{"id":107592,"date":"2026-10-23T13:42:12","date_gmt":"2026-10-23T13:42:12","guid":{"rendered":"https:\/\/skyplanner.ai\/integrari\/erp\/senior-erp\/ghid-de-integrare\/"},"modified":"2026-10-23T13:42:12","modified_gmt":"2026-10-23T13:42:12","slug":"ghid-de-integrare","status":"publish","type":"page","link":"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/senior-erp\/ghid-de-integrare\/","title":{"rendered":"Ghid de integrare Senior ERP pentru programarea produc\u021biei cu SkyPlanner APS"},"content":{"rendered":"\n<div class=\"wp-block-group sp-industry-page sp-industry sp-page sp-erp-page\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<section class=\"wp-block-group fx-hero\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__grid\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__copy sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-eyebrow ind-crumbs\"><span><a href=\"\/ro\/integrari\/\">Integr\u0103ri<\/a> \/ <a href=\"\/ro\/integrari\/erp\/\">ERP<\/a> \/ Senior ERP<\/span><\/p>\n\n\n<h1 class=\"wp-block-heading fx-hero__title\">Ghid de integrare Senior ERP <span class=\"hl\">pentru programarea produc\u021biei cu SkyPlanner APS<\/span><\/h1>\n\n\n<div class=\"wp-block-group fx-hero__sub ind-hero__intro\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Acest ghid de integrare Senior ERP le arat\u0103 partenerilor \u0219i echipelor IT cum s\u0103 conecteze Senior ERP de la Senior Sistemas (Gest\u00e3o Empresarial | ERP XT cu Senior X) la SkyPlanner APS. SkyPlanner se integreaz\u0103 bidirec\u021bional cu Senior ERP, prin interfe\u021bele proprii ale Senior:<\/p>\n\n\n<ul class=\"wp-block-list fxv-deliver__bul\">\n\n<li>\u00cen SkyPlanner sunt importate ordinele de produc\u021bie (OP), cu etapele lor, rutele tehnologice (roteiros), resursele \u0219i centrele de resurse, codurile SKU, structurile de produs, stocurile \u0219i comenzile de achizi\u021bie.<\/li>\n\n\n<li>Datele de \u00eenceput \u0219i de sf\u00e2r\u0219it planificate pentru fiecare etap\u0103 OP, precum \u0219i resursa aleas\u0103 pentru aceasta, sunt trimise \u00eenapoi \u00een OP.<\/li>\n\n\n<li>Dac\u0103 alege\u021bi aceast\u0103 op\u021biune, pontajele operatorilor sunt trimise \u00eenapoi ca apontamentos de produ\u00e7\u00e3o.<\/li>\n\n\n<li>Senior X Events Hub notific\u0103 SkyPlanner c\u00e2nd o etap\u0103 OP \u00ee\u0219i schimb\u0103 starea, iar webhookurile SkyPlanner transmit modific\u0103rile programului pe m\u0103sur\u0103 ce apar.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-buttons fx-hero__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/ro\/proba\/\">\u00cencepe\u021bi testarea gratuit\u0103<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/ro\/contact-vanzari\/\">Programa\u021bi o demonstra\u021bie<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-hero__media sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"fx-shot\"><div class=\"fx-shot__bar\" aria-hidden=\"true\"><i><\/i><i><\/i><i><\/i><span>skyplanner.ai \u00b7 Programarea produc\u021biei<\/span><\/div><img fetchpriority=\"high\" decoding=\"async\" loading=\"eager\" width=\"1024\" height=\"685\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/20-d7d44cbc-5430-4f97-99f5-fca4632862ef.png\" alt=\"Diagrama Gantt din SkyPlanner APS, cu opera\u021bii programate pe centre de lucru \u0219i o list\u0103 de comenzi dedesubt.\"><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--intro\" id=\"overview\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Echipa SkyPlanner configureaz\u0103 integrarea \u00een func\u021bie de configura\u021bia dumneavoastr\u0103 Senior ERP \u00een etapa de implementare ini\u021bial\u0103 \u0219i asigur\u0103 suportul dup\u0103 intrarea \u00een exploatare. Acest ghid se adreseaz\u0103 partenerilor \u0219i dezvoltatorilor care doresc s\u0103 participe sau s\u0103 dezvolte singuri o integrare folosind REST API documentat al SkyPlanner (<a href=\"https:\/\/integration.skyplanner.app\/api\/swagger\">documenta\u021bia API<\/a>).<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"senior-erp-s-integration-interfaces\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Interfe\u021bele de integrare Senior ERP<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>ERP XT este un sistem hibrid. Documenta\u021bia Senior precizeaz\u0103 c\u0103 Gest\u00e3o Empresarial XT &#8220;becomes a hybrid system: an on-premises (local) system with integration of cloud solutions&#8221; (devine un sistem hibrid: un sistem local, cu solu\u021bii cloud integrate) (<a href=\"https:\/\/documentacao.senior.com.br\/gestaoempresarialerp\/5.10.4\/xtended.htm\">documenta\u021bia Senior, \u00een traducere<\/a>). Un sistem de programare a produc\u021biei folose\u0219te trei interfe\u021be Senior:<\/p>\n\n\n<ol class=\"wp-block-list\">\n\n<li><strong>Servicii web G5 (SOAP).<\/strong> Aceste servicii ruleaz\u0103 pe serverul dumneavoastr\u0103 Senior \u0219i sunt denumite dup\u0103 modul (com.senior.g5.co.&lt;module&gt;&#8230;). Fiecare este publicat \u00een trei variante WSDL: sapiens_Sync, sapiens_Async \u0219i sapiens_Scheduled. Serviciile pentru produc\u021bie includ <strong>com.senior.g5.co.mpr.pcp.ordemproducao<\/strong>, care &#8220;calls the same production order generation routine&#8221; (apeleaz\u0103 aceea\u0219i rutin\u0103 de generare a ordinelor de produc\u021bie) ca ecranul ERP (<a href=\"https:\/\/documentacao.senior.com.br\/gestaoempresarialerp\/5.10.4\/webservices\/com_senior_g5_co_mpr_pcp_ordemproducao.htm\">documenta\u021bia Senior, \u00een traducere<\/a>), precum \u0219i servicii pentru produse (com.senior.g5.co.ger.cad.produto) \u0219i raportarea produc\u021biei.<\/li>\n\n\n<li><strong>API-uri REST Senior X Platform<\/strong> la api.senior.com.br, pentru domeniile ERP pe care Senior le expune \u00een Senior X, cum ar fi produsele \u0219i comenzile de v\u00e2nzare (<a href=\"https:\/\/documentacao.senior.com.br\/seniorxplatform\/manual-do-usuario\/erp\/mercado\/vendas\/integracao-pedido-venda-api.htm\">documenta\u021bia Senior<\/a>).<\/li>\n\n\n<li><strong>Webhookuri Events Hub.<\/strong> Se creeaz\u0103 \u00een Senior X, \u00een Tecnologia &gt; Customiza\u00e7\u00e3o &gt; Events Hub &gt; Webhooks. Modulul Manufacturing public\u0103 evenimentul <strong>erp_man\/pcp_programacaocontrole\/orderProductionStageChangeStatus<\/strong> c\u00e2nd o etap\u0103 OP \u00ee\u0219i schimb\u0103 starea (<a href=\"https:\/\/documentacao.senior.com.br\/fabrica-ao-vivo-x\/manual-do-usuario\/fabrica-ao-vivo-x\/cadastros\/\">documenta\u021bia Senior<\/a>).<\/li>\n\n<\/ol>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"authentication-and-access\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Autentificare \u0219i acces<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Senior X Platform.<\/strong> Integrarea se autentific\u0103 prin POST la platform.senior.com.br, pe calea \/t\/senior.com.br\/bridge\/1.0\/rest\/platform\/authentication\/actions\/Login, cu utilizatorul \u00een format user@tenant. R\u0103spunsul con\u021bine un token de acces Bearer \u0219i un token de re\u00eemprosp\u0103tare. Autentificarea cu chei de aplica\u021bie se poate face prin loginWithKey (access key, secret, tenant). Apelurile REST includ antetul authorization \u0219i un antet client_id care identific\u0103 aplica\u021bia conectat\u0103, \u00eenregistrat\u0103 \u00een portalul API Senior \u0219i asociat\u0103 unui rol \u00een ERP.<\/li>\n\n\n<li><strong>Servicii web G5.<\/strong> Apelurile includ parametrii user, password \u0219i encryption. Dac\u0103 se folose\u0219te un token Senior X, acesta \u00eenlocuie\u0219te parola (<a href=\"https:\/\/documentacao.senior.com.br\/tecnologia-senior-x\/manual-do-usuario\/integracoes\/web-services.htm\">documenta\u021bia Senior<\/a>).<\/li>\n\n\n<li><strong>Permisiuni.<\/strong> Crea\u021bi un utilizator Senior dedicat integr\u0103rii, cu acces la datele PCP, de inginerie, stoc \u0219i achizi\u021bii pe care integrarea le cite\u0219te \u0219i le scrie.<\/li>\n\n<\/ul>\n\n\n<p>\u00cen SkyPlanner, REST API folose\u0219te pentru autentificare un token API \u00een antetul Authorization-Token (SkyPlanner Settings &gt; API) \u0219i este documentat \u00een Swagger\/OpenAPI. <a href=\"\/ro\/docs\/tutorial-de-integrare\/\">Tutorialul de integrare<\/a> v\u0103 ghideaz\u0103 prin primele apeluri.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"events-and-polling\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Evenimente \u0219i interogare periodic\u0103<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Events Hub acoper\u0103 activitatea din atelier: c\u00e2nd o etap\u0103 OP \u00ee\u0219i schimb\u0103 starea, webhookul ajunge la SkyPlanner, iar programul se actualizeaz\u0103. Celelalte date sunt preluate prin interog\u0103ri periodice. Pentru a identifica ordinele noi, interog\u0103rile selecteaz\u0103 OP ferme \u0219i lansate \u0219i modific\u0103rile recente. Frecven\u021ba se stabile\u0219te pentru fiecare fabric\u0103: la c\u00e2teva minute pentru OP \u0219i o dat\u0103 pe or\u0103 pentru stocuri.<\/p>\n\n\n<p>SkyPlanner trimite notific\u0103ri webhook c\u00e2nd se modific\u0103 starea sau programul de produc\u021bie, astfel \u00eenc\u00e2t transmiterea datelor \u00eenapoi este declan\u0219at\u0103 de evenimente.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"data-mapping\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Maparea datelor<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th>Obiect Senior ERP (interfa\u021b\u0103)<\/th><th>Obiect SkyPlanner<\/th><th>Direc\u021bie<\/th><th>Frecven\u021b\u0103<\/th><\/tr><\/thead><tbody><tr><td>SKU: produto \u0219i deriva\u00e7\u00e3o, unit\u0103\u021bi de m\u0103sur\u0103 (servicii web G5 sau entit\u0103\u021bi Senior X)<\/td><td>Produse \u0219i materiale<\/td><td>Senior \u2192 SkyPlanner<\/td><td>\u00cenc\u0103rcare ini\u021bial\u0103, apoi interogare periodic\u0103<\/td><\/tr><tr><td>Structur\u0103 de produs (engenharia do SKU)<\/td><td>Structura produsului, subproduse, materiale pentru fiecare produs<\/td><td>Senior \u2192 SkyPlanner<\/td><td>\u00cenc\u0103rcare ini\u021bial\u0103, apoi la modificare<\/td><\/tr><tr><td>Roteiro cu est\u00e1gios: succesiune, dependen\u021b\u0103 de etapa precedent\u0103<\/td><td>Etapele procesului, \u00een ordine<\/td><td>Senior \u2192 SkyPlanner<\/td><td>\u00cenc\u0103rcare ini\u021bial\u0103, apoi la modificare<\/td><\/tr><tr><td>Recurso: Tempo processo, Tempo setup, Tempo carga e descarga, Tempo transfer\u00eancia, Fator de carga<\/td><td>Centre de lucru, durate, timpi de preg\u0103tire \u0219i de \u00eencheiere, eficien\u021be<\/td><td>Senior \u2192 SkyPlanner<\/td><td>\u00cenc\u0103rcare ini\u021bial\u0103, apoi rareori<\/td><\/tr><tr><td>Centro de recurso<\/td><td>Grupuri de centre de lucru<\/td><td>Senior \u2192 SkyPlanner<\/td><td>\u00cenc\u0103rcare ini\u021bial\u0103, apoi rar<\/td><\/tr><tr><td>Calend\u00e1rio: Feriados, calendar de produc\u021bie pe schimburi<\/td><td>Schimburi \u0219i zile nelucr\u0103toare<\/td><td>Senior \u2192 SkyPlanner<\/td><td>Zilnic sau schimburi gestionate direct \u00een SkyPlanner<\/td><\/tr><tr><td>Ordens de produ\u00e7\u00e3o (Firme, Liberada), cu etape \u0219i materiale<\/td><td>Comenzi \u0219i opera\u021bii cu termene de finalizare \u0219i necesar de materiale<\/td><td>Senior \u2192 SkyPlanner<\/td><td>Interogare la c\u00e2teva minute<\/td><\/tr><tr><td>Starea etapei OP (Events Hub orderProductionStageChangeStatus)<\/td><td>Progresul opera\u021biei<\/td><td>Senior \u2192 SkyPlanner<\/td><td>\u00cen timp real, prin webhook<\/td><\/tr><tr><td>Estoque pentru fiecare SKU<\/td><td>Solduri de stoc<\/td><td>Senior \u2192 SkyPlanner<\/td><td>Interogare o dat\u0103 pe or\u0103 sau la rularea program\u0103rii<\/td><\/tr><tr><td>Ordens de compra cu date de livrare<\/td><td>Comenzi de achizi\u021bie, materiale a\u0219teptate \u00een func\u021bie de data livr\u0103rii<\/td><td>Senior \u2192 SkyPlanner<\/td><td>Interogare periodic\u0103, la fiecare or\u0103 sau la rularea program\u0103rii<\/td><\/tr><tr><td>Etap\u0103 OP: date de \u00eenceput \u0219i de sf\u00e2r\u0219it planificate, resurs\u0103<\/td><td>Date de \u00eenceput \u0219i de sf\u00e2r\u0219it planificate pentru fiecare opera\u021bie, centrul de lucru alocat<\/td><td>SkyPlanner \u2192 Senior<\/td><td>La modificarea programului, prin webhook SkyPlanner<\/td><\/tr><tr><td>Apontamento de produ\u00e7\u00e3o: numOrp, codEtg, seqRot, qtdRel, qtdRfg, data \u0219i ora de \u00eenceput \u0219i de sf\u00e2r\u0219it<\/td><td>Pontaje \u0219i confirm\u0103ri ale operatorilor<\/td><td>SkyPlanner \u2192 Senior<\/td><td>La fiecare confirmare sau pe schimb, dac\u0103 se alege aceast\u0103 op\u021biune<\/td><\/tr><tr><td>Nu exist\u0103 \u00een Senior ERP<\/td><td>Matricea timpilor de preg\u0103tire, scule ca resurse cu capacitate finit\u0103, opera\u021bii cu mai mul\u021bi operatori, utilaje \u0219i personal alternativ<\/td><td>Gestionate \u00een SkyPlanner<\/td><td>Configurate \u00een etapa de implementare ini\u021bial\u0103<\/td><\/tr><\/tbody><\/table><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"integration-patterns\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Modele de integrare<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p><strong>1. \u00cenc\u0103rcarea ini\u021bial\u0103 a nomenclatoarelor.<\/strong> Citi\u021bi codurile SKU, structurile, roteiros, recursos, centros de recurso \u0219i calendarul de produc\u021bie. Stabili\u021bi cu aten\u021bie coresponden\u021ba centrelor de resurse: un centro de recurso cu patru utilaje devine un grup de centre de lucru sau patru centre de lucru. Converti\u021bi Fator de carga fie \u00een eficien\u021ba centrului de lucru SkyPlanner, fie \u00een schimburi, nu \u00een ambele.<\/p>\n\n\n<p><strong>2. Sincronizarea OP.<\/strong> Citi\u021bi OP cu st\u0103rile Firme \u0219i Liberada, \u00eempreun\u0103 cu etapele \u0219i materialele lor, precum \u0219i comenzile de achizi\u021bie deschise. OP cu starea Planejada pot fi \u00eenc\u0103 modificate sau \u0219terse de MRP, a\u0219a c\u0103 programa\u021bi-le doar dac\u0103 dori\u021bi o perspectiv\u0103 asupra produc\u021biei viitoare. SkyPlanner consider\u0103 materialul comandat disponibil la data de livrare a comenzii de achizi\u021bie \u0219i actualizeaz\u0103 stocul c\u00e2nd comanda este marcat\u0103 Delivered.<\/p>\n\n\n<p><strong>3. Scrierea programului \u00eenapoi \u00een ERP.<\/strong> C\u00e2nd motorul plaseaz\u0103 sau mut\u0103 o etap\u0103, un webhook SkyPlanner declan\u0219eaz\u0103 scrierea \u00eenapoi. Sunt actualizate datele de \u00eenceput \u0219i de sf\u00e2r\u0219it planificate pentru fiecare etap\u0103 OP \u0219i resursa aleas\u0103 pentru aceasta, adic\u0103 acelea\u0219i c\u00e2mpuri pe care planificatorul le modific\u0103 \u00een Programa\u00e7\u00e3o de produ\u00e7\u00e3o. Echipa SkyPlanner stabile\u0219te serviciul web exact \u00eempreun\u0103 cu dumneavoastr\u0103 \u0219i partenerul Senior \u00een etapa de definire a domeniului.<\/p>\n\n\n<p><strong>4. Confirm\u0103ri din atelier.<\/strong> Operatorii \u00ee\u0219i \u00eenregistreaz\u0103 activitatea cu SkyPlanner Mobile Confirmations sau Production Timer, iar pontajele men\u021bin programul actualizat. Dumneavoastr\u0103 decide\u021bi dac\u0103 timpii efectivi sunt trimi\u0219i \u00eenapoi \u00een Senior. Dac\u0103 da, fiecare confirmare devine un apontamento de produ\u00e7\u00e3o pentru etapa OP, cu cantitatea produs\u0103, rebuturile \u0219i orele de \u00eenceput \u0219i de sf\u00e2r\u0219it. Senior accept\u0103 raport\u0103ri de produc\u021bie doar pentru OP cu starea Liberada sau Andamento. Dac\u0103 raporta\u021bi prin F\u00e1brica ao Vivo, SkyPlanner preia progresul prin Events Hub.<\/p>\n\n\n<p><strong>5. Reguli privind responsabilitatea pentru date \u0219i solu\u021bionarea conflictelor.<\/strong> Documenta\u021bi-le \u00eenainte de punerea \u00een produc\u021bie:<\/p>\n\n\n<figure class=\"wp-block-table ind-table\"><table><thead><tr><th>Date<\/th><th>Sistem responsabil<\/th><\/tr><\/thead><tbody><tr><td>Coduri SKU, structuri, roteiros, cantit\u0103\u021bi \u0219i stare OP<\/td><td>Senior ERP<\/td><\/tr><tr><td>Succesiunea etapelor, ore de \u00eenceput \u0219i de sf\u00e2r\u0219it, alocarea resurselor<\/td><td>SkyPlanner<\/td><\/tr><tr><td>Matricea timpilor de preg\u0103tire, necesarul de scule \u0219i operatori, resurse alternative<\/td><td>SkyPlanner<\/td><\/tr><tr><td>Calendarul de produc\u021bie \u0219i schimburile<\/td><td>Un singur sistem, ales la definirea domeniului<\/td><\/tr><tr><td>Apontamentos, mi\u0219c\u0103ri de stoc, calcula\u021bia costurilor<\/td><td>Senior ERP, cu date introduse direct sau transmise din pontajele SkyPlanner<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>Alege\u021bi un singur sistem care s\u0103 scrie datele calendaristice ale etapelor. Dac\u0103 planificatorii continu\u0103 s\u0103 stabileasc\u0103 succesiunea acelora\u0219i OP \u00een Programa\u00e7\u00e3o de produ\u00e7\u00e3o sau \u00een diagrama Gantt, conveni\u021bi care OP sunt gestionate de SkyPlanner.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"typical-project-steps\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Etapele obi\u0219nuite ale proiectului<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Implementarea se finalizeaz\u0103 de obicei \u00een c\u00e2teva s\u0103pt\u0103m\u00e2ni de la \u00eenceperea etapei de implementare ini\u021bial\u0103. \u00cenainte de aceasta, valida\u021bi programul \u00een perioada de testare gratuit\u0103 de 30 de zile, cu resurse, roteiros \u0219i OP deschise exportate din Senior \u00een format CSV sau Excel.<\/p>\n\n\n<ol class=\"wp-block-list\">\n\n<li><strong>Mapare.<\/strong> Stabili\u021bi tabelul de coresponden\u021be, regulile privind sistemul responsabil, frecven\u021bele de sincronizare \u0219i dac\u0103 apontamentos sunt trimise \u00eenapoi.<\/li>\n\n\n<li><strong>Acces Senior.<\/strong> Crea\u021bi utilizatorul pentru integrare, \u00eenregistra\u021bi aplica\u021bia \u00een portalul API Senior \u0219i activa\u021bi serviciile web G5 \u0219i webhookul Events Hub. Testa\u021bi mai \u00eent\u00e2i \u00eentr-o baz\u0103 de date de testare.<\/li>\n\n\n<li><strong>\u00cenc\u0103rcare ini\u021bial\u0103.<\/strong> Coduri SKU, structuri, roteiros, recursos, centros de recurso, calendar.<\/li>\n\n\n<li><strong>Sincronizarea OP \u0219i a comenzilor de achizi\u021bie.<\/strong> Interog\u0103ri periodice cu filtre \u0219i re\u00eencerc\u0103ri, plus webhookul pentru starea etapelor.<\/li>\n\n\n<li><strong>Configurarea constr\u00e2ngerilor \u00een SkyPlanner.<\/strong> Matricea timpilor de preg\u0103tire, scule, num\u0103rul de operatori pentru fiecare opera\u021bie \u0219i utilaje sau personal alternativ.<\/li>\n\n\n<li><strong>Scrierea programului \u00eenapoi \u00een ERP.<\/strong> Datele calendaristice ale etapelor \u0219i resursele din webhookurile SkyPlanner, plus apontamentos dac\u0103 se alege aceast\u0103 op\u021biune.<\/li>\n\n\n<li><strong>Testare \u00een paralel.<\/strong> Rula\u021bi SkyPlanner \u00een paralel cu planul actual, compara\u021bi datele calendaristice \u0219i corecta\u021bi nomenclatoarele.<\/li>\n\n\n<li><strong>Punere \u00een produc\u021bie.<\/strong> Activa\u021bi transmiterea datelor \u00eenapoi dup\u0103 ce datele corespund.<\/li>\n\n<\/ol>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"what-to-plan-for-in-a-senior-erp-integration\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Ce trebuie s\u0103 ave\u021bi \u00een vedere la integrarea cu Senior ERP<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Patru timpi pentru fiecare resurs\u0103.<\/strong> Recurso con\u021bine timpul de procesare, de preg\u0103tire, de \u00eenc\u0103rcare \u0219i desc\u0103rcare \u0219i de transfer. Timpii de \u00eenc\u0103rcare \u0219i de transfer pot reprezenta manipulare, nu timp de utilizare a utilajului. Stabili\u021bi pentru fiecare resurs\u0103 cum se mapeaz\u0103 ace\u0219ti timpi; altfel, toate duratele vor fi gre\u0219ite.<\/li>\n\n\n<li><strong>Un singur timp de preg\u0103tire pentru fiecare resurs\u0103.<\/strong> Tempo setup din Senior are o singur\u0103 valoare. \u00cen etapa de implementare ini\u021bial\u0103, construi\u021bi matricea timpilor de preg\u0103tire \u00een SkyPlanner pe baza schimb\u0103rilor de serie efectuate \u00een produc\u021bie.<\/li>\n\n\n<li><strong>Variante de produs.<\/strong> \u00cen Senior, un SKU este format dintr-un produs \u0219i o deriva\u00e7\u00e3o, iar roteiros pot diferi de la o variant\u0103 la alta. Include\u021bi codul variantei \u00een cheile de produs din SkyPlanner.<\/li>\n\n\n<li><strong>St\u0103rile OP.<\/strong> Doar OP cu st\u0103rile Liberada \u0219i Andamento accept\u0103 raport\u0103ri de produc\u021bie. Gestiona\u021bi schimb\u0103rile de stare \u00een Senior \u0219i l\u0103sa\u021bi SkyPlanner s\u0103 le urm\u0103reasc\u0103 prin Events Hub.<\/li>\n\n\n<li><strong>Implementare hibrid\u0103.<\/strong> Serviciile web G5 ruleaz\u0103 pe serverul dumneavoastr\u0103 Senior, iar Events Hub ruleaz\u0103 \u00een Senior X. Planifica\u021bi accesul la re\u021bea pentru ambele.<\/li>\n\n\n<li><strong>Formatul numerelor.<\/strong> Serviciile web Senior resping numerele cu separatori de mii \u0219i impun virgula ca separator zecimal. Trimite\u021bi numerele \u00een acest format.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"who-configures-and-supports-the-senior-erp-integ\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Cine configureaz\u0103 integrarea cu Senior ERP \u0219i asigur\u0103 suportul<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ol class=\"wp-block-list\">\n\n<li><strong>Echipa SkyPlanner configureaz\u0103 integrarea \u00een etapa de implementare \u0219i asigur\u0103 suportul dup\u0103 punerea \u00een func\u021biune,<\/strong> pentru serviciile web, API-urile Senior X \u0219i webhook-urile Events Hub convenite. Fiecare fabric\u0103 folose\u0219te Senior ERP diferit, iar aceast\u0103 experien\u021b\u0103 este pus\u0103 \u00een practic\u0103 aici.<\/li>\n\n\n<li><strong>Partenerul dumneavoastr\u0103 Senior poate participa.<\/strong> Acesta v\u0103 cunoa\u0219te configura\u021bia, personaliz\u0103rile \u0219i licen\u021bele \u0219i poate colabora cu echipa SkyPlanner pentru a configura utilizatorul de integrare, \u00eenregistrarea \u00een portalul API \u0219i serviciile web.<\/li>\n\n\n<li><strong>Dezvoltatorii dumneavoastr\u0103 pot extinde integrarea<\/strong> folosind interfa\u021ba REST API SkyPlanner \u0219i un token API. Un token API este suficient pentru a \u00eencepe, iar echipa SkyPlanner ofer\u0103 asisten\u021b\u0103 la nevoie. Consulta\u021bi <a href=\"\/ro\/docs\/tutorial-de-integrare\/\">documenta\u021bia de integrare SkyPlanner<\/a>.<\/li>\n\n<\/ol>\n\n\n<p>SkyPlanner porne\u0219te de la 199 \u20ac pe lun\u0103, cu 5 centre de lucru incluse \u0219i facturare lunar\u0103. Oferta pentru integrare este stabilit\u0103 de la \u00eenceput, \u00een func\u021bie de procesele \u0219i nevoile dumneavoastr\u0103, \u00eempreun\u0103 cu abonamentul. Consulta\u021bi <a href=\"\/ro\/preturi\/\">pre\u021burile<\/a>, <a href=\"\/ro\/integrari\/erp\/senior-erp\/cu-capacitate-finita\/\">programarea cu capacitate finit\u0103 pentru Senior ERP<\/a>, <a href=\"\/ro\/integrari\/erp\/senior-erp\/\">pagina Senior ERP<\/a> \u0219i <a href=\"\/ro\/integrari\/erp\/\">sec\u021biunea de integr\u0103ri ERP<\/a>.<\/p>\n\n\n<div class=\"wp-block-buttons ind-prose__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/ro\/proba\/\">\u00cencepe\u021bi testarea gratuit\u0103<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/ro\/contact-vanzari\/\">Programa\u021bi o demonstra\u021bie<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"customers\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Ce spun produc\u0103torii despre SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-custs\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/utu-kalle-kalliomaki-2026.jpg\" alt=\"Kalle Kalliom\u00e4ki, specialist \u00een lan\u021bul de aprovizionare la UTU, \u00een hala de produc\u021bie a tablourilor electrice din Ulvila\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/23-beca6df2-3fa2-4315-80e8-7c38a9e3d2e1.png\" alt=\"UTU\" width=\"69\" height=\"59\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>2 h<\/b><span>economisite \u00een fiecare s\u0103pt\u0103m\u00e2n\u0103<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eCu SkyPlanner, am trecut de la planificarea produc\u021biei \u00een foi de calcul Excel la optimizarea produc\u021biei \u00een timp real.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Kalle Kalliom\u00e4ki, specialist \u00een lan\u021bul de aprovizionare<\/b><br>UTU \u00b7 Tablouri electrice \u0219i aparataj de comuta\u021bie<\/p>\n\n\n<p class=\"ind-cust__result\">Planificarea produc\u021biei economise\u0219te 2 ore de lucru \u00een fiecare s\u0103pt\u0103m\u00e2n\u0103, iar o nou\u0103 list\u0103 de opera\u021bii ajunge la linia de produc\u021bie \u00een c\u00e2teva secunde.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/ro\/povesti-ale-clientilor\/utu\/\">Citi\u021bi opinia UTU<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-35ce8dff-f7d0-4cf3-9e71-0fe7e7ff88d3.jpg\" alt=\"Operatori \u00een combinezoane pentru camere curate, la o linie de umplere a flacoanelor din fabrica de produse farmaceutice Laboratory &amp; Allied din Nairobi\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/09-8c2deb57-ac1c-468b-ad64-fafb9debd7eb.png\" alt=\"Laboratory &amp; Allied\" width=\"71\" height=\"44\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>+90%<\/b><span>eficien\u021b\u0103 \u00een produc\u021bie<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eEficien\u021ba \u00een produc\u021bie a crescut cu 90%.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Abdul Rucyinga, director IT<\/b><br>Laboratory &amp; Allied \u00b7 Produc\u021bie farmaceutic\u0103<\/p>\n\n\n<p class=\"ind-cust__result\">Eficien\u021ba \u00een produc\u021bie a crescut cu 90%, iar realizarea unui plan optimizat pe trei luni, pentru toate centrele de lucru, dureaz\u0103 mai pu\u021bin de 30 de minute.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/ro\/povesti-ale-clientilor\/laboratory-allied\/\">Citi\u021bi opinia Laboratory &amp; Allied<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/25-73c14230-f628-43c7-9890-005acea9125f.jpg\" alt=\"Hannu Ryyn\u00e4nen, director general al Mamec, \u00een hala de produc\u021bie a companiei din Lohja\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/26-733d2728-780d-4b41-b834-e23619dad50c.png\" alt=\"Mamec\" width=\"106\" height=\"20\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>1.000 de comenzi \u0219i mai mult<\/b><span>programate automat \u00een produc\u021bie<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eControl\u0103m produc\u021bia \u00eentr-un mod diferit \u0219i avem o cu totul alt\u0103 \u00een\u021belegere a capacit\u0103\u021bii noastre.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Hannu Ryyn\u00e4nen, director general<\/b><br>Mamec \u00b7 Mixere industriale, pompe \u0219i produc\u021bie la comand\u0103 de \u00eenalt\u0103 tehnologie<\/p>\n\n\n<p class=\"ind-cust__result\">Mii de comenzi de produc\u021bie sunt programate automat, iar \u00eentreaga organiza\u021bie are o imagine \u00een timp real asupra produc\u021biei.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/ro\/povesti-ale-clientilor\/mamec\/\">Citi\u021bi recenzia Mamec<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/homepage-v2\/logo-eskomatic.png\" alt=\"Eskomatic\" width=\"140\" height=\"15\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>Mai pu\u021bine<\/b><span>opriri cauzate de lipsa materialelor<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eValoarea pe care ne-o aduce SkyPlanner const\u0103 \u00een faptul c\u0103 este un instrument care func\u021bioneaz\u0103 \u00een activitatea de zi cu zi, mai ales pentru stabilirea termenelor de livrare.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Tommi M\u00e4nnist\u00f6, manager de planificare a produc\u021biei<\/b><br>Eskomatic \u00b7 Prelucr\u0103ri mecanice la comand\u0103<\/p>\n\n\n<p class=\"ind-cust__result\">Programarea automat\u0103 a \u00eenc\u0103rc\u0103rii permite stabilirea unor termene de livrare mai precise, iar opririle de produc\u021bie cauzate de lipsa materialelor s-au redus considerabil.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/ro\/povesti-ale-clientilor\/eskomatic\/\">Citi\u021bi opinia Eskomatic<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">\u00centreb\u0103ri frecvente<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group sp-faq fx-faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Senior ERP are un API pentru comenzile de produc\u021bie?<\/summary>\n<p class=\"sp-faq__a\">Da. Serviciul web G5 com.senior.g5.co.mpr.pcp.ordemproducao genereaz\u0103 OP-uri folosind aceea\u0219i rutin\u0103 ca ecranul din ERP, iar alte servicii G5 acoper\u0103 produsele \u0219i raportarea produc\u021biei. Senior X Platform adaug\u0103 API-uri REST cu autentificare prin token Bearer \u0219i webhook-uri Events Hub.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Senior ERP accept\u0103 webhook-uri?<\/summary>\n<p class=\"sp-faq__a\">Da. Senior X Events Hub trimite webhook-uri, inclusiv orderProductionStageChangeStatus atunci c\u00e2nd se schimb\u0103 starea unei etape dintr-un OP. SkyPlanner \u00eel folose\u0219te pentru a urm\u0103ri \u00een timp real progresul din produc\u021bie, iar propriile webhook-uri transmit \u00eenapoi modific\u0103rile programului.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Cum sunt transmise \u00eenapoi \u00een Senior ERP datele planificate?<\/summary>\n<p class=\"sp-faq__a\">SkyPlanner stabile\u0219te datele planificate de \u00eenceput \u0219i de sf\u00e2r\u0219it ale fiec\u0103rei etape dintr-un OP, precum \u0219i resursa aleas\u0103 pentru aceasta. Sunt acelea\u0219i c\u00e2mpuri pe care planificatorul le modific\u0103 \u00een Programa\u00e7\u00e3o de produ\u00e7\u00e3o. Un webhook SkyPlanner declan\u0219eaz\u0103 actualizarea \u00een Senior ERP la fiecare modificare a programului, prin ruta stabilit\u0103 de echipa SkyPlanner pentru instalarea dumneavoastr\u0103 Senior \u00een etapa de definire a domeniului integr\u0103rii, la implementare.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Integrarea func\u021bioneaz\u0103 cu Senior X \u0219i ERP XT?<\/summary>\n<p class=\"sp-faq__a\">Da. ERP XT ruleaz\u0103 pe serverul dumneavoastr\u0103, cu servicii cloud pe Senior X. Integrarea folose\u0219te serviciile web G5 de pe server, precum \u0219i API-urile Senior X \u0219i Events Hub din cloud.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Putem testa SkyPlanner \u00eenainte de a realiza integrarea?<\/summary>\n<p class=\"sp-faq__a\">Da. Perioada de testare gratuit\u0103 de 30 de zile permite utilizarea a p\u00e2n\u0103 la 20 de centre de lucru, cu importuri CSV sau Excel din Senior, f\u0103r\u0103 a fi necesar un card de credit. <a href=\"\/ro\/proba\/\">\u00cencepe\u021bi testarea<\/a> sau <a href=\"\/ro\/contact-vanzari\/\">discuta\u021bi cu echipa de v\u00e2nz\u0103ri<\/a> pentru definirea domeniului integr\u0103rii.<\/p>\n<\/details>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n<\/div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Integr\u0103ri \/ ERP \/ Senior ERP Ghid de integrare Senior ERP pentru programarea produc\u021biei cu SkyPlanner APS Acest ghid de integrare Senior ERP le arat\u0103 partenerilor \u0219i echipelor IT cum s\u0103 conecteze Senior ERP de la Senior Sistemas (Gest\u00e3o Empresarial | ERP XT cu Senior X) la SkyPlanner APS. SkyPlanner se integreaz\u0103 bidirec\u021bional cu Senior &#8230; <a title=\"Ghid de integrare Senior ERP pentru programarea produc\u021biei cu SkyPlanner APS\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/senior-erp\/ghid-de-integrare\/\" aria-label=\"Read more about Ghid de integrare Senior ERP pentru programarea produc\u021biei cu SkyPlanner APS\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":0,"parent":106517,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"class_list":["post-107592","page","type-page","status-publish"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Integrare Senior ERP\u2013APS: ghid pentru programarea produc\u021biei<\/title>\n<meta name=\"description\" content=\"Senior ERP\u2013SkyPlanner APS: API Senior X Platform, servicii web G5, webhookuri Events Hub, scriere \u00eenapoi a etapelor OP, maparea datelor \u0219i sfaturi de proiect.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/senior-erp\/ghid-de-integrare\/\" \/>\n<meta property=\"og:locale\" content=\"ro_RO\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Ghid de integrare Senior ERP pentru programarea produc\u021biei cu SkyPlanner APS\" \/>\n<meta property=\"og:description\" content=\"Senior ERP\u2013SkyPlanner APS: API Senior X Platform, servicii web G5, webhookuri Events Hub, scriere \u00eenapoi a etapelor OP, maparea datelor \u0219i sfaturi de proiect.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/senior-erp\/ghid-de-integrare\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Timp estimat pentru citire\" \/>\n\t<meta name=\"twitter:data1\" content=\"14 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/integrari\\\/erp\\\/senior-erp\\\/ghid-de-integrare\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/integrari\\\/erp\\\/senior-erp\\\/ghid-de-integrare\\\/\",\"name\":\"Integrare Senior ERP\u2013APS: ghid pentru programarea produc\u021biei\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/#website\"},\"datePublished\":\"2026-10-23T13:42:12+00:00\",\"description\":\"Senior ERP\u2013SkyPlanner APS: API Senior X Platform, servicii web G5, webhookuri Events Hub, scriere \u00eenapoi a etapelor OP, maparea datelor \u0219i sfaturi de proiect.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/integrari\\\/erp\\\/senior-erp\\\/ghid-de-integrare\\\/#breadcrumb\"},\"inLanguage\":\"ro-RO\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/integrari\\\/erp\\\/senior-erp\\\/ghid-de-integrare\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/integrari\\\/erp\\\/senior-erp\\\/ghid-de-integrare\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Integr\u0103ri de software ERP \u0219i MES cu SkyPlanner\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/integrari\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"SkyPlanner APS pentru ERP-ul dvs.\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/integrari\\\/erp\\\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"SkyPlanner APS pentru Senior ERP: programarea produc\u021biei cu capacitate finit\u0103\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/integrari\\\/erp\\\/senior-erp\\\/\"},{\"@type\":\"ListItem\",\"position\":5,\"name\":\"Ghid de integrare Senior ERP pentru programarea produc\u021biei cu SkyPlanner APS\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"ro-RO\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"ro-RO\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Integrare Senior ERP\u2013APS: ghid pentru programarea produc\u021biei","description":"Senior ERP\u2013SkyPlanner APS: API Senior X Platform, servicii web G5, webhookuri Events Hub, scriere \u00eenapoi a etapelor OP, maparea datelor \u0219i sfaturi de proiect.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/senior-erp\/ghid-de-integrare\/","og_locale":"ro_RO","og_type":"article","og_title":"Ghid de integrare Senior ERP pentru programarea produc\u021biei cu SkyPlanner APS","og_description":"Senior ERP\u2013SkyPlanner APS: API Senior X Platform, servicii web G5, webhookuri Events Hub, scriere \u00eenapoi a etapelor OP, maparea datelor \u0219i sfaturi de proiect.","og_url":"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/senior-erp\/ghid-de-integrare\/","og_site_name":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"Timp estimat pentru citire":"14 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/senior-erp\/ghid-de-integrare\/","url":"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/senior-erp\/ghid-de-integrare\/","name":"Integrare Senior ERP\u2013APS: ghid pentru programarea produc\u021biei","isPartOf":{"@id":"https:\/\/skyplanner.ai\/ro\/#website"},"datePublished":"2026-10-23T13:42:12+00:00","description":"Senior ERP\u2013SkyPlanner APS: API Senior X Platform, servicii web G5, webhookuri Events Hub, scriere \u00eenapoi a etapelor OP, maparea datelor \u0219i sfaturi de proiect.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/senior-erp\/ghid-de-integrare\/#breadcrumb"},"inLanguage":"ro-RO","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/ro\/integrari\/erp\/senior-erp\/ghid-de-integrare\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/senior-erp\/ghid-de-integrare\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/ro\/"},{"@type":"ListItem","position":2,"name":"Integr\u0103ri de software ERP \u0219i MES cu SkyPlanner","item":"https:\/\/skyplanner.ai\/ro\/integrari\/"},{"@type":"ListItem","position":3,"name":"SkyPlanner APS pentru ERP-ul dvs.","item":"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/"},{"@type":"ListItem","position":4,"name":"SkyPlanner APS pentru Senior ERP: programarea produc\u021biei cu capacitate finit\u0103","item":"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/senior-erp\/"},{"@type":"ListItem","position":5,"name":"Ghid de integrare Senior ERP pentru programarea produc\u021biei cu SkyPlanner APS"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/ro\/#website","url":"https:\/\/skyplanner.ai\/ro\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/ro\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/ro\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"ro-RO"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/ro\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/ro\/","logo":{"@type":"ImageObject","inLanguage":"ro-RO","@id":"https:\/\/skyplanner.ai\/ro\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/ro\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]}]}},"uagb_featured_image_src":{"full":false,"thumbnail":false,"medium":false,"medium_large":false,"large":false,"1536x1536":false,"2048x2048":false,"betterdocs-category-thumb":false},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/ro\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Integr\u0103ri \/ ERP \/ Senior ERP Ghid de integrare Senior ERP pentru programarea produc\u021biei cu SkyPlanner APS Acest ghid de integrare Senior ERP le arat\u0103 partenerilor \u0219i echipelor IT cum s\u0103 conecteze Senior ERP de la Senior Sistemas (Gest\u00e3o Empresarial | ERP XT cu Senior X) la SkyPlanner APS. SkyPlanner se integreaz\u0103 bidirec\u021bional cu Senior&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/pages\/107592","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/comments?post=107592"}],"version-history":[{"count":0,"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/pages\/107592\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/pages\/106517"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/media?parent=107592"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}