{"id":111621,"date":"2026-10-28T00:43:16","date_gmt":"2026-10-28T00:43:16","guid":{"rendered":"https:\/\/skyplanner.ai\/?p=111621"},"modified":"2026-10-28T00:45:33","modified_gmt":"2026-10-28T00:45:33","slug":"metoda-mtm","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/ro\/resurse\/metoda-mtm\/","title":{"rendered":"Metoda MTM: planifica\u021bi munca \u00eenainte de produc\u021bie"},"content":{"rendered":"<div class=\"gb-container gb-container-article01 article-main-content-container\">\n\n<h1 class=\"wp-block-heading\">Metoda MTM: planifica\u021bi munca \u00eenainte de produc\u021bie<\/h1>\n\n<div class=\"gb-container gb-container-article02\">\n\n<p><a href=\"\/ro\/\">Acas\u0103<\/a> &raquo; <a href=\"https:\/\/skyplanner.ai\/ro\/resurse\/\">Resurse<\/a> &raquo; Metoda MTM: planifica\u021bi munca \u00eenainte de produc\u021bie<\/p>\n\n\n<p class=\"yoast-reading-time__wrapper\"><span class=\"yoast-reading-time__icon\"><svg aria-hidden=\"true\" focusable=\"false\" data-icon=\"clock\" width=\"20\" height=\"20\" fill=\"none\" stroke=\"currentColor\" style=\"display:inline-block;vertical-align:-0.1em\" role=\"img\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewBox=\"0 0 24 24\"><path stroke-linecap=\"round\" stroke-linejoin=\"round\" stroke-width=\"2\" d=\"M12 8v4l3 3m6-3a9 9 0 11-18 0 9 9 0 0118 0z\"><\/path><\/svg><\/span><span class=\"yoast-reading-time__spacer\" style=\"display:inline-block;width:1em\"><\/span><span class=\"yoast-reading-time__descriptive-text\">Timp estimat de citire: <\/span><span class=\"yoast-reading-time__reading-time\">10<\/span><span class=\"yoast-reading-time__time-unit\"> minute<\/span><\/p>\n\n<\/div>\n<div class=\"gb-container gb-container-article03\">\n\n<p>Un nou ansamblu este preg\u0103tit pentru etapa de planificare a produc\u021biei, dar nu a fost realizat de suficiente ori pentru a putea stabili un timp mediu de \u00eencredere. Totu\u0219i, trebuie s\u0103 compara\u021bi variantele de amenajare a centrelor de lucru, s\u0103 estima\u021bi volumul de munc\u0103 \u0219i s\u0103 stabili\u021bi dac\u0103 exist\u0103 capacitate pentru primele comenzi.<\/p>\n\n\n<p>Metoda MTM (Methods-Time Measurement) v\u0103 permite s\u0103 analiza\u021bi metoda de lucru manual \u00eenainte de \u00eenceperea produc\u021biei curente. \u00cen loc s\u0103 a\u0219tepta\u021bi acumularea unui istoric al opera\u021biilor finalizate, stabili\u021bi timpul pe baza unor mi\u0219c\u0103ri definite \u0219i a unor date de timp prestabilite. Metoda de lucru are prioritate: un timp mai scurt este util doar dac\u0103 descrie o munc\u0103 pe care oamenii o pot efectua efectiv, \u00een siguran\u021b\u0103 \u0219i corect.<\/p>\n\n\n<p>Dup\u0103 aprobarea acestui timp pentru planificare, SkyPlanner APS v\u0103 ajut\u0103 s\u0103 \u00eel folosi\u021bi \u00een practic\u0103. Arcturus, motorul s\u0103u de programare bazat pe inteligen\u021b\u0103 artificial\u0103, \u00eencadreaz\u0103 duratele opera\u021biilor \u00een programul comun de produc\u021bie. Astfel, metoda \u00eembun\u0103t\u0103\u021bit\u0103 contribuie la un plan mai bine fundamentat, \u00een loc s\u0103 r\u0103m\u00e2n\u0103 o simpl\u0103 cifr\u0103 \u00eentr-un dosar tehnic.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Ce este metoda MTM?<\/h2>\n\n\n<p>Metoda MTM este un sistem de timpi predetermina\u021bi pentru mi\u0219c\u0103ri, folosit pentru descrierea, analiza \u0219i evaluarea muncii manuale. Analistul descompune o metod\u0103 de lucru definit\u0103 \u00een mi\u0219c\u0103ri sau elemente de proces, aplic\u0103 datele de timp \u0219i regulile corespunz\u0103toare \u0219i stabile\u0219te timpul necesar pentru acea metod\u0103 la un nivel de performan\u021b\u0103 de referin\u021b\u0103.<\/p>\n\n\n<p>\u00centr-o analiz\u0103 MTM-1 detaliat\u0103, mi\u0219c\u0103rile includ \u00eentinderea m\u00e2inii, apucarea, deplasarea, pozi\u021bionarea \u0219i eliberarea piesei. Condi\u021biile conteaz\u0103: preluarea unei piese u\u0219or accesibile nu este aceea\u0219i sarcin\u0103 cu selectarea \u0219i pozi\u021bionarea unei componente dificil de manevrat. MTM eviden\u021biaz\u0103 aceste diferen\u021be, \u00een loc s\u0103 le ascund\u0103 \u00eentr-o singur\u0103 estimare global\u0103.<\/p>\n\n\n<p>Timpii MTM sunt exprima\u021bi \u00een unit\u0103\u021bi de m\u0103surare a timpului, prescurtate TMU. Un TMU este egal cu 0,036 secunde; prin urmare, 1.000 TMU sunt egale cu 36 de secunde. TMU este o unitate de timp, nu un procent de eficien\u021b\u0103.<\/p>\n\n\n<p>Nivelul de performan\u021b\u0103 de referin\u021b\u0103 este, de asemenea, important. MTM nu porne\u0219te de la cronometrarea celui mai rapid operator pentru a declara apoi acel timp drept norm\u0103. Datele sale de timp au deja o baz\u0103 de performan\u021b\u0103 definit\u0103. Nu aplica\u021bi suplimentar o evaluare a ritmului de lucru specific\u0103 studiilor prin cronometrare doar pentru c\u0103 aceasta a fost folosit\u0103 \u00eentr-un alt studiu.<\/p>\n\n\n<h2 class=\"wp-block-heading\">C\u00e2nd s\u0103 folosi\u021bi MTM \u00een locul altei metode de stabilire a timpilor?<\/h2>\n\n\n<p>MTM este deosebit de util\u0103 c\u00e2nd decizia prive\u0219te proiectarea muncii manuale: un produs nou, un dispozitiv modificat, o alt\u0103 modalitate de prezentare a materialelor sau alegerea \u00eentre dou\u0103 secven\u021be de asamblare. Pute\u021bi compara con\u021binutul de munc\u0103 \u00eenainte de a adopta metoda.<\/p>\n\n\n<p>Aceasta nu \u00eenseamn\u0103 c\u0103 MTM este solu\u021bia potrivit\u0103 pentru orice \u00eentrebare legat\u0103 de timp. Alege\u021bi datele relevante pentru decizia de luat:<\/p>\n\n\n<ul class=\"wp-block-list\"><li><strong>MTM:<\/strong> C\u00e2t timp ar trebui s\u0103 necesite aceast\u0103 metod\u0103 de lucru manual bine definit\u0103? Este util\u0103 pentru proiectarea \u0219i compararea modurilor de lucru \u00eenainte de a exista un istoric de produc\u021bie suficient.<\/li><li><strong><a href=\"https:\/\/skyplanner.ai\/ro\/resurse\/normarea-timpului-de-munca\/\">Studiul timpului prin cronometrare<\/a>:<\/strong> C\u00e2t dureaz\u0103 elementele observate \u00een condi\u021biile precizate \u0219i ce norm\u0103 justificat\u0103 se poate stabili pe aceast\u0103 baz\u0103? Este util c\u00e2nd opera\u021bia exist\u0103 deja \u0219i poate fi studiat\u0103.<\/li><li><strong><a href=\"https:\/\/skyplanner.ai\/ro\/resurse\/observarea-instantanee-a-muncii\/\">Observarea instantanee a muncii<\/a>:<\/strong> Ce propor\u021bie din timp este alocat\u0103 asambl\u0103rii, preg\u0103tirii, a\u0219tept\u0103rii sau altor activit\u0103\u021bi? Este util\u0103 pentru a \u00een\u021belege cum se distribuie o perioad\u0103 de lucru, nu pentru a m\u0103sura fiecare mi\u0219care scurt\u0103.<\/li><li><strong><a href=\"https:\/\/skyplanner.ai\/ro\/resurse\/inregistrarea-timpilor-de-productie\/\">\u00cenregistrarea timpilor pe opera\u021bie<\/a>:<\/strong> Ce s-a \u00eent\u00e2mplat efectiv la aceast\u0103 comand\u0103 sau opera\u021bie? Este util\u0103 pentru analiza experien\u021bei din produc\u021bie \u0219i explicarea diferen\u021belor fa\u021b\u0103 de plan.<\/li><\/ul>\n\n\n<p>Aceste abord\u0103ri se pot completa reciproc. O analiz\u0103 MTM poate stabili timpul propus pentru o metod\u0103, iar observa\u021biile ulterioare din produc\u021bie pot scoate la iveal\u0103 un element omis sau o condi\u021bie schimbat\u0103. \u00cens\u0103 media orelor \u00eenregistrate, care include a\u0219teptarea materialelor, nu este acela\u0219i lucru cu volumul de munc\u0103 manual\u0103 stabilit prin timpi predetermina\u021bi.<\/p>\n\n\n<p>Pentru un ciclu automat al utilajului, stabili\u021bi separat timpul impus de proces. MTM poate descrie activit\u0103\u021bile de \u00eenc\u0103rcare, desc\u0103rcare \u0219i manipulare efectuate de operator; nu transform\u0103 programul de prelucrare al utilajului sau durata necesar\u0103 \u00eent\u0103ririi \u00eentr-o mi\u0219care a m\u00e2inii.<\/p>\n\n\n<h2 class=\"wp-block-heading\">MTM-1, MTM-2 \u0219i MTM-UAS: alege\u021bi nivelul potrivit<\/h2>\n\n\n<p>MTM este o familie de sisteme cu niveluri diferite de detaliere. Alegerea influen\u021beaz\u0103 at\u00e2t ceea ce descrie analiza, c\u00e2t \u0219i efortul necesar pentru realizarea ei.<\/p>\n\n\n<p><strong>MTM-1<\/strong> opereaz\u0103 la nivelul mi\u0219c\u0103rilor de baz\u0103. Este potrivit pentru examinarea detaliat\u0103 a activit\u0103\u021bilor manuale scurte \u0219i repetitive, \u00een care condi\u021biile fiec\u0103rei mi\u0219c\u0103ri conteaz\u0103 pentru proiectarea modului de lucru.<\/p>\n\n\n<p><strong>MTM-2<\/strong> reune\u0219te mi\u0219c\u0103rile de baz\u0103 \u00een grupuri mai mari. Permite o analiz\u0103 mai pu\u021bin detaliat\u0103 a activit\u0103\u021bilor c\u0103rora li se potrive\u0219te, f\u0103r\u0103 a necesita \u00eenregistrarea separat\u0103 a fiec\u0103rei mi\u0219c\u0103ri MTM-1.<\/p>\n\n\n<p><strong>MTM-UAS<\/strong>, Universal Analyzing System, folose\u0219te elemente de proces cu un nivel mai ridicat de agregare \u0219i este asociat cu produc\u021bia pe loturi. Nu este doar o alt\u0103 denumire pentru MTM-1.<\/p>\n\n\n<p>Alege\u021bi sistemul \u00eempreun\u0103 cu un analist instruit, \u00een func\u021bie de proces, de repetitivitatea \u0219i varia\u021biile acestuia \u0219i de decizia pe care trebuie s\u0103 o sus\u021bin\u0103 rezultatul. Un nivel mai mare de detaliere merit\u0103 efortul atunci c\u00e2nd poate schimba acea decizie. Aplicarea corect\u0103 necesit\u0103 instruirea aferent\u0103 sistemului ales, precum \u0219i datele \u0219i regulile sale actualizate; un ghid general nu le poate \u00eenlocui.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Cum ob\u021bine\u021bi dintr-o analiz\u0103 MTM un timp utilizabil \u00een planificare<\/h2>\n\n\n<p>Un rezultat util \u00eenseamn\u0103 mai mult dec\u00e2t o durat\u0103. \u00censeamn\u0103 o metod\u0103 documentat\u0103 \u0219i un timp a c\u0103rui semnifica\u021bie s\u0103 fie clar\u0103 \u0219i pentru urm\u0103torul planificator.<\/p>\n\n\n<h3 class=\"wp-block-heading\">1. Defini\u021bi activitatea \u0219i condi\u021biile de lucru<\/h3>\n\n\n<p>Alege\u021bi varianta de produs, opera\u021bia \u0219i revizia metodei. Descrie\u021bi sculele, dispozitivul de fixare, modul de prezentare a componentelor, succesiunea activit\u0103\u021bilor, verific\u0103rile de calitate \u0219i momentele care marcheaz\u0103 \u00eenceputul \u0219i sf\u00e2r\u0219itul activit\u0103\u021bii. Preciza\u021bi dac\u0103 analiza se refer\u0103 la o pies\u0103, la un ciclu sau la un lot.<\/p>\n\n\n<p>Implica\u021bi persoanele care efectueaz\u0103 sau vor efectua activitatea. Acestea pot identifica o \u00eentindere incomod\u0103 a bra\u021bului, o verificare necesar\u0103 sau o schimbare de recipient care poate sc\u0103pa din vedere \u00eentr-un desen bine pus la punct. P\u0103stra\u021bi \u00een metoda de lucru cerin\u021bele privind manipularea \u00een siguran\u021b\u0103 \u0219i calitatea produsului; eliminarea unei activit\u0103\u021bi esen\u021biale nu \u00eenseamn\u0103 \u00eembun\u0103t\u0103\u021bire.<\/p>\n\n\n<h3 class=\"wp-block-heading\">2. Analiza\u021bi succesiunea activit\u0103\u021bilor folosind sistemul ales<\/h3>\n\n\n<p>Un analist instruit descrie activitatea folosind elementele corespunz\u0103toare \u0219i \u021bin\u00e2nd cont de condi\u021biile care o influen\u021beaz\u0103. Analiza trebuie s\u0103 reflecte ceea ce se \u00eent\u00e2mpl\u0103 efectiv, inclusiv activit\u0103\u021bile efectuate doar la intervale definite.<\/p>\n\n\n<p>Respecta\u021bi regulile sistemului privind succesiunea \u0219i activit\u0103\u021bile simultane. Mi\u0219carea simultan\u0103 a ambelor m\u00e2ini nu \u00eenseamn\u0103 neap\u0103rat dou\u0103 intervale de timp consecutive. De asemenea, nu trebuie inventat un timp de mi\u0219care pentru a acoperi un gol dintr-o descriere incomplet\u0103 a metodei.<\/p>\n\n\n<p>P\u0103stra\u021bi o distinc\u021bie clar\u0103 \u00eentre preg\u0103tire \u0219i activit\u0103\u021bile repetitive. Preg\u0103tirea dispozitivului o singur\u0103 dat\u0103 pentru \u00eentregul lot nu trebuie transformat\u0103 \u00eentr-o activitate de preg\u0103tire al c\u0103rei timp se adaug\u0103 la fiecare pies\u0103.<\/p>\n\n\n<h3 class=\"wp-block-heading\">3. Compara\u021bi metodele, nu doar timpii totali<\/h3>\n\n\n<p>Folosi\u021bi analiza pentru a \u00een\u021belege de ce o metod\u0103 necesit\u0103 mai pu\u021bin\u0103 munc\u0103. Ar putea fi prezentat\u0103 componenta mereu \u00een aceea\u0219i orientare? Ar putea un dispozitiv s\u0103 elimine repozi\u021bion\u0103rile repetate? O alt\u0103 succesiune a activit\u0103\u021bilor elimin\u0103 manipul\u0103ri f\u0103r\u0103 a renun\u021ba la o verificare?<\/p>\n\n\n<p>Compara\u021bi alternativele p\u0103str\u00e2nd acelea\u0219i limite ale analizei \u0219i acelea\u0219i cerin\u021be de calitate. O metod\u0103 care pare mai rapid\u0103 pentru c\u0103 realimentarea sau inspec\u021bia au fost scoase din analiz\u0103 nu reduce neap\u0103rat volumul de munc\u0103. Aici MTM devine un instrument de proiectare a muncii, nu doar o estimare cu aspect riguros.<\/p>\n\n\n<h3 class=\"wp-block-heading\">4. Stabili\u021bi ce include timpul aprobat pentru utilizare<\/h3>\n\n\n<p>Verifica\u021bi baza de calcul a timpului \u00eenainte de a numi rezultatul norm\u0103 de produc\u021bie. Identifica\u021bi activit\u0103\u021bile auxiliare recurente \u0219i stabili\u021bi cum trebuie luate \u00een calcul necesit\u0103\u021bile personale, refacerea \u0219i \u00eent\u00e2rzierile inevitabile. Documenta\u021bi adaosurile de timp incluse \u0219i modul lor de calcul; nu presupune\u021bi c\u0103 exist\u0103 un procent universal.<\/p>\n\n\n<p>P\u0103stra\u021bi \u00eentreruperile evitabile la vedere, ca probleme de rezolvat. A\u0219teptarea unei componente lips\u0103 nu trebuie s\u0103 ajung\u0103, pe nesim\u021bite, parte din fiecare secven\u021b\u0103 de \u00eentindere a m\u00e2inii \u0219i apucare. La fel, dac\u0103 durata folosit\u0103 \u00een planificare omite activit\u0103\u021bi recurente necesare, noua metod\u0103 va p\u0103rea mai u\u0219or de programat dec\u00e2t este \u00een realitate.<\/p>\n\n\n<h3 class=\"wp-block-heading\">5. Valida\u021bi \u0219i aproba\u021bi metoda pentru utilizare<\/h3>\n\n\n<p>\u00cenainte de punerea \u00een aplicare, verifica\u021bi dac\u0103 metoda propus\u0103 poate fi executat\u0103 cu echipamentele prev\u0103zute, \u00een condi\u021biile stabilite de prezentare a materialelor \u0219i cu respectarea cerin\u021belor de calitate. Dac\u0103 ave\u021bi la dispozi\u021bie un lot-pilot sau un prim lot de produc\u021bie, investiga\u021bi diferen\u021bele fa\u021b\u0103 de lucr\u0103ri comparabile. Procesul de \u00eenv\u0103\u021bare, modificarea unui dispozitiv de fixare \u0219i omiterea unui element din analiz\u0103 necesit\u0103 m\u0103suri diferite.<\/p>\n\n\n<p>P\u0103stra\u021bi analiza \u0219i documenta\u021bi sistemul utilizat, revizia metodei, ipotezele, adaosurile de timp incluse, aprobarea \u0219i data intr\u0103rii \u00een vigoare. Reevalua\u021bi timpul atunci c\u00e2nd metoda sau condi\u021biile de aplicare se schimb\u0103. Scopul nu este s\u0103 p\u0103stra\u021bi la nesf\u00e2r\u0219it o cifr\u0103 impresionant\u0103, ci s\u0103 men\u021bine\u021bi o leg\u0103tur\u0103 fiabil\u0103 \u00eentre munca de executat \u0219i plan.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Exemplu: o metod\u0103 de asamblare mai bun\u0103 nu rezolv\u0103 de la sine programarea<\/h2>\n\n\n<p>Imagina\u021bi-v\u0103 un post de asamblare manual\u0103 unde piesele sosesc orientate diferit. Metoda propus\u0103 folose\u0219te o tav\u0103 \u00eembun\u0103t\u0103\u021bit\u0103 pentru prezentarea pieselor \u0219i un dispozitiv de pozi\u021bionare, reduc\u00e2nd opera\u021biile de selectare \u0219i repozi\u021bionare. Echipa verific\u0103 metoda \u0219i aprob\u0103 utilizarea ei.<\/p>\n\n\n<p>S\u0103 presupunem c\u0103 timpul rezultat, folosit \u00een planificare, scade de la dou\u0103 minute la un minut \u0219i jum\u0103tate pe pies\u0103. Acestea sunt date de planificare aprobate, folosite pentru ilustrare, nu valori preluate dintr-o fi\u0219\u0103 de date MTM. Presupunem c\u0103 o persoan\u0103 lucreaz\u0103 succesiv la un singur post, f\u0103r\u0103 suprapunere cu un ciclu al utilajului, iar timpii \u0219i calendarul de lucru disponibil au fost corelate \u00een privin\u021ba adaosurilor de timp.<\/p>\n\n\n<p>Pentru o comand\u0103 de 120 de piese, cu un timp de preg\u0103tire neschimbat de 30 de minute:<\/p>\n\n\n<ul class=\"wp-block-list\"><li><strong>Metoda anterioar\u0103:<\/strong> 120 \u00d7 2 minute + 30 de minute = 270 de minute, adic\u0103 patru ore \u0219i jum\u0103tate.<\/li><li><strong>Metoda nou\u0103:<\/strong> 120 \u00d7 1,5 minute + 30 de minute = 210 minute, adic\u0103 trei ore \u0219i jum\u0103tate.<\/li><\/ul>\n\n\n<p>Comanda necesit\u0103 cu o or\u0103 mai pu\u021bin la acest post. Este o capacitate util\u0103, dar nu \u00eenseamn\u0103 automat c\u0103 expedierea va avea loc cu o or\u0103 mai devreme. Ansamblul poate a\u0219tepta \u00een continuare eliberarea unui banc de testare, resursa pentru opera\u021bia urm\u0103toare poate fi ocupat\u0103 de o alt\u0103 comand\u0103 sau ora eliberat\u0103 poate s\u0103 nu se \u00eencadreze \u00een intervalul necesar unei alte opera\u021bii.<\/p>\n\n\n<p>Prin urmare, pasul urm\u0103tor nu este \u201es\u0103 devans\u0103m livrarea cu o or\u0103\u201d, ci \u201es\u0103 recalcul\u0103m cum pot fi programate aceast\u0103 comand\u0103 \u0219i celelalte lucr\u0103ri \u00een func\u021bie de resursele disponibile\u201d. Acesta este calculul pe care SkyPlanner \u00eel face pentru dumneavoastr\u0103.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Folosi\u021bi \u00een SkyPlanner timpii aproba\u021bi pentru metoda de lucru<\/h2>\n\n\n<p>SkyPlanner v\u0103 permite s\u0103 defini\u021bi durata unei opera\u021bii printr-un timp pe pies\u0103, o rat\u0103 de produc\u021bie sau un timp fix. Timpul de preg\u0103tire \u0219i timpul de demontare se introduc separat. Astfel, \u00een exemplul \u00een care toate activit\u0103\u021bile sunt manuale, durata aprobat\u0103 pe pies\u0103 folosit\u0103 \u00een planificare \u0219i timpul de preg\u0103tire a lotului pot r\u0103m\u00e2ne distincte atunci c\u00e2nd cantit\u0103\u021bile comandate se schimb\u0103.<\/p>\n\n\n<p>Verifica\u021bi mai \u00eent\u00e2i ce resurse trebuie rezervate pe durata respectiv\u0103. Volumul de munc\u0103 al operatorului, timpul de ocupare a utilajului \u0219i durata efectiv scurs\u0103 a opera\u021biei sunt m\u0103rimi diferite. Dac\u0103 utilajul func\u021bioneaz\u0103 \u00een timp ce operatorul preg\u0103te\u0219te o alt\u0103 pies\u0103, \u00eensumarea tuturor activit\u0103\u021bilor poate supraestima timpul pentru care trebuie rezervat utilajul. Dac\u0103 lua\u021bi \u00een calcul doar munca manual\u0103, pute\u021bi omite perioada \u00een care echipamentul nu este disponibil pentru o alt\u0103 opera\u021bie. Corela\u021bi metoda cu resursele de care opera\u021bia are efectiv nevoie.<\/p>\n\n\n<p>Corela\u021bi \u0219i adaosurile de timp incluse \u00een durat\u0103 cu calendarul de lucru. O pauz\u0103 deja sc\u0103zut\u0103 din capacitatea disponibil\u0103 nu trebuie sc\u0103zut\u0103 \u00eenc\u0103 o dat\u0103 printr-un adaos de timp pentru aceea\u0219i pauz\u0103. P\u0103stra\u021bi documenta\u021bia studiului aprobat \u0219i consemna\u021bi modul \u00een care componentele sale sunt transpuse \u00een date de planificare.<\/p>\n\n\n<p>Arcturus programeaz\u0103 opera\u021biile pe baza acestor durate, \u021bin\u00e2nd cont de centrele de lucru, schimburile, dependen\u021bele \u0219i priorit\u0103\u021bile configurate. Diagrama Gantt arat\u0103 cum se \u00eembin\u0103 toate lucr\u0103rile. C\u00e2nd introduce\u021bi o modificare aprobat\u0103 a metodei, actualiza\u021bi datele de planificare afectate \u0219i <a href=\"https:\/\/skyplanner.ai\/ro\/resurse\/ce-este-programarea-productiei\/\">recalcula\u021bi programul de produc\u021bie<\/a> pentru a vedea efectul asupra opera\u021biilor ulterioare \u0219i asupra celorlalte comenzi care solicit\u0103 acelea\u0219i resurse.<\/p>\n\n\n<p>Nu mai trebuie s\u0103 reface\u021bi manual liste separate de opera\u021bii dup\u0103 fiecare revizie. Mai important, pute\u021bi folosi un timp bine fundamentat pentru o metod\u0103 nou\u0103 \u00een planificarea viitoare, \u00eenainte de a avea un istoric amplu de opera\u021bii finalizate. Dumneavoastr\u0103 decide\u021bi ce metod\u0103 este aprobat\u0103 \u0219i ce angajamente au prioritate; SkyPlanner calculeaz\u0103 programul de produc\u021bie corelat.<\/p>\n\n\n<p>Ulterior, produc\u021bia efectiv\u0103 v\u0103 ofer\u0103 date suplimentare. SkyPlanner permite \u0219i estimarea duratei opera\u021biilor pe baza \u00eenregistr\u0103rilor istorice de timp. P\u0103stra\u021bi aceast\u0103 surs\u0103 distinct\u0103 de MTM: prima ofer\u0103 estim\u0103ri pe baza produc\u021biei \u00eenregistrate, \u00een timp ce MTM evalueaz\u0103 o metod\u0103 de lucru manual\u0103 definit\u0103, folosind date predeterminate.<\/p>\n\n\n<h3 class=\"wp-block-heading\">De ce conteaz\u0103 un program de produc\u021bie comun<\/h3>\n\n\n<p><a href=\"https:\/\/skyplanner.ai\/ro\/povesti-ale-clientilor\/utu\/\">UTU, un produc\u0103tor finlandez de tablouri electrice \u0219i aparataj de comuta\u021bie<\/a>, folosea anterior foi de calcul separate pentru fiecare departament. Modific\u0103rile ordinii de execu\u021bie din ERP nu ajungeau \u00eentotdeauna \u00een sec\u021bia de produc\u021bie, iar capacitatea real\u0103 era greu de evaluat.<\/p>\n\n\n<p>Prin conectarea SkyPlanner la Oracle NetSuite, UTU a reunit liniile \u0219i departamentele fabricii din Ulvila \u00eentr-un singur sistem. Echipa sa arat\u0103 c\u0103 lista actualizat\u0103 de opera\u021bii ajunge la montatori \u00een c\u00e2teva secunde \u0219i c\u0103 livr\u0103rile pentru proiecte sunt programate mai precis. Aceast\u0103 experien\u021b\u0103 ilustreaz\u0103 valoarea includerii \u00eentregului volum de lucru \u00eentr-un plan comun, \u00een loc ca fiecare departament s\u0103 \u00ee\u0219i coreleze separat propria list\u0103 de opera\u021bii.<\/p>\n\n\n<h2 class=\"wp-block-heading\">De la un timp de lucru bine fundamentat la un plan de produc\u021bie credibil<\/h2>\n\n\n<p>Folosi\u021bi MTM c\u00e2nd trebuie s\u0103 concepe\u021bi \u0219i s\u0103 fundamenta\u021bi munca manual\u0103 \u00eenainte ca istoricul de produc\u021bie s\u0103 v\u0103 poat\u0103 oferi r\u0103spunsul. Apoi alege\u021bi SkyPlanner c\u00e2nd trebuie s\u0103 integra\u021bi realist acel timp aprobat \u00een planificarea comenzilor. O metod\u0103 solid\u0103 v\u0103 arat\u0103 ce necesit\u0103 munca; programarea pe capacitate finit\u0103 v\u0103 arat\u0103 unde \u0219i c\u00e2nd poate fi executat\u0103.<\/p>\n\n\n<p>SkyPlanner se integreaz\u0103 cu orice sistem ERP sau MES prin interfa\u021ba sa REST API deschis\u0103, astfel \u00eenc\u00e2t o programare mai bun\u0103 s\u0103 poat\u0103 valorifica informa\u021biile de produc\u021bie pe care le ave\u021bi deja.<\/p>\n\n\n<p><a href=\"https:\/\/skyplanner.ai\/ro\/contact-vanzari\/\">Programa\u021bi o demonstra\u021bie SkyPlanner<\/a> \u0219i aduce\u021bi un timp aprobat pentru o metod\u0103 de lucru, fluxul tehnologic aferent \u0219i alte comenzi care solicit\u0103 aceea\u0219i capacitate. Vede\u021bi cum influen\u021beaz\u0103 schimbarea metodei planul de produc\u021bie \u0219i datele de livrare, nu doar durata unei singure opera\u021bii. Dac\u0103 prefera\u021bi s\u0103 explora\u021bi mai \u00eent\u00e2i, <a href=\"https:\/\/skyplanner.ai\/ro\/proba\/\">\u00eencerca\u021bi SkyPlanner cu date demonstrative<\/a> sau folosi\u021bi ghidul de configurare ini\u021bial\u0103 al Asistentului, cu ajutorul inteligen\u021bei artificiale.<\/p>\n\n<\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>Metoda MTM: planifica\u021bi munca \u00eenainte de produc\u021bie Acas\u0103 &raquo; Resurse &raquo; Metoda MTM: planifica\u021bi munca \u00eenainte de produc\u021bie Un nou ansamblu este preg\u0103tit pentru etapa de planificare a produc\u021biei, dar nu a fost realizat de suficiente ori pentru a putea stabili un timp mediu de \u00eencredere. Totu\u0219i, trebuie s\u0103 compara\u021bi variantele de amenajare a centrelor &#8230; <a title=\"Metoda MTM: planifica\u021bi munca \u00eenainte de produc\u021bie\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/ro\/resurse\/metoda-mtm\/\" aria-label=\"Read more about Metoda MTM: planifica\u021bi munca \u00eenainte de produc\u021bie\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":111623,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[2565,514],"tags":[],"class_list":["post-111621","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-eficienta-productiei","category-resurse","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Metoda MTM: planifica\u021bi munca \u00eenainte de produc\u021bie<\/title>\n<meta name=\"description\" content=\"Metod\u0103 manual\u0103 nou\u0103? Afla\u021bi cum MTM stabile\u0219te timpul \u00eenainte de produc\u021bie. Folosi\u021bi SkyPlanner pentru un program realizabil bazat pe timpi aproba\u021bi.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/ro\/resurse\/metoda-mtm\/\" \/>\n<meta property=\"og:locale\" content=\"ro_RO\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Metoda MTM: planifica\u021bi munca \u00eenainte de produc\u021bie\" \/>\n<meta property=\"og:description\" content=\"Metod\u0103 manual\u0103 nou\u0103? Afla\u021bi cum MTM stabile\u0219te timpul \u00eenainte de produc\u021bie. Folosi\u021bi SkyPlanner pentru un program realizabil bazat pe timpi aproba\u021bi.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/ro\/resurse\/metoda-mtm\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2026-10-28T00:43:16+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-28T00:45:33+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/methods-time-measurement-hero.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1774\" \/>\n\t<meta property=\"og:image:height\" content=\"887\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Scris de\" \/>\n\t<meta name=\"twitter:data1\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n\t<meta name=\"twitter:label2\" content=\"Timp estimat pentru citire\" \/>\n\t<meta name=\"twitter:data2\" content=\"14 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/resurse\\\/metoda-mtm\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/resurse\\\/metoda-mtm\\\/\"},\"author\":{\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\"},\"headline\":\"Metoda MTM: planifica\u021bi munca \u00eenainte de produc\u021bie\",\"datePublished\":\"2026-10-28T00:43:16+00:00\",\"dateModified\":\"2026-10-28T00:45:33+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/resurse\\\/metoda-mtm\\\/\"},\"wordCount\":2717,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/resurse\\\/metoda-mtm\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/methods-time-measurement-hero.png\",\"articleSection\":[\"Eficien\u021ba produc\u021biei\",\"Resurse\"],\"inLanguage\":\"ro-RO\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/resurse\\\/metoda-mtm\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/resurse\\\/metoda-mtm\\\/\",\"name\":\"Metoda MTM: planifica\u021bi munca \u00eenainte de produc\u021bie\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/resurse\\\/metoda-mtm\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/resurse\\\/metoda-mtm\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/methods-time-measurement-hero.png\",\"datePublished\":\"2026-10-28T00:43:16+00:00\",\"dateModified\":\"2026-10-28T00:45:33+00:00\",\"description\":\"Metod\u0103 manual\u0103 nou\u0103? Afla\u021bi cum MTM stabile\u0219te timpul \u00eenainte de produc\u021bie. Folosi\u021bi SkyPlanner pentru un program realizabil bazat pe timpi aproba\u021bi.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/resurse\\\/metoda-mtm\\\/#breadcrumb\"},\"inLanguage\":\"ro-RO\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/resurse\\\/metoda-mtm\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"ro-RO\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/resurse\\\/metoda-mtm\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/methods-time-measurement-hero.png\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/methods-time-measurement-hero.png\",\"width\":1774,\"height\":887,\"caption\":\"Loose assembly parts contrast with oriented parts and a locating fixture in an MTM method comparison.\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/resurse\\\/metoda-mtm\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Metoda MTM: planifica\u021bi munca \u00eenainte de produc\u021bie\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"ro-RO\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"ro-RO\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\",\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"ro-RO\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"caption\":\"Jussi M\u00e4ntyl\u00e4\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Metoda MTM: planifica\u021bi munca \u00eenainte de produc\u021bie","description":"Metod\u0103 manual\u0103 nou\u0103? Afla\u021bi cum MTM stabile\u0219te timpul \u00eenainte de produc\u021bie. Folosi\u021bi SkyPlanner pentru un program realizabil bazat pe timpi aproba\u021bi.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/ro\/resurse\/metoda-mtm\/","og_locale":"ro_RO","og_type":"article","og_title":"Metoda MTM: planifica\u021bi munca \u00eenainte de produc\u021bie","og_description":"Metod\u0103 manual\u0103 nou\u0103? Afla\u021bi cum MTM stabile\u0219te timpul \u00eenainte de produc\u021bie. Folosi\u021bi SkyPlanner pentru un program realizabil bazat pe timpi aproba\u021bi.","og_url":"https:\/\/skyplanner.ai\/ro\/resurse\/metoda-mtm\/","og_site_name":"SkyPlanner","article_published_time":"2026-10-28T00:43:16+00:00","article_modified_time":"2026-10-28T00:45:33+00:00","og_image":[{"width":1774,"height":887,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/methods-time-measurement-hero.png","type":"image\/png"}],"author":"Jussi M\u00e4ntyl\u00e4","twitter_card":"summary_large_image","twitter_misc":{"Scris de":"Jussi M\u00e4ntyl\u00e4","Timp estimat pentru citire":"14 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/ro\/resurse\/metoda-mtm\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/ro\/resurse\/metoda-mtm\/"},"author":{"name":"Jussi M\u00e4ntyl\u00e4","@id":"https:\/\/skyplanner.ai\/ro\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5"},"headline":"Metoda MTM: planifica\u021bi munca \u00eenainte de produc\u021bie","datePublished":"2026-10-28T00:43:16+00:00","dateModified":"2026-10-28T00:45:33+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/ro\/resurse\/metoda-mtm\/"},"wordCount":2717,"publisher":{"@id":"https:\/\/skyplanner.ai\/ro\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/ro\/resurse\/metoda-mtm\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/methods-time-measurement-hero.png","articleSection":["Eficien\u021ba produc\u021biei","Resurse"],"inLanguage":"ro-RO"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/ro\/resurse\/metoda-mtm\/","url":"https:\/\/skyplanner.ai\/ro\/resurse\/metoda-mtm\/","name":"Metoda MTM: planifica\u021bi munca \u00eenainte de produc\u021bie","isPartOf":{"@id":"https:\/\/skyplanner.ai\/ro\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/ro\/resurse\/metoda-mtm\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/ro\/resurse\/metoda-mtm\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/methods-time-measurement-hero.png","datePublished":"2026-10-28T00:43:16+00:00","dateModified":"2026-10-28T00:45:33+00:00","description":"Metod\u0103 manual\u0103 nou\u0103? Afla\u021bi cum MTM stabile\u0219te timpul \u00eenainte de produc\u021bie. Folosi\u021bi SkyPlanner pentru un program realizabil bazat pe timpi aproba\u021bi.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/ro\/resurse\/metoda-mtm\/#breadcrumb"},"inLanguage":"ro-RO","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/ro\/resurse\/metoda-mtm\/"]}]},{"@type":"ImageObject","inLanguage":"ro-RO","@id":"https:\/\/skyplanner.ai\/ro\/resurse\/metoda-mtm\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/methods-time-measurement-hero.png","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/methods-time-measurement-hero.png","width":1774,"height":887,"caption":"Loose assembly parts contrast with oriented parts and a locating fixture in an MTM method comparison."},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/ro\/resurse\/metoda-mtm\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/ro\/"},{"@type":"ListItem","position":2,"name":"Metoda MTM: planifica\u021bi munca \u00eenainte de produc\u021bie"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/ro\/#website","url":"https:\/\/skyplanner.ai\/ro\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/ro\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/ro\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"ro-RO"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/ro\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/ro\/","logo":{"@type":"ImageObject","inLanguage":"ro-RO","@id":"https:\/\/skyplanner.ai\/ro\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/ro\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]},{"@type":"Person","@id":"https:\/\/skyplanner.ai\/ro\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5","name":"Jussi M\u00e4ntyl\u00e4","image":{"@type":"ImageObject","inLanguage":"ro-RO","@id":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","caption":"Jussi M\u00e4ntyl\u00e4"}}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/methods-time-measurement-hero.png",1774,887,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/methods-time-measurement-hero-150x150.png",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/methods-time-measurement-hero-300x150.png",300,150,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/methods-time-measurement-hero-768x384.png",768,384,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/methods-time-measurement-hero-1024x512.png",1024,512,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/methods-time-measurement-hero-1536x768.png",1536,768,true],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/methods-time-measurement-hero.png",1774,887,false],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/methods-time-measurement-hero-360x180.png",360,180,true]},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/ro\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Metoda MTM: planifica\u021bi munca \u00eenainte de produc\u021bie Acas\u0103 &raquo; Resurse &raquo; Metoda MTM: planifica\u021bi munca \u00eenainte de produc\u021bie Un nou ansamblu este preg\u0103tit pentru etapa de planificare a produc\u021biei, dar nu a fost realizat de suficiente ori pentru a putea stabili un timp mediu de \u00eencredere. Totu\u0219i, trebuie s\u0103 compara\u021bi variantele de amenajare a centrelor&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/posts\/111621","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/comments?post=111621"}],"version-history":[{"count":1,"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/posts\/111621\/revisions"}],"predecessor-version":[{"id":111685,"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/posts\/111621\/revisions\/111685"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/media\/111623"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/media?parent=111621"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/categories?post=111621"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/tags?post=111621"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}