{"id":102544,"date":"2026-10-20T13:56:48","date_gmt":"2026-10-20T13:56:48","guid":{"rendered":"https:\/\/skyplanner.ai\/?p=102544"},"modified":"2026-10-20T13:58:47","modified_gmt":"2026-10-20T13:58:47","slug":"productie-in-curs-de-executie","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/ro\/resurse\/productie-in-curs-de-executie\/","title":{"rendered":"Produc\u021bia \u00een curs de execu\u021bie: cantitate, cost \u0219i control"},"content":{"rendered":"<div class=\"gb-container gb-container-article01 article-main-content-container\">\n\n<h1 class=\"wp-block-heading\">Produc\u021bia \u00een curs de execu\u021bie: cantitate, cost \u0219i control<\/h1>\n\n<div class=\"gb-container gb-container-article02\">\n\n<p><a href=\"\/ro\/\">Acas\u0103<\/a> &raquo; <a href=\"https:\/\/skyplanner.ai\/ro\/resurse\/\">Resurse<\/a> &raquo; Produc\u021bia \u00een curs de execu\u021bie: cantitate, cost \u0219i control<\/p>\n\n\n<p class=\"yoast-reading-time__wrapper\"><span class=\"yoast-reading-time__icon\"><svg aria-hidden=\"true\" focusable=\"false\" data-icon=\"clock\" width=\"20\" height=\"20\" fill=\"none\" stroke=\"currentColor\" style=\"display:inline-block;vertical-align:-0.1em\" role=\"img\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewBox=\"0 0 24 24\"><path stroke-linecap=\"round\" stroke-linejoin=\"round\" stroke-width=\"2\" d=\"M12 8v4l3 3m6-3a9 9 0 11-18 0 9 9 0 0118 0z\"><\/path><\/svg><\/span><span class=\"yoast-reading-time__spacer\" style=\"display:inline-block;width:1em\"><\/span><span class=\"yoast-reading-time__descriptive-text\">Timp estimat de citire: <\/span><span class=\"yoast-reading-time__reading-time\">9<\/span><span class=\"yoast-reading-time__time-unit\"> minute<\/span><\/p>\n\n<\/div>\n<div class=\"gb-container gb-container-article03\">\n\n<p>Produc\u021bia \u00een curs de execu\u021bie (WIP) cuprinde bunurile care au intrat \u00een produc\u021bie, dar nu sunt \u00eenc\u0103 finalizate. Include at\u00e2t piesele aflate \u00een prelucrare, c\u00e2t \u0219i produsele nefinalizate care a\u0219teapt\u0103 \u00eentre opera\u021bii. \u00cen contabilitate, WIP se refer\u0103 \u0219i la costurile de produc\u021bie acumulate \u00een aceste bunuri nefinalizate.<\/p>\n\n\n<p>Aceste dou\u0103 perspective r\u0103spund la \u00eentreb\u0103ri diferite. Num\u0103rul de unit\u0103\u021bi arat\u0103 c\u00e2t\u0103 produc\u021bie este nefinalizat\u0103. Valoarea costurilor arat\u0103 ce cost de produc\u021bie este imobilizat \u00een ea. Niciuna nu explic\u0103, de una singur\u0103, de ce un lot a\u0219teapt\u0103 de luni sau c\u00e2nd va putea, \u00een sf\u00e2r\u0219it, s\u0103 ias\u0103 din produc\u021bie.<\/p>\n\n\n<p>Pentru un manager de produc\u021bie, aceasta este urm\u0103toarea \u00eentrebare care merit\u0103 pus\u0103. SkyPlanner APS coreleaz\u0103 opera\u021biile r\u0103mase cu capacitatea, disponibilitatea materialelor \u0219i priorit\u0103\u021bile, ajut\u00e2ndu-v\u0103 s\u0103 finaliza\u021bi lucr\u0103rile \u00een loc s\u0103 tot ad\u0103uga\u021bi lucr\u0103ri \u00een cozile de a\u0219teptare. O programare mai bun\u0103 reduce acumul\u0103rile inutile de produc\u021bie \u00een curs \u0219i capitalul imobilizat \u00een acestea.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Ce se include \u00een produc\u021bia \u00een curs de execu\u021bie?<\/h2>\n\n\n<p>Privi\u021bi stocurile \u00een trei puncte ale fluxului de fabrica\u021bie:<\/p>\n\n\n<ul class=\"wp-block-list\"><li><strong>Materii prime:<\/strong> materiale \u0219i componente cump\u0103rate care a\u0219teapt\u0103 s\u0103 fie utilizate \u00een produc\u021bie.<\/li><li><strong>Produc\u021bie \u00een curs de execu\u021bie:<\/strong> bunuri a c\u0103ror fabrica\u021bie a \u00eenceput, dar care mai necesit\u0103 opera\u021bii de fabrica\u021bie, asamblare sau verific\u0103rile finale obligatorii.<\/li><li><strong>Produse finite:<\/strong> produse finalizate, chiar dac\u0103 nu au fost \u00eenc\u0103 v\u00e2ndute sau expediate.<\/li><\/ul>\n\n\n<p>O carcas\u0103 prelucrat\u0103 mecanic care a\u0219teapt\u0103 aplicarea unui strat de acoperire face parte din WIP. La fel \u0219i o unitate asamblat\u0103 care a\u0219teapt\u0103 inspec\u021bia final\u0103 necesar\u0103 pentru \u00eencheierea produc\u021biei. O unitate finalizat\u0103 \u0219i acceptat\u0103, care a\u0219teapt\u0103 camionul de livrare, este un produs finit, nu WIP.<\/p>\n\n\n<p>O pies\u0103 nefinalizat\u0103 r\u0103m\u00e2ne inclus\u0103 \u00een num\u0103r\u0103toare \u0219i atunci c\u00e2nd a\u0219teapt\u0103. A\u0219teptarea la coad\u0103, transferurile \u0219i bloc\u0103rile pot reprezenta o mare parte din timpul petrecut de un produs \u00een produc\u021bie, chiar dac\u0103 \u00een acel moment niciun utilaj nu \u00eel prelucreaz\u0103.<\/p>\n\n\n<p>Ve\u021bi \u00eent\u00e2lni \u0219i expresia <strong>lucr\u0103ri \u00een curs<\/strong>. Terminologia difer\u0103 de la o companie \u0219i de la o industrie la alta; \u00een acest ghid, WIP \u00eenseamn\u0103 stocul de produc\u021bie nefinalizat\u0103, nu un calcul pentru facturarea unui proiect sau num\u0103rul de sarcini de pe panoul unei echipe de dezvoltare software.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Cum m\u0103sura\u021bi cantitatea fizic\u0103 de produc\u021bie \u00een curs<\/h2>\n\n\n<p>\u00cencepe\u021bi prin a delimita clar ce urm\u0103ri\u021bi: de exemplu, o familie de produse, de la prima opera\u021bie de fabrica\u021bie p\u00e2n\u0103 la acceptarea final\u0103. Num\u0103ra\u021bi piesele nefinalizate din acest perimetru la un moment precizat. Pentru produc\u021bia \u00een vrac, unitatea potrivit\u0103 poate fi kilogramul sau litrul, nu bucata.<\/p>\n\n\n<p>Imagina\u021bi-v\u0103 o fabric\u0103 \u00een care se urm\u0103re\u0219te o familie de carcase identice. La sf\u00e2r\u0219itul schimbului de vineri, situa\u021bia este urm\u0103toarea:<\/p>\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Etapa curent\u0103<\/th><th>Carcase nefinalizate<\/th><th>Ce mai este de f\u0103cut<\/th><\/tr><\/thead><tbody><tr><td>\u00cen prelucrare mecanic\u0103<\/td><td>20<\/td><td>\u00cencheierea prelucr\u0103rii mecanice, finisare \u0219i inspec\u021bie<\/td><\/tr><tr><td>\u00cen a\u0219teptarea finis\u0103rii<\/td><td>60<\/td><td>Finisare \u0219i inspec\u021bie<\/td><\/tr><tr><td>\u00cen a\u0219teptarea inspec\u021biei finale<\/td><td>20<\/td><td>Inspec\u021bie \u0219i acceptare<\/td><\/tr><tr><td><strong>Total WIP<\/strong><\/td><td><strong>100<\/strong><\/td><td><strong>Volumul de munc\u0103 r\u0103mas difer\u0103<\/strong><\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>Num\u0103ra\u021bi fiecare carcas\u0103 o singur\u0103 dat\u0103, la etapa \u00een care se afl\u0103. Nu num\u0103ra\u021bi din nou acela\u0219i lot pentru fiecare opera\u021bie r\u0103mas\u0103 \u00een fluxul s\u0103u tehnologic.<\/p>\n\n\n<p>Pute\u021bi verifica \u0219i concordan\u021ba dintre intr\u0103rile \u0219i ie\u0219irile din perimetrul urm\u0103rit. S\u0103 presupunem c\u0103 s\u0103pt\u0103m\u00e2na a \u00eenceput cu 120 de carcase nefinalizate, alte 480 au intrat \u00een produc\u021bie, iar 500 au devenit produse finite. Dac\u0103 nu exist\u0103 rebuturi sau alte mi\u0219c\u0103ri:<\/p>\n\n\n<p><strong>WIP la sf\u00e2r\u0219itul perioadei = 120 + 480 \u2212 500 = 100 de carcase<\/strong><\/p>\n\n\n<p>Dac\u0103 rezultatul nu corespunde num\u0103rului de piese constatat fizic, verifica\u021bi finaliz\u0103rile ne\u00eenregistrate, transferurile ne\u00eenregistrate, rebuturile sau momentul de \u00eenchidere a eviden\u021bei \u00eenainte de a trage concluzii despre performan\u021ba produc\u021biei.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Num\u0103rul de piese nu este acela\u0219i lucru cu volumul de munc\u0103 r\u0103mas<\/h3>\n\n\n<p>Tabelul cuprinde 100 de piese nefinalizate, dar cele 20 care a\u0219teapt\u0103 inspec\u021bia necesit\u0103 mult mai pu\u021bin\u0103 munc\u0103 dec\u00e2t cele 20 aflate \u00eenc\u0103 \u00een prelucrare mecanic\u0103. Prin urmare, dou\u0103 cozi cu acela\u0219i num\u0103r de piese pot solicita capacitatea \u00een moduri foarte diferite.<\/p>\n\n\n<p>\u00centr-o fabric\u0103 cu produse variate, num\u0103rul comenzilor de lucru spune \u0219i mai pu\u021bin: o comand\u0103 poate necesita o inspec\u021bie scurt\u0103, iar alta, c\u00e2teva zile de lucru pe mai multe resurse. Urm\u0103ri\u021bi cantit\u0103\u021bile pe produs sau pe familii relevante \u0219i folosi\u021bi duratele opera\u021biilor r\u0103mase pentru a \u00een\u021belege \u00eenc\u0103rcarea. Exprima\u021bi aceast\u0103 \u00eenc\u0103rcare \u00een ore; ea nu este un alt mod de a denumi num\u0103rul de unit\u0103\u021bi WIP sau valoarea WIP.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Formula de calcul al costului produc\u021biei \u00een curs de execu\u021bie<\/h2>\n\n\n<p>Pentru o reconciliere simplificat\u0103 a costurilor unei perioade:<\/p>\n\n\n<p><strong>Costul WIP la sf\u00e2r\u0219itul perioadei = costul WIP la \u00eenceputul perioadei + costurile de produc\u021bie ad\u0103ugate \u2212 costul produc\u021biei finalizate<\/strong><\/p>\n\n\n<p>Costurile de produc\u021bie ad\u0103ugate includ materialele directe consumate, manopera direct\u0103 \u0219i cheltuielile indirecte de produc\u021bie repartizate. <strong>Costul produc\u021biei finalizate (COGM)<\/strong> este costul transferat la \u00eencheierea produc\u021biei. Nu reprezint\u0103 pre\u021bul de v\u00e2nzare \u0219i nici costul bunurilor v\u00e2ndute \u00een perioada respectiv\u0103.<\/p>\n\n\n<p>Imagina\u021bi-v\u0103 un exemplu separat, privind costurile lunare. Valoarea ini\u021bial\u0103 a WIP este de $18.000, produc\u021bia adaug\u0103 costuri de $72.000, iar bunurile finalizate, cu un cost de $65.000, sunt transferate \u00een stocul de produse finite. F\u0103r\u0103 alte ajust\u0103ri:<\/p>\n\n\n<p><strong>$18.000 + $72.000 \u2212 $65.000 = $25.000, costul WIP la sf\u00e2r\u0219itul perioadei<\/strong><\/p>\n\n\n<p>Acesta este un sold al costurilor, nu 25.000 de unit\u0103\u021bi sau un profit viitor de $25.000. Exemplul este separat de cel privind num\u0103rul de carcase de mai sus.<\/p>\n\n\n<h3 class=\"wp-block-heading\">De ce num\u0103rul de unit\u0103\u021bi nu v\u0103 indic\u0103 valoarea<\/h3>\n\n\n<p>Un produs nefinalizat a acumulat doar costurile care i-au fost atribuite p\u00e2n\u0103 \u00een acel moment. \u00cenmul\u021birea num\u0103rului de piese nefinalizate cu costul integral al produsului finit poate supraevalua soldul. Nici \u201ela jum\u0103tatea fluxului tehnologic\u201d nu \u00eenseamn\u0103 neap\u0103rat jum\u0103tate din costul total: materialele scumpe pot intra la \u00eenceput, \u00een timp ce costurile cu manopera \u0219i prelucrarea se acumuleaz\u0103 ulterior.<\/p>\n\n\n<p>Folosi\u021bi eviden\u021bele costurilor \u0219i politica contabil\u0103 aplicat\u0103 de echipa financiar\u0103. Reconcilierea soldului ini\u021bial cu cel final explic\u0103 mi\u0219carea costurilor; raportarea financiar\u0103 poate necesita \u0219i ajust\u0103ri de evaluare conform cadrului contabil aplicabil.<\/p>\n\n\n<p>Pentru deciziile de produc\u021bie, distinc\u021bia important\u0103 este mai simpl\u0103: costul acumulat arat\u0103 ce s-a investit p\u00e2n\u0103 acum \u00een lucrare. Opera\u021biile r\u0103mase din fluxul tehnologic arat\u0103 ce mai este necesar p\u00e2n\u0103 la finalizare. Ave\u021bi nevoie de ambele perspective, f\u0103r\u0103 a o \u00eenlocui pe una cu cealalt\u0103.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Ce indic\u0103, de fapt, un nivel ridicat sau sc\u0103zut de WIP<\/h2>\n\n\n<p>Un nivel ridicat de WIP este un motiv de analiz\u0103, nu un diagnostic complet. Poate reflecta o cerere mai mare, o structur\u0103 diferit\u0103 a produc\u021biei, capacitate protejat\u0103 \u00een mod deliberat sau lucr\u0103ri care se acumuleaz\u0103 \u00een urma unei \u00eentreruperi. Un nivel sc\u0103zut poate \u00eensemna un flux fluent, dar \u0219i c\u0103 o resurs\u0103 critic\u0103 are prea pu\u021bine lucr\u0103ri preg\u0103tite pentru prelucrare.<\/p>\n\n\n<p>Obiectivul nu este eliminarea complet\u0103 a produc\u021biei nefinalizate, ci men\u021binerea \u00een produc\u021bie a unui volum suficient din lucr\u0103rile necesare, astfel \u00eenc\u00e2t finalizarea lor s\u0103 fie previzibil\u0103, f\u0103r\u0103 lans\u0103ri premature, a\u0219tept\u0103ri \u0219i manipul\u0103ri inutile.<\/p>\n\n\n<p>S\u0103 revenim la cele 60 de carcase care a\u0219teapt\u0103 finisarea. Dac\u0103 au fost prelucrate mecanic \u00een aceast\u0103 diminea\u021b\u0103 pentru un interval de finisare programat \u00een aceast\u0103 dup\u0103-amiaz\u0103, coada poate fi pe deplin justificat\u0103. Dac\u0103 a\u0219teapt\u0103 de o s\u0103pt\u0103m\u00e2n\u0103, \u00een timp ce resursa de finisare prelucreaz\u0103 alte comenzi, acela\u0219i num\u0103r de piese descrie o problem\u0103 diferit\u0103.<\/p>\n\n\n<p>Pentru a \u00een\u021belege aceast\u0103 coad\u0103 de a\u0219teptare, stabili\u021bi:<\/p>\n\n\n<p>1. <strong>Vechimea lotului:<\/strong> c\u00e2nd a intrat \u00een produc\u021bie \u0219i de c\u00e2t timp a\u0219teapt\u0103 aici?<\/p>\n\n\n<p>2. <strong>Urm\u0103toarea opera\u021bie:<\/strong> de ce resurs\u0103, material sau aprobare are nevoie pentru a continua?<\/p>\n\n\n<p>3. <strong>Finalizarea planificat\u0103:<\/strong> c\u00e2nd pot fi programate opera\u021biile r\u0103mase \u0219i permite acest lucru respectarea termenului asumat pentru comand\u0103?<\/p>\n\n\n<p>4. <strong>Motivul a\u0219tept\u0103rii:<\/strong> este un stoc tampon planificat, mai multe lucr\u0103ri solicit\u0103 aceea\u0219i capacitate, lipsesc materiale, exist\u0103 o blocare din motive de calitate sau o alt\u0103 \u00eentrerupere?<\/p>\n\n\n<p>Astfel, constatarea \u201eavem prea mult\u0103 produc\u021bie \u00een curs\u201d devine o decizie concret\u0103, pe baza c\u0103reia se poate ac\u021biona. Lipsa unei componente cump\u0103rate necesit\u0103 o alt\u0103 interven\u021bie dec\u00e2t supra\u00eenc\u0103rcarea unui post de finisare. Prelucrarea mecanic\u0103 a \u00eenc\u0103 unui lot nu va rezolva niciuna dintre aceste probleme.<\/p>\n\n\n<p>Analiza\u021bi WIP \u00eempreun\u0103 cu <a href=\"https:\/\/skyplanner.ai\/ro\/resurse\/rata-de-productie\/\">volumul produc\u021biei finalizate<\/a> \u0219i performan\u021ba livr\u0103rilor. Dac\u0103 \u00een produc\u021bie intr\u0103 mai multe unit\u0103\u021bi dec\u00e2t ies sub form\u0103 de produse finite \u0219i nu exist\u0103 alte ie\u0219iri, stocul nefinalizat se acumuleaz\u0103. Dac\u0103 WIP scade doar fiindc\u0103 produc\u021bia nu mai prime\u0219te comenzi, aceasta nu este o dovad\u0103 a \u00eembun\u0103t\u0103\u021birii procesului. Compara\u021bi perioade \u0219i familii de produse similare, pentru a nu confunda o schimbare \u00een structura produc\u021biei cu o \u00eembun\u0103t\u0103\u021bire.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Folosi\u021bi SkyPlanner pentru a planifica finalizarea produc\u021biei \u00een curs<\/h2>\n\n\n<p>Odat\u0103 ce \u0219ti\u021bi unde a\u0219teapt\u0103 lucr\u0103rile, ave\u021bi de rezolvat o problem\u0103 concret\u0103 de programare: cum pot fi \u00eencadrate opera\u021biile r\u0103mase \u00een program, al\u0103turi de toate celelalte lucr\u0103ri pe care fabrica trebuie s\u0103 le finalizeze?<\/p>\n\n\n<p>SkyPlanner reune\u0219te posturile de lucru, schimburile, operatorii, etapele procesului \u0219i duratele \u00eentr-un <a href=\"https:\/\/skyplanner.ai\/ro\/resurse\/ce-este-programarea-productiei\/\">program de produc\u021bie comun<\/a>. Arcturus, motorul s\u0103u de programare bazat pe inteligen\u021b\u0103 artificial\u0103, programeaz\u0103 opera\u021biile \u00een func\u021bie de capacitatea, dependen\u021bele \u0219i priorit\u0103\u021bile configurate. Vizualizarea Gantt arat\u0103 succesiunea rezultat\u0103 pe resurse, \u00een loc ca fiecare departament s\u0103 \u00ee\u0219i gestioneze propria coad\u0103 de a\u0219teptare.<\/p>\n\n\n<p>Pentru carcasele aflate \u00een a\u0219teptare, pute\u021bi analiza opera\u021bia de finisare \u00een contextul lucr\u0103rilor care o preced\u0103 \u0219i o urmeaz\u0103. Resursa este ocupat\u0103 pentru a respecta un angajament anterior? Poate fi programat\u0103 apoi \u0219i inspec\u021bia? Lansarea acum a \u00eenc\u0103 unui lot de carcase nu ar face dec\u00e2t s\u0103 adauge alte piese \u00een a\u0219teptare?<\/p>\n\n\n<p>C\u00e2nd este activat\u0103 programarea care \u021bine cont de materiale, Arcturus ia \u00een calcul \u0219i stocurile, precum \u0219i disponibilitatea materialelor care urmeaz\u0103 s\u0103 soseasc\u0103. Acest lucru conteaz\u0103 atunci c\u00e2nd o opera\u021bie ulterioar\u0103 necesit\u0103 o component\u0103 achizi\u021bionat\u0103: nu este suficient ca primul utilaj s\u0103 fie disponibil dac\u0103 apoi comanda nu poate trece prin asamblare.<\/p>\n\n\n<p>Pentru ca planul s\u0103 r\u0103m\u00e2n\u0103 util, este nevoie de informa\u021bii despre progresul produc\u021biei. Func\u021bia Timer din SkyPlanner \u00eenregistreaz\u0103 \u00eenceperea \u0219i oprirea lucrului, precum \u0219i cantit\u0103\u021bile produse, iar interfa\u021ba sa deschis\u0103 REST API permite conectarea cu orice sistem ERP sau MES. Pe m\u0103sur\u0103 ce progresul, disponibilitatea sau priorit\u0103\u021bile se schimb\u0103, Arcturus poate recalcula programul pe baza informa\u021biilor actualizate. Dumneavoastr\u0103 stabili\u021bi priorit\u0103\u021bile; inteligen\u021ba artificial\u0103 se ocup\u0103 de calculul programului de produc\u021bie.<\/p>\n\n\n<p>Astfel, ave\u021bi mai pu\u021bin de lucru \u00een fiecare zi la corectarea separat\u0103 a cozilor de lucr\u0103ri de la fiecare utilaj \u0219i o baz\u0103 mai clar\u0103 pentru a decide ce lucr\u0103ri trebuie s\u0103 avanseze. Pute\u021bi evita alocarea prematur\u0103 de materiale \u0219i efort suplimentar unor comenzi, concentr\u00e2ndu-v\u0103 \u00een schimb pe lucr\u0103rile neterminate care trebuie finalizate pentru livrare.<\/p>\n\n\n<p>Finalizarea produc\u021biei nu elibereaz\u0103, \u00een sine, numerar: trecerea bunurilor din produc\u021bia \u00een curs de execu\u021bie \u00een stocul de produse finite le schimb\u0103 statutul, dar ele r\u0103m\u00e2n \u00een stoc. Beneficiul financiar provine din reducerea stocurilor inutile \u0219i din avansarea lucr\u0103rilor potrivite p\u00e2n\u0103 la satisfacerea cererii clien\u021bilor, nu doar din mic\u0219orarea valorii raportate pentru produc\u021bia \u00een curs de execu\u021bie.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Ce s-a schimbat la Mamec c\u00e2nd lucr\u0103rile au fost programate la momentul potrivit<\/h2>\n\n\n<p>Mamec, un produc\u0103tor finlandez de echipamente industriale de amestecare \u0219i de produse de \u00eenalt\u0103 tehnologie realizate pe baz\u0103 de contract, stabilea anterior priorit\u0103\u021bile pentru mii de comenzi de lucru interdependente dup\u0103 termenele de livrare \u00eenscrise pe documentele pe h\u00e2rtie. Planificarea din sistemul ERP nu oferea o imagine de ansamblu, iar conducerea se baza pe estim\u0103ri subiective pentru a evalua gradul de \u00eenc\u0103rcare a produc\u021biei.<\/p>\n\n\n<p>Prin integrarea SkyPlanner cu Oscar ERP, Mamec a ob\u021binut programare pe capacitate finit\u0103 \u0219i o imagine comun\u0103 asupra stadiului comenzilor \u0219i a program\u0103rii acestora. Angaja\u021bii puteau consulta direct o comand\u0103, \u00een loc s\u0103 depind\u0103 de interpret\u0103ri diferite ale situa\u021biei.<\/p>\n\n\n<p><a href=\"https:\/\/skyplanner.ai\/ro\/povesti-ale-clientilor\/mamec\/\">Mamec raporteaz\u0103<\/a> termene de produc\u021bie mai realiste, mai pu\u021bin efort de planificare \u0219i mai pu\u021bin capital de lucru imobilizat inutil \u00een produc\u021bia \u00een curs de execu\u021bie, deoarece lucr\u0103rile \u00eencep la momentul potrivit. Aceasta este leg\u0103tura practic\u0103 dintre stocul de produse neterminate \u0219i programarea produc\u021biei: fabrica are \u00een continuare lucr\u0103ri \u00een execu\u021bie, dar dispune de o baz\u0103 mai bun\u0103 pentru a decide c\u00e2nd trebuie s\u0103 se afle acestea \u00een produc\u021bie.<\/p>\n\n\n<h2 class=\"wp-block-heading\">\u00cencepe\u021bi cu un lot care a a\u0219teptat prea mult<\/h2>\n\n\n<p>Alege\u021bi o comand\u0103 neterminat\u0103 a c\u0103rei \u00eent\u00e2rziere este bine cunoscut\u0103 echipei. Preg\u0103ti\u021bi pentru demonstra\u021bia SkyPlanner informa\u021biile despre stadiul actual al comenzii, opera\u021biile r\u0103mase din fluxul tehnologic, necesarul de materiale \u0219i termenul de livrare asumat. Testul relevant este s\u0103 vede\u021bi dac\u0103 pute\u021bi ob\u021bine un plan corelat pentru finalizarea ei, care s\u0103 \u021bin\u0103 cont \u0219i de celelalte comenzi ce solicit\u0103 acelea\u0219i resurse.<\/p>\n\n\n<p><a href=\"https:\/\/skyplanner.ai\/ro\/contact-vanzari\/\">Programa\u021bi o demonstra\u021bie SkyPlanner<\/a> pentru a explora acest plan pornind de la situa\u021bia propriei produc\u021bii sau <a href=\"https:\/\/skyplanner.ai\/ro\/proba\/\">\u00eencerca\u021bi mai \u00eent\u00e2i SkyPlanner cu date demonstrative<\/a>. \u00cembun\u0103t\u0103\u021birea nivelului produc\u021biei \u00een curs de execu\u021bie \u00eencepe cu \u00een\u021belegerea lucr\u0103rilor neterminate. Un program de produc\u021bie mai bun v\u0103 ajut\u0103 s\u0103 lua\u021bi m\u0103suri concrete.<\/p>\n\n<\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>Produc\u021bia \u00een curs de execu\u021bie: cantitate, cost \u0219i control Acas\u0103 &raquo; Resurse &raquo; Produc\u021bia \u00een curs de execu\u021bie: cantitate, cost \u0219i control Produc\u021bia \u00een curs de execu\u021bie (WIP) cuprinde bunurile care au intrat \u00een produc\u021bie, dar nu sunt \u00eenc\u0103 finalizate. Include at\u00e2t piesele aflate \u00een prelucrare, c\u00e2t \u0219i produsele nefinalizate care a\u0219teapt\u0103 \u00eentre opera\u021bii. \u00cen &#8230; <a title=\"Produc\u021bia \u00een curs de execu\u021bie: cantitate, cost \u0219i control\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/ro\/resurse\/productie-in-curs-de-executie\/\" aria-label=\"Read more about Produc\u021bia \u00een curs de execu\u021bie: cantitate, cost \u0219i control\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":102580,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[2565,514],"tags":[],"class_list":["post-102544","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-eficienta-productiei","category-resurse","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Produc\u021bie \u00een curs de execu\u021bie: cantitate, cost \u0219i control<\/title>\n<meta name=\"description\" content=\"Afla\u021bi ce stoc este nefinalizat, c\u00e2t cost\u0103 \u0219i ce \u00eent\u00e2rzie finalizarea. Vede\u021bi cum SkyPlanner ajut\u0103 la reducerea acumul\u0103rilor inutile de produc\u021bie \u00een curs.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/ro\/resurse\/productie-in-curs-de-executie\/\" \/>\n<meta property=\"og:locale\" content=\"ro_RO\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Produc\u021bia \u00een curs de execu\u021bie: cantitate, cost \u0219i control\" \/>\n<meta property=\"og:description\" content=\"Afla\u021bi ce stoc este nefinalizat, c\u00e2t cost\u0103 \u0219i ce \u00eent\u00e2rzie finalizarea. Vede\u021bi cum SkyPlanner ajut\u0103 la reducerea acumul\u0103rilor inutile de produc\u021bie \u00een curs.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/ro\/resurse\/productie-in-curs-de-executie\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2026-10-20T13:56:48+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-20T13:58:47+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/work-in-process-inventory-hero-1.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1984\" \/>\n\t<meta property=\"og:image:height\" content=\"1116\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Scris de\" \/>\n\t<meta name=\"twitter:data1\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n\t<meta name=\"twitter:label2\" content=\"Timp estimat pentru citire\" \/>\n\t<meta name=\"twitter:data2\" content=\"12 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/resurse\\\/productie-in-curs-de-executie\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/resurse\\\/productie-in-curs-de-executie\\\/\"},\"author\":{\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\"},\"headline\":\"Produc\u021bia \u00een curs de execu\u021bie: cantitate, cost \u0219i control\",\"datePublished\":\"2026-10-20T13:56:48+00:00\",\"dateModified\":\"2026-10-20T13:58:47+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/resurse\\\/productie-in-curs-de-executie\\\/\"},\"wordCount\":2412,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/resurse\\\/productie-in-curs-de-executie\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/work-in-process-inventory-hero-1.png\",\"articleSection\":[\"Eficien\u021ba produc\u021biei\",\"Resurse\"],\"inLanguage\":\"ro-RO\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/resurse\\\/productie-in-curs-de-executie\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/resurse\\\/productie-in-curs-de-executie\\\/\",\"name\":\"Produc\u021bie \u00een curs de execu\u021bie: cantitate, cost \u0219i control\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/resurse\\\/productie-in-curs-de-executie\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/resurse\\\/productie-in-curs-de-executie\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/work-in-process-inventory-hero-1.png\",\"datePublished\":\"2026-10-20T13:56:48+00:00\",\"dateModified\":\"2026-10-20T13:58:47+00:00\",\"description\":\"Afla\u021bi ce stoc este nefinalizat, c\u00e2t cost\u0103 \u0219i ce \u00eent\u00e2rzie finalizarea. Vede\u021bi cum SkyPlanner ajut\u0103 la reducerea acumul\u0103rilor inutile de produc\u021bie \u00een curs.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/resurse\\\/productie-in-curs-de-executie\\\/#breadcrumb\"},\"inLanguage\":\"ro-RO\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/resurse\\\/productie-in-curs-de-executie\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"ro-RO\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/resurse\\\/productie-in-curs-de-executie\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/work-in-process-inventory-hero-1.png\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/work-in-process-inventory-hero-1.png\",\"width\":1984,\"height\":1116,\"caption\":\"Unfinished metal housings wait between machining and finishing, illustrating work-in-process inventory.\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/resurse\\\/productie-in-curs-de-executie\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Produc\u021bia \u00een curs de execu\u021bie: cantitate, cost \u0219i control\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"ro-RO\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"ro-RO\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\",\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"ro-RO\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"caption\":\"Jussi M\u00e4ntyl\u00e4\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Produc\u021bie \u00een curs de execu\u021bie: cantitate, cost \u0219i control","description":"Afla\u021bi ce stoc este nefinalizat, c\u00e2t cost\u0103 \u0219i ce \u00eent\u00e2rzie finalizarea. Vede\u021bi cum SkyPlanner ajut\u0103 la reducerea acumul\u0103rilor inutile de produc\u021bie \u00een curs.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/ro\/resurse\/productie-in-curs-de-executie\/","og_locale":"ro_RO","og_type":"article","og_title":"Produc\u021bia \u00een curs de execu\u021bie: cantitate, cost \u0219i control","og_description":"Afla\u021bi ce stoc este nefinalizat, c\u00e2t cost\u0103 \u0219i ce \u00eent\u00e2rzie finalizarea. Vede\u021bi cum SkyPlanner ajut\u0103 la reducerea acumul\u0103rilor inutile de produc\u021bie \u00een curs.","og_url":"https:\/\/skyplanner.ai\/ro\/resurse\/productie-in-curs-de-executie\/","og_site_name":"SkyPlanner","article_published_time":"2026-10-20T13:56:48+00:00","article_modified_time":"2026-10-20T13:58:47+00:00","og_image":[{"width":1984,"height":1116,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/work-in-process-inventory-hero-1.png","type":"image\/png"}],"author":"Jussi M\u00e4ntyl\u00e4","twitter_card":"summary_large_image","twitter_misc":{"Scris de":"Jussi M\u00e4ntyl\u00e4","Timp estimat pentru citire":"12 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/ro\/resurse\/productie-in-curs-de-executie\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/ro\/resurse\/productie-in-curs-de-executie\/"},"author":{"name":"Jussi M\u00e4ntyl\u00e4","@id":"https:\/\/skyplanner.ai\/ro\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5"},"headline":"Produc\u021bia \u00een curs de execu\u021bie: cantitate, cost \u0219i control","datePublished":"2026-10-20T13:56:48+00:00","dateModified":"2026-10-20T13:58:47+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/ro\/resurse\/productie-in-curs-de-executie\/"},"wordCount":2412,"publisher":{"@id":"https:\/\/skyplanner.ai\/ro\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/ro\/resurse\/productie-in-curs-de-executie\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/work-in-process-inventory-hero-1.png","articleSection":["Eficien\u021ba produc\u021biei","Resurse"],"inLanguage":"ro-RO"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/ro\/resurse\/productie-in-curs-de-executie\/","url":"https:\/\/skyplanner.ai\/ro\/resurse\/productie-in-curs-de-executie\/","name":"Produc\u021bie \u00een curs de execu\u021bie: cantitate, cost \u0219i control","isPartOf":{"@id":"https:\/\/skyplanner.ai\/ro\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/ro\/resurse\/productie-in-curs-de-executie\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/ro\/resurse\/productie-in-curs-de-executie\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/work-in-process-inventory-hero-1.png","datePublished":"2026-10-20T13:56:48+00:00","dateModified":"2026-10-20T13:58:47+00:00","description":"Afla\u021bi ce stoc este nefinalizat, c\u00e2t cost\u0103 \u0219i ce \u00eent\u00e2rzie finalizarea. Vede\u021bi cum SkyPlanner ajut\u0103 la reducerea acumul\u0103rilor inutile de produc\u021bie \u00een curs.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/ro\/resurse\/productie-in-curs-de-executie\/#breadcrumb"},"inLanguage":"ro-RO","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/ro\/resurse\/productie-in-curs-de-executie\/"]}]},{"@type":"ImageObject","inLanguage":"ro-RO","@id":"https:\/\/skyplanner.ai\/ro\/resurse\/productie-in-curs-de-executie\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/work-in-process-inventory-hero-1.png","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/work-in-process-inventory-hero-1.png","width":1984,"height":1116,"caption":"Unfinished metal housings wait between machining and finishing, illustrating work-in-process inventory."},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/ro\/resurse\/productie-in-curs-de-executie\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/ro\/"},{"@type":"ListItem","position":2,"name":"Produc\u021bia \u00een curs de execu\u021bie: cantitate, cost \u0219i control"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/ro\/#website","url":"https:\/\/skyplanner.ai\/ro\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/ro\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/ro\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"ro-RO"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/ro\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/ro\/","logo":{"@type":"ImageObject","inLanguage":"ro-RO","@id":"https:\/\/skyplanner.ai\/ro\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/ro\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]},{"@type":"Person","@id":"https:\/\/skyplanner.ai\/ro\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5","name":"Jussi M\u00e4ntyl\u00e4","image":{"@type":"ImageObject","inLanguage":"ro-RO","@id":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","caption":"Jussi M\u00e4ntyl\u00e4"}}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/work-in-process-inventory-hero-1.png",1984,1116,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/work-in-process-inventory-hero-1-150x150.png",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/work-in-process-inventory-hero-1-300x169.png",300,169,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/work-in-process-inventory-hero-1-768x432.png",768,432,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/work-in-process-inventory-hero-1-1024x576.png",1024,576,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/work-in-process-inventory-hero-1-1536x864.png",1536,864,true],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/work-in-process-inventory-hero-1.png",1984,1116,false],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/work-in-process-inventory-hero-1-360x203.png",360,203,true]},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/ro\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Produc\u021bia \u00een curs de execu\u021bie: cantitate, cost \u0219i control Acas\u0103 &raquo; Resurse &raquo; Produc\u021bia \u00een curs de execu\u021bie: cantitate, cost \u0219i control Produc\u021bia \u00een curs de execu\u021bie (WIP) cuprinde bunurile care au intrat \u00een produc\u021bie, dar nu sunt \u00eenc\u0103 finalizate. Include at\u00e2t piesele aflate \u00een prelucrare, c\u00e2t \u0219i produsele nefinalizate care a\u0219teapt\u0103 \u00eentre opera\u021bii. \u00cen&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/posts\/102544","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/comments?post=102544"}],"version-history":[{"count":2,"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/posts\/102544\/revisions"}],"predecessor-version":[{"id":102663,"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/posts\/102544\/revisions\/102663"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/media\/102580"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/media?parent=102544"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/categories?post=102544"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/tags?post=102544"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}