{"id":104587,"date":"2026-10-20T19:34:39","date_gmt":"2026-10-20T19:34:39","guid":{"rendered":"https:\/\/skyplanner.ai\/?p=104587"},"modified":"2026-10-20T19:37:08","modified_gmt":"2026-10-20T19:37:08","slug":"randament-la-prima-trecere","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/ro\/resurse\/randament-la-prima-trecere\/","title":{"rendered":"Randament la prima trecere: formul\u0103, exemplu \u0219i reprelucr\u0103ri ascunse"},"content":{"rendered":"<div class=\"gb-container gb-container-article01 article-main-content-container\">\n\n<h1 class=\"wp-block-heading\">Randament la prima trecere: formul\u0103, exemplu \u0219i reprelucr\u0103ri ascunse<\/h1>\n\n<div class=\"gb-container gb-container-article02\">\n\n<p><a href=\"\/ro\/\">Acas\u0103<\/a> &raquo; <a href=\"https:\/\/skyplanner.ai\/ro\/resurse\/\">Resurse<\/a> &raquo; Randament la prima trecere: formul\u0103, exemplu \u0219i reprelucr\u0103ri ascunse<\/p>\n\n\n<p class=\"yoast-reading-time__wrapper\"><span class=\"yoast-reading-time__icon\"><svg aria-hidden=\"true\" focusable=\"false\" data-icon=\"clock\" width=\"20\" height=\"20\" fill=\"none\" stroke=\"currentColor\" style=\"display:inline-block;vertical-align:-0.1em\" role=\"img\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewBox=\"0 0 24 24\"><path stroke-linecap=\"round\" stroke-linejoin=\"round\" stroke-width=\"2\" d=\"M12 8v4l3 3m6-3a9 9 0 11-18 0 9 9 0 0118 0z\"><\/path><\/svg><\/span><span class=\"yoast-reading-time__spacer\" style=\"display:inline-block;width:1em\"><\/span><span class=\"yoast-reading-time__descriptive-text\">Timp estimat de citire: <\/span><span class=\"yoast-reading-time__reading-time\">9<\/span><span class=\"yoast-reading-time__time-unit\"> minute<\/span><\/p>\n\n<\/div>\n<div class=\"gb-container gb-container-article03\">\n\n<p>Randamentul la prima trecere (FPY) reprezint\u0103 procentul de piese care \u00eendeplinesc cerin\u021bele de calitate stabilite la prima parcurgere a unui proces definit, f\u0103r\u0103 repara\u021bii, reprelucr\u0103ri sau repetarea unui test \u00een urma unui rezultat neconform. Acest indicator arat\u0103 c\u00e2t din produc\u021bie a fost conform\u0103 de la prima \u00eencercare, nu c\u00e2t a devenit \u00een cele din urm\u0103 acceptabil\u0103.<\/p>\n\n\n<p>Aceast\u0103 distinc\u021bie conteaz\u0103 atunci c\u00e2nd cantitatea de produse finite pare satisf\u0103c\u0103toare, dar fabrica abia \u021bine pasul. Piesele reparate pot fi totu\u0219i livrate, \u00eens\u0103 aducerea lor la starea conform\u0103 a consumat timp de care aveau nevoie alte comenzi. Urm\u0103rirea FPY \u00eempreun\u0103 cu efortul de recuperare scoate la iveal\u0103 ceea ce ascunde totalul pieselor conforme. Corelarea acestor lucr\u0103ri cu \u00eenregistr\u0103rile de produc\u021bie \u0219i cu programarea din SkyPlanner v\u0103 ajut\u0103 s\u0103 vede\u021bi efectul asupra capacit\u0103\u021bii \u0219i livr\u0103rilor.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Cum se calculeaz\u0103 randamentul la prima trecere<\/h2>\n\n\n<p>Folosi\u021bi urm\u0103toarea formul\u0103:<\/p>\n\n\n<p><strong>Randament la prima trecere (%) = Num\u0103rul de piese acceptate la prima \u00eencercare \u00f7 Num\u0103rul de piese intrate \u00een procesul definit \u00d7 100<\/strong><\/p>\n\n\n<p>Num\u0103ra\u021bi piesele distincte, nu controalele efectuate sau defectele individuale. O pies\u0103 respins\u0103, corectat\u0103 \u0219i apoi acceptat\u0103 intr\u0103 \u00een produc\u021bia final\u0103 conform\u0103, dar nu reprezint\u0103 o reu\u0219it\u0103 la prima trecere. \u00cen acest calcul, o pies\u0103 cu mai multe defecte r\u0103m\u00e2ne o singur\u0103 pies\u0103 neconform\u0103.<\/p>\n\n\n<p>Stabili\u021bi limitele procesului \u00eenainte de a colecta datele. Pute\u021bi m\u0103sura o opera\u021bie de prelucrare mecanic\u0103, activitatea unei sta\u021bii de testare sau un flux tehnologic complet. Num\u0103r\u0103torul \u0219i numitorul trebuie s\u0103 se refere la acela\u0219i grup de piese, \u00een limitele procesului ales.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Exemplu: randament la prima trecere de 90%, randament final de 96%<\/h3>\n\n\n<p>Imagina\u021bi-v\u0103 un lot de 500 de piese prelucrate mecanic, pentru care sunt disponibile toate rezultatele controlului la prima \u00eencercare:<\/p>\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Rezultatul la prima \u00eencercare<\/th><th>Num\u0103r de piese<\/th><th>Ce urmeaz\u0103<\/th><\/tr><\/thead><tbody><tr><td>Acceptate f\u0103r\u0103 corec\u021bii<\/td><td>450<\/td><td>Preg\u0103tite pentru urm\u0103toarea opera\u021bie<\/td><\/tr><tr><td>Trimise la reprelucrare<\/td><td>40<\/td><td>30 sunt acceptate ulterior; 10 sunt \u00een cele din urm\u0103 rebutate<\/td><\/tr><tr><td>Rebutate imediat<\/td><td>10<\/td><td>Nu pot trece mai departe<\/td><\/tr><tr><td>Total piese intrate \u00een opera\u021bie<\/td><td>500<\/td><td>Fiecare pies\u0103 are un singur rezultat la prima \u00eencercare<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>Randamentul la prima trecere este:<\/p>\n\n\n<p><strong>450 \u00f7 500 \u00d7 100 = 90%<\/strong><\/p>\n\n\n<p>Dup\u0103 reprelucrare, sunt acceptate 480 de piese: cele 450 acceptate ini\u021bial, plus 30 de piese recuperate. Prin urmare, randamentul final al lotului este:<\/p>\n\n\n<p><strong>480 \u00f7 500 \u00d7 100 = 96%<\/strong><\/p>\n\n\n<p>Ambele procente sunt utile. FPY descrie performan\u021ba la prima \u00eencercare. Randamentul final arat\u0103 propor\u021bia pieselor acceptate \u00een cele din urm\u0103, inclusiv cele reprelucrate cu succes. Raportarea doar a valorii de 96% ascunde corec\u021biile necesare pentru recuperarea celor 30 de piese.<\/p>\n\n\n<p>Nici procentul de 10% r\u0103mas \u00een calculul FPY nu reprezint\u0103 rata rebuturilor. \u00cen acest exemplu, 20 de piese sunt \u00een cele din urm\u0103 rebutate, astfel c\u0103 rata final\u0103 a rebuturilor este de 4%. Celelalte 6% din lotul ini\u021bial au fost recuperate prin lucr\u0103ri suplimentare. Sc\u0103z\u00e2nd doar rebuturile, a\u021bi ob\u021bine randamentul final, nu randamentul la prima trecere.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Stabili\u021bi corect regulile de num\u0103rare \u00eenainte de a v\u0103 baza pe procent<\/h2>\n\n\n<p>Calculul este simplu. P\u0103strarea sensului de \u201eprima \u00eencercare\u201d necesit\u0103 mai mult\u0103 aten\u021bie, mai ales c\u00e2nd \u00eenregistr\u0103rile de produc\u021bie \u0219i cele de control provin din sisteme diferite.<\/p>\n\n\n<p>1. <strong>Alege\u021bi un singur proces \u0219i un grup de produse comparabile.<\/strong> Un rezultat la prima trecere \u00een prelucrarea mecanic\u0103 nu echivaleaz\u0103 cu acceptarea final\u0103 a \u00eentregului ansamblu. Defini\u021bi clar fluxurile tehnologice \u0219i cerin\u021bele de acceptare, astfel \u00eenc\u00e2t o schimbare a structurii produc\u021biei s\u0103 nu par\u0103 o \u00eembun\u0103t\u0103\u021bire a calit\u0103\u021bii.<\/p>\n\n\n<p>2. <strong>Corela\u021bi grupul de piese intrate cu rezultatele sale.<\/strong> Porni\u021bi de la un lot sau de la un alt grup trasabil pentru care se cunosc rezultatele la prima \u00eencercare. Dac\u0103 \u00eemp\u0103r\u021bi\u021bi num\u0103rul pieselor finalizate \u0219i acceptate ast\u0103zi la num\u0103rul pieselor \u00eencepute ast\u0103zi, pute\u021bi amesteca piese diferite, mai ales c\u00e2nd opera\u021biile se \u00eentind pe mai multe schimburi.<\/p>\n\n\n<p>3. <strong>P\u0103stra\u021bi rezultatul ini\u021bial.<\/strong> \u00cenregistra\u021bi separat acceptarea la prima \u00eencercare \u0219i acceptarea ulterioar\u0103, dup\u0103 corec\u021bii sau repetarea testelor. \u00cenlocuirea rezultatului neconform atunci c\u00e2nd o pies\u0103 reparat\u0103 este acceptat\u0103 face istoricul s\u0103 arate mai bine, f\u0103r\u0103 a schimba ceea ce s-a \u00eent\u00e2mplat.<\/p>\n\n\n<p>4. <strong>Num\u0103ra\u021bi fiecare pies\u0103 o singur\u0103 dat\u0103 \u00een limitele procesului ales.<\/strong> Defectele multiple, testele repetate \u0219i \u00eenregistr\u0103rile repetate ale timpului nu m\u0103resc num\u0103rul pieselor ini\u021biale. Folosi\u021bi identificatori de pies\u0103 sau o eviden\u021b\u0103 de lot verificat\u0103 \u0219i corelat\u0103, care p\u0103streaz\u0103 cantit\u0103\u021bile \u0219i istoricul reprelucr\u0103rilor.<\/p>\n\n\n<p>5. <strong>Eviden\u021bia\u021bi rezultatele \u00eenc\u0103 nestabilite.<\/strong> Piesele care a\u0219teapt\u0103 controlul nu sunt automat acceptate sau respinse. Afi\u0219a\u021bi cantitatea pentru care rezultatul nu este \u00eenc\u0103 stabilit \u0219i definitiva\u021bi FPY pentru grupul urm\u0103rit c\u00e2nd sunt disponibile toate rezultatele la prima \u00eencercare, \u00een loc s\u0103 exclude\u021bi tacit din calcul piesele cu probleme.<\/p>\n\n\n<p>O opera\u021bie poate include mai multe controale planificate \u00een fluxul s\u0103u normal. Parcurgerea corect\u0103 de la prima \u00eencercare a acestei succesiuni stabilite este diferit\u0103 de repetarea unui test cu rezultat neconform sau de corectarea unui defect. Preciza\u021bi aceast\u0103 distinc\u021bie \u00een defini\u021bia indicatorului \u0219i aplica\u021bi-o consecvent.<\/p>\n\n\n<p>Dac\u0103 raportul con\u021bine doar <a href=\"https:\/\/skyplanner.ai\/ro\/resurse\/raport-de-productie\/\">cantit\u0103\u021bile totale finalizate \u0219i cantit\u0103\u021bile neconforme<\/a>, verifica\u021bi ce \u00eenseamn\u0103 aceste c\u00e2mpuri \u00eenainte de a le folosi la calculul FPY. Trebuie s\u0103 \u0219ti\u021bi dac\u0103 num\u0103rul pieselor acceptate include piese reparate \u0219i dac\u0103 prelucr\u0103rile repetate au fost num\u0103rate de mai multe ori.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Randamentul la prima trecere \u0219i randamentul cumulat pe flux<\/h2>\n\n\n<p>O opera\u021bie luat\u0103 separat poate p\u0103rea performant\u0103, de\u0219i \u00eentregul flux necesit\u0103 corec\u021bii substan\u021biale. Randamentul cumulat pe flux (RTY) arat\u0103 performan\u021ba combinat\u0103 la prima trecere de-a lungul etapelor succesive ale procesului.<\/p>\n\n\n<p>Pentru o succesiune de etape m\u0103surate pe aceea\u0219i baz\u0103, \u00eenmul\u021bi\u021bi randamentele etapelor exprimate ca frac\u021bii zecimale:<\/p>\n\n\n<p><strong>RTY (%) = Randamentul la prima trecere \u00een etapa 1 \u00d7 Randamentul la prima trecere \u00een etapa 2 \u00d7 \u2026 \u00d7 100<\/strong><\/p>\n\n\n<p>Imagina\u021bi-v\u0103 c\u0103 urm\u0103ri\u021bi 1.000 de piese pe parcursul a trei opera\u021bii. \u00cen acest exemplu, \u00een grupul urm\u0103rit continu\u0103 doar piesele care nu au avut niciun rezultat neconform la prima trecere; piesele reparate nu reintr\u0103 \u00een acest grup.<\/p>\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Opera\u021bie<\/th><th>Piese din grupul urm\u0103rit care intr\u0103 \u00een opera\u021bie<\/th><th>Piese acceptate la prima \u00eencercare<\/th><th>Randamentul etapei<\/th><\/tr><\/thead><tbody><tr><td>Prelucrare mecanic\u0103<\/td><td>1.000<\/td><td>900<\/td><td>90%<\/td><\/tr><tr><td>Finisare<\/td><td>900<\/td><td>810<\/td><td>90%<\/td><\/tr><tr><td>Testare<\/td><td>810<\/td><td>729<\/td><td>90%<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p><strong>0,90 \u00d7 0,90 \u00d7 0,90 \u00d7 100 = 72,9% RTY<\/strong><\/p>\n\n\n<p>Fiecare opera\u021bie are un randament de 90%, dar numai 729 dintre cele 1.000 de piese ini\u021biale trec prin toate cele trei opera\u021bii f\u0103r\u0103 niciun rezultat neconform. Media celor trei procente ar fi de 90% \u0219i ar ascunde efectul cumulat.<\/p>\n\n\n<p>\u00cen produc\u021bia real\u0103, piesele reparate pot reintra \u00een flux, iar produsele pot urma trasee diferite. Folosi\u021bi randamente ale etapelor care corespund unui flux compatibil \u0219i aceleia\u0219i baze de num\u0103rare; nu \u00eenmul\u021bi\u021bi medii ale unor sec\u021bii f\u0103r\u0103 leg\u0103tur\u0103 \u00eentre ele pentru a prezenta rezultatul drept o rat\u0103 de succes observat\u0103 pe \u00eentregul flux. P\u0103strarea istoricului primei \u00eencerc\u0103ri pentru fiecare pies\u0103 v\u0103 permite s\u0103 verifica\u021bi c\u00e2te dintre piesele ini\u021biale au parcurs efectiv \u00eentregul flux f\u0103r\u0103 corec\u021bii.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Ce \u00eenseamn\u0103 un randament bun la prima trecere?<\/h2>\n\n\n<p>O \u021bint\u0103 util\u0103 \u021bine cont de produs, proces, cerin\u021bele de calitate \u0219i consecin\u021bele neconformit\u0103\u021bilor. Un reper general nu este suficient pentru a aprecia dac\u0103 opera\u021bia dumneavoastr\u0103 are o performan\u021b\u0103 bun\u0103.<\/p>\n\n\n<p>\u00cencepe\u021bi cu evolu\u021bia \u00een timp a unor lucr\u0103ri comparabile. Analiza\u021bi procentul \u00eempreun\u0103 cu num\u0103rul de piese m\u0103surate, cauzele neconformit\u0103\u021bilor \u0219i volumul lucr\u0103rilor de corec\u021bie. Un FPY mai mare este relevant atunci c\u00e2nd se aplic\u0103 acelea\u0219i reguli de acceptare; nu reprezint\u0103 o \u00eembun\u0103t\u0103\u021bire dac\u0103 echipa doar a relaxat criteriile de control sau a eliminat din numitor piesele cu probleme.<\/p>\n\n\n<p>Pentru a \u00eembun\u0103t\u0103\u021bi rezultatele, c\u0103uta\u021bi o problem\u0103 recurent\u0103 asupra c\u0103reia pute\u021bi interveni. Grupa\u021bi neconformit\u0103\u021bile de la prima \u00eencercare dup\u0103 opera\u021bie \u0219i cauza confirmat\u0103. O problem\u0103 dimensional\u0103 recurent\u0103 la un produs v\u0103 poate \u00eendrepta aten\u021bia spre scul\u0103, dispozitivul de fixare, material sau metod\u0103; procentul singur nu v\u0103 poate spune care dintre acestea este cauza. Verifica\u021bi dovezile \u00eempreun\u0103 cu oamenii care execut\u0103 lucr\u0103rile, elimina\u021bi cauza \u0219i m\u0103sura\u021bi din nou o produc\u021bie comparabil\u0103.<\/p>\n\n\n<p>Lua\u021bi \u00een calcul \u0219i efortul de recuperare. Dou\u0103 opera\u021bii cu acela\u0219i FPY pot avea consecin\u021be foarte diferite dac\u0103 una necesit\u0103 o corec\u021bie rapid\u0103, iar cealalt\u0103 ocup\u0103 timp de ore \u00eentregi un utilaj folosit \u0219i pentru alte lucr\u0103ri. \u00cen acest punct, rezultatul privind calitatea st\u0103 la baza unei decizii de planificare.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Transforma\u021bi reprelucr\u0103rile din spatele FPY \u00eentr-un necesar realist de capacitate<\/h2>\n\n\n<p>S\u0103 revenim la lotul de 500 de piese. Imagina\u021bi-v\u0103 c\u0103 fiecare dintre cele 40 de \u00eencerc\u0103ri de reprelucrare necesit\u0103 \u00eenc\u0103 12 minute pe acela\u0219i centru de prelucrare, indiferent dac\u0103 piesa este \u00een cele din urm\u0103 acceptat\u0103 sau rebutat\u0103.<\/p>\n\n\n<p><strong>40 de \u00eencerc\u0103ri \u00d7 12 minute = 480 de minute = 8 ore de func\u021bionare a utilajului<\/strong><\/p>\n\n\n<p>Raportul privind randamentul final arat\u0103 480 de piese acceptate. Planul de produc\u021bie trebuie s\u0103 \u021bin\u0103 cont \u0219i de cele opt ore suplimentare. Preg\u0103tirile, inspec\u021biile sau manipul\u0103rile suplimentare pot necesita timp \u0219i \u00een alte etape.<\/p>\n\n\n<p>Nu presupune\u021bi c\u0103 o rat\u0103 de respingere la prima trecere de 10% \u00eenseamn\u0103 o pierdere de capacitate de exact 10%. Traseele de reprelucrare \u0219i duratele lor difer\u0103. Calcula\u021bi volumul efectiv de munc\u0103 necesar pentru fiecare dintre resursele care trebuie s\u0103 \u00eel execute. De asemenea, orele de func\u021bionare a utilajelor \u0219i orele de lucru ale operatorilor trebuie tratate separat atunci c\u00e2nd reprezint\u0103 constr\u00e2ngeri diferite.<\/p>\n\n\n<p>Dac\u0103 acel centru de prelucrare este deja ocupat p\u00e2n\u0103 la o expediere important\u0103, introducerea reprelucr\u0103rilor \u00eentr-o coad\u0103 separat\u0103 nu creeaz\u0103 capacitate. Schimb\u0103 doar ordinea \u00een care pot fi finalizate comenzile. Identificarea din timp a conflictului v\u0103 permite s\u0103 stabili\u021bi o prioritate, s\u0103 folosi\u021bi o alt\u0103 resurs\u0103 adecvat\u0103 sau s\u0103 reevalua\u021bi termenul de livrare promis, \u00eenainte ca situa\u021bia s\u0103 devin\u0103 o surpriz\u0103 de ultim moment.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Folosi\u021bi SkyPlanner pentru a include reprelucr\u0103rile \u00eenregistrate \u00een urm\u0103torul plan de produc\u021bie<\/h2>\n\n\n<p>SkyPlanner reune\u0219te \u00eenregistrarea timpilor de produc\u021bie, rapoartele detaliate \u0219i programarea cu inteligen\u021b\u0103 artificial\u0103. Pentru o fabric\u0103 \u00een care reprelucr\u0103rile perturb\u0103 frecvent livr\u0103rile, acesta este urm\u0103torul pas util: s\u0103 fac\u0103 vizibil efortul de recuperare a pieselor \u0219i s\u0103 aloce realist timp pentru opera\u021biile corective aprobate, al\u0103turi de comenzile clien\u021bilor.<\/p>\n\n\n<p>Func\u021bia Timer din SkyPlanner \u00eenregistreaz\u0103 timpul de lucru \u0219i cantit\u0103\u021bile produse sau neconforme. Raportul All Timelogs Report asociaz\u0103 \u00eenregistr\u0103rile cu opera\u021bia, etapa procesului, centrul de lucru, persoana, orele de \u00eenceput \u0219i de sf\u00e2r\u0219it, piesele finalizate \u0219i neconforme, timpul \u00eenregistrat \u0219i noti\u021bele. \u00cenregistr\u0103rile pot fi verificate, editate \u0219i aprobate direct \u00een raport.<\/p>\n\n\n<p>C\u00e2nd opera\u021biile corective sunt identificate \u00een datele opera\u021biei \u0219i \u00een \u00eenregistr\u0103rile de timp, pute\u021bi vedea pe ce s-a consumat timpul, \u00een loc ca acesta s\u0103 se piard\u0103 \u00eentr-un total zilnic nediferen\u021biat. Pentru calculul FPY, p\u0103stra\u021bi istoricul accept\u0103rii la prima \u00eencercare \u0219i al reprelucr\u0103rilor din eviden\u021bele de calitate sau din MES. Aceste eviden\u021be explic\u0103 rezultatul din punct de vedere al calit\u0103\u021bii, iar \u00eenregistr\u0103rile de timp asociate explic\u0103 efortul necesar pentru recuperarea pieselor.<\/p>\n\n\n<p>Apoi include\u021bi \u00een program <a href=\"https:\/\/skyplanner.ai\/ro\/resurse\/comanda-de-productie\/\">opera\u021biile corective aprobate<\/a>, duratele acestora \u0219i resursele care le pot executa. Arcturus, motorul de inteligen\u021b\u0103 artificial\u0103 pentru programarea produc\u021biei din SkyPlanner, calculeaz\u0103 programul \u021bin\u00e2nd cont de capacitatea configurat\u0103, de dependen\u021bele dintre opera\u021bii \u0219i de priorit\u0103\u021bi. Diagrama Gantt arat\u0103 succesiunea rezultat\u0103 \u0219i datele de finalizare. Dumneavoastr\u0103 stabili\u021bi priorit\u0103\u021bile \u0219i deciziile care trebuie p\u0103strate; Arcturus se ocup\u0103 de calculul programului \u0219i al tuturor interdependen\u021belor.<\/p>\n\n\n<p>Pentru lotul din acest scenariu ipotetic, \u00eentrebarea devine concret\u0103: unde pot fi \u00eencadrate \u00eenc\u0103 opt ore de prelucrare \u0219i ce se \u00eent\u00e2mpl\u0103 cu comenzile care folosesc deja resursa respectiv\u0103? Recalcularea <a href=\"https:\/\/skyplanner.ai\/ro\/resurse\/ce-este-programarea-productiei\/\">planului comun<\/a> face vizibil acest compromis, f\u0103r\u0103 s\u0103 fie nevoie s\u0103 ajusta\u021bi manual c\u00e2te o coad\u0103 separat\u0103 pentru fiecare centru de lucru afectat.<\/p>\n\n\n<p>SkyPlanner se integreaz\u0103 cu orice ERP sau MES prin interfa\u021ba sa deschis\u0103 REST API. Pute\u021bi p\u0103stra sistemele \u00een care se afl\u0103 comenzile \u0219i istoricul calit\u0103\u021bii, conect\u00e2nd totodat\u0103 opera\u021biile generate de acestea la programarea produc\u021biei pe capacitate finit\u0103.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Vede\u021bi cum afecteaz\u0103 livr\u0103rile pierderile la prima trecere<\/h2>\n\n\n<p>Alege\u021bi o opera\u021bie la care cantitatea final\u0103 acceptat\u0103 ascunde frecvent munc\u0103 suplimentar\u0103. Preg\u0103ti\u021bi pentru o demonstra\u021bie SkyPlanner rezultatele la prima \u00eencercare, un traseu tipic de reprelucrare aprobat \u0219i o comand\u0103 de client afectat\u0103.<\/p>\n\n\n<p>Ve\u021bi avea astfel un punct de plecare concret pentru a vedea cum \u00eenregistr\u0103rile din produc\u021bie \u0219i un program comun v\u0103 pot ajuta echipa s\u0103 reac\u021bioneze: s\u0103 \u00een\u021beleag\u0103 efortul de recuperare a pieselor, s\u0103 analizeze conflictul de capacitate \u0219i s\u0103 ia urm\u0103toarea decizie de livrare pe baza unui plan care include \u0219i opera\u021biile r\u0103mase de executat. <a href=\"https:\/\/skyplanner.ai\/ro\/contact-vanzari\/\">Programa\u021bi o demonstra\u021bie SkyPlanner<\/a> pentru a analiza procesul dumneavoastr\u0103 sau <a href=\"https:\/\/skyplanner.ai\/ro\/proba\/\">\u00eencerca\u021bi mai \u00eent\u00e2i SkyPlanner cu date demonstrative<\/a>.<\/p>\n\n<\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>Randament la prima trecere: formul\u0103, exemplu \u0219i reprelucr\u0103ri ascunse Acas\u0103 &raquo; Resurse &raquo; Randament la prima trecere: formul\u0103, exemplu \u0219i reprelucr\u0103ri ascunse Randamentul la prima trecere (FPY) reprezint\u0103 procentul de piese care \u00eendeplinesc cerin\u021bele de calitate stabilite la prima parcurgere a unui proces definit, f\u0103r\u0103 repara\u021bii, reprelucr\u0103ri sau repetarea unui test \u00een urma unui rezultat &#8230; <a title=\"Randament la prima trecere: formul\u0103, exemplu \u0219i reprelucr\u0103ri ascunse\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/ro\/resurse\/randament-la-prima-trecere\/\" aria-label=\"Read more about Randament la prima trecere: formul\u0103, exemplu \u0219i reprelucr\u0103ri ascunse\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":104594,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[2565,514],"tags":[],"class_list":["post-104587","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-eficienta-productiei","category-resurse","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Randament la prima trecere: formul\u0103, exemplu, reprelucr\u0103ri ascunse<\/title>\n<meta name=\"description\" content=\"Calcula\u021bi FPY f\u0103r\u0103 a num\u0103ra piesele reparate ca acceptate din prima. Vede\u021bi cum reprelucrarea consum\u0103 capacitate \u0219i cum v\u0103 ajut\u0103 SkyPlanner s\u0103 o planifica\u021bi.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/ro\/resurse\/randament-la-prima-trecere\/\" \/>\n<meta property=\"og:locale\" content=\"ro_RO\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Randament la prima trecere: formul\u0103, exemplu \u0219i reprelucr\u0103ri ascunse\" \/>\n<meta property=\"og:description\" content=\"Calcula\u021bi FPY f\u0103r\u0103 a num\u0103ra piesele reparate ca acceptate din prima. Vede\u021bi cum reprelucrarea consum\u0103 capacitate \u0219i cum v\u0103 ajut\u0103 SkyPlanner s\u0103 o planifica\u021bi.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/ro\/resurse\/randament-la-prima-trecere\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2026-10-20T19:34:39+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-20T19:37:08+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/first-pass-yield-hero.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1672\" \/>\n\t<meta property=\"og:image:height\" content=\"941\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Scris de\" \/>\n\t<meta name=\"twitter:data1\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n\t<meta name=\"twitter:label2\" content=\"Timp estimat pentru citire\" \/>\n\t<meta name=\"twitter:data2\" content=\"11 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/resurse\\\/randament-la-prima-trecere\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/resurse\\\/randament-la-prima-trecere\\\/\"},\"author\":{\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\"},\"headline\":\"Randament la prima trecere: formul\u0103, exemplu \u0219i reprelucr\u0103ri ascunse\",\"datePublished\":\"2026-10-20T19:34:39+00:00\",\"dateModified\":\"2026-10-20T19:37:08+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/resurse\\\/randament-la-prima-trecere\\\/\"},\"wordCount\":2245,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/resurse\\\/randament-la-prima-trecere\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/first-pass-yield-hero.png\",\"articleSection\":[\"Eficien\u021ba produc\u021biei\",\"Resurse\"],\"inLanguage\":\"ro-RO\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/resurse\\\/randament-la-prima-trecere\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/resurse\\\/randament-la-prima-trecere\\\/\",\"name\":\"Randament la prima trecere: formul\u0103, exemplu, reprelucr\u0103ri ascunse\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/resurse\\\/randament-la-prima-trecere\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/resurse\\\/randament-la-prima-trecere\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/first-pass-yield-hero.png\",\"datePublished\":\"2026-10-20T19:34:39+00:00\",\"dateModified\":\"2026-10-20T19:37:08+00:00\",\"description\":\"Calcula\u021bi FPY f\u0103r\u0103 a num\u0103ra piesele reparate ca acceptate din prima. Vede\u021bi cum reprelucrarea consum\u0103 capacitate \u0219i cum v\u0103 ajut\u0103 SkyPlanner s\u0103 o planifica\u021bi.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/resurse\\\/randament-la-prima-trecere\\\/#breadcrumb\"},\"inLanguage\":\"ro-RO\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/resurse\\\/randament-la-prima-trecere\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"ro-RO\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/resurse\\\/randament-la-prima-trecere\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/first-pass-yield-hero.png\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/first-pass-yield-hero.png\",\"width\":1672,\"height\":941,\"caption\":\"Machined flanges pass inspection directly or take a correction loop, illustrating first-pass yield and rework.\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/resurse\\\/randament-la-prima-trecere\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Randament la prima trecere: formul\u0103, exemplu \u0219i reprelucr\u0103ri ascunse\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"ro-RO\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"ro-RO\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\",\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"ro-RO\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"caption\":\"Jussi M\u00e4ntyl\u00e4\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Randament la prima trecere: formul\u0103, exemplu, reprelucr\u0103ri ascunse","description":"Calcula\u021bi FPY f\u0103r\u0103 a num\u0103ra piesele reparate ca acceptate din prima. Vede\u021bi cum reprelucrarea consum\u0103 capacitate \u0219i cum v\u0103 ajut\u0103 SkyPlanner s\u0103 o planifica\u021bi.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/ro\/resurse\/randament-la-prima-trecere\/","og_locale":"ro_RO","og_type":"article","og_title":"Randament la prima trecere: formul\u0103, exemplu \u0219i reprelucr\u0103ri ascunse","og_description":"Calcula\u021bi FPY f\u0103r\u0103 a num\u0103ra piesele reparate ca acceptate din prima. Vede\u021bi cum reprelucrarea consum\u0103 capacitate \u0219i cum v\u0103 ajut\u0103 SkyPlanner s\u0103 o planifica\u021bi.","og_url":"https:\/\/skyplanner.ai\/ro\/resurse\/randament-la-prima-trecere\/","og_site_name":"SkyPlanner","article_published_time":"2026-10-20T19:34:39+00:00","article_modified_time":"2026-10-20T19:37:08+00:00","og_image":[{"width":1672,"height":941,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/first-pass-yield-hero.png","type":"image\/png"}],"author":"Jussi M\u00e4ntyl\u00e4","twitter_card":"summary_large_image","twitter_misc":{"Scris de":"Jussi M\u00e4ntyl\u00e4","Timp estimat pentru citire":"11 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/ro\/resurse\/randament-la-prima-trecere\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/ro\/resurse\/randament-la-prima-trecere\/"},"author":{"name":"Jussi M\u00e4ntyl\u00e4","@id":"https:\/\/skyplanner.ai\/ro\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5"},"headline":"Randament la prima trecere: formul\u0103, exemplu \u0219i reprelucr\u0103ri ascunse","datePublished":"2026-10-20T19:34:39+00:00","dateModified":"2026-10-20T19:37:08+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/ro\/resurse\/randament-la-prima-trecere\/"},"wordCount":2245,"publisher":{"@id":"https:\/\/skyplanner.ai\/ro\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/ro\/resurse\/randament-la-prima-trecere\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/first-pass-yield-hero.png","articleSection":["Eficien\u021ba produc\u021biei","Resurse"],"inLanguage":"ro-RO"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/ro\/resurse\/randament-la-prima-trecere\/","url":"https:\/\/skyplanner.ai\/ro\/resurse\/randament-la-prima-trecere\/","name":"Randament la prima trecere: formul\u0103, exemplu, reprelucr\u0103ri ascunse","isPartOf":{"@id":"https:\/\/skyplanner.ai\/ro\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/ro\/resurse\/randament-la-prima-trecere\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/ro\/resurse\/randament-la-prima-trecere\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/first-pass-yield-hero.png","datePublished":"2026-10-20T19:34:39+00:00","dateModified":"2026-10-20T19:37:08+00:00","description":"Calcula\u021bi FPY f\u0103r\u0103 a num\u0103ra piesele reparate ca acceptate din prima. Vede\u021bi cum reprelucrarea consum\u0103 capacitate \u0219i cum v\u0103 ajut\u0103 SkyPlanner s\u0103 o planifica\u021bi.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/ro\/resurse\/randament-la-prima-trecere\/#breadcrumb"},"inLanguage":"ro-RO","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/ro\/resurse\/randament-la-prima-trecere\/"]}]},{"@type":"ImageObject","inLanguage":"ro-RO","@id":"https:\/\/skyplanner.ai\/ro\/resurse\/randament-la-prima-trecere\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/first-pass-yield-hero.png","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/first-pass-yield-hero.png","width":1672,"height":941,"caption":"Machined flanges pass inspection directly or take a correction loop, illustrating first-pass yield and rework."},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/ro\/resurse\/randament-la-prima-trecere\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/ro\/"},{"@type":"ListItem","position":2,"name":"Randament la prima trecere: formul\u0103, exemplu \u0219i reprelucr\u0103ri ascunse"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/ro\/#website","url":"https:\/\/skyplanner.ai\/ro\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/ro\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/ro\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"ro-RO"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/ro\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/ro\/","logo":{"@type":"ImageObject","inLanguage":"ro-RO","@id":"https:\/\/skyplanner.ai\/ro\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/ro\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]},{"@type":"Person","@id":"https:\/\/skyplanner.ai\/ro\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5","name":"Jussi M\u00e4ntyl\u00e4","image":{"@type":"ImageObject","inLanguage":"ro-RO","@id":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","caption":"Jussi M\u00e4ntyl\u00e4"}}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/first-pass-yield-hero.png",1672,941,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/first-pass-yield-hero-150x150.png",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/first-pass-yield-hero-300x169.png",300,169,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/first-pass-yield-hero-768x432.png",768,432,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/first-pass-yield-hero-1024x576.png",1024,576,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/first-pass-yield-hero-1536x864.png",1536,864,true],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/first-pass-yield-hero.png",1672,941,false],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/first-pass-yield-hero-360x203.png",360,203,true]},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/ro\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Randament la prima trecere: formul\u0103, exemplu \u0219i reprelucr\u0103ri ascunse Acas\u0103 &raquo; Resurse &raquo; Randament la prima trecere: formul\u0103, exemplu \u0219i reprelucr\u0103ri ascunse Randamentul la prima trecere (FPY) reprezint\u0103 procentul de piese care \u00eendeplinesc cerin\u021bele de calitate stabilite la prima parcurgere a unui proces definit, f\u0103r\u0103 repara\u021bii, reprelucr\u0103ri sau repetarea unui test \u00een urma unui rezultat&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/posts\/104587","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/comments?post=104587"}],"version-history":[{"count":1,"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/posts\/104587\/revisions"}],"predecessor-version":[{"id":104649,"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/posts\/104587\/revisions\/104649"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/media\/104594"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/media?parent=104587"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/categories?post=104587"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/tags?post=104587"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}