{"id":39807,"date":"2022-09-01T11:45:00","date_gmt":"2022-09-01T11:45:00","guid":{"rendered":"https:\/\/skyplanner.ai\/uncategorized-ro\/sistemul-mes-ce-este-si-ce-face\/"},"modified":"2026-10-10T14:05:53","modified_gmt":"2026-10-10T14:05:53","slug":"sistem-mes-ce-este-si-ce-face","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/ro\/resurse\/sistem-mes-ce-este-si-ce-face\/","title":{"rendered":"Sistemul MES \u2013 Ce este \u0219i ce face"},"content":{"rendered":"<div class=\"gb-container gb-container-3df1db73 no-overflow\"><div class=\"gb-inside-container\">\n<div class=\"gb-container gb-container-d55bc3f3\"><div class=\"gb-inside-container\">\n<div class=\"gb-grid-wrapper gb-grid-wrapper-8557534f special-color\">\n<div class=\"gb-grid-column gb-grid-column-fb47f507\"><div class=\"gb-container gb-container-fb47f507 special-color\">\n\n<p class=\"special-color\"><\/p>\n\n\n\n<p class=\"special-color\"><\/p>\n\n\n\n<p class=\"special-color\"><\/p>\n\n\n\n<p class=\"special-color\"><\/p>\n\n\n\n<p class=\"special-color\"><\/p>\n\n\n\n<p class=\"special-color\"><\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-fc5995b1 gb-headline-text\"><strong>Sistem MES<\/strong><\/h4>\n\n\n\n<p class=\"special-color has-contrast-color has-base-3-background-color has-text-color has-background\"><strong><a href=\"\/ro\/resurse\/mes-vs-erp-care-este-diferenta\/\">MES vs ERP<\/a><\/strong><br><br><strong><a href=\"\/ro\/resurse\/puterea-integrarii-mes-erp\/\">Integrare MES ERP<\/a><\/strong><br><br><a href=\"\/ro\/resurse\/beneficiile-functiilor-mes\/\"><strong>Func\u021bionalit\u0103\u021bi MES<\/strong><\/a><br>\u00b7 <a href=\"\/ro\/resurse\/monitorizarea-fabricatiei-mes\/\">Monitorizarea Produc\u021biei<\/a><br>\u00b7 <a href=\"\/ro\/resurse\/controlul-calitatii-mes-in-productie\/\">Controlul Calit\u0103\u021bii<\/a><br>\u00b7 <a href=\"\/ro\/resurse\/optimizarea-inventarului-mes\/\">Optimizarea Inventarului<\/a><br>\u00b7 <a href=\"\/ro\/resurse\/gestionarea-fluxului-de-date-mes\/\">Gestionarea Fluxului de Date<\/a><br>\u00b7<a href=\"\/ro\/resurse\/mes-analiza-de-fabricatie\/\"> Analiza Produc\u021biei<\/a><br>\u00b7<a href=\"\/ro\/resurse\/urmarirea-productiei-mes\/\"> Urm\u0103rirea Produc\u021biei<\/a><br><br><strong><a href=\"\/ro\/resurse\/solutii-mes-cum-sa-o-alegeti-pe-cea-potrivita\/\">Solu\u021bii MES<\/a><\/strong><br>\u00b7<a href=\"\/ro\/resurse\/mes-bazat-pe-cloud\/\"> MES bazat pe Cloud<\/a><br>\u00b7 <a href=\"\/ro\/resurse\/mes-la-fata-locului\/\"> MES On-premises<\/a><br>\u00b7 <a href=\"\/ro\/resurse\/mes-pentru-intreprinderile-mici\/\">MES pentru Afaceri Mici<\/a><br>\u00b7 <a href=\"\/ro\/resurse\/mes-bazat-pe-ai\/\">MES bazat pe AI<\/a><br>\u00b7 <a href=\"\/ro\/resurse\/mes-pentru-intreprinderi\/\">MES pentru \u00centreprinderi<\/a><br>\u00b7<a href=\"\/ro\/resurse\/mes-specific-industriei\/\"> MES Specific Industriei<\/a><\/p>\n\n<\/div><\/div>\n\n<div class=\"gb-grid-column gb-grid-column-8526f60b\"><div class=\"gb-container gb-container-8526f60b front-head\"><div class=\"gb-inside-container\">\n<div class=\"gb-container gb-container-93641464\"><div class=\"gb-inside-container\">\n<div class=\"yoast-breadcrumbs\"><span><span><a href=\"https:\/\/skyplanner.ai\/ro\/\">Home<\/a><\/span> \u00bb <span><a href=\"https:\/\/skyplanner.ai\/ro\/resurse\/\">Articole<\/a><\/span> \u00bb <span class=\"breadcrumb_last\" aria-current=\"page\">Sistemul MES \u2013 Ce este \u0219i ce face<\/span><\/span><\/div>\n<\/div><\/div>\n\n<div class=\"gb-container gb-container-26760224\"><div class=\"gb-inside-container\">\n\n<h1 class=\"wp-block-heading has-text-align-left has-text-color\" id=\"h-mes-system-what-it-is-and-what-it-does\" style=\"color:#1f1f33\">Sistemul MES \u2013 Ce este \u0219i ce face<\/h1>\n\n<\/div><\/div>\n\n<div class=\"gb-container gb-container-3112db8f\"><div class=\"gb-inside-container\">\n\n<p class=\"yoast-reading-time__wrapper\"><span class=\"yoast-reading-time__icon\"><svg aria-hidden=\"true\" focusable=\"false\" data-icon=\"clock\" width=\"20\" height=\"20\" fill=\"none\" stroke=\"currentColor\" style=\"display:inline-block;vertical-align:-0.1em\" role=\"img\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewBox=\"0 0 24 24\"><path stroke-linecap=\"round\" stroke-linejoin=\"round\" stroke-width=\"2\" d=\"M12 8v4l3 3m6-3a9 9 0 11-18 0 9 9 0 0118 0z\"><\/path><\/svg><\/span><span class=\"yoast-reading-time__spacer\" style=\"display:inline-block;width:1em\"><\/span><span class=\"yoast-reading-time__descriptive-text\">Timp estimat de citire: <\/span><span class=\"yoast-reading-time__reading-time\">13<\/span><span class=\"yoast-reading-time__time-unit\"> minute<\/span><\/p>\n\n<\/div><\/div>\n\n<div class=\"gb-container gb-container-6986ace5\"><div class=\"gb-inside-container\">\n\n<p class=\"has-text-align-left\">C\u00e2nd automatizarea a \u00eenceput s\u0103 fie \u00eencorporat\u0103 pentru prima dat\u0103 \u00een produc\u021bie, a fost creat termenul Manufacturing Execution System (MES). MES a fost un instrument pentru gestionarea sistemelor automatizate \u00eentr-un mod care s\u0103 permit\u0103 fabricilor s\u0103 func\u021bioneze f\u0103r\u0103 probleme. Acesta realiza acest lucru prin eficientizarea proceselor, urm\u0103rirea lor \u00een produc\u021bie \u0219i documentarea automat\u0103 a evenimentelor.<\/p>\n\n\n\n<p>Pe m\u0103sur\u0103 ce timpul a trecut, companiile au g\u0103sit noi modalit\u0103\u021bi de a utiliza acest nou instrument. Odat\u0103 cu cererea tot mai mare de produse personalizate, procesele trebuiau eficientizate pentru a func\u021biona la o eficien\u021b\u0103 mai mare, iar&nbsp;<a href=\"\/ro\/\" target=\"_blank\" rel=\"noreferrer noopener\">planificarea produc\u021biei<\/a>&nbsp;a necesitat optimizare. Pentru aceasta, MES s-a dovedit a fi un instrument fantastic.<\/p>\n\n\n\t\t\t\t<div class=\"wp-block-uagb-table-of-contents uagb-toc__align-left uagb-toc__columns-1  uagb-block-613f9f62      \"\n\t\t\t\t\tdata-scroll= \"1\"\n\t\t\t\t\tdata-offset= \"30\"\n\t\t\t\t\tstyle=\"\"\n\t\t\t\t>\n\t\t\t\t<div class=\"uagb-toc__wrap\">\n\t\t\t\t\t\t<div class=\"uagb-toc__title\">\n\t\t\t\t\t\t\tTable Of Contents\t\t\t\t\t\t<\/div>\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<div class=\"uagb-toc__list-wrap \">\n\t\t\t\t\t\t<ol class=\"uagb-toc__list\"><li class=\"uagb-toc__list\"><a href=\"#tldr\" class=\"uagb-toc-link__trigger\">TL;DR<\/a><li class=\"uagb-toc__list\"><a href=\"#ce-este-mes\" class=\"uagb-toc-link__trigger\">Ce este MES?<\/a><li class=\"uagb-toc__list\"><a href=\"#func\u021biile-mes\" class=\"uagb-toc-link__trigger\">Func\u021biile MES<\/a><li class=\"uagb-toc__list\"><a href=\"#func\u021bionalit\u0103\u021bi-mes\" class=\"uagb-toc-link__trigger\">Func\u021bionalit\u0103\u021bi MES<\/a><li class=\"uagb-toc__list\"><a href=\"#solu\u021bii-mes\" class=\"uagb-toc-link__trigger\">Solu\u021bii MES<\/a><li class=\"uagb-toc__list\"><a href=\"#sfaturi-pentru-alegerea-solu\u021biei-potrivite\" class=\"uagb-toc-link__trigger\">Sfaturi pentru alegerea solu\u021biei potrivite<\/a><li class=\"uagb-toc__list\"><a href=\"#mes-\u0219i-erp\" class=\"uagb-toc-link__trigger\">MES \u0219i ERP<\/a><li class=\"uagb-toc__list\"><a href=\"#beneficiile-utiliz\u0103rii-mes\" class=\"uagb-toc-link__trigger\">Beneficiile utiliz\u0103rii MES<\/a><li class=\"uagb-toc__list\"><a href=\"#aplica\u021bii-viitoare-ale-manufacturing-execution-system\" class=\"uagb-toc-link__trigger\">Aplica\u021bii viitoare ale Manufacturing Execution System<\/a><li class=\"uagb-toc__list\"><a href=\"#duce\u021bi-managementul-proceselor-companiei-dumneavoastr\u0103-la-nivelul-urm\u0103tor\" class=\"uagb-toc-link__trigger\">Duce\u021bi managementul proceselor companiei dumneavoastr\u0103 la nivelul urm\u0103tor!<\/a><li class=\"uagb-toc__list\"><a href=\"#\u00eentreb\u0103ri-frecvente\" class=\"uagb-toc-link__trigger\">\u00centreb\u0103ri Frecvente<\/a><\/ol>\t\t\t\t\t<\/div>\n\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\n<\/div><\/div>\n\n<div class=\"gb-container gb-container-b0f6164d\"><div class=\"gb-inside-container\">\n\n<h2 class=\"gb-headline gb-headline-a28df297 gb-headline-text\">TL;DR<\/h2>\n\n\n\n<p>Un sistem MES urm\u0103re\u0219te \u0219i documenteaz\u0103 produc\u021bia din sec\u021bie, oferind echipelor informa\u021bii actualizate despre opera\u021bii, materiale \u0219i calitate. ERP se ocup\u0103 de planificarea activit\u0103\u021bii \u00eentreprinderii, iar MES sprijin\u0103 execu\u021bia produc\u021biei. ISA-95 ofer\u0103 modele \u0219i terminologie pentru schimbul de informa\u021bii \u00eentre controlul produc\u021biei \u0219i func\u021biile \u00eentreprinderii; nu reprezint\u0103 o list\u0103 obligatorie de func\u021bionalit\u0103\u021bi MES. Sistemele MES moderne ofer\u0103 func\u021bionalit\u0103\u021bi precum urm\u0103rirea proceselor de fabrica\u021bie, urm\u0103rirea stocurilor \u0219i analiza datelor de produc\u021bie. Conectarea MES cu SkyPlanner APS adaug\u0103 programarea produc\u021biei pe baza datelor din produc\u021bie \u0219i a priorit\u0103\u021bilor stabilite de planificatori.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"h-what-is-mes\">Ce este MES?<\/h2>\n\n\n<div class=\"gb-container gb-container-ce737323\"><div class=\"gb-inside-container\">\n\n<p><strong>Un sistem MES este o solu\u021bie software care urm\u0103re\u0219te, documenteaz\u0103 \u0219i sprijin\u0103 execu\u021bia produc\u021biei \u00een sec\u021bie. Acesta colecteaz\u0103 date de la operatori, echipamente \u0219i sisteme conectate, astfel \u00eenc\u00e2t echipele s\u0103 poat\u0103 urm\u0103ri progresul opera\u021biilor, consumul de materiale \u0219i calitatea.<\/strong><\/p>\n\n<\/div><\/div>\n\n\n<p class=\"has-text-align-left\">MES \u0219i ERP au roluri complementare. ERP sprijin\u0103 procesele de afaceri, precum gestionarea comenzilor, achizi\u021biile \u0219i activit\u0103\u021bile financiare, iar MES ofer\u0103 informa\u021bii mai detaliate despre execu\u021bia produc\u021biei. Prin integrare, cele dou\u0103 sisteme pot face schimb de informa\u021bii privind cerin\u021bele \u0219i rezultatele produc\u021biei.<\/p>\n\n\n\n<p>MES este un sistem integrat de senzori \u0219i software care urm\u0103re\u0219te echipamentele, materialele \u0219i lucr\u0103torii. Acesta indic\u0103 blocajele din procese, ajut\u0103 la programarea mentenan\u021bei echipamentelor \u00een prealabil \u0219i poate fi, de asemenea, utilizat pentru a oferi instruc\u021biuni personalizate lucr\u0103torilor \u0219i echipamentelor pe baza comenzii. Acest lucru ajut\u0103 la men\u021binerea proceselor eficientizate \u0219i ofer\u0103 o programare mai fiabil\u0103.<\/p>\n\n\n\n<p>C\u00e2nd MES era \u00eenc\u0103 la \u00eenceput, era definit destul de vag. Aproape orice metod\u0103 de urm\u0103rire, documentare sau gestionare a unui proces putea fi numit\u0103 MES. Acest lucru a cauzat probleme la operarea interfe\u021belor dintre MES \u0219i alte sisteme.<\/p>\n\n\n\n<p><a href=\"https:\/\/www.isa.org\/standards-and-publications\/isa-standards\/isa-standards-committees\/isa95\">ISA-95<\/a> define\u0219te modele, terminologie \u0219i schimburi de informa\u021bii pentru integrarea controlului produc\u021biei cu func\u021biile \u00eentreprinderii. Domeniul de integrare pe care \u00eel acoper\u0103 este distinct de modelele istorice ale func\u021biilor MES dezvoltate de <a href=\"https:\/\/mesa.org\/topics-resources\/mesa-model\/\">MESA<\/a>. Lista de mai jos prezint\u0103 func\u021bii MES uzuale, nu cerin\u021be obligatorii ale ISA-95:<\/p>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"h-mes-functions\">Func\u021biile MES<\/h2>\n\n\n\n<ol class=\"wp-block-list\">\n<li>Colectarea datelor<\/li>\n\n\n\n<li>Controlul calit\u0103\u021bii<\/li>\n\n\n\n<li>Programarea produc\u021biei<\/li>\n\n\n\n<li>Analiza performan\u021bei<\/li>\n\n\n\n<li>Fluxul produselor<\/li>\n\n\n\n<li>Genealogie \u0219i trasabilitate<\/li>\n\n\n\n<li>Managementul proceselor<\/li>\n\n\n\n<li>Managementul resurselor<\/li>\n\n\n\n<li>Managementul personalului<\/li>\n\n\n\n<li>Managementul mentenan\u021bei<\/li>\n\n\n\n<li>Managementul documentelor<\/li>\n<\/ol>\n\n\n\n<p>Func\u021biile disponibile \u00eentr-un anumit sistem MES depind de produs \u0219i de modul \u00een care este implementat. Stabili\u021bi ce sistem este responsabil pentru fiecare sarcin\u0103 \u0219i cum circul\u0103 datele \u00eentre MES, ERP \u0219i solu\u021biile de programare a produc\u021biei, precum APS.<\/p>\n\n\n\n<h2 class=\"gb-headline gb-headline-ca25f6c8 gb-headline-text\">Func\u021bionalit\u0103\u021bi MES<\/h2>\n\n\n\n<p>Aprofund\u00e2nd domeniul acestui sistem, \u00eent\u00e2lnim o fa\u021bet\u0103 nou\u0103 \u0219i interesant\u0103:&nbsp;<a href=\"\/ro\/resurse\/beneficiile-functiilor-mes\/\">Func\u021bionalit\u0103\u021bi MES<\/a>. At\u00e2ta timp c\u00e2t \u00een\u021belegem nuan\u021bele acestui instrument, distingerea \u00eentre o func\u021bie MES \u0219i o func\u021bionalitate MES r\u0103m\u00e2ne crucial\u0103.<\/p>\n\n\n\n<p>Mai simplu spus, o func\u021bie MES se refer\u0103 la opera\u021biunile sau sarcinile de baz\u0103 pe care sistemul le poate efectua. Aceste func\u021bii formeaz\u0103 coloana vertebral\u0103 a sistemului MES. \u00centre timp, func\u021bionalit\u0103\u021bile sale eviden\u021biaz\u0103 instrumentele sau capacit\u0103\u021bile specifice ale sistemului, sporindu-i poten\u021bialul func\u021bional. \u00cen timpul explor\u0103rii sistemelor MES, am identificat \u0219ase func\u021bionalit\u0103\u021bi inovatoare care ies \u00een eviden\u021b\u0103:<\/p>\n\n\n\n<ol class=\"wp-block-list\">\n<li><strong><a href=\"\/ro\/resurse\/monitorizarea-fabricatiei-mes\/\">Monitorizarea produc\u021biei<\/a><\/strong>: Aceast\u0103 func\u021bie ofer\u0103 supraveghere \u00een timp real a procesului de produc\u021bie, asigur\u00e2nd c\u0103 totul func\u021bioneaz\u0103 f\u0103r\u0103 probleme \u0219i eficient. Prin aceast\u0103 monitorizare, planificatorii de produc\u021bie ob\u021bin informa\u021bii pre\u021bioase \u0219i pot face ajust\u0103ri atunci c\u00e2nd este nevoie.<\/li>\n\n\n\n<li><a href=\"\/ro\/resurse\/controlul-calitatii-mes-in-productie\/\"><strong>Controlul calit\u0103\u021bii \u00een produc\u021bie<\/strong>:<\/a> Un sistem MES robust nu se limiteaz\u0103 la urm\u0103rirea produc\u021biei, ci examineaz\u0103 \u0219i calitatea produselor fabricate. Acesta \u00eenregistreaz\u0103 verific\u0103rile de calitate \u0219i semnaleaz\u0103 abaterile, astfel \u00eenc\u00e2t echipa s\u0103 poat\u0103 lua m\u0103suri pentru respectarea standardelor impuse.<\/li>\n\n\n\n<li><strong><a href=\"\/ro\/resurse\/optimizarea-inventarului-mes\/\">Optimizarea stocurilor<\/a><\/strong>: Produc\u021bia este esen\u021bial\u0103, iar gestionarea stocurilor este aproape la fel de important\u0103. Sistemele MES urm\u0103resc mi\u0219c\u0103rile \u0219i consumul de materiale pentru a ajuta echipele s\u0103 identifice lipsurile \u0219i stocurile excedentare.<\/li>\n\n\n\n<li><strong><a href=\"\/ro\/resurse\/gestionarea-fluxului-de-date-mes\/\">Gestionarea fluxului de date<\/a><\/strong>: \u00cen era noastr\u0103 digitalizat\u0103, datele domnesc supreme. Prin urmare, gestionarea fluxului de date devine esen\u021bial\u0103. Un sistem MES dotat cu aceast\u0103 func\u021bie asigur\u0103 mi\u0219carea, stocarea \u0219i accesarea f\u0103r\u0103 probleme a datelor, f\u0103c\u00e2nd procesul decizional mai fluid.<\/li>\n\n\n\n<li><strong><a href=\"\/ro\/resurse\/mes-analiza-de-fabricatie\/\">Analiza produc\u021biei<\/a><\/strong>: P\u0103trunz\u00e2nd \u00een date, sistemele MES pot extrage analize esen\u021biale. Prin aceste analize, planificatorii de produc\u021bie pot identifica tipare, anticipa tendin\u021be \u0219i lua decizii bine fundamentate.<\/li>\n\n\n\n<li><strong><a href=\"\/ro\/resurse\/urmarirea-productiei-mes\/\">Urm\u0103rirea produc\u021biei<\/a><\/strong>: Nu \u00een ultimul r\u00e2nd, urm\u0103rirea produc\u021biei r\u0103m\u00e2ne o adev\u0103rat\u0103 bijuterie. Ofer\u0103 o imagine clar\u0103 asupra stadiului \u00een care se afl\u0103 fiecare produs pe linia de produc\u021bie, deschiz\u00e2nd calea c\u0103tre o mai bun\u0103 alocare a resurselor \u0219i o eficien\u021b\u0103 sporit\u0103.<\/li>\n<\/ol>\n\n\n\n<p>S\u0103 ne uit\u0103m la una dintre aceste func\u021bionalit\u0103\u021bi pentru o \u00een\u021belegere mai clar\u0103. Monitorizarea Produc\u021biei \u2013 Aceast\u0103 func\u021bionalitate ofer\u0103 o imagine de ansamblu cuprinz\u0103toare a procesului de fabrica\u021bie. G\u00e2ndi\u021bi-v\u0103 la ea ca la un gardian vigilent. Aceast\u0103 func\u021bionalitate detecteaz\u0103 activ neregulile, poten\u021bialele ineficien\u021be \u0219i semnele de defec\u021biuni ale sistemului. <\/p>\n\n\n\n<p>Prin furnizarea de date de ultim\u0103 or\u0103, Monitorizarea Produc\u021biei asigur\u0103 c\u0103 planificatorii de produc\u021bie sunt \u00eentotdeauna informa\u021bi, permi\u021b\u00e2ndu-le s\u0103 ac\u021bioneze prompt \u0219i s\u0103 \u00eembun\u0103t\u0103\u021beasc\u0103 procesele dup\u0103 cum este necesar.<br><br>Lumea sistemelor MES continu\u0103 s\u0103 evolueze, oferind instrumente \u0219i func\u021bionalit\u0103\u021bi mai sofisticate. R\u0103m\u00e2n\u00e2nd la curent \u0219i informa\u021bi, planificatorii de produc\u021bie pot valorifica \u00eentregul poten\u021bial al acestor sisteme, propuls\u00e2ndu-\u0219i opera\u021biunile c\u0103tre un viitor mai bun.<\/p>\n\n\n<div class=\"gb-container gb-container-0a56c9fa sticky\"><div class=\"gb-inside-container\">\n<div class=\"gb-container gb-container-eed176fc\"><div class=\"gb-inside-container\">\n<div class=\"gb-grid-wrapper gb-grid-wrapper-1b2f16ae\">\n<div class=\"gb-grid-column gb-grid-column-be655727\"><div class=\"gb-container gb-container-be655727\"><div class=\"gb-inside-container\">\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" width=\"1024\" height=\"685\" src=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Straight-PNG-1-1024x685.png\" alt=\"SkyPlanner APS \u2013 Imagine de produs pentru planificarea \u0219i programarea produc\u021biei, vedere frontal\u0103\" class=\"wp-image-4339\" srcset=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Straight-PNG-1-1024x685.png 1024w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Straight-PNG-1-300x201.png 300w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Straight-PNG-1-768x514.png 768w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Straight-PNG-1-1536x1027.png 1536w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Straight-PNG-1-2048x1370.png 2048w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n<\/div><\/div><\/div>\n\n<div class=\"gb-grid-column gb-grid-column-0821f9a0\"><div class=\"gb-container gb-container-0821f9a0\"><div class=\"gb-inside-container\">\n\n<h4 class=\"wp-block-heading mobile-text-center\" id=\"h-advanced-production-planning-with-ai-skyplanner-aps\" style=\"font-size:24px\">Planificare avansat\u0103 a produc\u021biei cu AI &#8211; SkyPlanner APS<\/h4>\n\n\n\n<p class=\"mobile-text-center\">Citi\u021bi mai multe despre abordarea noastr\u0103 privind planificarea \u0219i optimizarea produc\u021biei utiliz\u00e2nd puterea AI.<\/p>\n\n\n<div class=\"gb-button-wrapper gb-button-wrapper-690cb95e\">\n\n<a class=\"gb-button gb-button-7b87a903 gb-button-text\" href=\"\/ro\/\" aria-label=\"Programeaz\u0103 o demonstra\u021bie\">Planificarea produc\u021biei cu AI<\/a>\n\n<\/div>\n<\/div><\/div><\/div>\n<\/div>\n<\/div><\/div>\n<\/div><\/div>\n<\/div><\/div>\n\n<div class=\"gb-container gb-container-1794ec07\"><div class=\"gb-inside-container\">\n\n<h2 class=\"gb-headline gb-headline-3a1286ae gb-headline-text\">Solu\u021bii MES<\/h2>\n\n\n\n<p>Diverse <a href=\"\/ro\/resurse\/solutii-mes-cum-sa-o-alegeti-pe-cea-potrivita\/\">Solu\u021bii MES <\/a>sunt gata s\u0103 abordeze provoc\u0103ri opera\u021bionale distincte \u00een cadrul domeniului vast al sistemelor MES. Fiecare prezint\u0103 propunerea sa unic\u0103 de valoare, de la capacit\u0103\u021bile simplificate ale sistemelor bazate pe cloud la ofertele specializate ale MES specifice industriei. S\u0103 parcurgem \u00eempreun\u0103 aceste op\u021biuni, identific\u00e2nd modul \u00een care fiecare poate sus\u021bine \u0219i \u00eembun\u0103t\u0103\u021bi \u00een mod optim nevoile specifice de produc\u021bie ale companiei dumneavoastr\u0103.<\/p>\n\n\n\n<ol class=\"wp-block-list\">\n<li><strong><a href=\"\/ro\/resurse\/mes-bazat-pe-cloud\/\">MES \u00een cloud<\/a><\/strong>: Func\u021bioneaz\u0103 din cloud, ceea ce \u00eenseamn\u0103 c\u0103 \u00eel pute\u021bi accesa de oriunde ave\u021bi o conexiune la internet. Ofer\u0103 flexibilitate \u0219i implic\u0103 adesea costuri ini\u021biale mai mici. Totu\u0219i, depinde de o conexiune stabil\u0103 la internet.<\/li>\n\n\n\n<li><strong><a href=\"\/ro\/resurse\/mes-la-fata-locului\/\">MES on-premises<\/a><\/strong>: Acest sistem este instalat pe echipamentele \u0219i serverele companiei dumneavoastr\u0103. De\u0219i poate necesita o investi\u021bie ini\u021bial\u0103 mai mare, ofer\u0103 un control sporit asupra datelor \u0219i poate fi personalizat \u00een func\u021bie de nevoile companiei.<\/li>\n\n\n\n<li><strong><a href=\"\/ro\/resurse\/mes-pentru-intreprinderile-mici\/\">MES pentru afaceri mici<\/a><\/strong>: Concepute special pentru opera\u021biuni de dimensiuni reduse, aceste sisteme sunt de obicei mai simple \u0219i mai rentabile. Se concentreaz\u0103 pe func\u021biile esen\u021biale de care are nevoie o afacere mic\u0103, f\u0103r\u0103 a o cople\u0219i cu func\u021bionalit\u0103\u021bi complexe.<\/li>\n\n\n\n<li><strong><a href=\"\/ro\/resurse\/mes-bazat-pe-ai\/\">MES bazat pe AI<\/a><\/strong>: Prin integrarea inteligen\u021bei artificiale, aceste sisteme pot anticipa tendin\u021be, automatiza sarcini \u0219i optimiza procese. Este o alegere excelent\u0103 pentru companiile care doresc s\u0103 r\u0103m\u00e2n\u0103 \u00een fruntea inova\u021biei.<\/li>\n\n\n\n<li><strong><a href=\"\/ro\/resurse\/mes-pentru-intreprinderi\/\">MES pentru \u00eentreprinderi (enterprise)<\/a><\/strong>: Conceput pentru companii mari, cu nevoi complexe, acest tip de solu\u021bie ofer\u0103 func\u021bii extinse, poate gestiona volume mari de date \u0219i se integreaz\u0103 f\u0103r\u0103 probleme cu alte sisteme de \u00eentreprindere.<\/li>\n\n\n\n<li><strong><a href=\"\/ro\/resurse\/mes-specific-industriei\/\">MES specific industriei<\/a><\/strong>: Acestea sunt adaptate unor industrii anume, precum cea farmaceutic\u0103 sau auto. Vin echipate din start cu instrumente \u0219i func\u021bii specifice acelor sectoare.<\/li>\n<\/ol>\n\n\n\n<p>Alegerea solu\u021biei MES potrivite pentru afacerea dumneavoastr\u0103 poate fi esen\u021bial\u0103 pentru eficien\u021ba \u0219i succesul procesului de fabrica\u021bie.<\/p>\n\n\n\n<h2 class=\"gb-headline gb-headline-3cf0e0d5 gb-headline-text\">Sfaturi pentru alegerea solu\u021biei potrivite<\/h2>\n\n\n\n<p>Efectuarea celei mai bune alegeri din aceast\u0103 gam\u0103 divers\u0103 de sisteme MES ar putea p\u0103rea descurajant\u0103 la \u00eenceput. Este esen\u021bial s\u0103 alinia\u021bi sistemul selectat cu nevoile opera\u021bionale distincte \u0219i obiectivele viitoare ale companiei dumneavoastr\u0103. Pentru a v\u0103 ghida prin aceast\u0103 decizie critic\u0103, iat\u0103 c\u00e2teva sfaturi nepre\u021buite de luat \u00een considerare:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>\u00cen\u021belege\u021bi-v\u0103 nevoile<\/strong>: \u00cenainte de a decide, identifica\u021bi cerin\u021bele specifice ale companiei dumneavoastr\u0103. Ave\u021bi nevoie de func\u021bionalit\u0103\u021bi complexe sau doar de elementele de baz\u0103?<\/li>\n\n\n\n<li><strong>Aspecte legate de buget<\/strong>: De\u0219i este esen\u021bial s\u0103 alege\u021bi un sistem care s\u0103 r\u0103spund\u0103 nevoilor dumneavoastr\u0103, la fel de important este s\u0103 lua\u021bi \u00een calcul c\u00e2t sunte\u021bi dispus s\u0103 investi\u021bi.<\/li>\n\n\n\n<li><strong>Scalabilitate<\/strong>: G\u00e2ndi\u021bi pe termen lung. Alege\u021bi un sistem MES care poate cre\u0219te odat\u0103 cu compania dumneavoastr\u0103.<\/li>\n\n\n\n<li><strong>Integrare<\/strong>: Asigura\u021bi-v\u0103 c\u0103 Manufacturing Execution System se poate integra bine cu celelalte programe pe care le folosi\u021bi.<\/li>\n\n\n\n<li><strong>U\u0219urin\u021ba \u00een utilizare<\/strong>: Un sistem greu de navigat poate \u00eengreuna productivitatea. Opta\u021bi pentru unul intuitiv \u0219i u\u0219or de folosit.<\/li>\n\n\n\n<li><strong>Suport \u0219i instruire<\/strong>: Verifica\u021bi dac\u0103 furnizorul ofer\u0103 suport \u0219i sesiuni de instruire suficiente pentru a ajuta echipa dumneavoastr\u0103 s\u0103 se familiarizeze cu sistemul.<\/li>\n<\/ul>\n\n\n\n<p>De\u0219i sunt disponibile mai multe op\u021biuni de sisteme MES, alegerea corect\u0103 va fi \u00eentotdeauna cea care se aliniaz\u0103 cel mai bine cu nevoile unice \u0219i planurile de cre\u0219tere ale companiei dumneavoastr\u0103.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"h-mes-and-erp\">MES \u0219i ERP<\/h2>\n\n\n\n<p>C\u00e2nd ne scufund\u0103m \u00een complexitatea software-ului industrial, dezbaterea \u201e<a href=\"\/ro\/resurse\/mes-vs-erp-care-este-diferenta\/\">MES vs ERP<\/a>\u201d apare frecvent \u0219i este u\u0219or de \u00een\u021beles de ce.<\/p>\n\n\n\n<p class=\"has-text-align-left\">MES \u0219i&nbsp;<a href=\"\/ro\/resurse\/erp-pentru-productie-un-ghid-cuprinzator\/\" target=\"_blank\" rel=\"noreferrer noopener\">ERP<\/a>&nbsp;necesit\u0103 adesea clarific\u0103ri, deoarece este greu de spus unde se termin\u0103 unul \u0219i unde \u00eencepe cel\u0103lalt. Ambele sisteme au unele func\u021bii care se suprapun, iar \u00een unele cazuri rudimentare, MES nici m\u0103car nu este necesar. Cu toate acestea, optimizarea func\u021bion\u0103rii unei fabrici se poate dovedi dificil\u0103 doar cu ERP.<\/p>\n\n\n\n<p>ERP (Enterprise Resource Planning) este un sistem software conceput pentru a conduce o \u00eentreag\u0103 afacere. Acesta \u00eencearc\u0103 s\u0103 integreze \u0219i s\u0103 gestioneze toate aspectele afacerii unei companii. ERP func\u021bioneaz\u0103 ca o baz\u0103 de date cu actualizare constant\u0103 a evenimentelor la toate nivelurile. Aceast\u0103 informa\u021bie poate fi utilizat\u0103 manual sau automat pentru a gestiona resursele necesare pentru a func\u021biona optim.<\/p>\n\n\n\n<p>MES, \u00een schimb, nu iese din limitele fabricii. Rolul principal al acestui instrument este s\u0103 stabileasc\u0103 ce resurse are la dispozi\u021bie (materii prime, personal, echipamente) \u0219i cum le poate folosi c\u00e2t mai bine pentru a realiza produsele comandate. Aici intr\u0103 <a href=\"\/ro\/resurse\/ce-este-programarea-productiei\/\">programarea produc\u021biei<\/a>, mentenan\u021ba echipamentelor, controlul stocurilor, controlul calit\u0103\u021bii \u0219i documentarea, printre altele.<\/p>\n\n\n\n<p>\u00centr-o situa\u021bie optim\u0103, sistemele ERP pot face predic\u021bii bazate pe proiec\u021bia pie\u021bei pentru cererea viitoare de anumite produse \u0219i pot transmite aceste informa\u021bii c\u0103tre MES. MES poate apoi ajusta produc\u021bia pentru a se potrivi nevoilor ERP-ului. Manufacturing Execution System poate aloca mai multe resurse pentru a fabrica produsele cu cerere mare \u00een mod optim \u0219i automat. \u00cen acest fel, ERP \u0219i MES pot lucra perfect \u00eempreun\u0103.<\/p>\n\n\n\n<p>De\u0219i un ERP&nbsp;<em>poate&nbsp;<\/em>fi utilizat pentru a gestiona chiar \u0219i cele mai mici detalii ale unui proces de fabrica\u021bie, aceast\u0103 sarcin\u0103 este adesea l\u0103sat\u0103 cel mai bine \u00een seama Manufacturing Execution System. Software-ul ERP gestioneaz\u0103 \u00een mod ideal ceea ce intr\u0103 \u00een fabric\u0103 \u0219i ceea ce iese, \u00een timp ce MES gestioneaz\u0103 tot ce se \u00eent\u00e2mpl\u0103 \u00een interiorul cl\u0103dirii fabricii.<\/p>\n\n\n\n<p>Integrarea sistemelor MES \u0219i ERP nu este doar o chestiune de confort \u2014 este o mi\u0219care strategic\u0103 ce poate revolu\u021biona opera\u021biunile unei companii. C\u00e2nd aceste dou\u0103 sisteme puternice se sincronizeaz\u0103, ele ofer\u0103 o vedere armonizat\u0103 a opera\u021biunilor de produc\u021bie \u0219i a proceselor de afaceri, asigur\u00e2nd c\u0103 deciziile se bazeaz\u0103 pe date complete, \u00een timp real. O astfel de integrare elimin\u0103 sarcinile redundante, reduce lacunele informa\u021bionale \u0219i spore\u0219te eficien\u021ba general\u0103.<\/p>\n\n\n\n<p><a href=\"\/ro\/resurse\/puterea-integrarii-mes-erp\/\" target=\"_blank\" rel=\"noreferrer noopener\">Integrarea MES ERP<\/a>&nbsp;aduce o perspectiv\u0103 unificat\u0103 \u0219i coerent\u0103, pozi\u021bion\u00e2nd companiile s\u0103 fie mai agile, receptive \u0219i competitive.&nbsp;<\/p>\n\n<\/div><\/div>\n\n<div class=\"gb-container gb-container-68ae52c7\"><div class=\"gb-inside-container\">\n\n<h2 class=\"wp-block-heading\" id=\"h-benefits-of-using-mes\">Beneficiile utiliz\u0103rii MES<\/h2>\n\n\n\n<p class=\"has-text-align-left\">Un sistem MES colecteaz\u0103 date de produc\u021bie de la echipamentele conectate, de la operatori \u0219i din alte sisteme, apoi le pune la dispozi\u021bia echipei. Managerii pot folosi aceste informa\u021bii pentru a identifica \u00eent\u00e2rzierile \u0219i a decide ce trebuie schimbat. \u00cenregistr\u0103rile privind activitatea de produc\u021bie, consumul de materiale \u0219i verific\u0103rile de calitate sprijin\u0103 controlul calit\u0103\u021bii \u0219i al stocurilor.<\/p>\n\n\n<div class=\"gb-container gb-container-7f408084\"><div class=\"gb-inside-container\">\n\n<figure class=\"wp-block-image size-full\"><img decoding=\"async\" width=\"720\" height=\"560\" src=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Shapes-old-production-planning-1.png\" alt=\"SkyPlanner planificare \u0219i programare avansat\u0103 planificarea produc\u021biei\" class=\"wp-image-2061\" srcset=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Shapes-old-production-planning-1.png 720w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Shapes-old-production-planning-1-300x233.png 300w\" sizes=\"(max-width: 720px) 100vw, 720px\" \/><\/figure>\n\n<\/div><\/div>\n\n\n<p><a href=\"\/ro\/resurse\/cum-se-optimizeaza-timpul-de-executie-in-productie\/\" target=\"_blank\" rel=\"noreferrer noopener\">Optimizarea lead time-ului este esen\u021bial\u0103 pentru succes<\/a>, iar un sistem MES contribuie la aceasta oferind vizibilitate asupra progresului opera\u021biilor \u0219i a \u00eent\u00e2rzierilor. C\u00e2nd o comand\u0103 se modific\u0103, \u00eenregistr\u0103rile actualizate din produc\u021bie ajut\u0103 echipa s\u0103 evalueze ce opera\u021bii mai sunt de executat \u0219i dac\u0103 modificarea este fezabil\u0103. Efectul asupra lead time-ului depinde de capacitatea disponibil\u0103, de materiale \u0219i de lucr\u0103rile deja finalizate; personalizarea nu este lipsit\u0103 de perturb\u0103ri.<\/p>\n\n\n\n<p>MES poate transmite rezultatele produc\u021biei c\u0103tre ERP, men\u021bin\u00e2nd eviden\u021bele \u00eentreprinderii \u00een concordan\u021b\u0103 cu activitatea din sec\u021bia de produc\u021bie. ERP gestioneaz\u0103 procesele la nivelul \u00eentreprinderii, iar MES furnizeaz\u0103 detalii despre execu\u021bie. Sunt sisteme complementare, conectate prin integrare.<\/p>\n\n<\/div><\/div>\n\n<div class=\"gb-container gb-container-87005d77\"><div class=\"gb-inside-container\">\n\n<h2 class=\"wp-block-heading\" id=\"h-future-applications-of-manufacturing-execution-system\">Aplica\u021bii viitoare ale Manufacturing Execution System<\/h2>\n\n\n\n<p class=\"has-text-align-left\">\u00cen viitor, aplica\u021biile MES ar putea combina \u00eenregistr\u0103rile din produc\u021bie cu analiza datelor \u0219i inteligen\u021ba artificial\u0103 pentru a ajuta echipele s\u0103 identifice tipare \u0219i s\u0103 r\u0103spund\u0103 la schimb\u0103ri. Instrumentele de prognoz\u0103 trebuie evaluate \u00een raport cu datele reale de produc\u021bie \u0219i cu deciziile pe care sunt menite s\u0103 le sprijine.<\/p>\n\n\n\n<p>Programarea produc\u021biei cu ajutorul inteligen\u021bei artificiale are deja un rol practic al\u0103turi de MES. \u00cen SkyPlanner APS, planificatorii stabilesc priorit\u0103\u021bile \u0219i constr\u00e2ngerile, iar Arcturus calculeaz\u0103 programul de produc\u021bie folosind datele din produc\u021bie, capacitatea \u0219i materialele. Planificatorii p\u0103streaz\u0103 controlul prin aceste reguli \u0219i bloc\u0103ri. Este vorba despre automatizarea program\u0103rii produc\u021biei, nu despre gestionarea autonom\u0103 a \u00eentregii \u00eentreprinderi.<\/p>\n\n<\/div><\/div>\n\n<div class=\"gb-container gb-container-c6c85bb5\"><div class=\"gb-inside-container\">\n\n<h2 class=\"wp-block-heading\" id=\"h-take-your-company-s-process-management-to-the-next-level\">Duce\u021bi managementul proceselor companiei dumneavoastr\u0103 la nivelul urm\u0103tor!<\/h2>\n\n\n\n<p class=\"has-text-align-left\">Integrarea unui sistem MES cu un <a href=\"\/ro\/\">sistem APS precum SkyPlanner<\/a> conecteaz\u0103 datele despre execu\u021bia produc\u021biei cu programarea acesteia. <a href=\"\/ro\/functionalitati\/\">SkyPlanner APS<\/a> se integreaz\u0103 cu orice sistem ERP sau MES prin interfa\u021ba sa deschis\u0103 REST API \u0219i folose\u0219te aceste date \u00een planificare, pe baza priorit\u0103\u021bilor stabilite de planificatorii de produc\u021bie.<\/p>\n\n\n\n<p>C\u00e2nd comenzile, capacitatea sau progresul produc\u021biei se schimb\u0103, SkyPlanner APS folose\u0219te Arcturus pentru a recalcula programul de produc\u021bie conform regulilor \u0219i priorit\u0103\u021bilor planificatorului. Dac\u0103 Autopilot este activat, schimb\u0103rile pot declan\u0219a reprogramarea automat\u0103, cu respectarea \u00een continuare a regulilor \u0219i bloc\u0103rilor. Diagrama Gantt afi\u0219eaz\u0103 opera\u021biile programate pe posturile de lucru, astfel \u00eenc\u00e2t echipa s\u0103 poat\u0103 vedea planificarea actualizat\u0103.<\/p>\n\n\n\n<p>V\u0103 intereseaz\u0103 s\u0103 folosi\u021bi \u00eempreun\u0103 avantajele <a href=\"\/ro\/resurse\/planificare-si-programare-avansata-aps\/\">MES \u0219i APS<\/a> \u00een activitatea dvs.? <a href=\"\/ro\/contact-vanzari\/\">Contacta\u021bi-ne pentru mai multe detalii!<\/a><\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" width=\"1024\" height=\"302\" src=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Solutions-header-Flat-PNG-1024x302.png\" alt=\"SkyPlanner planificare \u0219i programare avansat\u0103 Solutions to production problems\" class=\"wp-image-4232\" srcset=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Solutions-header-Flat-PNG-1024x302.png 1024w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Solutions-header-Flat-PNG-300x88.png 300w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Solutions-header-Flat-PNG-768x226.png 768w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Solutions-header-Flat-PNG-1536x452.png 1536w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Solutions-header-Flat-PNG-2048x603.png 2048w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<p><\/p>\n\n\n\n<h2 class=\"gb-headline gb-headline-907bb0ac gb-headline-text\">\u00centreb\u0103ri Frecvente<\/h2>\n\n\n\n<p>Iat\u0103 c\u00e2teva \u00eentreb\u0103ri frecvente despre Manufacturing Execution Systems (MES) pentru a v\u0103 ajuta s\u0103 aprofunda\u021bi acest aspect vital al proceselor moderne de produc\u021bie. Aceste FAQ-uri ofer\u0103 o privire cuprinz\u0103toare asupra Manufacturing Execution System, de la defini\u021bia sa de baz\u0103 p\u00e2n\u0103 la modul \u00een care se diferen\u021biaz\u0103 de alte sisteme precum ERP. Indiferent dac\u0103 v\u0103 g\u00e2ndi\u021bi la func\u021biile sale, dori\u021bi s\u0103 \u00een\u021belege\u021bi caracteristicile sistemelor MES contemporane sau dori\u021bi s\u0103 descoperi\u021bi complexitatea evolu\u021biei sale, aceast\u0103 sec\u021biune FAQ are toate r\u0103spunsurile. <\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-6030632f gb-headline-text\">Ce este un Manufacturing Execution System (MES)?<\/h4>\n\n\n\n<p>Un sistem MES este o solu\u021bie software care urm\u0103re\u0219te, documenteaz\u0103 \u0219i sprijin\u0103 execu\u021bia produc\u021biei \u00een sec\u021bie. Acesta colecteaz\u0103 date de la operatori, echipamente \u0219i sisteme conectate pentru a oferi informa\u021bii despre progresul opera\u021biilor, consumul de materiale \u0219i calitate.<\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-60855819 gb-headline-text\">Cum difer\u0103 MES de ERP?<\/h4>\n\n\n\n<p>\u00cen timp ce Enterprise Resource Planning (ERP) este conceput pentru a conduce o \u00eentreag\u0103 afacere prin integrarea \u0219i gestionarea tuturor aspectelor, MES se concentreaz\u0103 \u00een mod specific pe activit\u0103\u021bile din mediul fabricii de produc\u021bie, optimiz\u00e2nd resursele \u0219i procesele.<\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-357c70af gb-headline-text\">Care sunt func\u021biile principale ale Manufacturing Execution System?<\/h4>\n\n\n\n<p>Unele func\u021bii de baz\u0103 ale acestui instrument includ achizi\u021bia de date, controlul calit\u0103\u021bii, programarea, analiza performan\u021bei, fluxul de produse \u0219i gestionarea resurselor, printre altele.<\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-33cf3c20 gb-headline-text\">Ce func\u021bionalit\u0103\u021bi ofer\u0103 sistemele MES moderne?<\/h4>\n\n\n\n<p>Sistemele MES moderne se m\u00e2ndresc cu func\u021bionalit\u0103\u021bi precum monitorizarea produc\u021biei \u00een timp real, controlul calit\u0103\u021bii \u00een produc\u021bie, optimizarea inventarului, gestionarea fluxului de date, analiza produc\u021biei \u0219i urm\u0103rirea produc\u021biei.<\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-68c7368f gb-headline-text\">Cum a evoluat defini\u021bia MES \u00een timp?<\/h4>\n\n\n\n<p>De-a lungul timpului, modelele func\u021bionale MES au contribuit la descrierea activit\u0103\u021bilor de execu\u021bie a produc\u021biei. MESA a publicat mai multe modele pentru \u00eentreprinderile produc\u0103toare. ISA-95 abordeaz\u0103 integrarea controlului produc\u021biei cu func\u021biile \u00eentreprinderii prin modele comune, terminologie \u0219i schimburi de informa\u021bii; nu reprezint\u0103 o list\u0103 fix\u0103 de func\u021bionalit\u0103\u021bi MES obligatorii.<\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-457889a7 gb-headline-text\">Ce tipuri de solu\u021bii MES sunt disponibile?<\/h4>\n\n\n\n<p>Solu\u021biile Manufacturing Execution System pot fi bazate pe cloud, on-premises, adaptate pentru afaceri mici, bazate pe AI, concepute pentru \u00eentreprinderi mari sau specifice anumitor industrii, cum ar fi cea farmaceutic\u0103.<\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-834d5e64 gb-headline-text\">Cum poate beneficia o afacere de integrarea MES cu alte sisteme?<\/h4>\n\n\n\n<p>MES furnizeaz\u0103 date despre execu\u021bia produc\u021biei, iar APS calculeaz\u0103 programul de produc\u021bie. SkyPlanner APS se conecteaz\u0103 cu orice sistem ERP sau MES prin interfa\u021ba sa deschis\u0103 REST API. Arcturus programeaz\u0103 opera\u021biile folosind datele din produc\u021bie \u0219i priorit\u0103\u021bile stabilite de planificatori, iar diagrama Gantt afi\u0219eaz\u0103 planificarea rezultat\u0103.<\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-4e467a7a gb-headline-text\">Cum se va adapta MES \u00een viitor?<\/h4>\n\n\n\n<p>MES ar putea conecta tot mai mult \u00eenregistr\u0103rile din produc\u021bie cu analiza datelor \u0219i cu instrumente asistate de inteligen\u021b\u0103 artificial\u0103. O aplica\u021bie practic\u0103 deja utilizat\u0103 este programarea produc\u021biei cu APS al\u0103turi de MES: planificatorii stabilesc priorit\u0103\u021bile, iar un motor de programare recalculeaz\u0103 planificarea pe m\u0103sur\u0103 ce apar schimb\u0103ri \u00een produc\u021bie. Automatizarea program\u0103rii r\u0103m\u00e2ne supus\u0103 regulilor \u0219i constr\u00e2ngerilor stabilite de planificator.<\/p>\n\n<\/div><\/div>\n\n<div class=\"gb-container gb-container-fb4bc7a3 sticky\"><div class=\"gb-inside-container\">\n<div class=\"gb-container gb-container-f791a09c\"><div class=\"gb-inside-container\">\n<div class=\"gb-grid-wrapper gb-grid-wrapper-ff11cdab\">\n<div class=\"gb-grid-column gb-grid-column-525e141f\"><div class=\"gb-container gb-container-525e141f\"><div class=\"gb-inside-container\">\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" width=\"1024\" height=\"588\" src=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Tilted-PNG-1024x588.png\" alt=\"SkyPlanner APS \u2013 Vizualizarea planific\u0103rii \u0219i program\u0103rii produc\u021biei\" class=\"wp-image-4273\" srcset=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Tilted-PNG-1024x588.png 1024w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Tilted-PNG-300x172.png 300w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Tilted-PNG-768x441.png 768w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Tilted-PNG-1536x882.png 1536w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Tilted-PNG-2048x1175.png 2048w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n<\/div><\/div><\/div>\n\n<div class=\"gb-grid-column gb-grid-column-279cad58\"><div class=\"gb-container gb-container-279cad58\"><div class=\"gb-inside-container\">\n\n<h4 class=\"wp-block-heading mobile-text-center\" id=\"h-skyrocket-your-production-with-skyplanner-aps\" style=\"font-size:24px\">Propulsa\u021bi-v\u0103 produc\u021bia cu SkyPlanner APS<\/h4>\n\n\n\n<p class=\"mobile-text-center\">Rezerva\u021bi un demo cu echipa noastr\u0103 tehnic\u0103 pentru a vedea cum func\u021bioneaz\u0103 SkyPlanner APS \u00een via\u021ba real\u0103.<\/p>\n\n\n<div class=\"gb-button-wrapper gb-button-wrapper-4efb82ec\">\n\n<a class=\"gb-button gb-button-89b98570 gb-button-text\" href=\"\/ro\/contact-vanzari\/\" aria-label=\"Programeaz\u0103 o demonstra\u021bie\">Programeaz\u0103 o demonstra\u021bie<\/a>\n\n<\/div>\n<\/div><\/div><\/div>\n<\/div>\n<\/div><\/div>\n<\/div><\/div>\n\n\n<hr class=\"wp-block-separator has-text-color has-base-color has-css-opacity has-base-background-color has-background\"\/>\n\n<\/div><\/div><\/div>\n<\/div>\n<\/div><\/div>\n<\/div><\/div>","protected":false},"excerpt":{"rendered":"","protected":false},"author":2,"featured_media":39808,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[514,2739],"tags":[],"class_list":["post-39807","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-resurse","category-sisteme-mes","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Sistemul MES \u2013 Ce este \u0219i ce face | SkyPlanner APS<\/title>\n<meta name=\"description\" content=\"MES (Manufacturing Execution System) este un sistem integrat de senzori \u0219i software care urm\u0103re\u0219te, documenteaz\u0103 \u0219i controleaz\u0103 produc\u021bia.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/ro\/resurse\/sistem-mes-ce-este-si-ce-face\/\" \/>\n<meta property=\"og:locale\" content=\"ro_RO\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Sistemul MES \u2013 Ce este \u0219i ce face\" \/>\n<meta property=\"og:description\" content=\"MES (Manufacturing Execution System) este un sistem integrat de senzori \u0219i software care urm\u0103re\u0219te, documenteaz\u0103 \u0219i controleaz\u0103 produc\u021bia.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/ro\/resurse\/sistem-mes-ce-este-si-ce-face\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2022-09-01T11:45:00+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-10T14:05:53+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/09\/MES-What-it-is-and-what-it-does-header-image.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1920\" \/>\n\t<meta property=\"og:image:height\" content=\"1280\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Jesse Sinisalo\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Scris de\" \/>\n\t<meta name=\"twitter:data1\" content=\"Jesse Sinisalo\" \/>\n\t<meta name=\"twitter:label2\" content=\"Timp estimat pentru citire\" \/>\n\t<meta name=\"twitter:data2\" content=\"16 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/resurse\\\/sistem-mes-ce-este-si-ce-face\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/resurse\\\/sistem-mes-ce-este-si-ce-face\\\/\"},\"author\":{\"name\":\"Jesse Sinisalo\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/#\\\/schema\\\/person\\\/eb1bfd6abe95a50b4a9ba1a081cce2dd\"},\"headline\":\"Sistemul MES \u2013 Ce este \u0219i ce face\",\"datePublished\":\"2022-09-01T11:45:00+00:00\",\"dateModified\":\"2026-10-10T14:05:53+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/resurse\\\/sistem-mes-ce-este-si-ce-face\\\/\"},\"wordCount\":3253,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/resurse\\\/sistem-mes-ce-este-si-ce-face\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/09\\\/MES-What-it-is-and-what-it-does-header-image.jpg\",\"articleSection\":[\"Resurse\",\"Sisteme MES\"],\"inLanguage\":\"ro-RO\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/resurse\\\/sistem-mes-ce-este-si-ce-face\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/resurse\\\/sistem-mes-ce-este-si-ce-face\\\/\",\"name\":\"Sistemul MES \u2013 Ce este \u0219i ce face | SkyPlanner APS\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/resurse\\\/sistem-mes-ce-este-si-ce-face\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/resurse\\\/sistem-mes-ce-este-si-ce-face\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/09\\\/MES-What-it-is-and-what-it-does-header-image.jpg\",\"datePublished\":\"2022-09-01T11:45:00+00:00\",\"dateModified\":\"2026-10-10T14:05:53+00:00\",\"description\":\"MES (Manufacturing Execution System) este un sistem integrat de senzori \u0219i software care urm\u0103re\u0219te, documenteaz\u0103 \u0219i controleaz\u0103 produc\u021bia.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/resurse\\\/sistem-mes-ce-este-si-ce-face\\\/#breadcrumb\"},\"inLanguage\":\"ro-RO\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/resurse\\\/sistem-mes-ce-este-si-ce-face\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"ro-RO\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/resurse\\\/sistem-mes-ce-este-si-ce-face\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/09\\\/MES-What-it-is-and-what-it-does-header-image.jpg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/09\\\/MES-What-it-is-and-what-it-does-header-image.jpg\",\"width\":1920,\"height\":1280},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/resurse\\\/sistem-mes-ce-este-si-ce-face\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Articole\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/resurse\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Sistemul MES \u2013 Ce este \u0219i ce face\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"ro-RO\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"ro-RO\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/#\\\/schema\\\/person\\\/eb1bfd6abe95a50b4a9ba1a081cce2dd\",\"name\":\"Jesse Sinisalo\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"ro-RO\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/f7fad7e89e1bc7e7f7a68406782bb2f01302bf59af6e67593343971c8f70786a?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/f7fad7e89e1bc7e7f7a68406782bb2f01302bf59af6e67593343971c8f70786a?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/f7fad7e89e1bc7e7f7a68406782bb2f01302bf59af6e67593343971c8f70786a?s=96&d=mm&r=g\",\"caption\":\"Jesse Sinisalo\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Sistemul MES \u2013 Ce este \u0219i ce face | SkyPlanner APS","description":"MES (Manufacturing Execution System) este un sistem integrat de senzori \u0219i software care urm\u0103re\u0219te, documenteaz\u0103 \u0219i controleaz\u0103 produc\u021bia.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/ro\/resurse\/sistem-mes-ce-este-si-ce-face\/","og_locale":"ro_RO","og_type":"article","og_title":"Sistemul MES \u2013 Ce este \u0219i ce face","og_description":"MES (Manufacturing Execution System) este un sistem integrat de senzori \u0219i software care urm\u0103re\u0219te, documenteaz\u0103 \u0219i controleaz\u0103 produc\u021bia.","og_url":"https:\/\/skyplanner.ai\/ro\/resurse\/sistem-mes-ce-este-si-ce-face\/","og_site_name":"SkyPlanner","article_published_time":"2022-09-01T11:45:00+00:00","article_modified_time":"2026-10-10T14:05:53+00:00","og_image":[{"width":1920,"height":1280,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/09\/MES-What-it-is-and-what-it-does-header-image.jpg","type":"image\/jpeg"}],"author":"Jesse Sinisalo","twitter_card":"summary_large_image","twitter_misc":{"Scris de":"Jesse Sinisalo","Timp estimat pentru citire":"16 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/ro\/resurse\/sistem-mes-ce-este-si-ce-face\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/ro\/resurse\/sistem-mes-ce-este-si-ce-face\/"},"author":{"name":"Jesse Sinisalo","@id":"https:\/\/skyplanner.ai\/ro\/#\/schema\/person\/eb1bfd6abe95a50b4a9ba1a081cce2dd"},"headline":"Sistemul MES \u2013 Ce este \u0219i ce face","datePublished":"2022-09-01T11:45:00+00:00","dateModified":"2026-10-10T14:05:53+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/ro\/resurse\/sistem-mes-ce-este-si-ce-face\/"},"wordCount":3253,"publisher":{"@id":"https:\/\/skyplanner.ai\/ro\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/ro\/resurse\/sistem-mes-ce-este-si-ce-face\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/09\/MES-What-it-is-and-what-it-does-header-image.jpg","articleSection":["Resurse","Sisteme MES"],"inLanguage":"ro-RO"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/ro\/resurse\/sistem-mes-ce-este-si-ce-face\/","url":"https:\/\/skyplanner.ai\/ro\/resurse\/sistem-mes-ce-este-si-ce-face\/","name":"Sistemul MES \u2013 Ce este \u0219i ce face | SkyPlanner APS","isPartOf":{"@id":"https:\/\/skyplanner.ai\/ro\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/ro\/resurse\/sistem-mes-ce-este-si-ce-face\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/ro\/resurse\/sistem-mes-ce-este-si-ce-face\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/09\/MES-What-it-is-and-what-it-does-header-image.jpg","datePublished":"2022-09-01T11:45:00+00:00","dateModified":"2026-10-10T14:05:53+00:00","description":"MES (Manufacturing Execution System) este un sistem integrat de senzori \u0219i software care urm\u0103re\u0219te, documenteaz\u0103 \u0219i controleaz\u0103 produc\u021bia.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/ro\/resurse\/sistem-mes-ce-este-si-ce-face\/#breadcrumb"},"inLanguage":"ro-RO","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/ro\/resurse\/sistem-mes-ce-este-si-ce-face\/"]}]},{"@type":"ImageObject","inLanguage":"ro-RO","@id":"https:\/\/skyplanner.ai\/ro\/resurse\/sistem-mes-ce-este-si-ce-face\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/09\/MES-What-it-is-and-what-it-does-header-image.jpg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/09\/MES-What-it-is-and-what-it-does-header-image.jpg","width":1920,"height":1280},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/ro\/resurse\/sistem-mes-ce-este-si-ce-face\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/ro\/"},{"@type":"ListItem","position":2,"name":"Articole","item":"https:\/\/skyplanner.ai\/ro\/resurse\/"},{"@type":"ListItem","position":3,"name":"Sistemul MES \u2013 Ce este \u0219i ce face"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/ro\/#website","url":"https:\/\/skyplanner.ai\/ro\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/ro\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/ro\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"ro-RO"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/ro\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/ro\/","logo":{"@type":"ImageObject","inLanguage":"ro-RO","@id":"https:\/\/skyplanner.ai\/ro\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/ro\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]},{"@type":"Person","@id":"https:\/\/skyplanner.ai\/ro\/#\/schema\/person\/eb1bfd6abe95a50b4a9ba1a081cce2dd","name":"Jesse Sinisalo","image":{"@type":"ImageObject","inLanguage":"ro-RO","@id":"https:\/\/secure.gravatar.com\/avatar\/f7fad7e89e1bc7e7f7a68406782bb2f01302bf59af6e67593343971c8f70786a?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/f7fad7e89e1bc7e7f7a68406782bb2f01302bf59af6e67593343971c8f70786a?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/f7fad7e89e1bc7e7f7a68406782bb2f01302bf59af6e67593343971c8f70786a?s=96&d=mm&r=g","caption":"Jesse Sinisalo"}}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/09\/MES-What-it-is-and-what-it-does-header-image.jpg",1920,1280,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/09\/MES-What-it-is-and-what-it-does-header-image-150x150.jpg",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/09\/MES-What-it-is-and-what-it-does-header-image-300x200.jpg",300,200,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/09\/MES-What-it-is-and-what-it-does-header-image-768x512.jpg",768,512,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/09\/MES-What-it-is-and-what-it-does-header-image-1024x683.jpg",1024,683,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/09\/MES-What-it-is-and-what-it-does-header-image-1536x1024.jpg",1536,1024,true],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/09\/MES-What-it-is-and-what-it-does-header-image.jpg",1920,1280,false],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/09\/MES-What-it-is-and-what-it-does-header-image.jpg",360,240,false]},"uagb_author_info":{"display_name":"Jesse Sinisalo","author_link":"https:\/\/skyplanner.ai\/ro\/author\/jesse\/"},"uagb_comment_info":0,"uagb_excerpt":null,"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/posts\/39807","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/comments?post=39807"}],"version-history":[{"count":3,"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/posts\/39807\/revisions"}],"predecessor-version":[{"id":95369,"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/posts\/39807\/revisions\/95369"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/media\/39808"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/media?parent=39807"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/categories?post=39807"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/tags?post=39807"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}