{"id":106187,"date":"2026-10-23T13:42:12","date_gmt":"2026-10-23T13:42:12","guid":{"rendered":"https:\/\/skyplanner.ai\/integracie\/erp\/qad-adaptive-erp\/"},"modified":"2026-10-23T13:42:12","modified_gmt":"2026-10-23T13:42:12","slug":"qad-adaptive-erp","status":"publish","type":"page","link":"https:\/\/skyplanner.ai\/sk\/integracie\/erp\/qad-adaptive-erp\/","title":{"rendered":"SkyPlanner APS pre QAD Adaptive ERP: Pl\u00e1novanie v\u00fdroby pod\u013ea re\u00e1lnych kapac\u00edt"},"content":{"rendered":"\n<div class=\"wp-block-group sp-industry-page sp-industry sp-page sp-erp-page\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<section class=\"wp-block-group fx-hero\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__grid\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__copy sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-eyebrow ind-crumbs\"><span><a href=\"\/sk\/integracie\/\">Integr\u00e1cie<\/a> \/ <a href=\"\/sk\/integracie\/erp\/\">ERP<\/a> \/ QAD Adaptive ERP<\/span><\/p>\n\n\n<h1 class=\"wp-block-heading fx-hero__title\">SkyPlanner APS pre QAD Adaptive ERP: <span class=\"hl\">Pl\u00e1novanie v\u00fdroby pod\u013ea re\u00e1lnych kapac\u00edt<\/span><\/h1>\n\n\n<p class=\"fx-hero__sub\">SkyPlanner APS je doplnok pre QAD Adaptive ERP (predt\u00fdm QAD Enterprise Applications a MFG\/PRO) na pl\u00e1novanie v\u00fdroby pod\u013ea skuto\u010dn\u00fdch kapac\u00edt strojov a pracovn\u00edkov. Pl\u00e1nuje vyu\u017eitie ka\u017ed\u00e9ho stroja, oper\u00e1tora, n\u00e1stroja aj materi\u00e1lu. Vid\u00edte, kde a kedy sa vykon\u00e1va ka\u017ed\u00e1 oper\u00e1cia v\u00fdrobn\u00e9ho pr\u00edkazu, a Autopilot pri zmen\u00e1ch vo v\u00fdrobe automaticky prepl\u00e1nuje rozvrh.<\/p>\n\n\n<div class=\"wp-block-buttons fx-hero__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/sk\/skusobna-verzia\/\">Spusti\u0165 bezplatn\u00fa sk\u00fa\u0161obn\u00fa verziu<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/sk\/kontakt-na-predaj\/\">Rezervova\u0165 demo<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-hero__media sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"fx-shot\"><div class=\"fx-shot__bar\" aria-hidden=\"true\"><i><\/i><i><\/i><i><\/i><span>skyplanner.ai \u00b7 Rozvrhovanie v\u00fdroby<\/span><\/div><img fetchpriority=\"high\" decoding=\"async\" loading=\"eager\" width=\"1024\" height=\"685\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/20-d7d44cbc-5430-4f97-99f5-fca4632862ef.png\" alt=\"Ganttov diagram v SkyPlanner APS s oper\u00e1ciami rozvrhnut\u00fdmi na jednotliv\u00e9 pracovisk\u00e1 a zoznamom z\u00e1kaziek pod n\u00edm.\"><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--intro\" id=\"overview\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>SkyPlanner je s QAD Adaptive ERP prepojen\u00fd obojsmerne: preber\u00e1 v\u00fdrobn\u00e9 pr\u00edkazy s oper\u00e1ciami, polo\u017eky, \u0161trukt\u00fary v\u00fdrobkov, technologick\u00e9 postupy, pracovisk\u00e1, z\u00e1soby a n\u00e1kupn\u00e9 objedn\u00e1vky. Napl\u00e1novan\u00e9 term\u00edny uvo\u013enenia a dokon\u010denia sa cez QAD QXtend pren\u00e1\u0161aj\u00fa sp\u00e4\u0165 do Work Order Maintenance. Vyk\u00e1zan\u00e1 pr\u00e1ca sa zapisuje ako hl\u00e1senia pr\u00e1ce a pr\u00edjmy z v\u00fdrobn\u00fdch pr\u00edkazov. T\u00edm SkyPlanner po\u010das zav\u00e1dzania prisp\u00f4sob\u00ed integr\u00e1ciu v\u00e1\u0161mu nastaveniu QAD.<\/p>\n\n\n<p>Cena sa za\u010d\u00edna na 199 \u20ac mesa\u010dne vr\u00e1tane 5 pracov\u00edsk. Ka\u017ed\u00e9 \u010fal\u0161ie pracovisko stoj\u00ed 20 \u20ac mesa\u010dne. Bezplatn\u00e1 sk\u00fa\u0161obn\u00e1 verzia trv\u00e1 30 dn\u00ed, umo\u017e\u0148uje pou\u017e\u00edva\u0165 a\u017e 20 pracov\u00edsk a nevy\u017eaduje platobn\u00fa kartu.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"what-changes-in-your-production\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">\u010co sa zmen\u00ed vo va\u0161ej v\u00fdrobe<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-pain ind-cards\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Poradie oper\u00e1ci\u00ed pod\u013ea kapacity ka\u017ed\u00e9ho stroja.<\/p>\n\n\n<p class=\"fx-pain__b\">Capacity Requirements Planning v QAD zobrazuje za\u0165a\u017eenie ka\u017ed\u00e9ho pracoviska. SkyPlanner prirad\u00ed ka\u017ed\u00fa oper\u00e1ciu v\u00fdrobn\u00e9ho pr\u00edkazu ku konkr\u00e9tnemu stroju alebo pracovn\u00edkovi v konkr\u00e9tnom \u010dase. Pritom zoh\u013ead\u0148uje skuto\u010dn\u00e9 zmeny, nepr\u00edtomnosti a nad\u010dasy.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Term\u00edny sa v\u00e1m u\u017e nemenia.<\/p>\n\n\n<p class=\"fx-pain__b\">SkyPlanner udr\u017eiava poradie oper\u00e1ci\u00ed a term\u00edny uvo\u013enenia a dokon\u010denia v\u00fdrobn\u00fdch pr\u00edkazov v QAD sa n\u00edm riadia. Pl\u00e1nova\u010di u\u017e nemusia po ka\u017edom spusten\u00ed CRP znova zad\u00e1va\u0165 term\u00edny oper\u00e1ci\u00ed.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Ni\u017e\u0161ie n\u00e1klady na pretypovanie.<\/p>\n\n\n<p class=\"fx-pain__b\">SkyPlanner eviduje \u010das pretypovania medzi ka\u017edou dvojicou v\u00fdrobkov v oboch smeroch. Pri prechode zo svetlej farby na tmav\u00fa m\u00f4\u017ee sta\u010di\u0165 kr\u00e1tky preplach, k\u00fdm opa\u010dn\u00fd smer vy\u017eaduje \u00fapln\u00e9 vy\u010distenie. Pl\u00e1novac\u00ed algoritmus zorad\u00ed oper\u00e1cie tak, aby sa stratilo \u010do najmenej \u010dasu.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Aj \u013eudia a n\u00e1stroje maj\u00fa obmedzen\u00fa kapacitu.<\/p>\n\n\n<p class=\"fx-pain__b\">Oper\u00e1cii, ktor\u00e1 potrebuje troch oper\u00e1torov, prirad\u00ed troch pracovn\u00edkov s vo\u013enou kapacitou po\u010das zmeny. Raznica alebo forma pou\u017e\u00edvan\u00e1 na jednom lise sa nikdy nenapl\u00e1nuje s\u00fa\u010dasne na in\u00fd. Ak je stroj obsaden\u00fd, pr\u00e1ca sa presunie na n\u00e1hradn\u00fd stroj alebo pracovn\u00edka.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">O za\u010dat\u00ed rozhoduje materi\u00e1l.<\/p>\n\n\n<p class=\"fx-pain__b\">SkyPlanner pri ka\u017edej polo\u017eke kontroluje z\u00e1soby a o\u010dak\u00e1van\u00e9 dod\u00e1vky z n\u00e1kupn\u00fdch objedn\u00e1vok. V\u00fdrobn\u00fd pr\u00edkaz, ktor\u00fd \u010dak\u00e1 na dod\u00e1vku od dod\u00e1vate\u013ea, napl\u00e1nuje a\u017e po jej term\u00edne. Pr\u00e1ca sa tak v dielni neza\u010dne len preto, aby sa vz\u00e1p\u00e4t\u00ed zastavila.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Oper\u00e1tori vidia poradie svojich oper\u00e1ci\u00ed.<\/p>\n\n\n<p class=\"fx-pain__b\">Ka\u017ed\u00fd oper\u00e1tor vid\u00ed nasleduj\u00face oper\u00e1cie na telef\u00f3ne alebo tablete a priebe\u017ene vykazuje pr\u00e1cu. Kancel\u00e1ria sleduje postup v re\u00e1lnom \u010dase a hl\u00e1senia pr\u00e1ce sa pren\u00e1\u0161aj\u00fa sp\u00e4\u0165 do QAD.<\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"customers\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Ako v\u00fdrobn\u00e9 firmy hodnotia SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-custs\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/utu-kalle-kalliomaki-2026.jpg\" alt=\"Kalle Kalliom\u00e4ki, \u0161pecialista dod\u00e1vate\u013esk\u00e9ho re\u0165azca v UTU, v dielni na v\u00fdrobu rozv\u00e1dza\u010dov v Ulvile\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/23-beca6df2-3fa2-4315-80e8-7c38a9e3d2e1.png\" alt=\"UTU\" width=\"69\" height=\"59\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>2 h<\/b><span>u\u0161etren\u00e9 ka\u017ed\u00fd t\u00fd\u017ede\u0148<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eV\u010faka SkyPlanner sme pri pl\u00e1novan\u00ed v\u00fdroby pre\u0161li od tabuliek v Exceli k optimaliz\u00e1cii v\u00fdroby v re\u00e1lnom \u010dase.\u201c<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Kalle Kalliom\u00e4ki, \u0161pecialista dod\u00e1vate\u013esk\u00e9ho re\u0165azca<\/b><br>UTU \u00b7 Elektrick\u00e9 rozv\u00e1dza\u010de a sp\u00ednacie zariadenia<\/p>\n\n\n<p class=\"ind-cust__result\">Pri pl\u00e1novan\u00ed v\u00fdroby u\u0161etria ka\u017ed\u00fd t\u00fd\u017ede\u0148 2 hodiny pracovn\u00e9ho \u010dasu a nov\u00fd zoznam oper\u00e1ci\u00ed sa dostane na linku za p\u00e1r sek\u00fand.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/sk\/pribehy-zakaznikov\/utu\/\">Pre\u010d\u00edta\u0165 recenziu UTU<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-35ce8dff-f7d0-4cf3-9e71-0fe7e7ff88d3.jpg\" alt=\"Oper\u00e1tori v odevoch do \u010dist\u00fdch priestorov pri linke na plnenie flia\u0161 vo farmaceutickom z\u00e1vode Laboratory &amp; Allied v Nairobi\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/09-8c2deb57-ac1c-468b-ad64-fafb9debd7eb.png\" alt=\"Laboratory &amp; Allied\" width=\"71\" height=\"44\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>+90%<\/b><span>efekt\u00edvnos\u0165 v\u00fdroby<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eEfekt\u00edvnos\u0165 v\u00fdroby sa zv\u00fd\u0161ila o 90%.\u201c<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Abdul Rucyinga, ved\u00faci IT<\/b><br>Laboratory &amp; Allied \u00b7 Farmaceutick\u00e1 v\u00fdroba<\/p>\n\n\n<p class=\"ind-cust__result\">Efekt\u00edvnos\u0165 v\u00fdroby sa zv\u00fd\u0161ila o 90% a vytvorenie optimalizovan\u00e9ho pl\u00e1nu na tri mesiace pre v\u0161etky pracovisk\u00e1 trv\u00e1 menej ne\u017e 30 min\u00fat.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/sk\/pribehy-zakaznikov\/laboratory-allied\/\">Pre\u010d\u00edta\u0165 recenziu Laboratory &amp; Allied<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/28-83df4743-ff34-41a5-9a41-c3dcc6f0897b.png\" alt=\"Opes Corporation\" width=\"106\" height=\"32\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>100%<\/b><span>spo\u013eahlivos\u0165 dod\u00e1vok od roku 2021<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eSkyPlanner n\u00e1m d\u00e1va preh\u013ead o kapacit\u00e1ch a vn\u00e1\u0161a do pl\u00e1novania predv\u00eddate\u013enos\u0165.\u201c<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Dan Berglund, COO\/CFO<\/b><br>Opes Corporation \u00b7 Chemick\u00e1 a potravin\u00e1rska v\u00fdroba<\/p>\n\n\n<p class=\"ind-cust__result\">Spo\u013eahlivos\u0165 dod\u00e1vok dosahuje 100% po cel\u00fd \u010das pou\u017e\u00edvania SkyPlanner, od roku 2021.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/sk\/pribehy-zakaznikov\/opes-corporation\/\">Pre\u010d\u00edta\u0165 si hodnotenie od Opes Corporation<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/07-d99dfa98-8de6-4a48-9bad-9560584a9a24.jpg\" alt=\"Zv\u00e1ra\u010d KJH-Comp br\u00fasi zv\u00e1ran\u00fa oce\u013eov\u00fa kon\u0161trukciu v z\u00e1vode Alah\u00e4rm\u00e4\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-b4d7c595-f03f-4472-afad-29a42f77e660.png\" alt=\"KJH-Comp\" width=\"126\" height=\"34\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>98%<\/b><span>spo\u013eahlivos\u0165 dod\u00e1vok oproti p\u00f4vodn\u00fdm pribli\u017ene 50%<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eSkyPlanner zohr\u00e1va rozhoduj\u00facu \u00falohu pri udr\u017eiavan\u00ed na\u0161ej spo\u013eahlivosti dod\u00e1vok.\u201c<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Hannu Lahtinen, v\u00fdkonn\u00fd riadite\u013e<\/b><br>KJH-Comp \u00b7 V\u00fdroba plechov\u00fdch dielov a z\u00e1kazkov\u00e1 v\u00fdroba<\/p>\n\n\n<p class=\"ind-cust__result\">Spo\u013eahlivos\u0165 dod\u00e1vok vzr\u00e1stla z pribli\u017ene 50% a\u017e na 98% a rozvrhovanie teraz zvl\u00e1dne jeden ved\u00faci namiesto dvoch.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/sk\/pribehy-zakaznikov\/kjh-comp\/\">Pre\u010d\u00edtajte si recenziu KJH-Comp<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"how-the-qad-adaptive-erp-integration-works\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Ako funguje integr\u00e1cia s QAD Adaptive ERP<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ol class=\"wp-block-list\">\n\n<li><strong>QAD odosiela v\u00fdrobn\u00e9 podklady.<\/strong> Do SkyPlanner sa pren\u00e1\u0161aj\u00fa v\u00fdrobn\u00e9 pr\u00edkazy s oper\u00e1ciami, polo\u017eky, \u0161trukt\u00fary v\u00fdrobkov, technologick\u00e9 postupy, pracovisk\u00e1, v\u00fdrobn\u00e9 kalend\u00e1re, z\u00e1soby a n\u00e1kupn\u00e9 objedn\u00e1vky.<\/li>\n\n\n<li><strong>SkyPlanner vytv\u00e1ra rozvrh a udr\u017eiava ho aktu\u00e1lny.<\/strong> Pl\u00e1novac\u00ed algoritmus Arcturus optimalizuje cel\u00fd pl\u00e1n v priebehu sek\u00fand a pri zmen\u00e1ch vo v\u00fdrobe ho prepl\u00e1nuje.<\/li>\n\n\n<li><strong>Term\u00edny a vyk\u00e1zan\u00e1 pr\u00e1ca sa pren\u00e1\u0161aj\u00fa sp\u00e4\u0165.<\/strong> Napl\u00e1novan\u00e9 term\u00edny uvo\u013enenia a dokon\u010denia sa vracaj\u00fa ku ka\u017ed\u00e9mu v\u00fdrobn\u00e9mu pr\u00edkazu cez QXtend Inbound QDoc do Work Order Maintenance (16.1). Potvrdenia oper\u00e1torov sa zapisuj\u00fa cez Labor Feedback by Work Order (16.20.1) a Work Order Receipt (16.11).<\/li>\n\n<\/ol>\n\n\n<p>QAD zost\u00e1va hlavn\u00fdm syst\u00e9mom evidencie. Polo\u017eky, \u0161trukt\u00fary v\u00fdrobkov, MRP, n\u00e1kup, z\u00e1soby, kalkul\u00e1cie n\u00e1kladov a financie zost\u00e1vaj\u00fa tam, kde s\u00fa. SkyPlanner m\u00e1 na starosti jedin\u00fa vec: poradie a na\u010dasovanie ka\u017edej oper\u00e1cie na ka\u017edom zdroji.<\/p>\n\n\n<p>SkyPlanner \u010d\u00edta \u00fadaje z QAD cez objekty QAD QXtend Outbound (Item, Product Structure, Routing, Work Center, Inventory Transaction) a rozhrania REST API na dopytovanie podnikov\u00fdch dokumentov QAD. Sp\u00e4tn\u00fd z\u00e1pis zabezpe\u010duje QAD QXtend Inbound, rozhranie QAD zalo\u017een\u00e9 na SOAP a XML, ktor\u00e9 pristupuje k rovnak\u00fdm programom ako pl\u00e1nova\u010d. Webhooky SkyPlanner odosielaj\u00fa ka\u017ed\u00fa zmenu rozvrhu hne\u010f, ako nastane.<\/p>\n\n\n<p>Ka\u017ed\u00fd z\u00e1vod pou\u017e\u00edva QAD inak, preto t\u00edm SkyPlanner po\u010das zav\u00e1dzania prisp\u00f4sob\u00ed integr\u00e1ciu v\u00e1\u0161mu nastaveniu a poskytuje podporu aj po spusten\u00ed ostrej prev\u00e1dzky. Cenov\u00fa ponuku na integr\u00e1ciu dostanete vopred pod\u013ea svojich procesov a potrieb. V\u00e1\u0161 partner pre QAD alebo vlastn\u00ed v\u00fdvoj\u00e1ri m\u00f4\u017eu integr\u00e1ciu vytvori\u0165 aj pomocou zdokumentovan\u00e9ho API SkyPlanner (<a href=\"https:\/\/integration.skyplanner.app\/api\/swagger\">referen\u010dn\u00e1 dokument\u00e1cia API<\/a>).<\/p>\n\n\n<p>QDocs, mapovanie \u00fadajov a pravidl\u00e1 sp\u00e4tn\u00e9ho z\u00e1pisu n\u00e1jdete v <a href=\"\/sk\/integracie\/erp\/qad-adaptive-erp\/sprievodca-integraciou\/\">pr\u00edru\u010dke integr\u00e1cie s QAD Adaptive ERP na rozvrhovanie v\u00fdroby<\/a>.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"what-qad-adaptive-erp-schedules-and-what-skyplan\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">\u010co rozvrhuje QAD Adaptive ERP a \u010do prid\u00e1va SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>QAD dobre pl\u00e1nuje materi\u00e1l a opakovan\u00fa v\u00fdrobu na link\u00e1ch riadi pomocou Line Schedule Workbench. Pri diskr\u00e9tnych v\u00fdrobn\u00fdch pr\u00edkazoch zabezpe\u010duje pl\u00e1novanie kapac\u00edt Capacity Requirements Planning. <a href=\"https:\/\/connect.qad.com\/documents\/2370665\/207142422\/Manufacturing_UG_v2020EE.pdf\/a61c043d-f21c-631a-4a2e-c0c2d152294c?t=1600374319852&amp;download=true\">Pou\u017e\u00edvate\u013esk\u00e1 pr\u00edru\u010dka QAD pre v\u00fdrobu<\/a> stanovuje tieto pravidl\u00e1:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>CRP rozvrhuje sp\u00e4tne od term\u00ednu dokon\u010denia.<\/strong> Pod\u013ea pr\u00edru\u010dky &#8222;takes the due date of an order or repetitive schedule and schedules each of its operations from the last operation in the order routing or process backward to the first one.&#8220; (Vych\u00e1dza z term\u00ednu dokon\u010denia pr\u00edkazu alebo rozvrhu opakovanej v\u00fdroby a rozvrhuje oper\u00e1cie sp\u00e4tne, od poslednej oper\u00e1cie technologick\u00e9ho postupu alebo procesu po prv\u00fa.)<\/li>\n\n\n<li><strong>Pre\u0165a\u017eenie rie\u0161i pl\u00e1nova\u010d.<\/strong> &#8222;If a work center or machine is over- or under-loaded, you can modify either its capacity or the timing or amount of the load.&#8220; (Ak je pracovisko alebo stroj pre\u0165a\u017een\u00fd \u010di nedostato\u010dne vy\u0165a\u017een\u00fd, m\u00f4\u017eete upravi\u0165 jeho kapacitu alebo na\u010dasovanie \u010di ve\u013ekos\u0165 za\u0165a\u017eenia.)<\/li>\n\n\n<li><strong>Cel\u00e9 za\u0165a\u017eenie pripadne na jeden de\u0148.<\/strong> &#8222;The system assigns the entire load for an operation to its scheduled start date.&#8220; (Syst\u00e9m prirad\u00ed cel\u00e9 za\u0165a\u017eenie oper\u00e1cie k napl\u00e1novan\u00e9mu d\u00e1tumu jej za\u010diatku.)<\/li>\n\n\n<li><strong>Op\u00e4tovn\u00e9 spustenie CRP men\u00ed term\u00edny.<\/strong> &#8222;When you run CRP, all open operations for selected work orders are rescheduled.&#8220; (Pri spusten\u00ed CRP sa prepl\u00e1nuj\u00fa v\u0161etky otvoren\u00e9 oper\u00e1cie vybran\u00fdch v\u00fdrobn\u00fdch pr\u00edkazov.)<\/li>\n\n<\/ul>\n\n\n<p>Pl\u00e1novanie za\u0165a\u017eenia pod\u013ea re\u00e1lnych kapac\u00edt je v z\u00e1kladnom QAD s\u00fa\u010das\u0165ou Advanced Repetitive, kde Line Schedule Workbench rozvrhuje v\u00fdrobn\u00e9 linky. Master and Production Scheduling Workbenches s\u00fa &#8222;.NET UI-only scheduling tools&#8220; (n\u00e1stroje na rozvrhovanie dostupn\u00e9 iba v rozhran\u00ed .NET UI) a vy\u017eaduj\u00fa akt\u00edvnu licenciu Maintenance (<a href=\"https:\/\/connect.qad.com\/documents\/2370665\/209256556\/PlanningSchedWorkbench_AG_v2021EE.pdf\/7adcba49-8b72-8124-9855-08b01a009d86?t=1632916378957&amp;download=true\">pr\u00edru\u010dka QAD<\/a>). N\u00e1stroj QAD na ur\u010dovanie poradia oper\u00e1ci\u00ed je samostatn\u00fd produkt QAD Advanced Scheduling, predstaven\u00fd v roku 2024 (<a href=\"https:\/\/www.qad.com\/solutions\/supply-chain-planning\/advanced-scheduling\">QAD<\/a>).<\/p>\n\n\n<p>V\u0161etky kroky a obmedzenia vysvet\u013euje \u010dl\u00e1nok <a href=\"\/sk\/integracie\/erp\/qad-adaptive-erp\/planovanie-vyroby\/\">Umo\u017e\u0148uje QAD Adaptive ERP pl\u00e1novanie v\u00fdroby pod\u013ea re\u00e1lnych kapac\u00edt?<\/a><\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"qad-adaptive-erp-today-and-with-skyplanner\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">QAD Adaptive ERP dnes a so SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th><\/th><th>QAD CRP a v\u00fdrobn\u00e9 pr\u00edkazy<\/th><th>QAD Adaptive ERP so SkyPlanner APS<\/th><\/tr><\/thead><tbody><tr><td>Kapacita<\/td><td>CRP rozvrhuje sp\u00e4tne a zobrazuje za\u0165a\u017eenie v porovnan\u00ed s kapacitou<\/td><td>Re\u00e1lna kapacita ka\u017ed\u00e9ho stroja, pracovn\u00edka a n\u00e1stroja pod\u013ea skuto\u010dn\u00fdch zmien<\/td><\/tr><tr><td>Pre\u0165a\u017eenie<\/td><td>Pl\u00e1nova\u010d upravuje kapacitu alebo na\u010dasovanie za\u0165a\u017eenia<\/td><td>Pl\u00e1novac\u00ed algoritmus men\u00ed poradie pod\u013ea va\u0161ich prior\u00edt<\/td><\/tr><tr><td>Za\u0165a\u017eenie<\/td><td>Cel\u00e9 za\u0165a\u017eenie oper\u00e1cie v de\u0148 jej za\u010diatku<\/td><td>Ka\u017ed\u00e1 oper\u00e1cia m\u00e1 ur\u010den\u00fd konkr\u00e9tny \u010das<\/td><\/tr><tr><td>Zmeny<\/td><td>Ka\u017ed\u00e9 spustenie CRP prepl\u00e1nuje otvoren\u00e9 oper\u00e1cie<\/td><td>Autopilot prepl\u00e1nuje rozvrh; Running Time Lock uzamkne pl\u00e1n na najbli\u017e\u0161ie hodiny<\/td><\/tr><tr><td>Pretypovanie<\/td><td>Jeden \u010das nastavenia na oper\u00e1ciu technologick\u00e9ho postupu; pretypovanie na link\u00e1ch s opakovanou v\u00fdrobou<\/td><td>Matica \u010dasov pr\u00edpravy na ka\u017edom pracovisku: najkrat\u0161\u00ed celkov\u00fd \u010das nastavenia<\/td><\/tr><tr><td>\u013dudia a n\u00e1stroje<\/td><td>Kapacita pracoviska odvoden\u00e1 od strojov alebo pracovn\u00edkov<\/td><td>Konkr\u00e9tni oper\u00e1tori so zmenami, oper\u00e1cie s viacer\u00fdmi oper\u00e1tormi, n\u00e1stroje ako zdie\u013ean\u00e9 zdroje s obmedzenou kapacitou<\/td><\/tr><tr><td>Materi\u00e1l<\/td><td>Pl\u00e1novan\u00e9 pr\u00edkazy MRP oddelen\u00e9 od \u010dasov\u00e9ho rozvrhu strojov<\/td><td>Oper\u00e1cie sa za\u010dn\u00fa, ke\u010f je materi\u00e1l na sklade alebo doraz\u00ed z n\u00e1kupn\u00fdch objedn\u00e1vok<\/td><\/tr><tr><td>Poh\u013ead pl\u00e1nova\u010da<\/td><td>Input\/Output Inquiry a zostavy CRP; pl\u00e1novacie n\u00e1stroje v rozhran\u00ed .NET UI<\/td><td>Interakt\u00edvny Ganttov diagram v prehliada\u010di: pres\u00favate oper\u00e1cie a pl\u00e1n zost\u00e1va konzistentn\u00fd<\/td><\/tr><tr><td>Diel\u0148a<\/td><td>Hl\u00e1senia pr\u00e1ce sa zad\u00e1vaj\u00fa v QAD<\/td><td>Oper\u00e1tori vidia svoje poradie oper\u00e1ci\u00ed a vykazuj\u00fa pr\u00e1cu na telef\u00f3ne alebo tablete<\/td><\/tr><\/tbody><\/table><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"qad-adaptive-erp-scheduling-software-and-add-ons\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Porovnanie softv\u00e9ru a doplnkov na rozvrhovanie pre QAD Adaptive ERP<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th>Mo\u017enos\u0165<\/th><th>\u010co pon\u00faka<\/th><th>Kedy je vhodn\u00e1<\/th><\/tr><\/thead><tbody><tr><td>QAD Advanced Scheduling (s QAD DSCP Production Planning a QAD Redzone)<\/td><td>Samostatn\u00e9 produkty QAD na pl\u00e1novanie a rozvrhovanie pre jeho ERP<\/td><td>Pl\u00e1nujete po jednotliv\u00fdch link\u00e1ch a chcete zosta\u0165 pri produktoch QAD<\/td><\/tr><tr><td>Lok\u00e1lne prev\u00e1dzkovan\u00fd APS s prepojen\u00edm na QAD (napr\u00edklad Asprova, PlanetTogether)<\/td><td>N\u00e1stroje na rozvrhovanie na po\u010d\u00edta\u010di alebo serveri, ktor\u00e9 z\u00edskavaj\u00fa \u00fadaje z QAD cez prepojenie alebo integra\u010dn\u00fd projekt<\/td><td>Pl\u00e1novac\u00ed t\u00edm spravuje samostatn\u00fd model rozvrhovania<\/td><\/tr><tr><td>Platformy na pl\u00e1novanie a pr\u00e1cu s agentmi (napr\u00edklad b2wise, Zentio)<\/td><td>Pl\u00e1novacie n\u00e1stroje, ktor\u00e9 uv\u00e1dzaj\u00fa QAD medzi syst\u00e9mami ERP, s ktor\u00fdmi sa prep\u00e1jaj\u00fa<\/td><td>Chcete doplni\u0165 QAD o analytiku z\u00e1sob alebo pl\u00e1novania<\/td><\/tr><tr><td>Cloudov\u00fd APS prepojen\u00fd s QAD (SkyPlanner APS)<\/td><td>N\u00e1stroj v prehliada\u010di na pl\u00e1novanie pod\u013ea re\u00e1lnych kapac\u00edt s obojsmernou synchroniz\u00e1ciou v\u00fdrobn\u00fdch pr\u00edkazov QAD<\/td><td>Rozvrh sa m\u00e1 s\u00e1m udr\u017eiava\u0165 aktu\u00e1lny a dosta\u0165 sa ku ka\u017ed\u00e9mu oper\u00e1torovi<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p><strong>Uprednostnite SkyPlanner pred QAD Advanced Scheduling a pl\u00e1novac\u00edmi n\u00e1strojmi QAD, ak:<\/strong><\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>V diskr\u00e9tnej v\u00fdrobe realizujete v\u00fdrobn\u00e9 pr\u00edkazy na strojoch s vyu\u017eit\u00edm pracovn\u00edkov.<\/strong> QAD opisuje Advanced Scheduling ako &#8222;a minute-by-minute, line-by-line optimized production schedule for each plant&#8220; (v\u00fdrobn\u00fd rozvrh pre ka\u017ed\u00fd z\u00e1vod optimalizovan\u00fd po min\u00fatach a jednotliv\u00fdch link\u00e1ch) (<a href=\"https:\/\/www.qad.com\/blog\/2024\/11\/supercharge-qad-redzone-with-production-planning-and-advanced-scheduling\">blog QAD<\/a>). SkyPlanner rozvrhuje ka\u017ed\u00fa oper\u00e1ciu v\u00fdrobn\u00e9ho pr\u00edkazu pre ka\u017ed\u00fd stroj, ka\u017ed\u00e9ho oper\u00e1tora a ka\u017ed\u00fd n\u00e1stroj.<\/li>\n\n\n<li><strong>Chcete rozvrh, nie cel\u00fd bal\u00edk pl\u00e1novac\u00edch n\u00e1strojov.<\/strong> QAD predstavuje Advanced Scheduling spolu s DSCP Production Planning a Redzone. SkyPlanner je jeden produkt, ktor\u00fd dop\u013a\u0148a QAD. Po\u010das 30-d\u0148ov\u00e9ho sk\u00fa\u0161obn\u00e9ho obdobia si ho otestujete na vlastn\u00fdch v\u00fdrobn\u00fdch pr\u00edkazoch a do ostrej prev\u00e1dzky ho nasad\u00edte v priebehu nieko\u013ek\u00fdch t\u00fd\u017ed\u0148ov od za\u010diatku zav\u00e1dzania.<\/li>\n\n\n<li><strong>Term\u00edny sa nesm\u00fa meni\u0165 po ka\u017edom spusten\u00ed CRP.<\/strong> QAD upozor\u0148uje, \u017ee ru\u010dne upraven\u00e9 term\u00edny oper\u00e1ci\u00ed \u201ewill probably be changed\u201c (sa pravdepodobne zmenia) pri spusten\u00ed CRP. SkyPlanner zapisuje term\u00edny uvo\u013enenia a dokon\u010denia v\u00fdrobn\u00fdch pr\u00edkazov pod\u013ea svojho rozvrhu, tak\u017ee CRP a pl\u00e1n s\u00fa v s\u00falade.<\/li>\n\n\n<li><strong>Pretypovania rozhoduj\u00fa o objeme v\u00fdroby.<\/strong> Matica \u010dasov nastavenia uchov\u00e1va pre ka\u017ed\u00e9 pracovisko \u010dasy pretypovania pod\u013ea smeru prechodu. Zora\u010fuje oper\u00e1cie pod\u013ea farby, pr\u00edchute alebo materi\u00e1lu tak, aby bol celkov\u00fd \u010das nastavenia \u010do najkrat\u0161\u00ed.<\/li>\n\n\n<li><strong>Pl\u00e1nova\u010di aj oper\u00e1tori pracuj\u00fa v prehliada\u010di.<\/strong> Pracovn\u00e9 panely QAD funguj\u00fa iba v rozhran\u00ed .NET UI. SkyPlanner funguje v prehliada\u010di, po\u010det pou\u017e\u00edvate\u013eov je neobmedzen\u00fd a Mobile Confirmations spr\u00edstup\u0148uj\u00fa aktu\u00e1lny rad oper\u00e1ci\u00ed v telef\u00f3ne alebo tablete.<\/li>\n\n\n<li><strong>Chcete jednu mesa\u010dn\u00fa cenu.<\/strong> Od 199 \u20ac mesa\u010dne. Cenu obojsmernej integr\u00e1cie pozn\u00e1te vopred a jej podporu zabezpe\u010duje t\u00edm SkyPlanner.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"how-to-get-started\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Ako za\u010da\u0165<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ol class=\"wp-block-list\">\n\n<li><strong>Spustite si bezplatn\u00fa sk\u00fa\u0161obn\u00fa verziu.<\/strong> 30 dn\u00ed, a\u017e 20 pracov\u00edsk, v\u0161etky funkcie bal\u00edka Basic, bez platobnej karty.<\/li>\n\n\n<li><strong>Vytvorte model svojej v\u00fdroby.<\/strong> V SkyPlanner vytvorte stroje, pracovn\u00edkov a zmeny alebo importujte pracovisk\u00e1 z QAD. K dispoz\u00edcii je aj pomoc so zav\u00e1dzan\u00edm.<\/li>\n\n\n<li><strong>Na\u010d\u00edtajte v\u00fdrobn\u00e9 pr\u00edkazy.<\/strong> Exportujte otvoren\u00e9 v\u00fdrobn\u00e9 pr\u00edkazy a ich technologick\u00e9 postupy z QAD do Excelu, importujte ich do SkyPlanner a porovnajte jeho rozvrh so svoj\u00edm s\u00fa\u010dasn\u00fdm pl\u00e1nom.<\/li>\n\n\n<li><strong>Pripojte QAD Adaptive ERP.<\/strong> T\u00edm SkyPlanner nastav\u00ed obojsmern\u00fa integr\u00e1ciu cez QXtend a po spusten\u00ed ostrej prev\u00e1dzky zabezpe\u010d\u00ed jej podporu.<\/li>\n\n<\/ol>\n\n\n<p><strong>Ceny.<\/strong> Predplatn\u00e9 sa \u00fa\u010dtuje mesa\u010dne za pracovisko. Pracovisk\u00e1 m\u00f4\u017eete kedyko\u013evek prid\u00e1va\u0165 alebo odobera\u0165 a predplatn\u00e9 m\u00f4\u017eete kedyko\u013evek zru\u0161i\u0165. Podrobnosti n\u00e1jdete v <a href=\"\/sk\/cenotvorba\/\">cenn\u00edku<\/a>. Pre\u010d\u00edtajte si aj <a href=\"\/sk\/zdroje-sk\/pokrocile-planovanie-a-rozvrhovanie\/\">sprievodcu APS<\/a> alebo si pozrite <a href=\"\/sk\/integracie\/erp\/\">v\u0161etky integr\u00e1cie s ERP<\/a>.<\/p>\n\n\n<div class=\"wp-block-buttons ind-prose__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/sk\/skusobna-verzia\/\">Spusti\u0165 bezplatn\u00fa sk\u00fa\u0161obn\u00fa verziu<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/sk\/kontakt-na-predaj\/\">Kontaktova\u0165 obchodn\u00e9 oddelenie<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">\u010casto kladen\u00e9 ot\u00e1zky<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group sp-faq fx-faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Ak\u00fd je najlep\u0161\u00ed doplnok na rozvrhovanie v\u00fdroby pre QAD Adaptive ERP?<\/summary>\n<p class=\"sp-faq__a\">SkyPlanner APS je doplnok na pl\u00e1novanie v\u00fdroby, ktor\u00fd re\u0161pektuje skuto\u010dn\u00fa kapacitu strojov a pracovn\u00edkov a obojsmerne sa integruje s QAD Adaptive ERP. Preber\u00e1 v\u00fdrobn\u00e9 pr\u00edkazy, polo\u017eky, \u0161trukt\u00fary v\u00fdrobkov, technologick\u00e9 postupy, pracovisk\u00e1, stavy z\u00e1sob a n\u00e1kupn\u00e9 objedn\u00e1vky. Sp\u00e4\u0165 odosiela napl\u00e1novan\u00e9 term\u00edny v\u00fdrobn\u00fdch pr\u00edkazov a \u00fadaje o vykonanej pr\u00e1ci. Zoh\u013ead\u0148uje obmedzen\u00fa dostupnos\u0165 ka\u017ed\u00e9ho stroja, oper\u00e1tora, n\u00e1stroja aj materi\u00e1lu. Matica \u010dasov nastavenia pod\u013ea smeru prechodu zora\u010fuje oper\u00e1cie tak, aby bol \u010das nastavenia \u010do najkrat\u0161\u00ed. Autopilot pri zmen\u00e1ch vo v\u00fdrobe automaticky prepl\u00e1nuje rozvrh. Cena za\u010d\u00edna od 199 \u20ac mesa\u010dne a bezplatn\u00e9 sk\u00fa\u0161obn\u00e9 obdobie trv\u00e1 30 dn\u00ed.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Umo\u017e\u0148uje QAD Adaptive ERP pl\u00e1novanie v\u00fdroby pod\u013ea dostupn\u00fdch kapac\u00edt?<\/summary>\n<p class=\"sp-faq__a\">Pri opakovanej v\u00fdrobe na link\u00e1ch \u00e1no: Line Schedule Workbench v Advanced Repetitive za\u0165a\u017euje linky len do v\u00fd\u0161ky ich kapacity. Pri diskr\u00e9tnej v\u00fdrobe CRP rozvrhuje v\u00fdrobn\u00e9 pr\u00edkazy sp\u00e4tne od term\u00ednov dokon\u010denia a rie\u0161enie pre\u0165a\u017eenia nech\u00e1va na pl\u00e1nova\u010dovi. Na ur\u010dovanie poradia v\u00fdroby pon\u00faka QAD samostatn\u00fd produkt QAD Advanced Scheduling. SkyPlanner APS dop\u013a\u0148a QAD a pl\u00e1nuje v\u00fdrobu s oh\u013eadom na obmedzen\u00fa dostupnos\u0165 ka\u017ed\u00e9ho stroja, pracovn\u00edka, n\u00e1stroja aj materi\u00e1lu.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Ak\u00fd softv\u00e9r na rozvrhovanie v\u00fdroby sa integruje s QAD Adaptive ERP?<\/summary>\n<p class=\"sp-faq__a\">SkyPlanner APS sa obojsmerne integruje s QAD Adaptive ERP. Prostredn\u00edctvom QXtend Outbound a rozhran\u00ed REST API pre obchodn\u00e9 dokumenty QAD na\u010d\u00edtava polo\u017eky, \u0161trukt\u00fary v\u00fdrobkov, technologick\u00e9 postupy, pracovisk\u00e1, v\u00fdrobn\u00e9 pr\u00edkazy a stavy z\u00e1sob. Napl\u00e1novan\u00e9 term\u00edny uvo\u013enenia a dokon\u010denia sa vracaj\u00fa do Work Order Maintenance cez QXtend Inbound QDoc. Potvrdenia sa zapisuj\u00fa cez Labor Feedback by Work Order a Work Order Receipt.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>M\u00e1me pou\u017e\u00edva\u0165 QAD Advanced Scheduling alebo SkyPlanner?<\/summary>\n<p class=\"sp-faq__a\">SkyPlanner, ak chcete v priebehu nieko\u013ek\u00fdch t\u00fd\u017ed\u0148ov zavies\u0165 rozvrh, ktor\u00fd re\u0161pektuje kapacitu ka\u017ed\u00e9ho stroja a pracovn\u00edka. QAD opisuje Advanced Scheduling ako rozvrh pre jednotliv\u00e9 linky ka\u017ed\u00e9ho z\u00e1vodu a predstavuje ho spolu s DSCP Production Planning a Redzone. SkyPlanner ur\u010duje poradie v\u00fdrobn\u00fdch pr\u00edkazov v diskr\u00e9tnej v\u00fdrobe, pl\u00e1nuje pretypovania, n\u00e1stroje, pracovn\u00e9 t\u00edmy aj materi\u00e1l a automaticky prepl\u00e1nuje v\u00fdrobu. Ka\u017ed\u00fd oper\u00e1tor m\u00e1 svoj rad oper\u00e1ci\u00ed v telef\u00f3ne a po\u010det pou\u017e\u00edvate\u013eov je neobmedzen\u00fd.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Funguje SkyPlanner s MFG\/PRO a QAD Enterprise Edition?<\/summary>\n<p class=\"sp-faq__a\">\u00c1no. QAD Adaptive ERP je s\u00fa\u010dasn\u00fd n\u00e1zov ERP syst\u00e9mu QAD, ktor\u00fd zah\u0155\u0148a niekdaj\u0161ie QAD Enterprise Applications Enterprise Edition a QAD Cloud ERP. Integr\u00e1cia vyu\u017e\u00edva rovnak\u00e9 programy na spr\u00e1vu v\u00fdrobn\u00fdch pr\u00edkazov, technologick\u00fdch postupov a pracov\u00edsk a rozhranie QXtend.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Ko\u013eko stoj\u00ed SkyPlanner pre z\u00e1vod pou\u017e\u00edvaj\u00faci QAD?<\/summary>\n<p class=\"sp-faq__a\">Od 199 \u20ac mesa\u010dne vr\u00e1tane 5 pracov\u00edsk, plus 20 \u20ac mesa\u010dne za ka\u017ed\u00e9 \u010fal\u0161ie pracovisko. Pracovisko je v\u00fdrobn\u00fd zdroj s vlastn\u00fdm radom napl\u00e1novan\u00fdch oper\u00e1ci\u00ed. Cenov\u00fa ponuku integr\u00e1cie pod\u013ea va\u0161ich procesov a potrieb dostanete vopred spolu s cenou zvolen\u00e9ho programu, tak\u017ee celkov\u00e9 n\u00e1klady pozn\u00e1te e\u0161te pred za\u010diatkom.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Ako dlho trv\u00e1 implement\u00e1cia?<\/summary>\n<p class=\"sp-faq__a\">Implement\u00e1cia sa zvy\u010dajne dokon\u010d\u00ed v priebehu nieko\u013ek\u00fdch t\u00fd\u017ed\u0148ov od za\u010diatku zav\u00e1dzania. T\u00edm namapuje va\u0161e pracovisk\u00e1, technologick\u00e9 postupy a polo\u017eky, prepoj\u00ed v\u00fdrobn\u00e9 pr\u00edkazy a n\u00e1kupn\u00e9 objedn\u00e1vky a nastav\u00ed sp\u00e4tn\u00fd prenos napl\u00e1novan\u00fdch term\u00ednov. Pred spusten\u00edm ostrej prev\u00e1dzky sa v\u0161etko otestuje porovnan\u00edm s va\u0161\u00edm s\u00fa\u010dasn\u00fdm pl\u00e1nom.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>M\u00f4\u017eeme SkyPlanner otestova\u0165 e\u0161te pred integr\u00e1ciou s QAD?<\/summary>\n<p class=\"sp-faq__a\">\u00c1no. Po\u010das 30-d\u0148ov\u00e9ho sk\u00fa\u0161obn\u00e9ho obdobia pracujete s exportom otvoren\u00fdch v\u00fdrobn\u00fdch pr\u00edkazov z QAD do Excelu. E\u0161te pred za\u010dat\u00edm pr\u00e1c na integr\u00e1cii uvid\u00edte <a href=\"\/sk\/zdroje-sk\/planovanie-s-obmedzenou-kapacitou\/\">pl\u00e1n vlastnej v\u00fdroby<\/a>, ktor\u00fd re\u0161pektuje skuto\u010dn\u00fa kapacitu strojov a pracovn\u00edkov.<\/p>\n<\/details>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n<\/div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Integr\u00e1cie \/ ERP \/ QAD Adaptive ERP SkyPlanner APS pre QAD Adaptive ERP: Pl\u00e1novanie v\u00fdroby pod\u013ea re\u00e1lnych kapac\u00edt SkyPlanner APS je doplnok pre QAD Adaptive ERP (predt\u00fdm QAD Enterprise Applications a MFG\/PRO) na pl\u00e1novanie v\u00fdroby pod\u013ea skuto\u010dn\u00fdch kapac\u00edt strojov a pracovn\u00edkov. Pl\u00e1nuje vyu\u017eitie ka\u017ed\u00e9ho stroja, oper\u00e1tora, n\u00e1stroja aj materi\u00e1lu. Vid\u00edte, kde a kedy sa vykon\u00e1va &#8230; <a title=\"SkyPlanner APS pre QAD Adaptive ERP: Pl\u00e1novanie v\u00fdroby pod\u013ea re\u00e1lnych kapac\u00edt\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/sk\/integracie\/erp\/qad-adaptive-erp\/\" aria-label=\"Pre\u010d\u00edtajte si viac o SkyPlanner APS pre QAD Adaptive ERP: Pl\u00e1novanie v\u00fdroby pod\u013ea re\u00e1lnych kapac\u00edt\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":0,"parent":100686,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"class_list":["post-106187","page","type-page","status-publish"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Integr\u00e1cia QAD Adaptive ERP: APS pod\u013ea re\u00e1lnych kapac\u00edt<\/title>\n<meta name=\"description\" content=\"SkyPlanner APS pre QAD Adaptive ERP: pl\u00e1novanie pod\u013ea kapac\u00edt strojov, \u013eud\u00ed, n\u00e1strojov a materi\u00e1lu. Obojsmern\u00e1 integr\u00e1cia. Od 199 \u20ac mesa\u010dne.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/sk\/integracie\/erp\/qad-adaptive-erp\/\" \/>\n<meta property=\"og:locale\" content=\"sk_SK\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"SkyPlanner APS pre QAD Adaptive ERP: Pl\u00e1novanie v\u00fdroby pod\u013ea re\u00e1lnych kapac\u00edt\" \/>\n<meta property=\"og:description\" content=\"SkyPlanner APS pre QAD Adaptive ERP: pl\u00e1novanie pod\u013ea kapac\u00edt strojov, \u013eud\u00ed, n\u00e1strojov a materi\u00e1lu. Obojsmern\u00e1 integr\u00e1cia. Od 199 \u20ac mesa\u010dne.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/sk\/integracie\/erp\/qad-adaptive-erp\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Predpokladan\u00fd \u010das \u010d\u00edtania\" \/>\n\t<meta name=\"twitter:data1\" content=\"16 min\u00fat\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sk\\\/integracie\\\/erp\\\/qad-adaptive-erp\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/sk\\\/integracie\\\/erp\\\/qad-adaptive-erp\\\/\",\"name\":\"Integr\u00e1cia QAD Adaptive ERP: APS pod\u013ea re\u00e1lnych kapac\u00edt\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sk\\\/#website\"},\"datePublished\":\"2026-10-23T13:42:12+00:00\",\"description\":\"SkyPlanner APS pre QAD Adaptive ERP: pl\u00e1novanie pod\u013ea kapac\u00edt strojov, \u013eud\u00ed, n\u00e1strojov a materi\u00e1lu. Obojsmern\u00e1 integr\u00e1cia. Od 199 \u20ac mesa\u010dne.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sk\\\/integracie\\\/erp\\\/qad-adaptive-erp\\\/#breadcrumb\"},\"inLanguage\":\"sk-SK\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/sk\\\/integracie\\\/erp\\\/qad-adaptive-erp\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sk\\\/integracie\\\/erp\\\/qad-adaptive-erp\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/sk\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Integr\u00e1cie ERP a MES softv\u00e9ru so SkyPlannerom\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/sk\\\/integracie\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"SkyPlanner APS pre v\u00e1\u0161 ERP\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/sk\\\/integracie\\\/erp\\\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"SkyPlanner APS pre QAD Adaptive ERP: Pl\u00e1novanie v\u00fdroby pod\u013ea re\u00e1lnych kapac\u00edt\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sk\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/sk\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sk\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/sk\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"sk-SK\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sk\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/sk\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"sk-SK\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sk\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sk\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Integr\u00e1cia QAD Adaptive ERP: APS pod\u013ea re\u00e1lnych kapac\u00edt","description":"SkyPlanner APS pre QAD Adaptive ERP: pl\u00e1novanie pod\u013ea kapac\u00edt strojov, \u013eud\u00ed, n\u00e1strojov a materi\u00e1lu. Obojsmern\u00e1 integr\u00e1cia. Od 199 \u20ac mesa\u010dne.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/sk\/integracie\/erp\/qad-adaptive-erp\/","og_locale":"sk_SK","og_type":"article","og_title":"SkyPlanner APS pre QAD Adaptive ERP: Pl\u00e1novanie v\u00fdroby pod\u013ea re\u00e1lnych kapac\u00edt","og_description":"SkyPlanner APS pre QAD Adaptive ERP: pl\u00e1novanie pod\u013ea kapac\u00edt strojov, \u013eud\u00ed, n\u00e1strojov a materi\u00e1lu. Obojsmern\u00e1 integr\u00e1cia. Od 199 \u20ac mesa\u010dne.","og_url":"https:\/\/skyplanner.ai\/sk\/integracie\/erp\/qad-adaptive-erp\/","og_site_name":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"Predpokladan\u00fd \u010das \u010d\u00edtania":"16 min\u00fat"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/sk\/integracie\/erp\/qad-adaptive-erp\/","url":"https:\/\/skyplanner.ai\/sk\/integracie\/erp\/qad-adaptive-erp\/","name":"Integr\u00e1cia QAD Adaptive ERP: APS pod\u013ea re\u00e1lnych kapac\u00edt","isPartOf":{"@id":"https:\/\/skyplanner.ai\/sk\/#website"},"datePublished":"2026-10-23T13:42:12+00:00","description":"SkyPlanner APS pre QAD Adaptive ERP: pl\u00e1novanie pod\u013ea kapac\u00edt strojov, \u013eud\u00ed, n\u00e1strojov a materi\u00e1lu. Obojsmern\u00e1 integr\u00e1cia. Od 199 \u20ac mesa\u010dne.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/sk\/integracie\/erp\/qad-adaptive-erp\/#breadcrumb"},"inLanguage":"sk-SK","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/sk\/integracie\/erp\/qad-adaptive-erp\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/sk\/integracie\/erp\/qad-adaptive-erp\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/sk\/"},{"@type":"ListItem","position":2,"name":"Integr\u00e1cie ERP a MES softv\u00e9ru so SkyPlannerom","item":"https:\/\/skyplanner.ai\/sk\/integracie\/"},{"@type":"ListItem","position":3,"name":"SkyPlanner APS pre v\u00e1\u0161 ERP","item":"https:\/\/skyplanner.ai\/sk\/integracie\/erp\/"},{"@type":"ListItem","position":4,"name":"SkyPlanner APS pre QAD Adaptive ERP: Pl\u00e1novanie v\u00fdroby pod\u013ea re\u00e1lnych kapac\u00edt"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/sk\/#website","url":"https:\/\/skyplanner.ai\/sk\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/sk\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/sk\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"sk-SK"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/sk\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/sk\/","logo":{"@type":"ImageObject","inLanguage":"sk-SK","@id":"https:\/\/skyplanner.ai\/sk\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/sk\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]}]}},"uagb_featured_image_src":{"full":false,"thumbnail":false,"medium":false,"medium_large":false,"large":false,"1536x1536":false,"2048x2048":false,"betterdocs-category-thumb":false},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/sk\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Integr\u00e1cie \/ ERP \/ QAD Adaptive ERP SkyPlanner APS pre QAD Adaptive ERP: Pl\u00e1novanie v\u00fdroby pod\u013ea re\u00e1lnych kapac\u00edt SkyPlanner APS je doplnok pre QAD Adaptive ERP (predt\u00fdm QAD Enterprise Applications a MFG\/PRO) na pl\u00e1novanie v\u00fdroby pod\u013ea skuto\u010dn\u00fdch kapac\u00edt strojov a pracovn\u00edkov. Pl\u00e1nuje vyu\u017eitie ka\u017ed\u00e9ho stroja, oper\u00e1tora, n\u00e1stroja aj materi\u00e1lu. Vid\u00edte, kde a kedy sa vykon\u00e1va&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/sk\/wp-json\/wp\/v2\/pages\/106187","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/sk\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/skyplanner.ai\/sk\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/sk\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/sk\/wp-json\/wp\/v2\/comments?post=106187"}],"version-history":[{"count":0,"href":"https:\/\/skyplanner.ai\/sk\/wp-json\/wp\/v2\/pages\/106187\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/sk\/wp-json\/wp\/v2\/pages\/100686"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/sk\/wp-json\/wp\/v2\/media?parent=106187"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}