{"id":107474,"date":"2026-10-23T13:42:12","date_gmt":"2026-10-23T13:42:12","guid":{"rendered":"https:\/\/skyplanner.ai\/integrari\/erp\/helios\/ghid-de-integrare\/"},"modified":"2026-10-23T13:42:12","modified_gmt":"2026-10-23T13:42:12","slug":"ghid-de-integrare","status":"publish","type":"page","link":"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/helios\/ghid-de-integrare\/","title":{"rendered":"Ghid de integrare HELIOS pentru programarea produc\u021biei cu SkyPlanner APS"},"content":{"rendered":"\n<div class=\"wp-block-group sp-industry-page sp-industry sp-page sp-erp-page\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<section class=\"wp-block-group fx-hero\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__grid\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__copy sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-eyebrow ind-crumbs\"><span><a href=\"\/ro\/integrari\/\">Integr\u0103ri<\/a> \/ <a href=\"\/ro\/integrari\/erp\/\">ERP<\/a> \/ HELIOS<\/span><\/p>\n\n\n<h1 class=\"wp-block-heading fx-hero__title\">Ghid de integrare HELIOS <span class=\"hl\">pentru programarea produc\u021biei cu SkyPlanner APS<\/span><\/h1>\n\n\n<div class=\"wp-block-group fx-hero__sub ind-hero__intro\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Acest ghid de integrare HELIOS le arat\u0103 partenerilor \u0219i echipelor IT cum s\u0103 conecteze HELIOS iNuvio \u0219i HELIOS Nephrite la SkyPlanner APS. SkyPlanner se integreaz\u0103 bidirec\u021bional cu HELIOS, folosind interfe\u021bele proprii ale HELIOS:<\/p>\n\n\n<ul class=\"wp-block-list fxv-deliver__bul\">\n\n<li>\u00cen SkyPlanner sunt preluate ordinele de produc\u021bie (v\u00fdrobn\u00ed p\u0159\u00edkazy) cu opera\u021biile aferente, piesele fabricate, listele de materiale, fluxurile tehnologice, locurile de munc\u0103, utilajele, meseriile, resursele de personal, stocurile \u0219i comenzile de achizi\u021bie.<\/li>\n\n\n<li>Datele planificate de \u00eenceput \u0219i de sf\u00e2r\u0219it sunt transmise \u00eenapoi c\u0103tre ordinele de produc\u021bie.<\/li>\n\n\n<li>Dac\u0103 dori\u021bi, pontajele operatorilor pot fi transmise \u00eenapoi ca \u00eenregistr\u0103ri ale opera\u021biilor (evidence v\u00fdrobn\u00edch operac\u00ed).<\/li>\n\n\n<li>Webhook-urile SkyPlanner transmit modific\u0103rile programului pe m\u0103sur\u0103 ce apar.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-buttons fx-hero__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/ro\/proba\/\">\u00cencepe\u021bi testarea gratuit\u0103<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/ro\/contact-vanzari\/\">Programa\u021bi o demonstra\u021bie<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-hero__media sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"fx-shot\"><div class=\"fx-shot__bar\" aria-hidden=\"true\"><i><\/i><i><\/i><i><\/i><span>skyplanner.ai \u00b7 Programarea produc\u021biei<\/span><\/div><img fetchpriority=\"high\" decoding=\"async\" loading=\"eager\" width=\"1024\" height=\"685\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/20-d7d44cbc-5430-4f97-99f5-fca4632862ef.png\" alt=\"Diagrama Gantt din SkyPlanner APS, cu opera\u021bii programate pe centre de lucru \u0219i o list\u0103 de comenzi dedesubt.\"><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--intro\" id=\"overview\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Echipa SkyPlanner configureaz\u0103 integrarea \u00een func\u021bie de configura\u021bia dumneavoastr\u0103 HELIOS \u00een etapa de implementare ini\u021bial\u0103 \u0219i asigur\u0103 asisten\u021b\u0103 dup\u0103 punerea \u00een func\u021biune. Acest ghid se adreseaz\u0103 partenerilor \u0219i dezvoltatorilor HELIOS care doresc s\u0103 participe sau s\u0103 dezvolte singuri solu\u021bii folosind REST API documentat al SkyPlanner (<a href=\"https:\/\/integration.skyplanner.app\/api\/swagger\">documenta\u021bia API<\/a>).<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"helios-s-integration-interfaces\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Interfe\u021bele de integrare HELIOS<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p><strong>Helios Inuvio Server (Inuvio REST API).<\/strong> Asseco \u00eel descrie ca pe o component\u0103 separat\u0103 a HELIOS iNuvio, care ofer\u0103 acces prin REST API la registrele HELIOS iNuvio (<a href=\"https:\/\/public.helios.eu\/inuvio\/doc\/cs\/index.php?title=Helios_Inuvio_Server\">documenta\u021bia Helios Inuvio Server<\/a>). Este inclus \u00een distribu\u021bia iNuvio, iar specifica\u021bia OpenAPI este publicat\u0103 \u00een formatele Rapidoc \u0219i Redoc. API-ul lucreaz\u0103 cu listele HELIOS (browses), fiecare av\u00e2nd propriul ID \u0219i propriile drepturi de acces:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>GET \/browses\/list<\/strong> \u0219i <strong>GET \/browses\/meta<\/strong> enumer\u0103 listele disponibile \u0219i coloanele acestora.<\/li>\n\n\n<li><strong>\/browses\/data<\/strong> cite\u0219te r\u00e2ndurile unei liste \u0219i permite scrierea lor acolo unde lista accept\u0103 crearea, actualizarea \u0219i \u0219tergerea.<\/li>\n\n\n<li><strong>\/api\/v1\/actions\/meta<\/strong> \u0219i <strong>\/api\/v1\/actions\/execute\/{dbName}\/{browseIdent}\/{actionIdent}<\/strong> execut\u0103 ac\u021biuni externe asupra unei liste. \u00cen prezent, sunt acceptate ac\u021biuni externe de tip Procedure, Browse \u0219i Plugin.<\/li>\n\n<\/ul>\n\n\n<p>Listele de produc\u021bie folosite de un planificator includ planul de produc\u021bie (v\u00fdrobn\u00ed pl\u00e1n), ordinele de produc\u021bie (v\u00fdrobn\u00ed p\u0159\u00edkazy), piesele aferente ordinelor de produc\u021bie, materialele \u0219i semifabricatele pentru produc\u021bie, meseriile, resursele de personal, set\u0103rile predefinite ale opera\u021biilor din fluxul tehnologic \u0219i \u00eenregistr\u0103rile opera\u021biilor. Stocurile, intr\u0103rile, ie\u0219irile \u0219i comenzile de achizi\u021bie emise (vydan\u00e9 objedn\u00e1vky) sunt disponibile \u00een acela\u0219i mod.<\/p>\n\n\n<p><strong>HELIOS Nephrite REST API.<\/strong> Planul de dezvoltare Nephrite include dezvoltarea REST API (<a href=\"https:\/\/www.helios.eu\/files\/road-to-2025-nephrite.pdf\">planul de dezvoltare HELIOS Nephrite<\/a>). \u00cen etapa de definire a domeniului proiectului, echipa SkyPlanner confirm\u0103 \u00eempreun\u0103 cu dumneavoastr\u0103 \u0219i partenerul HELIOS endpoint-urile Nephrite pentru instalarea dumneavoastr\u0103. Fluxurile de date de mai jos r\u0103m\u00e2n acelea\u0219i.<\/p>\n\n\n<p><strong>Excel \u0219i CSV.<\/strong> Fiecare list\u0103 HELIOS permite exportul \u00een Microsoft Office, suficient pentru \u00eenc\u0103rcarea datelor \u00een perioada de testare.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"authentication-and-licensing\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Autentificare \u0219i licen\u021biere<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Dou\u0103 metode de autentificare.<\/strong> iNuvio ofer\u0103 un API proprietar de autentificare mai vechi (\/api\/token) \u0219i un API OAuth2 mai nou, bazat pe RFC 6749 (\/oauth\/token, \/oauth\/revoke). Tokenurile sunt re\u00eennoite prin POST \/oauth\/token sau GET \/api\/token.<\/li>\n\n\n<li><strong>Licen\u021biere.<\/strong> Helios Inuvio Server \u00een sine este gratuit, iar REST API necesit\u0103 licen\u021b\u0103. \u00cencep\u00e2nd cu versiunea 3.0.2026.0301, API-urile de sistem \u0219i cele pentru registre sunt reunite \u00eentr-un singur Inuvio REST API, iar accesul la API nu mai este limitat de num\u0103rul de utilizatori.<\/li>\n\n\n<li><strong>Drepturi de acces.<\/strong> Utilizatorul dedicat integr\u0103rii are nevoie de drepturi de citire pentru listele de produc\u021bie \u0219i de stocuri, precum \u0219i de dreptul de a executa ac\u021biunile externe convenite.<\/li>\n\n<\/ul>\n\n\n<p>\u00cen SkyPlanner, autentificarea la REST API se face cu un token API \u00een antetul Authorization-Token (SkyPlanner Settings &gt; API), iar documenta\u021bia este disponibil\u0103 \u00een Swagger\/OpenAPI. <a href=\"\/ro\/docs\/tutorial-de-integrare\/\">Tutorialul de integrare<\/a> explic\u0103 pas cu pas primele apeluri.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"events-and-polling\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Evenimente \u0219i interogare periodic\u0103<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>SkyPlanner cite\u0219te datele din HELIOS la intervale stabilite. Apelurile c\u0103tre \/browses\/data, filtrate pentru ordinele de produc\u021bie deschise \u0219i modific\u0103rile recente, preiau noile lucr\u0103ri. Frecven\u021ba se stabile\u0219te pentru fiecare fabric\u0103: de la c\u00e2teva minute pentru ordinele de produc\u021bie p\u00e2n\u0103 la o or\u0103 pentru stocuri.<\/p>\n\n\n<p>SkyPlanner trimite notific\u0103ri webhook c\u00e2nd se schimb\u0103 starea sau programul de produc\u021bie, astfel \u00eenc\u00e2t transmiterea datelor \u00eenapoi este declan\u0219at\u0103 de evenimente.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"data-mapping\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Maparea datelor<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th>Obiect HELIOS (list\u0103)<\/th><th>Obiect SkyPlanner<\/th><th>Sens<\/th><th>Frecven\u021b\u0103<\/th><\/tr><\/thead><tbody><tr><td>Fi\u0219e de articole \u0219i piese fabricate (vyr\u00e1b\u011bn\u00e9 d\u00edlce), unit\u0103\u021bi de m\u0103sur\u0103<\/td><td>Produse \u0219i materiale<\/td><td>HELIOS \u2192 SkyPlanner<\/td><td>\u00cenc\u0103rcare ini\u021bial\u0103, apoi interogare periodic\u0103<\/td><\/tr><tr><td>Liste de materiale (kusovn\u00edk, kusovn\u00edkov\u00e9 vazby) cu perioad\u0103 de valabilitate<\/td><td>Structura produsului, produse intermediare, materiale pentru fiecare produs<\/td><td>HELIOS \u2192 SkyPlanner<\/td><td>\u00cenc\u0103rcare ini\u021bial\u0103, apoi la modificare<\/td><\/tr><tr><td>Fluxuri tehnologice (technologick\u00fd postup): opera\u021bie, loc de munc\u0103, timp de preg\u0103tire a utilajului \u0219i a operatorului, timp unitar, timp de \u00eencheiere, timp \u00eentre opera\u021bii<\/td><td>Etape de proces cu durate, timpi de preg\u0103tire \u0219i de \u00eencheiere<\/td><td>HELIOS \u2192 SkyPlanner<\/td><td>\u00cenc\u0103rcare ini\u021bial\u0103, apoi la modificare<\/td><\/tr><tr><td>Locuri de munc\u0103 (pracovi\u0161t\u011b), utilaje (stroje), locuri de munc\u0103 alternative<\/td><td>Centre de lucru, grupuri de centre de lucru, centre de lucru alternative<\/td><td>HELIOS \u2192 SkyPlanner<\/td><td>\u00cenc\u0103rcare ini\u021bial\u0103, rar ulterior<\/td><\/tr><tr><td>Meserii (v\u00fdrobn\u00ed profese), resurse de personal (v\u00fdrobn\u00ed person\u00e1ln\u00ed zdroje)<\/td><td>Personal \u0219i num\u0103r de operatori pentru fiecare opera\u021bie<\/td><td>HELIOS \u2192 SkyPlanner<\/td><td>\u00cenc\u0103rcare ini\u021bial\u0103, apoi la modificare<\/td><\/tr><tr><td>Calendare de planificare (pl\u00e1novac\u00ed kalend\u00e1\u0159e)<\/td><td>Schimburi \u0219i zile nelucr\u0103toare<\/td><td>HELIOS \u2192 SkyPlanner<\/td><td>Zilnic sau schimburi proprii \u00een SkyPlanner<\/td><\/tr><tr><td>Ordine de produc\u021bie (v\u00fdrobn\u00ed p\u0159\u00edkazy), piesele \u0219i opera\u021biile aferente, materiale pentru produc\u021bie<\/td><td>Comenzi \u0219i opera\u021bii cu termene de finalizare \u0219i necesar de materiale<\/td><td>HELIOS \u2192 SkyPlanner<\/td><td>Interogare la fiecare c\u00e2teva minute<\/td><\/tr><tr><td>Stocuri (stav skladu)<\/td><td>Solduri de stoc<\/td><td>HELIOS \u2192 SkyPlanner<\/td><td>Interogare la fiecare or\u0103 sau la rularea program\u0103rii<\/td><\/tr><tr><td>Comenzi de achizi\u021bie emise (vydan\u00e9 objedn\u00e1vky) cu date de livrare<\/td><td>Comenzi de achizi\u021bie, materiale de recep\u021bionat \u00een func\u021bie de data livr\u0103rii<\/td><td>HELIOS \u2192 SkyPlanner<\/td><td>Interogare la fiecare or\u0103 sau la rularea program\u0103rii<\/td><\/tr><tr><td>Momentele planificate de \u00eenceput \u0219i de sf\u00e2r\u0219it pentru fiecare opera\u021bie a ordinului de produc\u021bie (ac\u021biune extern\u0103)<\/td><td>Momentele planificate de \u00eenceput \u0219i de sf\u00e2r\u0219it pentru fiecare opera\u021bie<\/td><td>SkyPlanner \u2192 HELIOS<\/td><td>La modificarea programului de produc\u021bie, prin webhook SkyPlanner<\/td><\/tr><tr><td>\u00cenregistr\u0103ri ale opera\u021biilor (evidence v\u00fdrobn\u00edch operac\u00ed)<\/td><td>Pontaje \u0219i confirm\u0103ri ale operatorilor<\/td><td>SkyPlanner \u2192 HELIOS<\/td><td>La fiecare confirmare sau la fiecare schimb, dac\u0103 se opteaz\u0103 pentru aceasta<\/td><\/tr><tr><td>Nu exist\u0103 \u00een HELIOS<\/td><td>Matricea timpilor de preg\u0103tire, scule ca resurse cu capacitate finit\u0103, opera\u021bii cu mai mul\u021bi operatori<\/td><td>Gestionate \u00een SkyPlanner<\/td><td>Configurate \u00een etapa de implementare ini\u021bial\u0103<\/td><\/tr><\/tbody><\/table><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"integration-patterns\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Modele de integrare<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p><strong>1. \u00cenc\u0103rcarea ini\u021bial\u0103 a nomenclatoarelor.<\/strong> Citi\u021bi piesele fabricate, listele de materiale, fluxurile tehnologice, locurile de munc\u0103, utilajele, meseriile, resursele de personal \u0219i calendarele din listele TPV. Fiecare resurs\u0103 HELIOS are un indicator pentru includerea \u00een planificarea capacit\u0103\u021bii de produc\u021bie, a\u0219a c\u0103 stabili\u021bi pentru fiecare resurs\u0103 ce va programa SkyPlanner. Un loc de munc\u0103 cu patru utilaje devine un grup de centre de lucru sau patru centre de lucru.<\/p>\n\n\n<p><strong>2. Sincronizarea ordinelor.<\/strong> Citi\u021bi ordinele de produc\u021bie cu piesele, opera\u021biile \u0219i materialele aferente, precum \u0219i comenzile de achizi\u021bie emise. SkyPlanner consider\u0103 materialul comandat disponibil la data de livrare a comenzii de achizi\u021bie \u0219i actualizeaz\u0103 stocul c\u00e2nd comanda este marcat\u0103 Delivered. Programa\u021bi ordinele de produc\u021bie lansate. Cantit\u0103\u021bile planificate din planul de produc\u021bie r\u0103m\u00e2n \u00een HELIOS p\u00e2n\u0103 c\u00e2nd devin ordine de produc\u021bie.<\/p>\n\n\n<p><strong>3. Transmiterea programului de produc\u021bie \u00eenapoi \u00een HELIOS.<\/strong> C\u00e2nd motorul programeaz\u0103 sau mut\u0103 o opera\u021bie, un webhook SkyPlanner declan\u0219eaz\u0103 o ac\u021biune extern\u0103 asupra listei ordinelor de produc\u021bie prin \/api\/v1\/actions\/execute. Ac\u021biunea este o procedur\u0103 HELIOS, convenit\u0103 la definirea domeniului proiectului, care stabile\u0219te momentele planificate de \u00eenceput \u0219i de sf\u00e2r\u0219it ale opera\u021biei din ordin. HELIOS valideaz\u0103 modificarea conform propriei logici.<\/p>\n\n\n<p><strong>4. Confirm\u0103ri din produc\u021bie.<\/strong> Operatorii \u00ee\u0219i \u00eenregistreaz\u0103 activitatea cu SkyPlanner Mobile Confirmations sau Production Timer, iar pontajele men\u021bin programul de produc\u021bie la zi. Dumneavoastr\u0103 decide\u021bi dac\u0103 timpii efectivi sunt transmi\u0219i \u00eenapoi \u00een HELIOS. Dac\u0103 da, o ac\u021biune extern\u0103 \u00eei salveaz\u0103 ca \u00eenregistr\u0103ri pentru fiecare opera\u021bie a ordinului. Dac\u0103 nu, operatorii continu\u0103 s\u0103 raporteze la terminalele HELIOS, iar SkyPlanner cite\u0219te acele \u00eenregistr\u0103ri.<\/p>\n\n\n<p><strong>5. Responsabilitatea pentru date \u0219i regulile de solu\u021bionare a conflictelor.<\/strong> Documenta\u021bi-le \u00eenainte de punerea \u00een func\u021biune:<\/p>\n\n\n<figure class=\"wp-block-table ind-table\"><table><thead><tr><th>Date<\/th><th>Sistem responsabil<\/th><\/tr><\/thead><tbody><tr><td>Articole, liste de materiale, fluxuri tehnologice, cantit\u0103\u021bi, starea ordinului<\/td><td>HELIOS<\/td><\/tr><tr><td>Succesiunea opera\u021biilor, orele de \u00eenceput \u0219i de sf\u00e2r\u0219it, alocarea utilajelor<\/td><td>SkyPlanner<\/td><\/tr><tr><td>Matricea timpilor de preg\u0103tire, necesarul de scule \u0219i operatori, resurse alternative<\/td><td>SkyPlanner<\/td><\/tr><tr><td>Schimburi \u0219i zile nelucr\u0103toare<\/td><td>Un singur sistem, ales la definirea domeniului<\/td><\/tr><tr><td>\u00cenregistr\u0103ri ale opera\u021biilor, ie\u0219iri \u0219i intr\u0103ri de materiale<\/td><td>HELIOS, cu introducere direct\u0103 sau transmitere din pontajele SkyPlanner<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>Alege\u021bi un singur sistem care s\u0103 scrie datele calendaristice ale ordinelor. Dac\u0103 func\u021bia de planificare a capacit\u0103\u021bii de produc\u021bie din HELIOS sau Nephrite APS \u00eenc\u0103 scrie aceste date, dezactiva\u021bi scrierea pentru ordinele programate de SkyPlanner sau p\u0103stra\u021bi planul HELIOS doar pentru testare.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"typical-project-steps\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Etapele obi\u0219nuite ale proiectului<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>\u00cen mod normal, implementarea se finalizeaz\u0103 \u00een c\u00e2teva s\u0103pt\u0103m\u00e2ni de la \u00eenceperea etapei ini\u021biale. \u00cenainte de aceasta, valida\u021bi programul de produc\u021bie \u00een perioada de testare gratuit\u0103 de 30 de zile, folosind locurile de munc\u0103, fluxurile tehnologice \u0219i ordinele de produc\u021bie deschise exportate din HELIOS \u00een CSV sau Excel.<\/p>\n\n\n<ol class=\"wp-block-list\">\n\n<li><strong>Mapare.<\/strong> Stabili\u021bi tabelul de mapare, regulile privind sistemul responsabil pentru date, frecven\u021bele de sincronizare \u0219i dac\u0103 \u00eenregistr\u0103rile opera\u021biilor vor fi transmise \u00eenapoi.<\/li>\n\n\n<li><strong>Acces la HELIOS.<\/strong> Configura\u021bi Helios Inuvio Server, utilizatorul dedicat integr\u0103rii, datele de autentificare OAuth2 \u0219i licen\u021bierea REST API. Testa\u021bi mai \u00eent\u00e2i pe o copie a bazei de date.<\/li>\n\n\n<li><strong>\u00cenc\u0103rcare ini\u021bial\u0103.<\/strong> Piese fabricate, liste de materiale, fluxuri tehnologice, locuri de munc\u0103, utilaje, meserii, calendare.<\/li>\n\n\n<li><strong>Sincronizarea ordinelor de produc\u021bie \u0219i a comenzilor de achizi\u021bie.<\/strong> Interogare periodic\u0103 cu filtre, paginare \u0219i re\u00eencerc\u0103ri.<\/li>\n\n\n<li><strong>Configurarea constr\u00e2ngerilor \u00een SkyPlanner.<\/strong> Matricea timpilor de preg\u0103tire, sculele, num\u0103rul de operatori pentru fiecare opera\u021bie \u0219i utilajele alternative sau personalul de \u00eenlocuire.<\/li>\n\n\n<li><strong>Transmiterea programului de produc\u021bie \u00eenapoi \u00een HELIOS.<\/strong> Crea\u021bi \u0219i testa\u021bi ac\u021biunile externe pentru datele planificate \u0219i, dac\u0103 opta\u021bi pentru aceasta, pentru \u00eenregistr\u0103rile opera\u021biilor.<\/li>\n\n\n<li><strong>Testare \u00een paralel.<\/strong> Rula\u021bi SkyPlanner \u00een paralel cu planul actual, compara\u021bi datele \u0219i corecta\u021bi nomenclatoarele.<\/li>\n\n\n<li><strong>Punerea \u00een func\u021biune.<\/strong> Activa\u021bi transmiterea datelor \u00eenapoi dup\u0103 ce datele corespund.<\/li>\n\n<\/ol>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"what-to-plan-for-in-a-helios-integration\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Ce trebuie s\u0103 ave\u021bi \u00een vedere la integrarea cu HELIOS<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Indicatori de planificare.<\/strong> Numai resursele marcate pentru planificarea capacit\u0103\u021bii de produc\u021bie au date de capacitate fiabile. Verifica\u021bi indicatorii pentru locurile de munc\u0103, utilaje, meserii \u0219i subcontract\u0103ri \u00eenainte de prima \u00eenc\u0103rcare.<\/li>\n\n\n<li><strong>Unit\u0103\u021bi de timp.<\/strong> Timpii de preg\u0103tire, timpii unitari \u0219i timpii de \u00eencheiere pot fi introdu\u0219i \u00een ore, minute sau secunde. Converti\u021bi-i la import; altfel, toate duratele vor fi gre\u0219ite.<\/li>\n\n\n<li><strong>Timpul dintre opera\u021bii.<\/strong> Timpul constant dintre opera\u021bii reprezint\u0103 a\u0219teptare, nu timp de func\u021bionare a utilajului. Modela\u021bi-l ca timp de a\u0219teptare, nu ca necesar de capacitate.<\/li>\n\n\n<li><strong>Opera\u021bii subcontractate (kooperace).<\/strong> Timpul de transport se aplic\u0103 at\u00e2t la dus, c\u00e2t \u0219i la \u00eentors. Modela\u021bi opera\u021biile subcontractate ca etape care au doar o durat\u0103.<\/li>\n\n\n<li><strong>Liste care permit scrierea.<\/strong> Toate listele permit citirea, dar numai unele permit crearea, actualizarea \u0219i \u0219tergerea \u00eenregistr\u0103rilor. GET \/browses\/list cu filtrul browseCreateImplemented=1 arat\u0103 care sunt acestea. Listele de ordine de produc\u021bie permit doar citirea, a\u0219a c\u0103 datele planificate sunt trimise \u00eenapoi prin ac\u021biunea extern\u0103 convenit\u0103.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"who-configures-and-supports-the-helios-integrati\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Cine configureaz\u0103 integrarea cu HELIOS \u0219i asigur\u0103 suportul<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ol class=\"wp-block-list\">\n\n<li><strong>Echipa SkyPlanner configureaz\u0103 integrarea \u00een etapa de implementare \u0219i asigur\u0103 suportul dup\u0103 punerea \u00een func\u021biune,<\/strong> pentru listele \u0219i ac\u021biunile externe convenite. Fiecare fabric\u0103 folose\u0219te HELIOS \u00een mod diferit, iar aceste particularit\u0103\u021bi sunt luate \u00een considerare aici.<\/li>\n\n\n<li><strong>Partenerul dumneavoastr\u0103 HELIOS poate participa.<\/strong> Acesta cunoa\u0219te instalarea, procedurile personalizate \u0219i licen\u021bele dumneavoastr\u0103 \u0219i poate configura Helios Inuvio Server \u0219i ac\u021biunile externe \u00eempreun\u0103 cu echipa SkyPlanner.<\/li>\n\n\n<li><strong>Propriii dezvoltatori pot extinde integrarea<\/strong> folosind REST API al SkyPlanner, cu un token API. Un token API este suficient pentru a \u00eencepe, iar echipa SkyPlanner ofer\u0103 asisten\u021b\u0103 la nevoie. Detaliile sunt disponibile \u00een <a href=\"\/ro\/docs\/tutorial-de-integrare\/\">documenta\u021bia de integrare SkyPlanner<\/a>.<\/li>\n\n<\/ol>\n\n\n<p>SkyPlanner porne\u0219te de la 199 \u20ac pe lun\u0103, cu 5 centre de lucru incluse \u0219i facturare lunar\u0103. Oferta pentru integrare este stabilit\u0103 de la \u00eenceput, \u00een func\u021bie de procesul \u0219i nevoile dumneavoastr\u0103, \u00eempreun\u0103 cu abonamentul. Consulta\u021bi <a href=\"\/ro\/preturi\/\">tarifele<\/a>, <a href=\"\/ro\/integrari\/erp\/helios\/cu-capacitate-finita\/\">programarea cu capacitate finit\u0103 pentru HELIOS<\/a>, <a href=\"\/ro\/integrari\/erp\/helios\/\">pagina HELIOS<\/a> \u0219i <a href=\"\/ro\/integrari\/erp\/\">sec\u021biunea de integr\u0103ri ERP<\/a>. Pentru no\u021biunile de baz\u0103, consulta\u021bi pagina despre <a href=\"\/ro\/resurse\/ce-este-programarea-productiei\/\">programarea produc\u021biei<\/a>.<\/p>\n\n\n<div class=\"wp-block-buttons ind-prose__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/ro\/proba\/\">\u00cencepe\u021bi testarea gratuit\u0103<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/ro\/contact-vanzari\/\">Programa\u021bi o demonstra\u021bie<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"customers\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Ce spun produc\u0103torii despre SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-custs\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/utu-kalle-kalliomaki-2026.jpg\" alt=\"Kalle Kalliom\u00e4ki, specialist \u00een lan\u021bul de aprovizionare la UTU, \u00een hala de produc\u021bie a tablourilor electrice din Ulvila\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/23-beca6df2-3fa2-4315-80e8-7c38a9e3d2e1.png\" alt=\"UTU\" width=\"69\" height=\"59\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>2 h<\/b><span>economisite \u00een fiecare s\u0103pt\u0103m\u00e2n\u0103<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eCu SkyPlanner, am trecut de la planificarea produc\u021biei \u00een foi de calcul Excel la optimizarea produc\u021biei \u00een timp real.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Kalle Kalliom\u00e4ki, specialist \u00een lan\u021bul de aprovizionare<\/b><br>UTU \u00b7 Tablouri electrice \u0219i aparataj de comuta\u021bie<\/p>\n\n\n<p class=\"ind-cust__result\">Planificarea produc\u021biei economise\u0219te 2 ore de lucru \u00een fiecare s\u0103pt\u0103m\u00e2n\u0103, iar o nou\u0103 list\u0103 de opera\u021bii ajunge la linia de produc\u021bie \u00een c\u00e2teva secunde.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/ro\/povesti-ale-clientilor\/utu\/\">Citi\u021bi m\u0103rturia UTU<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-35ce8dff-f7d0-4cf3-9e71-0fe7e7ff88d3.jpg\" alt=\"Operatori \u00een combinezoane pentru camere curate la o linie de umplere a flacoanelor din fabrica farmaceutic\u0103 Laboratory &amp; Allied din Nairobi\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/09-8c2deb57-ac1c-468b-ad64-fafb9debd7eb.png\" alt=\"Laboratory &amp; Allied\" width=\"71\" height=\"44\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>+90%<\/b><span>eficien\u021b\u0103 \u00een produc\u021bie<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eEficien\u021ba \u00een produc\u021bie a crescut cu 90%.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Abdul Rucyinga, director IT<\/b><br>Laboratory &amp; Allied \u00b7 Produc\u021bie farmaceutic\u0103<\/p>\n\n\n<p class=\"ind-cust__result\">Eficien\u021ba \u00een produc\u021bie a crescut cu 90%, iar realizarea unui plan optimizat pe trei luni pentru toate centrele de lucru dureaz\u0103 mai pu\u021bin de 30 de minute.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/ro\/povesti-ale-clientilor\/laboratory-allied\/\">Citi\u021bi m\u0103rturia Laboratory &amp; Allied<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/25-73c14230-f628-43c7-9890-005acea9125f.jpg\" alt=\"Hannu Ryyn\u00e4nen, director general Mamec, \u00een hala de produc\u021bie a companiei din Lohja\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/26-733d2728-780d-4b41-b834-e23619dad50c.png\" alt=\"Mamec\" width=\"106\" height=\"20\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>Mii (1.000+)<\/b><span>de comenzi de produc\u021bie programate automat<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eAvem un alt nivel de control asupra produc\u021biei, iar \u00een\u021belegerea capacit\u0103\u021bii noastre este la un nivel complet diferit.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Hannu Ryyn\u00e4nen, director general<\/b><br>Mamec \u00b7 Mixere industriale, pompe \u0219i produc\u021bie pe baz\u0103 de contract cu tehnologii avansate<\/p>\n\n\n<p class=\"ind-cust__result\">Mii de comenzi de produc\u021bie sunt programate automat, iar \u00eentreaga organiza\u021bie are o imagine \u00een timp real asupra produc\u021biei.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/ro\/povesti-ale-clientilor\/mamec\/\">Citi\u021bi recenzia Mamec<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/28-83df4743-ff34-41a5-9a41-c3dcc6f0897b.png\" alt=\"Opes Corporation\" width=\"106\" height=\"32\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>100%<\/b><span>respectarea termenelor de livrare din 2021<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eSkyPlanner ne ofer\u0103 vizibilitate asupra capacit\u0103\u021bii \u0219i face planificarea predictibil\u0103.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Dan Berglund, COO\/CFO<\/b><br>Opes Corporation \u00b7 Produc\u021bie chimic\u0103 \u0219i alimentar\u0103<\/p>\n\n\n<p class=\"ind-cust__result\">Termenele de livrare au fost respectate \u00een propor\u021bie de 100% pe \u00eentreaga perioad\u0103 de utilizare a SkyPlanner, din 2021.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/ro\/povesti-ale-clientilor\/opes-corporation\/\">Citi\u021bi recenzia Opes Corporation<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">\u00centreb\u0103ri frecvente<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group sp-faq fx-faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>HELIOS are un API pentru comenzile de produc\u021bie?<\/summary>\n<p class=\"sp-faq__a\">Da. Helios Inuvio Server ofer\u0103 acces REST la listele din HELIOS iNuvio, inclusiv la planul de produc\u021bie, comenzile de produc\u021bie, componentele comenzilor, materialele pentru produc\u021bie \u0219i \u00eenregistr\u0103rile opera\u021biilor. Pentru HELIOS Nephrite, echipa SkyPlanner stabile\u0219te metoda de integrare pentru instalarea dumneavoastr\u0103 \u00eempreun\u0103 cu dumneavoastr\u0103 \u0219i partenerul HELIOS, la definirea domeniului proiectului \u00een etapa de implementare.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Cum preia SkyPlanner modific\u0103rile din HELIOS?<\/summary>\n<p class=\"sp-faq__a\">SkyPlanner interogheaz\u0103 periodic listele HELIOS, la intervale stabilite pentru fiecare fabric\u0103, folosind filtre pentru comenzile de produc\u021bie deschise \u0219i modific\u0103rile recente. Webhook-urile proprii ale SkyPlanner transmit modific\u0103rile programului de produc\u021bie pe m\u0103sur\u0103 ce apar.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Cum sunt transmise \u00eenapoi \u0219i \u00eenregistrate \u00een HELIOS datele planificate?<\/summary>\n<p class=\"sp-faq__a\">Printr-o ac\u021biune extern\u0103 asociat\u0103 listei de comenzi de produc\u021bie, executat\u0103 cu \/api\/v1\/actions\/execute. Ac\u021biunea este o procedur\u0103 HELIOS convenit\u0103 la definirea domeniului proiectului, astfel \u00eenc\u00e2t HELIOS \u00ee\u0219i aplic\u0103 propria logic\u0103 fiec\u0103rei date primite.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Ce metod\u0103 de autentificare folose\u0219te Inuvio REST API?<\/summary>\n<p class=\"sp-faq__a\">OAuth2 conform RFC 6749, la \/oauth\/token, sau metoda proprietar\u0103 mai veche, la \/api\/token. API-ul propriu al SkyPlanner folose\u0219te un token API \u00een antetul Authorization-Token.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Ce ar trebui s\u0103 propun\u0103 un partener HELIOS: HELIOS APS sau SkyPlanner?<\/summary>\n<p class=\"sp-faq__a\">SkyPlanner, atunci c\u00e2nd planul clientului se schimb\u0103 frecvent, iar programarea trebuie s\u0103 respecte capacitatea finit\u0103. Planificarea \u00een HELIOS se bazeaz\u0103 pe calcule efectuate pe un singur plan activ, poate trece la capacitate nelimitat\u0103 pentru a respecta termenele \u0219i las\u0103 rezolvarea suprapunerilor \u00een sarcina planificatorului (<a href=\"https:\/\/public.helios.eu\/inuvio\/doc\/cs\/index.php?title=Z%C3%A1kladn%C3%AD_kapacitn%C3%AD_pl%C3%A1nov%C3%A1n%C3%AD_-_V%C3%BDroba\">documenta\u021bia de ajutor HELIOS<\/a>). SkyPlanner se conecteaz\u0103 prin REST API, reprogrameaz\u0103 automat produc\u021bia, planific\u0103 schimb\u0103rile de serie, sculele, echipele \u0219i materialele \u0219i permite un num\u0103r nelimitat de utilizatori, de la 199 \u20ac pe lun\u0103.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Putem testa SkyPlanner \u00eenainte de a realiza integrarea?<\/summary>\n<p class=\"sp-faq__a\">Da. Perioada de testare gratuit\u0103 de 30 de zile permite utilizarea a p\u00e2n\u0103 la 20 de centre de lucru, cu importuri CSV sau Excel din HELIOS, f\u0103r\u0103 a fi necesar un card de credit. <a href=\"\/ro\/proba\/\">\u00cencepe\u021bi testarea<\/a> sau <a href=\"\/ro\/contact-vanzari\/\">discuta\u021bi cu echipa de v\u00e2nz\u0103ri<\/a> pentru definirea domeniului integr\u0103rii.<\/p>\n<\/details>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n<\/div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Integr\u0103ri \/ ERP \/ HELIOS Ghid de integrare HELIOS pentru programarea produc\u021biei cu SkyPlanner APS Acest ghid de integrare HELIOS le arat\u0103 partenerilor \u0219i echipelor IT cum s\u0103 conecteze HELIOS iNuvio \u0219i HELIOS Nephrite la SkyPlanner APS. SkyPlanner se integreaz\u0103 bidirec\u021bional cu HELIOS, folosind interfe\u021bele proprii ale HELIOS: skyplanner.ai \u00b7 Programarea produc\u021biei Echipa SkyPlanner configureaz\u0103 &#8230; <a title=\"Ghid de integrare HELIOS pentru programarea produc\u021biei cu SkyPlanner APS\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/helios\/ghid-de-integrare\/\" aria-label=\"Read more about Ghid de integrare HELIOS pentru programarea produc\u021biei cu SkyPlanner APS\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":0,"parent":106459,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"class_list":["post-107474","page","type-page","status-publish"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Integrare HELIOS APS: ghid pentru programarea produc\u021biei<\/title>\n<meta name=\"description\" content=\"Conecta\u021bi HELIOS\u2013SkyPlanner APS: Inuvio REST API, OAuth2, liste de ordine de produc\u021bie, scriere \u00eenapoi prin ac\u021biuni externe, mapare, sfaturi de proiect.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/helios\/ghid-de-integrare\/\" \/>\n<meta property=\"og:locale\" content=\"ro_RO\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Ghid de integrare HELIOS pentru programarea produc\u021biei cu SkyPlanner APS\" \/>\n<meta property=\"og:description\" content=\"Conecta\u021bi HELIOS\u2013SkyPlanner APS: Inuvio REST API, OAuth2, liste de ordine de produc\u021bie, scriere \u00eenapoi prin ac\u021biuni externe, mapare, sfaturi de proiect.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/helios\/ghid-de-integrare\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Timp estimat pentru citire\" \/>\n\t<meta name=\"twitter:data1\" content=\"14 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/integrari\\\/erp\\\/helios\\\/ghid-de-integrare\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/integrari\\\/erp\\\/helios\\\/ghid-de-integrare\\\/\",\"name\":\"Integrare HELIOS APS: ghid pentru programarea produc\u021biei\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/#website\"},\"datePublished\":\"2026-10-23T13:42:12+00:00\",\"description\":\"Conecta\u021bi HELIOS\u2013SkyPlanner APS: Inuvio REST API, OAuth2, liste de ordine de produc\u021bie, scriere \u00eenapoi prin ac\u021biuni externe, mapare, sfaturi de proiect.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/integrari\\\/erp\\\/helios\\\/ghid-de-integrare\\\/#breadcrumb\"},\"inLanguage\":\"ro-RO\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/integrari\\\/erp\\\/helios\\\/ghid-de-integrare\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/integrari\\\/erp\\\/helios\\\/ghid-de-integrare\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Integr\u0103ri de software ERP \u0219i MES cu SkyPlanner\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/integrari\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"SkyPlanner APS pentru ERP-ul dvs.\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/integrari\\\/erp\\\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"SkyPlanner APS pentru HELIOS: programarea produc\u021biei cu capacitate finit\u0103\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/integrari\\\/erp\\\/helios\\\/\"},{\"@type\":\"ListItem\",\"position\":5,\"name\":\"Ghid de integrare HELIOS pentru programarea produc\u021biei cu SkyPlanner APS\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"ro-RO\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"ro-RO\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Integrare HELIOS APS: ghid pentru programarea produc\u021biei","description":"Conecta\u021bi HELIOS\u2013SkyPlanner APS: Inuvio REST API, OAuth2, liste de ordine de produc\u021bie, scriere \u00eenapoi prin ac\u021biuni externe, mapare, sfaturi de proiect.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/helios\/ghid-de-integrare\/","og_locale":"ro_RO","og_type":"article","og_title":"Ghid de integrare HELIOS pentru programarea produc\u021biei cu SkyPlanner APS","og_description":"Conecta\u021bi HELIOS\u2013SkyPlanner APS: Inuvio REST API, OAuth2, liste de ordine de produc\u021bie, scriere \u00eenapoi prin ac\u021biuni externe, mapare, sfaturi de proiect.","og_url":"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/helios\/ghid-de-integrare\/","og_site_name":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"Timp estimat pentru citire":"14 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/helios\/ghid-de-integrare\/","url":"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/helios\/ghid-de-integrare\/","name":"Integrare HELIOS APS: ghid pentru programarea produc\u021biei","isPartOf":{"@id":"https:\/\/skyplanner.ai\/ro\/#website"},"datePublished":"2026-10-23T13:42:12+00:00","description":"Conecta\u021bi HELIOS\u2013SkyPlanner APS: Inuvio REST API, OAuth2, liste de ordine de produc\u021bie, scriere \u00eenapoi prin ac\u021biuni externe, mapare, sfaturi de proiect.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/helios\/ghid-de-integrare\/#breadcrumb"},"inLanguage":"ro-RO","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/ro\/integrari\/erp\/helios\/ghid-de-integrare\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/helios\/ghid-de-integrare\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/ro\/"},{"@type":"ListItem","position":2,"name":"Integr\u0103ri de software ERP \u0219i MES cu SkyPlanner","item":"https:\/\/skyplanner.ai\/ro\/integrari\/"},{"@type":"ListItem","position":3,"name":"SkyPlanner APS pentru ERP-ul dvs.","item":"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/"},{"@type":"ListItem","position":4,"name":"SkyPlanner APS pentru HELIOS: programarea produc\u021biei cu capacitate finit\u0103","item":"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/helios\/"},{"@type":"ListItem","position":5,"name":"Ghid de integrare HELIOS pentru programarea produc\u021biei cu SkyPlanner APS"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/ro\/#website","url":"https:\/\/skyplanner.ai\/ro\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/ro\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/ro\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"ro-RO"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/ro\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/ro\/","logo":{"@type":"ImageObject","inLanguage":"ro-RO","@id":"https:\/\/skyplanner.ai\/ro\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/ro\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]}]}},"uagb_featured_image_src":{"full":false,"thumbnail":false,"medium":false,"medium_large":false,"large":false,"1536x1536":false,"2048x2048":false,"betterdocs-category-thumb":false},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/ro\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Integr\u0103ri \/ ERP \/ HELIOS Ghid de integrare HELIOS pentru programarea produc\u021biei cu SkyPlanner APS Acest ghid de integrare HELIOS le arat\u0103 partenerilor \u0219i echipelor IT cum s\u0103 conecteze HELIOS iNuvio \u0219i HELIOS Nephrite la SkyPlanner APS. SkyPlanner se integreaz\u0103 bidirec\u021bional cu HELIOS, folosind interfe\u021bele proprii ale HELIOS: skyplanner.ai \u00b7 Programarea produc\u021biei Echipa SkyPlanner configureaz\u0103&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/pages\/107474","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/comments?post=107474"}],"version-history":[{"count":0,"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/pages\/107474\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/pages\/106459"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/media?parent=107474"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}