{"id":99685,"date":"2026-10-16T05:16:05","date_gmt":"2026-10-16T05:16:05","guid":{"rendered":"https:\/\/skyplanner.ai\/?p=99685"},"modified":"2026-10-16T05:18:04","modified_gmt":"2026-10-16T05:18:04","slug":"configurare-la-comanda","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/ro\/resurse\/configurare-la-comanda\/","title":{"rendered":"Configurare la comand\u0103: de la alegerea clientului la livrare"},"content":{"rendered":"<div class=\"gb-container gb-container-article01 article-main-content-container\">\n\n<h1 class=\"wp-block-heading\">Configurare la comand\u0103: de la alegerea clientului la livrare<\/h1>\n\n<div class=\"gb-container gb-container-article02\">\n\n<p><a href=\"\/ro\/\">Acas\u0103<\/a> &raquo; <a href=\"https:\/\/skyplanner.ai\/ro\/resurse\/\">Resurse<\/a> &raquo; Configurare la comand\u0103: de la alegerea clientului la livrare<\/p>\n\n\n<p class=\"yoast-reading-time__wrapper\"><span class=\"yoast-reading-time__icon\"><svg aria-hidden=\"true\" focusable=\"false\" data-icon=\"clock\" width=\"20\" height=\"20\" fill=\"none\" stroke=\"currentColor\" style=\"display:inline-block;vertical-align:-0.1em\" role=\"img\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewBox=\"0 0 24 24\"><path stroke-linecap=\"round\" stroke-linejoin=\"round\" stroke-width=\"2\" d=\"M12 8v4l3 3m6-3a9 9 0 11-18 0 9 9 0 0118 0z\"><\/path><\/svg><\/span><span class=\"yoast-reading-time__spacer\" style=\"display:inline-block;width:1em\"><\/span><span class=\"yoast-reading-time__descriptive-text\">Timp estimat de citire: <\/span><span class=\"yoast-reading-time__reading-time\">8<\/span><span class=\"yoast-reading-time__time-unit\"> minute<\/span><\/p>\n\n<\/div>\n<div class=\"gb-container gb-container-article03\">\n\n<p>Configurarea la comand\u0103 (CTO) \u00eenseamn\u0103 fabricarea unui produs pe baza op\u021biunilor alese de client dintr-un set predefinit de variante compatibile. Clientul prime\u0219te o combina\u021bie potrivit\u0103 nevoilor sale, iar produc\u0103torul reutilizeaz\u0103 solu\u021bii de proiectare \u0219i reguli deja stabilite pentru produs, \u00een loc s\u0103 ia de la zero proiectarea fiec\u0103rei comenzi.<\/p>\n\n\n<p>Avantajul este libertatea de alegere, f\u0103r\u0103 a pl\u0103ti de fiecare dat\u0103 pentru acelea\u0219i decizii de proiectare. Dar chiar \u0219i o combina\u021bie aprobat\u0103 are nevoie de materialele potrivite, de opera\u021bii de fabrica\u021bie \u0219i de timp \u00een produc\u021bie. Faptul c\u0103 un produs poate fi v\u00e2ndut nu \u00eenseamn\u0103 automat c\u0103 poate fi \u0219i livrat vinerea viitoare.<\/p>\n\n\n<p>SkyPlanner APS v\u0103 ajut\u0103 s\u0103 gestiona\u021bi aceast\u0103 a doua provocare. Arcturus, motorul s\u0103u de programare bazat pe inteligen\u021b\u0103 artificial\u0103, calculeaz\u0103 c\u00e2nd pot fi executate lucr\u0103rile necesare, \u021bin\u00e2nd cont \u0219i de celelalte comenzi. Vede\u021bi rezultatul \u00eentr-o diagram\u0103 Gantt \u0219i stabili\u021bi priorit\u0103\u021bile, \u00een loc s\u0103 reface\u021bi succesiunea lucr\u0103rilor la fiecare centru de lucru ori de c\u00e2te ori se schimb\u0103 mixul de produse.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Ce \u00eenseamn\u0103 c\u0103 un produs este configurat la comand\u0103?<\/h2>\n\n\n<p>CTO \u00eencepe \u00eenainte ca un client s\u0103 plaseze comanda. Departamentul de proiectare define\u0219te modulele produsului, op\u021biunile permise \u0219i regulile care le fac compatibile. Echipa de v\u00e2nz\u0103ri alege apoi din aceast\u0103 gam\u0103 aprobat\u0103.<\/p>\n\n\n<p>Imagina\u021bi-v\u0103 un produc\u0103tor de transportoare modulare. Clien\u021bii aleg l\u0103\u021bimea \u0219i lungimea din variantele standard, tipul benzii, materialul cadrului, sistemul de ac\u021bionare \u0219i pachetul de senzori. Regulile stabilesc ce sisteme de ac\u021bionare sunt potrivite pentru fiecare sarcin\u0103 \u0219i vitez\u0103, ce benzi corespund fiec\u0103rei aplica\u021bii \u0219i ce configura\u021bii de senzori sunt disponibile. O selec\u021bie valid\u0103 corespunde unei solu\u021bii deja definite, nu unei probleme de proiectare \u00eenc\u0103 nerezolvate.<\/p>\n\n\n<p>Aceste alegeri pot implica totu\u0219i un volum considerabil de munc\u0103 \u00een fabrica\u021bie. Un cadru din o\u021bel inoxidabil poate necesita fabrica\u021bie \u0219i lustruire \u00eenainte de asamblarea transportorului. CTO nu \u00eenseamn\u0103 c\u0103 toate piesele se afl\u0103 deja pe raft sau c\u0103 pentru executarea comenzii este suficient\u0103 doar asamblarea final\u0103.<\/p>\n\n\n<p>Limita este dat\u0103 de variantele de proiectare aprobate. Dac\u0103 un client solicit\u0103 o sarcin\u0103 sau o \u00eenclina\u021bie \u00een afara acestor limite, departamentul de proiectare trebuie s\u0103 evalueze cererea. Pute\u021bi oferi o alternativ\u0103 standard sau pute\u021bi trata excep\u021bia ca pe o lucrare de proiectare, \u00een loc s\u0103 o strecura\u021bi for\u021bat \u00een procesul de configurare.<\/p>\n\n\n<h3 class=\"wp-block-heading\">CTO, ETO, MTO \u0219i ATO descriu aspecte diferite<\/h3>\n\n\n<p>Ace\u0219ti termeni ajut\u0103 la descrierea unei comenzi, dar nu se exclud \u00eentotdeauna reciproc:<\/p>\n\n\n<ul class=\"wp-block-list\"><li><strong>Configurare la comand\u0103:<\/strong> Ce poate alege clientul? Produsul este configurat din op\u021biuni predefinite \u0219i compatibile.<\/li><li><strong><a href=\"https:\/\/skyplanner.ai\/ro\/resurse\/proiectare-si-productie-la-comanda\/\">Proiectare \u0219i produc\u021bie la comand\u0103 (ETO)<\/a>:<\/strong> Cererea necesit\u0103 o nou\u0103 solu\u021bie de proiectare? Trebuie dezvoltat\u0103 o solu\u021bie specific\u0103 pentru client, care poate include \u0219i piese standard.<\/li><li><strong><a href=\"https:\/\/skyplanner.ai\/ro\/resurse\/productie-la-comanda\/\">Produc\u021bie la comand\u0103 (MTO)<\/a>:<\/strong> Ce declan\u0219eaz\u0103 fabrica\u021bia? Produc\u021bia \u00eencepe dup\u0103 primirea comenzii de la client \u0219i se poate baza pe un proiect deja definit.<\/li><li><strong><a href=\"https:\/\/skyplanner.ai\/ro\/resurse\/asamblare-la-comanda\/\">Asamblare la comand\u0103 (ATO)<\/a>:<\/strong> Ce se preg\u0103te\u0219te \u00een avans? Componentele sau subansamblurile sunt gata \u00eenainte de primirea comenzii; produsul finit ales este asamblat ulterior.<\/li><\/ul>\n\n\n<p>Transportorul poate fi configurat la comand\u0103 \u0219i apoi fabricat la comand\u0103. O alt\u0103 familie de produse ar putea folosi acela\u0219i principiu de configurare, dar cu asamblarea la comand\u0103 a unor module din stoc. Configurarea descrie alegerea; strategia de produc\u021bie stabile\u0219te ce lucr\u0103ri mai sunt de executat dup\u0103 aceast\u0103 alegere.<\/p>\n\n\n<h2 class=\"wp-block-heading\">C\u00e2nd merit\u0103 configurarea la comand\u0103?<\/h2>\n\n\n<p>CTO se potrive\u0219te foarte bine atunci c\u00e2nd clien\u021bii au nevoie de o varietate relevant\u0103 de op\u021biuni, dar o mare parte din munca de proiectare se repet\u0103. Cele mai potrivite sunt familiile de produse pentru care un set u\u0219or de gestionat de module \u0219i reguli poate acoperi o parte semnificativ\u0103 a cererii.<\/p>\n\n\n<p>Analiza\u021bi comenzile recente. Ce diferen\u021be aduc cu adev\u0103rat valoare clientului? Care dintre ele fac necesar ca departamentul de proiectare s\u0103 r\u0103spund\u0103 mereu la acelea\u0219i \u00eentreb\u0103ri? Op\u021biunile de dimensiune, material, performan\u021b\u0103 sau accesorii care apar frecvent pot fi standardizate dac\u0103 se pot valida \u00een avans combina\u021biile dintre ele.<\/p>\n\n\n<p>Beneficiile vin din eliminarea muncii repetitive. Echipa de v\u00e2nz\u0103ri poate oferi combina\u021bii aprobate cu mai pu\u021bine schimburi de clarific\u0103ri. Proiectan\u021bii pot dedica mai mult timp solu\u021biilor noi \u0219i excep\u021biilor reale. Pentru achizi\u021bii \u0219i produc\u021bie, cerin\u021bele devin mai u\u0219or de reutilizat de la o comand\u0103 la alta. Pute\u021bi oferi o gam\u0103 mai larg\u0103 f\u0103r\u0103 a trata fiecare v\u00e2nzare ca pe un nou proiect de dezvoltare.<\/p>\n\n\n<p>Aceste beneficii presupun o investi\u021bie. Cineva trebuie s\u0103 proiecteze modulele, s\u0103 men\u021bin\u0103 regulile de compatibilitate \u0219i s\u0103 actualizeze informa\u021biile de produc\u021bie atunci c\u00e2nd se schimb\u0103 piesele sau proiectele. O op\u021biune care se vinde rar, dar necesit\u0103 un lan\u021b de aprovizionare special \u0219i un flux tehnologic propriu, poate costa mai mult dec\u00e2t aduce. Mai multe op\u021biuni nu \u00eenseamn\u0103 automat o ofert\u0103 mai bun\u0103.<\/p>\n\n\n<p>\u00cencepe\u021bi cu o familie de produse \u00een care repeti\u021bia este evident\u0103. Defini\u021bi op\u021biunile acceptate \u0219i procedura pentru excep\u021bii, apoi verifica\u021bi dac\u0103 echipele de v\u00e2nz\u0103ri, proiectare \u0219i produc\u021bie interpreteaz\u0103 aceea\u0219i selec\u021bie \u00een acela\u0219i fel. Standardiza\u021bi ceea ce clien\u021bii cump\u0103r\u0103 \u00een mod repetat, nu fiecare solicitare special\u0103 primit\u0103 vreodat\u0103.<\/p>\n\n\n<p>CTO este mai pu\u021bin atractiv\u0103 atunci c\u00e2nd majoritatea comenzilor necesit\u0103 \u00eentr-adev\u0103r proiectare nou\u0103 sau c\u00e2nd clien\u021bii nu accept\u0103 timpul de a\u0219teptare pentru fabrica\u021bia r\u0103mas\u0103 de executat. Pentru produsele populare de care clien\u021bii au nevoie imediat, livrarea din stocul de produse finite poate fi o solu\u021bie mai bun\u0103. Familii diferite pot folosi abord\u0103ri diferite f\u0103r\u0103 a compromite coeren\u021ba strategiei generale a fabricii.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Transforma\u021bi op\u021biunile alese \u00eentr-o comand\u0103 gata de lansat \u00een produc\u021bie<\/h2>\n\n\n<p>Configura\u021bia trebuie s\u0103 arate produc\u021biei ce are de fabricat, nu s\u0103 lase planificatorul s\u0103 deduc\u0103 acest lucru dintr-o ofert\u0103. La transferul c\u0103tre produc\u021bie sunt necesare specifica\u021bia aleas\u0103 \u0219i datele aferente: necesarul de materiale, succesiunea opera\u021biilor, duratele \u0219i resursele care pot fi utilizate.<\/p>\n\n\n<p>Un configurator de produse valideaz\u0103 alegerile. Software-ul CPQ, pentru configurare, stabilirea pre\u021bului \u0219i ofertare, poate sus\u021bine \u0219i calculul pre\u021burilor \u0219i \u00eentocmirea ofertelor. Sistemul ERP poate gestiona comanda acceptat\u0103 \u0219i datele de produc\u021bie. Programarea detaliat\u0103 aloc\u0103 apoi lucr\u0103rile necesare \u00een intervalele de timp disponibile. Aceste activit\u0103\u021bi sunt legate \u00eentre ele: validarea unei combina\u021bii nu rezerv\u0103, \u00een sine, capacitate de produc\u021bie.<\/p>\n\n\n<p>Pentru produc\u0103torul ipotetic de transportoare, impactul asupra planific\u0103rii ar putea ar\u0103ta astfel:<\/p>\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Op\u021biunea clientului<\/th><th>Implica\u021bii pentru fabrica\u021bie sau aprovizionare<\/th><th>Date necesare pentru programare<\/th><\/tr><\/thead><tbody><tr><td>Cadru din o\u021bel inoxidabil<\/td><td>Material diferit \u0219i opera\u021bii diferite de fabrica\u021bie \u0219i lustruire<\/td><td>Disponibilitatea materialului corespunz\u0103tor \u0219i opera\u021biile necesare<\/td><\/tr><tr><td>Cadru din o\u021bel cu acoperire de protec\u021bie<\/td><td>Fabrica\u021bie urmat\u0103 de fluxul aprobat pentru aplicarea acoperirii<\/td><td>Timpii de prelucrare, de preg\u0103tire \u0219i orice timp de a\u0219teptare necesar<\/td><\/tr><tr><td>Sistem de ac\u021bionare mai mare, din gama aprobat\u0103<\/td><td>O alt\u0103 component\u0103 achizi\u021bionat\u0103 \u0219i alte cerin\u021be de asamblare<\/td><td>Disponibilitatea componentei \u0219i duratele corespunz\u0103toare ale opera\u021biilor<\/td><\/tr><tr><td>Pachet op\u021bional de senzori<\/td><td>Montaj \u0219i verific\u0103ri suplimentare<\/td><td>Lucr\u0103rile \u0219i resursele suplimentare necesare \u00eenainte de finalizare<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>Include\u021bi \u00een comand\u0103 implica\u021biile fiec\u0103rei op\u021biuni. Dac\u0103 modifica\u021bi descrierea, dar l\u0103sa\u021bi fluxul tehnologic implicit neschimbat, lucr\u0103rile pe care tocmai le-a\u021bi v\u00e2ndut r\u0103m\u00e2n ascunse.<\/p>\n\n\n<p>Asigura\u021bi identificarea clar\u0103 a configura\u021biei alese, at\u00e2t la lansarea \u00een produc\u021bie, c\u00e2t \u0219i la modific\u0103rile ulterioare. Stabili\u021bi cine actualizeaz\u0103 necesarul de materiale \u0219i de lucr\u0103ri dac\u0103 un client schimb\u0103 o op\u021biune. Alegerea unei alte benzi sau a unui alt cadru poate afecta piesele achizi\u021bionate, lucr\u0103rile deja \u00eencepute \u0219i data de finalizare. Trata\u021bi aceast\u0103 situa\u021bie ca pe o modificare a comenzii care trebuie evaluat\u0103, nu doar ca pe o nou\u0103 pozi\u021bie \u00een ofert\u0103.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Programa\u021bi varianta concret\u0103, nu pe baza unor valori medii<\/h2>\n\n\n<p>S\u0103 revenim la produc\u0103torul de transportoare. Echipa de v\u00e2nz\u0103ri prime\u0219te mai multe comenzi pentru versiunea din o\u021bel inoxidabil. Num\u0103rul de transportoare este cel obi\u0219nuit, dar acum mai multe dintre ele necesit\u0103 lustruire. Lead time-ul standard al fabricii nu s-a schimbat; s-a schimbat \u00eens\u0103 \u00eenc\u0103rcarea resursei de lustruire.<\/p>\n\n\n<p>Dac\u0103 planificatorul programeaz\u0103 fiecare transportor pe baza unor valori medii, acele opera\u021bii suplimentare pot r\u0103m\u00e2ne invizibile p\u00e2n\u0103 c\u00e2nd produc\u021bia ajunge la ele. Fabrica\u021bia cadrelor se poate \u00eencheia rapid, dar acestea pot r\u0103m\u00e2ne \u00een a\u0219teptare la lustruire. Lansarea \u00een fabrica\u021bie a mai multor cadre nu creeaz\u0103 capacitate suplimentar\u0103 de lustruire.<\/p>\n\n\n<p>\u00centrebarea util\u0103 pentru stabilirea livr\u0103rii este, a\u0219adar: c\u00e2nd se pot \u00eencheia lucr\u0103rile efective ale acestei comenzi, \u021bin\u00e2nd cont de materiale \u0219i de <a href=\"https:\/\/skyplanner.ai\/ro\/resurse\/capacitate-finita\/\">capacitatea deja alocat\u0103 altor clien\u021bi<\/a>?<\/p>\n\n\n<p>SkyPlanner integreaz\u0103 aceste lucr\u0103ri \u00eentr-un program de produc\u021bie unitar. Defini\u021bi etapele procesului, duratele, centrele de lucru, schimburile \u0219i necesarul de resurse. Produsele reutilizate de la o comand\u0103 la alta pot avea fluxuri tehnologice prestabilite, iar pozi\u021biile comenzilor reprezint\u0103 lucr\u0103rile de programat. Comanda configurat\u0103 trebuie s\u0103 ajung\u0103 la planificare cu opera\u021biile \u0219i materialele corespunz\u0103toare variantei alese.<\/p>\n\n\n<p>Arcturus calculeaz\u0103 succesiunea lucr\u0103rilor din toate comenzile pe baza capacit\u0103\u021bii, a dependen\u021belor \u0219i a regulilor de programare pe care le-a\u021bi definit. \u00cen vizualizarea Gantt, pute\u021bi urm\u0103ri lucr\u0103rile pe diferite resurse \u0219i pute\u021bi vedea efectul comenzilor care concureaz\u0103 pentru aceea\u0219i capacitate. Astfel, coada de a\u0219teptare la lustruire este luat\u0103 \u00een calcul la evaluarea termenului de livrare, \u00eenainte s\u0103 devin\u0103 o surpriz\u0103 \u00een sec\u021bia de produc\u021bie.<\/p>\n\n\n<p>C\u00e2nd este activat\u0103 programarea \u00een func\u021bie de disponibilitatea materialelor, \u0219i aceasta intr\u0103 \u00een calcul. Un sistem de ac\u021bionare achizi\u021bionat, a c\u0103rui sosire este a\u0219teptat\u0103 mai t\u00e2rziu, nu poate fi tratat ca unul deja disponibil. Men\u021bine\u021bi informa\u021biile de aprovizionare la zi \u0219i recalcula\u021bi programul c\u00e2nd acestea se schimb\u0103.<\/p>\n\n\n<p>Dumneavoastr\u0103 stabili\u021bi priorit\u0103\u021bile \u0219i folosi\u021bi bloc\u0103rile pentru a p\u0103stra deciziile de programare. Dac\u0103 un transportor urgent cap\u0103t\u0103 prioritate, Arcturus recalculeaz\u0103 conform acestor instruc\u021biuni; verifica\u021bi apoi \u0219i datele rezultate pentru celelalte comenzi. Beneficiul este reducerea ajust\u0103rilor manuale ale succesiunii lucr\u0103rilor \u0219i o baz\u0103 mai clar\u0103 pentru a decide ce angajamente trebuie respectate cu prioritate.<\/p>\n\n\n<p>SkyPlanner se integreaz\u0103 cu orice ERP sau MES prin <a href=\"https:\/\/skyplanner.ai\/ro\/integrari\/\">interfa\u021ba sa deschis\u0103 REST API<\/a>. Conecta\u021bi datele existente despre comenzi, produse \u0219i produc\u021bie la programarea detaliat\u0103, \u00een loc s\u0103 \u00eencepe\u021bi prin \u00eenlocuirea sistemului ERP. Pentru o implementare CTO, stabili\u021bi cum se transpune varianta aleas\u0103 \u00een datele corecte despre materiale \u0219i opera\u021bii de-a lungul acestui flux. Aceasta este leg\u0103tura practic\u0103 dintre produsul v\u00e2ndut \u0219i lucr\u0103rile programate de Arcturus.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Ce a schimbat la UTU unificarea program\u0103rii produc\u021biei<\/h2>\n\n\n<p>UTU produce tablouri electrice \u0219i echipamente de comuta\u021bie. \u00cenainte de SkyPlanner, departamentele sale \u021bineau planuri separate \u00een Excel, iar modific\u0103rile succesiunii lucr\u0103rilor din ERP nu ajungeau \u00eentotdeauna \u00een sec\u021bia de produc\u021bie. Capacitatea real\u0103 era greu de evaluat, astfel c\u0103 respectarea termenelor de livrare promise necesita reprogram\u0103ri repetate.<\/p>\n\n\n<p>Prin integrarea SkyPlanner cu Oracle NetSuite \u0219i cu sistemul de salarizare, UTU a reunit liniile \u0219i departamentele fabricii \u00eentr-un singur sistem de planificare. Echipa eviden\u021biaz\u0103 avantajul combin\u0103rii program\u0103rii automate cu vizualizarea Gantt: capacitatea, gradul de \u00eenc\u0103rcare \u0219i succesiunea lucr\u0103rilor pot fi urm\u0103rite \u00eempreun\u0103.<\/p>\n\n\n<p>\u00cen <a href=\"https:\/\/skyplanner.ai\/ro\/povesti-ale-clientilor\/utu\/\">evaluarea SkyPlanner de c\u0103tre UTU<\/a>, compania arat\u0103 c\u0103 economise\u0219te aproximativ dou\u0103 ore pe s\u0103pt\u0103m\u00e2n\u0103, dedicate anterior actualiz\u0103rii foilor de calcul. De asemenea, men\u021bioneaz\u0103 o programare mai precis\u0103 a livr\u0103rilor aferente proiectelor \u0219i faptul c\u0103 listele actualizate cu ordinea lucr\u0103rilor ajung pe linia de produc\u021bie \u00een c\u00e2teva secunde. Aceasta este valoarea corel\u0103rii comenzii cu munca efectiv\u0103 din produc\u021bie: mai pu\u021bin efort pentru \u00eentre\u021binerea unor planuri separate \u0219i o coordonare mai clar\u0103 atunci c\u00e2nd se schimb\u0103 succesiunea lucr\u0103rilor.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Livra\u021bi mai u\u0219or configura\u021biile alese de clien\u021bi<\/h2>\n\n\n<p>CTO \u00ee\u0219i dovede\u0219te utilitatea transform\u00e2nd nevoile recurente ale clien\u021bilor \u00een op\u021biuni care pot fi alese \u00een mod repetat. P\u0103stra\u021bi acest avantaj pe tot parcursul produc\u021biei: folosi\u021bi cerin\u021bele de lucru corespunz\u0103toare variantei selectate \u0219i evalua\u021bi posibilitatea de livrare \u021bin\u00e2nd cont de resursele utilizate \u0219i de alte comenzi.<\/p>\n\n\n<p>Alege\u021bi SkyPlanner atunci c\u00e2nd aceast\u0103 coordonare a ajuns s\u0103 impun\u0103 un efort zilnic de reprogramare. Arcturus efectueaz\u0103 calculele de programare, vizualizarea Gantt arat\u0103 efectele, iar dumneavoastr\u0103 p\u0103stra\u021bi controlul asupra priorit\u0103\u021bilor. Pute\u021bi dedica mai mult timp rezolv\u0103rii constr\u00e2ngerii reale \u0219i mai pu\u021bin timp mut\u0103rii lucr\u0103rilor pentru a men\u021bine sincronizate listele de lucru separate.<\/p>\n\n\n<p><a href=\"https:\/\/skyplanner.ai\/ro\/contact-vanzari\/\">Programa\u021bi o demonstra\u021bie SkyPlanner<\/a> \u0219i preg\u0103ti\u021bi dou\u0103 configura\u021bii uzuale, opera\u021biile care difer\u0103 \u00eentre ele \u0219i o resurs\u0103 pe care o folosesc \u00een comun. Acestea sunt puncte de plecare utile pentru a vedea cum s-ar \u00eencadra variantele dumneavoastr\u0103 de produs \u00eentr-un program de produc\u021bie realist. Dac\u0103 prefera\u021bi s\u0103 explora\u021bi mai \u00eent\u00e2i, <a href=\"https:\/\/skyplanner.ai\/ro\/proba\/\">\u00eencerca\u021bi SkyPlanner cu date demonstrative<\/a>.<\/p>\n\n<\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>Configurare la comand\u0103: de la alegerea clientului la livrare Acas\u0103 &raquo; Resurse &raquo; Configurare la comand\u0103: de la alegerea clientului la livrare Configurarea la comand\u0103 (CTO) \u00eenseamn\u0103 fabricarea unui produs pe baza op\u021biunilor alese de client dintr-un set predefinit de variante compatibile. Clientul prime\u0219te o combina\u021bie potrivit\u0103 nevoilor sale, iar produc\u0103torul reutilizeaz\u0103 solu\u021bii de proiectare &#8230; <a title=\"Configurare la comand\u0103: de la alegerea clientului la livrare\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/ro\/resurse\/configurare-la-comanda\/\" aria-label=\"Read more about Configurare la comand\u0103: de la alegerea clientului la livrare\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":99687,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[2537,514],"tags":[],"class_list":["post-99685","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-aps-si-programare","category-resurse","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Configurare la comand\u0103: de la alegerea clientului la livrare<\/title>\n<meta name=\"description\" content=\"Oferi\u021bi op\u021biuni f\u0103r\u0103 reproiectare la fiecare comand\u0103. Afla\u021bi c\u00e2nd se potrive\u0219te CTO \u0219i cum programeaz\u0103 SkyPlanner produc\u021bia fiec\u0103rei configura\u021bii.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/ro\/resurse\/configurare-la-comanda\/\" \/>\n<meta property=\"og:locale\" content=\"ro_RO\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Configurare la comand\u0103: de la alegerea clientului la livrare\" \/>\n<meta property=\"og:description\" content=\"Oferi\u021bi op\u021biuni f\u0103r\u0103 reproiectare la fiecare comand\u0103. Afla\u021bi c\u00e2nd se potrive\u0219te CTO \u0219i cum programeaz\u0103 SkyPlanner produc\u021bia fiec\u0103rei configura\u021bii.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/ro\/resurse\/configurare-la-comanda\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2026-10-16T05:16:05+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-16T05:18:04+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/configure-to-order-hero.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1672\" \/>\n\t<meta property=\"og:image:height\" content=\"941\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Scris de\" \/>\n\t<meta name=\"twitter:data1\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n\t<meta name=\"twitter:label2\" content=\"Timp estimat pentru citire\" \/>\n\t<meta name=\"twitter:data2\" content=\"11 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/resurse\\\/configurare-la-comanda\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/resurse\\\/configurare-la-comanda\\\/\"},\"author\":{\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\"},\"headline\":\"Configurare la comand\u0103: de la alegerea clientului la livrare\",\"datePublished\":\"2026-10-16T05:16:05+00:00\",\"dateModified\":\"2026-10-16T05:18:04+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/resurse\\\/configurare-la-comanda\\\/\"},\"wordCount\":2309,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/resurse\\\/configurare-la-comanda\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/configure-to-order-hero.png\",\"articleSection\":[\"APS \u0219i programare\",\"Resurse\"],\"inLanguage\":\"ro-RO\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/resurse\\\/configurare-la-comanda\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/resurse\\\/configurare-la-comanda\\\/\",\"name\":\"Configurare la comand\u0103: de la alegerea clientului la livrare\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/resurse\\\/configurare-la-comanda\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/resurse\\\/configurare-la-comanda\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/configure-to-order-hero.png\",\"datePublished\":\"2026-10-16T05:16:05+00:00\",\"dateModified\":\"2026-10-16T05:18:04+00:00\",\"description\":\"Oferi\u021bi op\u021biuni f\u0103r\u0103 reproiectare la fiecare comand\u0103. Afla\u021bi c\u00e2nd se potrive\u0219te CTO \u0219i cum programeaz\u0103 SkyPlanner produc\u021bia fiec\u0103rei configura\u021bii.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/resurse\\\/configurare-la-comanda\\\/#breadcrumb\"},\"inLanguage\":\"ro-RO\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/resurse\\\/configurare-la-comanda\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"ro-RO\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/resurse\\\/configurare-la-comanda\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/configure-to-order-hero.png\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/configure-to-order-hero.png\",\"width\":1672,\"height\":941,\"caption\":\"A modular conveyor with alternative belts, drive modules and a sensor bracket for predefined product choices.\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/resurse\\\/configurare-la-comanda\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Configurare la comand\u0103: de la alegerea clientului la livrare\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"ro-RO\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"ro-RO\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\",\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"ro-RO\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"caption\":\"Jussi M\u00e4ntyl\u00e4\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Configurare la comand\u0103: de la alegerea clientului la livrare","description":"Oferi\u021bi op\u021biuni f\u0103r\u0103 reproiectare la fiecare comand\u0103. Afla\u021bi c\u00e2nd se potrive\u0219te CTO \u0219i cum programeaz\u0103 SkyPlanner produc\u021bia fiec\u0103rei configura\u021bii.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/ro\/resurse\/configurare-la-comanda\/","og_locale":"ro_RO","og_type":"article","og_title":"Configurare la comand\u0103: de la alegerea clientului la livrare","og_description":"Oferi\u021bi op\u021biuni f\u0103r\u0103 reproiectare la fiecare comand\u0103. Afla\u021bi c\u00e2nd se potrive\u0219te CTO \u0219i cum programeaz\u0103 SkyPlanner produc\u021bia fiec\u0103rei configura\u021bii.","og_url":"https:\/\/skyplanner.ai\/ro\/resurse\/configurare-la-comanda\/","og_site_name":"SkyPlanner","article_published_time":"2026-10-16T05:16:05+00:00","article_modified_time":"2026-10-16T05:18:04+00:00","og_image":[{"width":1672,"height":941,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/configure-to-order-hero.png","type":"image\/png"}],"author":"Jussi M\u00e4ntyl\u00e4","twitter_card":"summary_large_image","twitter_misc":{"Scris de":"Jussi M\u00e4ntyl\u00e4","Timp estimat pentru citire":"11 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/ro\/resurse\/configurare-la-comanda\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/ro\/resurse\/configurare-la-comanda\/"},"author":{"name":"Jussi M\u00e4ntyl\u00e4","@id":"https:\/\/skyplanner.ai\/ro\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5"},"headline":"Configurare la comand\u0103: de la alegerea clientului la livrare","datePublished":"2026-10-16T05:16:05+00:00","dateModified":"2026-10-16T05:18:04+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/ro\/resurse\/configurare-la-comanda\/"},"wordCount":2309,"publisher":{"@id":"https:\/\/skyplanner.ai\/ro\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/ro\/resurse\/configurare-la-comanda\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/configure-to-order-hero.png","articleSection":["APS \u0219i programare","Resurse"],"inLanguage":"ro-RO"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/ro\/resurse\/configurare-la-comanda\/","url":"https:\/\/skyplanner.ai\/ro\/resurse\/configurare-la-comanda\/","name":"Configurare la comand\u0103: de la alegerea clientului la livrare","isPartOf":{"@id":"https:\/\/skyplanner.ai\/ro\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/ro\/resurse\/configurare-la-comanda\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/ro\/resurse\/configurare-la-comanda\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/configure-to-order-hero.png","datePublished":"2026-10-16T05:16:05+00:00","dateModified":"2026-10-16T05:18:04+00:00","description":"Oferi\u021bi op\u021biuni f\u0103r\u0103 reproiectare la fiecare comand\u0103. Afla\u021bi c\u00e2nd se potrive\u0219te CTO \u0219i cum programeaz\u0103 SkyPlanner produc\u021bia fiec\u0103rei configura\u021bii.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/ro\/resurse\/configurare-la-comanda\/#breadcrumb"},"inLanguage":"ro-RO","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/ro\/resurse\/configurare-la-comanda\/"]}]},{"@type":"ImageObject","inLanguage":"ro-RO","@id":"https:\/\/skyplanner.ai\/ro\/resurse\/configurare-la-comanda\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/configure-to-order-hero.png","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/configure-to-order-hero.png","width":1672,"height":941,"caption":"A modular conveyor with alternative belts, drive modules and a sensor bracket for predefined product choices."},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/ro\/resurse\/configurare-la-comanda\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/ro\/"},{"@type":"ListItem","position":2,"name":"Configurare la comand\u0103: de la alegerea clientului la livrare"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/ro\/#website","url":"https:\/\/skyplanner.ai\/ro\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/ro\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/ro\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"ro-RO"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/ro\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/ro\/","logo":{"@type":"ImageObject","inLanguage":"ro-RO","@id":"https:\/\/skyplanner.ai\/ro\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/ro\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]},{"@type":"Person","@id":"https:\/\/skyplanner.ai\/ro\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5","name":"Jussi M\u00e4ntyl\u00e4","image":{"@type":"ImageObject","inLanguage":"ro-RO","@id":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","caption":"Jussi M\u00e4ntyl\u00e4"}}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/configure-to-order-hero.png",1672,941,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/configure-to-order-hero-150x150.png",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/configure-to-order-hero-300x169.png",300,169,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/configure-to-order-hero-768x432.png",768,432,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/configure-to-order-hero-1024x576.png",1024,576,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/configure-to-order-hero-1536x864.png",1536,864,true],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/configure-to-order-hero.png",1672,941,false],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/configure-to-order-hero-360x203.png",360,203,true]},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/ro\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Configurare la comand\u0103: de la alegerea clientului la livrare Acas\u0103 &raquo; Resurse &raquo; Configurare la comand\u0103: de la alegerea clientului la livrare Configurarea la comand\u0103 (CTO) \u00eenseamn\u0103 fabricarea unui produs pe baza op\u021biunilor alese de client dintr-un set predefinit de variante compatibile. Clientul prime\u0219te o combina\u021bie potrivit\u0103 nevoilor sale, iar produc\u0103torul reutilizeaz\u0103 solu\u021bii de proiectare&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/posts\/99685","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/comments?post=99685"}],"version-history":[{"count":1,"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/posts\/99685\/revisions"}],"predecessor-version":[{"id":99743,"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/posts\/99685\/revisions\/99743"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/media\/99687"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/media?parent=99685"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/categories?post=99685"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/tags?post=99685"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}