{"id":107416,"date":"2026-10-23T13:42:12","date_gmt":"2026-10-23T13:42:12","guid":{"rendered":"https:\/\/skyplanner.ai\/integrari\/erp\/divalto\/ghid-de-integrare\/"},"modified":"2026-10-23T13:42:12","modified_gmt":"2026-10-23T13:42:12","slug":"ghid-de-integrare","status":"publish","type":"page","link":"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/divalto\/ghid-de-integrare\/","title":{"rendered":"Ghid de integrare Divalto pentru programarea produc\u021biei cu SkyPlanner APS"},"content":{"rendered":"\n<div class=\"wp-block-group sp-industry-page sp-industry sp-page sp-erp-page\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<section class=\"wp-block-group fx-hero\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__grid\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__copy sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-eyebrow ind-crumbs\"><span><a href=\"\/ro\/integrari\/\">Integr\u0103ri<\/a> \/ <a href=\"\/ro\/integrari\/erp\/\">ERP<\/a> \/ Divalto infinity<\/span><\/p>\n\n\n<h1 class=\"wp-block-heading fx-hero__title\">Ghid de integrare Divalto <span class=\"hl\">pentru programarea produc\u021biei cu SkyPlanner APS<\/span><\/h1>\n\n\n<div class=\"wp-block-group fx-hero__sub ind-hero__intro\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Acest ghid de integrare Divalto arat\u0103 partenerilor \u0219i echipelor IT cum s\u0103 conecteze Divalto infinity la SkyPlanner APS. SkyPlanner se integreaz\u0103 bidirec\u021bional cu Divalto, folosind serviciile REST ale acestuia:<\/p>\n\n\n<ul class=\"wp-block-list fxv-deliver__bul\">\n\n<li>Se preiau OF \u0219i s\u00e9quences OF, gammes, nomenclatures, articles, centres de charge, postes de travail, ressources, op\u00e9rateurs, outillages, stocuri \u0219i comenzi c\u0103tre furnizori.<\/li>\n\n\n<li>Datele de \u00eenceput \u0219i de sf\u00e2r\u0219it planificate sunt transmise \u00eenapoi pentru fiecare OF \u0219i s\u00e9quence, \u00eempreun\u0103 cu noul centre sau poste atunci c\u00e2nd lucrul este mutat pe o resurs\u0103 alternativ\u0103.<\/li>\n\n\n<li>Dac\u0103 dori\u021bi, se pot transmite \u00eenapoi \u0219i timpii operatorilor \u0219i ciclurile finalizate.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-buttons fx-hero__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/ro\/proba\/\">\u00cencepe\u021bi testarea gratuit\u0103<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/ro\/contact-vanzari\/\">Programa\u021bi o demonstra\u021bie<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-hero__media sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"fx-shot\"><div class=\"fx-shot__bar\" aria-hidden=\"true\"><i><\/i><i><\/i><i><\/i><span>skyplanner.ai \u00b7 Programarea produc\u021biei<\/span><\/div><img fetchpriority=\"high\" decoding=\"async\" loading=\"eager\" width=\"1024\" height=\"685\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/20-d7d44cbc-5430-4f97-99f5-fca4632862ef.png\" alt=\"Diagram\u0103 Gantt \u00een SkyPlanner APS, cu opera\u021bii programate pe centre de lucru \u0219i o list\u0103 de comenzi dedesubt.\"><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"divalto-s-integration-interfaces\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Interfe\u021bele de integrare Divalto<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Platforma API Divalto infinity pune la dispozi\u021bia unui sistem extern de programare trei componente de baz\u0103:<\/p>\n\n\n<ol class=\"wp-block-list\">\n\n<li><strong>RecordSql (REST nativ).<\/strong> Cite\u0219te tabelele Divalto prin fi\u0219iere de interogare declarate (DHOQ). Aceasta este calea de citire pentru OF, s\u00e9quences, gammes, articles, postes \u0219i stocuri. Dup\u0103 declararea unei interog\u0103ri noi, poate dura p\u00e2n\u0103 la zece minute p\u00e2n\u0103 c\u00e2nd aceasta devine activ\u0103 (<a href=\"https:\/\/divalto.atlassian.net\/wiki\/spaces\/PAI\/pages\/10790043784\">set\u0103rile RecordSql din Divalto<\/a>).<\/li>\n\n\n<li><strong>WEBSERVICE_INFINITY (REST).<\/strong> Serviciile web Divalto pentru opera\u021biuni de business. Fiecare apel con\u021bine un corp JSON cu ac\u021biunea WEB_SERVICE_INFINITY, tokenul de acces \u0219i un parametru de tip \u0219ir de caractere care precizeaz\u0103 ac\u021biunea de business, dosarul \u0219i datele (<a href=\"https:\/\/divalto.atlassian.net\/wiki\/spaces\/PAI\/pages\/12248449079\">formatul apelului<\/a>). Ac\u021biunile pentru produc\u021bie includ <strong>create_dataxml<\/strong> (depunerea unui fi\u0219ier pentru componenta scrutateur de produc\u021bie), <strong>integration_dt<\/strong> (crearea datelor tehnice: componente, s\u00e9quences, ressources, outillages), interogarea stocurilor \u0219i crearea articolelor (<a href=\"https:\/\/divalto.atlassian.net\/wiki\/spaces\/PAI\/pages\/10516071762\">ac\u021biuni pentru produc\u021bie<\/a>).<\/li>\n\n\n<li><strong>Componenta scrutateur de produc\u021bie.<\/strong> Monitorizeaz\u0103 fi\u0219ierele din modulul de produc\u021bie Divalto \u0219i import\u0103 fi\u0219iere XML. create_dataxml \u00eei transmite un fi\u0219ier base64. Tipurile de import includ GG_DATES_ORDO pentru datele planificate, GG_TEMPS_IMPORT pentru timpi, GG_FIN_DE_CYCLE pentru ciclurile finalizate, CO_MES_IMPORT pentru datele MES \u0219i GG_COMPOSANT_OM pentru consumul de componente (<a href=\"https:\/\/divalto.atlassian.net\/wiki\/spaces\/PAI\/pages\/11074797569\">create_dataxml<\/a>).<\/li>\n\n<\/ol>\n\n\n<p>Serviciul SOAP al Divalto nu mai este acceptat pe platform\u0103, a\u0219a c\u0103 dezvolta\u021bi integrarea exclusiv pe REST.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"authentication\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Autentificare<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ul class=\"wp-block-list\">\n\n<li><strong>\u00cen Divalto.<\/strong> Integrarea trimite un nume de utilizator \u0219i o parol\u0103 la endpointul Authent\/Auth al gateway-ului API Divalto, folosind un cont creat \u00een DLMT. Prime\u0219te un token de acces care, conform Divalto, este valabil patruzeci \u0219i cinci de minute, astfel \u00eenc\u00e2t conectorul \u00eel re\u00eennoie\u0219te la intervale prestabilite. Tokenul este transmis \u00een corpul JSON al fiec\u0103rui apel de business, nu \u00eentr-un antet HTTP (<a href=\"https:\/\/divalto.atlassian.net\/wiki\/spaces\/PAI\/pages\/10550740818\">autentificarea Divalto<\/a>).<\/li>\n\n\n<li><strong>\u00cen SkyPlanner.<\/strong> REST API folose\u0219te pentru autentificare un token API \u00een antetul Authorization-Token (SkyPlanner Settings &gt; API), iar documenta\u021bia este disponibil\u0103 \u00een Swagger\/OpenAPI. <a href=\"\/ro\/docs\/tutorial-de-integrare\/\">Tutorialul de integrare<\/a> v\u0103 ghideaz\u0103 prin primele apeluri.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"events-and-polling\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Evenimente \u0219i interogare periodic\u0103<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Webhookurile Divalto primesc apeluri din exterior: un sistem extern apeleaz\u0103 un webhook Divalto pentru a porni un proces. Divalto precizeaz\u0103 c\u0103 un webhook nu este destinat return\u0103rii de date (<a href=\"https:\/\/divalto.atlassian.net\/wiki\/spaces\/PAI\/pages\/10584162355\">webhookurile Divalto<\/a>). Divalto nu transmite evenimente c\u0103tre sisteme externe.<\/p>\n\n\n<p>Prin urmare, datele din Divalto sunt preluate prin interog\u0103ri periodice. Interog\u0103rile RecordSql, filtrate dup\u0103 OF deschise \u0219i modific\u0103ri recente, preiau lucr\u0103rile noi. Frecven\u021ba se stabile\u0219te pentru fiecare fabric\u0103: de la c\u00e2teva minute pentru OF p\u00e2n\u0103 la o or\u0103 pentru stocuri.<\/p>\n\n\n<p>SkyPlanner trimite webhookuri c\u00e2nd se modific\u0103 starea sau programul de produc\u021bie, astfel \u00eenc\u00e2t transmiterea datelor \u00eenapoi \u00een Divalto este declan\u0219at\u0103 de evenimente.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"data-mapping\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Maparea datelor<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th>Obiect Divalto (interfa\u021b\u0103)<\/th><th>Obiect SkyPlanner<\/th><th>Direc\u021bie<\/th><th>Frecven\u021b\u0103<\/th><\/tr><\/thead><tbody><tr><td>Articole, caracteristici ale articolelor (RecordSql)<\/td><td>Produse \u0219i materiale, propriet\u0103\u021bi ale produselor<\/td><td>Divalto \u2192 SkyPlanner<\/td><td>\u00cenc\u0103rcare ini\u021bial\u0103, apoi interogare periodic\u0103<\/td><\/tr><tr><td>Nomenclatures (componente)<\/td><td>Structura produsului, subproduse, materiale pentru fiecare produs<\/td><td>Divalto \u2192 SkyPlanner<\/td><td>\u00cenc\u0103rcare ini\u021bial\u0103, apoi la modificare<\/td><\/tr><tr><td>Gammes: s\u00e9quences, op\u00e9rations standard, timpi, ressources, outillages<\/td><td>Etape de proces cu durate, timpi de preg\u0103tire \u0219i de demontare, scule<\/td><td>Divalto \u2192 SkyPlanner<\/td><td>\u00cenc\u0103rcare ini\u021bial\u0103, apoi la modificare<\/td><\/tr><tr><td>Ateliers, centres de charge, postes de travail<\/td><td>Centre de lucru, grupuri de centre de lucru, randamente<\/td><td>Divalto \u2192 SkyPlanner<\/td><td>\u00cenc\u0103rcare ini\u021bial\u0103, apoi rar<\/td><\/tr><tr><td>Op\u00e9rateurs \u0219i habilitations<\/td><td>Personal \u0219i centre de lucru la care este autorizat s\u0103 lucreze<\/td><td>Divalto \u2192 SkyPlanner<\/td><td>\u00cenc\u0103rcare ini\u021bial\u0103, apoi la modificare<\/td><\/tr><tr><td>Calendare pentru poste<\/td><td>Schimburi \u0219i zile nelucr\u0103toare<\/td><td>Divalto \u2192 SkyPlanner<\/td><td>Zilnic sau schimburi gestionate \u00een SkyPlanner<\/td><\/tr><tr><td>OF (BF) \u0219i s\u00e9quences OF (BH) cu termene \u0219i componente<\/td><td>Comenzi \u0219i opera\u021bii cu termene \u0219i necesar de materiale<\/td><td>Divalto \u2192 SkyPlanner<\/td><td>Interogare la fiecare c\u00e2teva minute<\/td><\/tr><tr><td>Stocuri pe articol \u0219i depozit<\/td><td>Solduri de stoc<\/td><td>Divalto \u2192 SkyPlanner<\/td><td>Interogare la fiecare or\u0103 sau la rularea program\u0103rii<\/td><\/tr><tr><td>Comenzi c\u0103tre furnizori cu date de livrare<\/td><td>Comenzi de achizi\u021bie, materiale de primit \u00een func\u021bie de data livr\u0103rii<\/td><td>Divalto \u2192 SkyPlanner<\/td><td>Interogare la fiecare or\u0103 sau la rularea program\u0103rii<\/td><\/tr><tr><td>GG_DATES_ORDO: \u00eenceputul \u0219i sf\u00e2r\u0219itul OF (BF.PLANDEBDH, BF.PLANFINDH), \u00eenceputul \u0219i sf\u00e2r\u0219itul s\u00e9quence (BH.PLANDEBDH, BH.PLANFINDH), CENTRE \u0219i POSTE<\/td><td>\u00cenceputul \u0219i sf\u00e2r\u0219itul planificate pentru fiecare opera\u021bie \u0219i etap\u0103, centrul de lucru alocat<\/td><td>SkyPlanner \u2192 Divalto<\/td><td>La modificarea programului, prin webhook SkyPlanner<\/td><\/tr><tr><td>GG_TEMPS_IMPORT: timpi pentru fiecare s\u00e9quence<\/td><td>\u00cenregistr\u0103ri de timp \u0219i confirm\u0103ri ale operatorilor<\/td><td>SkyPlanner \u2192 Divalto<\/td><td>La fiecare confirmare sau schimb, dac\u0103 se opteaz\u0103 pentru aceast\u0103 func\u021bie<\/td><\/tr><tr><td>GG_FIN_DE_CYCLE: cicluri finalizate<\/td><td>Cantit\u0103\u021bi finalizate<\/td><td>SkyPlanner \u2192 Divalto<\/td><td>La fiecare confirmare, dac\u0103 se opteaz\u0103 pentru aceast\u0103 func\u021bie<\/td><\/tr><tr><td>Nu exist\u0103 \u00een Divalto<\/td><td>Matricea timpilor de preg\u0103tire, scule ca resurse cu capacitate finit\u0103, alternative pentru utilaje \u0219i personal<\/td><td>Gestionate \u00een SkyPlanner<\/td><td>Configurate \u00een etapa de onboarding<\/td><\/tr><\/tbody><\/table><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"integration-patterns\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Modele de integrare<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p><strong>1. \u00cenc\u0103rcarea ini\u021bial\u0103 a nomenclatoarelor.<\/strong> Declara\u021bi interog\u0103rile RecordSql \u0219i citi\u021bi articles, nomenclatures, gammes, centres de charge, postes, op\u00e9rateurs, outillages \u0219i calendarele. Stabili\u021bi cu aten\u021bie coresponden\u021ba dintre centres \u0219i resursele SkyPlanner: un centre de charge cu patru postes devine un grup de centre de lucru cu patru centre de lucru.<\/p>\n\n\n<p><strong>2. Sincronizarea OF.<\/strong> Citi\u021bi OF deschise cu s\u00e9quences \u0219i componentele aferente, precum \u0219i comenzile deschise c\u0103tre furnizori. SkyPlanner consider\u0103 materialele comandate ca fiind disponibile la data de livrare a comenzii de achizi\u021bie \u0219i actualizeaz\u0103 stocul c\u00e2nd aceasta este marcat\u0103 Delivered. Citi\u021bi \u00eempreun\u0103 OF principal\u0103 \u0219i sub-OF aferente, deoarece Divalto reprogrameaz\u0103 doar OF principal\u0103.<\/p>\n\n\n<p><strong>3. Transmiterea programului \u00eenapoi \u00een Divalto.<\/strong> C\u00e2nd motorul programeaz\u0103 sau mut\u0103 o opera\u021bie, un webhook SkyPlanner declan\u0219eaz\u0103 un apel create_dataxml. Fi\u0219ierul este un document GG_DATES_ORDO care con\u021bine, pentru fiecare OF, dosarul, unitatea \u0219i num\u0103rul OF, datele de \u00eenceput \u0219i de sf\u00e2r\u0219it planificate, iar pentru fiecare s\u00e9quence, num\u0103rul acesteia, \u00eenceputul \u0219i sf\u00e2r\u0219itul planificate, precum \u0219i centre \u0219i poste dac\u0103 lucrul a fost mutat pe o resurs\u0103 alternativ\u0103 (<a href=\"https:\/\/divalto.atlassian.net\/wiki\/spaces\/PAI\/pages\/221844758\">formatul GG_DATES_ORDO<\/a>). Componenta scrutateur din Divalto import\u0103 aceste date \u00een antetul OF \u0219i \u00een liniile s\u00e9quence.<\/p>\n\n\n<p><strong>4. Confirm\u0103ri din produc\u021bie.<\/strong> Operatorii \u00eenregistreaz\u0103 lucrul \u00een SkyPlanner Mobile Confirmations sau Production Timer, iar \u00eenregistr\u0103rile de timp men\u021bin programul actualizat. Dumneavoastr\u0103 decide\u021bi dac\u0103 timpii sunt transmi\u0219i \u00eenapoi \u00een Divalto. Dac\u0103 da, timpii se transmit ca fi\u0219iere GG_TEMPS_IMPORT, iar ciclurile finalizate ca fi\u0219iere GG_FIN_DE_CYCLE. Dac\u0103 nu, timpii se introduc \u00een MES-ul Divalto ca \u00eenainte.<\/p>\n\n\n<p><strong>5. Reguli privind responsabilitatea pentru date \u0219i rezolvarea conflictelor.<\/strong> Documenta\u021bi-le \u00eenainte de punerea \u00een produc\u021bie:<\/p>\n\n\n<figure class=\"wp-block-table ind-table\"><table><thead><tr><th>Date<\/th><th>Sistem responsabil<\/th><\/tr><\/thead><tbody><tr><td>Articles, nomenclatures, gammes, cantit\u0103\u021bile \u0219i starea OF<\/td><td>Divalto<\/td><\/tr><tr><td>Ordinea obiectelor s\u00e9quence, momentele de \u00eenceput \u0219i de sf\u00e2r\u0219it, alocarea la un poste<\/td><td>SkyPlanner<\/td><\/tr><tr><td>Matricea timpilor de preg\u0103tire, cerin\u021bele privind sculele \u0219i operatorii, resursele alternative<\/td><td>SkyPlanner<\/td><\/tr><tr><td>Schimburi \u0219i zile nelucr\u0103toare<\/td><td>Un singur sistem, ales la definirea domeniului proiectului<\/td><\/tr><tr><td>Timpi, consumuri \u0219i finaliz\u0103ri<\/td><td>Divalto, cu introducere direct\u0103 sau transmitere din \u00eenregistr\u0103rile de timp SkyPlanner<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>Alege\u021bi un singur sistem care s\u0103 scrie datele calendaristice ale OF. SkyPlanner \u00eenlocuie\u0219te Opcenter APS \u0219i reprogramarea manual\u0103 \u00een stabilirea datelor planificate. Dac\u0103 folosi\u021bi Opcenter APS, dezactiva\u021bi importul acestuia pentru OF programate de SkyPlanner, deoarece ambele folosesc GG_DATES_ORDO.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"typical-project-steps\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Etapele obi\u0219nuite ale proiectului<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Implementarea se finalizeaz\u0103, de regul\u0103, \u00een c\u00e2teva s\u0103pt\u0103m\u00e2ni de la \u00eenceperea etapei de onboarding. \u00cenainte de aceasta, valida\u021bi programul de produc\u021bie \u00een perioada de prob\u0103 gratuit\u0103 de 30 de zile, folosind postes, gammes \u0219i OF deschise exportate din Divalto \u00een format CSV sau Excel.<\/p>\n\n\n<ol class=\"wp-block-list\">\n\n<li><strong>Mapare.<\/strong> Stabili\u021bi tabelul de mapare, regulile privind responsabilitatea pentru date, frecven\u021bele de sincronizare \u0219i dac\u0103 timpii vor fi transmi\u0219i \u00eenapoi \u00een Divalto.<\/li>\n\n\n<li><strong>Acces la Divalto.<\/strong> Crea\u021bi contul de integrare \u00een DLMT, declara\u021bi interog\u0103rile RecordSql \u0219i activa\u021bi scrutateur pentru produc\u021bie. Testa\u021bi mai \u00eent\u00e2i \u00eentr-un mediu de testare.<\/li>\n\n\n<li><strong>\u00cenc\u0103rcare ini\u021bial\u0103.<\/strong> Articles, nomenclatures, gammes, centres, postes, op\u00e9rateurs, outillages \u0219i calendare.<\/li>\n\n\n<li><strong>Sincronizarea OF \u0219i a comenzilor c\u0103tre furnizori.<\/strong> Interogare periodic\u0103, cu filtre, paginare \u0219i re\u00eencerc\u0103ri.<\/li>\n\n\n<li><strong>Configurarea constr\u00e2ngerilor \u00een SkyPlanner.<\/strong> Matricea timpilor de preg\u0103tire, sculele, num\u0103rul de operatori pentru fiecare opera\u021bie \u0219i resursele alternative de tip postes sau personal.<\/li>\n\n\n<li><strong>Transmiterea programului \u00eenapoi \u00een Divalto.<\/strong> GG_DATES_ORDO prin create_dataxml, cu apelul declan\u0219at de webhookurile SkyPlanner, plus transmiterea timpilor \u00eenapoi \u00een Divalto, dac\u0103 a\u021bi ales aceast\u0103 op\u021biune.<\/li>\n\n\n<li><strong>Testare \u00een paralel.<\/strong> Rula\u021bi SkyPlanner \u00een paralel cu planul actual, compara\u021bi datele calendaristice \u0219i corecta\u021bi nomenclatoarele.<\/li>\n\n\n<li><strong>Punere \u00een func\u021biune.<\/strong> Activa\u021bi scrierea \u00eenapoi \u00een Divalto dup\u0103 ce datele coincid.<\/li>\n\n<\/ol>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"what-to-plan-for-in-a-divalto-integration\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Ce trebuie s\u0103 ave\u021bi \u00een vedere la integrarea cu Divalto<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Set\u0103rile scrutateur.<\/strong> Fi\u0219ierele create_dataxml ajung la destina\u021bie numai dac\u0103 scrutateur pentru produc\u021bie este activ, caseta MES este bifat\u0103 \u0219i \u00een dosarul Production este configurat\u0103 o cale \u201eInterfaces\u201d.<\/li>\n\n\n<li><strong>Re\u00eennoirea tokenului.<\/strong> Tokenul de acces Divalto expir\u0103 dup\u0103 un timp scurt (consulta\u021bi sec\u021biunea Autentificare). Re\u00eennoi\u021bi-l \u00eenaintea fiec\u0103rui lot de apeluri.<\/li>\n\n\n<li><strong>Declararea interog\u0103rilor.<\/strong> Activarea interog\u0103rilor RecordSql noi sau modificate dureaz\u0103 c\u00e2teva minute. Declara\u021bi-le \u00eenainte de \u00eenc\u0103rcarea ini\u021bial\u0103.<\/li>\n\n\n<li><strong>OF principal \u0219i sub-OF.<\/strong> Divalto recalculeaz\u0103 datele calendaristice numai pentru OF principal. Programa\u021bi sub-OF ca subproduse, astfel \u00eenc\u00e2t ordinul p\u0103rinte s\u0103 a\u0219tepte componentele necesare.<\/li>\n\n\n<li><strong>Caracteristicile articolului.<\/strong> Divalto stocheaz\u0103 propriet\u0103\u021bile de programare ale unui articol \u00een zece c\u00e2mpuri de caracteristici. Acestea se pot asocia u\u0219or cu propriet\u0103\u021bile produselor din SkyPlanner pentru matricea timpilor de preg\u0103tire \u0219i op\u021biunea \u201eAllow similarity\u201d.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"who-configures-and-supports-the-divalto-integrat\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Cine configureaz\u0103 integrarea cu Divalto \u0219i asigur\u0103 asisten\u021ba<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ol class=\"wp-block-list\">\n\n<li><strong>Echipa SkyPlanner configureaz\u0103 integrarea \u00een etapa de implementare \u0219i asigur\u0103 asisten\u021b\u0103 dup\u0103 punerea \u00een func\u021biune,<\/strong> pentru interog\u0103rile RecordSql \u0219i ac\u021biunile serviciilor web convenite. Fiecare fabric\u0103 folose\u0219te Divalto \u00een mod diferit, iar aceste cuno\u0219tin\u021be sunt valorificate \u00een configurare.<\/li>\n\n\n<li><strong>Partenerul dumneavoastr\u0103 Divalto poate participa.<\/strong> Acesta cunoa\u0219te dosarul, personaliz\u0103rile de tip surcharges \u0219i set\u0103rile dumneavoastr\u0103 \u0219i poate configura contul DLMT, interog\u0103rile \u0219i scrutateur \u00eempreun\u0103 cu echipa SkyPlanner.<\/li>\n\n\n<li><strong>Dezvoltatorii dumneavoastr\u0103 pot extinde integrarea<\/strong> folosind REST API din SkyPlanner, cu un token API. Pentru a \u00eencepe este suficient un token API, iar echipa SkyPlanner ofer\u0103 ajutor la nevoie. Consulta\u021bi <a href=\"\/ro\/docs\/tutorial-de-integrare\/\">documenta\u021bia de integrare SkyPlanner<\/a>.<\/li>\n\n<\/ol>\n\n\n<p>SkyPlanner porne\u0219te de la 199 \u20ac pe lun\u0103, cu 5 centre de lucru incluse \u0219i facturare lunar\u0103. Oferta pentru integrare este stabilit\u0103 de la \u00eenceput, \u00een func\u021bie de procesul \u0219i nevoile dumneavoastr\u0103, \u00eempreun\u0103 cu abonamentul. Consulta\u021bi <a href=\"\/ro\/preturi\/\">pre\u021burile<\/a>, <a href=\"\/ro\/integrari\/erp\/divalto\/cu-capacitate-finita\/\">programarea cu capacitate finit\u0103 pentru Divalto<\/a>, <a href=\"\/ro\/integrari\/erp\/divalto\/\">pagina Divalto<\/a> \u0219i <a href=\"\/ro\/integrari\/erp\/\">pagina integr\u0103rilor ERP<\/a>.<\/p>\n\n\n<div class=\"wp-block-buttons ind-prose__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/ro\/proba\/\">\u00cencepe\u021bi testarea gratuit\u0103<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/ro\/contact-vanzari\/\">Programa\u021bi o demonstra\u021bie<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"customers\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Ce spun produc\u0103torii despre SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-custs\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/utu-kalle-kalliomaki-2026.jpg\" alt=\"Kalle Kalliom\u00e4ki, specialist \u00een lan\u021bul de aprovizionare la UTU, \u00een sec\u021bia de produc\u021bie a tablourilor electrice din Ulvila\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/23-beca6df2-3fa2-4315-80e8-7c38a9e3d2e1.png\" alt=\"UTU\" width=\"69\" height=\"59\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>2 h<\/b><span>economisite \u00een fiecare s\u0103pt\u0103m\u00e2n\u0103<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eCu SkyPlanner, am trecut de la planificarea produc\u021biei \u00een foi de calcul Excel la optimizarea produc\u021biei \u00een timp real.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Kalle Kalliom\u00e4ki, specialist \u00een lan\u021bul de aprovizionare<\/b><br>UTU \u00b7 Tablouri electrice \u0219i aparataj de comuta\u021bie<\/p>\n\n\n<p class=\"ind-cust__result\">Planificarea produc\u021biei economise\u0219te 2 ore de lucru \u00een fiecare s\u0103pt\u0103m\u00e2n\u0103, iar o nou\u0103 list\u0103 de opera\u021bii ajunge la linia de produc\u021bie \u00een c\u00e2teva secunde.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/ro\/povesti-ale-clientilor\/utu\/\">Citi\u021bi m\u0103rturia UTU<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-35ce8dff-f7d0-4cf3-9e71-0fe7e7ff88d3.jpg\" alt=\"Operatori \u00een combinezoane pentru camere curate la o linie de umplere a flacoanelor din fabrica farmaceutic\u0103 Laboratory &amp; Allied din Nairobi\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/09-8c2deb57-ac1c-468b-ad64-fafb9debd7eb.png\" alt=\"Laboratory &amp; Allied\" width=\"71\" height=\"44\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>+90%<\/b><span>eficien\u021ba produc\u021biei<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eEficien\u021ba \u00een produc\u021bie a crescut cu 90%.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Abdul Rucyinga, director IT<\/b><br>Laboratory &amp; Allied \u00b7 Produc\u021bie farmaceutic\u0103<\/p>\n\n\n<p class=\"ind-cust__result\">Eficien\u021ba produc\u021biei a crescut cu 90%, iar realizarea unui plan optimizat pe trei luni, pentru toate centrele de lucru, dureaz\u0103 mai pu\u021bin de 30 de minute.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/ro\/povesti-ale-clientilor\/laboratory-allied\/\">Citi\u021bi m\u0103rturia Laboratory &amp; Allied<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/28-83df4743-ff34-41a5-9a41-c3dcc6f0897b.png\" alt=\"Opes Corporation\" width=\"106\" height=\"32\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>100%<\/b><span>respectarea termenelor de livrare din 2021<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eSkyPlanner ne ofer\u0103 o imagine clar\u0103 asupra capacit\u0103\u021bii \u0219i face planificarea previzibil\u0103.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Dan Berglund, COO\/CFO<\/b><br>Opes Corporation \u00b7 Produc\u021bie chimic\u0103 \u0219i alimentar\u0103<\/p>\n\n\n<p class=\"ind-cust__result\">Termenele de livrare au fost respectate \u00een propor\u021bie de 100% pe \u00eentreaga perioad\u0103 de utilizare a SkyPlanner, din 2021.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/ro\/povesti-ale-clientilor\/opes-corporation\/\">Citi\u021bi m\u0103rturia Opes Corporation<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/homepage-v2\/logo-eskomatic.png\" alt=\"Eskomatic\" width=\"140\" height=\"15\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>Mai pu\u021bine<\/b><span>opriri din lips\u0103 de materiale<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201eValoarea pe care ne-o aduce SkyPlanner este c\u0103 func\u021bioneaz\u0103 \u00een activitatea de zi cu zi, mai ales la stabilirea termenelor de livrare.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Tommi M\u00e4nnist\u00f6, manager de planificare a produc\u021biei<\/b><br>Eskomatic \u00b7 Prelucr\u0103ri mecanice la comand\u0103<\/p>\n\n\n<p class=\"ind-cust__result\">Programarea automat\u0103 a \u00eenc\u0103rc\u0103rii resurselor permite stabilirea unor termene de livrare mai precise, iar opririle produc\u021biei cauzate de lipsa materialelor s-au redus considerabil.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/ro\/povesti-ale-clientilor\/eskomatic\/\">Citi\u021bi m\u0103rturia Eskomatic<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">\u00centreb\u0103ri frecvente<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group sp-faq fx-faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Divalto are un API pentru ordinele de fabrica\u021bie?<\/summary>\n<p class=\"sp-faq__a\">Da. RecordSql cite\u0219te OF, s\u00e9quences \u0219i alte tabele prin REST, iar serviciul WEBSERVICE_INFINITY execut\u0103 ac\u021biuni de business pentru produc\u021bie, precum create_dataxml \u0219i integration_dt.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Divalto accept\u0103 webhook-uri?<\/summary>\n<p class=\"sp-faq__a\">Webhook-urile Divalto sunt doar de intrare \u0219i nu returneaz\u0103 date. Integrarea interogheaz\u0103 periodic Divalto prin RecordSql, la intervale stabilite pentru fiecare fabric\u0103, iar webhook-urile proprii SkyPlanner transmit modific\u0103rile programului pe m\u0103sur\u0103 ce apar.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Cum sunt transmise \u00eenapoi \u00een Divalto datele calendaristice planificate?<\/summary>\n<p class=\"sp-faq__a\">Printr-un fi\u0219ier XML GG_DATES_ORDO trimis cu ac\u021biunea create_dataxml. Acesta con\u021bine datele planificate de \u00eenceput \u0219i de sf\u00e2r\u0219it pentru fiecare OF \u0219i fiecare s\u00e9quence, precum \u0219i un centre sau poste alternativ atunci c\u00e2nd lucrul este mutat. Procesul scrutateur pentru produc\u021bie din Divalto import\u0103 fi\u0219ierul.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Integrarea necesit\u0103 Opcenter APS?<\/summary>\n<p class=\"sp-faq__a\">Nu. SkyPlanner realizeaz\u0103 programarea cu capacitate finit\u0103 \u0219i scrie direct datele calendaristice planificate. Dac\u0103 utiliza\u021bi \u00een prezent Opcenter APS, SkyPlanner preia rolul de unic sistem care scrie datele calendaristice ale OF.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Ce ar trebui s\u0103 propun\u0103 un partener Divalto: Opcenter APS sau SkyPlanner?<\/summary>\n<p class=\"sp-faq__a\">SkyPlanner, atunci c\u00e2nd clientul dore\u0219te ca programarea cu capacitate finit\u0103 s\u0103 fie func\u021bional\u0103 \u00een c\u00e2teva s\u0103pt\u0103m\u00e2ni \u0219i s\u0103 se men\u021bin\u0103 actualizat\u0103 automat. Opcenter APS din Divalto ruleaz\u0103 c\u00e2nd este pornit de planificator \u0219i schimb\u0103 fi\u0219iere printr-un folder Windows (<a href=\"https:\/\/divalto.atlassian.net\/wiki\/spaces\/UDI107\/pages\/10530586641\">documenta\u021bia Divalto<\/a>). SkyPlanner se conecteaz\u0103 prin serviciile REST ale Divalto, reprogrameaz\u0103 automat, planific\u0103 schimb\u0103rile de serie, sculele, echipele \u0219i materialele \u0219i permite un num\u0103r nelimitat de utilizatori, de la 199 \u20ac pe lun\u0103.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Putem testa SkyPlanner \u00eenainte de a realiza integrarea?<\/summary>\n<p class=\"sp-faq__a\">Da. Perioada de testare gratuit\u0103 de 30 de zile permite utilizarea a p\u00e2n\u0103 la 20 de centre de lucru, cu importuri CSV sau Excel din Divalto, f\u0103r\u0103 card de credit. <a href=\"\/ro\/proba\/\">\u00cencepe\u021bi testarea<\/a> sau <a href=\"\/ro\/contact-vanzari\/\">discuta\u021bi cu echipa de v\u00e2nz\u0103ri<\/a> pentru definirea domeniului integr\u0103rii.<\/p>\n<\/details>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n<\/div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Integr\u0103ri \/ ERP \/ Divalto infinity Ghid de integrare Divalto pentru programarea produc\u021biei cu SkyPlanner APS Acest ghid de integrare Divalto arat\u0103 partenerilor \u0219i echipelor IT cum s\u0103 conecteze Divalto infinity la SkyPlanner APS. SkyPlanner se integreaz\u0103 bidirec\u021bional cu Divalto, folosind serviciile REST ale acestuia: skyplanner.ai \u00b7 Programarea produc\u021biei Interfe\u021bele de integrare Divalto Platforma API &#8230; <a title=\"Ghid de integrare Divalto pentru programarea produc\u021biei cu SkyPlanner APS\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/divalto\/ghid-de-integrare\/\" aria-label=\"Read more about Ghid de integrare Divalto pentru programarea produc\u021biei cu SkyPlanner APS\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":0,"parent":106430,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"class_list":["post-107416","page","type-page","status-publish"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Integrare Divalto APS: ghid pentru programarea produc\u021biei<\/title>\n<meta name=\"description\" content=\"Divalto infinity\u2013SkyPlanner APS: citire RecordSql, scriere WEBSERVICE_INFINITY create_dataxml cu GG_DATES_ORDO, maparea datelor \u0219i sfaturi de proiect.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/divalto\/ghid-de-integrare\/\" \/>\n<meta property=\"og:locale\" content=\"ro_RO\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Ghid de integrare Divalto pentru programarea produc\u021biei cu SkyPlanner APS\" \/>\n<meta property=\"og:description\" content=\"Divalto infinity\u2013SkyPlanner APS: citire RecordSql, scriere WEBSERVICE_INFINITY create_dataxml cu GG_DATES_ORDO, maparea datelor \u0219i sfaturi de proiect.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/divalto\/ghid-de-integrare\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Timp estimat pentru citire\" \/>\n\t<meta name=\"twitter:data1\" content=\"12 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/integrari\\\/erp\\\/divalto\\\/ghid-de-integrare\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/integrari\\\/erp\\\/divalto\\\/ghid-de-integrare\\\/\",\"name\":\"Integrare Divalto APS: ghid pentru programarea produc\u021biei\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/#website\"},\"datePublished\":\"2026-10-23T13:42:12+00:00\",\"description\":\"Divalto infinity\u2013SkyPlanner APS: citire RecordSql, scriere WEBSERVICE_INFINITY create_dataxml cu GG_DATES_ORDO, maparea datelor \u0219i sfaturi de proiect.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/integrari\\\/erp\\\/divalto\\\/ghid-de-integrare\\\/#breadcrumb\"},\"inLanguage\":\"ro-RO\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/integrari\\\/erp\\\/divalto\\\/ghid-de-integrare\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/integrari\\\/erp\\\/divalto\\\/ghid-de-integrare\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Integr\u0103ri de software ERP \u0219i MES cu SkyPlanner\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/integrari\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"SkyPlanner APS pentru ERP-ul dvs.\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/integrari\\\/erp\\\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"SkyPlanner APS pentru Divalto: programarea produc\u021biei cu capacitate finit\u0103\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/integrari\\\/erp\\\/divalto\\\/\"},{\"@type\":\"ListItem\",\"position\":5,\"name\":\"Ghid de integrare Divalto pentru programarea produc\u021biei cu SkyPlanner APS\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"ro-RO\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"ro-RO\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ro\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Integrare Divalto APS: ghid pentru programarea produc\u021biei","description":"Divalto infinity\u2013SkyPlanner APS: citire RecordSql, scriere WEBSERVICE_INFINITY create_dataxml cu GG_DATES_ORDO, maparea datelor \u0219i sfaturi de proiect.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/divalto\/ghid-de-integrare\/","og_locale":"ro_RO","og_type":"article","og_title":"Ghid de integrare Divalto pentru programarea produc\u021biei cu SkyPlanner APS","og_description":"Divalto infinity\u2013SkyPlanner APS: citire RecordSql, scriere WEBSERVICE_INFINITY create_dataxml cu GG_DATES_ORDO, maparea datelor \u0219i sfaturi de proiect.","og_url":"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/divalto\/ghid-de-integrare\/","og_site_name":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"Timp estimat pentru citire":"12 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/divalto\/ghid-de-integrare\/","url":"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/divalto\/ghid-de-integrare\/","name":"Integrare Divalto APS: ghid pentru programarea produc\u021biei","isPartOf":{"@id":"https:\/\/skyplanner.ai\/ro\/#website"},"datePublished":"2026-10-23T13:42:12+00:00","description":"Divalto infinity\u2013SkyPlanner APS: citire RecordSql, scriere WEBSERVICE_INFINITY create_dataxml cu GG_DATES_ORDO, maparea datelor \u0219i sfaturi de proiect.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/divalto\/ghid-de-integrare\/#breadcrumb"},"inLanguage":"ro-RO","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/ro\/integrari\/erp\/divalto\/ghid-de-integrare\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/divalto\/ghid-de-integrare\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/ro\/"},{"@type":"ListItem","position":2,"name":"Integr\u0103ri de software ERP \u0219i MES cu SkyPlanner","item":"https:\/\/skyplanner.ai\/ro\/integrari\/"},{"@type":"ListItem","position":3,"name":"SkyPlanner APS pentru ERP-ul dvs.","item":"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/"},{"@type":"ListItem","position":4,"name":"SkyPlanner APS pentru Divalto: programarea produc\u021biei cu capacitate finit\u0103","item":"https:\/\/skyplanner.ai\/ro\/integrari\/erp\/divalto\/"},{"@type":"ListItem","position":5,"name":"Ghid de integrare Divalto pentru programarea produc\u021biei cu SkyPlanner APS"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/ro\/#website","url":"https:\/\/skyplanner.ai\/ro\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/ro\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/ro\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"ro-RO"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/ro\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/ro\/","logo":{"@type":"ImageObject","inLanguage":"ro-RO","@id":"https:\/\/skyplanner.ai\/ro\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/ro\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]}]}},"uagb_featured_image_src":{"full":false,"thumbnail":false,"medium":false,"medium_large":false,"large":false,"1536x1536":false,"2048x2048":false,"betterdocs-category-thumb":false},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/ro\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Integr\u0103ri \/ ERP \/ Divalto infinity Ghid de integrare Divalto pentru programarea produc\u021biei cu SkyPlanner APS Acest ghid de integrare Divalto arat\u0103 partenerilor \u0219i echipelor IT cum s\u0103 conecteze Divalto infinity la SkyPlanner APS. SkyPlanner se integreaz\u0103 bidirec\u021bional cu Divalto, folosind serviciile REST ale acestuia: skyplanner.ai \u00b7 Programarea produc\u021biei Interfe\u021bele de integrare Divalto Platforma API&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/pages\/107416","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/comments?post=107416"}],"version-history":[{"count":0,"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/pages\/107416\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/pages\/106430"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/ro\/wp-json\/wp\/v2\/media?parent=107416"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}