\u00e9 cez QXO ako webov\u00e1 slu\u017eba. \u00dadaje, ktor\u00e9 QXO nepokr\u00fdva, pravidelne na\u010d\u00edtava cez dopytovacie rozhrania REST API. Work Order nepatr\u00ed medzi \u0161tandardn\u00e9 podnikov\u00e9 objekty QXO. Integr\u00e1cia preto bu\u010f prid\u00e1 podnikov\u00fd objekt QXO nad tabu\u013ekami v\u00fdrobn\u00fdch pr\u00edkazov (<code>wo_mstr<\/code>, <code>wr_route<\/code>), alebo na\u010d\u00edtava v\u00fdrobn\u00e9 pr\u00edkazy cez dopytovacie rozhrania REST API ka\u017ed\u00fdch nieko\u013eko min\u00fat.<\/p>\n\n\n<p>SkyPlanner odosiela webhooky pri zmene stavu alebo rozvrhu, tak\u017ee sp\u00e4tn\u00fd z\u00e1pis je riaden\u00fd udalos\u0165ami.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"data-mapping\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Mapovanie d\u00e1t<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th>Objekt QAD (program, rozhranie)<\/th><th>Objekt v SkyPlanner<\/th><th>Smer<\/th><th>Frekvencia<\/th><\/tr><\/thead><tbody><tr><td>Polo\u017eky (Item Master Maintenance 1.4.1; QXO Item)<\/td><td>Produkty a materi\u00e1ly<\/td><td>QAD \u2192 SkyPlanner<\/td><td>\u00davodn\u00e9 na\u010d\u00edtanie, potom pri zmene cez QXO<\/td><\/tr><tr><td>\u0160trukt\u00fary v\u00fdrobkov (13.5; QXO Product Structure)<\/td><td>\u0160trukt\u00fara produktu, \u010diastkov\u00e9 produkty, materi\u00e1ly pre jednotliv\u00e9 produkty<\/td><td>QAD \u2192 SkyPlanner<\/td><td>\u00davodn\u00e9 na\u010d\u00edtanie, potom pri zmene cez QXO<\/td><\/tr><tr><td>Technologick\u00e9 postupy (14.13.1; QXO Routing): \u010dakanie pred oper\u00e1ciou, pr\u00edprava, spracovanie, \u010dakanie po oper\u00e1cii, presun<\/td><td>Oper\u00e1cie s \u010dasmi trvania, pr\u00edpravy a ukon\u010denia<\/td><td>QAD \u2192 SkyPlanner<\/td><td>\u00davodn\u00e9 na\u010d\u00edtanie, potom pri zmene cez QXO<\/td><\/tr><tr><td>Pracovisk\u00e1 (14.5) a oddelenia (14.1; QXO Work Center, Department)<\/td><td>Pracovisk\u00e1, skupiny pracov\u00edsk, efektivita<\/td><td>QAD \u2192 SkyPlanner<\/td><td>\u00davodn\u00e9 na\u010d\u00edtanie, potom len zriedka<\/td><\/tr><tr><td>Kalend\u00e1re v\u00fdroby a pracov\u00edsk<\/td><td>Zmeny a nepracovn\u00e9 dni<\/td><td>QAD \u2192 SkyPlanner<\/td><td>Denne alebo spr\u00e1va zmien v SkyPlanner<\/td><\/tr><tr><td>V\u00fdrobn\u00e9 pr\u00edkazy (16.1) s technologick\u00fdm postupom pr\u00edkazu (16.13.13) a komponentmi<\/td><td>Z\u00e1kazky a oper\u00e1cie s term\u00ednmi dokon\u010denia a po\u017eiadavkami na materi\u00e1l<\/td><td>QAD \u2192 SkyPlanner<\/td><td>Vlastn\u00fd objekt QXO alebo na\u010d\u00edtavanie cez REST ka\u017ed\u00fdch nieko\u013eko min\u00fat<\/td><\/tr><tr><td>Z\u00e1soby (QXO Inventory Status, Inventory Transaction)<\/td><td>Stavy z\u00e1sob<\/td><td>QAD \u2192 SkyPlanner<\/td><td>Pri zmene alebo ka\u017ed\u00fa hodinu<\/td><\/tr><tr><td>N\u00e1kupn\u00e9 objedn\u00e1vky s term\u00ednmi dodania<\/td><td>N\u00e1kupn\u00e9 objedn\u00e1vky, o\u010dak\u00e1van\u00fd materi\u00e1l pod\u013ea d\u00e1tumu dodania<\/td><td>QAD \u2192 SkyPlanner<\/td><td>Na\u010d\u00edtavanie ka\u017ed\u00fa hodinu alebo pri spusten\u00ed rozvrhovania<\/td><\/tr><tr><td>D\u00e1tumy uvo\u013enenia a dokon\u010denia v\u00fdrobn\u00fdch pr\u00edkazov (Work Order Maintenance 16.1, QXtend Inbound QDoc)<\/td><td>Pl\u00e1novan\u00fd za\u010diatok a koniec ka\u017edej z\u00e1kazky<\/td><td>SkyPlanner \u2192 QAD<\/td><td>Pri zmene rozvrhu cez webhook SkyPlanner<\/td><\/tr><tr><td>Labor Feedback by Work Order (16.20.1): \u010das pr\u00edpravy a spracovania pre ka\u017ed\u00fa oper\u00e1ciu<\/td><td>\u010casov\u00e9 z\u00e1znamy a potvrdenia obsluhy<\/td><td>SkyPlanner \u2192 QAD<\/td><td>Pri ka\u017edom potvrden\u00ed alebo za ka\u017ed\u00fa zmenu, ak si to zvol\u00edte<\/td><\/tr><tr><td>Work Order Receipt (16.11)<\/td><td>Dokon\u010den\u00e9 mno\u017estv\u00e1<\/td><td>SkyPlanner \u2192 QAD<\/td><td>Pri ka\u017edom potvrden\u00ed, ak si to zvol\u00edte<\/td><\/tr><tr><td>Nie je v QAD<\/td><td>Matica \u010dasov prestavenia, n\u00e1stroje ako zdroje s obmedzenou kapacitou, alternat\u00edvne stroje a pracovn\u00edci<\/td><td>Spravuje sa v SkyPlanner<\/td><td>Nastavenie po\u010das zav\u00e1dzania<\/td><\/tr><\/tbody><\/table><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"integration-patterns\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Integra\u010dn\u00e9 postupy<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p><strong>1. \u00davodn\u00e9 na\u010d\u00edtanie kme\u0148ov\u00fdch d\u00e1t.<\/strong> Na\u010d\u00edtajte polo\u017eky, \u0161trukt\u00fary v\u00fdrobkov, technologick\u00e9 postupy, pracovisk\u00e1 a kalend\u00e1re cez QXO alebo dopytovacie rozhrania REST API. Mapovanie pracov\u00edsk si premyslite: z pracoviska so \u0161tyrmi strojmi vznikne jedna skupina pracov\u00edsk alebo \u0161tyri pracovisk\u00e1. Na pracovisk\u00e1 mo\u017eno previes\u0165 aj linky opakovanej v\u00fdroby z Production Line Maintenance.<\/p>\n\n\n<p><strong>2. Synchroniz\u00e1cia v\u00fdrobn\u00fdch pr\u00edkazov.<\/strong> Na\u010d\u00edtajte pevne napl\u00e1novan\u00e9 a uvo\u013enen\u00e9 v\u00fdrobn\u00e9 pr\u00edkazy s ich technologick\u00fdmi postupmi a komponentmi, ako aj otvoren\u00e9 n\u00e1kupn\u00e9 objedn\u00e1vky. SkyPlanner pova\u017euje objednan\u00fd materi\u00e1l za dostupn\u00fd k d\u00e1tumu dodania n\u00e1kupnej objedn\u00e1vky a aktualizuje z\u00e1soby, ke\u010f sa objedn\u00e1vka ozna\u010d\u00ed stavom Delivered.<\/p>\n\n\n<p>Rozvrhujte v\u00fdrobn\u00e9 pr\u00edkazy, nie pl\u00e1novan\u00e9 objedn\u00e1vky MRP. Pl\u00e1novan\u00e9 objedn\u00e1vky sa musia najprv v QAD zmeni\u0165 na pevne napl\u00e1novan\u00e9 alebo uvo\u013enen\u00e9 v\u00fdrobn\u00e9 pr\u00edkazy.<\/p>\n\n\n<p><strong>3. Sp\u00e4tn\u00fd z\u00e1pis rozvrhu.<\/strong> Ke\u010f pl\u00e1novac\u00ed mechanizmus zarad\u00ed alebo presunie z\u00e1kazku, webhook SkyPlanner vyvol\u00e1 QXtend Inbound QDoc pre Work Order Maintenance (16.1). D\u00e1tum uvo\u013enenia nastav\u00ed pod\u013ea prvej napl\u00e1novanej oper\u00e1cie a d\u00e1tum dokon\u010denia pod\u013ea poslednej. QXtend spust\u00ed program s vlastnou valid\u00e1ciou QAD a vr\u00e1ti odpove\u010f vo forme dokumentu QDoc, ktor\u00fa integr\u00e1cia skontroluje.<\/p>\n\n\n<p>Poradie oper\u00e1ci\u00ed na ka\u017edom stroji zost\u00e1va v SkyPlanner a oper\u00e1tori ho dost\u00e1vaj\u00fa cez Mobile Confirmations. Integr\u00e1cia sa tak vyhne obmedzeniam QAD, ktor\u00e9 pri uvo\u013enen\u00fdch pr\u00edkazoch blokuj\u00fa zmeny technologick\u00e9ho postupu.<\/p>\n\n\n<p><strong>4. Potvrdzovanie pr\u00e1ce vo v\u00fdrobe.<\/strong> Oper\u00e1tori zaznamen\u00e1vaj\u00fa pr\u00e1cu cez SkyPlanner Mobile Confirmations alebo Production Timer. \u010casov\u00e9 z\u00e1znamy udr\u017eiavaj\u00fa rozvrh aktu\u00e1lny. Vy rozhodnete, \u010di sa skuto\u010dn\u00e9 \u010dasy maj\u00fa zapisova\u0165 sp\u00e4\u0165 do QAD. Ak \u00e1no, \u010das pr\u00edpravy a spracovania sa pren\u00e1\u0161a pre ka\u017ed\u00fa oper\u00e1ciu do Labor Feedback by Work Order a dokon\u010den\u00e9 mno\u017estv\u00e1 do Work Order Receipt. Ak nie, pr\u00e1ca sa eviduje v QAD ako doteraz.<\/p>\n\n\n<p><strong>5. Pravidl\u00e1 vlastn\u00edctva \u00fadajov a rie\u0161enia konfliktov.<\/strong> Sp\u00ed\u0161te ich pred spusten\u00edm ostrej prev\u00e1dzky:<\/p>\n\n\n<figure class=\"wp-block-table ind-table\"><table><thead><tr><th>\u00dadaje<\/th><th>Vlastn\u00edk<\/th><\/tr><\/thead><tbody><tr><td>Polo\u017eky, \u0161trukt\u00fary v\u00fdrobkov, technologick\u00e9 postupy, mno\u017estv\u00e1, stav v\u00fdrobn\u00e9ho pr\u00edkazu<\/td><td>QAD<\/td><\/tr><tr><td>Poradie oper\u00e1ci\u00ed, \u010dasy za\u010diatku a konca, priradenie strojov<\/td><td>SkyPlanner<\/td><\/tr><tr><td>D\u00e1tumy uvo\u013enenia a dokon\u010denia v\u00fdrobn\u00fdch pr\u00edkazov<\/td><td>SkyPlanner zapisuje, QAD uklad\u00e1<\/td><\/tr><tr><td>Matica \u010dasov prestavenia, po\u017eiadavky na n\u00e1stroje a oper\u00e1torov, alternat\u00edvne zdroje<\/td><td>SkyPlanner<\/td><\/tr><tr><td>Zmeny a nepracovn\u00e9 dni<\/td><td>Jeden syst\u00e9m vybran\u00fd pri definovan\u00ed rozsahu<\/td><\/tr><tr><td>Pr\u00e1ca, v\u00fddaje komponentov a pr\u00edjmy<\/td><td>QAD; \u00fadaje sa zad\u00e1vaj\u00fa priamo v \u0148om alebo pren\u00e1\u0161aj\u00fa z \u010dasov\u00fdch z\u00e1znamov SkyPlanner<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>Ur\u010dte jeden syst\u00e9m, ktor\u00fd bude zapisova\u0165 d\u00e1tumy v\u00fdrobn\u00fdch pr\u00edkazov. SkyPlanner nepotrebuje rozvrhovac\u00ed modul QAD. Pri z\u00e1kazk\u00e1ch, ktor\u00e9 rozvrhuje, preto preber\u00e1 z\u00e1pis d\u00e1tumov namiesto n\u00e1strojov na rozvrhovanie alebo in\u00fdch rozvrhovac\u00edch syst\u00e9mov.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"typical-project-steps\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Typick\u00fd priebeh projektu<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Implement\u00e1cia sa zvy\u010dajne dokon\u010d\u00ed v priebehu nieko\u013ek\u00fdch t\u00fd\u017ed\u0148ov od za\u010diatku zav\u00e1dzania. E\u0161te predt\u00fdm si po\u010das 30-d\u0148ovej bezplatnej sk\u00fa\u0161obnej verzie overte rozvrh s pracoviskami, technologick\u00fdmi postupmi a otvoren\u00fdmi v\u00fdrobn\u00fdmi pr\u00edkazmi exportovan\u00fdmi z QAD vo form\u00e1te CSV alebo Excel.<\/p>\n\n\n<ol class=\"wp-block-list\">\n\n<li><strong>Mapovanie.<\/strong> Dohodnite mapovaciu tabu\u013eku, pravidl\u00e1 vlastn\u00edctva \u00fadajov, zahrnut\u00e9 prev\u00e1dzky a dom\u00e9ny, frekvenciu synchroniz\u00e1cie a to, \u010di sa \u00fadaje o pr\u00e1ci bud\u00fa zapisova\u0165 sp\u00e4\u0165.<\/li>\n\n\n<li><strong>Pr\u00edstup do QAD.<\/strong> Vytvorte integra\u010dn\u00e9ho pou\u017e\u00edvate\u013ea, overte licencie QXtend a nastavte prij\u00edma\u010d QXtend a odberate\u013ea QXO. Najprv v\u0161etko otestujte v testovacej dom\u00e9ne.<\/li>\n\n\n<li><strong>Nastavenie QDoc.<\/strong> Tam, kde existuj\u00fa vydan\u00e9 dokumenty QDoc, ich pou\u017eite. Pod\u013ea potreby vygenerujte pomocou QGen dokumenty QDoc pre Work Order Maintenance, Labor Feedback by Work Order a Work Order Receipt.<\/li>\n\n\n<li><strong>\u00davodn\u00e9 na\u010d\u00edtanie.<\/strong> Polo\u017eky, \u0161trukt\u00fary v\u00fdrobkov, technologick\u00e9 postupy, pracovisk\u00e1 a kalend\u00e1re.<\/li>\n\n\n<li><strong>Synchroniz\u00e1cia v\u00fdrobn\u00fdch pr\u00edkazov a n\u00e1kupn\u00fdch objedn\u00e1vok.<\/strong> Udalosti QXO alebo pravideln\u00e9 na\u010d\u00edtavanie cez REST s filtrovan\u00edm, str\u00e1nkovan\u00edm a opakovan\u00edm ne\u00faspe\u0161n\u00fdch po\u017eiadaviek.<\/li>\n\n\n<li><strong>Nastavenie obmedzen\u00ed v SkyPlanner.<\/strong> Matica \u010dasov prestavenia, n\u00e1stroje, po\u010dty oper\u00e1torov na oper\u00e1ciu a alternat\u00edvne stroje alebo pracovn\u00edci.<\/li>\n\n\n<li><strong>Sp\u00e4tn\u00fd z\u00e1pis rozvrhu a s\u00fabe\u017en\u00e9 testovanie.<\/strong> Zapisujte d\u00e1tumy na z\u00e1klade webhookov SkyPlanner, testujte s\u00fabe\u017ene so s\u00fa\u010dasn\u00fdm pl\u00e1nom, porovn\u00e1vajte d\u00e1tumy a opravujte kme\u0148ov\u00e9 d\u00e1ta.<\/li>\n\n\n<li><strong>Spustenie ostrej prev\u00e1dzky.<\/strong> Ke\u010f sa \u00fadaje zhoduj\u00fa, zapnite sp\u00e4tn\u00fd z\u00e1pis.<\/li>\n\n<\/ol>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"what-to-plan-for-in-a-qad-adaptive-erp-integrati\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Na \u010do myslie\u0165 pri integr\u00e1cii s QAD Adaptive ERP<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Op\u00e4tovn\u00e9 spustenie CRP.<\/strong> CRP prepl\u00e1nuje v\u0161etky otvoren\u00e9 oper\u00e1cie vybran\u00fdch v\u00fdrobn\u00fdch pr\u00edkazov. QAD zachov\u00e1 ru\u010dne nastaven\u00e9 term\u00edny len vtedy, ke\u010f \u201eyou also adjusted the work order release and due date to match,\u201c (zodpovedaj\u00facim sp\u00f4sobom uprav\u00edte aj d\u00e1tum uvo\u013enenia a term\u00edn dokon\u010denia v\u00fdrobn\u00e9ho pr\u00edkazu), \u010do s\u00fa presne \u00fadaje, ktor\u00e9 SkyPlanner zapisuje. Spustite CRP po sp\u00e4tnom z\u00e1pise alebo z neho vyl\u00fa\u010dte pr\u00edkazy, ktor\u00e9 rozvrhuje SkyPlanner.<\/li>\n\n\n<li><strong>Uvo\u013enen\u00e9 technologick\u00e9 postupy sa u\u017e nedaj\u00fa meni\u0165.<\/strong> \u201eOnce the work order status is Exploded, Allocated, or Released, no more changes can be made to the routing.\u201c (Ke\u010f je v\u00fdrobn\u00fd pr\u00edkaz v stave Exploded, Allocated alebo Released, technologick\u00fd postup u\u017e nemo\u017eno meni\u0165.) Na\u010d\u00edtajte technologick\u00fd postup pri uvo\u013enen\u00ed pr\u00edkazu a postupy me\u0148te len pri pl\u00e1novan\u00fdch alebo pevne pl\u00e1novan\u00fdch pr\u00edkazoch.<\/li>\n\n\n<li><strong>\u010casov\u00e9 jednotky v technologickom postupe.<\/strong> Pr\u00edpravn\u00fd a v\u00fdrobn\u00fd \u010das sa zapo\u010d\u00edtavaj\u00fa do za\u0165a\u017eenia, zatia\u013e \u010do \u201equeue, wait, and move times are excluded from load calculations.\u201c (\u010dasy vo fronte, \u010dakania a presunu s\u00fa z v\u00fdpo\u010dtov za\u0165a\u017eenia vyl\u00fa\u010den\u00e9). V SkyPlanner ich modelujte ako kroky, ktor\u00e9 zaberaj\u00fa iba \u010das, a overte, \u010di sa v\u00fdrobn\u00fd \u010das vz\u0165ahuje na jednotku alebo na cel\u00fd pr\u00edkaz.<\/li>\n\n\n<li><strong>Priepustnos\u0165 QXtend.<\/strong> QAD upozor\u0148uje: \u201eUI API adapter performance may be unacceptable when processing high volumes of data or real-time transactions.\u201c (V\u00fdkon adapt\u00e9ra UI API m\u00f4\u017ee by\u0165 pri spracovan\u00ed ve\u013ek\u00fdch objemov d\u00e1t alebo transakci\u00ed v re\u00e1lnom \u010dase neprijate\u013en\u00fd.) Posielajte v d\u00e1vkach iba zmenen\u00e9 pr\u00edkazy a tam, kde s\u00fa k dispoz\u00edcii nat\u00edvne QDocs, pou\u017e\u00edvajte ich.<\/li>\n\n\n<li><strong>Dom\u00e9ny a z\u00e1vody.<\/strong> In\u0161tal\u00e1cie QAD s viacer\u00fdmi dom\u00e9nami ved\u00fa pracovisk\u00e1 a v\u00fdrobn\u00e9 pr\u00edkazy pod\u013ea dom\u00e9ny a z\u00e1vodu. Ka\u017ed\u00fd z\u00e1vod zahrnut\u00fd do rozsahu integr\u00e1cie namapujte na vlastn\u00fa skupinu pracov\u00edsk.<\/li>\n\n\n<li><strong>Kombin\u00e1cia opakovanej a diskr\u00e9tnej v\u00fdroby.<\/strong> Linky v Advanced Repetitive pou\u017e\u00edvaj\u00fa rozvrhy opakovanej v\u00fdroby, nie v\u00fdrobn\u00e9 pr\u00edkazy. Pri definovan\u00ed rozsahu ur\u010dte, ktor\u00e9 linky bude SkyPlanner rozvrhova\u0165.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"who-configures-and-supports-the-qad-integration\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Kto nastavuje integr\u00e1ciu s QAD a poskytuje podporu<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ol class=\"wp-block-list\">\n\n<li><strong>T\u00edm SkyPlanner nastav\u00ed integr\u00e1ciu po\u010das zav\u00e1dzania a po spusten\u00ed ostrej prev\u00e1dzky poskytuje podporu<\/strong> pre dohodnut\u00e9 QDocs, odbery QXO a dopyty REST. Ka\u017ed\u00fd z\u00e1vod pou\u017e\u00edva QAD inak a pr\u00e1ve pri integr\u00e1cii sa tieto znalosti uplatnia.<\/li>\n\n\n<li><strong>Zapoji\u0165 sa m\u00f4\u017ee aj v\u00e1\u0161 partner pre QAD.<\/strong> Pozn\u00e1 va\u0161e dom\u00e9ny, \u00fapravy syst\u00e9mu aj licen\u010dn\u00e9 podmienky a spolu s t\u00edmom SkyPlanner m\u00f4\u017ee nastavi\u0165 QXtend, QGen QDocs a integra\u010dn\u00e9ho pou\u017e\u00edvate\u013ea.<\/li>\n\n\n<li><strong>Va\u0161i vlastn\u00ed v\u00fdvoj\u00e1ri m\u00f4\u017eu integr\u00e1ciu \u010falej rozv\u00edja\u0165<\/strong> cez REST API syst\u00e9mu SkyPlanner s pou\u017eit\u00edm API tokenu. Na za\u010diatok sta\u010d\u00ed API token a t\u00edm SkyPlanner v pr\u00edpade potreby pom\u00f4\u017ee. Dokument\u00e1ciu n\u00e1jdete na str\u00e1nke <a href=\"\/sk\/docs\/navod-na-integraciu\/\">Dokument\u00e1cia integr\u00e1cie SkyPlanner<\/a>.<\/li>\n\n<\/ol>\n\n\n<p>Cena SkyPlanner za\u010d\u00edna na 199 \u20ac mesa\u010dne pri mesa\u010dnej faktur\u00e1cii a zah\u0155\u0148a 5 pracov\u00edsk. Cenov\u00fa ponuku na integr\u00e1ciu pod\u013ea va\u0161ich procesov a potrieb dostanete vopred spolu s ponukou na predplatn\u00e9. Pozrite si <a href=\"\/sk\/cenotvorba\/\">cenn\u00edk<\/a>, <a href=\"\/sk\/integracie\/erp\/qad-adaptive-erp\/planovanie-vyroby\/\">pl\u00e1novanie v\u00fdroby s oh\u013eadom na re\u00e1lne kapacity strojov a pracovn\u00edkov pre QAD Adaptive ERP<\/a>, <a href=\"\/sk\/integracie\/erp\/qad-adaptive-erp\/\">str\u00e1nku QAD Adaptive ERP<\/a> a <a href=\"\/sk\/integracie\/erp\/\">preh\u013ead integr\u00e1ci\u00ed s ERP<\/a>.<\/p>\n\n\n<div class=\"wp-block-buttons ind-prose__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/sk\/skusobna-verzia\/\">Vysk\u00fa\u0161a\u0165 zadarmo<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/sk\/kontakt-na-predaj\/\">Rezervova\u0165 prezent\u00e1ciu<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"customers\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Ako v\u00fdrobcovia hodnotia SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-custs\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/utu-kalle-kalliomaki-2026.jpg\" alt=\"Kalle Kalliom\u00e4ki, \u0161pecialista dod\u00e1vate\u013esk\u00e9ho re\u0165azca v UTU, v hale na v\u00fdrobu rozv\u00e1dza\u010dov v Ulvile\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/23-beca6df2-3fa2-4315-80e8-7c38a9e3d2e1.png\" alt=\"UTU\" width=\"69\" height=\"59\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>2 h<\/b><span>u\u0161etren\u00e9 ka\u017ed\u00fd t\u00fd\u017ede\u0148<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eV\u010faka SkyPlanner sme pri pl\u00e1novan\u00ed v\u00fdroby pre\u0161li od excelov\u00fdch tabuliek k optimaliz\u00e1cii v\u00fdroby v re\u00e1lnom \u010dase.\u201c<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Kalle Kalliom\u00e4ki, \u0161pecialista dod\u00e1vate\u013esk\u00e9ho re\u0165azca<\/b><br>UTU \u00b7 Elektrick\u00e9 rozv\u00e1dza\u010de a sp\u00ednacie zariadenia<\/p>\n\n\n<p class=\"ind-cust__result\">Pl\u00e1novanie v\u00fdroby \u0161etr\u00ed ka\u017ed\u00fd t\u00fd\u017ede\u0148 2 hodiny pracovn\u00e9ho \u010dasu a nov\u00fd zoznam oper\u00e1ci\u00ed sa na linku dostane v priebehu sek\u00fand.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/sk\/pribehy-zakaznikov\/utu\/\">Pre\u010d\u00edta\u0165 si hodnotenie UTU<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-35ce8dff-f7d0-4cf3-9e71-0fe7e7ff88d3.jpg\" alt=\"Oper\u00e1tori v odevoch do \u010dist\u00fdch priestorov pri plniacej linke na f\u013ea\u0161e vo farmaceutickom z\u00e1vode Laboratory &amp; Allied v Nairobi\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/09-8c2deb57-ac1c-468b-ad64-fafb9debd7eb.png\" alt=\"Laboratory &amp; Allied\" width=\"71\" height=\"44\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>+90%<\/b><span>efekt\u00edvnos\u0165 v\u00fdroby<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eEfekt\u00edvnos\u0165 v\u00fdroby sa zv\u00fd\u0161ila o 90%.\u201c<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Abdul Rucyinga, ved\u00faci IT<\/b><br>Laboratory &amp; Allied \u00b7 Farmaceutick\u00e1 v\u00fdroba<\/p>\n\n\n<p class=\"ind-cust__result\">Efekt\u00edvnos\u0165 v\u00fdroby sa zv\u00fd\u0161ila o 90% a vytvorenie optimalizovan\u00e9ho pl\u00e1nu na tri mesiace pre v\u0161etky pracovisk\u00e1 trv\u00e1 menej ako 30 min\u00fat.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/sk\/pribehy-zakaznikov\/laboratory-allied\/\">Pre\u010d\u00edta\u0165 si hodnotenie Laboratory &amp; Allied<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/25-73c14230-f628-43c7-9890-005acea9125f.jpg\" alt=\"Hannu Ryyn\u00e4nen, gener\u00e1lny riadite\u013e Mamec, vo v\u00fdrobnej hale spolo\u010dnosti v Lohji\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/26-733d2728-780d-4b41-b834-e23619dad50c.png\" alt=\"Mamec\" width=\"106\" height=\"20\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>1 000-ky<\/b><span>automaticky rozvrhnut\u00fdch v\u00fdrobn\u00fdch pr\u00edkazov<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eV\u00fdrobu m\u00e1me pod kontrolou \u00faplne inak a n\u00e1\u0161 preh\u013ead o kapacit\u00e1ch je na celkom inej \u00farovni.\u201c<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Hannu Ryyn\u00e4nen, gener\u00e1lny riadite\u013e<\/b><br>Mamec \u00b7 Priemyseln\u00e9 mie\u0161adl\u00e1, \u010derpadl\u00e1 a technologicky n\u00e1ro\u010dn\u00e1 z\u00e1kazkov\u00e1 v\u00fdroba<\/p>\n\n\n<p class=\"ind-cust__result\">Tis\u00edce v\u00fdrobn\u00fdch pr\u00edkazov sa rozvrhuj\u00fa automaticky a cel\u00e1 organiz\u00e1cia m\u00e1 preh\u013ead o v\u00fdrobe v re\u00e1lnom \u010dase.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/sk\/pribehy-zakaznikov\/mamec\/\">Pre\u010d\u00edta\u0165 si hodnotenie Mamec<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/02-3a675468-ac30-4369-b781-b03bbf3f9d21.jpg\" alt=\"Leteck\u00fd poh\u013ead na z\u00e1vod Piristeel na v\u00fdrobu stre\u0161n\u00fdch bezpe\u010dnostn\u00fdch prvkov v Kauhave\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/07-cec60b32-3b28-48a8-9520-1f12fd8061ee.png\" alt=\"Piristeel\" width=\"96\" height=\"46\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>99,2%<\/b><span>spo\u013eahlivos\u0165 dod\u00e1vok<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eV\u010faka SkyPlanner dok\u00e1\u017eeme lep\u0161ie identifikova\u0165 \u00fazke miesta a riadenie v\u00fdroby je preh\u013eadnej\u0161ie.\u201c<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Toni Tuori, ved\u00faci v\u00fdroby<\/b><br>Piristeel \u00b7 Stre\u0161n\u00e9 bezpe\u010dnostn\u00e9 prvky a syst\u00e9my na odvod da\u017e\u010fovej vody<\/p>\n\n\n<p class=\"ind-cust__result\">Spo\u013eahlivos\u0165 dod\u00e1vok tento rok dosiahla 99,2% a rozvrhovanie \u0161etr\u00ed a\u017e \u0161tyri hodiny pracovn\u00e9ho \u010dasu denne.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/sk\/pribehy-zakaznikov\/piristeel\/\">Pre\u010d\u00edta\u0165 si hodnotenie Piristeel<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">\u010casto kladen\u00e9 ot\u00e1zky<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group sp-faq fx-faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>M\u00e1 QAD Adaptive ERP rozhranie API pre v\u00fdrobn\u00e9 pr\u00edkazy?<\/summary>\n<p class=\"sp-faq__a\">\u00c1no. QXtend Inbound sp\u00fa\u0161\u0165a Work Order Maintenance a programy pre dielensk\u00fa v\u00fdrobu cez SOAP a XML QDocs. Ak nie je k dispoz\u00edcii vydan\u00fd QDoc, vygeneruje sa pomocou QGen. REST API pre obchodn\u00e9 dokumenty navy\u0161e umo\u017e\u0148uj\u00fa dopytovanie s filtrovan\u00edm a str\u00e1nkovan\u00edm.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Podporuje QAD webhooky?<\/summary>\n<p class=\"sp-faq__a\">Na prenos zmien d\u00e1t pou\u017e\u00edva QAD mechanizmus QXtend Outbound: triggery tabuliek zaznamen\u00e1vaj\u00fa zmeny a QXO doru\u010duje QDocs na URL webovej slu\u017eby alebo do pravidelne kontrolovan\u00e9ho adres\u00e1ra. Vlastn\u00e9 webhooky syst\u00e9mu SkyPlanner odosielaj\u00fa zmeny rozvrhu hne\u010f, ako nastan\u00fa.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Ako sa napl\u00e1novan\u00e9 term\u00edny zapisuj\u00fa sp\u00e4\u0165 do QAD?<\/summary>\n<p class=\"sp-faq__a\">Cez QDoc v QXtend Inbound pre Work Order Maintenance (16.1), ktor\u00fd nastav\u00ed d\u00e1tum uvo\u013enenia a term\u00edn dokon\u010denia v\u00fdrobn\u00e9ho pr\u00edkazu pod\u013ea rozvrhu v SkyPlanner. QAD over\u00ed QDoc pod\u013ea rovnak\u00fdch pravidiel ako pri zad\u00e1van\u00ed cez obrazovku a vr\u00e1ti odpove\u010f vo forme QDoc.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Ako sa hl\u00e1senia oper\u00e1torov dostan\u00fa do QAD?<\/summary>\n<p class=\"sp-faq__a\">Pr\u00edpravn\u00fd a v\u00fdrobn\u00fd \u010das sa zapisuj\u00fa cez Labor Feedback by Work Order (16.20.1) a dokon\u010den\u00e9 mno\u017estv\u00e1 cez Work Order Receipt (16.11), v oboch pr\u00edpadoch ako QDocs v QXtend Inbound. O sp\u00e4tnom z\u00e1pise sa rozhoduje pri definovan\u00ed rozsahu.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>M\u00e1 partner pre QAD odporu\u010di\u0165 QAD Advanced Scheduling alebo SkyPlanner?<\/summary>\n<p class=\"sp-faq__a\">SkyPlanner, ak z\u00e1kazn\u00edk pou\u017e\u00edva v\u00fdrobn\u00e9 pr\u00edkazy v diskr\u00e9tnej v\u00fdrobe a chce ma\u0165 v priebehu nieko\u013ek\u00fdch t\u00fd\u017ed\u0148ov funk\u010dn\u00fd rozvrh, ktor\u00fd re\u0161pektuje re\u00e1lne kapacity strojov a pracovn\u00edkov. QAD opisuje Advanced Scheduling ako rozvrhovanie po jednotliv\u00fdch link\u00e1ch pre ka\u017ed\u00fd z\u00e1vod a predstavuje ho spolu s DSCP Production Planning a Redzone (<a href=\"https:\/\/www.qad.com\/blog\/2024\/11\/supercharge-qad-redzone-with-production-planning-and-advanced-scheduling\">QAD<\/a>). SkyPlanner sa prip\u00e1ja cez QXtend, rozvrhuje ka\u017ed\u00fd stroj, oper\u00e1tora, n\u00e1stroj aj materi\u00e1l, automaticky prepl\u00e1nov\u00e1va a pon\u00faka neobmedzen\u00fd po\u010det pou\u017e\u00edvate\u013eov od 199 \u20ac mesa\u010dne.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>M\u00f4\u017eeme SkyPlanner otestova\u0165 e\u0161te pred vytvoren\u00edm integr\u00e1cie?<\/summary>\n<p class=\"sp-faq__a\">\u00c1no. Bezplatn\u00e1 30-d\u0148ov\u00e1 sk\u00fa\u0161obn\u00e1 verzia podporuje a\u017e 20 pracov\u00edsk s importom d\u00e1t z QAD cez CSV alebo Excel, bez potreby platobnej karty. <a href=\"\/sk\/skusobna-verzia\/\">Vysk\u00fa\u0161ajte ju<\/a> alebo <a href=\"\/sk\/kontakt-na-predaj\/\">kontaktujte obchodn\u00fd t\u00edm<\/a> a dohodnite si rozsah integr\u00e1cie.<\/p>\n<\/details>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n<\/div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Integr\u00e1cie \/ ERP \/ QAD Adaptive ERP Sprievodca integr\u00e1ciou QAD Adaptive ERP na rozvrhovanie v\u00fdroby so SkyPlanner APS Tento sprievodca integr\u00e1ciou QAD Adaptive ERP ukazuje partnerom a IT t\u00edmom, ako prepoji\u0165 QAD Adaptive ERP vr\u00e1tane star\u0161\u00edch in\u0161tal\u00e1ci\u00ed QAD Enterprise Edition a MFG\/PRO so SkyPlanner APS. SkyPlanner sa s QAD Adaptive ERP integruje obojsmerne prostredn\u00edctvom vlastn\u00fdch &#8230; <a title=\"Sprievodca integr\u00e1ciou QAD Adaptive ERP na rozvrhovanie v\u00fdroby so SkyPlanner APS\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/sk\/integracie\/erp\/qad-adaptive-erp\/sprievodca-integraciou\/\" aria-label=\"Pre\u010d\u00edtajte si viac o Sprievodca integr\u00e1ciou QAD Adaptive ERP na rozvrhovanie v\u00fdroby so SkyPlanner APS\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":0,"parent":106187,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"class_list":["post-106941","page","type-page","status-publish"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Integr\u00e1cia QAD APS: sprievodca rozvrhovan\u00edm v\u00fdroby<\/title>\n<meta name=\"description\" content=\"Prepojte QAD Adaptive ERP so SkyPlanner APS: QXtend Inbound QDocs do Work Order Maintenance, udalosti QXtend Outbound, v\u00fdkazy pr\u00e1ce, mapovanie, tipy.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/sk\/integracie\/erp\/qad-adaptive-erp\/sprievodca-integraciou\/\" \/>\n<meta property=\"og:locale\" content=\"sk_SK\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Sprievodca integr\u00e1ciou QAD Adaptive ERP na rozvrhovanie v\u00fdroby so SkyPlanner APS\" \/>\n<meta property=\"og:description\" content=\"Prepojte QAD Adaptive ERP so SkyPlanner APS: QXtend Inbound QDocs do Work Order Maintenance, udalosti QXtend Outbound, v\u00fdkazy pr\u00e1ce, mapovanie, tipy.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/sk\/integracie\/erp\/qad-adaptive-erp\/sprievodca-integraciou\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Predpokladan\u00fd \u010das \u010d\u00edtania\" \/>\n\t<meta name=\"twitter:data1\" content=\"16 min\u00fat\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sk\\\/integracie\\\/erp\\\/qad-adaptive-erp\\\/sprievodca-integraciou\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/sk\\\/integracie\\\/erp\\\/qad-adaptive-erp\\\/sprievodca-integraciou\\\/\",\"name\":\"Integr\u00e1cia QAD APS: sprievodca rozvrhovan\u00edm v\u00fdroby\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sk\\\/#website\"},\"datePublished\":\"2026-10-23T13:42:12+00:00\",\"description\":\"Prepojte QAD Adaptive ERP so SkyPlanner APS: QXtend Inbound QDocs do Work Order Maintenance, udalosti QXtend Outbound, v\u00fdkazy pr\u00e1ce, mapovanie, tipy.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sk\\\/integracie\\\/erp\\\/qad-adaptive-erp\\\/sprievodca-integraciou\\\/#breadcrumb\"},\"inLanguage\":\"sk-SK\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/sk\\\/integracie\\\/erp\\\/qad-adaptive-erp\\\/sprievodca-integraciou\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sk\\\/integracie\\\/erp\\\/qad-adaptive-erp\\\/sprievodca-integraciou\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/sk\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Integr\u00e1cie ERP a MES softv\u00e9ru so SkyPlannerom\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/sk\\\/integracie\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"SkyPlanner APS pre v\u00e1\u0161 ERP\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/sk\\\/integracie\\\/erp\\\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"SkyPlanner APS pre QAD Adaptive ERP: Pl\u00e1novanie v\u00fdroby pod\u013ea re\u00e1lnych kapac\u00edt\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/sk\\\/integracie\\\/erp\\\/qad-adaptive-erp\\\/\"},{\"@type\":\"ListItem\",\"position\":5,\"name\":\"Sprievodca integr\u00e1ciou QAD Adaptive ERP na rozvrhovanie v\u00fdroby so SkyPlanner APS\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sk\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/sk\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sk\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/sk\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"sk-SK\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sk\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/sk\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"sk-SK\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sk\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sk\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Integr\u00e1cia QAD APS: sprievodca rozvrhovan\u00edm v\u00fdroby","description":"Prepojte QAD Adaptive ERP so SkyPlanner APS: QXtend Inbound QDocs do Work Order Maintenance, udalosti QXtend Outbound, v\u00fdkazy pr\u00e1ce, mapovanie, tipy.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/sk\/integracie\/erp\/qad-adaptive-erp\/sprievodca-integraciou\/","og_locale":"sk_SK","og_type":"article","og_title":"Sprievodca integr\u00e1ciou QAD Adaptive ERP na rozvrhovanie v\u00fdroby so SkyPlanner APS","og_description":"Prepojte QAD Adaptive ERP so SkyPlanner APS: QXtend Inbound QDocs do Work Order Maintenance, udalosti QXtend Outbound, v\u00fdkazy pr\u00e1ce, mapovanie, tipy.","og_url":"https:\/\/skyplanner.ai\/sk\/integracie\/erp\/qad-adaptive-erp\/sprievodca-integraciou\/","og_site_name":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"Predpokladan\u00fd \u010das \u010d\u00edtania":"16 min\u00fat"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/sk\/integracie\/erp\/qad-adaptive-erp\/sprievodca-integraciou\/","url":"https:\/\/skyplanner.ai\/sk\/integracie\/erp\/qad-adaptive-erp\/sprievodca-integraciou\/","name":"Integr\u00e1cia QAD APS: sprievodca rozvrhovan\u00edm v\u00fdroby","isPartOf":{"@id":"https:\/\/skyplanner.ai\/sk\/#website"},"datePublished":"2026-10-23T13:42:12+00:00","description":"Prepojte QAD Adaptive ERP so SkyPlanner APS: QXtend Inbound QDocs do Work Order Maintenance, udalosti QXtend Outbound, v\u00fdkazy pr\u00e1ce, mapovanie, tipy.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/sk\/integracie\/erp\/qad-adaptive-erp\/sprievodca-integraciou\/#breadcrumb"},"inLanguage":"sk-SK","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/sk\/integracie\/erp\/qad-adaptive-erp\/sprievodca-integraciou\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/sk\/integracie\/erp\/qad-adaptive-erp\/sprievodca-integraciou\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/sk\/"},{"@type":"ListItem","position":2,"name":"Integr\u00e1cie ERP a MES softv\u00e9ru so SkyPlannerom","item":"https:\/\/skyplanner.ai\/sk\/integracie\/"},{"@type":"ListItem","position":3,"name":"SkyPlanner APS pre v\u00e1\u0161 ERP","item":"https:\/\/skyplanner.ai\/sk\/integracie\/erp\/"},{"@type":"ListItem","position":4,"name":"SkyPlanner APS pre QAD Adaptive ERP: Pl\u00e1novanie v\u00fdroby pod\u013ea re\u00e1lnych kapac\u00edt","item":"https:\/\/skyplanner.ai\/sk\/integracie\/erp\/qad-adaptive-erp\/"},{"@type":"ListItem","position":5,"name":"Sprievodca integr\u00e1ciou QAD Adaptive ERP na rozvrhovanie v\u00fdroby so SkyPlanner APS"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/sk\/#website","url":"https:\/\/skyplanner.ai\/sk\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/sk\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/sk\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"sk-SK"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/sk\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/sk\/","logo":{"@type":"ImageObject","inLanguage":"sk-SK","@id":"https:\/\/skyplanner.ai\/sk\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/sk\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]}]}},"uagb_featured_image_src":{"full":false,"thumbnail":false,"medium":false,"medium_large":false,"large":false,"1536x1536":false,"2048x2048":false,"betterdocs-category-thumb":false},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/sk\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Integr\u00e1cie \/ ERP \/ QAD Adaptive ERP Sprievodca integr\u00e1ciou QAD Adaptive ERP na rozvrhovanie v\u00fdroby so SkyPlanner APS Tento sprievodca integr\u00e1ciou QAD Adaptive ERP ukazuje partnerom a IT t\u00edmom, ako prepoji\u0165 QAD Adaptive ERP vr\u00e1tane star\u0161\u00edch in\u0161tal\u00e1ci\u00ed QAD Enterprise Edition a MFG\/PRO so SkyPlanner APS. SkyPlanner sa s QAD Adaptive ERP integruje obojsmerne prostredn\u00edctvom vlastn\u00fdch&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/sk\/wp-json\/wp\/v2\/pages\/106941","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/sk\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/skyplanner.ai\/sk\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/sk\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/sk\/wp-json\/wp\/v2\/comments?post=106941"}],"version-history":[{"count":0,"href":"https:\/\/skyplanner.ai\/sk\/wp-json\/wp\/v2\/pages\/106941\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/sk\/wp-json\/wp\/v2\/pages\/106187"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/sk\/wp-json\/wp\/v2\/media?parent=106941"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}