{"id":97304,"date":"2026-10-10T08:49:19","date_gmt":"2026-10-10T08:49:19","guid":{"rendered":"https:\/\/skyplanner.ai\/?p=97304"},"modified":"2026-10-10T08:51:14","modified_gmt":"2026-10-10T08:51:14","slug":"respectarea-planului-de-productie","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/ro\/resurse\/respectarea-planului-de-productie\/","title":{"rendered":"Respectarea planului de produc\u021bie: formul\u0103 \u0219i exemplu"},"content":{"rendered":"<div class=\"gb-container gb-container-article01 article-main-content-container\">\n\n<h1 class=\"wp-block-heading\">Respectarea planului de produc\u021bie: formul\u0103 \u0219i exemplu<\/h1>\n\n<div class=\"gb-container gb-container-article02\">\n\n<p><a href=\"\/ro\/\">Acas\u0103<\/a> &raquo; <a href=\"https:\/\/skyplanner.ai\/ro\/resurse\/\">Resurse<\/a> &raquo; Respectarea planului de produc\u021bie: formul\u0103 \u0219i exemplu<\/p>\n\n\n<p class=\"yoast-reading-time__wrapper\"><span class=\"yoast-reading-time__icon\"><svg aria-hidden=\"true\" focusable=\"false\" data-icon=\"clock\" width=\"20\" height=\"20\" fill=\"none\" stroke=\"currentColor\" style=\"display:inline-block;vertical-align:-0.1em\" role=\"img\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewBox=\"0 0 24 24\"><path stroke-linecap=\"round\" stroke-linejoin=\"round\" stroke-width=\"2\" d=\"M12 8v4l3 3m6-3a9 9 0 11-18 0 9 9 0 0118 0z\"><\/path><\/svg><\/span><span class=\"yoast-reading-time__spacer\" style=\"display:inline-block;width:1em\"><\/span><span class=\"yoast-reading-time__descriptive-text\">Timp estimat de citire: <\/span><span class=\"yoast-reading-time__reading-time\">10<\/span><span class=\"yoast-reading-time__time-unit\"> minute<\/span><\/p>\n\n<\/div>\n<div class=\"gb-container gb-container-article03\">\n\n<p>Respectarea planului de produc\u021bie arat\u0103 \u00een ce m\u0103sur\u0103 activitatea efectiv\u0103 urmeaz\u0103 programul transmis \u00een sec\u021bia de produc\u021bie. Pentru o verificare bazat\u0103 pe finalizare, \u00eemp\u0103r\u021bi\u021bi num\u0103rul opera\u021biilor programate \u0219i finalizate integral p\u00e2n\u0103 la termenele lor planificate la num\u0103rul tuturor opera\u021biilor programate cu termen \u00een perioada de raportare, apoi \u00eenmul\u021bi\u021bi cu 100. Compara\u021bi opera\u021biile cu acelea\u0219i ID-uri cu un plan salvat: realizarea cantit\u0103\u021bii totale prev\u0103zute nu dovede\u0219te c\u0103 opera\u021biile necesare au fost finalizate la timp.<\/p>\n\n\n<p><strong>Respectarea planului de produc\u021bie pe baza finaliz\u0103rii (%) = opera\u021bii programate finalizate integral p\u00e2n\u0103 la termenele lor planificate \u00f7 opera\u021bii programate cu termen \u00een perioada analizat\u0103 \u00d7 100<\/strong><\/p>\n\n\n<p>Acest ghid folose\u0219te exact aceast\u0103 regul\u0103. Finalizarea \u00eenainte de termen este permis\u0103, \u00eent\u00e2rzierile nu sunt admise \u0219i se ia \u00een calcul numai produc\u021bia acceptat\u0103. Nu se verific\u0103 respectarea momentelor de \u00eencepere planificate sau a ordinii de execu\u021bie. Dac\u0103 acestea conteaz\u0103 pentru procesul dumneavoastr\u0103 de produc\u021bie, trebuie verificate separat.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Ce formul\u0103 s\u0103 folosi\u021bi pentru respectarea planului de produc\u021bie?<\/h2>\n\n\n<p>Alege\u021bi formula care r\u0103spunde \u00eentreb\u0103rii dumneavoastr\u0103 opera\u021bionale, apoi consemna\u021bi regulile \u00eenainte de a m\u0103sura rezultatele. At\u00e2t verificarea volumului pe schimb, c\u00e2t \u0219i verificarea termenelor pentru fiecare opera\u021bie pot fi utile, dar rezultatele nu pot fi comparate ca \u0219i cum ar m\u0103sura acela\u0219i lucru.<\/p>\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Indicator<\/th><th>\u00centrebare<\/th><th>Calcul folosit \u00een acest ghid<\/th><\/tr><\/thead><tbody><tr><td>Respectarea planului de produc\u021bie pe baza finaliz\u0103rii<\/td><td>Opera\u021biile planificate au fost finalizate integral p\u00e2n\u0103 la termenele lor?<\/td><td>Opera\u021bii care \u00eendeplinesc criteriile \u00f7 opera\u021bii programate cu termen \u00een perioada analizat\u0103 \u00d7 100<\/td><\/tr><tr><td>Realizarea volumului total planificat<\/td><td>Am produs cantitatea total\u0103 planificat\u0103 \u00een perioada analizat\u0103?<\/td><td>Cantitate produs\u0103 \u0219i acceptat\u0103 \u00f7 cantitate planificat\u0103 \u00d7 100<\/td><\/tr><tr><td>Livrare la timp<\/td><td>Comenzile clien\u021bilor au ajuns \u00een intervalul convenit?<\/td><td>Comenzi livrate care \u00eendeplinesc criteriile \u00f7 comenzi din grupul definit pentru evaluarea livr\u0103rilor \u00d7 100<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>Calculul volumului presupune unit\u0103\u021bi comparabile. Dac\u0103 aduna\u021bi tone, buc\u0103\u021bi \u0219i ore de munc\u0103, procentul de realizare ob\u021binut nu are sens. Chiar \u0219i un total calculat corect poate ascunde o structur\u0103 a produc\u021biei care nu corespunde produselor planificate.<\/p>\n\n\n<p>Denumirea indicatorului nu este suficient\u0103 pentru a stabili formula. <a href=\"https:\/\/docs.machinemetrics.com\/docs\/product-guides\/schedule-attainment-guide\/\">Ghidul MachineMetrics privind realizarea programului<\/a> include compara\u021bia dintre momentele planificate \u0219i cele efective \u0219i raporteaz\u0103 separat \u00eenceperile \u0219i finaliz\u0103rile la timp. Prin urmare, realizarea programului nu desemneaz\u0103 \u00eentotdeauna un indicator strict cantitativ. <a href=\"https:\/\/www.supplychain-masters.fr\/indicateur\/taux-de-respect-du-pdp\">Defini\u021bia respect\u0103rii PDP oferit\u0103 de Supply Chain Masters<\/a> num\u0103r\u0103 comenzile de produc\u021bie cu termen \u00eentr-o anumit\u0103 perioad\u0103 \u0219i finalizate \u00een acea perioad\u0103. Acest interval este mai larg dec\u00e2t termenul individual al fiec\u0103rei opera\u021bii folosit aici.<\/p>\n\n\n<p><a href=\"https:\/\/www.symestic.com\/en-us\/what-is\/schedule-adherence\">Defini\u021bia SYMESTIC pentru produc\u021bie<\/a> distinge \u00eentre cantitate, \u00eencadrarea \u00een timp \u0219i ordinea de execu\u021bie. Formula noastr\u0103 bazat\u0103 pe finalizare verific\u0103 realizarea cantit\u0103\u021bii integrale \u0219i respectarea termenului de finalizare; nu este un scor compozit care acoper\u0103 toate cele trei dimensiuni. \u00cen alt\u0103 limb\u0103 sau \u00een alt sistem, o denumire tradus\u0103 prin \u201e\u00eendeplinirea planului\u201d poate desemna realizarea cantit\u0103\u021bii planificate. Afi\u0219a\u021bi regula efectiv\u0103 de num\u0103rare l\u00e2ng\u0103 denumire.<\/p>\n\n\n<p>Livrarea la timp are un alt reper: acordul cu clientul. <a href=\"https:\/\/www.apqc.org\/what-we-do\/benchmarking\/open-standards-benchmarking\/measures\/percentage-sales-orders-delivered-time\">APQC \u00ee\u0219i define\u0219te indicatorul de livrare a comenzilor de v\u00e2nzare<\/a> \u00een raport cu livrarea \u00een intervalul convenit. Data \u0219i ora finaliz\u0103rii interne a produc\u021biei nu dovedesc c\u0103 clientul a primit comanda la timp.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Cum calcula\u021bi respectarea planului de produc\u021bie folosind un plan salvat<\/h2>\n\n\n<p>Pentru un calcul util, ave\u021bi nevoie de o singur\u0103 versiune de referin\u021b\u0103, de un grup de opera\u021bii clar definit \u0219i de rezultate efective asociate r\u00e2ndurilor din acea versiune.<\/p>\n\n\n<p>1. <strong>Salva\u021bi planul transmis \u00een sec\u021bia de produc\u021bie.<\/strong> Consemna\u021bi versiunea \u0219i momentul transmiterii \u00eenainte de \u00eenceperea activit\u0103\u021bii evaluate. P\u0103stra\u021bi ID-urile ini\u021biale ale opera\u021biilor, cantit\u0103\u021bile planificate \u0219i termenele. Continua\u021bi s\u0103 actualiza\u021bi programul de lucru c\u00e2nd este necesar, dar p\u0103stra\u021bi aceast\u0103 versiune de referin\u021b\u0103 pentru compara\u021bie.<\/p>\n\n\n<p>2. <strong>Alege\u021bi unitatea de num\u0103rare \u0219i perioada.<\/strong> Folosi\u021bi consecvent opera\u021bii, comenzi de lucru sau loturi. \u00cen aceast\u0103 metod\u0103, numitorul include toate opera\u021biile programate s\u0103 se finalizeze \u00een perioada de raportare, inclusiv opera\u021biile nefinalizate \u0219i cele blocate.<\/p>\n\n\n<p>3. <strong>Defini\u021bi ce \u00eenseamn\u0103 finalizare integral\u0103 \u0219i la timp.<\/strong> Aici, o opera\u021bie \u00eendepline\u0219te criteriile dac\u0103 \u00eentreaga cantitate planificat\u0103 este acceptat\u0103 p\u00e2n\u0103 la termenul ei individual de finalizare. Finalizarea mai devreme este permis\u0103; cea cu \u00eent\u00e2rziere nu este. Dac\u0103 procesul dumneavoastr\u0103 necesit\u0103 un interval cu limit\u0103 inferioar\u0103 \u0219i superioar\u0103, verificarea momentului de \u00eencepere sau o regul\u0103 privind ordinea de execu\u021bie, documenta\u021bi acea regul\u0103 \u00een locul celei de aici. Stabili\u021bi \u00een prealabil fusul orar \u0219i orice toleran\u021b\u0103.<\/p>\n\n\n<p>4. <strong>Asocia\u021bi rezultatul efectiv fiec\u0103rui r\u00e2nd din plan.<\/strong> \u00cenregistra\u021bi cantitatea acceptat\u0103, data \u0219i ora la care s-a atins \u00eentreaga cantitate planificat\u0103, precum \u0219i orice \u00eenregistr\u0103ri lips\u0103 sau contestate. Folosi\u021bi momentul evenimentului din produc\u021bie, nu momentul la care cineva l-a introdus ulterior \u00een sistem. Dac\u0103 aprobarea de c\u0103tre controlul calit\u0103\u021bii face parte din criteriul de finalizare, folosi\u021bi evenimentul de aprobare cerut de regula dumneavoastr\u0103.<\/p>\n\n\n<p>5. <strong>Num\u0103ra\u021bi r\u00e2ndurile care \u00eendeplinesc criteriile \u0219i raporta\u021bi excep\u021biile.<\/strong> \u00cemp\u0103r\u021bi\u021bi num\u0103rul r\u00e2ndurilor conforme la num\u0103rul tuturor r\u00e2ndurilor cu termen \u00een perioada analizat\u0103. P\u0103stra\u021bi vizibile r\u00e2ndurile \u00eent\u00e2rziate, realizate par\u021bial, blocate \u0219i neconfirmate, \u00eempreun\u0103 cu motivele. Dac\u0103 nicio opera\u021bie nu era programat\u0103 s\u0103 se finalizeze, raporta\u021bi \u201enu se aplic\u0103\u201d, nu 100%.<\/p>\n\n\n<p>Nu include\u021bi \u00een numitor doar opera\u021biile finalizate. Astfel a\u021bi exclude tocmai opera\u021biile care nu au fost realizate conform programului. La fel, o opera\u021bie neprogramat\u0103 nu poate \u00eenlocui o opera\u021bie programat\u0103, dar nerealizat\u0103, doar pentru c\u0103 adaug\u0103 produc\u021bie util\u0103.<\/p>\n\n\n<p>O foaie de calcul practic\u0103 include coloane pentru versiunea planului, ID-ul opera\u021biei, cantitatea planificat\u0103, termenul de finalizare planificat, cantitatea efectiv\u0103 acceptat\u0103, momentul finaliz\u0103rii efective, \u00eendeplinirea sau ne\u00eendeplinirea criteriilor \u0219i motivul excep\u021biei. Ad\u0103uga\u021bi momentele de \u00eencepere planificate \u0219i efective numai dac\u0103 inten\u021biona\u021bi s\u0103 m\u0103sura\u021bi \u0219i respectarea momentelor de \u00eencepere planificate.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Exemplu de calcul: volum realizat 100%, respectarea planului de produc\u021bie 50%<\/h2>\n\n\n<p>Acesta este un exemplu inventat, nu date ale unui client sau un tablou de bord al unui software. Aisha, planificator de produc\u021bie, transmite planul de la 07:00 pentru Celula de ambalare 1. Ben trebuie s\u0103 finalizeze patru opera\u021bii de ambalare p\u00e2n\u0103 la termenele indicate, \u00een schimbul 07:00\u201315:00. Pentru fiecare opera\u021bie sunt necesare 25 de pachete de aceea\u0219i dimensiune standard, dar cu o etichet\u0103 de produs diferit\u0103; pachetele de pe un r\u00e2nd nu pot acoperi necesarul de pe alt r\u00e2nd.<\/p>\n\n\n<p>Compara\u021bia folose\u0219te planul salvat de la 07:00. Acceptarea de c\u0103tre controlul calit\u0103\u021bii este obligatorie, finalizarea \u00eenainte de termen este permis\u0103 \u0219i nu exist\u0103 toleran\u021b\u0103 pentru \u00eent\u00e2rzieri. Verificarea final\u0103 a \u00eenregistr\u0103rilor are loc la 15:00.<\/p>\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Opera\u021bie<\/th><th>Pachete planificate<\/th><th>Termen de finalizare planificat<\/th><th>Pachete acceptate p\u00e2n\u0103 la termenul opera\u021biei<\/th><th>Pachete acceptate p\u00e2n\u0103 la 15:00<\/th><th>Cantitate integral\u0103 la timp?<\/th><\/tr><\/thead><tbody><tr><td>A: Eticheta A<\/td><td>25<\/td><td>09:00<\/td><td>25<\/td><td>25<\/td><td>Da<\/td><\/tr><tr><td>B: Eticheta B<\/td><td>25<\/td><td>11:00<\/td><td>30<\/td><td>30<\/td><td>Da<\/td><\/tr><tr><td>C: Eticheta C<\/td><td>25<\/td><td>13:00<\/td><td>20<\/td><td>25<\/td><td>Nu: \u00eent\u00e2rziere<\/td><\/tr><tr><td>D: Eticheta D<\/td><td>25<\/td><td>15:00<\/td><td>20<\/td><td>20<\/td><td>Nu: realizare par\u021bial\u0103<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>Pentru A, se ajunge la 25 de pachete acceptate la 08:55. Pentru B, cele 25 planificate sunt acceptate \u00eenainte de 11:00, dup\u0103 care se produc \u00eenc\u0103 cinci pachete, de asemenea acceptate. Pentru C, p\u00e2n\u0103 la 13:00 sunt acceptate doar 20; cele cinci r\u0103mase sunt acceptate la 14:10. Pentru D, Ben produce 25 de pachete, dar Tess, responsabil\u0103 de controlul calit\u0103\u021bii, re\u021bine cinci pentru inspec\u021bie. La momentul-limit\u0103 sunt acceptate doar 20, deci D nu \u00eendepline\u0219te criteriile.<\/p>\n\n\n<p><strong>Realizarea volumului total planificat: 100 de pachete acceptate \u00f7 100 de pachete planificate \u00d7 100 = 100%.<\/strong><\/p>\n\n\n<p><strong>Respectarea planului de produc\u021bie pe baza finaliz\u0103rii: 2 opera\u021bii care \u00eendeplinesc criteriile \u00f7 4 opera\u021bii programate \u00d7 100 = 50%.<\/strong><\/p>\n\n\n<p>Ambele calcule sunt corecte conform regulilor enun\u021bate pentru fiecare. \u00cen total, cele cinci pachete suplimentare de la B compenseaz\u0103 cele cinci pachete acceptate care lipsesc de la D. \u0218i finalizarea cu \u00eent\u00e2rziere a opera\u021biei C este mascat\u0103 de totalul pe schimb. Verificarea la nivel de opera\u021bie scoate la iveal\u0103 ambele abateri.<\/p>\n\n\n<p>O verificare a cantit\u0103\u021bii pe fiecare produs, la 15:00, ar lua \u00een calcul cel mult cele 25 de pachete planificate pe fiecare r\u00e2nd. Ar rezulta 95 de pachete realizate din cele 100 planificate, adic\u0103 95%. Astfel se observ\u0103 c\u0103 surplusul de la B nu poate compensa lipsa de la D, dar tot nu se vede c\u0103 opera\u021bia C a dep\u0103\u0219it termenul de 13:00. Verificarea cantit\u0103\u021bilor pe produs \u0219i verificarea termenelor r\u0103spund unor \u00eentreb\u0103ri diferite.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Cum trata\u021bi realiz\u0103rile par\u021biale, \u00eenregistr\u0103rile lips\u0103 \u0219i modific\u0103rile planului?<\/h2>\n\n\n<p><strong>Finalizare par\u021bial\u0103.<\/strong> \u00cen aceast\u0103 metod\u0103, o opera\u021bie fie \u00eendepline\u0219te integral criteriile, fie nu le \u00eendepline\u0219te: 20 de pachete acceptate din 25 nu se contabilizeaz\u0103 ca o frac\u021biune de opera\u021bie conform\u0103. Afi\u0219a\u021bi cele 20 de pachete ca progres util, al\u0103turi de r\u00e2ndul opera\u021biei care nu \u00eendepline\u0219te criteriile. Dac\u0103 alege\u021bi \u00een schimb un indicator ponderat dup\u0103 cantitate, da\u021bi-i o denumire distinct\u0103 \u0219i preciza\u021bi cum limita\u021bi cantitatea suplimentar\u0103 luat\u0103 \u00een calcul pentru fiecare articol.<\/p>\n\n\n<p><strong>Rebuturi, reprelucrare \u0219i produse re\u021binute pentru controlul calit\u0103\u021bii.<\/strong> Num\u0103ra\u021bi produc\u021bia care \u00eendepline\u0219te regula de finalizare convenit\u0103. Nu considera\u021bi piesele respinse drept produc\u021bie acceptat\u0103 \u0219i nu num\u0103ra\u021bi aceea\u0219i pies\u0103 de dou\u0103 ori c\u00e2nd revine dup\u0103 reprelucrare. Preciza\u021bi dac\u0103 re\u021binerea pentru inspec\u021bie \u00eenseamn\u0103 c\u0103 opera\u021bia este incomplet\u0103; \u00een exemplu, acesta este cazul.<\/p>\n\n\n<p><strong>Date efective lips\u0103.<\/strong> Un r\u00e2nd neconfirmat r\u0103m\u00e2ne \u00een numitor \u0219i nu este considerat conform \u00een rezultatul provizoriu. Marca\u021bi-l ca neconfirmat, nu ca o nerealizare dovedit\u0103 \u00een produc\u021bie. Clarifica\u021bi \u00eenregistrarea \u0219i emite\u021bi o corec\u021bie care poate fi urm\u0103rit\u0103. Astfel, lipsa datelor raportate din produc\u021bie nu \u00eembun\u0103t\u0103\u021be\u0219te scorul pe ascuns.<\/p>\n\n\n<p><strong>Opera\u021bii blocate sau anulate.<\/strong> Lipsa materialelor nu elimin\u0103 o opera\u021bie programat\u0103 din planul de referin\u021b\u0103 salvat. \u00cenregistra\u021bi nerespectarea planului \u0219i cauza acesteia. Dac\u0103 o anulare autorizat\u0103 modific\u0103 angajamentul, p\u0103stra\u021bi \u00eenregistrarea modific\u0103rii; raporta\u021bi separat compara\u021bia cu planul ini\u021bial \u0219i orice compara\u021bie cu planul revizuit, \u00een loc s\u0103 \u0219terge\u021bi ulterior r\u00e2ndul ini\u021bial.<\/p>\n\n\n<p><strong>Opera\u021bii urgente ad\u0103ugate \u00een timpul schimbului.<\/strong> \u00cenregistra\u021bi-le ca ad\u0103ugiri. Aceasta poate fi decizia potrivit\u0103 pentru client, chiar dac\u0103 \u00eenlocuie\u0219te o opera\u021bie planificat\u0103. Evaluarea respect\u0103rii planului ini\u021bial arat\u0103 costul modific\u0103rii, f\u0103r\u0103 a sugera c\u0103 decizia a fost neap\u0103rat gre\u0219it\u0103.<\/p>\n\n\n<p><strong>Reprogramarea produc\u021biei.<\/strong> Un nou plan de lucru ajut\u0103 sec\u021bia de produc\u021bie s\u0103 reac\u021bioneze. Acesta nu trebuie s\u0103 suprascrie planul folosit pentru evaluarea angajamentului anterior. Altfel, mutarea unui termen nerespectat dup\u0103 momentul finaliz\u0103rii efective poate face ca o opera\u021bie \u00eent\u00e2rziat\u0103 s\u0103 par\u0103 finalizat\u0103 la timp.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Cum interpreta\u021bi procentul de respectare a planului de produc\u021bie?<\/h2>\n\n\n<p>Analiza\u021bi r\u00e2ndurile care nu au respectat planul de produc\u021bie \u00eenainte de a alege o m\u0103sur\u0103 corectiv\u0103. Lipsa materialelor indic\u0103 o problem\u0103 de disponibilitate a acestora; dep\u0103\u0219irile repetate ale duratelor sugereaz\u0103 verificarea timpilor opera\u021biilor sau a <a href=\"https:\/\/skyplanner.ai\/ro\/resurse\/planificarea-capacitatii-de-productie\/\">capacit\u0103\u021bii disponibile<\/a>; blocarea din motive de calitate necesit\u0103 o decizie privind calitatea. Dac\u0103 lipsesc \u00eenregistr\u0103rile de finalizare, verifica\u021bi datele \u00eenainte de a atribui problema execu\u021biei.<\/p>\n\n\n<p>Procentul, luat separat, nu permite diferen\u021bierea acestor cauze. Prezenta\u021bi al\u0103turi de el num\u0103rul de opera\u021bii din numitor, versiunea planului, regula de m\u0103surare \u0219i defalcarea abaterilor. C\u00e2nd sunt evaluate pu\u021bine opera\u021bii, o singur\u0103 opera\u021bie care nu respect\u0103 planul poate modifica semnificativ procentul.<\/p>\n\n\n<p>Un indicator bazat pe num\u0103rul de opera\u021bii acord\u0103 aceea\u0219i pondere unei opera\u021bii scurte \u0219i uneia lungi. Dac\u0103 volumul de munc\u0103 este relevant, ad\u0103uga\u021bi un indicator definit separat, ponderat cu timpii normativi planifica\u021bi, exprima\u021bi \u00een minute. Nu \u00eenlocui\u021bi num\u0103rul ini\u021bial de opera\u021bii f\u0103r\u0103 a \u00eenregistra modificarea defini\u021biei \u0219i nu folosi\u021bi dep\u0103\u0219irile efective ale duratelor drept ponderi care se schimb\u0103 dup\u0103 ce rezultatul este cunoscut.<\/p>\n\n\n<p>Nu exist\u0103 o \u021bint\u0103 universal\u0103 util\u0103 dac\u0103 nu se folosesc acela\u0219i set de opera\u021bii, aceea\u0219i unitate de num\u0103rare, aceea\u0219i regul\u0103 privind termenele \u0219i aceea\u0219i politic\u0103 de acceptare. Stabili\u021bi propria valoare de referin\u021b\u0103 pe baza unei defini\u021bii stabile, apoi verifica\u021bi dac\u0103 abaterile recurente se reduc. Un rezultat mai bun ob\u021binut prin l\u0103rgirea toleran\u021bei sau reducerea volumului de munc\u0103 programat nu dovede\u0219te o execu\u021bie mai bun\u0103.<\/p>\n\n\n<p>Pentru a lua urm\u0103toarea decizie, <a href=\"https:\/\/skyplanner.ai\/ro\/resurse\/ce-este-programarea-productiei\/\">programarea produc\u021biei<\/a> v\u0103 ajut\u0103 s\u0103 stabili\u021bi dac\u0103 planul este fezabil, iar <a href=\"https:\/\/skyplanner.ai\/ro\/resurse\/shop-floor\/\">controlul produc\u021biei \u00een sec\u021bie<\/a> se ocup\u0103 de modul \u00een care informa\u021biile despre opera\u021bii \u0219i abateri circul\u0103 \u00eentre sec\u021bie \u0219i planificator. Acest calcul ofer\u0103 datele care leag\u0103 cele dou\u0103 activit\u0103\u021bi, f\u0103r\u0103 a \u00eenlocui vreuna dintre ele.<\/p>\n\n\n<h2 class=\"wp-block-heading\">De la evaluarea respect\u0103rii planului de produc\u021bie la actualizarea lui<\/h2>\n\n\n<p>SkyPlanner calculeaz\u0103 programele de produc\u021bie pe baza posturilor de lucru, a schimburilor, a operatorilor, a materialelor \u0219i a priorit\u0103\u021bilor stabilite de planificator. Arcturus recalculeaz\u0103 programul c\u00e2nd acesta trebuie actualizat, iar vizualizarea Gantt afi\u0219eaz\u0103 rezultatul. SkyPlanner se integreaz\u0103 cu orice ERP sau MES prin interfa\u021ba sa deschis\u0103 REST API. <a href=\"https:\/\/skyplanner.ai\/ro\/proba\/\">O perioad\u0103 de testare gratuit\u0103 cu date demonstrative<\/a> v\u0103 permite s\u0103 explora\u021bi acest flux de programare a produc\u021biei.<\/p>\n\n\n<p>Foaia de calcul \u0219i formulele din acest ghid sunt exemple de m\u0103surare; prezentarea lor nu \u00eenseamn\u0103 c\u0103 produsul include acest tablou de bord pentru respectarea planului de produc\u021bie. P\u0103stra\u021bi planul de referin\u021b\u0103 salvat pentru m\u0103surare separat de planul de lucru pe care \u00eel folosi\u021bi pentru a r\u0103spunde schimb\u0103rilor.<\/p>\n\n\n<h2 class=\"wp-block-heading\">\u00centreb\u0103ri frecvente despre respectarea planului de produc\u021bie<\/h2>\n\n\n<h3 class=\"wp-block-heading\">Respectarea planului de produc\u021bie este acela\u0219i lucru cu realizarea planului?<\/h3>\n\n\n<p>Nu \u00eentotdeauna. Unele echipe folosesc realizarea planului pentru a compara produc\u021bia total\u0103 cu o \u021bint\u0103 cantitativ\u0103; altele folosesc termenul pentru a compara momentele planificate cu cele efective. \u00cenainte de a compara rezultatele, verifica\u021bi num\u0103r\u0103torul, numitorul, unitatea de num\u0103rare \u0219i regula de timp documentate.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Poate respectarea planului de produc\u021bie s\u0103 dep\u0103\u0219easc\u0103 100%?<\/h3>\n\n\n<p>Formula la nivel de opera\u021bie din acest ghid nu poate dep\u0103\u0219i 100%, deoarece fiecare opera\u021bie programat\u0103 poate fi considerat\u0103 conform\u0103 o singur\u0103 dat\u0103. Un indicator f\u0103r\u0103 plafon, calculat prin \u00eemp\u0103r\u021birea cantit\u0103\u021bii efective la cantitatea planificat\u0103, poate dep\u0103\u0219i 100% prin supraproduc\u021bie. Sunt calcule diferite.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Finalizarea mai devreme se consider\u0103 respectare a planului de produc\u021bie?<\/h3>\n\n\n<p>Da, conform regulii din acest ghid, care cere finalizarea p\u00e2n\u0103 la termen. Un proces care impune finalizarea \u00eentr-un anumit interval de timp sau \u00eentr-o anumit\u0103 succesiune poate trata diferit opera\u021biile finalizate mai devreme. Stabili\u021bi de comun acord aceast\u0103 regul\u0103 \u00eenainte de a calcula rezultatul.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Realizarea a 100% din cantitatea de produc\u021bie planificat\u0103 \u00eenseamn\u0103 c\u0103 toate opera\u021biile planificate sunt finalizate?<\/h3>\n\n\n<p>Nu. \u00cen total, cantitatea suplimentar\u0103 produs\u0103 la o opera\u021bie poate compensa un deficit la alta, iar totalul pe schimb ascunde termenele nerespectate anterior. Asocia\u021bi cantitatea efectiv produs\u0103 cu fiecare opera\u021bie planificat\u0103, apoi aplica\u021bi regula privind finalizarea \u0219i respectarea termenului pentru opera\u021bia respectiv\u0103.<\/p>\n\n<\/div>\n<\/div>\n\n<script type=\"application\/ld+json\">{\"@context\":\"https:\/\/schema.org\",\"@type\":\"FAQPage\",\"mainEntity\":[{\"@type\":\"Question\",\"name\":\"Is production schedule adherence the same as schedule attainment?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"Not consistently. Some teams use attainment for total output versus a quantity target; others use it for planned-versus-actual timing. Check the documented numerator, denominator, counting unit and time rule before comparing figures.\"}},{\"@type\":\"Question\",\"name\":\"Can schedule adherence exceed 100%?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"The operation-level formula in this guide cannot exceed 100% because each scheduled operation can pass only once. An uncapped actual-quantity-divided-by-planned-quantity measure can exceed 100% through overproduction. Those are different calculations.\"}},{\"@type\":\"Question\",\"name\":\"Does finishing early count as adherence?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"It does under this guide's completion-by-deadline rule. A process requiring completion within a specific time window or in a particular sequence may treat early work differently. Agree on that rule before calculating the score.\"}},{\"@type\":\"Question\",\"name\":\"Does 100% output attainment mean every planned job is complete?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"No. Extra output on one job can offset a shortage on another in the total, and a shift total hides earlier missed deadlines. Match actual output to each planned operation, then apply its completion and timing rule.\"}}]}<\/script>\n\n","protected":false},"excerpt":{"rendered":"<p>Respectarea planului de produc\u021bie: formul\u0103 \u0219i exemplu Acas\u0103 &raquo; Resurse &raquo; Respectarea planului de produc\u021bie: formul\u0103 \u0219i exemplu Respectarea planului de produc\u021bie arat\u0103 \u00een ce m\u0103sur\u0103 activitatea efectiv\u0103 urmeaz\u0103 programul transmis \u00een sec\u021bia de produc\u021bie. Pentru o verificare bazat\u0103 pe finalizare, \u00eemp\u0103r\u021bi\u021bi num\u0103rul opera\u021biilor programate \u0219i finalizate integral p\u00e2n\u0103 la termenele lor planificate la num\u0103rul &#8230; <a title=\"Respectarea planului de produc\u021bie: formul\u0103 \u0219i exemplu\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/ro\/resurse\/respectarea-planului-de-productie\/\" aria-label=\"Read more about Respectarea planului de produc\u021bie: formul\u0103 \u0219i exemplu\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":97330,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[2537,514],"tags":[],"class_list":["post-97304","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-aps-scheduling","category-resurse","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.3) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Respectarea planului de produc\u021bie: formul\u0103<\/title>\n<meta name=\"description\" content=\"Volum atins, dar opera\u021bii ratate? Calcula\u021bi respectarea planului de produc\u021bie fa\u021b\u0103 de un plan salvat, cu un exemplu \u0219i reguli clare de num\u0103rare.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/ro\/resurse\/respectarea-planului-de-productie\/\" \/>\n<meta property=\"og:locale\" content=\"ro_RO\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Respectarea planului de produc\u021bie: formul\u0103 \u0219i exemplu\" \/>\n<meta property=\"og:description\" content=\"Volum atins, dar opera\u021bii ratate? Calcula\u021bi respectarea planului de produc\u021bie fa\u021b\u0103 de un plan salvat, cu un exemplu \u0219i reguli clare de num\u0103rare.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/ro\/resurse\/respectarea-planului-de-productie\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2026-10-10T08:49:19+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-10T08:51:14+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-schedule-adherence-hero.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1672\" \/>\n\t<meta property=\"og:image:height\" content=\"941\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Scris de\" \/>\n\t<meta name=\"twitter:data1\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n\t<meta name=\"twitter:label2\" content=\"Timp estimat pentru citire\" \/>\n\t<meta name=\"twitter:data2\" content=\"13 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/resurse\\\/respectarea-planului-de-productie\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/resurse\\\/respectarea-planului-de-productie\\\/\"},\"author\":{\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\"},\"headline\":\"Respectarea planului de produc\u021bie: formul\u0103 \u0219i exemplu\",\"datePublished\":\"2026-10-10T08:49:19+00:00\",\"dateModified\":\"2026-10-10T08:51:14+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/resurse\\\/respectarea-planului-de-productie\\\/\"},\"wordCount\":2603,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/resurse\\\/respectarea-planului-de-productie\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/production-schedule-adherence-hero.png\",\"articleSection\":[\"APS &amp; Scheduling\",\"Resurse\"],\"inLanguage\":\"ro-RO\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/resurse\\\/respectarea-planului-de-productie\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/resurse\\\/respectarea-planului-de-productie\\\/\",\"name\":\"Respectarea planului de produc\u021bie: formul\u0103\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/resurse\\\/respectarea-planului-de-productie\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/resurse\\\/respectarea-planului-de-productie\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/production-schedule-adherence-hero.png\",\"datePublished\":\"2026-10-10T08:49:19+00:00\",\"dateModified\":\"2026-10-10T08:51:14+00:00\",\"description\":\"Volum atins, dar opera\u021bii ratate? Calcula\u021bi respectarea planului de produc\u021bie fa\u021b\u0103 de un plan salvat, cu un exemplu \u0219i reguli clare de num\u0103rare.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/resurse\\\/respectarea-planului-de-productie\\\/#breadcrumb\"},\"inLanguage\":\"ro-RO\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/resurse\\\/respectarea-planului-de-productie\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"ro-RO\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/resurse\\\/respectarea-planului-de-productie\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/production-schedule-adherence-hero.png\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/production-schedule-adherence-hero.png\",\"width\":1672,\"height\":941},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/resurse\\\/respectarea-planului-de-productie\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Respectarea planului de produc\u021bie: formul\u0103 \u0219i exemplu\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"ro-RO\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"ro-RO\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skyplanner-aps\\\/\",\"https:\\\/\\\/www.youtube.com\\\/@SkyPlannerAPS\",\"https:\\\/\\\/www.capterra.com\\\/p\\\/265911\\\/SkyPlanner-APS\\\/\",\"https:\\\/\\\/www.trustradius.com\\\/products\\\/skyplanner-aps\\\/reviews\",\"https:\\\/\\\/www.saasworthy.com\\\/product\\\/skyplanner-aps\",\"https:\\\/\\\/sourceforge.net\\\/software\\\/product\\\/SkyPlanner-APS\\\/\",\"https:\\\/\\\/www.g2.com\\\/products\\\/skyplanner-aps\\\/\",\"https:\\\/\\\/www.getapp.com\\\/project-management-planning-software\\\/a\\\/skyplanner-aps\\\/\",\"https:\\\/\\\/www.softwareadvice.com\\\/cmms\\\/skyplanner-aps-profile\\\/\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\",\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"ro-RO\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"caption\":\"Jussi M\u00e4ntyl\u00e4\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Respectarea planului de produc\u021bie: formul\u0103","description":"Volum atins, dar opera\u021bii ratate? Calcula\u021bi respectarea planului de produc\u021bie fa\u021b\u0103 de un plan salvat, cu un exemplu \u0219i reguli clare de num\u0103rare.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/ro\/resurse\/respectarea-planului-de-productie\/","og_locale":"ro_RO","og_type":"article","og_title":"Respectarea planului de produc\u021bie: formul\u0103 \u0219i exemplu","og_description":"Volum atins, dar opera\u021bii ratate? Calcula\u021bi respectarea planului de produc\u021bie fa\u021b\u0103 de un plan salvat, cu un exemplu \u0219i reguli clare de num\u0103rare.","og_url":"https:\/\/skyplanner.ai\/ro\/resurse\/respectarea-planului-de-productie\/","og_site_name":"SkyPlanner","article_published_time":"2026-10-10T08:49:19+00:00","article_modified_time":"2026-10-10T08:51:14+00:00","og_image":[{"width":1672,"height":941,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-schedule-adherence-hero.png","type":"image\/png"}],"author":"Jussi M\u00e4ntyl\u00e4","twitter_card":"summary_large_image","twitter_misc":{"Scris de":"Jussi M\u00e4ntyl\u00e4","Timp estimat pentru citire":"13 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/ro\/resurse\/respectarea-planului-de-productie\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/ro\/resurse\/respectarea-planului-de-productie\/"},"author":{"name":"Jussi M\u00e4ntyl\u00e4","@id":"https:\/\/skyplanner.ai\/ro\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5"},"headline":"Respectarea planului de produc\u021bie: formul\u0103 \u0219i exemplu","datePublished":"2026-10-10T08:49:19+00:00","dateModified":"2026-10-10T08:51:14+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/ro\/resurse\/respectarea-planului-de-productie\/"},"wordCount":2603,"publisher":{"@id":"https:\/\/skyplanner.ai\/ro\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/ro\/resurse\/respectarea-planului-de-productie\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-schedule-adherence-hero.png","articleSection":["APS &amp; Scheduling","Resurse"],"inLanguage":"ro-RO"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/ro\/resurse\/respectarea-planului-de-productie\/","url":"https:\/\/skyplanner.ai\/ro\/resurse\/respectarea-planului-de-productie\/","name":"Respectarea planului de produc\u021bie: formul\u0103","isPartOf":{"@id":"https:\/\/skyplanner.ai\/ro\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/ro\/resurse\/respectarea-planului-de-productie\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/ro\/resurse\/respectarea-planului-de-productie\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-schedule-adherence-hero.png","datePublished":"2026-10-10T08:49:19+00:00","dateModified":"2026-10-10T08:51:14+00:00","description":"Volum atins, dar opera\u021bii ratate? Calcula\u021bi respectarea planului de produc\u021bie fa\u021b\u0103 de un plan salvat, cu un exemplu \u0219i reguli clare de num\u0103rare.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/ro\/resurse\/respectarea-planului-de-productie\/#breadcrumb"},"inLanguage":"ro-RO","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/ro\/resurse\/respectarea-planului-de-productie\/"]}]},{"@type":"ImageObject","inLanguage":"ro-RO","@id":"https:\/\/skyplanner.ai\/ro\/resurse\/respectarea-planului-de-productie\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-schedule-adherence-hero.png","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-schedule-adherence-hero.png","width":1672,"height":941},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/ro\/resurse\/respectarea-planului-de-productie\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/ro\/"},{"@type":"ListItem","position":2,"name":"Respectarea planului de produc\u021bie: formul\u0103 \u0219i exemplu"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/ro\/#website","url":"https:\/\/skyplanner.ai\/ro\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/ro\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/ro\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"ro-RO"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/ro\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/ro\/","logo":{"@type":"ImageObject","inLanguage":"ro-RO","@id":"https:\/\/skyplanner.ai\/ro\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/ro\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882","https:\/\/www.linkedin.com\/company\/skyplanner-aps\/","https:\/\/www.youtube.com\/@SkyPlannerAPS","https:\/\/www.capterra.com\/p\/265911\/SkyPlanner-APS\/","https:\/\/www.trustradius.com\/products\/skyplanner-aps\/reviews","https:\/\/www.saasworthy.com\/product\/skyplanner-aps","https:\/\/sourceforge.net\/software\/product\/SkyPlanner-APS\/","https:\/\/www.g2.com\/products\/skyplanner-aps\/","https:\/\/www.getapp.com\/project-management-planning-software\/a\/skyplanner-aps\/","https:\/\/www.softwareadvice.com\/cmms\/skyplanner-aps-profile\/"]},{"@type":"Person","@id":"https:\/\/skyplanner.ai\/ro\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5","name":"Jussi M\u00e4ntyl\u00e4","image":{"@type":"ImageObject","inLanguage":"ro-RO","@id":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","caption":"Jussi M\u00e4ntyl\u00e4"}}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-schedule-adherence-hero.png",1672,941,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-schedule-adherence-hero-150x150.png",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-schedule-adherence-hero-300x169.png",300,169,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-schedule-adherence-hero-768x432.png",768,432,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-schedule-adherence-hero-1024x576.png",1024,576,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-schedule-adherence-hero-1536x864.png",1536,864,true],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-schedule-adherence-hero.png",1672,941,false],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-schedule-adherence-hero-360x203.png",360,203,true]},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/ro\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Respectarea planului de produc\u021bie: formul\u0103 \u0219i exemplu Acas\u0103 &raquo; Resurse &raquo; Respectarea planului de produc\u021bie: formul\u0103 \u0219i exemplu Respectarea planului de produc\u021bie arat\u0103 \u00een ce m\u0103sur\u0103 activitatea efectiv\u0103 urmeaz\u0103 programul transmis \u00een sec\u021bia de produc\u021bie. Pentru o verificare bazat\u0103 pe finalizare, \u00eemp\u0103r\u021bi\u021bi num\u0103rul opera\u021biilor programate \u0219i finalizate integral p\u00e2n\u0103 la termenele lor planificate la num\u0103rul&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/posts\/97304","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/comments?post=97304"}],"version-history":[{"count":1,"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/posts\/97304\/revisions"}],"predecessor-version":[{"id":97365,"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/posts\/97304\/revisions\/97365"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/media\/97330"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/media?parent=97304"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/categories?post=97304"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/tags?post=97304"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}