{"id":107882,"date":"2026-10-23T13:42:12","date_gmt":"2026-10-23T13:42:12","guid":{"rendered":"https:\/\/skyplanner.ai\/integrari\/erp\/karat\/ghid-de-integrare\/"},"modified":"2026-10-23T13:42:12","modified_gmt":"2026-10-23T13:42:12","slug":"ghid-de-integrare","status":"publish","type":"page","link":"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/karat\/ghid-de-integrare\/","title":{"rendered":"Ghid de integrare KARAT pentru programarea produc\u021biei cu SkyPlanner APS"},"content":{"rendered":"\n<div class=\"wp-block-group sp-industry-page sp-industry sp-page sp-erp-page\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<section class=\"wp-block-group fx-hero\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__grid\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__copy sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-eyebrow ind-crumbs\"><span><a href=\"\/ro\/integrari\/\">Integr\u0103ri<\/a> \/ <a href=\"\/ro\/integrari\/erp\/\">ERP<\/a> \/ KARAT<\/span><\/p>\n\n\n<h1 class=\"wp-block-heading fx-hero__title\">Ghid de integrare KARAT <span class=\"hl\">pentru programarea produc\u021biei cu SkyPlanner APS<\/span><\/h1>\n\n\n<div class=\"wp-block-group fx-hero__sub ind-hero__intro\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Acest ghid de integrare KARAT le arat\u0103 partenerilor \u0219i echipelor IT cum s\u0103 conecteze IS KARAT la SkyPlanner APS. Integrarea dintre SkyPlanner \u0219i KARAT este bidirec\u021bional\u0103 \u0219i folose\u0219te interfe\u021bele proprii ale KARAT:<\/p>\n\n\n<ul class=\"wp-block-list fxv-deliver__bul\">\n\n<li>\u00cen SkyPlanner sunt importate ordinele de produc\u021bie (v\u00fdrobn\u00ed p\u0159\u00edkazy) \u0219i comenzile de produc\u021bie (v\u00fdrobn\u00ed zak\u00e1zky), \u00eempreun\u0103 cu opera\u021biile aferente, fi\u0219ele de articol, listele de materiale, fluxurile tehnologice, utilajele, posturile de lucru, resursele umane, stocurile \u0219i comenzile de achizi\u021bie emise.<\/li>\n\n\n<li>Datele planificate de \u00eenceput \u0219i de sf\u00e2r\u0219it sunt retransmise c\u0103tre KARAT \u0219i \u00eenregistrate \u00een datele de produc\u021bie.<\/li>\n\n\n<li>Dac\u0103 dori\u021bi, \u00eenregistr\u0103rile timpului de lucru al operatorilor pot fi trimise \u00eenapoi prin interfa\u021ba de raportare de la terminale a KARAT.<\/li>\n\n\n<li>Webhook-urile SkyPlanner transmit modific\u0103rile programului pe m\u0103sur\u0103 ce apar.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-buttons fx-hero__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/ro\/proba\/\">\u00cencepe\u021bi testarea gratuit\u0103<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/ro\/contact-vanzari\/\">Programa\u021bi o demonstra\u021bie<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-hero__media sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"fx-shot\"><div class=\"fx-shot__bar\" aria-hidden=\"true\"><i><\/i><i><\/i><i><\/i><span>skyplanner.ai \u00b7 Programarea produc\u021biei<\/span><\/div><img fetchpriority=\"high\" decoding=\"async\" loading=\"eager\" width=\"1024\" height=\"685\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/20-d7d44cbc-5430-4f97-99f5-fca4632862ef.png\" alt=\"Diagrama Gantt din SkyPlanner APS, cu opera\u021bii programate pe centre de lucru \u0219i o list\u0103 de comenzi dedesubt.\"><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--intro\" id=\"overview\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Echipa SkyPlanner configureaz\u0103 integrarea \u00een func\u021bie de configura\u021bia KARAT pe care o utiliza\u021bi, \u00een etapa de implementare ini\u021bial\u0103, \u0219i ofer\u0103 asisten\u021b\u0103 dup\u0103 punerea \u00een func\u021biune. Acest ghid se adreseaz\u0103 partenerilor \u0219i dezvoltatorilor KARAT care doresc s\u0103 participe la integrare sau s\u0103 dezvolte singuri solu\u021bii folosind REST API documentat al SkyPlanner (<a href=\"https:\/\/integration.skyplanner.app\/api\/swagger\">documenta\u021bia API<\/a>).<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"karat-s-integration-interfaces\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Interfe\u021bele de integrare KARAT<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-pain ind-cards\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Interfa\u021b\u0103 de date agreat\u0103.<\/p>\n\n\n<p class=\"fx-pain__b\">KARAT Software precizeaz\u0103 c\u0103 arhitectura deschis\u0103 a ERP KARAT permite conectarea la alte sisteme informatice externe \u0219i c\u0103 sistemul accept\u0103 schimbul electronic de date \u00een formatele XML, EDI, ISDOC \u0219i ISDS (<a href=\"https:\/\/www.karatsoftware.cz\/podpora-a-sluzby\/vyvoj-software-a-aplikaci\/\">dezvoltare software KARAT<\/a>). Pentru programarea produc\u021biei, aceasta \u00eenseamn\u0103 o interfa\u021b\u0103 agreat\u0103 pentru instalarea dumneavoastr\u0103, care export\u0103 ordinele de produc\u021bie deschise, fluxurile tehnologice, resursele, stocurile \u0219i comenzile de achizi\u021bie \u0219i import\u0103 datele planificate.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Interfa\u021b\u0103 de raportare de la terminale.<\/p>\n\n\n<p class=\"fx-pain__b\">Modulul KARAT de raportare de la terminale (termin\u00e1lov\u00e9 odv\u00e1d\u011bn\u00ed) preg\u0103te\u0219te datele pentru exportul c\u0103tre un sistem extern \u0219i accept\u0103 date importate conform unei interfe\u021be agreate (<a href=\"https:\/\/www.karatsoftware.cz\/erp-karat\/terminalove-odvadeni\/\">raportare de la terminale<\/a>). Acesta gestioneaz\u0103 \u00eenceperea, \u00eentreruperea \u0219i \u00eencheierea lucrului, predarea opera\u021biilor, eliberarea materialelor \u00een produc\u021bie \u0219i recep\u021bia produselor finite. Este calea fireasc\u0103 pentru transmiterea activit\u0103\u021bii \u00eenregistrate \u00een SkyPlanner.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Serviciu de integrare a sistemelor.<\/p>\n\n\n<p class=\"fx-pain__b\">KARAT Software ofer\u0103 un serviciu prin care conecteaz\u0103 IS KARAT la sisteme de colectare a datelor din produc\u021bie, depozite automatizate, CAD\/CAM \u0219i alte aplica\u021bii specializate (<a href=\"https:\/\/www.karatsoftware.cz\/podpora-a-sluzby\/systemova-integrace\/\">integrarea sistemelor<\/a>). Echipa SkyPlanner stabile\u0219te de comun acord interfa\u021ba cu KARAT Software sau cu partenerul dumneavoastr\u0103 KARAT \u00een etapa de definire a domeniului proiectului.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Excel \u0219i CSV.<\/p>\n\n\n<p class=\"fx-pain__b\">Ordinele de produc\u021bie deschise, exportate \u00een Excel sau CSV, sunt suficiente pentru \u00eenc\u0103rcarea de prob\u0103.<\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"authentication-and-licensing\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Autentificare \u0219i licen\u021biere<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Utilizator pentru integrare.<\/strong> Interfa\u021ba ruleaz\u0103 cu un cont de utilizator KARAT care are drepturi asupra datelor de produc\u021bie, depozit \u0219i achizi\u021bii pe care le cite\u0219te \u0219i le scrie. Drepturile de acces KARAT pot fi definite p\u00e2n\u0103 la nivelul fiec\u0103rei chei de tabel, a\u0219a c\u0103 limita\u021bi-le strict la ceea ce este necesar.<\/li>\n\n\n<li><strong>Mediu de instalare.<\/strong> IS KARAT ruleaz\u0103 local, \u00een regim externalizat sau ca SaaS. Mecanismul de transfer pentru interfa\u021ba agreat\u0103 (schimb de fi\u0219iere sau un endpoint de serviciu) este stabilit \u00een func\u021bie de mediul dumneavoastr\u0103, \u00een etapa de definire a domeniului proiectului.<\/li>\n\n\n<li><strong>Licen\u021biere.<\/strong> Interfa\u021ba agreat\u0103 \u0219i orice lucr\u0103ri efectuate de KARAT Software se stabilesc cu KARAT Software sau cu partenerul dumneavoastr\u0103.<\/li>\n\n<\/ul>\n\n\n<p>\u00cen SkyPlanner, autentificarea pentru REST API se face cu un token API \u00een antetul Authorization-Token (SkyPlanner Settings &gt; API), iar documenta\u021bia este disponibil\u0103 \u00een Swagger\/OpenAPI. <a href=\"\/ro\/docs\/tutorial-de-integrare\/\">Tutorialul de integrare<\/a> v\u0103 ghideaz\u0103 prin primele apeluri.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"events-and-polling\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Evenimente \u0219i interog\u0103ri periodice<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>SkyPlanner cite\u0219te datele din KARAT la intervale stabilite. Exporturile sau citirile periodice prin interfa\u021ba agreat\u0103 preiau lucr\u0103rile noi, folosind filtre pentru ordinele de produc\u021bie deschise \u0219i modific\u0103rile recente. Frecven\u021ba se stabile\u0219te pentru fiecare fabric\u0103: de la c\u00e2teva minute pentru ordinele de produc\u021bie p\u00e2n\u0103 la o or\u0103 pentru stocuri.<\/p>\n\n\n<p>SkyPlanner trimite webhookuri c\u00e2nd se modific\u0103 starea sau programul de produc\u021bie, astfel \u00eenc\u00e2t scrierea datelor \u00eenapoi este declan\u0219at\u0103 de evenimente.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"data-mapping\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Maparea datelor<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th>Obiect KARAT<\/th><th>Obiect SkyPlanner<\/th><th>Direc\u021bie<\/th><th>Frecven\u021b\u0103<\/th><\/tr><\/thead><tbody><tr><td>Fi\u0219e de articol (karty), unit\u0103\u021bi de m\u0103sur\u0103<\/td><td>Produse \u0219i materiale<\/td><td>KARAT \u2192 SkyPlanner<\/td><td>\u00cenc\u0103rcare ini\u021bial\u0103, apoi interog\u0103ri periodice<\/td><\/tr><tr><td>Liste de materiale (kusovn\u00edky)<\/td><td>Structura produsului, subproduse, materiale pentru fiecare produs<\/td><td>KARAT \u2192 SkyPlanner<\/td><td>\u00cenc\u0103rcare ini\u021bial\u0103, apoi la modific\u0103ri<\/td><\/tr><tr><td>Fluxuri tehnologice (technologick\u00e9 postupy), opera\u021bii \u0219i timpi<\/td><td>Etape de proces cu durate, timpi de preg\u0103tire \u0219i de demontare<\/td><td>KARAT \u2192 SkyPlanner<\/td><td>\u00cenc\u0103rcare ini\u021bial\u0103, apoi la modific\u0103ri<\/td><\/tr><tr><td>Resurse (zdroje): utilaje, posturi de lucru<\/td><td>Centre de lucru, grupuri de centre de lucru, centre de lucru alternative<\/td><td>KARAT \u2192 SkyPlanner<\/td><td>\u00cenc\u0103rcare ini\u021bial\u0103, apoi rareori<\/td><\/tr><tr><td>Resurse umane<\/td><td>Personal \u0219i num\u0103r de operatori pentru fiecare opera\u021bie<\/td><td>KARAT \u2192 SkyPlanner<\/td><td>\u00cenc\u0103rcare ini\u021bial\u0103, apoi la modific\u0103ri<\/td><\/tr><tr><td>Ordine de produc\u021bie (v\u00fdrobn\u00ed p\u0159\u00edkazy), comenzi de produc\u021bie (v\u00fdrobn\u00ed zak\u00e1zky), opera\u021bii, materiale<\/td><td>Comenzi \u0219i opera\u021bii cu termene \u0219i necesar de materiale<\/td><td>KARAT \u2192 SkyPlanner<\/td><td>Interog\u0103ri la fiecare c\u00e2teva minute<\/td><\/tr><tr><td>Stocuri din depozite (sklady)<\/td><td>Solduri de stoc<\/td><td>KARAT \u2192 SkyPlanner<\/td><td>Interog\u0103ri la fiecare or\u0103 sau la rularea program\u0103rii<\/td><\/tr><tr><td>Comenzi de achizi\u021bie emise (objedn\u00e1vky vydan\u00e9), cu date de livrare<\/td><td>Comenzi de achizi\u021bie, materiale de primit \u00een func\u021bie de data livr\u0103rii<\/td><td>KARAT \u2192 SkyPlanner<\/td><td>Interog\u0103ri la fiecare or\u0103 sau la rularea program\u0103rii<\/td><\/tr><tr><td>\u00cenceput \u0219i sf\u00e2r\u0219it planificate pentru fiecare opera\u021bie a ordinului (import agreat)<\/td><td>\u00cenceput \u0219i sf\u00e2r\u0219it planificate pentru fiecare opera\u021bie<\/td><td>SkyPlanner \u2192 KARAT<\/td><td>La modificarea programului, printr-un webhook SkyPlanner<\/td><\/tr><tr><td>Raportare de la terminale: \u00eenceput, oprire, predare, cantit\u0103\u021bi<\/td><td>\u00cenregistr\u0103ri ale timpului de lucru \u0219i confirm\u0103ri ale operatorilor<\/td><td>SkyPlanner \u2192 KARAT<\/td><td>La fiecare confirmare sau la fiecare schimb, dac\u0103 se alege aceast\u0103 op\u021biune<\/td><\/tr><tr><td>Nu se afl\u0103 \u00een KARAT<\/td><td>Matricea timpilor de preg\u0103tire, scule ca resurse cu capacitate finit\u0103, opera\u021bii cu mai mul\u021bi operatori<\/td><td>Gestionate \u00een SkyPlanner<\/td><td>Configurate \u00een etapa de implementare ini\u021bial\u0103<\/td><\/tr><\/tbody><\/table><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"integration-patterns\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Modele de integrare<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p><strong>1. \u00cenc\u0103rcarea ini\u021bial\u0103 a nomenclatoarelor.<\/strong> Citi\u021bi fi\u0219ele de articol, listele de materiale, fluxurile tehnologice \u0219i resursele. Alege\u021bi cu aten\u021bie cum mapa\u021bi resursele \u00een SkyPlanner: un post de lucru cu patru utilaje devine un grup de centre de lucru sau patru centre de lucru. Personalul care desf\u0103\u0219oar\u0103 activit\u0103\u021bi de preg\u0103tire a produc\u021biei \u0219i pentru care se folose\u0219te planificarea ponderat\u0103, cum ar fi tehnologii \u0219i proiectan\u021bii, nu este inclus \u00een programul atelierului dec\u00e2t dac\u0103 decide\u021bi altfel.<\/p>\n\n\n<p><strong>2. Sincronizarea comenzilor.<\/strong> Citi\u021bi ordinele de produc\u021bie lansate, \u00eempreun\u0103 cu opera\u021biile \u0219i materialele aferente, precum \u0219i comenzile de achizi\u021bie emise. SkyPlanner consider\u0103 c\u0103 materialele comandate sunt disponibile la data de livrare a comenzii de achizi\u021bie \u0219i actualizeaz\u0103 stocul c\u00e2nd aceasta este marcat\u0103 ca Delivered.<\/p>\n\n\n<p><strong>3. Scrierea programului \u00eenapoi \u00een KARAT.<\/strong> C\u00e2nd motorul de programare plaseaz\u0103 sau mut\u0103 o opera\u021bie, un webhook SkyPlanner declan\u0219eaz\u0103 importul datelor planificate de \u00eenceput \u0219i de sf\u00e2r\u0219it \u00een KARAT prin interfa\u021ba agreat\u0103. Destina\u021bia importului \u00een KARAT \u2014 rezerv\u0103rile de resurse sau datele opera\u021biilor din ordinul de produc\u021bie \u2014 se stabile\u0219te la definirea domeniului proiectului, \u00een etapa de implementare ini\u021bial\u0103.<\/p>\n\n\n<p><strong>4. Confirm\u0103ri din atelier.<\/strong> Operatorii \u00ee\u0219i \u00eenregistreaz\u0103 activitatea cu SkyPlanner Mobile Confirmations sau Production Timer, iar \u00eenregistr\u0103rile timpului de lucru men\u021bin programul actualizat. Dumneavoastr\u0103 decide\u021bi dac\u0103 timpii efectivi sunt trimi\u0219i \u00eenapoi \u00een KARAT. Dac\u0103 da, ace\u0219tia sunt importa\u021bi prin interfa\u021ba de raportare de la terminale ca evenimente de \u00eenceput, oprire \u0219i cantitate pentru fiecare opera\u021bie. Dac\u0103 nu, operatorii continu\u0103 s\u0103 raporteze la terminalele KARAT, iar SkyPlanner cite\u0219te aceste raport\u0103ri.<\/p>\n\n\n<p><strong>5. Reguli privind responsabilitatea pentru date \u0219i gestionarea conflictelor.<\/strong> Documenta\u021bi-le \u00eenainte de punerea \u00een func\u021biune:<\/p>\n\n\n<figure class=\"wp-block-table ind-table\"><table><thead><tr><th>Date<\/th><th>Sistem responsabil<\/th><\/tr><\/thead><tbody><tr><td>Fi\u0219e de articol, liste de materiale, fluxuri tehnologice, cantit\u0103\u021bi, starea comenzii<\/td><td>KARAT<\/td><\/tr><tr><td>Succesiunea opera\u021biilor, momentele de \u00eenceput \u0219i de sf\u00e2r\u0219it, alocarea utilajelor<\/td><td>SkyPlanner<\/td><\/tr><tr><td>Matricea timpilor de preg\u0103tire, necesarul de scule \u0219i operatori, resurse alternative<\/td><td>SkyPlanner<\/td><\/tr><tr><td>Schimburi \u0219i zile nelucr\u0103toare<\/td><td>Un singur sistem, ales la definirea domeniului proiectului<\/td><\/tr><tr><td>Raport\u0103ri ale opera\u021biilor, eliber\u0103ri \u0219i recep\u021bii de materiale<\/td><td>KARAT, prin introducere direct\u0103 sau prin transmiterea \u00eenregistr\u0103rilor timpului de lucru din SkyPlanner<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>Alege\u021bi un singur sistem care s\u0103 scrie datele calendaristice ale ordinelor. Dac\u0103 APS KARAT \u00eenc\u0103 salveaz\u0103 planurile \u00een datele de produc\u021bie, dezactiva\u021bi aceast\u0103 func\u021bie pentru ordinele programate de SkyPlanner, astfel \u00eenc\u00e2t cele dou\u0103 sisteme s\u0103 nu \u00ee\u0219i suprascrie niciodat\u0103 datele.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"typical-project-steps\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Etapele obi\u0219nuite ale proiectului<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Implementarea se finalizeaz\u0103, de regul\u0103, \u00een c\u00e2teva s\u0103pt\u0103m\u00e2ni de la \u00eenceperea etapei ini\u021biale. \u00cenainte de aceasta, valida\u021bi programul de produc\u021bie \u00een perioada de prob\u0103 gratuit\u0103 de 30 de zile, folosind utilajele, fluxurile tehnologice \u0219i ordinele de produc\u021bie deschise exportate din KARAT \u00een CSV sau Excel.<\/p>\n\n\n<ol class=\"wp-block-list\">\n\n<li><strong>Mapare.<\/strong> Stabili\u021bi tabelul de mapare, regulile privind responsabilitatea pentru date, frecven\u021bele de sincronizare \u0219i dac\u0103 raport\u0103rile opera\u021biilor sunt trimise \u00eenapoi.<\/li>\n\n\n<li><strong>Interfa\u021ba KARAT.<\/strong> Stabili\u021bi de comun acord cu KARAT Software sau cu partenerul dumneavoastr\u0103 formatul \u0219i mecanismul de transfer pentru export \u0219i import \u0219i configura\u021bi utilizatorul pentru integrare. Testa\u021bi mai \u00eent\u00e2i pe o copie a bazei de date.<\/li>\n\n\n<li><strong>\u00cenc\u0103rcare ini\u021bial\u0103.<\/strong> Fi\u0219e de articol, liste de materiale, fluxuri tehnologice, resurse.<\/li>\n\n\n<li><strong>Sincronizarea ordinelor de produc\u021bie \u0219i a comenzilor de achizi\u021bie.<\/strong> Citiri periodice cu filtre \u0219i re\u00eencerc\u0103ri.<\/li>\n\n\n<li><strong>Configurarea constr\u00e2ngerilor \u00een SkyPlanner.<\/strong> Matricea timpilor de preg\u0103tire, sculele, num\u0103rul de operatori pentru fiecare opera\u021bie \u0219i utilajele sau personalul alternativ.<\/li>\n\n\n<li><strong>Retransmiterea programului \u00een sistem.<\/strong> Testa\u021bi importul datelor planificate \u0219i, dac\u0103 a\u021bi ales aceast\u0103 op\u021biune, importul raport\u0103rilor de la terminale.<\/li>\n\n\n<li><strong>Testarea \u00een paralel.<\/strong> Rula\u021bi SkyPlanner \u00een paralel cu planul curent, compara\u021bi datele \u0219i corecta\u021bi nomenclatoarele.<\/li>\n\n\n<li><strong>Punerea \u00een produc\u021bie.<\/strong> Activa\u021bi retransmiterea datelor dup\u0103 ce acestea coincid.<\/li>\n\n<\/ol>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"what-to-plan-for-in-a-karat-integration\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Ce trebuie s\u0103 ave\u021bi \u00een vedere la integrarea cu KARAT<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Interfa\u021ba se stabile\u0219te pentru fiecare instalare.<\/strong> Aloca\u021bi timp pentru definirea domeniului \u00eempreun\u0103 cu KARAT Software sau cu partenerul dumneavoastr\u0103 \u0219i documenta\u021bi formatul de export \u0219i import \u00een cadrul map\u0103rii datelor.<\/li>\n\n\n<li><strong>Responsabilitatea pentru plan.<\/strong> La \u00eenchidere, APS KARAT salveaz\u0103 planurile \u00een datele de produc\u021bie. Stabili\u021bi dac\u0103 va mai planifica anumite comenzi \u0219i care sunt acestea.<\/li>\n\n\n<li><strong>Planul general pentru toate fabricile.<\/strong> Stabili\u021bi, pentru fiecare fabric\u0103, ce comenzi programeaz\u0103 SkyPlanner.<\/li>\n\n\n<li><strong>Integr\u0103rile existente cu terminalele.<\/strong> Dac\u0103 raport\u0103rile de la terminale sunt deja exportate c\u0103tre alt sistem, reutiliza\u021bi interfa\u021ba convenit\u0103 pentru \u00eenregistr\u0103rile de timp din SkyPlanner, \u00een loc s\u0103 ad\u0103uga\u021bi o a doua interfa\u021b\u0103.<\/li>\n\n\n<li><strong>Unit\u0103\u021bile de timp.<\/strong> La prima \u00eenc\u0103rcare, verifica\u021bi unit\u0103\u021bile \u00een care sunt exprima\u021bi timpii opera\u021biilor din rutele tehnologice. Toate duratele depind de acestea.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"who-configures-and-supports-the-karat-integratio\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Cine configureaz\u0103 integrarea cu KARAT \u0219i asigur\u0103 suportul<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ol class=\"wp-block-list\">\n\n<li><strong>Echipa SkyPlanner configureaz\u0103 integrarea \u00een etapa de implementare ini\u021bial\u0103 \u0219i asigur\u0103 suportul dup\u0103 punerea \u00een produc\u021bie,<\/strong> pentru fluxurile convenite de export, import \u0219i raportare de la terminale. Fiecare fabric\u0103 folose\u0219te KARAT \u00een mod diferit, iar aceste cuno\u0219tin\u021be sunt valorificate \u00een configurare.<\/li>\n\n\n<li><strong>KARAT Software sau partenerul dumneavoastr\u0103 KARAT poate participa.<\/strong> Ace\u0219tia cunosc instalarea \u0219i structurile dumneavoastr\u0103 de date \u0219i pot configura interfa\u021ba convenit\u0103 \u0219i contul de utilizator pentru integrare \u00eempreun\u0103 cu echipa SkyPlanner.<\/li>\n\n\n<li><strong>Dezvoltatorii dumneavoastr\u0103 pot extinde integrarea<\/strong> folosind REST API din SkyPlanner \u0219i un token API. Un token API este suficient pentru a \u00eencepe, iar echipa SkyPlanner ofer\u0103 ajutor la nevoie. Consulta\u021bi <a href=\"\/ro\/docs\/tutorial-de-integrare\/\">documenta\u021bia de integrare SkyPlanner<\/a>.<\/li>\n\n<\/ol>\n\n\n<p>SkyPlanner porne\u0219te de la 199 \u20ac pe lun\u0103, cu 5 centre de lucru incluse \u0219i facturare lunar\u0103. Oferta pentru integrare este stabilit\u0103 de la \u00eenceput, \u00een func\u021bie de procesul \u0219i nevoile dumneavoastr\u0103, \u00eempreun\u0103 cu abonamentul. Consulta\u021bi <a href=\"\/ro\/preturi\/\">pre\u021burile<\/a>, <a href=\"\/ro\/integrari\/erp\/karat\/cu-capacitate-finita\/\">programarea cu capacitate finit\u0103 pentru KARAT<\/a>, <a href=\"\/ro\/integrari\/erp\/karat\/\">pagina KARAT<\/a> \u0219i <a href=\"\/ro\/integrari\/erp\/\">pagina dedicat\u0103 integr\u0103rilor ERP<\/a>. Pentru no\u021biunile de baz\u0103, consulta\u021bi pagina despre <a href=\"\/ro\/resurse\/ce-este-programarea-productiei\/\">programarea produc\u021biei<\/a>.<\/p>\n\n\n<div class=\"wp-block-buttons ind-prose__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/ro\/proba\/\">\u00cencepe\u021bi testarea gratuit\u0103<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/ro\/contact-vanzari\/\">Programa\u021bi o demonstra\u021bie<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"customers\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Ce spun produc\u0103torii despre SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-custs\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/utu-kalle-kalliomaki-2026.jpg\" alt=\"Kalle Kalliom\u00e4ki, specialist \u00een lan\u021bul de aprovizionare la UTU, \u00een sec\u021bia de produc\u021bie a tablourilor electrice din Ulvila\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/23-beca6df2-3fa2-4315-80e8-7c38a9e3d2e1.png\" alt=\"UTU\" width=\"69\" height=\"59\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>2 h<\/b><span>economisite \u00een fiecare s\u0103pt\u0103m\u00e2n\u0103<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eCu SkyPlanner am trecut de la planificarea produc\u021biei \u00een foi de calcul Excel la optimizarea produc\u021biei \u00een timp real.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Kalle Kalliom\u00e4ki, specialist \u00een lan\u021bul de aprovizionare<\/b><br>UTU \u00b7 Tablouri electrice \u0219i aparataj de comuta\u021bie<\/p>\n\n\n<p class=\"ind-cust__result\">Planificarea produc\u021biei economise\u0219te 2 ore de lucru \u00een fiecare s\u0103pt\u0103m\u00e2n\u0103, iar o nou\u0103 list\u0103 de opera\u021bii ajunge la linia de produc\u021bie \u00een c\u00e2teva secunde.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/ro\/povesti-ale-clientilor\/utu\/\">Citi\u021bi opinia UTU<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-35ce8dff-f7d0-4cf3-9e71-0fe7e7ff88d3.jpg\" alt=\"Operatori \u00een combinezoane pentru camere curate, la o linie de umplere a flacoanelor din fabrica farmaceutic\u0103 Laboratory &amp; Allied din Nairobi\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/09-8c2deb57-ac1c-468b-ad64-fafb9debd7eb.png\" alt=\"Laboratory &amp; Allied\" width=\"71\" height=\"44\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>+90%<\/b><span>eficien\u021b\u0103 \u00een produc\u021bie<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eEficien\u021ba \u00een produc\u021bie a crescut cu 90%.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Abdul Rucyinga, director IT<\/b><br>Laboratory &amp; Allied \u00b7 Produc\u021bie farmaceutic\u0103<\/p>\n\n\n<p class=\"ind-cust__result\">Eficien\u021ba \u00een produc\u021bie a crescut cu 90%, iar realizarea unui plan optimizat pe trei luni, pentru toate centrele de lucru, dureaz\u0103 mai pu\u021bin de 30 de minute.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/ro\/povesti-ale-clientilor\/laboratory-allied\/\">Citi\u021bi opinia Laboratory &amp; Allied<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/02-3a675468-ac30-4369-b781-b03bbf3f9d21.jpg\" alt=\"Vedere aerian\u0103 a fabricii Piristeel de sisteme de siguran\u021b\u0103 pentru acoperi\u0219uri din Kauhava\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/07-cec60b32-3b28-48a8-9520-1f12fd8061ee.png\" alt=\"Piristeel\" width=\"96\" height=\"46\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>99,2%<\/b><span>respectarea termenelor de livrare<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eSkyPlanner ne-a oferit vizibilitatea necesar\u0103 pentru a identifica blocajele \u0219i a adus mai mult\u0103 claritate \u00een gestionarea produc\u021biei.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Toni Tuori, director de produc\u021bie<\/b><br>Piristeel \u00b7 Sisteme de siguran\u021b\u0103 pentru acoperi\u0219uri \u0219i sisteme pluviale<\/p>\n\n\n<p class=\"ind-cust__result\">Rata de respectare a termenelor de livrare a ajuns la 99,2% anul acesta, iar programarea produc\u021biei economise\u0219te p\u00e2n\u0103 la patru ore de lucru pe zi.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/ro\/povesti-ale-clientilor\/piristeel\/\">Citi\u021bi opinia Piristeel<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/homepage-v2\/logo-eskomatic.png\" alt=\"Eskomatic\" width=\"140\" height=\"15\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>Mai pu\u021bine<\/b><span>opriri din lips\u0103 de materiale<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eValoarea pe care ne-o aduce SkyPlanner const\u0103 \u00een faptul c\u0103 este un instrument care func\u021bioneaz\u0103 \u00een activitatea de zi cu zi, \u00een special pentru stabilirea termenelor de livrare.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Tommi M\u00e4nnist\u00f6, manager de planificare a produc\u021biei<\/b><br>Eskomatic \u00b7 Prelucr\u0103ri mecanice la comand\u0103<\/p>\n\n\n<p class=\"ind-cust__result\">Programarea automat\u0103 a \u00eenc\u0103rc\u0103rii resurselor permite stabilirea unor termene de livrare mai precise, iar opririle produc\u021biei cauzate de lipsa materialelor s-au redus considerabil.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/ro\/povesti-ale-clientilor\/eskomatic\/\">Citi\u021bi recenzia Eskomatic<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">\u00centreb\u0103ri frecvente<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group sp-faq fx-faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Cum se conecteaz\u0103 SkyPlanner la KARAT?<\/summary>\n<p class=\"sp-faq__a\">Printr-o interfa\u021b\u0103 de date KARAT convenit\u0103, \u00een format XML, pentru comenzi, nomenclatoare \u0219i date planificate, \u0219i prin raportarea de la terminalele KARAT pentru munca \u00eenregistrat\u0103. Echipa SkyPlanner o configureaz\u0103 \u00eempreun\u0103 cu KARAT Software sau cu partenerul dumneavoastr\u0103 KARAT \u00een etapa de implementare ini\u021bial\u0103.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Cum preia SkyPlanner modific\u0103rile din KARAT?<\/summary>\n<p class=\"sp-faq__a\">SkyPlanner cite\u0219te datele din KARAT la intervale stabilite pentru fiecare fabric\u0103, folosind filtre pentru comenzile de produc\u021bie deschise \u0219i modific\u0103rile recente. Webhook-urile proprii SkyPlanner transmit modific\u0103rile programului pe m\u0103sur\u0103 ce acestea apar.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Cum sunt retransmise datele planificate \u00een KARAT?<\/summary>\n<p class=\"sp-faq__a\">Prin importul datelor planificate de \u00eenceput \u0219i de sf\u00e2r\u0219it pentru fiecare opera\u021bie a comenzii, prin interfa\u021ba convenit\u0103. \u00cen timpul implement\u0103rii ini\u021biale, la definirea domeniului integr\u0103rii, echipa SkyPlanner stabile\u0219te destina\u021bia importului: rezerv\u0103rile de resurse sau datele opera\u021biilor din comanda de produc\u021bie.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Pot fi retransmise \u00een KARAT \u00eenregistr\u0103rile de timp ale operatorilor?<\/summary>\n<p class=\"sp-faq__a\">Da, dac\u0103 alege\u021bi aceast\u0103 op\u021biune. Raportarea de la terminalele KARAT accept\u0103 date importate printr-o interfa\u021b\u0103 convenit\u0103, astfel \u00eenc\u00e2t \u00eenregistr\u0103rile de timp din SkyPlanner sunt transmise ca evenimente de pornire, oprire \u0219i raportare a cantit\u0103\u021bii pentru fiecare opera\u021bie.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Ce ar trebui s\u0103 recomande un partener KARAT: APS KARAT sau SkyPlanner?<\/summary>\n<p class=\"sp-faq__a\">SkyPlanner, atunci c\u00e2nd planul clientului se schimb\u0103 frecvent \u0219i trebuie s\u0103 se bazeze pe date actualizate \u00een timp real. APS KARAT planific\u0103 pe baza datelor exportate din produc\u021bie, iar planificatorii creeaz\u0103 variante \u00eenainte de a salva una dintre ele \u00eenapoi \u00een sistem (<a href=\"https:\/\/www.karatsoftware.cz\/propojeni-pokrocileho-planovani-vyroby-aps-a-rizeni-dodavatelskeho-retezce-scm-v-is-karat\/\">KARAT<\/a>). SkyPlanner replanific\u0103 automat, planific\u0103 schimb\u0103rile de serie, sculele, echipele \u0219i materialele \u0219i permite un num\u0103r nelimitat de utilizatori, de la 199 \u20ac pe lun\u0103.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Putem testa SkyPlanner \u00eenainte de a realiza integrarea?<\/summary>\n<p class=\"sp-faq__a\">Da. Perioada de testare gratuit\u0103 de 30 de zile permite utilizarea a p\u00e2n\u0103 la 20 de centre de lucru, cu importuri CSV sau Excel din KARAT, f\u0103r\u0103 a fi necesar un card de credit. <a href=\"\/ro\/proba\/\">\u00cencepe\u021bi testarea<\/a> sau <a href=\"\/ro\/contact-vanzari\/\">discuta\u021bi cu echipa de v\u00e2nz\u0103ri<\/a> pentru definirea domeniului integr\u0103rii.<\/p>\n<\/details>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n<\/div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Integr\u0103ri \/ ERP \/ KARAT Ghid de integrare KARAT pentru programarea produc\u021biei cu SkyPlanner APS Acest ghid de integrare KARAT le arat\u0103 partenerilor \u0219i echipelor IT cum s\u0103 conecteze IS KARAT la SkyPlanner APS. Integrarea dintre SkyPlanner \u0219i KARAT este bidirec\u021bional\u0103 \u0219i folose\u0219te interfe\u021bele proprii ale KARAT: skyplanner.ai \u00b7 Programarea produc\u021biei Echipa SkyPlanner configureaz\u0103 integrarea &#8230; <a title=\"Ghid de integrare KARAT pentru programarea produc\u021biei cu SkyPlanner APS\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/karat\/ghid-de-integrare\/\" aria-label=\"Read more about Ghid de integrare KARAT pentru programarea produc\u021biei cu SkyPlanner APS\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":0,"parent":106662,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"class_list":["post-107882","page","type-page","status-publish"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Integrare KARAT cu APS: ghid pentru programarea produc\u021biei<\/title>\n<meta name=\"description\" content=\"KARAT\u2013SkyPlanner APS: interfa\u021b\u0103 XML agreat\u0103, import raport\u0103ri terminale, mapare ordine de produc\u021bie, reguli de retur al datelor \u0219i sfaturi de proiect.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/karat\/ghid-de-integrare\/\" \/>\n<meta property=\"og:locale\" content=\"ro_RO\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Ghid de integrare KARAT pentru programarea produc\u021biei cu SkyPlanner APS\" \/>\n<meta property=\"og:description\" content=\"KARAT\u2013SkyPlanner APS: interfa\u021b\u0103 XML agreat\u0103, import raport\u0103ri terminale, mapare ordine de produc\u021bie, reguli de retur al datelor \u0219i sfaturi de proiect.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/karat\/ghid-de-integrare\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Timp estimat pentru citire\" \/>\n\t<meta name=\"twitter:data1\" content=\"13 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/integrari\\\/erp\\\/karat\\\/ghid-de-integrare\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/integrari\\\/erp\\\/karat\\\/ghid-de-integrare\\\/\",\"name\":\"Integrare KARAT cu APS: ghid pentru programarea produc\u021biei\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/#website\"},\"datePublished\":\"2026-10-23T13:42:12+00:00\",\"description\":\"KARAT\u2013SkyPlanner APS: interfa\u021b\u0103 XML agreat\u0103, import raport\u0103ri terminale, mapare ordine de produc\u021bie, reguli de retur al datelor \u0219i sfaturi de proiect.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/integrari\\\/erp\\\/karat\\\/ghid-de-integrare\\\/#breadcrumb\"},\"inLanguage\":\"ro-RO\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/integrari\\\/erp\\\/karat\\\/ghid-de-integrare\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/integrari\\\/erp\\\/karat\\\/ghid-de-integrare\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Integr\u0103ri de software ERP \u0219i MES cu SkyPlanner\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/integrari\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"SkyPlanner APS pentru ERP-ul dvs.\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/integrari\\\/erp\\\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"SkyPlanner APS pentru KARAT: programarea produc\u021biei cu capacitate finit\u0103\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/integrari\\\/erp\\\/karat\\\/\"},{\"@type\":\"ListItem\",\"position\":5,\"name\":\"Ghid de integrare KARAT pentru programarea produc\u021biei cu SkyPlanner APS\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"ro-RO\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"ro-RO\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Integrare KARAT cu APS: ghid pentru programarea produc\u021biei","description":"KARAT\u2013SkyPlanner APS: interfa\u021b\u0103 XML agreat\u0103, import raport\u0103ri terminale, mapare ordine de produc\u021bie, reguli de retur al datelor \u0219i sfaturi de proiect.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/karat\/ghid-de-integrare\/","og_locale":"ro_RO","og_type":"article","og_title":"Ghid de integrare KARAT pentru programarea produc\u021biei cu SkyPlanner APS","og_description":"KARAT\u2013SkyPlanner APS: interfa\u021b\u0103 XML agreat\u0103, import raport\u0103ri terminale, mapare ordine de produc\u021bie, reguli de retur al datelor \u0219i sfaturi de proiect.","og_url":"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/karat\/ghid-de-integrare\/","og_site_name":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"Timp estimat pentru citire":"13 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/karat\/ghid-de-integrare\/","url":"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/karat\/ghid-de-integrare\/","name":"Integrare KARAT cu APS: ghid pentru programarea produc\u021biei","isPartOf":{"@id":"https:\/\/skyplanner.ai\/ro\/#website"},"datePublished":"2026-10-23T13:42:12+00:00","description":"KARAT\u2013SkyPlanner APS: interfa\u021b\u0103 XML agreat\u0103, import raport\u0103ri terminale, mapare ordine de produc\u021bie, reguli de retur al datelor \u0219i sfaturi de proiect.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/karat\/ghid-de-integrare\/#breadcrumb"},"inLanguage":"ro-RO","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/ro\/integrari\/erp\/karat\/ghid-de-integrare\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/karat\/ghid-de-integrare\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/ro\/"},{"@type":"ListItem","position":2,"name":"Integr\u0103ri de software ERP \u0219i MES cu SkyPlanner","item":"https:\/\/skyplanner.ai\/ro\/integrari\/"},{"@type":"ListItem","position":3,"name":"SkyPlanner APS pentru ERP-ul dvs.","item":"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/"},{"@type":"ListItem","position":4,"name":"SkyPlanner APS pentru KARAT: programarea produc\u021biei cu capacitate finit\u0103","item":"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/karat\/"},{"@type":"ListItem","position":5,"name":"Ghid de integrare KARAT pentru programarea produc\u021biei cu SkyPlanner APS"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/ro\/#website","url":"https:\/\/skyplanner.ai\/ro\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/ro\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/ro\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"ro-RO"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/ro\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/ro\/","logo":{"@type":"ImageObject","inLanguage":"ro-RO","@id":"https:\/\/skyplanner.ai\/ro\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/ro\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]}]}},"uagb_featured_image_src":{"full":false,"thumbnail":false,"medium":false,"medium_large":false,"large":false,"1536x1536":false,"2048x2048":false,"betterdocs-category-thumb":false},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/ro\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Integr\u0103ri \/ ERP \/ KARAT Ghid de integrare KARAT pentru programarea produc\u021biei cu SkyPlanner APS Acest ghid de integrare KARAT le arat\u0103 partenerilor \u0219i echipelor IT cum s\u0103 conecteze IS KARAT la SkyPlanner APS. Integrarea dintre SkyPlanner \u0219i KARAT este bidirec\u021bional\u0103 \u0219i folose\u0219te interfe\u021bele proprii ale KARAT: skyplanner.ai \u00b7 Programarea produc\u021biei Echipa SkyPlanner configureaz\u0103 integrarea&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/pages\/107882","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/comments?post=107882"}],"version-history":[{"count":0,"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/pages\/107882\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/pages\/106662"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/media?parent=107882"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}