{"id":106274,"date":"2026-10-23T13:42:12","date_gmt":"2026-10-23T13:42:12","guid":{"rendered":"https:\/\/skyplanner.ai\/integracie\/erp\/visma-l7\/"},"modified":"2026-10-23T13:42:12","modified_gmt":"2026-10-23T13:42:12","slug":"visma-l7","status":"publish","type":"page","link":"https:\/\/skyplanner.ai\/sk\/integracie\/erp\/visma-l7\/","title":{"rendered":"SkyPlanner APS pre Visma L7: Pl\u00e1novanie v\u00fdroby pod\u013ea re\u00e1lnych kapac\u00edt"},"content":{"rendered":"\n<div class=\"wp-block-group sp-industry-page sp-industry sp-page sp-erp-page\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<section class=\"wp-block-group fx-hero\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__grid\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__copy sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-eyebrow ind-crumbs\"><span><a href=\"\/sk\/integracie\/\">Integr\u00e1cie<\/a> \/ <a href=\"\/sk\/integracie\/erp\/\">ERP<\/a> \/ Visma L7<\/span><\/p>\n\n\n<h1 class=\"wp-block-heading fx-hero__title\">SkyPlanner APS pre Visma L7: <span class=\"hl\">Pl\u00e1novanie v\u00fdroby pod\u013ea re\u00e1lnych kapac\u00edt<\/span><\/h1>\n\n\n<p class=\"fx-hero__sub\">SkyPlanner APS je doplnok na pl\u00e1novanie v\u00fdroby pod\u013ea re\u00e1lnych kapac\u00edt strojov a pracovn\u00edkov pre Visma L7, ERP syst\u00e9m pou\u017e\u00edvan\u00fd vo ve\u013ek\u00fdch a stredn\u00fdch f\u00ednskych priemyseln\u00fdch, dod\u00e1vate\u013esk\u00fdch a energetick\u00fdch spolo\u010dnostiach. Ka\u017ed\u00fd stroj, oper\u00e1tor, n\u00e1stroj aj materi\u00e1l sa pl\u00e1nuje na konkr\u00e9tny \u010das s oh\u013eadom na dostupn\u00fa kapacitu. Ke\u010f sa v\u00fdroba zmen\u00ed, Autopilot automaticky uprav\u00ed rozvrh.<\/p>\n\n\n<div class=\"wp-block-buttons fx-hero__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/sk\/skusobna-verzia\/\">Spusti\u0165 bezplatn\u00fa sk\u00fa\u0161obn\u00fa verziu<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/sk\/kontakt-na-predaj\/\">Rezervova\u0165 demo<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-hero__media sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"fx-shot\"><div class=\"fx-shot__bar\" aria-hidden=\"true\"><i><\/i><i><\/i><i><\/i><span>skyplanner.ai \u00b7 Rozvrhovanie v\u00fdroby<\/span><\/div><img fetchpriority=\"high\" decoding=\"async\" loading=\"eager\" width=\"1024\" height=\"685\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/20-d7d44cbc-5430-4f97-99f5-fca4632862ef.png\" alt=\"Ganttov diagram v SkyPlanner APS s oper\u00e1ciami rozvrhnut\u00fdmi na jednotliv\u00e9 pracovisk\u00e1 a zoznamom z\u00e1kaziek pod n\u00edm.\"><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--intro\" id=\"overview\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>SkyPlanner sa s Visma L7 prep\u00e1ja obojsmerne cez Visma L7 REST API. Z L7 preber\u00e1 \u010d\u00edsla v\u00fdrobn\u00fdch z\u00e1kaziek (ty\u00f6numero), v\u00fdrobn\u00e9 oper\u00e1cie (ty\u00f6nvaihe), zdroje, \u0161trukt\u00fary v\u00fdrobkov, materi\u00e1ly, skladov\u00e9 z\u00e1soby a polo\u017eky n\u00e1kupn\u00fdch objedn\u00e1vok. Do ka\u017edej pracovnej karty zapisuje napl\u00e1novan\u00e9 d\u00e1tumy za\u010datia, zdroje, priority, pracovn\u00edkov a hodiny na jednotliv\u00e9 dni. T\u00edm SkyPlanner pri zav\u00e1dzan\u00ed nastav\u00ed integr\u00e1ciu pod\u013ea va\u0161ej konfigur\u00e1cie L7.<\/p>\n\n\n<p>Cena sa za\u010d\u00edna na 199 \u20ac mesa\u010dne vr\u00e1tane 5 pracov\u00edsk. Ka\u017ed\u00e9 \u010fal\u0161ie pracovisko stoj\u00ed 20 \u20ac mesa\u010dne. Bezplatn\u00e1 sk\u00fa\u0161obn\u00e1 verzia trv\u00e1 30 dn\u00ed, umo\u017e\u0148uje pou\u017e\u00edva\u0165 a\u017e 20 pracov\u00edsk a nevy\u017eaduje platobn\u00fa kartu.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"what-changes-in-your-production\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">\u010co sa zmen\u00ed vo va\u0161ej v\u00fdrobe<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-pain ind-cards\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Ka\u017ed\u00e1 oper\u00e1cia v konkr\u00e9tnom \u010dase.<\/p>\n\n\n<p class=\"fx-pain__b\">L7 pl\u00e1nuje ka\u017ed\u00fa v\u00fdrobn\u00fa oper\u00e1ciu ako po\u010det hod\u00edn na jednotliv\u00e9 dni. SkyPlanner ju zarad\u00ed na vo\u013en\u00e9 pracovisko v konkr\u00e9tnom \u010dase a zoh\u013eadn\u00ed pritom zmeny, sviatky, nepr\u00edtomnos\u0165 aj nad\u010dasy. Dve oper\u00e1cie nikdy nezaberaj\u00fa ten ist\u00fd stroj v rovnakom \u010dase.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Samostatn\u00fd rozvrh pre ka\u017ed\u00fd stroj.<\/p>\n\n\n<p class=\"fx-pain__b\">V L7 sa pr\u00e1ca v r\u00e1mci zdroja del\u00ed pod\u013ea po\u010dtu strojov. SkyPlanner pridel\u00ed ka\u017ed\u00e9mu stroju vlastn\u00fd rad oper\u00e1ci\u00ed. Ak je prv\u00e9 zvolen\u00e9 pracovisko obsaden\u00e9, presunie oper\u00e1ciu na alternat\u00edvne pracovisko. Vybran\u00fd zdroj zap\u00ed\u0161e sp\u00e4\u0165 do pracovnej karty v L7.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Aj \u013eudia a n\u00e1stroje maj\u00fa svoje limity.<\/p>\n\n\n<p class=\"fx-pain__b\">Pr\u00edpravok pou\u017e\u00edvan\u00fd na jednom stroji sa nikdy nerezervuje s\u00fa\u010dasne na inom. Oper\u00e1cii, ktor\u00e1 potrebuje troch oper\u00e1torov, sa pridelia traja pracovn\u00edci s vo\u013enou kapacitou v pr\u00edslu\u0161n\u00fdch zmen\u00e1ch.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Menej nastavovania.<\/p>\n\n\n<p class=\"fx-pain__b\">SkyPlanner uchov\u00e1va \u010dasy pretypovania medzi v\u00fdrobkami v matici nastavovac\u00edch \u010dasov, a to pre oba smery prechodu. Prechod z modrej na \u010derven\u00fa m\u00f4\u017ee trva\u0165 30 min\u00fat a z \u010dervenej na modr\u00fa 60. Arcturus rad\u00ed podobn\u00e9 oper\u00e1cie za sebou a vyber\u00e1 poradie s najmen\u0161\u00edm \u010dasom nastavovania, pri\u010dom zoh\u013ead\u0148uje aj term\u00edny dokon\u010denia.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Oper\u00e1cie sa za\u010dn\u00fa, ke\u010f je materi\u00e1l k dispoz\u00edcii.<\/p>\n\n\n<p class=\"fx-pain__b\">SkyPlanner vypo\u010d\u00edtava bud\u00faci stav z\u00e1sob zo skladov\u00fdch z\u00e1sob a polo\u017eiek n\u00e1kupn\u00fdch objedn\u00e1vok v L7. Oper\u00e1ciu, ktor\u00e1 \u010dak\u00e1 na dod\u00e1vku od dod\u00e1vate\u013ea, napl\u00e1nuje na \u010das pr\u00edchodu materi\u00e1lu. Ak sa dod\u00e1vka oneskor\u00ed, posunie sa aj oper\u00e1cia.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Pl\u00e1novanie, ktor\u00e9 zostane aj po zmene ERP.<\/p>\n\n\n<p class=\"fx-pain__b\">Visma ukon\u010dila v\u00fdvoj nov\u00fdch funkci\u00ed pre L7. Va\u0161e pracovisk\u00e1, v\u00fdrobn\u00e9 kroky, matica nastavovac\u00edch \u010dasov aj pravidl\u00e1 zost\u00e1vaj\u00fa v SkyPlanner. Pri prechode na nov\u00fd ERP sa tak men\u00ed iba prepojenie.<\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"customers\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Ako v\u00fdrobn\u00e9 firmy hodnotia SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-custs\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/07-d99dfa98-8de6-4a48-9bad-9560584a9a24.jpg\" alt=\"Zv\u00e1ra\u010d spolo\u010dnosti KJH-Comp br\u00fasi zv\u00e1ran\u00fa oce\u013eov\u00fa kon\u0161trukciu v z\u00e1vode Alah\u00e4rm\u00e4\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-b4d7c595-f03f-4472-afad-29a42f77e660.png\" alt=\"KJH-Comp\" width=\"126\" height=\"34\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>98%<\/b><span>spo\u013eahlivos\u0165 dod\u00e1vok, n\u00e1rast z pribli\u017ene 50%<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eSkyPlanner zohr\u00e1va rozhoduj\u00facu \u00falohu pri udr\u017eiavan\u00ed spo\u013eahlivosti na\u0161ich dod\u00e1vok.\u201c<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Hannu Lahtinen, v\u00fdkonn\u00fd riadite\u013e<\/b><br>KJH-Comp \u00b7 Spracovanie plechu a z\u00e1kazkov\u00e1 v\u00fdroba<\/p>\n\n\n<p class=\"ind-cust__result\">Spo\u013eahlivos\u0165 dod\u00e1vok vzr\u00e1stla z pribli\u017ene 50% a\u017e na 98% a na rozvrhovanie teraz sta\u010d\u00ed jeden ved\u00faci namiesto dvoch.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/sk\/pribehy-zakaznikov\/kjh-comp\/\">Pre\u010d\u00edtajte si hodnotenie KJH-Comp<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/25-73c14230-f628-43c7-9890-005acea9125f.jpg\" alt=\"Hannu Ryyn\u00e4nen, gener\u00e1lny riadite\u013e spolo\u010dnosti Mamec, vo v\u00fdrobnej hale spolo\u010dnosti v meste Lohja\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/26-733d2728-780d-4b41-b834-e23619dad50c.png\" alt=\"Mamec\" width=\"106\" height=\"20\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>1 000 a viac<\/b><span>automaticky rozvrhnut\u00fdch v\u00fdrobn\u00fdch pr\u00edkazov<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eV\u00fdrobu m\u00e1me pod kontrolou \u00faplne inak a n\u00e1\u0161 preh\u013ead o kapacit\u00e1ch je na celkom inej \u00farovni.\u201c<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Hannu Ryyn\u00e4nen, gener\u00e1lny riadite\u013e<\/b><br>Mamec \u00b7 Priemyseln\u00e9 mie\u0161adl\u00e1, \u010derpadl\u00e1 a technologicky n\u00e1ro\u010dn\u00e1 z\u00e1kazkov\u00e1 v\u00fdroba<\/p>\n\n\n<p class=\"ind-cust__result\">Tis\u00edce v\u00fdrobn\u00fdch pr\u00edkazov sa rozvrhuj\u00fa automaticky a cel\u00e1 organiz\u00e1cia m\u00e1 preh\u013ead o v\u00fdrobe v re\u00e1lnom \u010dase.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/sk\/pribehy-zakaznikov\/mamec\/\">Pre\u010d\u00edtajte si hodnotenie Mamec<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/utu-kalle-kalliomaki-2026.jpg\" alt=\"Kalle Kalliom\u00e4ki, \u0161pecialista dod\u00e1vate\u013esk\u00e9ho re\u0165azca v UTU, v dielni na v\u00fdrobu rozv\u00e1dza\u010dov v meste Ulvila\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/23-beca6df2-3fa2-4315-80e8-7c38a9e3d2e1.png\" alt=\"UTU\" width=\"69\" height=\"59\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>2 h<\/b><span>u\u0161etren\u00e9 ka\u017ed\u00fd t\u00fd\u017ede\u0148<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eV\u010faka SkyPlanner sme pri pl\u00e1novan\u00ed v\u00fdroby pre\u0161li z excelov\u00fdch tabuliek na optimaliz\u00e1ciu v\u00fdroby v re\u00e1lnom \u010dase.\u201c<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Kalle Kalliom\u00e4ki, \u0161pecialista dod\u00e1vate\u013esk\u00e9ho re\u0165azca<\/b><br>UTU \u00b7 Elektrick\u00e9 rozv\u00e1dza\u010de a sp\u00ednacie zariadenia<\/p>\n\n\n<p class=\"ind-cust__result\">Pri pl\u00e1novan\u00ed v\u00fdroby sa ka\u017ed\u00fd t\u00fd\u017ede\u0148 u\u0161etria 2 hodiny pracovn\u00e9ho \u010dasu a nov\u00fd rad oper\u00e1ci\u00ed sa dostane na linku v priebehu sek\u00fand.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/sk\/pribehy-zakaznikov\/utu\/\">Pre\u010d\u00edtajte si hodnotenie UTU<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-35ce8dff-f7d0-4cf3-9e71-0fe7e7ff88d3.jpg\" alt=\"Oper\u00e1tori v odevoch do \u010dist\u00fdch priestorov pri linke na plnenie flia\u0161 vo farmaceutickom z\u00e1vode Laboratory &amp; Allied v Nairobi\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/09-8c2deb57-ac1c-468b-ad64-fafb9debd7eb.png\" alt=\"Laboratory &amp; Allied\" width=\"71\" height=\"44\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>+90%<\/b><span>efekt\u00edvnos\u0165 v\u00fdroby<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eEfekt\u00edvnos\u0165 v\u00fdroby sa zv\u00fd\u0161ila o 90%.\u201c<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Abdul Rucyinga, ved\u00faci IT<\/b><br>Laboratory &amp; Allied \u00b7 Farmaceutick\u00e1 v\u00fdroba<\/p>\n\n\n<p class=\"ind-cust__result\">Efekt\u00edvnos\u0165 v\u00fdroby vzr\u00e1stla o 90% a vytvorenie optimalizovan\u00e9ho pl\u00e1nu na tri mesiace pre v\u0161etky pracovisk\u00e1 trv\u00e1 menej ne\u017e 30 min\u00fat.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/sk\/pribehy-zakaznikov\/laboratory-allied\/\">Pre\u010d\u00edtajte si hodnotenie Laboratory &amp; Allied<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"how-the-visma-l7-integration-works\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Ako funguje integr\u00e1cia s Visma L7<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ol class=\"wp-block-list\">\n\n<li><strong>L7 odosiela \u00fadaje o pr\u00e1ci.<\/strong> SkyPlanner na\u010d\u00edtava v\u00fdrobn\u00e9 oper\u00e1cie cez <code>GET \/manufphases\/<\/code>, zdroje cez <code>GET \/manufresources\/<\/code>, diely a materi\u00e1ly cez <code>GET \/manufcomponents\/<\/code> a <code>GET \/manufmaterials\/<\/code>. Na\u010d\u00edtava aj v\u00fdrobky, skladov\u00e9 z\u00e1soby a polo\u017eky predajn\u00fdch a n\u00e1kupn\u00fdch objedn\u00e1vok. Po prvom na\u010d\u00edtan\u00ed sa pri t\u00fdchto po\u017eiadavk\u00e1ch pou\u017e\u00edva <code>modifiedAfter<\/code>, tak\u017ee sa pren\u00e1\u0161aj\u00fa iba z\u00e1znamy zmenen\u00e9 od posledn\u00e9ho na\u010d\u00edtania.<\/li>\n\n\n<li><strong>SkyPlanner vytvor\u00ed rozvrh a priebe\u017ene ho aktualizuje.<\/strong> Pl\u00e1novac\u00ed algoritmus Arcturus optimalizuje cel\u00fd pl\u00e1n v priebehu sek\u00fand so zoh\u013eadnen\u00edm ka\u017ed\u00e9ho stroja, pracovn\u00edka, n\u00e1stroja aj materi\u00e1lu. Autopilot pri zmen\u00e1ch vo v\u00fdrobe pl\u00e1n prepo\u010d\u00edta.<\/li>\n\n\n<li><strong>Rozvrh sa zap\u00ed\u0161e sp\u00e4\u0165 do L7.<\/strong> Po\u017eiadavka <code>PUT \/manufphases\/<\/code> zap\u00ed\u0161e zdroj, d\u00e1tum za\u010datia, prioritu, pracovn\u00edka a hodiny na jednotliv\u00e9 dni z ka\u017edej pracovnej karty do v\u00fdrobnej oper\u00e1cie v L7. Po\u017eiadavka <code>POST \/resourceupdates\/<\/code> udr\u017eiava kapacitu v kalend\u00e1ri zdroja v s\u00falade s rozvrhom. Pracovn\u00e9 fronty v L7 potom zobrazuj\u00fa oper\u00e1cie v porad\u00ed ur\u010denom v SkyPlanner.<\/li>\n\n\n<li><strong>\u00dadaje o priebehu v\u00fdroby sa na\u010d\u00edtaj\u00fa sp\u00e4\u0165.<\/strong> V\u00fdrobn\u00e9 udalosti zaznamenan\u00e9 v pracovn\u00fdch frontoch L7 sa na\u010d\u00edtavaj\u00fa cez <code>GET \/manufevents\/<\/code>. Oper\u00e1tori m\u00f4\u017eu pr\u00e1cu potvrdzova\u0165 aj v SkyPlanner Mobile Confirmations.<\/li>\n\n<\/ol>\n\n\n<p>SkyPlanner be\u017e\u00ed v cloude a prip\u00e1ja sa k L7 REST API na va\u0161om serveri Visma LTR, tak\u017ee do L7 sa ni\u010d nein\u0161taluje. Visma uv\u00e1dza Skycode so SkyPlanner na svojej <a href=\"https:\/\/vismal7.fi\/integraatiot\/\">str\u00e1nke integr\u00e1ci\u00ed L7<\/a>. T\u00edm SkyPlanner nastav\u00ed integr\u00e1ciu pod\u013ea va\u0161ej konfigur\u00e1cie L7 a poskytuje podporu aj po spusten\u00ed do prev\u00e1dzky.<\/p>\n\n\n<p>Cenov\u00fa ponuku na integr\u00e1ciu dostanete vopred spolu s ponukou predplatn\u00e9ho, pod\u013ea va\u0161ich procesov a potrieb. Integr\u00e1ciu m\u00f4\u017ee vytvori\u0165 aj v\u00e1\u0161 partner Visma alebo va\u0161i v\u00fdvoj\u00e1ri pomocou zdokumentovan\u00e9ho API SkyPlanner (<a href=\"https:\/\/integration.skyplanner.app\/api\/swagger\">referen\u010dn\u00e1 dokument\u00e1cia API<\/a>). Koncov\u00e9 body, mapovanie pol\u00ed a pravidl\u00e1 vlastn\u00edctva \u00fadajov n\u00e1jdete v <a href=\"\/sk\/integracie\/erp\/visma-l7\/sprievodca-integraciou\/\">pr\u00edru\u010dke integr\u00e1cie Visma L7 na rozvrhovanie v\u00fdroby<\/a>.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"what-visma-l7-schedules-and-what-skyplanner-adds\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">\u010co rozvrhuje Visma L7 a \u010do prid\u00e1va SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Riadenie v\u00fdroby v L7 (Tuotannonohjaus) vyu\u017e\u00edva na pl\u00e1novanie v\u00fdpo\u010det potrieb (Tarvelaskenta), detailn\u00e9 pl\u00e1novanie (Hienosuunnittelu) a pl\u00e1novaciu tabu\u013eku v\u00fdroby. Detailn\u00e9 pl\u00e1novanie rozvrhuje oper\u00e1cie na jednotliv\u00e9 dni v kalend\u00e1ri zdroja a zobrazuje jeho denn\u00e9 vy\u0165a\u017eenie. Dokument\u00e1cia Visma uv\u00e1dza tieto obmedzenia:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Pr\u00e1ca sa del\u00ed pod\u013ea po\u010dtu strojov.<\/strong> Pri zdroji s viacer\u00fdmi strojmi sa potrebn\u00e1 kapacita vydel\u00ed po\u010dtom strojov (<a href=\"https:\/\/eteinen.vismal7.fi\/s\/article\/Perustiedot-resurssit\">zdroj<\/a>). SkyPlanner rozvrhuje ka\u017ed\u00fd stroj ako samostatn\u00e9 pracovisko.<\/li>\n\n\n<li><strong>Pre\u0165a\u017eenie sa ozna\u010d\u00ed, nie vyrie\u0161i.<\/strong> Ke\u010f vy\u0165a\u017eenie prekro\u010d\u00ed kapacitu, L7 zobraz\u00ed hodnoty vy\u0165a\u017eenia \u010dervenou farbou (<a href=\"https:\/\/eteinen.vismal7.fi\/s\/article\/Resurssin-paivakohtainen-kuorma\">zdroj<\/a>). Rozvrhovanie s pevn\u00fdmi oper\u00e1ciami umo\u017e\u0148uje pre\u0165a\u017eenie a podporuje iba jedno\u00farov\u0148ov\u00e9 \u0161trukt\u00fary (<a href=\"https:\/\/vismal7.fi\/app\/uploads\/2024\/05\/L7-LTR-koulutuspaivan-2024-Mathal.pdf\">\u0161koliaci materi\u00e1l z roku 2024<\/a>). SkyPlanner nikdy nerezervuje stroj, pracovn\u00edka ani n\u00e1stroj na dve oper\u00e1cie s\u00fa\u010dasne.<\/li>\n\n\n<li><strong>Poradie pr\u00e1ce na dan\u00fd de\u0148 ur\u010duje pl\u00e1nova\u010d.<\/strong> Oper\u00e1cie na dan\u00fd de\u0148 sa zora\u010fuj\u00fa ru\u010dne a priorita nastaven\u00e1 extern\u00fdm syst\u00e9mom zost\u00e1va nezmenen\u00e1 (<a href=\"https:\/\/eteinen.vismal7.fi\/s\/article\/Jarjesta-paivan-tyot-toimi\">zdroj<\/a>). SkyPlanner nastav\u00ed t\u00fato prioritu za v\u00e1s a L7 ju zachov\u00e1.<\/li>\n\n\n<li><strong>Na ch\u00fdbaj\u00face dni v kalend\u00e1ri si treba d\u00e1va\u0165 pozor.<\/strong> Ch\u00fdbaj\u00face dni v podnikovom kalend\u00e1ri m\u00f4\u017eu posun\u00fa\u0165 oper\u00e1cie do minulosti (<a href=\"https:\/\/eteinen.vismal7.fi\/s\/article\/Tehdaskalenteri\">zdroj<\/a>). SkyPlanner pracuje s kalend\u00e1rmi zmien, ktor\u00e9 zah\u0155\u0148aj\u00fa sviatky aj nepr\u00edtomnos\u0165.<\/li>\n\n\n<li><strong>Ch\u00fdba logika pretypovania.<\/strong> Detailn\u00e9 pl\u00e1novanie L7 nem\u00e1 maticu nastavovac\u00edch \u010dasov. SkyPlanner pod\u013ea tejto matice zora\u010fuje oper\u00e1cie tak, aby sa \u010das nastavovania minimalizoval.<\/li>\n\n<\/ul>\n\n\n<p>V\u0161etky nastavenia a obmedzenia vysvet\u013euje \u010dl\u00e1nok <a href=\"\/sk\/integracie\/erp\/visma-l7\/planovanie-vyroby\/\">Podporuje Visma L7 pl\u00e1novanie v\u00fdroby pod\u013ea re\u00e1lnych kapac\u00edt?<\/a><\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"visma-l7-today-and-with-skyplanner\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Visma L7 dnes a so SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th><\/th><th>Detailn\u00e9 pl\u00e1novanie Visma L7<\/th><th>Visma L7 so SkyPlanner APS<\/th><\/tr><\/thead><tbody><tr><td>\u010casov\u00e9 \u010dlenenie<\/td><td>Hodiny na de\u0148 pre ka\u017ed\u00fa v\u00fdrobn\u00fa oper\u00e1ciu<\/td><td>Konkr\u00e9tne \u010dasy pre ka\u017ed\u00fa oper\u00e1ciu, stroj a pracovn\u00edka<\/td><\/tr><tr><td>Stroje<\/td><td>Jeden zdroj; pr\u00e1ca sa del\u00ed pod\u013ea po\u010dtu strojov<\/td><td>Ka\u017ed\u00fd stroj je samostatn\u00fdm pracoviskom; Arcturus vyber\u00e1 z alternat\u00edv, ktor\u00e9 povol\u00edte<\/td><\/tr><tr><td>Pre\u0165a\u017eenie<\/td><td>Hodnoty vy\u0165a\u017eenia sa zobrazia \u010dervenou; pl\u00e1nova\u010d pres\u00fava oper\u00e1cie<\/td><td>Bez pre\u0165a\u017eenia; re\u0161pektuje sa kapacita ka\u017ed\u00e9ho zdroja<\/td><\/tr><tr><td>Poradie oper\u00e1ci\u00ed<\/td><td>Priorita a ru\u010dn\u00e9 zoradenie dennej pr\u00e1ce<\/td><td>Arcturus optimalizuje cel\u00fd pl\u00e1n v priebehu sek\u00fand<\/td><\/tr><tr><td>Pretypovanie<\/td><td>Detailn\u00e9 pl\u00e1novanie nem\u00e1 maticu nastavovac\u00edch \u010dasov<\/td><td>Matica nastavovac\u00edch \u010dasov ur\u010duje poradie oper\u00e1ci\u00ed tak, aby sa minimalizovalo nastavovanie<\/td><\/tr><tr><td>Materi\u00e1ly<\/td><td>V\u00fdpo\u010det potrieb a rezerv\u00e1cie<\/td><td>Za\u010diatok oper\u00e1cie ur\u010duje predpokladan\u00fd stav z\u00e1sob a o\u010dak\u00e1van\u00e9 dod\u00e1vky z n\u00e1kupn\u00fdch objedn\u00e1vok<\/td><\/tr><tr><td>Zmeny<\/td><td>Pl\u00e1nova\u010d znova spust\u00ed pl\u00e1novanie<\/td><td>Autopilot pri zmen\u00e1ch vo v\u00fdrobe automaticky uprav\u00ed rozvrh<\/td><\/tr><tr><td>Diel\u0148a<\/td><td>Pracovn\u00e9 fronty v L7 a LTR<\/td><td>Mobile Confirmations a sp\u00e4tn\u00e9 na\u010d\u00edtanie v\u00fdrobn\u00fdch udalost\u00ed z L7<\/td><\/tr><\/tbody><\/table><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"what-moves-between-visma-l7-and-skyplanner\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Ak\u00e9 \u00fadaje sa pren\u00e1\u0161aj\u00fa medzi Visma L7 a SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th>Visma L7<\/th><th>Smer<\/th><th>SkyPlanner<\/th><\/tr><\/thead><tbody><tr><td>V\u00fdrobky a \u0161trukt\u00fary v\u00fdrobkov (tuoterakenne)<\/td><td>L7 \u2192 SkyPlanner<\/td><td>V\u00fdrobky, podzostavy, materi\u00e1ly<\/td><\/tr><tr><td>\u010c\u00edsla v\u00fdrobn\u00fdch pr\u00edkazov a pracovn\u00e9 oper\u00e1cie (<code>\/manufphases\/<\/code>)<\/td><td>L7 \u2192 SkyPlanner<\/td><td>Z\u00e1kazky a oper\u00e1cie pod\u013ea pracoviska<\/td><\/tr><tr><td>Zdroje (<code>\/manufresources\/<\/code>)<\/td><td>L7 \u2192 SkyPlanner<\/td><td>Pracovisk\u00e1 a skupiny<\/td><\/tr><tr><td>Stavy z\u00e1sob a riadky n\u00e1kupn\u00fdch objedn\u00e1vok<\/td><td>L7 \u2192 SkyPlanner<\/td><td>Z\u00e1soby a o\u010dak\u00e1van\u00e9 dod\u00e1vky z n\u00e1kupn\u00fdch objedn\u00e1vok<\/td><\/tr><tr><td>Predajn\u00e9 objedn\u00e1vky a ich riadky<\/td><td>L7 \u2192 SkyPlanner<\/td><td>Term\u00edny dodania a priorita z\u00e1kazn\u00edka<\/td><\/tr><tr><td>V\u00fdrobn\u00e9 udalosti (<code>\/manufevents\/<\/code>)<\/td><td>L7 \u2192 SkyPlanner<\/td><td>Priebeh ka\u017edej oper\u00e1cie<\/td><\/tr><tr><td>Zdroj, d\u00e1tum za\u010diatku, priorita, pracovn\u00edk, po\u010det hod\u00edn za de\u0148 (<code>PUT \/manufphases\/<\/code>)<\/td><td>SkyPlanner \u2192 L7<\/td><td>Rozvrh v\u00fdroby<\/td><\/tr><tr><td>Kapacita v kalend\u00e1ri zdroja (<code>POST \/resourceupdates\/<\/code>)<\/td><td>SkyPlanner \u2192 L7<\/td><td>Kapacita zmien<\/td><\/tr><\/tbody><\/table><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"visma-l7-scheduling-software-and-add-ons-compare\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Porovnanie softv\u00e9ru a doplnkov na rozvrhovanie v\u00fdroby pre Visma L7<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th>Mo\u017enos\u0165<\/th><th>\u010co pon\u00faka<\/th><th>Kedy sa hod\u00ed<\/th><\/tr><\/thead><tbody><tr><td>Riadenie v\u00fdroby vo Visma L7<\/td><td>V\u00fdpo\u010det potrieb, detailn\u00e9 pl\u00e1novanie a preh\u013eady vy\u0165a\u017eenia priamo v L7<\/td><td>Jeden pl\u00e1nova\u010d zostavuje denn\u00fd pl\u00e1n a L7 budete pou\u017e\u00edva\u0165 a\u017e do konca jeho \u017eivotn\u00e9ho cyklu<\/td><\/tr><tr><td>Bal\u00edky APS (napr\u00edklad Delfoi Planner)<\/td><td>Softv\u00e9r na pl\u00e1novanie a simul\u00e1ciu, ktor\u00fd uv\u00e1dza L7 medzi podporovan\u00fdmi integr\u00e1ciami s ERP<\/td><td>Projekt zavedenia riadi samostatn\u00fd pl\u00e1novac\u00ed t\u00edm<\/td><\/tr><tr><td>Nov\u00fd ERP so zabudovan\u00fdm pl\u00e1novan\u00edm (napr\u00edklad Monitor ERP alebo Odoo s Collapick Tempo)<\/td><td>Nahradenie L7 aj jeho riadenia v\u00fdroby v jednom projekte<\/td><td>Chcete s\u00fa\u010dasne zmeni\u0165 ERP aj pl\u00e1novac\u00ed n\u00e1stroj<\/td><\/tr><tr><td>Cloudov\u00fd APS prepojen\u00fd cez API (SkyPlanner APS)<\/td><td>N\u00e1stroj na rozvrhovanie v prehliada\u010di, ktor\u00fd na\u010d\u00edtava pracovn\u00e9 oper\u00e1cie z L7 a zapisuje rozvrh sp\u00e4\u0165<\/td><td>Chcete u\u017e teraz pl\u00e1nova\u0165 v\u00fdrobu pod\u013ea re\u00e1lnych kapac\u00edt strojov a pracovn\u00edkov a zachova\u0165 si pl\u00e1n aj pri prechode na \u010fal\u0161\u00ed ERP<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p><strong>SkyPlanner namiesto L7 Hienosuunnittelu si vyberte, ke\u010f:<\/strong><\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Potrebujete presn\u00e9 \u010dasy.<\/strong> L7 uklad\u00e1 oper\u00e1ciu ako po\u010det hod\u00edn v jednotliv\u00fdch d\u0148och. SkyPlanner ka\u017edej oper\u00e1cii prirad\u00ed \u010das za\u010diatku a konca v r\u00e1mci skuto\u010dnej zmeny.<\/li>\n\n\n<li><strong>Pod jedn\u00fdm zdrojom m\u00e1te viacero strojov.<\/strong> L7 del\u00ed pr\u00e1cu po\u010dtom strojov (<a href=\"https:\/\/eteinen.vismal7.fi\/s\/article\/Perustiedot-resurssit\">zdroj<\/a>). SkyPlanner rozvrhuje pr\u00e1cu pre ka\u017ed\u00fd stroj osobitne a vyber\u00e1 vo\u013en\u00fd stroj.<\/li>\n\n\n<li><strong>\u010cerven\u00e9 hodnoty vy\u0165a\u017eenia v\u00e1s ka\u017ed\u00fd t\u00fd\u017ede\u0148 stoja hodiny pr\u00e1ce.<\/strong> L7 upozor\u0148uje na pre\u0165a\u017eenie (<a href=\"https:\/\/eteinen.vismal7.fi\/s\/article\/Resurssin-paivakohtainen-kuorma\">zdroj<\/a>). SkyPlanner zostav\u00ed pl\u00e1n bez pre\u0165a\u017eenia u\u017e od za\u010diatku.<\/li>\n\n\n<li><strong>Va\u0161e v\u00fdrobky maj\u00fa viac\u00farov\u0148ov\u00fa \u0161trukt\u00faru.<\/strong> Rozvrhovanie pevn\u00fdch oper\u00e1ci\u00ed v L7 podporuje len jedno\u00farov\u0148ov\u00e9 \u0161trukt\u00fary (<a href=\"https:\/\/vismal7.fi\/app\/uploads\/2024\/05\/L7-LTR-koulutuspaivan-2024-Mathal.pdf\">zdroj<\/a>). SkyPlanner rozvrhuje podzostavy aj zostavy v jednom pl\u00e1ne.<\/li>\n\n\n<li><strong>Pretypovania rozhoduj\u00fa o objeme va\u0161ej v\u00fdroby.<\/strong> SkyPlanner pomocou matice pr\u00edpravn\u00fdch \u010dasov zora\u010fuje oper\u00e1cie tak, aby bol \u010das na pr\u00edpravu \u010do najkrat\u0161\u00ed.<\/li>\n\n\n<li><strong>\u010cak\u00e1 v\u00e1s zmena ERP.<\/strong> Visma zastavila \u010fal\u0161\u00ed v\u00fdvoj L7 a pou\u017e\u00edvanie produktu sa skon\u010d\u00ed na konci roka 2028 (<a href=\"https:\/\/eteinen.vismal7.fi\/s\/\">ozn\u00e1menie spolo\u010dnosti Visma<\/a>). Pl\u00e1novanie nastaven\u00e9 v SkyPlanner zostane zachovan\u00e9 aj pri prechode.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"how-to-get-started\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Ako za\u010da\u0165<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ol class=\"wp-block-list\">\n\n<li><strong>Vysk\u00fa\u0161ajte si SkyPlanner zadarmo.<\/strong> 30 dn\u00ed, a\u017e 20 pracov\u00edsk, v\u0161etky funkcie bal\u00edka Basic, bez platobnej karty.<\/li>\n\n\n<li><strong>Vytvorte model svojej v\u00fdroby.<\/strong> Zadajte do SkyPlanner stroje, pracovn\u00edkov a zmeny alebo ich importujte. K dispoz\u00edcii je aj pomoc s \u00favodn\u00fdm nastaven\u00edm.<\/li>\n\n\n<li><strong>Na\u010d\u00edtajte v\u00fdrobn\u00e9 \u00fadaje.<\/strong> Exportujte z L7 \u010d\u00edsla otvoren\u00fdch v\u00fdrobn\u00fdch pr\u00edkazov, oper\u00e1cie a zdroje do Excelu alebo CSV. Importujte ich a porovnajte rozvrh zo SkyPlanner so svoj\u00edm s\u00fa\u010dasn\u00fdm pl\u00e1nom.<\/li>\n\n\n<li><strong>Pripojte Visma L7.<\/strong> V\u00e1\u0161 spr\u00e1vca LTR vytvor\u00ed pou\u017e\u00edvate\u013ea API. T\u00edm SkyPlanner nastav\u00ed obojsmern\u00fa integr\u00e1ciu a bude ju podporova\u0165 aj po spusten\u00ed do ostrej prev\u00e1dzky.<\/li>\n\n<\/ol>\n\n\n<p><strong>Ceny.<\/strong> Bal\u00edky sa \u00fa\u010dtuj\u00fa mesa\u010dne pod\u013ea po\u010dtu pracov\u00edsk. Pracovisk\u00e1 m\u00f4\u017eete kedyko\u013evek prid\u00e1va\u0165 \u010di odobera\u0165 alebo predplatn\u00e9 zru\u0161i\u0165. Podrobnosti n\u00e1jdete v <a href=\"\/sk\/cenotvorba\/\">cenn\u00edku<\/a> a \u010fal\u0161ie syst\u00e9my v <a href=\"\/sk\/integracie\/erp\/\">preh\u013eade integr\u00e1ci\u00ed s ERP<\/a>. Z\u00e1klady pl\u00e1novania pod\u013ea re\u00e1lnej kapacity n\u00e1jdete v <a href=\"\/sk\/zdroje-sk\/planovanie-s-obmedzenou-kapacitou\/\">pr\u00edru\u010dke pl\u00e1novania v\u00fdroby<\/a>.<\/p>\n\n\n<div class=\"wp-block-buttons ind-prose__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/sk\/skusobna-verzia\/\">Vysk\u00fa\u0161a\u0165 zadarmo<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/sk\/kontakt-na-predaj\/\">Kontaktova\u0165 predaj<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">\u010casto kladen\u00e9 ot\u00e1zky<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group sp-faq fx-faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Ak\u00fd je najlep\u0161\u00ed doplnok na rozvrhovanie v\u00fdroby pre Visma L7?<\/summary>\n<p class=\"sp-faq__a\">SkyPlanner APS je doplnok na pl\u00e1novanie v\u00fdroby pod\u013ea re\u00e1lnych kapac\u00edt strojov a pracovn\u00edkov s obojsmernou integr\u00e1ciou s Visma L7. Na\u010d\u00edtava pracovn\u00e9 oper\u00e1cie, zdroje, \u0161trukt\u00fary v\u00fdrobkov, materi\u00e1ly, stavy z\u00e1sob a riadky n\u00e1kupn\u00fdch objedn\u00e1vok. Sp\u00e4\u0165 zapisuje zdroj, d\u00e1tum za\u010diatku, prioritu, pracovn\u00edka a po\u010det hod\u00edn za de\u0148 pre ka\u017ed\u00fa pracovn\u00fa kartu. Zoh\u013ead\u0148uje obmedzen\u00fa dostupnos\u0165 ka\u017ed\u00e9ho stroja, oper\u00e1tora, n\u00e1stroja aj materi\u00e1lu. Matica pr\u00edpravn\u00fdch \u010dasov, ktor\u00e1 zoh\u013ead\u0148uje smer prechodu medzi oper\u00e1ciami, ur\u010duje ich poradie tak, aby bol \u010das na pr\u00edpravu \u010do najkrat\u0161\u00ed. Cena za\u010d\u00edna od 199 \u20ac mesa\u010dne a bezplatn\u00e9 sk\u00fa\u0161obn\u00e9 obdobie trv\u00e1 30 dn\u00ed.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Ak\u00fd softv\u00e9r na rozvrhovanie v\u00fdroby sa integruje s Visma L7?<\/summary>\n<p class=\"sp-faq__a\">SkyPlanner APS sa integruje s Visma L7 cez Visma L7 REST API. Visma na svojej str\u00e1nke integr\u00e1ci\u00ed pre L7 uv\u00e1dza Skycode so SkyPlanner. K L7 sa prip\u00e1jaj\u00fa aj bal\u00edky APS, napr\u00edklad Delfoi Planner. SkyPlanner funguje v prehliada\u010di, zapisuje rozvrh sp\u00e4\u0165 do pracovn\u00fdch kariet L7 a ka\u017ed\u00e9mu oper\u00e1torovi zobrazuje poradie jeho oper\u00e1ci\u00ed na telef\u00f3ne alebo tablete.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>M\u00e1me pou\u017e\u00edva\u0165 Visma L7 Hienosuunnittelu alebo SkyPlanner?<\/summary>\n<p class=\"sp-faq__a\">Detailn\u00e9 pl\u00e1novanie v L7 pou\u017eite vtedy, ak ka\u017ed\u00fd zdroj predstavuje jeden stroj, va\u0161e \u0161trukt\u00fary s\u00fa jedno\u00farov\u0148ov\u00e9 a pl\u00e1nova\u010d m\u00e1 \u010das zostavova\u0165 pl\u00e1n na ka\u017ed\u00fd de\u0148. SkyPlanner pou\u017eite, ke\u010f potrebujete presn\u00e9 \u010dasy, viacero strojov pod jedn\u00fdm zdrojom, viac\u00farov\u0148ov\u00e9 \u0161trukt\u00fary, poradie oper\u00e1ci\u00ed s \u010do najkrat\u0161ou pr\u00edpravou alebo automatick\u00e9 prepl\u00e1novanie. SkyPlanner v\u00e1m zachov\u00e1 nastaven\u00e9 pl\u00e1novanie aj pri v\u00fdmene L7.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>\u010co sa stane so SkyPlanner, ke\u010f prestaneme pou\u017e\u00edva\u0165 Visma L7?<\/summary>\n<p class=\"sp-faq__a\">Va\u0161e pracovisk\u00e1, kroky v\u00fdrobn\u00e9ho postupu, matica pr\u00edpravn\u00fdch \u010dasov, zmeny a pravidl\u00e1 zostan\u00fa v SkyPlanner. Integr\u00e1cia sa prepoj\u00ed na nov\u00fd ERP, napr\u00edklad <a href=\"\/sk\/integracie\/erp\/business-central\/\">Business Central<\/a>, <a href=\"\/sk\/integracie\/erp\/visma-net\/\">Visma Net<\/a>, <a href=\"\/sk\/integracie\/erp\/lemonsoft\/\">Lemonsoft<\/a>, <a href=\"\/sk\/integracie\/erp\/monitor-erp\/\">Monitor ERP<\/a> alebo <a href=\"\/sk\/integracie\/erp\/odoo\/\">Odoo<\/a>. V\u00fdroba si po\u010das prechodu zachov\u00e1 rovnak\u00fd pl\u00e1n.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Je Visma L7 to ist\u00e9 ako Visma Net alebo Visma Nova?<\/summary>\n<p class=\"sp-faq__a\">Nie. Visma L7 je ERP od spolo\u010dnosti Visma pre dod\u00e1vate\u013esk\u00e9, energetick\u00e9 a priemyseln\u00e9 firmy, spravidla ve\u013ek\u00e9 a stredne ve\u013ek\u00e9. <a href=\"\/sk\/integracie\/erp\/visma-net\/\">Visma Net<\/a> je cloudov\u00fd ERP spolo\u010dnosti Visma pre stredn\u00e9 a ve\u013ek\u00e9 firmy, zatia\u013e \u010do <a href=\"\/sk\/integracie\/erp\/visma-nova\/\">Visma Nova<\/a> sl\u00fa\u017ei mal\u00fdm firm\u00e1m. Ka\u017ed\u00fd z t\u00fdchto syst\u00e9mov m\u00e1 vlastn\u00fd d\u00e1tov\u00fd model aj vlastn\u00fa str\u00e1nku na webe SkyPlanner.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Mus\u00edme do Visma L7 nie\u010do in\u0161talova\u0165?<\/summary>\n<p class=\"sp-faq__a\">Nie. SkyPlanner be\u017e\u00ed v cloude a vol\u00e1 L7 REST API na va\u0161om serveri Visma LTR. V\u00e1\u0161 spr\u00e1vca LTR vytvor\u00ed pou\u017e\u00edvate\u013ea API a tokeny. Na koncov\u00e9 body REST, ktor\u00e9 integr\u00e1cia pou\u017e\u00edva, si zabezpe\u010d\u00edte licencie.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Ko\u013eko stoj\u00ed SkyPlanner pre firmu pou\u017e\u00edvaj\u00facu Visma L7?<\/summary>\n<p class=\"sp-faq__a\">Od 199 \u20ac mesa\u010dne vr\u00e1tane 5 pracov\u00edsk, plus 20 \u20ac mesa\u010dne za ka\u017ed\u00e9 \u010fal\u0161ie pracovisko. Pracovisko je v\u00fdrobn\u00fd zdroj s vlastn\u00fdm \u010dasovo rozvrhnut\u00fdm porad\u00edm oper\u00e1ci\u00ed. Cenov\u00fa ponuku na integr\u00e1ciu priprav\u00edme vopred pod\u013ea va\u0161ich procesov a potrieb spolu s cenou bal\u00edka, aby ste poznali celkov\u00e9 n\u00e1klady e\u0161te pred za\u010diatkom.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Ako dlho trv\u00e1 zavedenie?<\/summary>\n<p class=\"sp-faq__a\">Zavedenie sa zvy\u010dajne dokon\u010d\u00ed v priebehu nieko\u013ek\u00fdch t\u00fd\u017ed\u0148ov od za\u010diatku \u00favodn\u00e9ho nastavenia. T\u00edm namapuje va\u0161e zdroje a pracovn\u00e9 oper\u00e1cie, prepoj\u00ed \u010d\u00edsla v\u00fdrobn\u00fdch pr\u00edkazov a materi\u00e1ly a nastav\u00ed z\u00e1pis rozvrhu sp\u00e4\u0165 do L7. Pred spusten\u00edm do ostrej prev\u00e1dzky sa v\u0161etko otestuje oproti v\u00e1\u0161mu s\u00fa\u010dasn\u00e9mu pl\u00e1nu.<\/p>\n<\/details>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n<\/div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Integr\u00e1cie \/ ERP \/ Visma L7 SkyPlanner APS pre Visma L7: Pl\u00e1novanie v\u00fdroby pod\u013ea re\u00e1lnych kapac\u00edt SkyPlanner APS je doplnok na pl\u00e1novanie v\u00fdroby pod\u013ea re\u00e1lnych kapac\u00edt strojov a pracovn\u00edkov pre Visma L7, ERP syst\u00e9m pou\u017e\u00edvan\u00fd vo ve\u013ek\u00fdch a stredn\u00fdch f\u00ednskych priemyseln\u00fdch, dod\u00e1vate\u013esk\u00fdch a energetick\u00fdch spolo\u010dnostiach. Ka\u017ed\u00fd stroj, oper\u00e1tor, n\u00e1stroj aj materi\u00e1l sa pl\u00e1nuje na konkr\u00e9tny &#8230; <a title=\"SkyPlanner APS pre Visma L7: Pl\u00e1novanie v\u00fdroby pod\u013ea re\u00e1lnych kapac\u00edt\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/sk\/integracie\/erp\/visma-l7\/\" aria-label=\"Pre\u010d\u00edtajte si viac o SkyPlanner APS pre Visma L7: Pl\u00e1novanie v\u00fdroby pod\u013ea re\u00e1lnych kapac\u00edt\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":0,"parent":100686,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"class_list":["post-106274","page","type-page","status-publish"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Visma L7: Integr\u00e1cia APS na pl\u00e1novanie pod\u013ea re\u00e1lnych kapac\u00edt<\/title>\n<meta name=\"description\" content=\"SkyPlanner APS: doplnok pre Visma L7 na pl\u00e1novanie pod\u013ea kapac\u00edt. Obojsmerne prep\u00e1ja oper\u00e1cie, zdroje, \u013eud\u00ed a materi\u00e1l. Od 199 \u20ac mesa\u010dne.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/sk\/integracie\/erp\/visma-l7\/\" \/>\n<meta property=\"og:locale\" content=\"sk_SK\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"SkyPlanner APS pre Visma L7: Pl\u00e1novanie v\u00fdroby pod\u013ea re\u00e1lnych kapac\u00edt\" \/>\n<meta property=\"og:description\" content=\"SkyPlanner APS: doplnok pre Visma L7 na pl\u00e1novanie pod\u013ea kapac\u00edt. Obojsmerne prep\u00e1ja oper\u00e1cie, zdroje, \u013eud\u00ed a materi\u00e1l. Od 199 \u20ac mesa\u010dne.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/sk\/integracie\/erp\/visma-l7\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Predpokladan\u00fd \u010das \u010d\u00edtania\" \/>\n\t<meta name=\"twitter:data1\" content=\"15 min\u00fat\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sk\\\/integracie\\\/erp\\\/visma-l7\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/sk\\\/integracie\\\/erp\\\/visma-l7\\\/\",\"name\":\"Visma L7: Integr\u00e1cia APS na pl\u00e1novanie pod\u013ea re\u00e1lnych kapac\u00edt\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sk\\\/#website\"},\"datePublished\":\"2026-10-23T13:42:12+00:00\",\"description\":\"SkyPlanner APS: doplnok pre Visma L7 na pl\u00e1novanie pod\u013ea kapac\u00edt. Obojsmerne prep\u00e1ja oper\u00e1cie, zdroje, \u013eud\u00ed a materi\u00e1l. Od 199 \u20ac mesa\u010dne.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sk\\\/integracie\\\/erp\\\/visma-l7\\\/#breadcrumb\"},\"inLanguage\":\"sk-SK\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/sk\\\/integracie\\\/erp\\\/visma-l7\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sk\\\/integracie\\\/erp\\\/visma-l7\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/sk\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Integr\u00e1cie ERP a MES softv\u00e9ru so SkyPlannerom\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/sk\\\/integracie\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"SkyPlanner APS pre v\u00e1\u0161 ERP\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/sk\\\/integracie\\\/erp\\\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"SkyPlanner APS pre Visma L7: Pl\u00e1novanie v\u00fdroby pod\u013ea re\u00e1lnych kapac\u00edt\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sk\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/sk\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sk\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/sk\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"sk-SK\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sk\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/sk\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"sk-SK\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sk\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sk\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Visma L7: Integr\u00e1cia APS na pl\u00e1novanie pod\u013ea re\u00e1lnych kapac\u00edt","description":"SkyPlanner APS: doplnok pre Visma L7 na pl\u00e1novanie pod\u013ea kapac\u00edt. Obojsmerne prep\u00e1ja oper\u00e1cie, zdroje, \u013eud\u00ed a materi\u00e1l. Od 199 \u20ac mesa\u010dne.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/sk\/integracie\/erp\/visma-l7\/","og_locale":"sk_SK","og_type":"article","og_title":"SkyPlanner APS pre Visma L7: Pl\u00e1novanie v\u00fdroby pod\u013ea re\u00e1lnych kapac\u00edt","og_description":"SkyPlanner APS: doplnok pre Visma L7 na pl\u00e1novanie pod\u013ea kapac\u00edt. Obojsmerne prep\u00e1ja oper\u00e1cie, zdroje, \u013eud\u00ed a materi\u00e1l. Od 199 \u20ac mesa\u010dne.","og_url":"https:\/\/skyplanner.ai\/sk\/integracie\/erp\/visma-l7\/","og_site_name":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"Predpokladan\u00fd \u010das \u010d\u00edtania":"15 min\u00fat"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/sk\/integracie\/erp\/visma-l7\/","url":"https:\/\/skyplanner.ai\/sk\/integracie\/erp\/visma-l7\/","name":"Visma L7: Integr\u00e1cia APS na pl\u00e1novanie pod\u013ea re\u00e1lnych kapac\u00edt","isPartOf":{"@id":"https:\/\/skyplanner.ai\/sk\/#website"},"datePublished":"2026-10-23T13:42:12+00:00","description":"SkyPlanner APS: doplnok pre Visma L7 na pl\u00e1novanie pod\u013ea kapac\u00edt. Obojsmerne prep\u00e1ja oper\u00e1cie, zdroje, \u013eud\u00ed a materi\u00e1l. Od 199 \u20ac mesa\u010dne.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/sk\/integracie\/erp\/visma-l7\/#breadcrumb"},"inLanguage":"sk-SK","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/sk\/integracie\/erp\/visma-l7\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/sk\/integracie\/erp\/visma-l7\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/sk\/"},{"@type":"ListItem","position":2,"name":"Integr\u00e1cie ERP a MES softv\u00e9ru so SkyPlannerom","item":"https:\/\/skyplanner.ai\/sk\/integracie\/"},{"@type":"ListItem","position":3,"name":"SkyPlanner APS pre v\u00e1\u0161 ERP","item":"https:\/\/skyplanner.ai\/sk\/integracie\/erp\/"},{"@type":"ListItem","position":4,"name":"SkyPlanner APS pre Visma L7: Pl\u00e1novanie v\u00fdroby pod\u013ea re\u00e1lnych kapac\u00edt"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/sk\/#website","url":"https:\/\/skyplanner.ai\/sk\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/sk\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/sk\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"sk-SK"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/sk\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/sk\/","logo":{"@type":"ImageObject","inLanguage":"sk-SK","@id":"https:\/\/skyplanner.ai\/sk\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/sk\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]}]}},"uagb_featured_image_src":{"full":false,"thumbnail":false,"medium":false,"medium_large":false,"large":false,"1536x1536":false,"2048x2048":false,"betterdocs-category-thumb":false},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/sk\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Integr\u00e1cie \/ ERP \/ Visma L7 SkyPlanner APS pre Visma L7: Pl\u00e1novanie v\u00fdroby pod\u013ea re\u00e1lnych kapac\u00edt SkyPlanner APS je doplnok na pl\u00e1novanie v\u00fdroby pod\u013ea re\u00e1lnych kapac\u00edt strojov a pracovn\u00edkov pre Visma L7, ERP syst\u00e9m pou\u017e\u00edvan\u00fd vo ve\u013ek\u00fdch a stredn\u00fdch f\u00ednskych priemyseln\u00fdch, dod\u00e1vate\u013esk\u00fdch a energetick\u00fdch spolo\u010dnostiach. Ka\u017ed\u00fd stroj, oper\u00e1tor, n\u00e1stroj aj materi\u00e1l sa pl\u00e1nuje na konkr\u00e9tny&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/sk\/wp-json\/wp\/v2\/pages\/106274","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/sk\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/skyplanner.ai\/sk\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/sk\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/sk\/wp-json\/wp\/v2\/comments?post=106274"}],"version-history":[{"count":0,"href":"https:\/\/skyplanner.ai\/sk\/wp-json\/wp\/v2\/pages\/106274\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/sk\/wp-json\/wp\/v2\/pages\/100686"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/sk\/wp-json\/wp\/v2\/media?parent=106274"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}