{"id":61497,"date":"2025-03-06T12:14:16","date_gmt":"2025-03-06T12:14:16","guid":{"rendered":"https:\/\/skyplanner.ai\/docs\/casove-zaznamy\/"},"modified":"2025-10-07T11:27:49","modified_gmt":"2025-10-07T11:27:49","password":"","slug":"casove-zaznamy","status":"publish","type":"docs","link":"https:\/\/skyplanner.ai\/sk\/docs\/casove-zaznamy\/","title":{"rendered":"\u010casov\u00e9 z\u00e1znamy"},"content":{"rendered":"\n<h4 class=\"wp-block-heading\">D\u00e1tov\u00e1 \u0161trukt\u00fara Skyplanner<\/h4>\n\n<p>Sk\u00f4r ako sa za\u010dneme venova\u0165 \u010dasov\u00fdm z\u00e1znamom, mus\u00edme si poveda\u0165 nie\u010do o \u0161trukt\u00fare \u00fadajov v programe Skyplanner a o tom, ako funguj\u00fa pod kapotou. Toto v\u0161etko sa bude hodi\u0165 nesk\u00f4r. <\/p>\n\n<p>Ak ste integrovali svoje \u00fadaje o objedn\u00e1vkach\/pracovn\u00fdch pr\u00edkazoch\/pracovn\u00fdch miestach do programu Skyplanner, pravdepodobne ste pou\u017eili aspo\u0148 tieto body API:<\/p>\n\n<ul class=\"wp-block-list\">\n<li>phaser-orders<\/li>\n\n\n\n<li>phaser-order-rows<\/li>\n\n\n\n<li>phaser-jobs<\/li>\n<\/ul>\n\n<p>\u00dadaje vlo\u017een\u00e9 do t\u00fdchto koncov\u00fdch bodov s\u00fa v pou\u017e\u00edvate\u013eskom rozhran\u00ed Skyplanneru reprezentovan\u00e9 takto:<\/p>\n<div class=\"wp-block-image\">\n<figure class=\"alignleft size-large\"><img decoding=\"async\" width=\"1024\" height=\"714\" src=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/03\/image-25-1024x714.png\" alt=\"\" class=\"wp-image-55194\" srcset=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/03\/image-25-1024x714.png 1024w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/03\/image-25-300x209.png 300w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/03\/image-25-768x535.png 768w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/03\/image-25-360x251.png 360w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/03\/image-25.png 1142w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><figcaption class=\"wp-element-caption\"><strong>Obr. 1.<\/strong>  Objedn\u00e1vka (phaser-orders)<\/figcaption><\/figure>\n<\/div>\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" width=\"1024\" height=\"715\" src=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/03\/image-26-1024x715.png\" alt=\"\" class=\"wp-image-55228\" srcset=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/03\/image-26-1024x715.png 1024w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/03\/image-26-300x210.png 300w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/03\/image-26-768x536.png 768w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/03\/image-26-360x251.png 360w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/03\/image-26.png 1144w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><figcaption class=\"wp-element-caption\"><strong>Obr. 2.<\/strong>  Polo\u017eky objedn\u00e1vky (phaser-order-rows (\u010derven\u00e1)), Kroky procesu (phaser-jobs (zelen\u00e1))<\/figcaption><\/figure>\n\n<p>Po vlo\u017een\u00ed objedn\u00e1vok do programu Skyplanner <strong>ich<\/strong> budete chcie\u0165 <strong>exportova\u0165<\/strong> (m\u00f4\u017eete to urobi\u0165 prostredn\u00edctvom pou\u017e\u00edvate\u013esk\u00e9ho rozhrania alebo koncov\u00e9ho bodu \/phaser-orders\/export-endpoint) do modulu Pl\u00e1novanie v\u00fdroby:<\/p>\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" width=\"1024\" height=\"596\" src=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/03\/image-27-1024x596.png\" alt=\"\" class=\"wp-image-55288\" srcset=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/03\/image-27-1024x596.png 1024w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/03\/image-27-300x175.png 300w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/03\/image-27-768x447.png 768w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/03\/image-27-360x209.png 360w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/03\/image-27.png 1074w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><figcaption class=\"wp-element-caption\"><strong>Obr. 3.<\/strong>  Exportovanie prostredn\u00edctvom pou\u017e\u00edvate\u013esk\u00e9ho rozhrania<\/figcaption><\/figure>\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" width=\"1024\" height=\"597\" src=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/03\/image-28-1024x597.png\" alt=\"\" class=\"wp-image-55326\" srcset=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/03\/image-28-1024x597.png 1024w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/03\/image-28-300x175.png 300w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/03\/image-28-768x448.png 768w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/03\/image-28-360x210.png 360w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/03\/image-28.png 1074w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><figcaption class=\"wp-element-caption\"><strong>Obr. 4.<\/strong>  Exportovan\u00e1 objedn\u00e1vka v pl\u00e1novan\u00ed v\u00fdroby<\/figcaption><\/figure>\n\n<p>Pri exporte objedn\u00e1vok Skyplanner \u00fa\u010dinne kop\u00edruje \u00fadaje o objedn\u00e1vkach z jednej tabu\u013eky datab\u00e1zy do druhej. Ak teda nie\u010do zmen\u00edte napr\u00edklad prostredn\u00edctvom koncov\u00e9ho bodu \/phaser-orders, mus\u00edte \u00fadaje znovu exportova\u0165, aby ste ich aktualizovali v pl\u00e1novan\u00ed v\u00fdroby. To tie\u017e znamen\u00e1, \u017ee na pr\u00edstup k objedn\u00e1vkam, ktor\u00e9 vid\u00edte v okne Pl\u00e1novanie v\u00fdroby, mus\u00edte pou\u017ei\u0165 r\u00f4zne API-endpointy!  <\/p>\n\n<p>&#8222;Zmenen\u00e9&#8220; koncov\u00e9 body vyzeraj\u00fa takto:<\/p>\n\n<ul class=\"wp-block-list\">\n<li>\/phaser-orders \u2192 \/orders<\/li>\n\n\n\n<li>\/phaser-order-rows \u2192 \/order-rows<\/li>\n\n\n\n<li>\/phaser-jobs \u2192 \/jobs<\/li>\n<\/ul>\n\n<p>Toto je d\u00f4le\u017eit\u00e9 vedie\u0165, preto\u017ee pri pou\u017e\u00edvan\u00ed koncov\u00e9ho bodu \/timelogs na zaznamen\u00e1vanie udalost\u00ed vo v\u00fdrobe at\u010f. <strong>mus\u00edte pou\u017e\u00edva\u0165 s\u00favisiace entity, ktor\u00e9 sa nach\u00e1dzaj\u00fa v koncovom bode Pl\u00e1novanie v\u00fdroby!<\/strong><\/p>\n\n<p>Na POSTovanie nov\u00e9ho \u010dasov\u00e9ho z\u00e1znamu potrebujete napr\u00edklad <strong>production_planning_job_id <\/strong>(zopakujme: production_planning_jobs s\u00fa entity, ku ktor\u00fdm sa pristupuje z koncov\u00e9ho bodu \/jobs):<\/p>\n\n<figure class=\"wp-block-image size-full\"><img decoding=\"async\" width=\"867\" height=\"603\" src=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/03\/image-29.png\" alt=\"\" class=\"wp-image-55407\" srcset=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/03\/image-29.png 867w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/03\/image-29-300x209.png 300w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/03\/image-29-768x534.png 768w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/03\/image-29-360x250.png 360w\" sizes=\"(max-width: 867px) 100vw, 867px\" \/><figcaption class=\"wp-element-caption\"><strong>Obr. 5.<\/strong>  Po\u017eiadavka POST na \u010dasov\u00fd z\u00e1znam<\/figcaption><\/figure>\n\n<p>Potrebn\u00e9 production_planning_job_id n\u00e1jdete bu\u010f v koncovom bode \/phaser-jobs:<\/p>\n\n<figure class=\"wp-block-image size-full\"><img decoding=\"async\" width=\"924\" height=\"870\" src=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/03\/image-30.png\" alt=\"\" class=\"wp-image-55455\" srcset=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/03\/image-30.png 924w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/03\/image-30-300x282.png 300w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/03\/image-30-768x723.png 768w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/03\/image-30-360x339.png 360w\" sizes=\"(max-width: 924px) 100vw, 924px\" \/><figcaption class=\"wp-element-caption\"><strong>Obr. 6.<\/strong> Po\u017eiadavka GET na \u00falohu Phaser (\u010dervenou farbou je phaser_job_id, <strong>NEPOU\u017d\u00cdVAJTE ju v \u010dasov\u00fdch z\u00e1znamoch<\/strong>)<\/figcaption><\/figure>\n\n<p>Alebo z koncov\u00e9ho bodu \/job:<\/p>\n\n<figure class=\"wp-block-image size-full\"><img decoding=\"async\" width=\"926\" height=\"872\" src=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/03\/image-31.png\" alt=\"\" class=\"wp-image-55490\" srcset=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/03\/image-31.png 926w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/03\/image-31-300x283.png 300w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/03\/image-31-768x723.png 768w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/03\/image-31-360x339.png 360w\" sizes=\"(max-width: 926px) 100vw, 926px\" \/><figcaption class=\"wp-element-caption\"><strong>Obr. 7.<\/strong>  \/job GET po\u017eiadavka<\/figcaption><\/figure>\n\n<h4 class=\"wp-block-heading\">Vytv\u00e1ranie \u010dasov\u00fdch z\u00e1znamov pomocou REST-API<\/h4>\n\n<p>Vytv\u00e1ranie \u010dasov\u00fdch z\u00e1znamov do programu Skyplanner prostredn\u00edctvom rozhrania API vyu\u017e\u00edva rovnak\u00e9 pravidl\u00e1 a syst\u00e9my, ktor\u00e9 s\u00fa v pou\u017e\u00edvate\u013eskom rozhran\u00ed. Preto by mohlo by\u0165 prospe\u0161n\u00e9 obozn\u00e1mi\u0165 sa s t\u00fdm, ako syst\u00e9m funguje v pou\u017e\u00edvate\u013eskom rozhran\u00ed, sk\u00f4r ako sa ho pok\u00fasite pou\u017e\u00edva\u0165 prostredn\u00edctvom API. <\/p>\n\n<h5 class=\"wp-block-heading\">Z\u00e1klady \u010dasov\u00e9ho z\u00e1znamu<\/h5>\n\n<p>Skyplanner m\u00e1 \u0161tyri typy udalost\u00ed \u010dasov\u00e9ho z\u00e1znamu:<\/p>\n\n<ul class=\"wp-block-list\">\n<li>shift_begin<\/li>\n\n\n\n<li>pozastaven\u00e9<\/li>\n\n\n\n<li>pokra\u010dovanie<\/li>\n\n\n\n<li>shift_end<\/li>\n<\/ul>\n\n<p>Udalos\u0165 Shift_begin sa odo\u0161le pri prvom spusten\u00ed \u00falohy.  <strong>Nikdy neposielajte viac ako jednu udalos\u0165 shift_begin pre ka\u017ed\u00fa \u00falohu!<\/strong><\/p>\n\n<p>Udalos\u0165 Paused pozastav\u00ed \u00falohu.<\/p>\n\n<p>Pokra\u010dovanie udalosti pokra\u010duje v pozastavenej pr\u00e1ci.<\/p>\n\n<p>Shift_end dokon\u010d\u00ed pr\u00e1cu.  <strong>Nikdy neposielajte viac ako jednu udalos\u0165 shift_end pre ka\u017ed\u00fa \u00falohu!<\/strong><\/p>\n\n<p>Po\u017eadovan\u00e9 \u00fadaje pre \u010dasov\u00e9 z\u00e1znamy:<\/p>\n\n<ul class=\"wp-block-list\">\n<li>person_id\n<ul class=\"wp-block-list\">\n<li>Mo\u017eno ho n\u00e1js\u0165 v koncovom bode \/people<\/li>\n\n\n\n<li>Nie je to ist\u00e9 ako user_id!<\/li>\n<\/ul>\n<\/li>\n\n\n\n<li>planned_workstation_id\n<ul class=\"wp-block-list\">\n<li>Pracovisko, na ktorom sa pr\u00e1ca vykon\u00e1va<\/li>\n\n\n\n<li>Mo\u017eno ho n\u00e1js\u0165 v koncovom bode \/workstations-endpoint<\/li>\n<\/ul>\n<\/li>\n\n\n\n<li>date_time\n<ul class=\"wp-block-list\">\n<li>Bod, v ktorom sa udalos\u0165 uskuto\u010dn\u00ed<\/li>\n\n\n\n<li>Form\u00e1t: 2024-01-01 10:30:11<\/li>\n<\/ul>\n<\/li>\n<\/ul>\n\n<p>Ak chcete ur\u010di\u0165, ak\u00fd \u010dasov\u00fd z\u00e1znam programu Skyplanner je viazan\u00fd na \u010dasov\u00fd z\u00e1znam z ak\u00e9hoko\u013evek extern\u00e9ho syst\u00e9mu, ktor\u00fd pou\u017e\u00edvate, m\u00f4\u017eete pou\u017ei\u0165 pole <strong>external_id <\/strong>. Pomocou tohto id potom m\u00f4\u017eete napr\u00edklad zad\u00e1va\u0165 po\u017eiadavky GET, aby ste na\u0161li konkr\u00e9tny \u010dasov\u00fd z\u00e1znam z programu Skyplanner. <\/p>\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" width=\"1024\" height=\"438\" src=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/03\/image-32-1024x438.png\" alt=\"\" class=\"wp-image-55587\" srcset=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/03\/image-32-1024x438.png 1024w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/03\/image-32-300x128.png 300w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/03\/image-32-768x328.png 768w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/03\/image-32-360x154.png 360w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/03\/image-32.png 1415w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><figcaption class=\"wp-element-caption\"><strong>Obr. 8.<\/strong>  External_id v \u010dasov\u00fdch z\u00e1znamoch<\/figcaption><\/figure>\n\n<h4 class=\"wp-block-heading\">Za\u010datie pr\u00e1ce<\/h4>\n\n<p>\u00dalohy m\u00f4\u017eete spusti\u0165 odoslan\u00edm POST-po\u017eiadavky takto do API:<\/p>\n\n<figure class=\"wp-block-image size-full\"><img decoding=\"async\" width=\"624\" height=\"766\" src=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/03\/image-33.png\" alt=\"\" class=\"wp-image-55638\" srcset=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/03\/image-33.png 624w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/03\/image-33-244x300.png 244w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/03\/image-33-360x442.png 360w\" sizes=\"(max-width: 624px) 100vw, 624px\" \/><figcaption class=\"wp-element-caption\"><strong>Obr. 9.<\/strong>  Shift_begin \u010dasov\u00fd z\u00e1znam<\/figcaption><\/figure>\n\n<p>Pri nastavovan\u00ed \u00fadajov POST pre \u010dasov\u00e9 z\u00e1znamy nastavte <strong>workshift_id <\/strong>ako 0 a <strong>timelog_finalized <\/strong>ako <strong>true<\/strong><\/p>\n\n<h4 class=\"wp-block-heading\">Pozastavenie \u00falohy<\/h4>\n\n<p>\u00dalohy pozastav\u00edte odoslan\u00edm tejto po\u017eiadavky POST:<\/p>\n\n<figure class=\"wp-block-image size-full\"><img decoding=\"async\" width=\"697\" height=\"760\" src=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/03\/image-34.png\" alt=\"\" class=\"wp-image-55676\" srcset=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/03\/image-34.png 697w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/03\/image-34-275x300.png 275w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/03\/image-34-360x393.png 360w\" sizes=\"(max-width: 697px) 100vw, 697px\" \/><figcaption class=\"wp-element-caption\"><strong>Obr. 10.<\/strong>  Pozastaven\u00fd \u010dasov\u00fd z\u00e1znam<\/figcaption><\/figure>\n\n<p>V \u010dasov\u00fdch z\u00e1znamoch typu paused m\u00f4\u017eete nastavi\u0165 <strong>sumu <\/strong>a <strong>chybn\u00fa sumu<\/strong>. V\u0161imnite si tie\u017e <strong>typ <\/strong>\u010dasov\u00e9ho z\u00e1znamu a <strong>d\u00e1tum_\u010dasu<\/strong>. <\/p>\n\n<h4 class=\"wp-block-heading\">Pokra\u010dovanie v pr\u00e1ci<\/h4>\n\n<p>Tu je uveden\u00fd postup pokra\u010dovania pozastaven\u00e9ho \u010dasov\u00e9ho z\u00e1znamu:<\/p>\n\n<figure class=\"wp-block-image size-full\"><img decoding=\"async\" width=\"713\" height=\"722\" src=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/03\/image-35.png\" alt=\"\" class=\"wp-image-55715\" srcset=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/03\/image-35.png 713w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/03\/image-35-296x300.png 296w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/03\/image-35-360x365.png 360w\" sizes=\"(max-width: 713px) 100vw, 713px\" \/><figcaption class=\"wp-element-caption\"><strong>Obr. 11.<\/strong>  Pokra\u010dovanie \u010dasov\u00e9ho z\u00e1znamu<\/figcaption><\/figure>\n\n<p>Upozor\u0148ujeme, \u017ee ak sa pok\u00fasite pokra\u010dova\u0165 v \u00falohe, ktor\u00e1 bola ukon\u010den\u00e1 udalos\u0165ou shift_end, zobraz\u00ed sa chyba.<\/p>\n\n<h4 class=\"wp-block-heading\">Ukon\u010denie pracovn\u00e9ho pomeru<\/h4>\n\n<p>Tu je uveden\u00fd sp\u00f4sob ukon\u010denia \u00falohy pomocou \u010dasov\u00e9ho z\u00e1znamu shift_end:<\/p>\n\n<figure class=\"wp-block-image size-full\"><img decoding=\"async\" width=\"711\" height=\"764\" src=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/03\/image-36.png\" alt=\"\" class=\"wp-image-55761\" srcset=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/03\/image-36.png 711w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/03\/image-36-279x300.png 279w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/03\/image-36-360x387.png 360w\" sizes=\"(max-width: 711px) 100vw, 711px\" \/><figcaption class=\"wp-element-caption\"><strong>Obr. 12.<\/strong>  Shift_end timelog<\/figcaption><\/figure>\n\n<p>V shift_end-events m\u00f4\u017eete zada\u0165 hodnoty <strong>amount <\/strong>a <strong>faulty_amount <\/strong>rovnako ako v paused-events. Upozor\u0148ujeme, \u017ee ak sa pok\u00fasite vykona\u0165 shift_end-event pre \u00falohu, ktor\u00e1 nie je spusten\u00e1, zobraz\u00ed sa chyba. <\/p>\n\n<h4 class=\"wp-block-heading\">Aktualiz\u00e1cia \u010dasov\u00fdch z\u00e1znamov<\/h4>\n\n<p>\u00dadaje \u010dasov\u00e9ho z\u00e1znamu m\u00f4\u017eete aktualizova\u0165 zaslan\u00edm po\u017eiadavky PUT na koncov\u00fd bod \/timelogs-endpoint, napr\u00edklad takto:<\/p>\n\n<figure class=\"wp-block-image size-full\"><img decoding=\"async\" width=\"694\" height=\"757\" src=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/03\/image-37.png\" alt=\"\" class=\"wp-image-55796\" srcset=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/03\/image-37.png 694w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/03\/image-37-275x300.png 275w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/03\/image-37-360x393.png 360w\" sizes=\"(max-width: 694px) 100vw, 694px\" \/><figcaption class=\"wp-element-caption\"><strong>Obr. 13.<\/strong>  \u00daprava \u010dasov\u00fdch z\u00e1znamov<\/figcaption><\/figure>\n\n<p>V\u0161imnite si, \u017ee na vykonanie aktualiz\u00e1cie mus\u00edte ma\u0165 nastaven\u00e9 \u00fadaje <strong>beginTimelog <\/strong>aj <strong>endTimelog <\/strong>. \u010casov\u00e9 z\u00e1znamy v programe Skyplanner s\u00fa ulo\u017een\u00e9 takto: ka\u017ed\u00fd &#8222;\u00fapln\u00fd&#8220; (\u010dasov\u00fd z\u00e1znam, ktor\u00fd m\u00e1 za\u010diatok aj koniec (napr. shift_begin\/continued &amp; paused\/shift_end) \u010dasov\u00fd z\u00e1znam m\u00e1 samostatn\u00fa entitu pre za\u010diatok a koniec. <\/p>\n\n<p>Tieto s\u00fa sp\u00e1rovan\u00e9 pod\u013ea hodnoty <strong>begin_id <\/strong>, ktor\u00e1 sa nach\u00e1dza v endlogu. Vo vy\u0161\u0161ie uvedenom pr\u00edklade m\u00e1 beginTimelog hodnotu id 1, a preto m\u00e1 jeho endTimelog hodnotu <strong>begin_id <\/strong>1. <\/p>\n\n<p>Hodnoty <strong>person_id <\/strong>a <strong>endTimelog <\/strong>mus\u00edte uvies\u0165 aj pri ka\u017edej po\u017eiadavke na aktualiz\u00e1ciu, aj ke\u010f ich nemen\u00edte.<\/p>\n\n<h4 class=\"wp-block-heading\">Alternat\u00edvne sp\u00f4soby tvorby \u010dasov\u00fdch z\u00e1znamov<\/h4>\n\n<p>Tu je nieko\u013eko alternat\u00edvnych sp\u00f4sobov, ako sa m\u00f4\u017eete prihl\u00e1si\u0165 do svojich \u00faloh pomocou rozhrania API.<\/p>\n\n<h5 class=\"wp-block-heading\">Logfull<\/h5>\n\n<p>Ak chcete posla\u0165 za\u010diatok aj koniec \u010dasov\u00e9ho z\u00e1znamu v jednej po\u017eiadavke, m\u00f4\u017eete pou\u017ei\u0165 <strong>\/timelogs\/log-full<\/strong> -endpoint, napr\u00edklad takto:<\/p>\n\n<figure class=\"wp-block-image size-full\"><img decoding=\"async\" width=\"691\" height=\"721\" src=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/03\/image-38.png\" alt=\"\" class=\"wp-image-55828\" srcset=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/03\/image-38.png 691w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/03\/image-38-288x300.png 288w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/03\/image-38-360x376.png 360w\" sizes=\"(max-width: 691px) 100vw, 691px\" \/><figcaption class=\"wp-element-caption\"><strong>Obr. 14.<\/strong>  \u00dapln\u00e1 \u017eiados\u0165 o prihl\u00e1senie<\/figcaption><\/figure>\n\n<p>V\u0161imnite si, ako sa tu posielaj\u00fa sumy: prv\u00e1 hodnota &#8222;suma&#8220; ozna\u010duje <strong>chybn\u00fa sumu<\/strong> a druh\u00e1 <strong>sumu<\/strong>. T\u00e1to po\u017eiadavka vytv\u00e1ra entity beginlog a endlog v jednej po\u017eiadavke. <\/p>\n\n<h5 class=\"wp-block-heading\">Quicklog<\/h5>\n\n<p>&#8222;R\u00fdchle prihl\u00e1senie&#8220; k \u00falohe ju dokon\u010d\u00ed v jednej po\u017eiadavke, nastav\u00ed dokon\u010den\u00e9 mno\u017estvo v\u00fdrobkov tak, aby zodpovedalo hodnote nastavenej v polo\u017eke objedn\u00e1vky. Quicklogging sa vykon\u00e1va pomocou <strong>\/timelogs\/quick-log<\/strong> -endpoint: <\/p>\n\n<figure class=\"wp-block-image size-full\"><img decoding=\"async\" width=\"695\" height=\"723\" src=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/03\/image-39.png\" alt=\"\" class=\"wp-image-55857\" srcset=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/03\/image-39.png 695w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/03\/image-39-288x300.png 288w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/03\/image-39-360x375.png 360w\" sizes=\"(max-width: 695px) 100vw, 695px\" \/><figcaption class=\"wp-element-caption\"><strong>Obr. 15.<\/strong>  Quicklogging<\/figcaption><\/figure>\n\n<p>V\u0161imnite si, \u017ee tu sta\u010d\u00ed zada\u0165 len <strong>production_planning_job_id<\/strong>, <strong>planned_workstation_id <\/strong>a <strong>person_id<\/strong>. Hodnoty \u010dasu a sumy sa vyplnia automaticky. Taktie\u017e si uvedomte, \u017ee quicklogovan\u00e9 \u00falohy s\u00fa v\u017edy ukon\u010den\u00e9 udalos\u0165ou shift_end-event, tak\u017ee po quicklogovan\u00ed nie je mo\u017en\u00e9 \u017eiadne \u010fal\u0161ie logovanie!  <\/p>\n\n<p><\/p>\n","protected":false},"excerpt":{"rendered":"<p>D\u00e1tov\u00e1 \u0161trukt\u00fara Skyplanner Sk\u00f4r ako sa za\u010dneme venova\u0165 \u010dasov\u00fdm z\u00e1znamom, mus\u00edme si poveda\u0165 nie\u010do o \u0161trukt\u00fare \u00fadajov v programe Skyplanner a o tom, ako funguj\u00fa pod kapotou. Toto v\u0161etko sa bude hodi\u0165 nesk\u00f4r. Ak ste integrovali svoje \u00fadaje o objedn\u00e1vkach\/pracovn\u00fdch pr\u00edkazoch\/pracovn\u00fdch miestach do programu Skyplanner, pravdepodobne ste pou\u017eili aspo\u0148 tieto body API: \u00dadaje vlo\u017een\u00e9 do &#8230; <a title=\"\u010casov\u00e9 z\u00e1znamy\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/sk\/docs\/casove-zaznamy\/\" aria-label=\"Pre\u010d\u00edtajte si viac o \u010casov\u00e9 z\u00e1znamy\">Read more<\/a><\/p>\n","protected":false},"author":8,"featured_media":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"doc_category":[657],"doc_tag":[658,1529],"class_list":["post-61497","docs","type-docs","status-publish","hentry","doc_category-integracie","doc_tag-api-sk","doc_tag-integracia"],"acf":[],"year_month":"2026-11","word_count":1149,"total_views":"196","reactions":{"happy":"0","normal":"0","sad":"0"},"author_info":{"name":"Sami","author_nicename":"sami","author_url":"https:\/\/skyplanner.ai\/sk\/author\/sami\/"},"doc_category_info":[{"term_name":"Integr\u00e1cie","term_url":"https:\/\/skyplanner.ai\/sk\/docs-category\/integracie\/"}],"doc_tag_info":[{"term_name":"API","term_url":"https:\/\/skyplanner.ai\/sk\/docs-tag\/api-sk\/"},{"term_name":"Integr\u00e1cia","term_url":"https:\/\/skyplanner.ai\/sk\/docs-tag\/integracia\/"}],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>\u010casov\u00e9 z\u00e1znamy &#8211; SkyPlanner<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/sk\/docs\/casove-zaznamy\/\" \/>\n<meta property=\"og:locale\" content=\"sk_SK\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"\u010casov\u00e9 z\u00e1znamy\" \/>\n<meta property=\"og:description\" content=\"D\u00e1tov\u00e1 \u0161trukt\u00fara Skyplanner Sk\u00f4r ako sa za\u010dneme venova\u0165 \u010dasov\u00fdm z\u00e1znamom, mus\u00edme si poveda\u0165 nie\u010do o \u0161trukt\u00fare \u00fadajov v programe Skyplanner a o tom, ako funguj\u00fa pod kapotou. Toto v\u0161etko sa bude hodi\u0165 nesk\u00f4r. Ak ste integrovali svoje \u00fadaje o objedn\u00e1vkach\/pracovn\u00fdch pr\u00edkazoch\/pracovn\u00fdch miestach do programu Skyplanner, pravdepodobne ste pou\u017eili aspo\u0148 tieto body API: \u00dadaje vlo\u017een\u00e9 do ... Read more\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/sk\/docs\/casove-zaznamy\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:modified_time\" content=\"2025-10-07T11:27:49+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/03\/image-25.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1142\" \/>\n\t<meta property=\"og:image:height\" content=\"796\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Predpokladan\u00fd \u010das \u010d\u00edtania\" \/>\n\t<meta name=\"twitter:data1\" content=\"6 min\u00fat\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sk\\\/docs\\\/casove-zaznamy\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/sk\\\/docs\\\/casove-zaznamy\\\/\",\"name\":\"\u010casov\u00e9 z\u00e1znamy &#8211; SkyPlanner\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sk\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sk\\\/docs\\\/casove-zaznamy\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sk\\\/docs\\\/casove-zaznamy\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2025\\\/03\\\/image-25-1024x714.png\",\"datePublished\":\"2025-03-06T12:14:16+00:00\",\"dateModified\":\"2025-10-07T11:27:49+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sk\\\/docs\\\/casove-zaznamy\\\/#breadcrumb\"},\"inLanguage\":\"sk-SK\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/sk\\\/docs\\\/casove-zaznamy\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"sk-SK\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sk\\\/docs\\\/casove-zaznamy\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2025\\\/03\\\/image-25-1024x714.png\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2025\\\/03\\\/image-25-1024x714.png\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sk\\\/docs\\\/casove-zaznamy\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/sk\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Docs\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/sk\\\/docs\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"\u010casov\u00e9 z\u00e1znamy\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sk\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/sk\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sk\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/sk\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"sk-SK\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sk\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/sk\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"sk-SK\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sk\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/sk\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"\u010casov\u00e9 z\u00e1znamy &#8211; SkyPlanner","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/sk\/docs\/casove-zaznamy\/","og_locale":"sk_SK","og_type":"article","og_title":"\u010casov\u00e9 z\u00e1znamy","og_description":"D\u00e1tov\u00e1 \u0161trukt\u00fara Skyplanner Sk\u00f4r ako sa za\u010dneme venova\u0165 \u010dasov\u00fdm z\u00e1znamom, mus\u00edme si poveda\u0165 nie\u010do o \u0161trukt\u00fare \u00fadajov v programe Skyplanner a o tom, ako funguj\u00fa pod kapotou. Toto v\u0161etko sa bude hodi\u0165 nesk\u00f4r. Ak ste integrovali svoje \u00fadaje o objedn\u00e1vkach\/pracovn\u00fdch pr\u00edkazoch\/pracovn\u00fdch miestach do programu Skyplanner, pravdepodobne ste pou\u017eili aspo\u0148 tieto body API: \u00dadaje vlo\u017een\u00e9 do ... Read more","og_url":"https:\/\/skyplanner.ai\/sk\/docs\/casove-zaznamy\/","og_site_name":"SkyPlanner","article_modified_time":"2025-10-07T11:27:49+00:00","og_image":[{"width":1142,"height":796,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/03\/image-25.png","type":"image\/png"}],"twitter_card":"summary_large_image","twitter_misc":{"Predpokladan\u00fd \u010das \u010d\u00edtania":"6 min\u00fat"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/sk\/docs\/casove-zaznamy\/","url":"https:\/\/skyplanner.ai\/sk\/docs\/casove-zaznamy\/","name":"\u010casov\u00e9 z\u00e1znamy &#8211; SkyPlanner","isPartOf":{"@id":"https:\/\/skyplanner.ai\/sk\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/sk\/docs\/casove-zaznamy\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/sk\/docs\/casove-zaznamy\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/03\/image-25-1024x714.png","datePublished":"2025-03-06T12:14:16+00:00","dateModified":"2025-10-07T11:27:49+00:00","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/sk\/docs\/casove-zaznamy\/#breadcrumb"},"inLanguage":"sk-SK","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/sk\/docs\/casove-zaznamy\/"]}]},{"@type":"ImageObject","inLanguage":"sk-SK","@id":"https:\/\/skyplanner.ai\/sk\/docs\/casove-zaznamy\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/03\/image-25-1024x714.png","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/03\/image-25-1024x714.png"},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/sk\/docs\/casove-zaznamy\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/sk\/"},{"@type":"ListItem","position":2,"name":"Docs","item":"https:\/\/skyplanner.ai\/sk\/docs\/"},{"@type":"ListItem","position":3,"name":"\u010casov\u00e9 z\u00e1znamy"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/sk\/#website","url":"https:\/\/skyplanner.ai\/sk\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/sk\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/sk\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"sk-SK"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/sk\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/sk\/","logo":{"@type":"ImageObject","inLanguage":"sk-SK","@id":"https:\/\/skyplanner.ai\/sk\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/sk\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]}]}},"uagb_featured_image_src":{"full":false,"thumbnail":false,"medium":false,"medium_large":false,"large":false,"1536x1536":false,"2048x2048":false,"betterdocs-category-thumb":false},"uagb_author_info":{"display_name":"Sami","author_link":"https:\/\/skyplanner.ai\/sk\/author\/sami\/"},"uagb_comment_info":0,"uagb_excerpt":"D\u00e1tov\u00e1 \u0161trukt\u00fara Skyplanner Sk\u00f4r ako sa za\u010dneme venova\u0165 \u010dasov\u00fdm z\u00e1znamom, mus\u00edme si poveda\u0165 nie\u010do o \u0161trukt\u00fare \u00fadajov v programe Skyplanner a o tom, ako funguj\u00fa pod kapotou. Toto v\u0161etko sa bude hodi\u0165 nesk\u00f4r. Ak ste integrovali svoje \u00fadaje o objedn\u00e1vkach\/pracovn\u00fdch pr\u00edkazoch\/pracovn\u00fdch miestach do programu Skyplanner, pravdepodobne ste pou\u017eili aspo\u0148 tieto body API: \u00dadaje vlo\u017een\u00e9 do&hellip;","knowledge_base_info":[],"knowledge_base_slug":[],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/sk\/wp-json\/wp\/v2\/docs\/61497","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/sk\/wp-json\/wp\/v2\/docs"}],"about":[{"href":"https:\/\/skyplanner.ai\/sk\/wp-json\/wp\/v2\/types\/docs"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/sk\/wp-json\/wp\/v2\/users\/8"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/sk\/wp-json\/wp\/v2\/comments?post=61497"}],"version-history":[{"count":0,"href":"https:\/\/skyplanner.ai\/sk\/wp-json\/wp\/v2\/docs\/61497\/revisions"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/sk\/wp-json\/wp\/v2\/media?parent=61497"}],"wp:term":[{"taxonomy":"doc_category","embeddable":true,"href":"https:\/\/skyplanner.ai\/sk\/wp-json\/wp\/v2\/doc_category?post=61497"},{"taxonomy":"doc_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/sk\/wp-json\/wp\/v2\/doc_tag?post=61497"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}