{"id":113091,"date":"2026-10-30T01:32:22","date_gmt":"2026-10-30T01:32:22","guid":{"rendered":"https:\/\/skyplanner.ai\/?p=113091"},"modified":"2026-10-30T01:34:50","modified_gmt":"2026-10-30T01:34:50","slug":"control-la-receptie","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/ro\/resurse\/control-la-receptie\/","title":{"rendered":"Control la recep\u021bie: de la sosire la aprobarea pentru produc\u021bie"},"content":{"rendered":"<div class=\"gb-container gb-container-article01 article-main-content-container\">\n\n<h1 class=\"wp-block-heading\">Control la recep\u021bie: de la sosire la aprobarea pentru produc\u021bie<\/h1>\n\n<div class=\"gb-container gb-container-article02\">\n\n<p><a href=\"\/ro\/\">Acas\u0103<\/a> &raquo; <a href=\"https:\/\/skyplanner.ai\/ro\/resurse\/\">Resurse<\/a> &raquo; Control la recep\u021bie: de la sosire la aprobarea pentru produc\u021bie<\/p>\n\n\n<p class=\"yoast-reading-time__wrapper\"><span class=\"yoast-reading-time__icon\"><svg aria-hidden=\"true\" focusable=\"false\" data-icon=\"clock\" width=\"20\" height=\"20\" fill=\"none\" stroke=\"currentColor\" style=\"display:inline-block;vertical-align:-0.1em\" role=\"img\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewBox=\"0 0 24 24\"><path stroke-linecap=\"round\" stroke-linejoin=\"round\" stroke-width=\"2\" d=\"M12 8v4l3 3m6-3a9 9 0 11-18 0 9 9 0 0118 0z\"><\/path><\/svg><\/span><span class=\"yoast-reading-time__spacer\" style=\"display:inline-block;width:1em\"><\/span><span class=\"yoast-reading-time__descriptive-text\">Timp estimat de citire: <\/span><span class=\"yoast-reading-time__reading-time\">10<\/span><span class=\"yoast-reading-time__time-unit\"> minute<\/span><\/p>\n\n<\/div>\n<div class=\"gb-container gb-container-article03\">\n\n<p><strong>Controlul la recep\u021bie<\/strong> const\u0103 \u00een verificarea materialelor, pieselor sau componentelor achizi\u021bionate \u00een raport cu cerin\u021bele specificate, \u00eenainte de aprobarea lor pentru utilizare. Numit \u0219i inspec\u021bie la recep\u021bie, acesta face leg\u0103tura \u00eentre ceea ce a livrat furnizorul \u0219i ceea ce fabrica poate introduce \u00een siguran\u021b\u0103 \u00een produc\u021bie.<\/p>\n\n\n<p>Aceast\u0103 distinc\u021bie conteaz\u0103 \u00eentr-o zon\u0103 de recep\u021bie aglomerat\u0103. Materialele dintr-o livrare pot fi deja sosite, num\u0103rate \u0219i \u00eenregistrate \u00een stoc, dar s\u0103 a\u0219tepte \u00eenc\u0103 o verificare dimensional\u0103 sau un certificat obligatoriu. Dac\u0103 produc\u021bia le consider\u0103 disponibile, succesiunea urm\u0103toarelor opera\u021bii la utilaj poate fi deja stabilit\u0103 pe baza unei presupuneri gre\u0219ite.<\/p>\n\n\n<p>Un proces eficient de control la recep\u021bie se \u00eencheie, a\u0219adar, cu o decizie clar\u0103: ce materiale sunt aprobate pentru utilizare, ce cantitate poate fi folosit\u0103 \u0219i ce r\u0103m\u00e2ne blocat. Include\u021bi aceast\u0103 decizie \u00een planificarea produc\u021biei \u0219i ve\u021bi putea reac\u021biona la un deficit \u00eenainte ca acesta s\u0103 duc\u0103 la un schimb f\u0103r\u0103 activitate sau la o livrare \u00eent\u00e2rziat\u0103. SkyPlanner APS v\u0103 ajut\u0103 s\u0103 transforma\u021bi situa\u021bia actualizat\u0103 a materialelor \u00eentr-un program realizabil, \u021bin\u00e2nd cont de comenzile \u0219i resursele care au nevoie de acelea\u0219i materiale.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Ce trebuie verificat la controlul la recep\u021bie?<\/h2>\n\n\n<p>Porni\u021bi de la cerin\u021bele articolului, nu de la o list\u0103 generic\u0103 de verific\u0103ri aplicat\u0103 tuturor \u00een acela\u0219i mod. O pies\u0103 prelucrat\u0103 achizi\u021bionat\u0103, o component\u0103 electronic\u0103 \u0219i o materie prim\u0103 sensibil\u0103 la temperatur\u0103 necesit\u0103 dovezi diferite de conformitate.<\/p>\n\n\n<p>Pentru fiecare recep\u021bie, stabili\u021bi verific\u0103rile relevante:<\/p>\n\n\n<ul class=\"wp-block-list\"><li><strong>Identificare:<\/strong> furnizorul, codul piesei, revizia \u0219i marca materialului trebuie s\u0103 corespund\u0103 cerin\u021belor, cu identificarea lotului, a \u0219arjei sau a num\u0103rului de serie, acolo unde este necesar.<\/li><li><strong>Cantitate:<\/strong> cantitatea livrat\u0103 \u0219i unit\u0103\u021bile de m\u0103sur\u0103, comparate cu comanda de achizi\u021bie \u0219i documentele de livrare.<\/li><li><strong>Stare:<\/strong> deterior\u0103ri, contaminare, integritatea ambalajului \u0219i orice condi\u021bii de transport sau depozitare specificate.<\/li><li><strong>Documente:<\/strong> certificatele, rapoartele de \u00eencercare sau alte dovezi necesare, care trebuie s\u0103 corespund\u0103 materialelor efectiv primite.<\/li><li><strong>Caracteristicile produsului:<\/strong> dimensiunile, aspectul, compozi\u021bia, func\u021bionarea sau alte propriet\u0103\u021bi specificate \u00een planul de control.<\/li><\/ul>\n\n\n<p>Un certificat este util doar dac\u0103 se refer\u0103 la materialul corect \u0219i furnizeaz\u0103 dovezile cerute de cerin\u021bele aplicabile. Un cod de pies\u0103 corect nu compenseaz\u0103 o revizie gre\u0219it\u0103, iar o cutie intact\u0103 nu demonstreaz\u0103 c\u0103 o dimensiune critic\u0103 se \u00eencadreaz\u0103 \u00een toleran\u021b\u0103.<\/p>\n\n\n<p>Nu confunda\u021bi acest control cu <a href=\"https:\/\/skyplanner.ai\/ro\/resurse\/inspectia-primului-articol\/\">inspec\u021bia primului articol<\/a>. Controlul la recep\u021bie vizeaz\u0103 un lot livrat \u0219i primit. Inspec\u021bia primului articol verific\u0103 un exemplar ini\u021bial de produc\u021bie \u00een raport cu cerin\u021bele aplicabile \u0219i furnizeaz\u0103 dovezile aferente. Aprobarea primului articol nu \u00eenseamn\u0103, \u00een sine, acceptarea tuturor livr\u0103rilor ulterioare.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Un proces practic de control la recep\u021bie<\/h2>\n\n\n<p>Fluxul de mai jos le ofer\u0103 echipelor de recep\u021bie, calitate, achizi\u021bii \u0219i produc\u021bie un parcurs comun, de la sosirea materialelor p\u00e2n\u0103 la utilizarea lor. Atribui\u021bi responsabilit\u0103\u021bile unor roluri clar definite \u00een propria organiza\u021bie; \u00eentr-o fabric\u0103 mic\u0103, aceea\u0219i persoan\u0103 poate \u00eendeplini mai multe roluri.<\/p>\n\n\n<h3 class=\"wp-block-heading\">1. Preg\u0103ti\u021bi cerin\u021bele \u00eenainte de sosirea livr\u0103rii<\/h3>\n\n\n<p>Pune\u021bi la dispozi\u021bia celor care efectueaz\u0103 verific\u0103rile desenul sau specifica\u021bia \u00een vigoare, cerin\u021bele de achizi\u021bie \u0219i instruc\u021biunile de control. Stabili\u021bi ce trebuie verificat, criteriile de acceptare, metoda de e\u0219antionare, unde este cazul, \u0219i cine poate aproba utilizarea materialelor.<\/p>\n\n\n<p>Stabili\u021bi \u0219i ce documente doveditoare trebuie s\u0103 \u00eenso\u021beasc\u0103 livrarea. Solicitarea unui certificat de material lips\u0103 dup\u0103 ce utilajul a fost rezervat provoac\u0103 o \u00eent\u00e2rziere care putea fi evitat\u0103. Echipa de achizi\u021bii poate comunica explicit aceast\u0103 cerin\u021b\u0103 furnizorului \u00eenainte de expediere.<\/p>\n\n\n<p>Adapta\u021bi amploarea controlului la consecin\u021bele unei neconformit\u0103\u021bi, la cerin\u021bele aplicabile \u0219i la performan\u021ba furnizorului. Nu reduce\u021bi o verificare obligatorie doar pentru c\u0103 livrarea este urgent\u0103. Dac\u0103 sunt necesare \u00eencerc\u0103ri externe, include\u021bi durata acestora \u00een estimarea disponibilit\u0103\u021bii, \u00een loc s\u0103 presupune\u021bi c\u0103 materialele pot intra \u00een produc\u021bie chiar \u00een ziua recep\u021biei.<\/p>\n\n\n<h3 class=\"wp-block-heading\">2. Recep\u021biona\u021bi, identifica\u021bi \u0219i \u021bine\u021bi materialele sub control<\/h3>\n\n\n<p>\u00cenregistra\u021bi recep\u021bia \u0219i verifica\u021bi identitatea materialelor, cantitatea \u0219i eventualele deterior\u0103ri vizibile cauzate de transport. P\u0103stra\u021bi leg\u0103tura dintre materialele fizice, lotul furnizorului \u0219i documentele aferente. Nu amesteca\u021bi materialele dintr-o livrare neverificat\u0103 cu stocul aprobat pentru utilizare astfel \u00eenc\u00e2t s\u0103 nu mai poat\u0103 fi deosebite.<\/p>\n\n\n<p>Folosi\u021bi o zon\u0103 de carantin\u0103 desemnat\u0103, marcaje clare ale statutului \u0219i controale adecvate \u00een sistem, pentru ca materialele \u00een a\u0219teptarea unei decizii s\u0103 nu fie prelevate ca stoc aprobat pentru utilizare. \u0218i articolele voluminoase, care nu \u00eencap \u00een zona de carantin\u0103, trebuie s\u0103 aib\u0103 un statut neechivoc.<\/p>\n\n\n<p>Recep\u021bia confirm\u0103 ce a sosit. Aprobarea din partea calit\u0103\u021bii confirm\u0103 ce poate fi utilizat. Cele dou\u0103 evenimente pot avea loc la scurt timp unul de cel\u0103lalt, dar nu trebuie confundate doar pentru c\u0103 ambele modific\u0103 o \u00eenregistrare de stoc.<\/p>\n\n\n<h3 class=\"wp-block-heading\">3. Efectua\u021bi controlul \u0219i \u00eenregistra\u021bi rezultatul<\/h3>\n\n\n<p>Efectua\u021bi verific\u0103rile specificate cu echipamente adecvate \u0219i conform instruc\u021biunilor \u00een vigoare. C\u00e2nd sunt necesare m\u0103sur\u0103tori, folosi\u021bi echipamente de m\u0103surare a c\u0103ror adecvare \u0219i stare de etalonare respect\u0103 cerin\u021bele procesului de calitate.<\/p>\n\n\n<p>\u00cenregistra\u021bi suficiente dovezi pentru a putea justifica ulterior decizia: ce a fost verificat, ce cerin\u021b\u0103 s-a aplicat, rezultatul, identificarea materialului, cine a efectuat controlul \u0219i c\u00e2nd. La o verificare dimensional\u0103, o valoare m\u0103surat\u0103, asociat\u0103 toleran\u021bei sale, este mai util\u0103 dec\u00e2t o simpl\u0103 bif\u0103 f\u0103r\u0103 explica\u021bii.<\/p>\n\n\n<p>Dac\u0103 lipsesc dovezile necesare, consemna\u021bi explicit acest lucru. Un raport lips\u0103 \u0219i o neconformitate constatat\u0103 prin m\u0103surare sunt probleme diferite, chiar dac\u0103 ambele \u00eempiedic\u0103 momentan aprobarea pentru utilizare. Aceast\u0103 distinc\u021bie ajut\u0103 echipa de achizi\u021bii s\u0103 ob\u021bin\u0103 r\u0103spunsul potrivit de la furnizor.<\/p>\n\n\n<h3 class=\"wp-block-heading\">4. Decide\u021bi ce se \u00eent\u00e2mpl\u0103 cu lotul<\/h3>\n\n\n<p>Persoana autorizat\u0103 decide dac\u0103 materialele \u00eendeplinesc cerin\u021bele pentru utilizare. Materialele acceptate primesc un statut clar de aprobare pentru utilizare. Cele pentru care se a\u0219teapt\u0103 dovezi suplimentare r\u0103m\u00e2n blocate, cu un responsabil desemnat \u0219i o ac\u021biune urm\u0103toare stabilit\u0103.<\/p>\n\n\n<p>\u00cen cazul unei neconformit\u0103\u021bi, identifica\u021bi materialele afectate, \u00eenregistra\u021bi abaterea \u0219i preveni\u021bi utilizarea accidental\u0103. \u00cen func\u021bie de decizia de tratare aprobat\u0103, urm\u0103torul pas poate fi returnarea la furnizor, \u00eenlocuirea, sortarea, reprelucrarea sau respingerea. Orice utilizare prin derogare necesit\u0103 aprobarea prev\u0103zut\u0103 de procedura aplicabil\u0103; un termen de produc\u021bie nu \u021bine loc de aprobare.<\/p>\n\n\n<p>Consemna\u021bi cu precizie aprob\u0103rile par\u021biale pentru utilizare. Dac\u0103 o parte identificat\u0103 separat poate fi acceptat\u0103 \u00een mod justificat, \u00eenregistra\u021bi exact cantitatea \u0219i identitatea materialelor aprobate, precum \u0219i ceea ce r\u0103m\u00e2ne blocat. O not\u0103 ambigu\u0103 la nivelul livr\u0103rii nu trebuie s\u0103 devin\u0103 permisiunea de a utiliza con\u021binutul tuturor recipientelor.<\/p>\n\n\n<h3 class=\"wp-block-heading\">5. Actualiza\u021bi disponibilitatea \u0219i planul de produc\u021bie<\/h3>\n\n\n<p>Comunica\u021bi prompt cantitatea aprobat\u0103 pentru utilizare. Dac\u0103 unele materiale r\u0103m\u00e2n blocate, transmite\u021bi echipei de planificare cea mai bine fundamentat\u0103 estimare a disponibilit\u0103\u021bii, problema nerezolvat\u0103 \u0219i cine r\u0103spunde de urm\u0103toarea actualizare. Promisiunea furnizorului de a r\u0103spunde m\u00e2ine nu echivaleaz\u0103 cu o confirmare c\u0103 materialele vor fi aprobate m\u00e2ine.<\/p>\n\n\n<p>Actualiza\u021bi at\u00e2t datele de planificare, c\u00e2t \u0219i \u00eenregistr\u0103rile de calitate. Altfel, stocul din depozit poate figura corect ca blocat, \u00een timp ce programul de produc\u021bie continu\u0103 s\u0103 prevad\u0103 consumul materialelor respective. \u00cen practic\u0103, trebuie transmise <strong>cantitatea utilizabil\u0103 \u0219i o estimare credibil\u0103 a momentului disponibilit\u0103\u021bii<\/strong>, corelate cu comenzile care au nevoie de acele materiale.<\/p>\n\n\n<p>Analiza\u021bi apoi consecin\u021bele asupra produc\u021biei. Ce opera\u021bii pot continua? Pentru care este necesar un lot de \u00eenlocuire? Se poate folosi capacitatea disponibil\u0103 pentru alte lucr\u0103ri p\u00e2n\u0103 la rezolvarea problemei? Din acest punct, controlul nu mai este doar o sarcin\u0103 izolat\u0103 la recep\u021bie, ci contribuie la respectarea angajamentelor de livrare.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Verifica\u021bi fiecare articol sau folosi\u021bi e\u0219antionarea?<\/h2>\n\n\n<p>Nu exist\u0103 un procent unic de verificare potrivit pentru toate materialele primite. Alegerea depinde de cerin\u021be, de consecin\u021bele accept\u0103rii unui defect, de metoda de control \u0219i de situa\u021bia furnizorului. \u00cencerc\u0103rile distructive influen\u021beaz\u0103 \u0219i ele ceea ce se poate face \u00een practic\u0103.<\/p>\n\n\n<p>Controlul de acceptare prin e\u0219antionare folose\u0219te rezultatele unui e\u0219antion selectat aleatoriu pentru a lua o decizie privind un lot definit. Acesta nu demonstreaz\u0103 c\u0103 fiecare articol \u00een parte este conform. Planul trebuie s\u0103 prevad\u0103 o m\u0103rime a e\u0219antionului \u0219i reguli de decizie stabilite \u00een avans, nu s\u0103 se bazeze pe c\u00e2teva piese luate din partea de sus a unei cutii doar pentru c\u0103 sunt u\u0219or accesibile.<\/p>\n\n\n<p>Dac\u0103 rezultatul impune respingerea lotului, urma\u021bi procedura stabilit\u0103 pentru tratarea acestuia. Eliminarea pieselor defecte g\u0103site \u00een e\u0219antion nu face automat acceptabil restul lotului, care nu a fost verificat. Controalele suplimentare sau sortarea pot face parte din m\u0103surile autorizate, dar necesit\u0103 o decizie separat\u0103.<\/p>\n\n\n<p>Pentru fundamentele statistice, <a href=\"https:\/\/www.itl.nist.gov\/div898\/handbook\/pmc\/section2\/pmc21.htm\">ghidul NIST privind acceptarea loturilor prin e\u0219antionare<\/a> explic\u0103 diferen\u021ba dintre evaluarea unui lot \u0219i controlul procesului furnizorului. Folosi\u021bi schema de e\u0219antionare cerut\u0103 pentru aplica\u021bia dumneavoastr\u0103, f\u0103r\u0103 a trata un exemplu general drept standard de acceptare.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Transmiterea deciziei privind utilizarea materialelor: o scurt\u0103 list\u0103 de verificare<\/h2>\n\n\n<p>\u00cenainte de a \u00eencheia un control la recep\u021bie, asigura\u021bi-v\u0103 c\u0103 persoana care preia informa\u021biile poate r\u0103spunde la aceste \u00eentreb\u0103ri f\u0103r\u0103 \u00eenc\u0103 un apel telefonic:<\/p>\n\n\n<ul class=\"wp-block-list\"><li><strong>Despre ce material este vorba?<\/strong> Furnizorul, articolul \u0219i revizia, \u00eempreun\u0103 cu referin\u021bele aferente recep\u021biei \u0219i lotului.<\/li><li><strong>Ce s-a decis?<\/strong> Utilizare aprobat\u0103, blocare men\u021binut\u0103 sau respingere, cu dovezile rezultate din control \u0219i decizia persoanei autorizate.<\/li><li><strong>Ce cantitate poate fi utilizat\u0103?<\/strong> Cantitatea exact\u0103 aprobat\u0103 pentru utilizare \u0219i unit\u0103\u021bile de m\u0103sur\u0103, separat de cantitatea blocat\u0103 sau respins\u0103.<\/li><li><strong>Ce a r\u0103mas de rezolvat?<\/strong> Dovezi lips\u0103, teste suplimentare, un r\u0103spuns de la furnizor sau lucr\u0103ri corective aprobate, cu un responsabil desemnat \u0219i un termen pentru urm\u0103toarea actualizare.<\/li><li><strong>Ce informa\u021bii are acum produc\u021bia?<\/strong> Disponibilitatea actualizat\u0103 a materialelor utilizabile \u0219i opera\u021biile sau angajamentele afectate care trebuie reanalizate.<\/li><\/ul>\n\n\n<p>Reanaliza\u021bi periodic materialele blocate de mai mult timp. Dac\u0103 nimeni nu r\u0103spunde de rezolvarea bloc\u0103rii, materialele pot ajunge, pe nesim\u021bite, s\u0103 fie considerate disponibile \u00een planificare, mai ales c\u00e2nd se afl\u0103 deja \u00een fabric\u0103 de c\u00e2teva zile. Defectele recurente \u0219i problemele de documenta\u021bie trebuie comunicate \u0219i celor care gestioneaz\u0103 rela\u021bia cu furnizorii, pentru ca aceea\u0219i problem\u0103 s\u0103 nu fie redescoperit\u0103 la fiecare livrare.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Folosi\u021bi decizia de aprobare a materialelor pentru a crea un program realist cu SkyPlanner<\/h2>\n\n\n<p>Imagina\u021bi-v\u0103 o livrare de 1.000 de componente, \u00eemp\u0103r\u021bit\u0103 \u00een dou\u0103 subloturi identificate separat. Verific\u0103rile necesare au fost finalizate pentru un sublot de 600 de componente, a c\u0103rui utilizare este aprobat\u0103. Celelalte 400 r\u0103m\u00e2n blocate deoarece lipsesc dovezile necesare.<\/p>\n\n\n<p>Dou\u0103 comenzi de produc\u021bie au nevoie de 400, respectiv 350 de componente. Cele 600 de componente aprobate pentru utilizare nu pot acoperi ambele comenzi. Dac\u0103 prima comand\u0103 are prioritate, pentru a doua r\u0103m\u00e2n 200: insuficiente pentru \u00eentregul necesar. Considerarea \u00eentregii livr\u0103ri ca fiind utilizabil\u0103 ar ascunde deficitul; aprobarea utiliz\u0103rii celor 600 de componente nu le face implicit disponibile \u0219i pe celelalte 400.<\/p>\n\n\n<p>Chiar \u0219i dup\u0103 ce rezolva\u021bi alocarea materialelor, ambele comenzi pot avea nevoie de acela\u0219i post de asamblare \u0219i, ulterior, de capacitate de testare. Mutarea unei opera\u021bii \u00een program schimb\u0103 intervalele disponibile pentru alte lucr\u0103ri. O list\u0103 de recep\u021bii poate indica starea corect\u0103 a materialelor, f\u0103r\u0103 s\u0103 arate cum se pot \u00eencadra acum toate aceste opera\u021bii \u00een program.<\/p>\n\n\n<p><strong>SkyPlanner APS include <a href=\"https:\/\/skyplanner.ai\/ro\/resurse\/ce-este-programarea-productiei\/\">disponibilitatea materialelor \u0219i capacitatea de produc\u021bie<\/a> \u00een acela\u0219i calcul de programare.<\/strong> C\u00e2nd este activat\u0103 programarea care \u021bine cont de materiale, motorul s\u0103u de inteligen\u021b\u0103 artificial\u0103, Arcturus, folose\u0219te cantit\u0103\u021bile de materiale men\u021binute la zi, al\u0103turi de resursele de produc\u021bie, schimburi, dependen\u021bele dintre etapele procesului \u0219i priorit\u0103\u021bile dumneavoastr\u0103 de programare. Diagrama Gantt arat\u0103 succesiunea rezultat\u0103 a opera\u021biilor \u0219i datele de finalizare. Petrece\u021bi mai pu\u021bin timp corel\u00e2nd lista de materiale cu cozile de opera\u021bii ale fiec\u0103rui utilaj \u0219i mai mult timp hot\u0103r\u00e2nd cum s\u0103 proteja\u021bi livr\u0103rile importante.<\/p>\n\n\n<p>SkyPlanner se integreaz\u0103 cu orice sistem ERP sau MES prin API-ul s\u0103u REST deschis. Stocurile de materiale pot fi men\u021binute la zi prin integrare sau gestionate prin tranzac\u021bii de stoc \u00een modulul Depozit din SkyPlanner. \u00cen timpul implement\u0103rii, stabili\u021bi de comun acord cum se reflect\u0103 decizia de calitate \u00een disponibilitatea pentru utilizare din datele de planificare, inclusiv \u00een cazul aprob\u0103rilor par\u021biale \u0219i al modific\u0103rii estim\u0103rilor privind materialele blocate.<\/p>\n\n\n<p>Acest transfer de informa\u021bii este important, deoarece confirmarea sosirii nu \u00eenseamn\u0103 aprobarea din punctul de vedere al calit\u0103\u021bii. \u00cen SkyPlanner, data de livrare a unei comenzi de achizi\u021bie reprezint\u0103 data estimat\u0103 a disponibilit\u0103\u021bii, iar marcarea ei ca Livrat\u0103 actualizeaz\u0103 stocul. Asigura\u021bi-v\u0103 c\u0103 fluxul de date convenit reflect\u0103 ceea ce produc\u021bia poate utiliza efectiv; controlul \u0219i decizia de aprobare a utiliz\u0103rii \u021bin de procesul dumneavoastr\u0103 de calitate.<\/p>\n\n\n<p>Pute\u021bi lucra \u0219i prin propriul asistent de inteligen\u021b\u0103 artificial\u0103, precum Claude, ChatGPT sau Microsoft Copilot. Conexiunea MCP a SkyPlanner ofer\u0103 unui asistent autorizat acces la datele, informa\u021biile despre produs \u0219i func\u021biile SkyPlanner, astfel \u00eenc\u00e2t s\u0103 pute\u021bi explica sarcina de planificare \u00een loc s\u0103 o reconstrui\u021bi trec\u00e2nd de la un ecran la altul. De exemplu, \u00eentreba\u021bi ce comenzi depind de o component\u0103 blocat\u0103, apoi cere\u021bi asistentului s\u0103 v\u0103 ajute s\u0103 folosi\u021bi func\u021biile SkyPlanner pentru a actualiza planul, \u00een limitele drepturilor dumneavoastr\u0103 de acces. Arcturus efectueaz\u0103 calculul de programare; dumneavoastr\u0103 stabili\u021bi priorit\u0103\u021bile. Asistentul nu \u00eenlocuie\u0219te decizia autorizat\u0103 de aprobare a utiliz\u0103rii materialelor.<\/p>\n\n\n<h3 class=\"wp-block-heading\">De ce merit\u0103 trecerea la un plan comun<\/h3>\n\n\n<p>La produc\u0103torul de echipamente electrice UTU, planificarea produc\u021biei se baza c\u00e2ndva pe foi de calcul separate pentru fiecare departament. Modific\u0103rile succesiunii de produc\u021bie din ERP nu ajungeau \u00eentotdeauna \u00een sec\u021bia de produc\u021bie. SkyPlanner a reunit liniile \u0219i departamentele fabricii \u00eentr-un singur sistem de planificare, integrat cu ERP-ul; potrivit UTU, lista actualizat\u0103 a lucr\u0103rilor ajunge la montatori \u00een c\u00e2teva secunde.<\/p>\n\n\n<p><a href=\"https:\/\/skyplanner.ai\/ro\/povesti-ale-clientilor\/utu\/\">Experien\u021ba UTU cu SkyPlanner<\/a> arat\u0103 valoarea renun\u021b\u0103rii la planurile actualizate separat. Acela\u0219i principiu de planificare este util \u0219i pentru echipa care gestioneaz\u0103 materialele primite: c\u00e2nd disponibilitatea se schimb\u0103, succesiunea de produc\u021bie trebuie s\u0103 reflecte schimbarea acolo unde sunt repartizate efectiv lucr\u0103rile.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Vede\u021bi cum v\u0103 afecteaz\u0103 comenzile blocarea unui material<\/h2>\n\n\n<p>Un proces riguros de control la recep\u021bie v\u0103 ofer\u0103 o decizie pe care v\u0103 pute\u021bi baza. SkyPlanner valorific\u0103 aceast\u0103 decizie \u00een programarea produc\u021biei: ce lucr\u0103ri pot fi executate, unde se \u00eencadreaz\u0103 \u0219i ce \u00eenseamn\u0103 planul actualizat pentru livr\u0103ri.<\/p>\n\n\n<p><a href=\"https:\/\/skyplanner.ai\/ro\/contact-vanzari\/\">Programa\u021bi o demonstra\u021bie SkyPlanner<\/a> pornind de la un caz real: o component\u0103 primit\u0103, cantitatea aprobat\u0103 pentru utilizare sau estimat\u0103 ca utilizabil\u0103 \u0219i comenzile care concureaz\u0103 pentru aceasta. Folosi\u021bi acest caz pentru a explora modul \u00een care disponibilitatea materialelor \u0219i capacitatea finit\u0103 modific\u0103 \u00eempreun\u0103 planul.<\/p>\n\n\n<p>Dac\u0103 prefera\u021bi s\u0103 explora\u021bi mai \u00eent\u00e2i, <a href=\"https:\/\/skyplanner.ai\/ro\/proba\/\">\u00eencerca\u021bi SkyPlanner cu date demonstrative<\/a> sau parcurge\u021bi Getting Started cu asisten\u021b\u0103 bazat\u0103 pe inteligen\u021b\u0103 artificial\u0103 \u00een SkyPlanner Assistant. Pute\u021bi vedea cum func\u021bioneaz\u0103 programarea \u00eenainte de a defini propriul flux prin care rezultatele controlului se reflect\u0103 \u00een disponibilitatea materialelor.<\/p>\n\n<\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>Control la recep\u021bie: de la sosire la aprobarea pentru produc\u021bie Acas\u0103 &raquo; Resurse &raquo; Control la recep\u021bie: de la sosire la aprobarea pentru produc\u021bie Controlul la recep\u021bie const\u0103 \u00een verificarea materialelor, pieselor sau componentelor achizi\u021bionate \u00een raport cu cerin\u021bele specificate, \u00eenainte de aprobarea lor pentru utilizare. Numit \u0219i inspec\u021bie la recep\u021bie, acesta face leg\u0103tura \u00eentre &#8230; <a title=\"Control la recep\u021bie: de la sosire la aprobarea pentru produc\u021bie\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/ro\/resurse\/control-la-receptie\/\" aria-label=\"Read more about Control la recep\u021bie: de la sosire la aprobarea pentru produc\u021bie\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":113099,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[2537,514],"tags":[],"class_list":["post-113091","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-aps-si-programare","category-resurse","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Control la recep\u021bie: de la sosire la aprobarea pentru produc\u021bie<\/title>\n<meta name=\"description\" content=\"Recep\u021bionat nu \u00eenseamn\u0103 utilizabil. Crea\u021bi un proces de control la recep\u021bie care gestioneaz\u0103 aprobarea materialelor \u0219i ofer\u0103 produc\u021biei un program aplicabil.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/ro\/resurse\/control-la-receptie\/\" \/>\n<meta property=\"og:locale\" content=\"ro_RO\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Control la recep\u021bie: de la sosire la aprobarea pentru produc\u021bie\" \/>\n<meta property=\"og:description\" content=\"Recep\u021bionat nu \u00eenseamn\u0103 utilizabil. Crea\u021bi un proces de control la recep\u021bie care gestioneaz\u0103 aprobarea materialelor \u0219i ofer\u0103 produc\u021biei un program aplicabil.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/ro\/resurse\/control-la-receptie\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2026-10-30T01:32:22+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-30T01:34:50+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/incoming-inspection-manufacturing-hero.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1672\" \/>\n\t<meta property=\"og:image:height\" content=\"941\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Scris de\" \/>\n\t<meta name=\"twitter:data1\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n\t<meta name=\"twitter:label2\" content=\"Timp estimat pentru citire\" \/>\n\t<meta name=\"twitter:data2\" content=\"13 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/resurse\\\/control-la-receptie\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/resurse\\\/control-la-receptie\\\/\"},\"author\":{\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\"},\"headline\":\"Control la recep\u021bie: de la sosire la aprobarea pentru produc\u021bie\",\"datePublished\":\"2026-10-30T01:32:22+00:00\",\"dateModified\":\"2026-10-30T01:34:50+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/resurse\\\/control-la-receptie\\\/\"},\"wordCount\":2645,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/resurse\\\/control-la-receptie\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/incoming-inspection-manufacturing-hero.png\",\"articleSection\":[\"APS \u0219i programare\",\"Resurse\"],\"inLanguage\":\"ro-RO\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/resurse\\\/control-la-receptie\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/resurse\\\/control-la-receptie\\\/\",\"name\":\"Control la recep\u021bie: de la sosire la aprobarea pentru produc\u021bie\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/resurse\\\/control-la-receptie\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/resurse\\\/control-la-receptie\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/incoming-inspection-manufacturing-hero.png\",\"datePublished\":\"2026-10-30T01:32:22+00:00\",\"dateModified\":\"2026-10-30T01:34:50+00:00\",\"description\":\"Recep\u021bionat nu \u00eenseamn\u0103 utilizabil. Crea\u021bi un proces de control la recep\u021bie care gestioneaz\u0103 aprobarea materialelor \u0219i ofer\u0103 produc\u021biei un program aplicabil.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/resurse\\\/control-la-receptie\\\/#breadcrumb\"},\"inLanguage\":\"ro-RO\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/resurse\\\/control-la-receptie\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"ro-RO\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/resurse\\\/control-la-receptie\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/incoming-inspection-manufacturing-hero.png\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/incoming-inspection-manufacturing-hero.png\",\"width\":1672,\"height\":941,\"caption\":\"Incoming brackets under a magnifier, with separate trays, an amber divider and a path to a workstation.\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/resurse\\\/control-la-receptie\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Control la recep\u021bie: de la sosire la aprobarea pentru produc\u021bie\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"ro-RO\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"ro-RO\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\",\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"ro-RO\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"caption\":\"Jussi M\u00e4ntyl\u00e4\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Control la recep\u021bie: de la sosire la aprobarea pentru produc\u021bie","description":"Recep\u021bionat nu \u00eenseamn\u0103 utilizabil. Crea\u021bi un proces de control la recep\u021bie care gestioneaz\u0103 aprobarea materialelor \u0219i ofer\u0103 produc\u021biei un program aplicabil.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/ro\/resurse\/control-la-receptie\/","og_locale":"ro_RO","og_type":"article","og_title":"Control la recep\u021bie: de la sosire la aprobarea pentru produc\u021bie","og_description":"Recep\u021bionat nu \u00eenseamn\u0103 utilizabil. Crea\u021bi un proces de control la recep\u021bie care gestioneaz\u0103 aprobarea materialelor \u0219i ofer\u0103 produc\u021biei un program aplicabil.","og_url":"https:\/\/skyplanner.ai\/ro\/resurse\/control-la-receptie\/","og_site_name":"SkyPlanner","article_published_time":"2026-10-30T01:32:22+00:00","article_modified_time":"2026-10-30T01:34:50+00:00","og_image":[{"width":1672,"height":941,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/incoming-inspection-manufacturing-hero.png","type":"image\/png"}],"author":"Jussi M\u00e4ntyl\u00e4","twitter_card":"summary_large_image","twitter_misc":{"Scris de":"Jussi M\u00e4ntyl\u00e4","Timp estimat pentru citire":"13 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/ro\/resurse\/control-la-receptie\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/ro\/resurse\/control-la-receptie\/"},"author":{"name":"Jussi M\u00e4ntyl\u00e4","@id":"https:\/\/skyplanner.ai\/ro\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5"},"headline":"Control la recep\u021bie: de la sosire la aprobarea pentru produc\u021bie","datePublished":"2026-10-30T01:32:22+00:00","dateModified":"2026-10-30T01:34:50+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/ro\/resurse\/control-la-receptie\/"},"wordCount":2645,"publisher":{"@id":"https:\/\/skyplanner.ai\/ro\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/ro\/resurse\/control-la-receptie\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/incoming-inspection-manufacturing-hero.png","articleSection":["APS \u0219i programare","Resurse"],"inLanguage":"ro-RO"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/ro\/resurse\/control-la-receptie\/","url":"https:\/\/skyplanner.ai\/ro\/resurse\/control-la-receptie\/","name":"Control la recep\u021bie: de la sosire la aprobarea pentru produc\u021bie","isPartOf":{"@id":"https:\/\/skyplanner.ai\/ro\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/ro\/resurse\/control-la-receptie\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/ro\/resurse\/control-la-receptie\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/incoming-inspection-manufacturing-hero.png","datePublished":"2026-10-30T01:32:22+00:00","dateModified":"2026-10-30T01:34:50+00:00","description":"Recep\u021bionat nu \u00eenseamn\u0103 utilizabil. Crea\u021bi un proces de control la recep\u021bie care gestioneaz\u0103 aprobarea materialelor \u0219i ofer\u0103 produc\u021biei un program aplicabil.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/ro\/resurse\/control-la-receptie\/#breadcrumb"},"inLanguage":"ro-RO","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/ro\/resurse\/control-la-receptie\/"]}]},{"@type":"ImageObject","inLanguage":"ro-RO","@id":"https:\/\/skyplanner.ai\/ro\/resurse\/control-la-receptie\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/incoming-inspection-manufacturing-hero.png","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/incoming-inspection-manufacturing-hero.png","width":1672,"height":941,"caption":"Incoming brackets under a magnifier, with separate trays, an amber divider and a path to a workstation."},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/ro\/resurse\/control-la-receptie\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/ro\/"},{"@type":"ListItem","position":2,"name":"Control la recep\u021bie: de la sosire la aprobarea pentru produc\u021bie"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/ro\/#website","url":"https:\/\/skyplanner.ai\/ro\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/ro\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/ro\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"ro-RO"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/ro\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/ro\/","logo":{"@type":"ImageObject","inLanguage":"ro-RO","@id":"https:\/\/skyplanner.ai\/ro\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/ro\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]},{"@type":"Person","@id":"https:\/\/skyplanner.ai\/ro\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5","name":"Jussi M\u00e4ntyl\u00e4","image":{"@type":"ImageObject","inLanguage":"ro-RO","@id":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","caption":"Jussi M\u00e4ntyl\u00e4"}}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/incoming-inspection-manufacturing-hero.png",1672,941,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/incoming-inspection-manufacturing-hero-150x150.png",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/incoming-inspection-manufacturing-hero-300x169.png",300,169,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/incoming-inspection-manufacturing-hero-768x432.png",768,432,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/incoming-inspection-manufacturing-hero-1024x576.png",1024,576,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/incoming-inspection-manufacturing-hero-1536x864.png",1536,864,true],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/incoming-inspection-manufacturing-hero.png",1672,941,false],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/incoming-inspection-manufacturing-hero-360x203.png",360,203,true]},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/ro\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Control la recep\u021bie: de la sosire la aprobarea pentru produc\u021bie Acas\u0103 &raquo; Resurse &raquo; Control la recep\u021bie: de la sosire la aprobarea pentru produc\u021bie Controlul la recep\u021bie const\u0103 \u00een verificarea materialelor, pieselor sau componentelor achizi\u021bionate \u00een raport cu cerin\u021bele specificate, \u00eenainte de aprobarea lor pentru utilizare. Numit \u0219i inspec\u021bie la recep\u021bie, acesta face leg\u0103tura \u00eentre&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/posts\/113091","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/comments?post=113091"}],"version-history":[{"count":1,"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/posts\/113091\/revisions"}],"predecessor-version":[{"id":113154,"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/posts\/113091\/revisions\/113154"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/media\/113099"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/media?parent=113091"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/categories?post=113091"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/tags?post=113091"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}